CRYOGENIC ABOVE GROUND STORAGE TANKS: FULL CONTAINMENT AND MEMBRANE COMPARISON OF TECHNOLOGIES

Similar documents
GST, A NEW GENERATION OF LNG MEMBRANE-TYPE LAND STORAGE TANK

Tentative Interim Amendment NFPA 59A. Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition

Key Technologies of Mitsubishi LNG Carriers - Present and Future -

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

TYPES OF GAS CARRIERS

Andrii Oliinyk**, Mariusz aciak* SAFETY TECHNICAL PROBLEMS ASSOCIATED WITH THE STORAGE OF LIQUEFIED NATURAL GAS (LNG)

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

Comparison of Spherical and Membrane Large LNG. Carriers in Terms of Cargo Handling

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Natural Gas and LNG Fundamentals

RPV - RP - RA air handling units

Company DUOL. Dušan Olaj CEO

Tank Lifting. A.P.I. 650 and 653 only give general guide lines to the type of foundation. Number of different types, evaluated on the basis for:

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

Single Point Mooring System (SPM) for an Offshore LNG Terminal

Cannon T4 Modular Data Centres. For Outside Deployment & Challenging Environments

Chapter 3 Pre-Installation, Foundations and Piers

solarplus solar systems general features

Since HMT Inc. 24 Waterway Avenue, Suite 400 The Woodlands, Texas Ph: Fax:

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

Growing in challenging markets

Avoiding the Landfill: The Recycling of Vinyl Roof Membranes

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL


EAST LYME HIGH SCHOOL

LNG Monitoring. Fiber-Optic Leakage Detection System. Pipeline leakage detection. Regasification and liquefaction monitoring

Module 1 : Conduction. Lecture 5 : 1D conduction example problems. 2D conduction

METHOD OF STATEMENT FOR STATIC LOADING TEST

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Annex of the certificate (Page 1/6) Accreditation Scope

Unbeatable energy efficient glass curtain wall system

James M. Pleasants Company

Wärtsilä Ship Power Piero Zoglia. Gas Storage and supply systems /Piero Zoglia

FLEXWELL Safety Pipe. Pipe systems for installations Technical details

Corrugated Tubular Heat Exchangers

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

Steam System Best Practices Condensate System Piping

Roof Curbs, Extensions and Equipment Supports

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

Energy Company Obligation (ECO): Technical Monitoring Questions

LEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES API 598/API 6D/MSS SP-61/FCI 70-2

Nonrenewable Natural Gas. Natural Gas Basics. How Was Natural Gas Formed?

About Smith Tank. Gonzales, LA. 26-Acre facility with rail spur capabilities. 10,000-sq-ft appurtenance fabrication shop

CHAPTER 7: Building Systems ROOFING SYSTEMS

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

Excerpts from the Canadian National Building Code (NBC)

LNG Fuel Tank System LNG Tank overview

Marine & Offshore Insulation. - products and constructions November 2009

TOSCA. How companies work to realize sustainability goals

AMSC s Superconductor Cable Technologies for Electric Utilities

Safe & Sound Bridge Terminology

HOW METAL BUILDING INSURANCE COSTS COMPARE TO OTHER BUILDING TYPES

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

CHAPTER 2 QUANTITY TAKE-OFF

IH-635 MANAGED LANES PROJECT, SEG. 3.2

SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps

Packaged Terminal Air Conditioner Wall Sleeve Installation

Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5

The following definitions apply with regard to requirements specified in this document:

Detailing of Reinforcment in Concrete Structures

TABLE OF CONTENT

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

September September Consulting Structural and Civil Engineers. 100 St John Street London EC1M 4EH. akt-uk.com

The following definitions apply with regard to requirements specified in this document:

1.2 Advantages and Types of Prestressing

Confort 160. Sliding Systems. Sapa Building System

Rooflight INSTALLATION INSTRUCTIONS

District Cooling Best Practices Piping Systems

ArcticStore. product guide environmentally friendly storage solutions

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Introduction to Pressure Pipe Rehabilitation with CIPP

HIGH STANDARD VALVES FOR NON-STANDARD CONDITIONS.

