Single Point Mooring System (SPM) for an Offshore LNG Terminal

Size: px
Start display at page:

Download "Single Point Mooring System (SPM) for an Offshore LNG Terminal"

Transcription

1 Single Point Mooring System (SPM) for an Offshore LNG Terminal GASTECH 2005, Session 7 - Technical Bilbao, March 15 th, 2005 Max Krekel Senior Naval Architect Bluewater Offshore Production Systems Neal Prescott Director Subsea Deepwater Technology Fluor Corporation

2 SPM System for Offshore Transfer of LNG Subsea Cryogenic Pipelines DOE/NETL research study to Bishop Process Offshore LNG Receiving Terminals Content

3 Introduction Production & Terminals for LNG moving offshore Need for offshore LNG transfer systems High system availability Weathervaning system Robust cryogenic flow path Suitable for open terminals, i.e. Vessels of opportunity, transfer at existing man. as well as dedicated terminals Dedicated vessels with bow loading facilities

4 LNG Transfer Systems MANIPULATOR HOSES QUICK (DIS)-CONNECTOR In-plane Motion Envelope of Hose Manipulator MANIPULATOR HARD PIPING

5 Cryogenic hoses vs. loading arms Large diameter cryogenic hoses promissing: Most robust option with min. mechanical components Number of designs technically ready (e.g. Technip, BPP- Dantech, Amnitec..) However.. Perceived as technology risk by some operators Preference for hard pipe loading arms Dynamic swivels seen as marginal technology increase Manipulator works with both options

6 FLNG or FSRU with Big Sweep

7 LNG Terminal in Shallow Water

8 LNG Terminal in Shallow Water

9 Open Terminal - Berthing No. 2 : Approach & Transfer No. 1 : Approach of Mooring Line messenger No. 3 : Mooring line messenger connected No. 4 : Mooring line connected & LNG tanker in position No. 5 : BIG SWEEP dynamically positioned alongside No. 6 : Hoses connected & LNG transfer

10 Dedicated Terminal - Berthing

11 Subsea Cryogenic Pipelines

12 Subsea Cryogenic Pipeline Key to Offshore LNG terminals are Sub Sea Cryogenic pipelines: Technology based on Bundles and Pipe In Pipe (PIP) systems used in the GoM and North Sea for hot flows Main design challenge is to acc. thermal contraction: Use of low expansion materials (e.g. Invar) Application of bellows (typ. every 50 ft) Both have major drawbacks for cost & reliability Recently new concepts developed

13 Subsea LNG Transfer System Delta Cost Savings of approximately 20% - 25% over competing systems Advantages Does not use exotic metals (Invar) for product line Uses standard 9% Ni Steel for product line Does not use vacuum in annular space Ease of Fabrication and Welding Extremely effective insulation - Aspen Aerogels, Inc. Conventional Bundle Fabrication and Installation

14 Insulated Cryogenic Pipeline Configuration Nanoporous insulation inside annular space. Flexible Aerogel (Aspen Aerogels, Inc. Can Install Below Ground in a trench Can install above ground on sleepers with gimbaled supports Internal cryogenic product pipe for LNG / vapor / LPG service. ASTM 333 Grade 8, 9% Nickel Steel Concrete weight coating if required External casing pipe Carbon Steel with FBE corrosion coating. Note: Inner and outer pipe connected with non-metallic or metallic bulkheads.

15 Cryogenic Subsea Pipeline Metallic Bulkhead Details Cut-Away view of metallic bulkhead at field joint 1 x external split sleeve 3 x prefab transitions Pipe-in in-pipe joint Pipe-in in-pipe joint Prefab transition Split sleeve Prefab transition External insulation at joint, if required

16 Cryogenic Subsea Pipeline Non-metallic Bulkhead Details Non-metallic bulkhead used to transfer thermal contraction and growth loads from inner pipe to outer pipe. Material is installed in annular space to transfer loads by friction and / or shear. A water-stop is incorporated in the design. Pipe-in in-pipe joint Pipe-in in-pipe joint External insulation at joint, if required

17 DoE/NETL cooperative Research Study to Bishop Process

18 Tank Based Terminals LNG Carrier Bishop Process Bishop Process Salt Cavern Terminals F LIQUID Tank Storage Offshore Mooring 2000 psi + 40F LNG Pumps 1000 psi 0.5 to 1.5 Bcf/d Pump to Pipeline Pressure Warm to Vapor Heat Exchanger GAS Cavern Storage 3+ Bcf/d Natural Gas Grid

19 Bishop Process 400 Formations ~ 1,000 Storage Caverns

20 Bishop Process Infrastructure Saturation Gulf Coast Region 30% Capacity Available

21 Bishop Process Bishop Terminal Conceptual Design Big Sweep Mooring System Shallow Water Mooring System Weathervaning Allows non dedicated LNGCs Flexible Design Options Big Sweep Mooring System With Bishop Platform In Background Bishop Platform

22 Model Basin Tests Model Basin Tests to verify system for: Survivability in Extreme Hurricane Conditions Structural loads w/o LNG carrier Operability in Normal Operating Conditions Hawser loads, DP thrust requirements Overall behavior, relative motions Characteristics in Calibration Conditions Regular waves to verify and/or calibrate analytical models

23 Model Basin Tests Model Basin Test Program - Pictures: Survival Waves

24 Model Basin Tests Model Basin Test Program - Pictures: Operational Waves

25 Model Basin Tests Final report by Oceanic Consulting: Throughout the tests, general observations showed that the arm and tanker would prove adequate for this type of mooring arrangement. And Overall, nothing observed during the tests indicates that such a setup will not be able to operate in the conditions tested.

