CONSTRUCTION MANAGEMENT PLAN

Similar documents
Construction Traffic Management Plan

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Traffic Management Plan

Site Layout & Traffic Plan

Construction Traffic Management Plan

University Arms Hotel, Cambridge

Construction Phase Traffic Management Plan

Construction Management Statement. Introduction. Contents

Construction Management Plan (CMP) Application

Construction Site Set Up Requirements

Repton Primary School. Traffic Management Plan

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

Foulford Primary School Site Traffic Management Plan. December 2012 (Review date October 2013)

Site Security and Access Policy and Procedures. Written By. Kent Walmsley Creation date Summer 2010 Adopted by Governors 7 December 2010 Reviewed By

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/ Galloper Wind Farm Limited

Howard Primary School Construction Management Plan

GUIDE NOTES FOR SCHOOLS, ACADEMIES AND COLLEGES

Madras College Site Traffic Management Plan (South Street) August 2015

Site Traffic Management Plan

Health & Safety Policy For Locations Hosting Film Production Companies

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

Site Traffic Management Plan

THIS PAGE INTENTIONALLY LEFT BLANK

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

Event Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES

AVOIDANCE OF ELECTRICAL HAZARDS WHEN WORKING NEAR OVERHEAD ELECTRIC LINES

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

PROOF ONLY. Police and Fire Service Home Security & Fire Safety Checklist. Student Accommodation Security Checklist

Whistler Village Construction Management Strategy

17 Traffic Management Plan

Demolition & Construction Management Plan

Household waste & recycling storage requirements

RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON

Physical Security Assessment Form

Risk Assessment for visits by schools and other groups including children.

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Traffic Management Plan

Bedford Girls School Job Description. Director of Music

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

RINGSHALL SCHOOL COMMUNICATIONS POLICY

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

1.0 APPOINTMENTS 2.0 FIRE RISK ASSESSMENTS

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

This Policy applies to all pupils including EYFS

TRAFFIC MANAGEMENT PLAN

Health and Safety Policy

19-27 Young Street Development Kensington

Perton Middle School Business Continuity Plan

Health and safety guidance for research undertaken in the community

SCHOOL SECURITY SURVEY

CATERING CONTRACTORS General Code of Safety Practice

LONDON ROAD SEVENOAKS

RAVENSCOTE JUNIOR SCHOOL. Security POLICY. Headteacher

Communications Policy

Approved Document Q: Security

Our repairs and maintenance service

Caravan Parks and Camping Sites. Flood Evacuation Plan Guidance for owners and operators of sites in Kent

SCHOOL SECURITY POLICY & PROCEDURES

Parking Regulations. Why?

Signed by Ann Slater, Chair of Governors of: Harris Primary Academy Chafford Hundred and Harris Primary Academy Mayflower

NORWICH CITY COUNCIL. Report for Resolution

New Scheme Teacher Accreditation Policy

THE BRITISH INTERNATIONAL SCHOOL OF STAVANGER EDUCATIONAL VISITS POLICY & PROCEDURES. References

CONSTRUCTION SEQUENCE & PROGRAMME

Development Layout Design

EMERGENCY PLANS FACT SHEET

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Introduction. Welcome London Road, Mitcham

Contra Costa Community College District Business Procedure PARKING AND TRAFFIC REGULATIONS

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)

Modern Methods of Construction (MMC)

Measuring your capabilities in Fleet Safety Management ACC Fleet Saver

TRAFFIC MANAGEMENT PLAN

Safety Systems Review Facilities Management Guidance and specification Version

The Construction (Design and Management) Regulations 2007

BRITISH SCHOOL OF GENEVA HEALTH AND SAFETY POLICY

Design and Access Statement Earls Court Road London SW5 9RH

Transcription:

CONSTRUCTION MANAGEMENT PLAN for CHILDRENS CENTRE, PRIMARY CLASSROOM & REPLACEMENT PRESCHOOL AT CLYST ST MARY PRIMARY SCHOOL EXETER, DEVON EX5 1BG REVISION A 7 May 2010 1 P a g e

