Physical Address: City: State: Zip Code:



Similar documents
Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

FIT TIER 2 Application

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Interconnection Application For Residential and Commercial Power Systems 10 kw or Smaller

How To Connect A Distributed Generation Facility In Illinois

TABLE OF CONTENTS 1.0 INTRODUCTION PURPOSE DEVIATION INTERTIE PROTECTION REQUIREMENTS... 4

Appendix N: GENERATOR DATA SHEET FOR SYNCHRONOUS GENERATORS CONNECTED TO PG&E ELECTRIC SYSTEM

SYNCHRONOUS MACHINES

Basics of Electricity

K LI 000 ENt GY Knoliwood Energy of MA LLC P.O. Box 30 Chester, New Jersey September 17, 2015 ~$~~j(: ~

Rule Fast Track Analysis for National Life Insurance Co.

Transient analysis of integrated solar/diesel hybrid power system using MATLAB Simulink

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

Unit 33 Three-Phase Motors

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

TERMS AND CONDITIONS

DHANALAKSHMI COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE ELECTRICAL MACHINES II UNIT-I SYNCHRONOUS GENERATOR

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Interconnection of Generators to EDI s Distribution System

UCI274C - Technical Data Sheet

VOLTAGE REGULATOR AND PARALLEL OPERATION

UCI274H - Technical Data Sheet

SPECIFICATION COG-2007

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321)

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

HCM434F - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

PM734F - Technical Data Sheet Winding 28

2. A conductor of length 2m moves at 4m/s at 30 to a uniform magnetic field of 0.1T. Which one of the following gives the e.m.f. generated?

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Equipment: Power Supply, DAI, Synchronous motor (8241), Electrodynamometer (8960), Tachometer, Timing belt.

PI144K - Winding 311 APPROVED DOCUMENT. Technical Data Sheet. Generator Solutions AS

PI044E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

PI734D - Technical Data Sheet

PI734B - Technical Data Sheet

BCI184E - Technical Data Sheet

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Three phase circuits

Renewable Energy Laboratory for Engineering Students

NORTH CAROLINA INTERCONNECTION PROCEDURES, FORMS, AND AGREEMENTS. For State-Jurisdictional Generator Interconnections. Effective June 16, 2009

ET 332b Ac Electric Machines and Power Systems

MicroFIT Connection Application Guidelines

INDUCTION MOTOR PERFORMANCE TESTING WITH AN INVERTER POWER SUPPLY, PART 2

Synchronous generators are built in large units, their rating ranging from tens to hundreds of megawatts.

Keywords: synchronous generator, synchronous motor, automatic voltage regulator, V- curves, synchronizing power, hunting, excitation system

Step Voltage Regulators

IV. Three-Phase Induction Machines. Induction Machines

Alternative and Renewable Energy Systems

Motor Fundamentals. DC Motor

Lab 8: DC generators: shunt, series, and compounded.

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011

Prof. Krishna Vasudevan, Prof. G. Sridhara Rao, Prof. P. Sasidhara Rao

To complete the process for a net metering interconnection, please follow the steps below:

8 Speed control of Induction Machines

3-Phase AC Calculations Revisited

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) J. Instruction Leaflet

13 ELECTRIC MOTORS Basic Relations

DIMENSIONING OF CURRENT TRANSFORMERS FOR PROTECTON APPLICATION

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

Comparison of Interconnection Standards 3/28/2003

CHAPTER 5 SYNCHRONOUS GENERATOR

APPLICATION NOTE. Increasing PV Hosting Capacity on LV Secondary Circuits with the Gridco System empower TM Solution

Electric Rate Schedule

Science and Reactor Fundamentals Electrical CNSC Technical Training Group. Table of Contents

INDUCTION REGULATOR. Objective:

Modeling and Testing of Unbalanced Loading and Voltage Regulation

Chapter 24. Three-Phase Voltage Generation

How To Understand And Understand The Electrical Power System

Lab 14: 3-phase alternator.

Advance Electronic Load Controller for Micro Hydro Power Plant

Direct Current Motors

Equipment: Power Supply, DAI, Wound rotor induction motor (8231), Electrodynamometer (8960), timing belt.