26 Insulated Cryogenic Pipeline Test Configuration

27 Insulated Cryogenic Pipeline Test Configuration

28 Offshore LNG Receiving Terminals

29 Offshore LNG receiving terminals CAPEX for total LNG chain significantly more than for traditional oil field development LNG receiving terminal is only ~10% of total investment Oil companies plan for proven terminals onshore

30 Offshore LNG receiving terminals Courtesy LNG express, Vol. XIV, No. 12 December 1, 2004

31 Offshore LNG receiving terminals However Local community concerns frustrate US onshore terminals Offshore terminals are considered as fall back No technology risks, only proven onshore technologies: Gravity Base Structure Dolphin mooring arrangement Loading arms for LNG transfer

32 Offshore LNG receiving terminals Remote SPM type offloading system (1) Improved terminal lay-out: LLC Separation between storage, process and DEEPWATER OIL PORT, U.S.A. LNGC 28 55'23"N 90 00'37"W 28 54'52"N 89 59'36"W 28 54'52"N 89 57'00"W #4 Mitigates escalation in case of incident Allows future expansions (2 nd 28 54'05"N 28 53'50"N 89 56'38"W 90 04'07"W A MARINE TERMINAL SPM) 1 NM 28 53'06"N 90 01'30"W SPM 104 SPM C 28 52'21"N 89 57'47"W ANCHORAGE 28 53'10"N 89 53'42"W B 28 52'04"N 89 52'42"W 28 51'07"N 90 03'06"W # '09"N 90 02'24"W APPROACH SECTION # '20"N 89 53'51"W 28 49'05"N 89 55'54"W # '36"N 89 55'00"W 28 48'15"N 89 54'18"W SAFETY FAIRWAY = NAV-AID BUOY

33 Offshore LNG receiving terminals Remote SPM type offloading system (2) Superior marine operations: Approach & Berthing: LNGC approach always up weather, abort fail to safe Transfer operation with minimal LNGC motions; possibility for roll mitigation Easy disconnect under all circumstances

34 Offshore LNG receiving terminals Remote SPM type offloading system (3) Therefore increased terminal availability & regularity of operations Marine operations can start & continue in higher seastates Shorter weather window required to start LNG transfer operations Will allow catch-up after disrupt situations (e.g. hurricanes)

35 Cryogenic Pipeline Offshore SPM with Pipeline Cryogenic Site with Tanker Terminal for loading / offloading Offshore LNG Pipeline Gas Plant

36 Cryogenic Pipeline Offshore SPM with Pipeline Cryogenic Site with Tanker Terminal for loading / offloading Remote Offshore LNG Unloading Terminals Offshore LNG Pipelines Offshore GBS with LNG Storage and Regasification Gas Export Pipeline

37 Cryogenic Pipeline Offshore SPM with Pipeline Cryogenic Site with Tanker Terminal for loading / offloading Offshore LNG Pipelines Offshore Platform with Regasification and Salt Cavern storage

38 Table 1: Comparison FPSO and LNG terminal West Africa Large FPSO Gulf of Mexico LNG terminal Arrangement spread moored barge gravity base structure Production: Storage: Im/Export: Transfer: volume energy value (1) dollar value (2) volume days production volume parcel value Carrier value Location to terminal Type frequency Environment: H significant (1-year) H significant (100 years) Notes: (1) (2) (3) (4) (5) (6) Offshore LNG receiving terminals 200,000 bopd 1,100 B Btu/d 7.0 MM us$/d 2,000,000 bbls 5.0 days 1,000,000 bbls 35 MM us$ 70 MM us$ Remote ( ~ 6000 ft) Weathervaning 50~75 (3) parcels/yr 2.4 m (4) / 1.2 m (5) 3.6 m / 1.2 m Assuming oil to be 5.5 MMBtu/bbls and gas 1.1 MBtu/scf Assuming oil at us$ 35 / bbls and gas at us$ 5 / MMBtu At plateau production, will decline in later life Swell conditions Wind waves Non hurricane 1,000 MMscfd 1,100 B Btu/d 5.5 MM us$/d 175,000 m days 135,000 m 3 16 MM us$ 150 MM us$ Close (~ 150 ft) Fixed heading 120~140 parcels/yr 4.3 m (6) 9.4 m

39 Offshore LNG receiving terminals Comparing Gulf LNG terminals with WA FPSOs: With a higher combined value for parcel and carrier With double the number of transfer operations In more onerous sea conditions Moor to a more difficult berth In close proximity to production & storage facilities Is this really the right way to go??

