2 UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0 Prepared By: Patrick L. Paquin, EnergySolutions Date Reviewed By: Mirza I. Baig, EnergySolutions Date Approved By: Thomas F. Dougherty, Columbiana Hi Tech Date
3 Table of Contents Section Page 1.0 Introduction General Approach Test Pad Cylinder Preparation Drop Test Observations Free Drop No. 1: Side Drop onto UX-30 Cradle Free Drop No. 2 Puncture Test Free Drop No. 3 Center of Gravity over Cylinder Plug Free Drop No. 4 Side Drop onto UX-30 Closure Pins Free Drop No. 5 Center of Gravity over Parting Plane Post Drop Test Inspections and Testing Thermal... 8 Page 2 of 30
4 1.0 Introduction The UX-30 Overpack is licensed for domestic use in the US by the Nuclear Regulatory Commission (NRC) under Certificate of Compliance No. 9196, USA/9196/B(U)F-96 for the transport of unirradiated or reprocessed uranium in the form of UF 6. Multiple regulatory drop tests have been performed on full-scale UX-30 overpacks with both 30B and 30C compliant cylinders. The testing performed in these tests was performed to address specific questions raised in a Request for Additional Information (RAI) issued by the French Competent Authority, ASN, regarding UX-30 validation, USA/9196/B(U)F-96. The testing is used to: Demonstrate the effectiveness of the UX-30 at -40 C (-40 F) and at the maximum evaluated internal cylinder temperature of C (145.3 F). Demonstrate the leak tightness of the cylinder s plug during the prescribed 1 m and 9 m drop tests. Evaluate the consequences of any outer shell damage resulting from the prescribed 1 m puncture and 9 m drop tests and the possible effect on the polyurethane foam and the UX- 30 thermal analysis. Evaluate the consequences of any polyurethane foam deformation resulting from the prescribed drop tests and the possible effect on the UX-30 thermal analysis. Evaluate the consequences of any outer shell damage resulting from the UX-30 transport cradle during the prescribed 9 m drop test. Demonstrate the effectiveness UX-30 closure system during the prescribed 9 m drop test. 1.1 General Approach Five separate Drop Tests (two Puncture and three Free Drop Tests) were performed. Each test used a full-scale production unit UX-30 overpack along with a full size ANSI compliant Model 30B cylinder (the same overpack and cylinder were used for two or more tests) as the Test Unit. One of the free drop tests included attaching the UX-30 transport cradle to the Test Unit. All testing was performed with a cylinder containing sufficient material (steel shot) to properly simulate payload mass. In all five tests, the cylinder sustained no deformation and was shown to meet the required leak criteria after being subjected to three 30- foot drops and two 40-inch puncture tests. 1.2 Test Pad The test pad used was designed to simulate an unyielding surface. Reinforced Concrete 3,000 psi: Type I Portland cement with maximum aggregate size of 25 mm (1 inch) Concrete reinforced with ASTM A-615 Gr. 60 steel rebar Pad Dimensions: 2,438 mm wide x 7,315 mm long x 1,372 mm thick (8 x 24 x 4-6 ) Pad Weight: approximately 129,600 pounds (exclusive of a 1-1/4 thick A36 carbon steel plate covering the pad). Weight Ratio of Test Pad to Test Unit: greater than 10:1 (129,600/8,300). Page 3 of 30
5 1.3 Cylinder Preparation Two 30 inch (model 30B) uranium hexafluoride cylinders were used for free drop testing. The cylinders were verified to be compliant with ANSI N14.1 and fabricated in accordance with Section VIII, Division I of the American Society of Mechanical Engineers Boiler and Pressure Code and were ASME Code Stamped. The 30B Cylinders were loaded with over 5,400 lbs of steel shot, 400 lbs more than the maximum allowable payload weight. Prior to the test, the UX-30 and cylinders were visually inspected for damage, including dents, creases, weld flaws, and corrosion. After adding the steel shot and prior to drop testing, each 30B cylinder was pressurized with helium to a pressure of 16.7 psia. Each cylinder was placed into a test chamber and the chamber evacuated to approximately 100 milli-torr. An integrated helium leak test was performed on the cylinder per ANSI N (test sensitivity of at least 5 x 10-8 refcm 3 /sec). Each cylinder was verified to have a measured leak rate of less than 1 x 10-7 cm 3 /sec. 1.4 Test Unit Heating and Cooling (See photos Heating & Cooling Enclosure) To perform the elevated temperature tests, the Test Unit (Cylinder and Overpack) was placed inside of a large reinforced wooden structure covered with insulating material. The Test Unit was heated until all temperature labels read greater than 63 C (145 F). To perform the reduced temperature tests, the Test Unit (Cylinder and Overpack) was placed inside of a large reinforced wooden structure covered with insulating material. Cooling of the Test Unit was accomplished by introducing liquid nitrogen through holes within the structure. The Test Unit was be cooled until all temperature labels read less than - 40 C (-40 F). 