Great Lakes Data Room Case Study



Similar documents
Small Data / Telecommunications Room on Slab Floor

Benefits of. Air Flow Management. Data Center

Data center upgrade proposal. (phase one)

Data Center Components Overview

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential

Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER

Managing Data Centre Heat Issues

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Airflow Simulation Solves Data Centre Cooling Problem

Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers

2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings

Driving Data Center Efficiency Through the Adoption of Best Practices

Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers

Power and Cooling for Ultra-High Density Racks and Blade Servers

Cabinets 101: Configuring A Network Or Server Cabinet

Benefits of Cold Aisle Containment During Cooling Failure

Unified Physical Infrastructure (UPI) Strategies for Thermal Management

High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.

Enclosure and Airflow Management Solution

APC APPLICATION NOTE #92

Cooling Audit for Identifying Potential Cooling Problems in Data Centers

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

How Row-based Data Center Cooling Works

Reducing Room-Level Bypass Airflow Creates Opportunities to Improve Cooling Capacity and Operating Costs

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

Choosing Close-Coupled IT Cooling Solutions

Airflow Management Solutions

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

How To Improve Energy Efficiency Through Raising Inlet Temperatures

Using Simulation to Improve Data Center Efficiency

Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009

- White Paper - Data Centre Cooling. Best Practice

RACKMOUNT SOLUTIONS. 1/7/2013 AcoustiQuiet /UCoustic User Guide. The AcoustiQuiet /UCoustic User Guide provides useful

A Comparative Study of Various High Density Data Center Cooling Technologies. A Thesis Presented. Kwok Wu. The Graduate School

Data Center 2020: Delivering high density in the Data Center; efficiently and reliably

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Data Center Optimization Services. Maximize Your Data Center

Center Thermal Management Can Live Together

Rack Hygiene. Data Center White Paper. Executive Summary

Measure Server delta- T using AUDIT- BUDDY

Cabinet V800 V800 CABINETS

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

APC APPLICATION NOTE #112

Product Brochure. Airflow Management Solutions

Data Center Power Consumption

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences

Data Center Cooling: Fend Off The Phantom Meltdown Of Mass Destruction. 670 Deer Road n Cherry Hill, NJ n n

14 WeRackYourWorld.com

Thinking Outside the Box Server Design for Data Center Optimization

Layer Zero. for the data center

Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres

Source: Infosys e-book A Successful Data Center Migration g Cradle to Grave

ADC-APC Integrated Cisco Data Center Solutions

Layer Zero. for the data center

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Managing Cooling Capacity & Redundancy In Data Centers Today

Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360

Intelligent Containment Systems

Data Center Rack Systems Key to Business-Critical Continuity. A White Paper from the Experts in Business-Critical Continuity TM

Data Centers: How Does It Affect My Building s Energy Use and What Can I Do?

LEVEL 3 DATA CENTER ASSESSMENT

How To Cool A Data Center

Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc.

Element D Services Heating, Ventilating, and Air Conditioning

Airflow Utilization Efficiency (AUE) Can we cool today s servers with airflow?

Energy-efficient & scalable data center infrastructure design

BRUNS-PAK Presents MARK S. EVANKO, Principal

Overview & Design of Data Center Cabinets

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment

The New Data Center Cooling Paradigm The Tiered Approach

Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015

Alan Matzka, P.E., Senior Mechanical Engineer Bradford Consulting Engineers

Specialty Environment Design Mission Critical Facilities

Customized Server Cabinets

Data Centre Cooling Air Performance Metrics

Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant

Elements of Energy Efficiency in Data Centre Cooling Architecture

News in Data Center Cooling

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

Using CFD for optimal thermal management and cooling design in data centers

Thermal Optimisation in the Data Centre

HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE

Data Center Technology: Physical Infrastructure

DOE FEMP First Thursday Seminar. Learner Guide. Core Competency Areas Addressed in the Training. Energy/Sustainability Managers and Facility Managers

Data Centers. Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions

Transcription:

Great Lakes Data Room Case Study WeRackYourWorld.com

Problem: During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure in the network enclosure. After an equipment audit and a site survey, it was determined that the switch had overheated and the room itself had exceeded its designed HVAC capacity. After discovering the causes related to the failure, it was determined that the entire infrastructure and cooling methodology should be redesigned. Datacenter concerns typically trend in a cyclical fashion. Driven by increased demand from software requirements, increased computer capacity is needed which creates a demand for increased power capacity. As these two demands are met the increased load in the datacenter adds additional heat which, in turn creates a need to add cooling capacity, or make existing cooling technologies more efficient. The Room: 250 sq. ft. with single Mitsubishi Mr. Slim cooling unit rated at 34,600 BTU or 10.1 kw 2 enclosures with plexiglass front doors and solid rear doors, vented top for thermal exhaust Using two LAN furniture systems to house the servers and workstations in addition to the switch racks, the total BTU of equipment load was calculated at 39,600 BTU/12kW. This capacity, in addition to lack of enclosure cooling design (plexi-glass front doors) was creating thermal issues in the switch, raising the intake temperatures of other equipment in the room. In order to maintain a stable operating temperature, the set-point of the CRAC unit was 64 degrees F. IT plans for new server and networking hardware increased the equipment load to 44,300/13kW. Page 2 Great Lakes Case & Cabinet