A Guide to Structural Waterproofing

9.3 Two-way Slabs (Part I)

SECTION GROUND WATER STORAGE TANKS

New River Valley Commerce Park Virtual Shell Building

OHV / OHVL Type OH3 Vertical Inline Pumps ISO (API 610)

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same!

The following are just a few of the advantages that Techno-Solis offers you as a solar contractor: Contact Us!

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Technical Services & Capabilities

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES

Prestressed Storage Tanks

Structural Failures Cost Lives and Time

TruLaser Tube: Optimal tube. and. profile cutting. Machine Tools / Power Tools Laser Technology / Electronics Medical Technology

UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0

Transcription:

CRYOGENIC ABOVE GROUND STORAGE TANKS: FULL CONTAINMENT AND MEMBRANE COMPARISON OF TECHNOLOGIES Jérôme Thierçault Caroline Egels Technical Division BOUYGUES Travaux Publics 1 Avenue Eugène Freyssinet 78061 Saint-Quentin-en-Yvelines - France ABSTRACT Over the last couple of years the LNG industry has shown a continuous trend for: Being more cost effective Improving land area utilization Being able to provide larger and larger tanks to accommodate the progressive increase in the gross capacity of ocean going methane carriers Reducing construction schedules Reducing carbon footprint. The aim and purpose of the proposed paper is to compare the different technologies of above ground storage tanks with regards to: Safety and integrity of the tank (including seismic event) Construction cost and schedule Carbon footprint. Note: This comparison will reflect latest development in storage tank technologies. Special attention will be paid to the comparison of carbon footprints from a life cycle perspective, knowing that it appears that membrane tanks provide a significant reduction compared with conventional self standing technologies. 1.0 BACKGROUND Bouygues is in perfect position to compare available technologies of cryogenic storage tanks, thanks to: Its leading position among civil EPC Contractors, Its large experience of both membrane and full containment technologies, Its involvement in normative working groups dealing with cryogenic storage tanks, Its constant commitment to reduce the impact of construction on the environment. 2.0 INTRODUCTION This paper dealing with cryogenic above ground storage tank is aimed at providing technologies comparison, with special focus on carbon footprint. In the first part of this note: The most commonly specified tank technologies will be introduced, Their basic design concept will be presented. 1

A second part will provide high level comparison of their performances and discuss their design limitations. Finally, carbon footprints and how it compares between both technologies will be discussed. 3.0 MOST COMMONLY SPECIFIED TANK TECHNOLOGIES FOR LNG CONTAINMENT 3.1 Full Containment Tank For this containment technology: The primary container is a thick 9% Nickel welded steel tank. The secondary container is a pre-stressed concrete tank equipped with a thermal corner protection. The space between primary and secondary container is filled with thermal insulation. The primary and secondary containers each possess separate hydrostatic stability and are thus referred to as self-standing. Keys: 1. Primary container (9% Ni steel) 5. Insulated suspended deck (aluminum & fibreglass) 2. Bottom insulation (load bearing rigid cellular glass) 6. Hemispherical dome roof (reinforced concrete) 3. Slab (reinforced concrete) 7. Sidewalls (pre-stressed concrete) 4. Slab heating system 8. Wall insulation (loose fill perlite / 1m thick) Notes: - The inner face of items 3, 6 & 7 (red bolded line) is covered by a carbon steel liner aimed at ensuring gas tightness. - The thermal corner protection extending 5m above the bottom slab protects the wall-to-base joint. - The annular space 8 is connected to the vapour space on the tank and is thus filled with methane gas. 3.2 Membrane Tank For this containment technology: Figure 1: Full Containment Design Concept The primary container is a thin stainless steel corrugated membrane. The secondary container is a pre-stressed concrete tank equipped with a thermal corner protection. The space between primary and secondary container is filled with thermal insulation. This concept is based on the separation of structural and tightness functions. The primary container ensures liquid and gas tightness, The secondary container provides the hydrostatic stability, The load bearing insulation system transfers hydrostatic loads to the secondary container and limits the heat entrances to meet the specified boil-off rate criteria. 2