Module Title: Electrotechnology for Mech L7

100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd

REC Eligibility Application Result #Alec Smith

The following table shows approximate percentage wise the

Rotary Phase Converters

Interconnection Service - Frequently Asked Questions

Equipment: Power Supply, DAI, Transformer (8341), Variable resistance (8311), Variable inductance (8321), Variable capacitance (8331)

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

Induction Motor Theory

SOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

6. Synchronous machine dynamics

MICRO HYDRO POWER PLANT WITH INDUCTION GENERATOR SUPPLYING SINGLE PHASE LOADS

Three-Phase Induction Motor

THE PER-UNIT SYSTEM. (2) The per-unit values for various components lie within a narrow range regardless of the equipment rating.

Cahier technique no. 196

TERMS AND CONDITIONS

Chapter 3 AUTOMATIC VOLTAGE CONTROL

Key Concepts Of Distributed Generation

Power System Analysis

Advanced Protection of Distribution Networks with Distributed Generators

Dually Fed Permanent Magnet Synchronous Generator Condition Monitoring Using Stator Current

Verification of Short Circuit Test Results of Salient Poles Synchronous Generator

Transcription:

Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection (For Small Generator Facilities with Electric Nameplate Capacities of 10 MW and less) Applicant Contact Information : Name: Mailing Address: Physical Address: City: State: Zip Code: Telephone (Daytime): Facsimile Number: (Evening): E-Mail Address: Address of Customer Facility Where Small Generator Facility will be Interconnected : (if different from above) Street Address: City: State: Zip Code: System Installer/Consulting Engineer : Name: Mailing Address: City: State: Zip Code: Telephone (Daytime): Facsimile Number: (Evening): E-Mail Address: Electric Service Information for Applicant s Facility Where Generator Will Be Interconnected : Capacity: (Amps) Voltage: (Volts) Type of Service: Single Phase Three Phase Will a transformer be used between the generator and the point of common coupling? Yes No Transformer Data (If Applicable, for Interconnection Customer-Owned Transformer): Is the transformer: single phase three phase? Size: kva Transformer Impedance: % on kva Base

If Three Phase: Transformer Primary: Volts Delta Wye Wye Grounded Transformer Secondary: Volts Delta Wye Wye Grounded Transformer Tertiary: Volts Delta Wye Wye Grounded Requested Procedure Under Which to Evaluate Interconnection Request 1 : Please indicate below which review procedure applies to the interconnection request. Tier 2 - Certified interconnection equipment with an aggregate Electric Nameplate Capacity of 2 MW or less. Indicate type of certification below. The application fee amount is $500. Lab Tested - tested to IEEE 1547.1 and other specified standards by a nationally recognized testing laboratory and is appropriately labeled. Field Tested an identical small generator facility has been approved by the public utility under a Tier 4 study review process within the prior 36 months of the date of this interconnection request. Tier 3 A Small Generator Facility connected to the T&D system that does not export power. The Electric Nameplate Capacity rating may be 50 kw or smaller, if connecting to area network or 10 MW or smaller, if connecting to a radial distribution feeder. The application fee amount is $1000. Tier 4 Electric Nameplate Capacity rating is 10 MW or smaller and the Small Generator Facility does not qualify for a Tier 1, Tier 2 or Tier 3 review or has been reviewed but not approved under a Tier 1, Tier 2 or Tier 3 review. Application fee amount is $1000. 1 Note: Descriptions for interconnection review categories do not list all criteria that must be satisfied. For a complete list of criteria, please refer to PUC Rule OAR 860, Division 082, (Rule). Field Tested Equipment: If the field tested equipment box is checked above, please include with the completed application the following information which will be required for review of Tier 2 field tested small generator facilities: A copy of the Certificate of Completion, signed by the public utility that has approved an identical small generator facility for parallel operation. A copy of all documentation submitted to the public utility that approved the Small Generator Facility for parallel operation under a Tier 4 study process. 2