2.0 Drop Test Observations 2.1 Free Drop No. 1: Side Drop onto UX-30 Cradle A free drop slap down (See Fig. 1) was performed with Test Unit 1 through a distance of 9 m (30 ft) onto the test pad, striking the surface in a position for which maximum damage is expected. Overpack orientation: Horizontal with Test Unit 1 Parting Plane axis at 7 to the drop test pad, bottom half down with transport cradle attached in its normal orientation for transport. Cylinder type and orientation: Model 30B with its plug end down (normal orientation for transport) so as to be nearest to contact point from the transport cradle. Test Unit Temperature: Minimum of C (145.3 F). Page 4 of 30
6 The test was performed at an elevated temperature condition, since foam strength decreases with increasing temperature, yielding maximum foam deformation and maximum outer shell damage. After the drop, Test Unit 1 was removed from the cradle. The following observations were made (see photos Drop Test 1-1 through 1-7): The overpack remained closed and the parting plane gap remained within tolerance. Nine of 10 locking pins remained engaged. One locking pin at the plug end of the overpack sheared. There were no observed tears in the package. The lower half of the overpack deformed in the shape of the cradle supports, but did not tear. The deformation on the plug end of the overpack, making initial contact, measured approximately 44 mm (1-3/4 inches) deep. The deformation on the opposite end of the overpack (slap-down end) was approximately 51 mm (2 inches) deep. 2.2 Free Drop No. 2 Puncture Test A free drop (See Figure 2) of Test Unit 2 was performed through a distance of 1 m (40 in) onto the upper end of a solid, vertical, cylindrical, mild steel bar mounted on the test pad with a drop angle that maximized the damage to the shell of the overpack. Overpack orientation: Center of Gravity over cylinder plug, with Test Unit 2 Parting Plane axis at 17 to the pin. Initial contact of puncture bar was on the Test Unit 2 end plate, ~9 inches from the corner of the overpack. Model 30B Cylinder orientation: Plug end down (normal orientation for transport) so as to be nearest to the contact point from the puncture bar. Test Unit Temperature: Minimum of C (145.3 F). The test was performed at an elevated temperature condition, since foam strength decreases with increasing temperature, yielding maximum foam deformation and maximum outer shell damage. After the drop, the following observations were made (see photos Drop Test 2-1 through 2-4): The overpack remained closed and the parting plane gap remained within tolerance. All 10 locking pins remained engaged. The puncture pin indented the package outer skin at an angle with plug end of the overpack. The maximum depth of the indent was 76 mm (3 inches). The elongated indent was approximately 178 mm (7 inches) wide. All welds remained intact, and, with the exception of the puncture pin tear, the package outer skin was not breached. Page 5 of 30
7 2.3 Free Drop No. 3 Center of Gravity over Cylinder Plug A free drop (See Figure 3) of Test Unit 2 (second sequential drop of this unit) through a distance of 9 m (30 ft) onto the test pad, striking the surface in a position for which maximum damage is expected. Overpack orientation: Center of Gravity over cylinder plug, with the Test Unit Parting Plane axis at 17 to the drop test pad. Model 30B Cylinder orientation: Plug end down (normal orientation for transport) so as to be nearest to contact point from the drop test pad. Test Unit Temperature: Minimum of C (145.3 F). The test was performed at an elevated temperature condition, since foam strength decreases with increasing temperature, yielding maximum foam deformation and maximum outer shell damage. After the drop, the following observations were made (see photos Drop Test 3-1 through 3-6): The overpack remained closed and the parting plane gap remained within tolerance. All 10 locking pins remained engaged. There was deformation of the outer skin at the plug end of the overpack along the area of impact with the test pad. The maximum deformation was approximately 100 mm (4 inches). As a result of the impact, the outer skin compressed the foam in the area of the puncture pin indent such that indent depth was reduced to a maximum of 25 mm (1 inch). All welds remained intact, and, with the exception of the puncture pin tear, the package outer skin was not breached. 