Keys: 1. SS corrugated membrane (1.2mm thick) 5. Slab heating system 2. Sidewalls (pre-stressed concrete) 6. Insulated suspended deck (aluminum & fibreglass) 3. Bottom insulation (load bearing PU / 40cm thick) 7. Hemispherical dome roof (reinforced concrete) 4. Slab (reinforced concrete) 8. Wall insulation (load bearing PU / 40cm thick) Notes: - The inner face of item 7 (red bolded line) is covered by a carbon steel liner aimed together with the primary container (item 1) at ensuring gas tightness. - The thermal corner protection extending 5m above the bottom slab protects the wall-to-base joint. - The insulation space between the membrane and the concrete vessel is isolated from the vapour space of the tank. A nitrogen breathing system operates on the space to monitor the methane concentration and keep the pressure within normal operating bounds. The nitrogen system can be used to purge the insulation space in the unlikely event of a leak. 3.3 Others Figure 2: Membrane Tank Design Concept Other tank technologies exist, but none of them compares to the above. Most well-know technologies are: Single and double containment tanks (because of their reduced safety in operation such tanks are limited to remote located areas, where very limited population or facilities are present and/or where modest storage capacity is to be provided), Double concrete tanks (felt difficult to implement because of the lack of references and codes recognizing this technology). 4.0 PERFORMANCE COMPARISON 4.1 Intrinsic Key Performances Figure 3 below provides a multi-parameters summary of how both technologies compare in term of intrinsic performances: 3

Efficiency in severe seismic context Full Containment GST Membrane Robustness / Reliability 5 4 3 2 Safety in operation 1 0 Compliance with legislative context Thermal efficiency (BOR) Figure 3: Comparison of tank intrinsic key performances Both technologies are considered proven, safe and reliable, with few differentiating strengths and weaknesses. 4.2 Implementation Performances Figure 4 below provides a multi-parameters summary of how both technologies compare from an implementation constraints standpoint: Figure 4: Comparison of tank implementation performances Membrane tank exhibits a number of implementation advantages as against full containment. As a matter of fact, where large tanks are required, membrane can be considered 15% less expensive and 3 months shorter to implement, for the same storage capacity. However, particular attention needs to be paid to the specifics of the project under consideration that may dictate the storage tank technology. Key parameters of influence are: Local circumstances, local codes and/or corporate practices, Lack and/or cost of skilled mechanical workforce, Tank size, Earthquake magnitude. 4.3 Design limitations In both cases, the most stringent limiting factor is the size of the hemispherical dome roof. Numerous studies have led to the conclusion that both tanks exhibit similar boundary limit in that regards, namely: In benign and mild earthquake areas, an internal diameter of 110m has been found as the limiting factor. This large tank span could be accommodated by the current concrete section thickness, but more limiting is the extent of peripheral demand to constrain the dome outward thrust. In this case 4

has been found to require substantial/impractical post-tensioning patterns (i.e. 11 no. 37-strand tendons provided at 500mm distance). In severe earthquake area it has been found practical to set the radius of curvature to 0.8d (in lieu of the typically adopted d) and that inner tank behaviour need be looked at with due care. 5.0 CARBON FOOTPRINTS COMPARISON 5.1 Case Study The carbon footprints displayed in this paper have been established on the following case study: One (1) tank of 190,000 m 3 storage capacity to be built in Gladstone (Australia). Battery limit lies in nozzle flange on dome top. Externals are thus excluded (can be neglected because there is no difference in these components, between full containment and membrane tank). Tank is assumed to rest on shallow foundation (in case of deep foundation, the corresponding carbon footprint is expected to be slightly larger for full containment as against membrane tank). 5.2 System Boundaries The system boundaries include the complete life time cycle from raw material extraction to LNG tank dismantling (cradle-to-grave): Figure 5: Tank Life Cycle However, for the sake of simplification, the contribution of operation, maintenance and dismantling have been neglected. The rationale for this approximation lies in the following reasons: The aim and purpose is to compare the relative environmental impact between tank technologies, Operation carbon footprint is expected to be similar for both technologies. As a matter of fact insulation thickness is selected such that both technologies have same boil-off gas rate (0.05% volume per day) and electrical demand (slab heating system), Maintenance carbon footprint is negligible. Storage tanks ( static equivalent) are known to be virtually maintenance free, Dismantling carbon footprint is expected to be larger for full containment as against membrane tank. 5.3 Calculation Principles The carbon footprint CF of a LNG tank can be calculated as follows: CF = CF manufacturing + CF transportation + CF construction + CF O&M / Dismantling Where: CF manufacturing = Σi Wi x Fi Wi is the weight of the material i Fi is the per unit Global Warning Potential in ton CO2-eq for the production of 1 ton of material i 5

