Physical Address: City: State: Zip Code:

Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

FIT TIER 2 Application

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Interconnection Application For Residential and Commercial Power Systems 10 kw or Smaller

Unit 33 Three-Phase Motors

TABLE OF CONTENTS 1.0 INTRODUCTION PURPOSE DEVIATION INTERTIE PROTECTION REQUIREMENTS... 4

SYNCHRONOUS MACHINES

Rule Fast Track Analysis for National Life Insurance Co.

Basics of Electricity

How To Connect A Distributed Generation Facility In Illinois

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

DHANALAKSHMI COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE ELECTRICAL MACHINES II UNIT-I SYNCHRONOUS GENERATOR

Appendix N: GENERATOR DATA SHEET FOR SYNCHRONOUS GENERATORS CONNECTED TO PG&E ELECTRIC SYSTEM

UCI274C - Technical Data Sheet

UCI274H - Technical Data Sheet

TERMS AND CONDITIONS

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

HCM434F - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

PM734F - Technical Data Sheet Winding 28

PI144K - Winding 311 APPROVED DOCUMENT. Technical Data Sheet. Generator Solutions AS

Transient analysis of integrated solar/diesel hybrid power system using MATLAB Simulink

PI044E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

MicroFIT Connection Application Guidelines

INDUCTION MOTOR PERFORMANCE TESTING WITH AN INVERTER POWER SUPPLY, PART 2

PI734D - Technical Data Sheet

Interconnection of Generators to EDI s Distribution System

PI734B - Technical Data Sheet

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

BCI184E - Technical Data Sheet

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321)

Equipment: Power Supply, DAI, Synchronous motor (8241), Electrodynamometer (8960), Tachometer, Timing belt.

ET 332b Ac Electric Machines and Power Systems

2. A conductor of length 2m moves at 4m/s at 30 to a uniform magnetic field of 0.1T. Which one of the following gives the e.m.f. generated?

Prof. Krishna Vasudevan, Prof. G. Sridhara Rao, Prof. P. Sasidhara Rao

VOLTAGE REGULATOR AND PARALLEL OPERATION

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

Synchronous generators are built in large units, their rating ranging from tens to hundreds of megawatts.

IV. Three-Phase Induction Machines. Induction Machines

NORTH CAROLINA INTERCONNECTION PROCEDURES, FORMS, AND AGREEMENTS. For State-Jurisdictional Generator Interconnections. Effective June 16, 2009

Lab 8: DC generators: shunt, series, and compounded.

Induction Motor Theory

Three-Phase Induction Motor

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011

Motor Fundamentals. DC Motor

Three phase circuits

Equipment: Power Supply, DAI, Transformer (8341), Variable resistance (8311), Variable inductance (8321), Variable capacitance (8331)

Science and Reactor Fundamentals Electrical CNSC Technical Training Group. Table of Contents

Verification of Short Circuit Test Results of Salient Poles Synchronous Generator

Equipment: Power Supply, DAI, Wound rotor induction motor (8231), Electrodynamometer (8960), timing belt.

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

Renewable Energy Laboratory for Engineering Students

Rotary Phase Converters

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

SPECIFICATION COG-2007

Step Voltage Regulators

CHAPTER 5 SYNCHRONOUS GENERATOR

Lab 14: 3-phase alternator.

How To Understand And Understand The Electrical Power System

Section 10. Application Manual for NEMA Motors. Special Applications

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Principles and Working of DC and AC machines

Dually Fed Permanent Magnet Synchronous Generator Condition Monitoring Using Stator Current

INDUCTION REGULATOR. Objective:

To complete the process for a net metering interconnection, please follow the steps below:

Keywords: synchronous generator, synchronous motor, automatic voltage regulator, V- curves, synchronizing power, hunting, excitation system

K LI 000 ENt GY Knoliwood Energy of MA LLC P.O. Box 30 Chester, New Jersey September 17, 2015 ~$~~j(: ~

