Kuala Lumpur conquers the underground. Using pioneering tunnelling technology made in Germany.



Similar documents
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle

Sany Tunnel Boring Machines

Member Nation Report 2010 from Denmark.

TBM CROSSING OF STATIONS

State Route 640 Itinerary Agrigento-Caltanissetta-A19. Description of work

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

by Morgan Anamoah & Martin Feeney

MINIMIZING DEFECTS OCCURRENCES ON SFRC TUNNEL SEGMENT OF KLANG VALLEY MRT PROJECT

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Monitoring of cutting tools in TBM S

The Follo Line Project

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

Tunnelling & Underground. Specialists

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT Nina Tveiten Norwegian National Rail Administration

GOWANUS EXPRESSWAY TUNNEL PRIMER

Machine Foundation Design

Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company)

TBMs for Norwegian Hydropower projects. Sindre Log The Robbins Company

Milan M5 metro extension the construction of Lotto station

Integrated Tunnelling Data Management, Analysis and Visualization New IT Tools for Better Projects

Frequently Asked Transmission Pipeline Questions

Severn Trent Water Ltd has undergone a massive investment programme in the River Tame catchment over the

hs2 Ground A non-technical guide

Floods in Malaysia: Tzu Chi Offered Quick Relief Aid

Risk Management Applied to Mechanized Tunnelling in Urban Area Piergiorgio GRASSO - GEODATA, Italy

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

TRENCHLESS TECHNOLOGY RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES

Indianapolis Midfield Terminal Thermal Utility Construction

BENEFITS OF USING MOBILE CRUSHING AND SCREENING PLANTS IN QUARRYING CRUSHED STONE. 1. Introduction. Mario Klanfar*, Darko Vrkljan*

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels

Design and Construction of Auger Cast Piles

BUTE Department of Construction Management and Technology

Baton Rouge Foundation Repair

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.

UNDERGROUND MASTER PLAN OF HELSINKI

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Step 2: Learn where the nearest divergent boundaries are located.

Annular Space Grouting of Slipline Products

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

Contractor of the Year

THE 1 ST TRAINING COURSE ON TUNNELLING IN URBAN AREAS WEDNESDAY 09 FRIDAY 11 APRIL, HALL RAILWAY PROJECT MANAGEMENT UNIT (RPMU)

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

2 nd Annual Underground Space Engineering

Linear Schedules for Tunnel Projects

SANITARY SEWER BACKUP. Causes & Prevention

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

DATA MANAGEMENT SYSTEM FOR TUNNELLING

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Spiral pipe plants. Tailor-made solutions with measurable benefits

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Type of Sewer Systems. Solomon Seyoum

Air Masses and Fronts

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Facts About. Industrial gases for better injection molding. This article appeared in the trade journal Kunststoffe plast europe, issue 12/2004.

Conveyor Belt Group. Flexowell -belts for safe and efficient steep inclined and vertical conveying

ATLAS RESISTANCE Pier Foundation Systems

Automated underground transportation of cargo

Getec. The Geo Structural Monitoring Experts

TUNNEL boring was originally attempted over 150 years

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

NEW BLUE LINE CONNECTIONS

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.

METHOD OF STATEMENT FOR STATIC LOADING TEST

A study on the causes of troubles in shield tunneling site with numerical analysis

HELSINKI EXPERIENCE WITH MASTER PLANNING FOR USE OF UNDERGROUND SPACE

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Building over or close to a public sewer

Seasonal & Daily Temperatures. Seasons & Sun's Distance. Solstice & Equinox. Seasons & Solar Intensity

How to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No May 15, 2013

New Guided Urban Transit Systems in Japan

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T

INTERNATIONAL. Technical journal for piping system integrity and efficiency

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Ardessie Hydro Electric Project

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

SECTION ABANDONMENT OF SEWER MAINS

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

Why Go Underground? ITA - AITES Why Go Underground? 1

Specification for tunnelling third edition. The British Tunnelling Society and The Institution of Civil Engineers

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

SECTION STORM DRAIN SYSTEM

Appendix A: Acceptable pipe and fitting materials

BOREHOLE SEALING IN A COAXIAL HEAT EXCHANGER BY BENTONITE TREATMENT

PISA. Agenzia Regionale per la Protezione ambientale della Toscana (ARPAT)