40 Conclusions Offshore transfer of LNG can be done safely but: Avoiding technology risks may in fact incur operation & safety risks Lessons learnt in over 40 years of offshore transfer of oil are valid for LNG industry Confirmation of feasibility completed: SPM systems for LNG Transfer Offshore Subsea Cryogenic Pipelines

Safe Offloading from Floating LNG Platforms (SAFE OFFLOAD) R. V. Ahilan Noble Denton Europe

Safe Offloading from Floating LNG Platforms (SAFE OFFLOAD) R. V. Ahilan Noble Denton Europe Safe Offloading from Floating LNG Platforms (SAFE OFFLOAD) R. V. Ahilan Noble Denton Europe Overview Background Project Objective Partners Work Scope Key Developments Deliverables Schedule Additional Participation

More information

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS Augusto Bulte Project Manager Foster Wheeler C/Gabriel García Márquez 2 Las Rozas 28232 Madrid (Spain) ABSTRACT Several developments

More information

Pandora FLNG Wison Offshore & Marine

Pandora FLNG Wison Offshore & Marine Pandora FLNG Wison Offshore & Marine Cott O&G representatives on the Caribbean FLNG vessel, Nantong. Page:1 Contents Project Background Wison Capability FLNG Solution Capital Cost Operational Expenditure

More information

SSP Offshore. Well Containment. April 2011

SSP Offshore. Well Containment. April 2011 SSP Offshore Well Containment April 2011 Well Containment - Points to Discuss 2 Lessons Learned in the Aftermath of the Deepwater Horizon Incident The Containment Solutions : Interim MWCS and the MCV solution

More information

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager LNG Storage and Fuel Gas Systems LNG: Fuel for Shipping, London 15-Feb-2011 Carriers & Offshore Units Jürgen Harperscheidt Sales Manager CONTENT TGE Company Profile Small LNG carriers Bunkering LNG fuel

More information

Design and Construction of LNG Regasification Vessel

Design and Construction of LNG Regasification Vessel Design and Construction of LNG Regasification Vessel GASTECH 2005 March 14 17, 2005 Bilbao, Spain Hochung Kim, JungHan Lee Daewoo Shipbuilding & Marine Engineering Co. Ltd. (DSME) Gastech 2005 Design and

More information

OFFSHORE FIELD DEVELOPMENT

OFFSHORE FIELD DEVELOPMENT OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering Hoannn@pidc.com.vn PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy

More information

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen Content Short Company Introduction Small LNGC and LNG tanks Terminals and distribution

More information

Engineering and technologies Floating LNG

Engineering and technologies Floating LNG Engineering and technologies Floating LNG Major contracts confirm Technip's leadership Technip at a glance Technip is a world leader in project management, engineering and construction for the oil and

More information

Latest trends -FSRU and FSU

Latest trends -FSRU and FSU Latest trends -FSRU and FSU Vikas Singh 2013,Kochi 28 th November Content Types of LNG carrier & LNG tank Floating Storage Unit Floating Storage Regasification unit FSRU Design & Construction Mooring Arrangement

More information

Design Concepts for. IMO type C cargo tanks. Dr. K.D. Gerdsmeyer. Carriers & Carriers & Offshore Units

Design Concepts for. IMO type C cargo tanks. Dr. K.D. Gerdsmeyer. Carriers & Carriers & Offshore Units Design Concepts for LNG FSRU/FPSO with IMO type C cargo tanks Dr. K.D. Gerdsmeyer Carriers & Carriers & Offshore Units Design Concepts for LNG FSRU/FPSO with IMO type C cargo tanks Content: TGE s experience

More information

Creating more Value out of Storage

Creating more Value out of Storage Creating more Value out of Storage By Gary Howorth, Founder Energy-Redefined Introduction Gas Storage is a complicated business which carries with it large risks and potentially low rewards. Assets can

More information

Kodiak Deepwater Project Challenges and Solutions

Kodiak Deepwater Project Challenges and Solutions Kodiak Deepwater Project Challenges and Solutions Marine Technology Society September 24, 2015 Deep Gulf Energy II, LLC Overview of Deep Gulf Energy Companies Deep Gulf Energy Background Exploration and

More information

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston Content Short Company Introduction Small LNGC and LNG tanks Bunker supply chain LNG fuel gas systems Conclusions LNG 17 -

More information

Marine Transportation of Compressed Natural Gas

Marine Transportation of Compressed Natural Gas Marine Transportation of Compressed Natural Gas Omid Shakeri, Aghil Barati Iranian Fuel Conservation Organization (IFCO), September 26-27, 2009, The 3rd Iran Gas Forum Introduction Natural gas is rapidly

More information

MARINE TRANSPORTATION OF NATURAL GAS: LNG versus CNG. Dr. Marius Eugen OPRAN MEMBER OF THE EXECUTIVE BUREAU

MARINE TRANSPORTATION OF NATURAL GAS: LNG versus CNG. Dr. Marius Eugen OPRAN MEMBER OF THE EXECUTIVE BUREAU MARINE TRANSPORTATION OF NATURAL GAS: LNG versus CNG Dr. Marius Eugen OPRAN MEMBER OF THE EXECUTIVE BUREAU Case Study : AZ NG FLOATING DELIVERIES via GE - to BG & to RO o ONE SUPPLIER AZ: Max. 8 Bn CM/Y

More information

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011 Subsea Technology Alain Marion, Senior VP Assets & Subsea Technology Investor Day in Brazil, October 4, 2011 Subsea Technology Technip s Commitment to Subsea R&D Technip Leadership Position Emerging Technologies

More information

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011 Carriers & Offshore Units Jürgen Harperscheidt Sales Manager CONTENT TGE Company Profile Small LNG carriers as part of a bunkering