CF transportation = (Σi Droadi x Wroadi x Froadi) + (Σi Dseai x Wseai x Fseai) Di is the distances travelled by the material i, by road and/or sea Wi is the weight of material i, transported by road and/or sea Fi is the per unit Global Warning Potential in ton CO2-eq of 1 ton.km for each type of transportation CF construction = (Σi Ei x Fi) + (Σi Di x Fi) + (Σi Ii x Fi) Ei is the consumption of energy i to perform construction and site staff transport Di is the average distance to be travelled by of personnel to access to site (by road and air) Ii is for equipment i its weight multiplied by mobilization duration Fi is the per unit unit Global Warning Potential in ton CO2-eq corresponding to Ei, Di and Ii. CF O&M / Dismantling = neglected as explained in paragraph 5.2 5.4 Key parameters of influence LNG Tanks material take off The following table summarizes the quantities of material involved for both technologies under consideration. Table 1: 190,000 m 3 Tanks Material Take Off (*): In a full containment the quantity to be laid on the suspended is about half that of a membrane tank, but this difference in quantity is fully compensated by the existence of the resilient blanket which is fastened to the inner tank shell. As a matter of fact membrane tank uses far less metals, for similar quantities of rebars and insulation. For the case study under consideration, the difference amounts to -35%. Per unit global warning potential of each component The following per unit global warning potential of each component have been obtained from suppliers published data, with the exception of concrete which has been computed with SNBPE BETie analytical tool to reflect the specifics of cryogenic tank concrete mix. Orders of magnitudes have been cross checked with published data base by Bouygues in-house team of specialists. 6

Table 2: Per unit global warning potential of each component Per unit global warning potential of transport and construction The following per unit global warning potential have been calculated from ADEME database (French environment and energy management public agency, aiming at protecting the environment and managing energy). Table 3: Per unit global warning potential of transportation and construction activities 5.5 Results (*): Material such as insulation are too light to take up the maximum authorized payload of truck and container, thus implying greater unit GWP Figure 6 below displays the computed aggregated carbon footprints: 30 000 25 000 Carbon Footprint in tons CO2-eq 20 000 15 000 10 000 Construct Transport 5 000 Manufacture 0 Full Containment Membrane Figure 6: Aggregated Carbon Footprints, with split per contributors 7

Membrane tank allows a significant reduction of the impact on the environment as against Full Containment tank. This mainly results from the fact that membrane tank uses far less metal and insulation, for similar quantities of concrete as evidenced on figure 7. 10 000 Carbon Footprint in tons CO2-eq 8 000 6 000 4 000 2 000 Concrete Metal Insulation 0 Full Containment Membrane 6.0 CONCLUSION Figure 7: Manufacturing Carbon Footprints split per components nature The present paper has established that the performances of both technologies are mostly identical. Main difference lies in implementation constraints: Membrane tank is generally less expensive and shorter to implement, for the same tank storage capacity, Membrane tank allows a significant reduction of the impact on the environment (-24% global warning potential for the case study addressed in this paper. Expected to be greater in case of a construction in Europe). 8