A written statement by the Applicant indicating that the small generator facility being proposed is identical, except for Minor Equipment Modification, to the one previously approved by the public utility for parallel operation. If a Tier 2 Application, utilizing Field Tested equipment, is proposed the remainder of the application will not be required to be completed. Small Generator Facility Information: List interconnection components/system(s) to be used in the Small Generation Facility that is lab certified (required for Lab Tested, Tier 2 Interconnection requests only). Component/System NRTL Providing Label & Listing 1. 2. 3. 4. 5. Please provide copies of manufacturer brochures or technical specifications Energy Production Equipment/Inverter Information: Synchronous Induction Inverter Other Electric Nameplate Rating: kw kva Rated Voltage: Volts Rated Current: Amps System Type Tested (Total System): Yes No; (attach product literature) Customer-Site Load: (kw) (if none, so state) Maximum Physical Export Capability Requested: (kw) Individual Generator Power Factor Rated Power Factor: Leading: Lagging: For Synchronous Machines: Manufacturer: Model No.: Version No.: Submit copies of the Saturation Curve and the Vee Curve. Salient Non-Salient Torque: lb-ft Rated RPM: 3

Field Amperes: at rated generator voltage and current and % PF over-excited Type of Exciter: Output Power of Exciter: Type of Voltage Regulator: Locked Rotor Current: Amps Synchronous Speed: RPM Winding Connection: Min. Operating Freq./Time: Generator Connection: Delta Wye Wye Grounded Direct-axis Synchronous Reactance: (Xd) ohms Direct-axis Transient Reactance: (X'd) ohms Direct-axis Sub-transient Reactance: (X"d) ohms Negative Sequence Reactance, X 2 : P.U. Zero Sequence Reactance, X 0 : P.U. KVA Base: Field Volts: Field Amperes: Provide appropriate IEEE model block diagram of excitation system and governor system in accordance with the regional reliability council criteria (WECC/NERC Reliability Standard MOD-012-0). A copy of the manufacturer's block diagram may not be substituted. For Induction Machines: Manufacturer: Model No.: Version No.: Locked Rotor Current: Amps Rotor Resistance: (Rr) ohms Exciting Current: Amps Rotor Reactance: (Xr) ohms Reactive Power Required: Magnetizing Reactance: (Xm) ohms VARs (No Load) Stator Resistance: (Rs) ohms VARs (Full Load) Stator Reactance: (Xs) ohms Short Circuit Reactance: (X"d) ohms Phases: Single Three-Phase Frame Size: Design Letter: Temp. Rise: O C. 4

Reverse Power Relay Information: (This section applies to Tier 3 Review Only) Manufacturer: Model: Electric Nameplate Capacity rating: (kva) Additional Information For Inverter Based Facilities: Inverter Information: Manufacturer: Model: Type: Forced Commutated Line Commutated Electric Nameplate Capacity Rated Output: Amps Volts kw Efficiency: % Power Factor: % DC Source / Prime Mover: Solar Wind Hydro Other Electric Nameplate Capacity Rating: kw Rating: kva Rated Voltage: Volts Open Circuit Voltage (If applicable): Volts Rated Current: Amps Short Circuit Current (If applicable): Amps Other Facility Information: Is Facility a QF? Yes No If yes, has Applicant completed FERC Notice of Self Certification? Yes No Energy Source: Solar Wind Hydro Diesel Natural Gas Other Prime Mover Type: Photovoltaic Reciprocating Engine Fuel Cell Turbine Other One Line Diagram attached: Yes No Plot Plan attached: Yes No Installation Test Plan attached: Yes No Estimated Commissioning Date (if known): Enclose copy of site electrical one-line diagram showing the configuration of all Small Generating Facility equipment, current and potential circuits, and protection and control schemes. 5

Enclose copy of any site documentation that indicates the precise physical location of the proposed Small Generating Facility (e.g., USGS topographic map, distance from public utility facility number, other diagram or documentation). Enclose copy of any documents that provide proof of site control. Applicant Signature: I hereby certify that all of the information provided in this application request form is correct. Applicant Signature: Title: Date: An application fee is required before the application can be processed. Please verify that the appropriate fee is included with the application: Application fee included Amount Public Utility Acknowledgement: I hereby acknowledge the receipt of a Interconnection Request and Application Fee, Approval for a Tier 2, Tier 3 or Tier 4 Small Generator Facility interconnection is contingent upon the Applicant s Small Generator Facility passing the screens and completing the review process set forth in the PUC rules found in OAR 860, Division 082 and is not granted by the EDC s signature on this Application Form. Public Utility Signature: Date: Printed Name: Title: Note: The Public Utility shall retain a copy of this completed and signed form and return the original and any attachments to the Applicant. 6