Failing Coastal Wood Infrastructure on the Great Lakes

Similar documents
Evaluating the Condition of Seawalls/Bulkheads

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.

HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan

MEMORANDUM West Swann Avenue, Suite 225 Tampa, Florida Phone (813) Fax (813)

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.

Safe & Sound Bridge Terminology

WATERFRONT FACILITIES MAINTENANCE MANAGEMENT SYSTEM INSPECTION GUIDELINES MANUAL OCTOBER 1999

Building Condition Assessment: North Howard Street Baltimore, Maryland

Inspection and Rehabilitation

Structural Failures Cost Lives and Time

Rehabilitation of Locks on the Kentucky River

COASTAL DAMAGE INSPECTION SOUTHWEST VITI LEVU, FIJI AFTER CYCLONE SINA

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Repair and Strengthening of Bridge Substructures

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Building Condition Assessment: West Lexington Street Baltimore, Maryland

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

Construction. Pile Restoration Timber/Concrete Pile Repair

CP40: FRP/Concrete Piles

FX-70 Structural Repair and Protection System

7 Crucial Questions to Ask Before Repairing Your Home s Foundation

Piers, Wharves & Docks

Page & Turnbull imagining change in historic environments through design, research, and technology

Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Steve Brinkman Alain Pinel Realtors 167 S San Antonio Road Los Altos, CA RE: Foundation Inspection for 162 Del Monte Ave. Los Altos, CA 94022

Lighthouse Engineering, L.L.C.

Managing Our Water Retention Systems

IH-635 MANAGED LANES PROJECT, SEG. 3.2

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

Storm Protection. Storm Protection

Underwater Bridge Repair, Rehabilitation, and Countermeasures

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

REHABILITATION PACKAGE 1-a

Repair or Replacement - Band-Aids vs. Surgery

Increase Life Cycle and Decrease Cost for Navigation Buoys

SECTION 3 ONM & J STRUCTURAL ANALYSIS

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners

BUTE Department of Construction Management and Technology

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway

Offshore Structures. Offshore Drilling Equipment

Exterior Elevated Elements Inspection Guidelines

BRIDGES ARE relatively expensive but often are

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

PROFESSIONAL ENGINEERING INSPECTIONS, INC.

How To Repair A Steel Pier With A Watertight Frame

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

MEMORANDUM. General: Foundation:

Breakaway Walls

CITY OF TRAIL MEMORANDUM

King Post Wall Information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

How To Repair A House

AP ENVIRONMENTAL SCIENCE 2015 SCORING GUIDELINES

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage

GLOSSARY OF TERMINOLOGY

Wastewater Capital Projects Management Standard Construction Specification

The minimum reinforcement for the stem wall is the placement of:

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Module 3: Sewer Material Lecture 3: Sewer Material

INSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, Perfonned By: Drew Schneider

Oil and Gas Pipeline Design, Maintenance and Repair

Mezalick Design Studio, LLC Stained Glass ~ Mosaics ~ Promotions

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

Basement & Foundation Damage

Vehicle Tracking Pad

DOCKS, BULKHEADS AND WHARFS PAPER. Written by the AIMU Technical Services Committee

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions

Illinois Coastal Management Program 2011

Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction

Building Foundation and Structure

OTTAWA CIVIC CENTRE & NORTH SIDE STANDS LANSDOWNE PARK FRANK CLAIR STADIUM STRUCTURAL ADEQUACY REPORT 2007

PETERSONS WATERFRONT CONDOMINIUMS

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Emergency Spillways (Sediment basins)

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

Building Restoration

2015 ODOT Bridge Design Conference May 12, DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

Measuring the Condition of Prestressed Concrete Cylinder Pipe

Specifications for Residential Property Owners Connection to New Public Sewer

Greater New Orleans Hurricane & Storm Damage Risk Reduction System

Lighthouse Engineering, L.L.C.

Sewer Rehabilitation Design Requirements

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Section 2100-Trenching and Tunneling

EAST LYME HIGH SCHOOL

Transcription:

University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many Great Lakes coastal communities, ports and harbors are protected from damaging storms, waves and ice by offshore and coastal structures. This critical waterfront infrastructure protects channel entrances used for both commercial and recreational navigation, interior harbor slips, public and private waterfront facilities (power generators, water intake and supply facilities and other commercial structures) as well as many marinas, beaches and private property shorelines. Many larger harbor entrance structures were initially constructed and maintained by the U.S. Army Corps of Engineers. The majority of these structures were constructed 100 years ago or earlier, some as long ago as 1860. Since they were first constructed, Great Lakes harbors have become less important for commercial shipping, but they have become extremely important for recreation. However, due to a lack of federal funding, maintenance of these structures has lagged and many are now in poor condition. Many of these failing structures are made partially or totally from wood. Failure of these structures would be catastrophic for the valuable Great Lakes coastal communities they protect. A 2010 study of U.S. and Canadian Great Lakes ports found that they support 227,000 jobs, contribute $14.1 billion in annual personal income, $33.5 billion in business revenue and $6.4 billion in local purchases. Common Wood Structure/ Component Types Many of the early harbor entrance breakwaters were constructed with an underwater timber crib base filled with rock. On top of the structure a cap of either stone or concrete was added as a superstructure above the water surface. Figure 1 shows a typical breakwater built with a timber crib foundation and a concrete cap on top. Figure 2 shows a schematic of a typical U.S. Army Corps of Engineers breakwater section. Other designs incorporate timber pilings with a concrete cap. Timber is also attached to slip walls in a horizontal fashion to protect against vessel wear and to absorb vessel impacts. Timber walls are also common. This design often incorporates vertical steel H-piles with wood timbers placed horizontally between the vertical steel piles. Figure 3 shows a typical timber wall design (often called a soldier pile wall). seagrant.wisc.edu