More information

The Dalian Developer A new approach to oil spill response

The Dalian Developer A new approach to oil spill response The Dalian Developer A new approach to oil spill response Presenter: Jim O Sullivan, Vice President Technip USA National Ocean Industries Association Scottsdale, Arizona, October 18, 2012 Contents Introduction

More information

CRYOGENIC ABOVE GROUND STORAGE TANKS: FULL CONTAINMENT AND MEMBRANE COMPARISON OF TECHNOLOGIES

CRYOGENIC ABOVE GROUND STORAGE TANKS: FULL CONTAINMENT AND MEMBRANE COMPARISON OF TECHNOLOGIES CRYOGENIC ABOVE GROUND STORAGE TANKS: FULL CONTAINMENT AND MEMBRANE COMPARISON OF TECHNOLOGIES Jérôme Thierçault Caroline Egels Technical Division BOUYGUES Travaux Publics 1 Avenue Eugène Freyssinet 78061

More information

TECHNIP AT A GLANCE 2014

TECHNIP AT A GLANCE 2014 TECHNIP AT A GLANCE 2014 Unique range of activities A world leader in project management, engineering and construction for the energy industry S U B S E A OFFSHORE Subsea infrastructures, from deep to

More information

Electric heat tracing

Electric heat tracing PIPELINE DESIGN Figure 1. Shorter, more complex piping at a process plant. Electric heat tracing Neil Malone, Heat Trace, UK, discusses electric heat tracing of long pipelines. In considering electric

More information

Conceptual benefits with a cylindrical hull for FPSO, FLNG, drilling and floating powerplant applications

Conceptual benefits with a cylindrical hull for FPSO, FLNG, drilling and floating powerplant applications 21st FPSO Research Forum April 23, 2008, Trondheim, Norway Conceptual benefits with a cylindrical hull for FPSO, FLNG, drilling and floating powerplant applications Fredrik Major, VP Bus. Dev/ R&D, Sevan

More information

137 Northpark Blvd. Telephone: (985) 276-6100 Covington, LA 70433 Fax: (985) 276-6284. Prepared Statement by. Thomas L. Shaw, President LOOP LLC

137 Northpark Blvd. Telephone: (985) 276-6100 Covington, LA 70433 Fax: (985) 276-6284. Prepared Statement by. Thomas L. Shaw, President LOOP LLC 137 Northpark Blvd. Telephone: (985) 276-6100 Covington, LA 70433 Fax: (985) 276-6284 Prepared Statement by Thomas L. Shaw, President LOOP LLC Before Public Meeting on the Quadrennial Energy Review Petroleum

More information

OUR CONVERSATION TODAY

OUR CONVERSATION TODAY OUR CONVERSATION TODAY Our goal is to raise the level of awareness around the natural gas supply chain among key stakeholders in order to facilitate positive working relationships and more informed decision

More information

Optimising a LNG supply chain and its assets through performance prediction studies

Optimising a LNG supply chain and its assets through performance prediction studies Optimising a LNG supply chain and its assets through performance prediction studies LNG Summit Barcelona 28 th September 2015 Fabien Treillaud DNV GL 1 SAFER, SMARTER, GREENER Introduction How to assess

More information

LNG A Different Approach The Teesside GasPort Project

LNG A Different Approach The Teesside GasPort Project LNG A Different Approach The Teesside GasPort Project Presented to Winter Outlook Seminar by John Baldwin of Gas Strategies and James Ball On behalf of Rob Bryngelson, Executive Vice President and Chief

More information

How To Build An Lng Fuel Tank Container

How To Build An Lng Fuel Tank Container Marine LNG Fuel Tank Container An Introduction Marine Service GmbH Hamburg, January 2014 LNG Fuel Tank Container 2 Agenda Introduction Marine Service GmbH LNG Fuel Tank Container LNG Fuel Tank Container

More information

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification Energy for growth South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification capacity and the gas supply from the South Hook LNG

More information

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people Asset Management Conformity Assessment Fitness for Service QHSE Oil & Gas Services and Tools For the benefit of business and people Services along the whole life of Facilities Bureau Veritas services can

More information

Facility Support Services

Facility Support Services Facility Support Services The Precision Group has a breadth of experience delivering innovative, first class facility support service solutions to clients across the public and private sectors. Our expert

More information

LNG SAFETY MYTHS and LEGENDS

LNG SAFETY MYTHS and LEGENDS LNG SAFETY MYTHS and LEGENDS Doug Quillen ChevronTexaco Corp. Natural Gas Technology Investment in a Healthy U.S. Energy Future May 14-15, 2002 Houston Introduction North America is Becoming the Focal

More information

Ichthys Lng Securing the Future

Ichthys Lng Securing the Future Ichthys LNG Project Ichthys LNG onshore facilities plan Ichthys Lng Securing the Future Key Facts The Ichthys Field represents the largest discovery of hydrocarbon liquids in Australia in 40 years, estimated

More information

New generation of modern LNG carriers with type C cargo tanks and LNG propulsion system

New generation of modern LNG carriers with type C cargo tanks and LNG propulsion system Gastech London 2012 New generation of modern LNG carriers with type C cargo tanks and LNG propulsion system Björn Munko Content Introduction Vessels Delivered/Under Construction Gas Plant Design New Designs

More information

This will also provide you with the knowledge to insure long life for your Investment