2.4 Free Drop No. 4 Side Drop onto UX-30 Closure Pins A free drop (See Figure 4) of Test Unit 1 (second sequential drop of this unit) through a distance of 9 m (30 ft) onto the test pad, striking the surface in a position for which maximum damage is expected. Overpack orientation: Horizontal with Test Unit 1 Parting Plane axis rotated 90 from normal condition of transport such that closure pins will make contact with drop test pad. Model 30B Cylinder orientation: Plug end down (cylinder was rotated within the UX from its normal orientation for transport) so as to have the plug nearest to contact point from the drop test pad. Test Unit Temperature: Maximum of -40 C (-40 F). The test was performed at a reduced temperature condition, since maximum foam strength occurs at the minimum temperature condition, since foam strength increases with decreasing Page 6 of 30
8 temperature. Maximum structural effects due to impact reaction loading are generally expected at minimum temperature conditions, where loads will be greatest relative to closure component structural strength. The following observations were made after the drop (see photos Drop Test 4-1 through 4-7): The overpack remained closed and the parting plane gap remained within tolerance at the valve end of the overpack. At the plug end of the overpack the parting plane separated slightly in the area where the locking pin had sheared in Free Drop No. 1, measuring approximately 16 mm (5/8 inch). The gap decreased down to within tolerance at the opposite end of the overpack. The gap was on the side of the overpack 180 away from the side of the overpack that impacted the test pad. Nine of 10 locking pins remained engaged. The one locking pin at the very end of the overpack which sheared in Free Drop No. 1 was not replaced for this test. There was deformation and some buckling of the outer skin of the overpack along the parting plane which impacted the test pad. There were no observed tears in the package. 2.5 Free Drop No. 5 Center of Gravity over Parting Plane A free drop (See Figure 5) of Test Unit 1 (third sequential drop of this unit) through a distance of 1 m (40 in) onto the upper end of a solid, vertical, cylindrical, mild steel bar mounted on the test pad, with a drop angle that maximizes the damage to the shell of the overpack caused by Free Drop No. 4. Overpack orientation: Impact orientation (Center of Gravity over parting plane) was determined following Drop Test No. 4. Model 30B Cylinder orientation: As oriented for Drop Test No. 4. Test Unit Temperature: Ambient. The test was performed at ambient temperature condition. The following observations were made after the drop (see photos Drop Test 5-1 through 5-5): The overpack remained closed and the parting plane gap remained within tolerance at the valve end of the overpack, except at the area of contact with the steel bar that deformed the skin at the parting plane. The parting plane at the plug end of the overpack did not change from Free Drop No. 4. Nine of 10 locking pins remained engaged. The one locking pin at the very end of the overpack which sheared in Free Drop No. 1 was not replaced for this test. The puncture pin indented the package outer skin at an angle with valve end of the overpack. One side of the indent penetrated to a depth of approximately 51 mm (2 inches) and the other side to a maximum depth of 114 mm (4.5 inches). The elongated indent was approximately 178 mm (7 inches) wide. All welds remained intact, and, with the exception of the puncture pin tear, the package outer skin was not breached. Page 7 of 30