Interconnection Service - Frequently Asked Questions

Variable Frequency Drives - a Comparison of VSI versus LCI Systems

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) J. Instruction Leaflet

Simulation and Analysis of Parameter Identification Techniques for Induction Motor Drive

On the Influence of Stator Slot shape on the Energy Conservation Associated with the Submersible Induction Motors

Power System Analysis

SYNCHRONOUS MACHINE TESTING WITH MOTOR CIRCUIT ANALYSIS INSTRUMENTATION

3-Phase AC Calculations Revisited

Comparison of Interconnection Standards 3/28/2003

TERMS AND CONDITIONS

Electric Rate Schedule

AC Kinetics Variable Frequency Drive Comparative Transient Inertial Testing. This document was prepared by Advanced Energy.

Modeling and Testing of Unbalanced Loading and Voltage Regulation

Equipment: Power Supply, DAI, Universal motor (8254), Electrodynamometer (8960), timing belt.

Understanding the Alternator

Photovoltaic Incentive Program

PowerFlex Dynamic Braking Resistor Calculator

LOSSELESS STARTING METHOD FOR THE WOUND ROTOR INDUCTION MOTOR

THREE-PHASE INDUCTION MOTOR March 2007

The following table shows approximate percentage wise the

Synchronous motor. Type. Non-excited motors

Mathematical Modeling and Dynamic Simulation of a Class of Drive Systems with Permanent Magnet Synchronous Motors

Advance Electronic Load Controller for Micro Hydro Power Plant

AC-Synchronous Generator

Chapter 24. Three-Phase Voltage Generation

WIND TURBINE TECHNOLOGY

6. Synchronous machine dynamics

Transcription:

Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection (See ARSD chapter 20:10:36 for the requirements for a Tier 2, Tier 3, or Tier 4 Interconnection.) Applicant/Interconnection Customer Contact Information: Name: Mailing Address: City: State: Zip Code: Telephone (Daytime): (Evening): Facsimile Number: E-Mail Address: Address of Customer Facility Where Small Generator Facility will be Interconnected: (if different from above) Street Address: City: State: Zip Code: System Installer/Consulting Engineer: Name: Mailing Address: City: State: Zip Code: Telephone (Daytime): (Evening): Facsimile Number: E-Mail Address: Electric Service Information for Applicant s Facility Where Generator Will Be Interconnected: Capacity: (Amps) Voltage: (Volts) Type of Service: Single Phase Three Phase If Three-Phase Transformer, Indicate Type: Wye Delta

Requested Procedure Under Which to Evaluate Interconnection Request: Please indicate below which review procedure applies to the interconnection request. Tier 2 - Certified interconnection equipment with an aggregate Electric Nameplate Capacity of 2 MW or less. Indicate type of certification below. The application fee amount is ($50 plus $1 per KW of rated generation output up to a maximum of $500). Lab Tested -- tested to IEEE 1547.1 and other specified standards by a nationally recognized testing laboratory and is appropriately labeled. Field Tested an identical small generator facility has been approved by the Public Utility under a Tier 4 study review process within the prior 36 months of the date of this interconnection request. Tier 3 A Small Generator Facility connected to the EDS that does not export power. The Electric Nameplate Capacity rating must be 50 KW or smaller if connecting to an area network, or 2 MW or smaller if connecting to a radial distribution feeder. The application fee amount is ($100 plus $2 per KW of rated generation output up to a maximum of $1,000). Tier 4 Electric Nameplate Capacity rating is 10 MW or smaller and the Small Generator Facility does not qualify for a Tier 1, Tier 2, or Tier 3 review or has been reviewed but not approved under a Tier 1, Tier 2, or Tier 3 review. Application fee amount is ($100 plus $2 per KW of rated generation output up to a maximum of $1,000). Field Tested Equipment: If the field tested equipment box is checked above, please include with the completed application the following information which will be required for review of Tier 2 field tested small generator facilities: A copy of the Certificate of Completion, signed by the Public Utility that has approved an identical small generator facility for parallel operation. A copy of all documentation submitted to the Public Utility that approved the Small Generator Facility for parallel operation under a Tier 4 study process. A written statement by the Applicant indicating that the small generator facility being proposed is identical, except for Minor Equipment Modification, to the one previously approved by the Public Utility for parallel operation. If a Tier 2 Application utilizing Field Tested equipment is proposed, the remainder of the application will not be required to be completed. Small Generator Facility Information: List interconnection components/system(s) to be used in the Small Generation Facility that is lab certified (required for Lab Tested, Tier 2 Interconnection requests only). 2