This is a view of the previous rack configuration used to house the IT infrastructure (i.e., patch panels, switch gear, telephony, firewall and routers) used to run the network. The remainder of the equipment (servers, workstations etc.) were installed on LAN furniture. This design was inefficient as it relied on ambient air cooling from the room, instead of using a rack configuration to direct air to the intake and segregating the exhaust air reducing short circuits resulting in excess cooling and poor equipment reliability. This switch failed due to overheating as a result of insufficient airflow. The primary cause of the airflow restriction was the use of acrylic front doors with limited ventilation. The new rack design uses perforated front doors to allow for proper equipment ventilation as well as cabling best practices to maximize airflow. The use of brush grommet along the side rails and filler panels in the unused RMU s to restrict by-pass air as well as short circuits while still providing cable pass-through from front to rear of the enclosure. After careful design consideration, it was decided that another identical CRAC unit was required to achieve effective cooling and to add redundancy. This provided 69,000/20.2 kw BTU of cooling as well as failover in the event of a single unit loss. When engineering a cooling solution for this room, there were several design considerations which required consistency based on the room layout. Great Lakes Case & Cabinet Page 3

Room Layout The room has a slab floor construction. The enclosures intake side face away from the CRAC units conditioned air flow. The design of each CRAC unit is such that it sits at the top of the wall and has an intake parallel to the wall, while supplying cold air from the base of the unit. This provided a unique challenge to the room as the unit would essentially be providing cold air in the standard hot-aisle. To handle this load while maintaining N+1 CRAC unit redundancy the set point of the CRAC units would have to be raised, by providing more BTU of capacity at a lower delta. Given these design constraints Great Lakes chose to use it s existing proven cooling technologies along with a custom solution designed to improve the efficiency of the CRAC unit based on its design. New Design: Four Enclosures (described in order from left to right) First and Second Enclosure Configurations GL780ES-3042 Contour Mesh front door Split Solid rear door Brush Grommet Kit Top cable trough Levelers and Casters Filler Panels First Enclosure (Telephony) Second Enclosure (Networking) Third and Fourth Enclosure Configurations GL780ES-2442 Adjustable Air Manager w/ active cooling Custom chimney w/ active cooling Filler Panels Top Cable Trough Levelers and Casters Third Enclosure (IT) Fourth Enclosure (Data) Page 4 Great Lakes Case & Cabinet

Custom chimney directs air at 85 o F and uses a acrylic baffle to assist exhaust direction toward the CRAC unit intake, preventing it from mixing with the conditioned air and maximizing the efficiency of the unit. Two 6 chimney fans created 600 CFM @ 70W draw on 120 VAC Great Lakes adjustable air manager (AM- ES) directs air passively on a raised floor or through active cooling by utilizing fans on a slab floor as shown with casters and levelers. Two 6 air manager fans created 600 CFM @ 70W draw on 120 VAC Great Lakes Case & Cabinet Page 5

Cross section view of the Great Lakes close coupled air cooling solution. This demonstrates how the conditioned air is used more effectively by directing the air in front of the equipment intakes and reducing the amount of room white-space being cooled. Hot Exhaust Return Ducted Exhaust Chimney (Eliminates Recirculation) Hot Aisle Eliminated 60 o F - 65 o F at equipment intake Mesh Front Door Aisle Space Temperature Estimate* 65 o - 72 o F Solid Rear Door Air Manager (60 o F - 65 o F) Conditioned Air With Air Manager (and optional chimney) *Actual temperature will be based on actual data center conditions.

Temperature 105 o An example of CFD (computational fluid dynamic modeling) analysis showing airflow intake and exhaust rates tested at 10 kw+ equipment load. 99.7 o 94.4 o 89.1 o 83.8 o 78.4 o 73.1 o 67.8 o 62.5 o CFD Model of the room shows airflow and temperatures in the room during operation. The model is used to plan for additional capacity and to improve airflow performance. Page 6 Great Lakes Case & Cabinet

Data was acquired using an anemometer to obtain airflow speeds as well as air temperature. Additionally Upsite Technologies temperature strips were installed at two points (air-manager, and top RMU) and in the upper RMU on back of the enclosures. Cold aisle temperature 72 o (Recommended Range of 65-80 ASHRAE TC 9.9 specification) Measured at 4 above the floor 2 from the front enclosure door. Intake & Exhaust Temperatures Comparison w/air Manager and Chimney (fans on) Temperature Decrease Enclosure Number 1 2 3 2 3 2 3 Eq Intake @ Bottom 68 68 70 66 68-2 -2 Eq Intake @ Top 76 81 83 69 69-12 -14 Equipment Exhaust Top Rear 74 85 85 86 76-9 -10 Δt F (Exhaust-Intake Avg.) +1.75 +10.5 +9.5 +8.5 +8.5 #1 AVG #2 #3 The Conclusion: The new design has exceeded the performance expectations projected by the design team and has achieved a higher degree of efficiency, capacity and redundancy. The active air manager in use with the brush grommet kit and filler panels has created a consistent intake temperature inside the IT and Data enclosures from bottom to top as well as a lower delta of temperature rise from equipment intake to exhaust. This allowed us to raise the set point of the CRAC units to 70 degrees F while still keeping server intake temperatures low. With this new rack configuration we were able to see an 11 to 13 degree decrease in intake temperatures.

Corporate Headquarters P.O. Box 551 Edinboro, PA 16412 1-866-TRY-GLCC (1-866-879-4522) Phone: 814.734.7303 Fax: 814.734.3907 Western Distribution 4750 Joule Street Reno, NV 89502 Phone: 775.829.9913 Fax: 775.829.9926 ISO 9000 : 2008 REGISTERED ISO 9001 : 2008 ETSI Associate Member 8/22/2011 rev. 0 Great Lakes Case & Cabinet