This will also provide you with the knowledge to insure long life for your Investment CONDUIT PIPE DRYING This Presentation will guide you to why systems fail! This will also provide you with the knowledge to insure long life for your Investment Drainable and Dryable System Design Trough

More information

Offshore Structures. Offshore Drilling Equipment

Offshore Structures. Offshore Drilling Equipment Offshore Structures Offshore Drilling Equipment The drill string is lowered through a conduit (riser). The drill string consists of a drill bit, drill collar and drill pipe. Drill pipe sections are added

More information

lng conversion (General)

lng conversion (General) lng conversion (General) 1 Wärtsilä 10.4.2013 Jens Häggblom Content DF conversion portfolio and references Reasons for conversion DF conversion in practice LNG storage, process and bunkering system (Wärtsilä

More information

13. FPSO Operational Problems Don Smith, OGP

13. FPSO Operational Problems Don Smith, OGP OGP Marine Risks Workshop Proceedings 13. FPSO Operational Problems Don Smith, OGP FPSO Operational Problems Don Smith OGP Analysis of Accident Statistics for Floating Monohull and Fixed Installations

More information

Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO

Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO Agenda 1 Importance of Diversifying to Natural Gas 2 Natural Gas Diversification Strategy 2 Currently, Puerto

More information

The Use of Coatings for Corrosion Control on Offshore Oil Structures. J. Peter Ault, P.E. Consultant Ocean City, NJ

The Use of Coatings for Corrosion Control on Offshore Oil Structures. J. Peter Ault, P.E. Consultant Ocean City, NJ The Use of Coatings for Corrosion Control on Offshore Oil Structures J. Peter Ault, P.E. Consultant Ocean City, NJ Protective coatings are ubiquitous on offshore oil structures. As with most situations,

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION Page: 1/6 This checklist recognizes the major accident hazards found by experience of previous HAZID studies. It is not intended to be totally exhaustive and feedback from users should be incorporated

More information

High Capacity Helical Piles Limited Access Projects

High Capacity Helical Piles Limited Access Projects High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices

More information

Steam System Best Practices Condensate System Piping

Steam System Best Practices Condensate System Piping Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum

More information

MERMAID FLEET PROFILE SUBSEA SERVICES

MERMAID FLEET PROFILE SUBSEA SERVICES 010 Mermaid Maritime Public Company Limited MERMAID ENDURER (Built in 2010) The DSV Mermaid Endurer is a Norwegian purpose-built DP2 dive support and light construction vessel, specially designed for operations

More information

Ultrasonic Guided Waves Evaluation of Trials for Pipeline Inspection

Ultrasonic Guided Waves Evaluation of Trials for Pipeline Inspection 17th World Conference on Nondestructive Testing, 25-28 Oct 2008, Shanghai, China Ultrasonic Guided Waves Evaluation of Trials for Pipeline Inspection Francisco C. R. MARQUES 1, Alessandro DEMMA 2 1 E&P

More information

CHALLENGES OF ACCURATE COST ESTIMATION FOR FACILITIES PAM BOSCHEE OIL AND GAS FACILITIES EDITOR

CHALLENGES OF ACCURATE COST ESTIMATION FOR FACILITIES PAM BOSCHEE OIL AND GAS FACILITIES EDITOR CHALLENGES OF ACCURATE COST ESTIMATION FOR FACILITIES PAM BOSCHEE OIL AND GAS FACILITIES EDITOR ost estimation for facilities depends C on early concept selection and critical inputs, often complicated

More information

Mexican Experience in New LNG Plants

Mexican Experience in New LNG Plants Mexican Experience in New LNG Plants 2007 APEC Clean Fossil Energy Workshop Information Exchange on LNG Public Education Campaigns Hans Valadez Executive Secretary, CRE 5-7 November, 2007. Guangzhou, China

More information

Languages: : French (Mother tongue), English (Fluent), Portuguese (Basic Level)

Languages: : French (Mother tongue), English (Fluent), Portuguese (Basic Level) curriculum vitae Name: : Jeremy de BARBARIN Position: : Engineering Manager Date/Place of Birth: : 14 th of June 1973 in Marseille (France) Nationality: : French Languages: : French (Mother tongue), English

More information

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL December 3, 2014 Presenter: Mike Cargol Agenda Development Update HPHT Capping Stack Mudline Closure Device Divert and Flow System Well Kill

More information

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, 2015. Matthew Sievert Director Business Development LNG

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, 2015. Matthew Sievert Director Business Development LNG Crowley LNG Puget Sound Harbor Safety Committee June 3 rd, 2015 Matthew Sievert Director Business Development LNG Company Profile Crowley was founded in 1892. Largest US Jones Act Co. Focusing on Marine

More information

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure LNG as Ship Fuel Effects on Ship Design, Operations and Supporting Infrastructure New Technologies for the Marine Highway TRB Marine Highways Committee (AW010(1)) January 14, 2013 LNG as a Ship s Fuel

More information

Hurricanes and the Offshore oil and Natural Gas Industry

Hurricanes and the Offshore oil and Natural Gas Industry Every year, hurricanes of varying strength lay siege to America s coasts. The images of wind-battered buildings and flooded lands are well-known - 2004 and 2005 were particularly destructive seasons. The

More information

A Decision Regarding the Selection of Estimating Software for An Offshore Contractor