Figure 1: A typical U.S. Army Corps of Engineers breakwater section Figure 3: Timber soldier pile wall (Gene Clark/UW Sea Grant Institute). Wood Structure Failure Mechanisms Figure 2: Section drawing of a U.S. Army Corps of Engineers breakwater (U.S. Army Corps of Engineers). 2 When Great Lakes timber structures remain underwater, the timber can last indefinitely. However, when exposed to air, the timber will begin to rot. Although wood borers can cause damage in marine environments, there are no freshwater wood borers. Failing timber cribs have been observed at many older ports and harbors as the timber core sections begin to decay and slump, bringing the superstructure down with it. Several Great Lakes locations have experienced complete failure of the structures due to deteriorating timbers. This problem has increased in the recent decades due to lower-than-average water levels in the Great Lakes over the last several years. Timber pilings will also rot when exposed to constant cycles of wet and dry. Figure 4 shows a timber crib wall with significant rot, and Figure 5 shows timber pilings rotting near the water surface. Once the timber begins to rot, the stone filling the crib- or pile-supported structure can spill out and disperse into the lake alongside the structure. Figure 6 shows an example of the loss of interior stone from an underwater timber crib. Poorly designed timber crib foundations have also caused structure failure. Wave action at the base of these structures scours the foundation material away, causing the timber crib to settle. This scour can also be due to low water conditions with additional ship thruster action contributing to structural deterioration. Figure 7 shows a timber crib section that has failed due to a poor foundation.

Figure 4: Timber structure rot (Gene Clark/UW Sea Grant Institute). Figure 6: Timber crib with interior rock loss (Bill Brose SmithGroupJJR). Figure 5: Timber piling rotting at the water surface (Larry Ryan Baird). Figure 7: Timber crib settlement failure Timber wear or abrasion due to ice or ship damage are other common conditions that can lead to timber failure. While this type of failure does not often compromise the structure behind the timber, it can cause significant damage to the vessel attempting to moor alongside the vertical face of the structure. Figure 8 shows abrasion damage to a timber abrasion protection section. Another reason more timber crib structures have failed recently is that the steel pins used to connect them have been corroding. (For more information, refer to the Wisconsin Sea Grant fact sheet Accelerated Freshwater Harbor Corrosion, which is available in the Aquatic Sciences online publication store at http://aqua.wisc.edu/publications/pdfs/freshwaterharborcorrosion.pdf.) Once these steel pins corrode, the timber cribs start to come apart and fail similarly to those with rot issues. Figure 9 shows a corroded steel pin. Note that steel remains where the pin would be in the timber, but it is corroded where the pin would exit the crib and cross the open stone-filled interior of the crib. 3

Figure 8: Timber ice abrasion damage Figure 9: Corroded timber crib connection steel pin Repair Methods Repair methods for failing timber structures depend upon the type of structure and whether the damage is located near the existing waterline or if it continues down to the base of the structure. The method of repair would also vary depending upon the degree of timber degradation. When the timber deterioration is near the water surface, the failed timber can be removed and a new structure attached to the remaining crib top near the water level. This structure could be a new timber crib or steel H-beams attached to the existing crib, with either new timber beams or precast concrete panels placed between the vertical beams (soldier pile walls). See Figure 10 for an example of a new concrete wall constructed on top of a failed timber crib. 4 Figure 10: New wall constructed on top of failed timber crib (Chad Scott AMI Consulting Engineers).

Figure 11: A failed timber reinforcement section (Larry Ryan Baird). on the type of structure. Options include a complete new facing that consists of a steel H-piling driven in front of the failing crib or wood wall from the lake bottom to above the existing surface with timber beams or precast concrete panels. The front facing could also be constructed of steel sheet pile with a fill of stone between the old and new structure. Figure 12 shows a new steel and concrete wall built in front of a failing timber structure. Wood pilings that have not rotted too severely could be encapsulated with jackets for example, using steel pipe halves bolted together around the damaged sections, fiberglass shells filled with either a concrete or epoxy grout, or high-density polyethylene wraps. See Figures 13, 14 and 15 for examples of jackets used on steel H- and pipe-piles. They are representative of timber piling protection as well. Conclusions Figure 12: A new wall in front of a failed timber structure (Chad Scott AMI Consulting Engineers). If the timber has only slightly deteriorated, the existing timber can be reinforced with new timber members if easy access is possible and there is no danger to the remaining section. Figure 11 shows vertical reinforcing added to an existing timber crib. For crib or timber wall structures that have suffered timber damage so severe that complete replacement of the failed structure is required, potential solutions depend Any Great Lakes timber structure repair method requires the services of a professional engineer with significant experience in Great Lakes structure inspection and design. Often the services of a professional diver are required for adequate structure inspection. Currently, the American Society of Civil Engineers is completing a new Waterfront Facility Inspection Manual as well as a new Timber Waterfront Manual. Both will provide useful information for the inspection, planning and design of deteriorating Great Lake timber structure repair or replacement. 5

Figure 13: Steel jacket option shown on steel pile Figure 15: High-density polyethylene jacket option shown on steel pile (Gene Clark/UW Sea Grant Institute For Additional Information ASCE Underwater Investigations Standard Practice Manual No. 101, 2001. The Repair, Maintenance and Rehabilitation (REMR) Notebook, U.S. Army Corps of Engineers, 1991. Best-Practice Inspection Guidelines for Great Lakes Port, Harbor and Marina Structures, University of Wisconsin Sea Grant Fact Sheet, 2012. Figure 14: Fiberglass jacket option shown on steel H-pile Sea Grant University of Wisconsin June 2013 WISCU-G-13-003