9 2.6 Post Drop Test Inspections and Testing Following completion of the drop tests, the cylinders were removed from the overpacks and inspected. Test Unit 2 was wedged closed and had to be pried open (see Test Unit 2 Post Drop Test photos). There was no discernible damage to the interior of Test Unit 1 or Test Unit 2 UX-30 overpacks or to either of the 30B cylinders from any of the drop tests. Glazing material applied to the end of the cylinder plug showed no deformation, indicating that the plug did not contact the inner shell of the UX-30 at any time during the testing. Following the overpack and cylinder inspections, both cylinders were leak tested and the post-drop test measured integrated leakage rates were 4.3x10-7 atm-cc/sec. and 6.3x10-8 atmcc/sec. The damage sustained to the UX-30s was consistent with previous drop tests for the same model, and no damage was sustained by the Test Units from any of the drop tests which would compromise the package's ability to meet the requirements of 10 CFR Thermal The effect of the hypothetical accident fire event is examined in Section 3.5 of the UX-30 Safety Analysis Report (SAR). The results of the UX-30 fire test scenario and associated thermal analysis models, used to correct for deviations between test conditions and initial conditions required for the hypothetical accident, are discussed in detail in Appendix of the UX-30 Safety Analysis Report (SAR). The drop tests addressed in this report show that the effect of these drops is a local crushing of the foam, and possible rupture of the impact limiter skin. The puncture drop tests also show the crushing of the foam and rupture of the skin in the vicinity of the impact location. The local crushing of the foam during the drop and puncture tests will increase the foam density. The effect of the local density increase of the foam is addressed in Section of the SAR. The rupture of the impact limiter skin after the drop and puncture tests may minimally expose the polyurethane foam material to the fire. However, the polyurethane fire retardant characteristics will mitigate the effect of the direct exposure to fire due to formation of intumescent char. The following is a quote from the General Plastics sales brochure. The primary fire retardant mechanism of FR-3700 is the production of an intumescent char when thermally degraded. The foam acts much like the small pallets children light on the fourth of July which grows a long worm when burning. The intumescent char has the ability to seal large voids which could be caused by the impact damage. The char also provides a secondary thermal barrier which breaks down very slowly at 2000 to 2200 F. Tests performed by General Plastics where the open face of a foam filled 5-gallon bucket is exposed to direct fire show the formation of the char that prevents the fire from extending into the underlying foam. These tests also indicate that for the 11¾ foam thickness in the test, the effect of 30-minute fire has a minimal effect on the end opposite the exposed end. Page 8 of 30
10 These tests were performed for various density foams and it was shown that the effectiveness of the foam is enhanced with the increasing foam density. With lb/ft 3 foam nominal density and a nominal thickness of 6 inches in the UX-30 overpack, the effect of exposure of a small portion of foam due to rupture during the drop and puncture test will not have a significant effect on the impact limiter performance during the fire. Page 9 of 30
11 FIGURE 1 30 Foot Drop Slap Down onto UX-30 Cradle Page 10 of 30
12 FIGURE 2 Puncture CG over 30B cylinder plug Pin below plug Page 11 of 30
13 FIGURE 3 30 Foot Drop - CG over 30B cylinder plug Plug end down Page 12 of 30
14 FIGURE 4 30 Foot Drop - Side Drop onto UX-30 Closure Pins Page 13 of 30
15 FIGURE 5 Puncture CG over Parting Plane Page 14 of 30
16 PHOTOS Page 15 of 30
17 HEATING/COOLING ENCLOSURE Page 16 of 30
18 CYLINDER LEAK TEST CHAMBER Page 17 of 30
19 TEST 1 Drop Test 1-1 Drop Test 1-2 Page 18 of 30
20 Drop Test 1-3 Drop Test 1-4 Page 19 of 30
21 Drop Test 1-5 Drop Test 1-6 Drop Test 1-7 Page 20 of 30
22 TEST 2 Drop Test 2-1 Drop Test 2-2 Page 21 of 30
23 Drop Test 2-3 Drop Test 2-4 Page 22 of 30
24 TEST 3 Drop Test 3-1 Drop Test 3-2 Drop Test 3-3 Page 23 of 30
25 Drop Test 3-4 Drop Test 3-5 Drop Test 3-6 Page 24 of 30
26 TEST 4 Drop Test 4-1 Drop Test 4-2 Drop Test 4-4 Drop Test 4-3 Page 25 of 30
27 Drop Test 4-5 Drop Test 4-6 Drop Test 4-7 Page 26 of 30
28 TEST 5 Drop Test 5-1 Drop Test 5-2 Drop Test 5-3 Page 27 of 30
29 Drop Test 5-4 Drop Test 5-5 Page 28 of 30
30 Test Unit 2 POST DROP TESTS Page 29 of 30
31 Page 30 of 30
Itemized RAI Responses
Itemized RAI Responses Question 1-1: Justify the use of a tapped bar or equivalent with a helicoil insert. This justification should specifically address any reduction in packaging performance from the
The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35
Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE
Solid shape molding is not desired in injection molding due to following reasons.