A Decision Regarding the Selection of Estimating Software for An Offshore Contractor A Decision Regarding the Selection of Estimating Software for An Offshore Contractor Submitted to Dr. Ernest H. Forman for Executive Decision Making by Tom Bourque & Rolland White April 12, 2000 Mgt. 224,

More information

NON-PIPELINE TRANSPORT OF NATURAL GAS

NON-PIPELINE TRANSPORT OF NATURAL GAS NON-PIPELINE TRANSPORT OF NATURAL GAS Jón Steinar Gudmundsson TPG4140 NATURGASS NTNU September 16, 2010 Associated Gas Problem World-wide, oil fields cannot be developed unless the associated gas problem

More information

Presentation to the State of Alaska Legislature. Liquid Natural Gas (LNG) NPV Analysis and Results

Presentation to the State of Alaska Legislature. Liquid Natural Gas (LNG) NPV Analysis and Results Presentation to the State of Alaska Legislature Liquid Natural Gas (LNG) NPV Analysis and Results June 9, 2008 Key Conclusions LNG Projects Have Higher Capital Costs and Therefore Greater Risk than a Pipeline

More information

Marine integrity monitoring Offshore oil and gas

Marine integrity monitoring Offshore oil and gas Marine integrity monitoring Offshore oil and gas Where will our knowledge take you? BMT has over 0 years experience in the design, procurement, integration and installation of monitoring systems worldwide.

More information

Dry Gas Seals for LNG Compressors

Dry Gas Seals for LNG Compressors SEALING solutions Dry Gas Seals for LNG Compressors Sealing answers for liquefied natural gas By Daniel Goebel and Francesco Grillo, EagleBurgmann With the discoveries of large new natural gas deposits,

More information

LNG terminal project in Lithuania November, 2012

LNG terminal project in Lithuania November, 2012 LNG terminal project in Lithuania November, 2012 Areas of activities Klaipedos nafta Oil transshipment terminal LNG Terminal Klaipėdos Nafta 2 LNG Terminal Project - Background The necessity to have an

More information

Coil-Wound Heat Exchangers

Coil-Wound Heat Exchangers Coil-Wound Heat Exchangers 2 Contents. 3 Introduction 4 Characteristics Thermal and hydraulic design 5 Mechanical design Fabrication and special features Applications 6 Benefits Selected references 7 Coil-wound

More information

Natural Gas and LNG Fundamentals

Natural Gas and LNG Fundamentals Natural Gas and LNG Fundamentals ExxonMobil Gas & Power Marketing Taking on the world s toughest energy challenges. This presentation includes forward-looking statements. Actual future conditions (including

More information

Bundle Pipeline Systems & Shell FRAM Development Iain Watson & Peter Walker

Bundle Pipeline Systems & Shell FRAM Development Iain Watson & Peter Walker Bundle Pipeline Systems & Shell FRAM Development Iain Watson & Peter Walker March 21 st, 2012 27.1.11 Page 1 Agenda Bundle Technologies Advantages of Bundle Systems Shell Fram Bundle FEED 27.1.11 Page

More information

Assessment of Hydrocarbon Explosion and Fire Risks. Professor Jeom Paik. The LRET Research Collegium Southampton, 11 July 2 September 2011

Assessment of Hydrocarbon Explosion and Fire Risks. Professor Jeom Paik. The LRET Research Collegium Southampton, 11 July 2 September 2011 Assessment of Hydrocarbon Explosion and Fire Risks by Professor Jeom Paik The LRET Research Collegium Southampton, 11 July 2 September 2011 1 Assessment of Hydrocarbon Explosion and Fire Risks in Offshore

More information

ENERGY CARRIERS AND CONVERSION SYSTEMS Vol. II - Liquid Hydrogen Storage - Takuji Hanada, Kunihiro Takahashi

ENERGY CARRIERS AND CONVERSION SYSTEMS Vol. II - Liquid Hydrogen Storage - Takuji Hanada, Kunihiro Takahashi LIQUIDHYDROGEN STORAGE Takuji Hanada Air Liquide Japan Co., Ltd., Tokyo, Japan Kunihiro Center for Supply Control and Disaster Management, Tokyo Gas Co., Ltd., Tokyo, Japan Keywords: liquidhydrogen, insulation

More information

Communication Links for Offshore Platforms. A User s Guide to Troposcatter Communications

Communication Links for Offshore Platforms. A User s Guide to Troposcatter Communications Communication Links for Offshore Platforms A User s Guide to Troposcatter Communications 1.0 INTRODUCTION Offshore platforms, whether for coastal defense systems, environmental monitoring, pipe line operations,

More information

Offshore Renewable Energy Services and solutions

Offshore Renewable Energy Services and solutions Offshore Renewable Energy Services and solutions Where will our knowledge take you? Contents : Metocean Information Services : Marine Operations and Risk 3 3: Specialist Vessel Design 4: Engineering 4

More information

LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39

LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39 LNG Poised to Significantly Increase its Share of Global Gas Market David Wood February 2004 Petroleum Review p.38-39 For the past few years LNG has experienced high levels of activity and investment in

More information

Ultrasonic Gas Leak Detection

Ultrasonic Gas Leak Detection Ultrasonic Gas Leak Detection What is it and How Does it Work? Because every life has a purpose... Ultrasonic Gas Leak Detection Introduction Ultrasonic gas leak detection (UGLD) is a comparatively recent