Mansell have been appointed under the DCC Framework agreement to construct the new building. The following strategy has therefore been compiled by the contracting team who will be undertaking the project. Reference should also be made to the preferred Option 1 on page 4 of the Primary School Travel Plan (dated April 2010). This describes action to be taken by the school to safeguard pupils during the construction period. Local roads leading to and from the existing school are very narrow, making large deliveries difficult. In addition, the construction access route will need to be segregated from school pedestrian and delivery traffic. Site parking will not be permitted in the immediate vicinity of the school. The Construction Site Plan overleaf highlights the following: a. Traffic routes. b. Storage area. c. Site boundary. d. Site accommodation. Mansell will consult with the school and community before finalising the proposals. Contact details and out of hours phone numbers will be displayed during the construction period. On completion neighbours and parents will also be surveyed to seek feedback on the contractor s performance. Traffic routes in and out of the Project. All deliveries will continue on the A3052 and take the first exit by the garage towards the school. No deliveries will be made through Clyst St Mary village. Day to day operations and deliveries of smaller vehicles the routes will be the same, however a gateman will be control access and egress through the main entrance gates and into the secure site compound. This will be the case throughout the school term. Deliveries will be brought into the school under supervision and turned right once through the main gates directly past the site entrance gates adjacent to the school entrance doors and towards the grassed play area. From there the deliveries will turn right into the site compound where they will be off loaded & stored in the area marked yellow on the Site Plan. No deliveries will be allowed during the school s arrival and departure periods. All orders will note these restrictions, specify maximum vehicle size, and include our site phone number to confirm arrival before entering the access road. 2 P a g e

There will be some large deliveries, such as concrete, windows etc. but these will be planned in advance and outside of key school hours via the routes shown. It may be necessary to request that residents do not park in the road on specific occasions. There are two options available for the delivery of the structural timber frame to site: Option A Further to advice and consultation with the highways authority and police plan delivery by crane from the roundabout over the boundary into the site; either on a Sunday or at night. (Refer to purple hatched area on Site Plan). Option B Design the frame in smaller panels sections that can be offloaded at the front entrance and carried around to the site within the defined contractor s compound area. Again this will be timed to fall outside of key school hours. Site accommodation will comprise of 1 x office unit, 1 x welfare with drying facilities, 1 x wc unit & 2 x lockable storage units. Temporary utilities will be taken from the existing School supplies. The site boundary (shown red) will be fully secured by hoarding or haras panels. The Construction Learning Experience The construction of Clyst St Mary Primary School creates the opportunity for Mansell to work with the pupils and staff of the school in order to take full advantage of the practical learning environment a construction site creates. Of prime importance to this relationship is the introduction of the contractors Health and Safety Policy to both staff and pupils. This runs in parallel with a commitment to the Considerate Contractors Scheme (CCS). Mansell have also highlighted the following: Safety sites should not endanger any person Whilst working in a live school environment ensuring The Health and Safety of students, staff and visitors at all times is our number one priority, followed by minimising disruption to the day to day function of the school. Instrumental to the success of this project is effective communication between Mansell and Clyst St Mary Primary School. Our site staff will introduce themselves to the school before commencement. They will address the high level of Health and Safety Regulations required by the industry through presentations in school assemblies and will include updates on the progress of the project. Mansell is privileged to have been involved in many education related projects and in all of these projects, our staff, supply chain and the teachers and children have lasting memories of the successful pupil involvement. 3 P a g e

Our Education Liaison Officer, Fiona Gush, who has a wealth of experience within the construction industry and education, will establish an early relationship with key staff members and develop construction projects related to the curriculum and designed to suit the age group of the pupils. Below is an example of some of the projects which can be presented to the schools. Construct an offsite viewing platform where pupils can have safe access to view the work being carried out on the construction site. Presentation on the building process, this activity is broken down into three phases, and where possible includes a site visit. A presentation to the pupils would take place prior to the site visits. This will give the pupils a clear understanding of the build process, the variety of trades involved and the technical and professional qualifications required to complete the project. Weekly photographs taken from the same point on site for the duration of the project. These photographs can be shown as a slideshow which will clearly demonstrate the build process. Pupils might like to interview the site staff and from this compile a newsletter for their parents. Presentation on materials. This would involve collecting a range of materials from the demolition of the existing building, comparing them to the materials used in the new build and discussing the benefits and drawbacks of the materials. We would also look at sustainability and recycling. The use of straw bale technology, we hope the children will be able to participate in the straw bale construction. They can learn about the other different insulation products how double glazing and expanded foam work. Design and technology project investigating how different parts of the building are joined together, what methods are used and what materials are involve and the importance of measurement. A day in the life of presentations in assembly carried out by our subcontractors or site staff where they will describe their role and follow this up with a practical demonstration of how various tools are used for their particular trade. A timecapsule buried beside the new building, its position indicated by a plaque. The pupils will have the opportunity to choose what they would like included in the capsule. Mansell will provide drawings and photographs and there is an opportunity for the Education Authority and the Board of Governors to be involved in this project. The pupils could have the opportunity to paint the hoarding or design the hoarding which we could get graphically printed. 4 P a g e

CONSTRUCTION SITE PLAN 5 P a g e