PLASTICS PART DESIGN and MOULDABILITY Injection molding is popular manufacturing method because of its high-speed production capability. Performance of plastics part is limited by its properties which
Testing Packaged Products Weighing up to 150 Lbs.
Testing Packaged Products Weighing up to 150 Lbs. We recommend a series of pre-shipment tests to simulate FedEx air and ground shipping environments. Follow our instructions or let us do the testing for
Packaged-Products for Parcel Delivery System Shipment 70 kg (150 lb) or Less
Packaged-Products for Parcel Delivery System Shipment 70 kg (150 lb) or Less 3A2 008 ISTA 3 Series General Simulation Performance Procedure VERSION DATE Last TECHNICAL Change: FEBRUARY 2008 Last EDITORIAL
Guide for SOLID CONCRETE BLOCK SEALS
Guide for SOLID CONCRETE BLOCK SEALS July, 2006 Mine Safety and Health Administration SOLID CONCRETE BLOCK SEAL Formersection 30 CFR 75.335(a)(1) specifies requirements for seals constructed using solid
Installation and Operating Instructions Installation Instructions for SS EPE-316L Series
INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This
Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805
CEMEX USA - Technical Bulletin 2.1 Proper use of the Rebound Hammer Updated to reflect the changes to ASTM C805 The Rebound Hammer has been around since the late 1940 s and today is a commonly used method
TEST REPORT. Report No.: A9814.01 109 44. Rendered to: BAMCO INC. Middlesex, New Jersey. PRODUCT TYPE: Wall Cladding System SERIES/MODEL: Dry Concept
Architectural Testing TEST REPORT Report No.: A9814.01 109 44 Rendered to: BAMCO INC. Middlesex, New Jersey PRODUCT TYPE: Wall Cladding System SERIES/MODEL: Dry Concept AAMA 508 07, Voluntary Test Method
PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall
PERFORMANCE TEST REPORT Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall Report No.: Test Dates: 04/17/12 Through: 04/18/12 Report Date: 06/13/12 130 Derry Court
AST M F 1642-04/GSA TS01 T EST R EPO R T. Rendered to: UNI T E D ST A T ES A L U M INU M
AST M F 1642-04/GSA TS01 T EST R EPO R T Rendered to: UNI T E D ST A T ES A L U M INU M SE RI ES/M O D E L : B W3250 PR O DU C T T YPE : Aluminum Combination Fixed Window Summary of Results Title Test
SWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
International Forum on Pressure Vessels for Hydrogen and Natural Gas Vehicles
International Forum on Pressure Vessels for Hydrogen and Natural Gas Vehicles COMPOSITE TANK TESTING, CERTIFICATION, AND FIELD PERFORMANCE Beijing September 27-29, 2010 Joe Wong 0 POWERTECH Hydrogen &
Fiberglas, Exterior Wall Thermal Insulation
PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.
PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.
Exelon Generation 200 Exelo11 Way Kennett Square. PA 19348 www.pxeloncoroi.c cm 10 CFR 50.55a August 13, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Peach
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 *
SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 * PRODUCT: Polymer (Foam-Filled) Fuel Cells 1.0 GENERAL INFORMATION 1.1 This SFI Specification establishes uniform test procedures and minimum standards
07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying
Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete
Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES
EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES Prepared for AIR LOGISTICS, INC. Azusa, California September 2005 Revision 1 STRESS ENGINEERING SERVICES, INC. Houston, Texas
Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.