Sample Micro Hydro Initial Report

Appendix E Construction Methods

EXPLAINING GROUNDWATER AND WATER WELLS

Membrane for tunnels and underground construction

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

ON SALE! FINE SOLID SEPARATION CENTRIFUDGE DP45

Overview of Singapore s Drainage Management Approach July 2011

Available online at I-SEEC Proceeding - Science and Engineering (2013)

Transcription:

Herrenknecht All Around Multi-mode TBM Story Page 1 / Story Kuala Lumpur conquers the underground. Using pioneering tunnelling technology made in Germany. Author: Adrian Greeman Photography: Ming Thein Everyday life on the roads of Kuala Lumpur: The 1.6 million inhabitants have to include long waits at rush hour when traveling through the center of the Malaysian capital. A big step to improve the traffic situation in Malaysia s capital with its about 7 million inhabitants is the new Klang Valley Mass Rapid Transit (KVMRT) system. For the construction of the demanding underground sections through the heart of the metropolis, 6 newly developed Variable Density TBMs from Herrenknecht are also on track. Kuala Lumpur s international airport is as 21st century as it comes; vaulted terminal spaces match any modern flight hub. The rail link to the high rise city center of Malaysia s capital is a fast 50 minutes, through palm oil plantations interspersed with new town developments, numerous multi-story apartment blocks clustered together for the fast growing population.

Herrenknecht All Around Multi-mode TBM Story Page 2 / 11 Strained traffic situation in the city But once in the city s crowded center transport is a little more difficult. Past decades have seen the provision of a small two-car monorail system and two light rail transit (LRT) lines but the city still relies on roads which, while numerous, can be clogged and jammed at rush hour. The crowds thronging the shopping malls in the Golden Triangle or sitting under monsoon rainproof awnings over the rows of street restaurants serving every kind of delicious food, from Malay and Chinese to Thai and Indian, will mostly get back home by car. Marcus Karakashian, project director with the newly-created Mass Rapid Transit (MRT) Corporation says a good network of mainly tolled expressways spans across the 70 kilometers of Greater Kuala Lumpur. This has developed as the city has grown, but goes hand in hand with high car ownership encouraged by the country s development of its own Proton car industry, meaning that the population has to endure long waits in traffic at rush-hours. The population has expanded significantly particularly since independence in 1957. Marcus Karakashian, Project Director MRT Demographic growth aggravates traffic problem By 2020, Kuala Lumpur should be one of the world s 20 most attractive cities to live in. Karakashian is now overseeing the building of a new public transport system to alleviate the problems. He sketches out the city s shape on a whiteboard at the fifth story offices of the MRT Corporation, set up by the government as the project client. The population has expanded significantly he explains particularly since independence in 1957. Kuala Lumpur proper covers 243 square kilometers and had an estimated 1.6 million inhabitants in 2012, while the overall urban area has about 7 million. In some years time the city could face much greater problems with traffic, Karakashian says, and it is already almost impossible to get a parking space in the center, something we found out on our way to the MRT Corp offices. It is not good for modern life if you cannot get people around he comments. In particular, it does not square with ambitions for the city to become one of the world s top urban centers and business destinations, and get on to the top twenty list of liveable cities by 2020. Heavy seasonal monsoon rains exacerbate the situation. When weather conditions are bad, things can get even more difficult says Karakashian. So when the big contractor MMC-Gamuda investigated an MRT scheme and then proposed it to government in 2010, the idea was taken up.

Herrenknecht All Around Multi-mode TBM Story Page 3 / 11 Three metro lines will later ensure smooth traffic in the city. The Blue Line from west to east is being built first. Two lines running through the city and a third circle line which will link these and the existing LRTs. Satpal Bhogal, Project Director MMC-Gamuda The overall concept: three new metro lines for Kuala Lumpur The whole concept is for three lines, two running northwest to south-east through the city and a third circle line which will link these and the existing LRTs says Satpal Bhogal, outlining the scheme at a spacious office in the contractor s project headquarters, in one of many new office and retail complexes - this one just south of the city center. Bhogal is currently project director for the central tunnel section of the project for joint venture contractor MMC-Gamuda. For the moment, he says, the government has agreed on the first line, running from Sungai-Buloh to Kajang in the south. The go-ahead was given in July 2011 and decisions on the second and third lines are pending.