Component/System NRTL Providing Label & Listing 1. 2. 3. 4. 5. Please provide copies of manufacturer brochures or technical specifications. Energy Production Equipment/Inverter Information: Synchronous Induction Inverter Other Electric Nameplate Rating: KW kva Rated Voltage: Volts Rated Current: Amps System Type Tested (Total System): Yes No (attach product literature) For Synchronous Machines: Manufacturer: Model No.: Version No.: Submit copies of the Saturation Curve and the Vee Curve. Salient Non-Salient Torque: lb-ft Rated RPM: Field Amperes: at rated generator voltage and current and % PF over-excited Type of Exciter: Output Power of Exciter: Type of Voltage Regulator: Locked Rotor Current: Amps Synchronous Speed: RPM Winding Connection: Min. Operating Frequency/Time: Generator Connection: Delta Wye Wye Grounded Direct-axis Synchronous Reactance: (Xd) ohms Direct-axis Transient Reactance: (X'd) ohms Direct-axis Sub-transient Reactance: (X d) ohms For Induction Machines: Manufacturer: Model No.: Version No.: Locked Rotor Current: Amps Rotor Resistance: (Rr) ohms Exciting Current: Amps 3

Rotor Reactance: (Xr) ohms Reactive Power Required: Magnetizing Reactance: (Xm) ohms VARs (No Load) Stator Resistance: (Rs) ohms VARs (Full Load) Stator Reactance: (Xs) ohms Short Circuit Reactance: (X d) ohms Phase: Single Three-Phase Frame Size: Design Letter: Temp. Rise: O C. Reverse Power Relay Information: (This section applies to Tier 3 Review only.) Manufacturer: Model: Electric Nameplate Capacity rating: (kva) Additional Information For Inverter Based Facilities: Inverter Information: Manufacturer: Model: Type: Forced Commutated Line Commutated Electric Nameplate Capacity Rated Output: Amps Volts KW Efficiency: % Power Factor: % DC Source / Prime Mover: Solar Wind Hydro Other Electric Nameplate Capacity Rating: KW Rating: kva Rated Voltage: Volts Open Circuit Voltage (if applicable): Volts Rated Current: Amps Short Circuit Current (If applicable): Amps Other Facility Information: Is Facility a Qualified Facility? Yes No If yes, has Applicant completed FERC s Notice of Self Certification? Yes No Verification Number Received from FERC: One Line Diagram attached: Yes No Plot Plan attached: Yes No Installation Test Plan attached: Yes No Estimated Commissioning Date (if known): 4

Applicant Signature: I hereby certify that all of the information provided in this application request form is correct. Applicant Signature: Title: Date: An application fee is required before the application can be processed. Please verify that the appropriate fee is included with the application: Application fee included: Amount 5

Tier 2, 3, or 4 Interconnection Request Acknowledgement I hereby acknowledge the receipt of an Interconnection Request and Application Fee. Approval for a Tier 2, Tier 3, or Tier 4 Small Generator Facility interconnection is contingent upon the Applicant s Small Generator Facility passing the screens and completing the review process set forth in ARSD chapter 20:10:36 and is not granted by the Public Utility s signature on this Application form. Public Utility Signature: Date: Printed Name: Title: Note: The Public Utility shall retain a copy of this completed and signed form and return the original and any attachments to the Applicant. 6