Sample Questions REVISED FIRST CLASS PARTS A1, A2, AND A3 (NOTE: these questions are intended as representations of the style of questions that may appear on examinations. They are not intended as study
pdi PLASTIC DRUM INSTITUTE Plastic Drum Paneling Issues
pdi PLASTIC DRUM INSTITUTE Plastic Drum Paneling Issues PANELING BACKGROUND This report will explain the causes of paneling and suggest some possible ways to eliminate or minimize the paneling of plastic
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code
LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900
Field Application Note
Field Application Note Reverse Dial Indicator Alignment RDIA Mis-alignment can be the most usual cause for unacceptable operation and high vibration levels. New facilities or new equipment installations
Lab 1 Concrete Proportioning, Mixing, and Testing
Lab 1 Concrete Proportioning, Mixing, and Testing Supplemental Lab manual Objectives Concepts Background Experimental Procedure Report Requirements Discussion Prepared By Mutlu Ozer Objectives Students
METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE
STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Transportation Laboratory 5900 Folsom Blvd. Sacramento, California 95819-4612
foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
Excerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
UNITED NATIONS / DOT PERFORMANCE CERTIFICATION 31HA1 PERIODIC DESIGN REQUALIFICATION
UNITED NATIONS / DOT PERFORMANCE CERTIFICATION 31HA1 PERIODIC DESIGN REQUALIFICATION MX275-275 Gallon Composite IBC with 6 Fill Port Opening on Steel Pallet (Nova Resin) TEST REPORT #: 15-MN40095 u n 31HA1
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes
Naue GmbH&Co.KG Quality Control and Quality Assurance Manual For Geomembranes July 2004 V.O TABLE OF CONTENTS 1. Introduction 2. Quality Assurance and Control 2.1 General 2.2 Quality management acc. to
High Pressure Equipment Pressure Vessels and Reactors Index
Pressure Vessels and Reacrs High Pressure Equipment Company designs and manufactures a broad range of pressure vessels and reacrs for both bench-scale and pilot plant applications. We have over 0 standard
(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark
Spectrum Laboratories Ltd is accredited by International Accreditation New Zealand (formerly Telarc). The tests reported herein have been performed in accordance with the terms of our accreditation. This
Drum Dispensing Stations
Drum Dispensing Stations O Safely Dispense from 55 Gallon Drums over a Spill Compliant Sump. 1-2-and 4 drum models available Drums are securely held on racks by galvanized positioners Sump and frame constructed
Architectural Testing
FIELD AND MOCK-UP TESTING SERVICES 130 Derry Court York, PA 17406-8405 phone: 717-764-7700 fax: 717-764-4129 www.archtest.com Mock-up Test Methods (Laboratory Mock-up or Field Mock-up): ASTM E 283, Standard
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
Double Coated Urethane Foam Tapes
3 Double Coated Urethane Foam Tapes 4004 4008 4016 4026 4032 4052 4056 4085 Technical Data April, 2009 Product Description 3M Double Coated Urethane Foam Tapes are conformable foams that offer high shear
CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests
PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
Rehabilitation of an Aging Concrete Reservoir Adit Tower
Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco
PANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!
WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! Atlanta (Monroe) GA 770-267-3787 [email protected] www.gpmhydraulic.com What You Don t Know About Hydraulic Accumulators Can Kill You TABLE OF CONTENTS
EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS
EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS 1. SCOPE 1.1 This specification covers the type, physical properties and dimensions of Expanded Polystyrene Insulation Board intended for use
High Performance PSA in Sheet Membrane in Water Protection
High Performance PSA in Sheet Membrane in Water Protection Xia Cao, Senior R&D Chemist, W. R. Grace, Cambridge MA 02140 Jyoti Seth, Strategic Program Leader, W. R. Grace, Cambridge MA 02140 Concrete is
CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
Project Report. Structural Investigations Hotel del Sol Yuma, Arizona
Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,
MATERIALS AND MECHANICS OF BENDING
HAPTER Reinforced oncrete Design Fifth Edition MATERIALS AND MEHANIS OF BENDING A. J. lark School of Engineering Department of ivil and Environmental Engineering Part I oncrete Design and Analysis b FALL
B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
GreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES
OPERATIONS & MAINTENANCE (O&M) FOR PROPANE STORAGE FACILITIES Reference: National Fire Protection Association (NFPA) Pamphlet No. 58 Liquefied Petroleum Gas Code, 2001, Chapter 11 Type of Facility: Petroleum
Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens
Contents: Section 1 Overview...2 Section 2 Apparatus...3 Section 3 Test Specimens...4 Section 4 Procedure...5 Texas Department of Transportation 1 08/99 06/08 Section 1 Overview Effective dates: August
1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
THERMAL BARRIERS FOR THE SPRAY POLYURETHANE FOAM INDUSTRY
THERMAL BARRIERS FOR THE SPRAY POLYURETHANE FOAM INDUSTRY Spray Polyurethane Foam Alliance Copyright 2005 To order copies of this publication, call 800-523-6154 and request SPFA Stock Number AY 126 TECHNICAL
Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in
REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory
INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS. Published: April 1999
INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS Published: April 1999 CONTENTS 1 Introduction 2 Test Procedures General 3 Standards and Specific Test Procedures
BLADDER SURGE CONTROL SYSTEM
PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
FedEx s Fire Suppression System
FedEx s Fire Suppression System In September of 1996 a FedEx DC-10 had an in flight fire. While the crew was able to land and evacuate the aircraft, the aircraft hull and its entire contents were destroyed.
Flanged and Butt-= Weld Type
Document : PG00 Year : 09 Product Group 00 Flanged and Butt-= Weld Type (LNG and LPG) Page 09 Document : PG00 Year : 09 Product Group 00 Cryogenic Butterfly valves The Cryogenic Butterfly Valve Design
Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description
Worldwide Contacts www.tyco-fire.com Model F thru F3 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description The Mulsifyre Nozzles are open (nonautomatic) nozzles and they are designed
FLAMMABILITY REQUIREMENTS FOR 25.853-1 AIRCRAFT SEAT CUSHIONS
FLAMMABILITY REQUIREMENTS FOR 25.853-1 AIRCRAFT SEAT CUSHIONS ANM-110 1. PURPOSE. This Advisory Circular (AC) provides guidance material for demonstrating compliance with the Federal Aviation Regulations
Type D3 PROTECTOSPRAY Directional Spray Nozzles, Open, Medium Velocity General Description
Worldwide Contacts www.tyco-fire.com Type D3 PROTECTOSPRAY Directional Spray Nozzles, Open, Medium Velocity General Description The TYCO Type D3 PROTECTO- SPRAY Nozzles are open (non-automatic) directional
HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
Caps STANDARD WEIGHT Inches / Pounds
Standard Caps you are here: Home > Weldbend Catalog > Fittings > Caps Caps STANDARD WEIGHT Inches / Pounds For Metric Units >Click Here Nominal Pipe Size Outside Inside Wall Thickness (T) Length (E) Pipe
A Guide to Thermoform Processing of Polypropylene. Introduction
A Guide to Thermoform Processing of Polypropylene Introduction Thermoforming is the process of heating plastic sheet to a pliable state and forming it into shape. Thermoforming offers processing advantages
R-VALUES AND U-FACTORS OF SINGLE WYTHE CONCRETE MASONRY WALLS. TEK 6-2B Energy & IAQ (2009) Related TEK: 6-1B, 6-11, 6-12C INTRODUCTION