Herrenknecht All Around Multi-mode TBM Story Page 4 / 11 The first line has an overall length of 51 kilometers from the north-east to the south-west. Much is on viaducts along the Klang Valley, the main area of the urban spread of the growing city, but there is a critical underground section through the central area running past the main railway station, the business district with its famous Petronas twin towers, and through the crowded Golden Triangle. Fitting the Bukit Bintang underground station into the narrow streets of shops, food and bars here, is one of the major challenges of the project. Working together on the MRT megaproject MMC-Gamuda, well established in Malaysia, has two distinct roles on the project. Firstly it was taken on by the government as a special project delivery partner (PDP) to work with the MRT Corporation to oversee the construction management of the entire line. Most of this is the elevated viaduct track with around 24 elevated stations and is being let out by the PDP in a series of packages which are currently in construction by a variety of contractors. Above: Satpal Bhogal, Project Director for the joint-venture contractor MMC-Gamuda. Below: KVMRT creates new links for Kuala Lumpur and relieves the city s strained road network. But really MMC-Gamuda was interested in the central tunnelled section says Karakashian which is 9.5 kilometer long with seven underground stations. This tunnelled section has been let to MMC-Gamuda as a single large designand-build contract, one of Malaysia s biggest and large in global terms for a single contract. It followed an open international bidding process which the government allowed them to participate in says Karakashian. They won with a MYR 8.28 bn ( 1.85 bn) bid on combined technical competence and lowest cost grounds. Mott MacDonald and Aecom are the main consultants in the JV. For this large central work package, of course, MMC-Gamuda s PDP role does not apply and MRT Corp as the project owner is overseeing the job directly. In the thick of things: new technology from Herrenknecht The tunnelled section runs through the heart of the busy city. Its twin tunnels and underground stations are the major challenge facing the entire MRT project. However, it is a section where MMC-Gamuda felt it could do well based on past experience. The geology of the city splits into three types, a hard granite rock area, softer mixed ground known as Kenny Hill formation and a limestone area. The line runs in the last two. The Kenny Hill is relatively good mixed soft tunnelling ground but the limestone on the east side is highly karstic explains Bhogal with multiple fissures, caverns, filled sinkholes and sudden voids. Sudden drops in the rockhead are common. There are few more difficult tests for a TBM and this is where Herrenknecht s new variable density TBM concept is proving its worth. The first 1,100 meters drives have just been completed and six of the newly designed machines are on site now for the project.

Herrenknecht All Around Multi-mode TBM Story Page 5 / 11 Herrenknecht is supplying customized tunnelling technology to Kuala Lumpur for MMC-Gamuda. The karstic limestone is just about the most difficult ground to get through for a tunneller. Gusztáv Klados, Project Manager MMC-Gamuda Experienced engineers for challenging geology One highly experienced tunnel engineer working on the metro is Hungarian-born Gusztáv Klados whose expansive figure and loquacious expertise is well-known in the world tunnelling community. He has worked on projects from the Channel Tunnel to the Budapest metro and many in south-east Asia and is now back in Kuala Lumpur as the project manager, the main man for the tunnel work. Outside one of the coffee shops in the shaded atrium of the office complex where MMC-Gamuda is resident, he chats about the challenges. The karstic limestone is he says just about the most difficult ground to get through for a tunneller. Having worked on Kuala Lumpur s first major project in this ground,