More information

SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY

SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY 87th Annual Convention Grapevine, Texas, USA March 2-5, 2008 SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY Peter Schinkelshoek MSc Eng Twister BV Principal Process Engineer Peter.Schinkelshoek@TwisterBV.com

More information

Synfuels GASRICH Transport Light Gas Technology

Synfuels GASRICH Transport Light Gas Technology Synfuels GASRICH Transport Light Gas Technology Storage and Transport of Light Gas and LNG Blends Abstract The Liquefied Natural Gas (LNG) industry is well established and growing. Recently depressed Natural

More information

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013 1 Building an LNG driven vessel LNG developments at Meyer Werft Viking Grace 18_09_2013 Berufsbildung 13.09.2013 2 Meyer Werft Papenburg MEYER WERFT is a company with tradition, which started operations

More information

2001/073 OFFSHORE TECHNOLOGY REPORT. Failure modes, reliability and integrity of floating storage unit (FPSO, FSU) turret and swivel systems HSE

2001/073 OFFSHORE TECHNOLOGY REPORT. Failure modes, reliability and integrity of floating storage unit (FPSO, FSU) turret and swivel systems HSE HSE Health & Safety Executive Failure modes, reliability and integrity of floating storage unit (FPSO, FSU) turret and swivel systems Prepared by AEA Technology Engineering Solutions for the Health and

More information

Maritime Human Resources Solutions Seminar. Robert Cadigan President & CEO Newfoundland & Labrador Oil & Gas Industries Association

Maritime Human Resources Solutions Seminar. Robert Cadigan President & CEO Newfoundland & Labrador Oil & Gas Industries Association Maritime Human Resources Solutions Seminar Robert Cadigan President & CEO Newfoundland & Labrador Oil & Gas Industries Association About NOIA NOIA s mission is to promote development of East Coast Canada

More information

Profile. Offshore Oil & Gas To meet the global demand for energy. Offshore and EPC Contractors

Profile. Offshore Oil & Gas To meet the global demand for energy. Offshore and EPC Contractors Profile Offshore Oil & Gas To meet the global demand for energy Offshore and EPC Contractors Offshore Pipeline Installation Shallow water pipelay barge Stingray in Taiwan Leading global offshore contractor

More information

Solar Hot Water Heaters

Solar Hot Water Heaters Solar Hot Water Heaters Three High Vacuum Water inlet Stainless Steel screw Gel seal and insulation Water outlet Dust proof seals Non Pressure Models Details ASWH-1b ( Color Painted 304 ) ASWH-1c ( stainless

More information

Case Study: Sand Removal from 3 Phase Production Separators and Vessels

Case Study: Sand Removal from 3 Phase Production Separators and Vessels Case Study: Sand Removal from 3 Phase Production Separators and Vessels Online De-sanding Syphonvac Sand removed whilst vessel in full production no loss of production Reduces deferral costs Reduces critical

More information

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC) APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines

More information

A DEEPER LOOK AT MODULARIZATION IN FACILITIES CONSTRUCTION. Stephen Whitfield Oil and Gas Facilities Staff Writer

A DEEPER LOOK AT MODULARIZATION IN FACILITIES CONSTRUCTION. Stephen Whitfield Oil and Gas Facilities Staff Writer A DEEPER LOOK AT MODULARIZATION IN FACILITIES CONSTRUCTION Stephen Whitfield Oil and Gas Facilities Staff Writer The Eagle Louisiana, a modular capture vessel (MCV), docked at the Marine Well Containment

More information

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING 60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed

More information

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Code Edition I - Ship Technology Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Part 1 - Seagoing Ships Chapter 1 - Hull Structures I-1-1 2016-01 Chapter 1 - Hull Structures

More information

Nozzle Check Valves. NOREVA nozzle check valves are used

Nozzle Check Valves. NOREVA nozzle check valves are used Nozzle Check Valves NOREVA nozzle check valves are used in applications where the reverse flow of a fluid has to be avoided. These valves are suitable for all kind of liquid and gaseous fluids and fire

More information

Natural Gas Fueling Our Future 2014 NGV Conference

Natural Gas Fueling Our Future 2014 NGV Conference Natural Gas Fueling Our Future 2014 NGV Conference Sept 16, 2014 Houston Texas Introduction Who We Are We are a Ulysses, PA based a full service Well to Wheel LNG fuel distributor One of the very first

More information

Key Technologies of Mitsubishi LNG Carriers - Present and Future -

Key Technologies of Mitsubishi LNG Carriers - Present and Future - 47 Key Technologies of Mitsubishi LNG Carriers - Present and Future - Kazuaki Yuasa* 1 Katsuya Uwatoko* 1 Junshiro Ishimaru* 2 CO2 emission control is recognized as the essential issue related to the greenhouse

More information

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation Steam Generator Boilers Compact Steam Boilers Rapid Start-Up Safe in Operation AB&CO TT BOILERS The boiler maker AB&CO TT BOILERS LTD. have since the middle sixties produced industrial boilers and heaters

More information

SUBSEA CONNECTORS FOR MARINE RENEWABLE ENERGY APPLICATIONS

SUBSEA CONNECTORS FOR MARINE RENEWABLE ENERGY APPLICATIONS SUBSEA CONNECTORS FOR MARINE RENEWABLE ENERGY APPLICATIONS This was the initial perception since proved incorrect! THE ENVIRONMENT IS FAR MORE SEVERE THAN DEEPER WATERS SEABED CONDITIONS often no possibility