An information series from the national authority on concrete masonry technology R-VALUES AND U-FACTORS OF SINGLE WYTHE CONCRETE MASONRY WALLS TEK 6-2B Energy & IAQ (2009) INTRODUCTION Single wythe concrete
Flexible Spill Containment Protecting You And The Environment
Flexible Protecting You And The Environment Unit Liner Company C o nta i n m ent Syste m s C o nta i n m ent Syste m s Foam Foam Clean and store for repeated use Includes Clean and patch store kit for
SURFACE TREATMENT BOND TEST
Test Procedure for SURFACE TREATMENT BOND TEST Effective Date: March 2011 Published: February 2012 1. SCOPE 1.1. This test procedure is used to determine the bond strength characteristics of the interfaces
These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:
LO TORC Plug Valve The high value, dependable performance, and low maintenance requirements of Halliburton Lo Torc valves can help reduce overall operating costs and help cut downtime. These features have
This will also provide you with the knowledge to insure long life for your Investment
CONDUIT PIPE DRYING This Presentation will guide you to why systems fail! This will also provide you with the knowledge to insure long life for your Investment Drainable and Dryable System Design Trough
AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels
AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels AISI No. 1008 1010 1012 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 10 1026 1027 1029 10 1035 1036 1037 1038 1039 10 1041 1042 1043
Technical Report Example (1) Chartered (CEng) Membership
Technical Report Example (1) Chartered (CEng) Membership A TECHNICAL REPORT IN SUPPORT OF APPLICATION FOR CHARTERED MEMBERSHIP OF IGEM DESIGN OF 600 (103 BAR) 820MM SELF SEALING REPAIR CLAMP AND VERIFICATION
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
Agilent X/P/K281C Adapters
Agilent X/P/K281C Adapters Including Options 006, 012, 013, 106 Operating and Service Manual Contents 1 Introduction 7 Product Overview 8 Options 8 Instruments Covered by Manual 10 2 Installation 11 Initial
SECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
External Visual Inspection Form
Tank ID Code Part 1 (a): Information on Registered Facility Name of Registered Facility: Address: Town: Postal Code: Province: Phone Number: Person Conducting the Inspection: Transport Canada Facility
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes 1. Scope This Japanese Industrial Standard specifies the electric resistance welded carbon steel tubes, hereinafter
SPECIFICATION Aluminum Module Frames. Allowed anodization before fabrication for clear frames.
SPECIFICATION Allowed anodization before fabrication for clear frames. Page 2 of 9 1. SCOPE 1.1. This document provides general requirements for aluminum frames used in the assembly of photovoltaic modules.
E-Line and Braided Line. E-Line Open Hole wireline
E-Line and Braided Line E-Line Open Hole wireline Braided Line More strength Less feel Harder to seal Much harder to fish Braided line stronger (2800 to 3500 lb working strength, but less feel when fishing
Tentative Interim Amendment NFPA 59A. Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition
Tentative Interim Amendment NFPA 59A Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition Reference: Various TIA 16-1 (SC 15-12-4 / TIA Log #1187R) Note: Text
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS Subpart G General Construction
Flygt Ball Check Valves
4/13 Supersedes: 6/96 The basic purpose of a check valve is to permit flow in one direction, prevent flow in the opposite direction and perform this function automatically and with minimum maintenance.
AD-A236 607 DODPOPHM/USA/DOD/NADTR9 1107
AD-A236 607 DODPOPHM/USA/DOD/NADTR9 1107,., 4 PERFORMANCE ORIENTED PACKAGING TESTING OF 7 MS-27884-2 METAL DRUM FOR MK 64 MOD 0 GAS GENERATOR BY: BILLIE LANDSTROM a Performing Activity:.. -. Navel Weapons
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Ergo-Pro Single Line Solar Station Installation and Operating Instructions
Rp 3/4 Ergo-Pro Single Line Solar Station Installation and Operating Instructions Item No Pump type 677.21.70 WILO ST 15/6 13 2 4 11 Technical Specifications Max. operating pressure: 6 bar Max. operating
CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
THERMAL INSULATION MATERIALS TEST METHOD SELECTION LIST
THERMAL INSULATION MATERIALS TEST METHOD SELECTION LIST Instruction: Check each test method for which you are requesting accreditation. An asterisk beside the NVLAP Test Method Code indicates that proficiency