Herrenknecht All Around Multi-mode TBM Story Page 6 / 11 the famous SMART tunnel project completed in 2007, he should know. The highly unusual scheme, for a unique combined monsoon floodwater relief tunnel which doubles as a road bypass in dry conditions, was successfully completed by MMC-Gamuda using two huge 13.8 meter diameter Herrenknecht Mixshield TBMs. But it was not without its troubles, including a few sinkholes and some damage to buildings. The problem is that not only is the rock riddled with cavities, which can be empty voids, or filled with soft running ground and water, but many of them are joined together. They can run for more than a kilometre producing the cave systems loved by potholers he declares. In Kuala Lumpur, the old lead mine workings have also left many areas backfilled with old mine waste which is unconsolidated. This means that tunnel excavation alone cannot suddenly be letting in pressurised water, or soft infill material, but rather that settlement resulting from such inrush can run to the surface far from the tunnel line. Unlike normal bentonite, the denser slurry would not flow easily into a void. Gusztáv Klados, Project Manager MMC-Gamuda An idea: denser slurry for difficult mixed soils Above: The cutting wheel of the Variable Density TBM is fitted with disc cutters and cutting knives for the excavation of the different soils. Below: Gusztáv Klados, Project Manager at MMC-Gamuda and therefore the most important man when it comes to tunnelling. Using the Mixshield TBMs for SMART illustrated the challenges, because, although the slurry provides good face support, when voids suddenly occurred the bentonite mixture could flow into them uncontrolled. But tackling these challenges also gave the contractor new ideas about how to deal with such ground. What they did was first carry out extensive ground investigation along the route line, to locate voids and fissures as much as possible and grout them tight. Some have swallowed 60 cubic meters of grout says Klados. But you can easily miss them. So the team also came up with the idea to use a denser type of slurry which would balance both groundwater and earth pressure in the TBM face. Back in his office Klados draws a quick diagram to show the pressure gradient for thick and thin slurry; extrapolating the line for normal bentonite sees it cut the surface whereas the less steep graph line for a denser material does not. That means it does not come to surface he says Unlike normal bentonite mix, it would also not flow easily into a void.

Herrenknecht All Around Multi-mode TBM Story Page 7 / 11 A crane was used to lower all components more than 30 meters down into the launch shaft. Innovation: Herrenknecht develops the Variable Density technology MMC-Gamuda asked Herrenknecht to explore such a concept. The task for the company was twofold: firstly to find a way to make a thicker and more dense slurry without inordinate expense and secondly to devise ways to handle it on a TBM. The outcome after much design work and research in conjunction with universities such as Bochum was to use slurry thickened with limestone dust. To handle this thick, dense slurry meant design changes. For example, the dense slurry requires a concrete pump rather than a normal one. It will not flow easily out of the cutting face chamber to carry the spoil back to the surface. That meant incorporating features from both an EPB machine and a slurry shield TBM. A normal slurry circuit provides the basic face support using a compressed air bubble the same way as in a Mixshield. An additional pipeline is needed to bring the much more dense slurry added to thicken the face support. Variable amounts can be added according to ground conditions. But the thicker paste this creates at the face will not exit the cutterhead in the usual way by pipe outlet. Therefore a screw conveyor is used in the same way it is used in an EPB machine. This does not discharge onto a

Herrenknecht All Around Multi-mode TBM Story Page 8 / 11 conveyor belt for muck removal, but drops the thick material into a special slurryfier unit. This first has a crusher box to reduce larger chunks of face rock, and then a mixing unit where thin, or normal, slurry is mixed into the paste. With this diluted spoil, the machine can again behave as a slurry TBM. The slurry and its spoil are pumped to the surface through pipes where the spoil is extracted as usual in a separation plant. Machine conversion from slurry to belt conveyance directly in the tunnel Above: The dense slurry developed especially for the Variable Density TBM is stored in separate bentonite tanks. Below: Tunnelling is monitored and recorded during the entire process. An additional advantage of this system is that by changing from slurry to belt conveyance the TBM can quickly be converted to a full EPB directly in the tunnel. The back-up system is provided with a belt conveyor along the length for just this purpose and a small extension conveyor at the front, which is retracted until the conversion is made. For the Kuala Lumpur project, MMC-Gamuda currently has five of these machines in operation and one more in reserve. It is also using two conventional EPBs from Herrenknecht and two other EPB machines, the last four for drives in the Kenny Hill formation. Each is 6.62 meters in diameter to form the single running tunnels of the new line. Hydraulic pipelines and a belt conveyor are installed on the back-up. This allows a change of operating mode without major modifications to the back-up.

