Page 1 of 5 Job Function Morris has nearly 28 years in the power industry including design and construction of transmission line and substation facilities, He has extensive experience in contract development and negotiations for engineering, construction and EPC contracts, project management, proposal development, and direct hire labor. He has managed both an engineering design office and construction office and has assisted in development of policies and procedures in safety, quality, cost and human resources. He is also knowledgeable in development of and execution of subcontract services necessary to execute transmission line and substation engineering and construction projects. Recently, Morris transferred from Kiewit Power Engineers to Kiewit Power Constructors and has been named the Director of the Rock Island Clean Line Project for Kiewit. Kiewit Experience Manager, Power Delivery Responsible for program management for all power delivery projects including cost, quality, schedule and staffing. Supports in the development of estimates, scope of work, and contract management for engineering and EPC contracts. Works closely with business development to expand both existing and potential client base for power delivery. Other Relevant Experience Kiewit.com Page 1 of 5
Page 2 of 5 Overland Contracting Inc. Conyers, Georgia 2007 2009 Vice President, Group Manager Energy Managed company resources including safety, quality, human resources, project controls, procurement, estimating and construction Provided business development support for developing markets such as solar and biomass Responsible to the client for the overall success of the construction services for power generation projects and the effective use of the company resources Oversaw project execution including financial, quality, schedule and performance Supported construction of a new GE LM6000 project in College Station, Texas which was mechanically complete in September 2000 Responsible for construction of a major scrubber addition on three coal fired units in south Alabama. The project included addition of a Chiyoda scrubber, 3,000 tons of ductwork and over 30,000 feet of steel and fiberglass pipe. The project was completed on time and on budget. Served as Group Manager for an EPC project in Central Kansas for four GE LM6000 and three GE 7FA turbines. The project was also completed safely, on time, and within budget. Overland Contracting Inc. Conyers, Georgia 2003 2007 Director OCI Construction/Vice President Responsible for management of all power delivery and telecom construction projects for OCI Managed company resources including safety, quality, human resources, project controls, procurement, estimating, and construction for offices in Conyers, Baltimore, Jacksonville and Mobile. Responsible for all aspects of construction for power delivery and telecom open shop, direct hire projects. Managed construction equipment and fleet services and expanded that operation during the time. Notable projects during this time included the following o Two GIS substations for National Grid in Massachusetts o Over 60 miles of 230 kv transmission construction for Conectiv. A large portion of this construction was accomplished in wetlands using heavy lift helicopters and non-traditional construction methods o Construction of 30 miles of 230kV transmission for Georgia Transmission o Expansion of a 500 kv substation for Sempra Energy o Hurricane restoration work for T Mobile in both Jacksonville and Mobile o Construction of nationwide deployment for Media Flo o Ongoing dedicated crew work for Alabama Power, Conectiv, Baltimore Gas and Electric, First Energy, and Georgia Power Kiewit.com Page 2 of 5
Page 3 of 5 Black & Veatch 1998 2003 Partner / Project Executive / Vice President Managed Power Delivery projects located in the Southeast U.S. Responsible for all aspects of the project including financial, engineering, procurement, construction management, and construction Notable projects during this time included the following o Overall management of 25 EPC substation projects for various clients. Most of these projects were large 115, 230 or 500 kv ring bus substations associated with generation interconnects. o Overall management of 11 EPC transmission projects o Project Executive providing traditional engineering and construction management services for all clients in the Southeast including Orlando Utilities Commission, Georgia Transmission Corporation, Progress, Georgia Power, Alabama Power, Power & Light, Tampa Electric and numerous municipalities PCS Buildout; DiGiPH PCS Alabama 1997 1998 Project manager for turnkey installation of 152 digital cellular communications towers. Responsible for all phases of the project including engineering, project management, right-of-way procurement, material procurement, construction management and construction. PCS System Sites; Powertel PCS Inc. Georgia 1996 1997 Responsible for engineering, procurement, and construction management for 450 cellular communications sites in Tennessee, Alabama, Mississippi,, and Georgia. Duties included managing three construction offices in Tennessee, Alabama, and ; along with managing site acquisition, survey, and soil investigation activities. OH Ground Wire Changeout and Fiber 400 Project Power Corporation 1996 1997 Responsible for engineering, procurement and construction specifications for changeout of 200 miles of overhead ground wire and engineering, analysis, and engineering support during construction of 400 miles of 144-fiber OPGW on existing transmission facilities. Project schedule for the 200 miles required completion of engineering and all construction in less than three months. From start of engineering to construction completion on the 400-mile project was less than nine months. Kiewit.com Page 3 of 5
Page 4 of 5 Rocky Mountain-Pinson 500kV Line Oglethorpe Power Corporation Georgia 1995 Responsible for engineering, procurement, and construction specification for 18 miles of 500 kv lattice steel transmission line. Project included foundation design, tower modeling, preparation of construction specifications, line layout, fiber optic ground wire design, and engineering support during construction. Black & Veatch 1994 1997 Office Manager In addition to duties as, served as Office Manager for Black & Veatch s design engineering office located in Orlando. Duties included project staffing assignments and management of personnel, overhead budgets, and support facilities. DDC Celebration City Disney Development Company 1994 Served as project manager on relocation of two 230 kv and one 69 kv transmission line totaling 10 miles. Duties included conceptual and detail design, soil investigation, survey, right-of-way assistance, permitting, environmental permitting, preparation of plan profiles, material specifications, construction contracting, and engineering support during construction. Power Corporation 1988 1996 / Project Engineer Served as project manager and project engineer on over 20 transmission line projects totaling more than 150 miles. Voltages ranged from 69 kv through 500 kv. Duties included conceptual and detail design, soil investigation, survey, right-of-way assistance, environmental permitting, permitting, preparation of plan profiles, material specifications, construction contracting, and engineering support during construction. City of St. Cloud New 230/69 kv substation, seven miles of 230 kv transmission line, 15 miles of 69 kv transmission line, and addition of a 69 kv substation to an existing 25 kv substation. Duties included inspection of civil work, foundations, steel erection, pole erection, equipment installation, checkout, and commissioning. Also, reviewed and approved payments to construction contractors and material vendors, prepared and issued project construction reports, and scheduled deliveries and outages. Kiewit.com Page 4 of 5
Page 5 of 5 Orlando Utilities Commission Responsible for inspection on construction of six miles of double circuit 230 kv lattice steel transmission line and installation of a second circuit on an additional seven miles of transmission line. Duties included inspection, field modifications, approval of construction payments, scheduling, and construction reporting on a pile contractor and line erection contractor. Project also included outage scheduling and modifications to existing 230 kv transmission line facilities. Indian River Substation Owner: Orlando Utilities Commission Responsible for inspection of construction on a new control house and 230 kv circuit breakers in an existing 115/230 kv substation. Duties included inspection, approval of construction payments, scheduling, construction reporting, and project closeout. Lake Tarpon-Kathleen 500kV Transmission Line Owner: Power Corporation 1985 1986 Engineer Responsible for design and analysis of lattice and tubular steel transmission structure for a 44-mile 500kV transmission line. Duties also included shop drawing review and approval of transmission structures. Education and Experience B.S. Civil Engineering University of Nebraska, 1982 Registrations and Organizations Professional Engineer Kiewit.com Page 5 of 5