More information

New Generation of Modern Small LNG Carriers and Re- Gas Barges for the Chinese Market

New Generation of Modern Small LNG Carriers and Re- Gas Barges for the Chinese Market New Generation of Modern Small LNG Carriers and Re- Gas Barges for the Chinese Market Björn Munko Small Scale LNG, Stavanger, 2014 Content Introduction LNG Carriers LNG Barges Stavanger 2014 2 Company

More information

Gas Marketplace Work? July 9-13, 2007

Gas Marketplace Work? July 9-13, 2007 What Makes a Natural Gas Marketplace Work? July 9-13, 2007 Accra TOPIC I: Resource & Infrastructure Investment for Delivery Key value chain components Physical Infrastructure Gathering Removal of basic

More information

PTFE Slide Bearings 04/10 149

PTFE Slide Bearings 04/10 149 04/10 149 1.0 GENERAL INFORMATION In a wide range of applications, PTFE Slide bearings are superior to conventional expansion plates, rollers and rocker arm type supports. They support petrochemical plant,

More information

il Castorone la più avanzata nave posatubi al mondo: acquisti e logistica Paolo Daleffe Armando Favi

il Castorone la più avanzata nave posatubi al mondo: acquisti e logistica Paolo Daleffe Armando Favi il Castorone la più avanzata nave posatubi al mondo: acquisti e logistica Paolo Daleffe Armando Favi Castorone concentration of technologies and efficiency, Castorone is designed for high productivity

More information

Application Guide. Compensators Hose Assemblies Expansion Joints FLEX-WELD INCORPORATED FLEX-WELD.COM. Manufactured By:

Application Guide. Compensators Hose Assemblies Expansion Joints FLEX-WELD INCORPORATED FLEX-WELD.COM. Manufactured By: Compensators Hose Assemblies Expansion Joints Manufactured By: FLEX-WELD INCORPORATED FLEX-WELD.COM What we need to know... A. Physical / System Parameters 1 Size of Assembly: Measure Pipe size (ID) of

More information

NFPA 30-2008: Basic Requirements for Storage Tanks

NFPA 30-2008: Basic Requirements for Storage Tanks NFPA 30-2008: Basic Requirements for Storage Tanks New York City Metro Chapter Society of Fire Protection Engineers New York, NY February 22, 2011 NFPA 30, Flammable and Combustible Liquids Code Storage

More information

OIL & MARINE PRODUCT RANGE. Dock & onshore Floating roof tank drain Mooring Rig supply

OIL & MARINE PRODUCT RANGE. Dock & onshore Floating roof tank drain Mooring Rig supply OIL & MARINE PRODUCT RANGE Dock & onshore Floating roof tank drain Mooring Rig supply ALFAGOMMA GROUP A SUCCESS STORY Alfagomma Group, founded in 1956, is a result of a continuous and successful growth:

More information

Strategy. Øivind Tangen. Group Strategy Director September 19, 2014. SBM Offshore 2014. All rights reserved. www.sbmoffshore.com

Strategy. Øivind Tangen. Group Strategy Director September 19, 2014. SBM Offshore 2014. All rights reserved. www.sbmoffshore.com Strategy Øivind Tangen Group Strategy Director September 19, 2014 SBM Offshore 2014. All rights reserved. www.sbmoffshore.com Disclaimer Some of the statements contained in this presentation that are not

More information

MICROPACK Visual Flame Detection Application Note

MICROPACK Visual Flame Detection Application Note MICROPACK Visual Flame Detection Application Note ABSTRACT Optical flame detection has evolved over the last 30 years with improved sensors, processing power, and high electronics reliability, which has

More information

AT A GLANCE. $17 billion $60 billion 42 million 6,000

AT A GLANCE. $17 billion $60 billion 42 million 6,000 APACHE AT A GLANCE Apache s asset portfolio reaches from the United States where its operations are focused on the Gulf Coast and the Gulf of Mexico, the Anadarko Basin and the Permian Basin to Canada,

More information

and to mutually agree mitigation measures to reduce identified concerns and risks to acceptable levels.

and to mutually agree mitigation measures to reduce identified concerns and risks to acceptable levels. PTC ID: 88 Connecting Offshore Platforms to a Subsea Cable System Jerry Brown, Ocean Specialists Inc. Technical Manager Subsea. Introduction Bandwidth hungry applications for process controls and business

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

OUR CONVERSATION TODAY

OUR CONVERSATION TODAY OUR CONVERSATION TODAY Our goal is to raise the level of awareness around the oil supply chain among key stakeholders in order to facilitate positive working relationships and more informed decision making.

More information

Air Eliminators and Combination Air Eliminators Strainers

Air Eliminators and Combination Air Eliminators Strainers Description Air Eliminators and Combination Air Eliminator Strainers are designed to provide separation, elimination and prevention of air in piping systems for a variety of installations and conditions.

More information

Comparison of multiple port and end port connections for pressure vessels

Comparison of multiple port and end port connections for pressure vessels Desalination 221 (2008) 202 206 Comparison of multiple port and end port connections for pressure vessels Nadav Shachaf*, Tobias Haarburger BEL Group Ltd. email: shachaf@bel-g.com Received 24 January 2007;

More information