Herrenknecht All Around Multi-mode TBM Story Page 9 / 11 Two TBMs headed north and two headed south they have worked well. Gusztáv Klados, Project Manager MMC-Gamuda Full TBM power in north and south Sections of the single-lane tunnels with a diameter of 6.62 m are already complete. Most of the Variable Density TBMs have now set out, four of them in the Cochrane station box in the southern section of the tunnel route. As with several other stations in the limestone area, an excavation more than 30 meters deep was formed, supported by secant piling in the upper area. This was driven through the overburden, then drilling and blasting was done into the limestone below. The station is the main base for the contractor which has a large, well-appointed work camp nearby and offices, as well as a big separation plant for servicing the four machines. A rank of large silos hold the special limestone-enriched bentonite slurry. Two TBMs headed north, the first starting in May 2013, and two headed south in September 2013 explains Klados. They have worked well he says. Two of the TBMs will reach the boundary between the limestone and the Kenny Hill formation on their drives. They will be converted to EPB mode with dry mucking for the remaining drive says local Herrenknecht manager Lorenz Nummsen. The work will take only a few days, as the Variable Density Machines are designed for quick conversion. First breakthrough with a Variable Density TBM in January 2014 The first of the machines is already heading north. Meanwhile a second TBM driving from the Cochrane station completed its drive in early January without any serious mishaps, breaking through at a well-publicized event on January 9. Both have made good rates says Klados, averaging around 7 to 8 rings a day and reaching 11 on good days. Rings are 1.4 meter long so this is about 12 meters a day. We use a seven segment universal ring with a half segment key he says and for the first time in Malaysia, steel fibre reinforcement. Herrenknecht Formwork precision moulds have been used for the segments which are manufactured by suppliers outside Kuala Lumpur.

Herrenknecht All Around Multi-mode TBM Story Page 10 / 11 January 9, 2014: The world s first breakthrough with a Variable Density TBM in the Malaysian capital. They are delivered to the machines by crane at the Cochrane station excavation and then along the tunnels using rubber tired segment carriers from Techni-Métal Systèmes of France. That too is part of the Herrenknecht delivery, since the firm was acquired by Herrenknecht two years ago. I am a practical engineer not a salesman. But this is the future technology. Lorenz Nummsen, Senior Technical Manager Herrenknecht Services Malaysia

Herrenknecht All Around Multi-mode TBM Story Page 11 / 11 Good opportunities to build more metro lines The contract team is pleased with the performance of the machines, which have proved able so far to control the potential problems that karstic cavities can bring. They are keeping their fingers crossed that the success so far will continue and that the equipment and the experience in using it will stand them in good stead for the next sections of the metro, assuming that the Malaysian government chooses to go ahead. For Herrenknecht s local representative Lorenz Nummsen, the progress so far vindicates the new design of machine, particularly for use in karstic ground which occurs in many countries. Listen, I am a practical engineer not a salesman. But this is the future technology he says and not just for limestone. It is suitable for many types of mixed ground. On average around 7 to 8 segment rings a day are installed ensuring a smooth tunnelling operation. There is a chance that the machines will get further use in KL however, if the next two lines go ahead. MMC-Gamuda will bid if it comes to pass, and believes it has a good chance with its skills and the still almost new TBMs, being stored long term when they finish their work. Going on right now: TBMs in operation Meanwhile the five installed Variable Density TBMs have driven more than 5,000 m in difficult geology. In the initial sections all of them were used exclusively in slurry mode with thin or dense slurry. Two of the machines are being converted to EPB mode with dry mucking for the boundary between the limestone and the Kenny Hill formation. Adrian Greeman, journalist and photographer, has been covering the most interesting major construction projects for more than 30 years. In early 2014, he traveled for Herrenknecht to Kuala Lumpur and was on site to attend the worldwide first breakthrough by a Variable Density TBM. Machine data 6 Variable Density TBM, S-774 S-779 2 EPB Shield, S-796, S-797 Diameter: 6,620 mm Cutterhead power: 1,280 kw Project data Tunnel lengths: 11,400 m (total) Geology: Kenny Hill Formation, Kuala Lumpur karstic limestone Contractor: MMC-Gamuda KVMRT (T) Sdn Bhd Herrenknecht AG 77963 Schwanau Germany Phone +49 7824 302-0 Fax +49 7824 3403 pr@herrenknecht.com www.herrenknecht.com