Subject: County of Los Angeles Data Center Space Requirement



Similar documents
19 Site Location, Design and Attributes. Site Location, Design and Attributes

OPERATOR - FACILITY ADDRESS - DATE

N O W A V A I L A B L E

Experience Matters...

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport

san francisco//usa data center specifications tel: fax: internet + intellectual property + intelligence

Data Center Colocation Build vs. Buy

Building a Tier 4 Data Center on a Tier 1 Budget

LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.

Assessment of Existing Data Centers for Critical Facilities Round Table Group

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

Introduction to Datacenters & the Cloud

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

House your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data

Santa Clara, CA 95054

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

How To Write An Infrastructural Standard For Data Center Infrastructure

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX VAZATA.COM

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

NY-1 DATACENTER AT A GLANCE. NY-1 is a Tier III-rated, SAS SSAE16 and HIPAA-certified data center

Data Centre Barrie, Ontario

Data Center Commissioning: What you need to know

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

N O W A V A I L A B L E

ISOMEDIA COLOCATION

World s Greenest High Performance Data Center

Data Center CH1. Elk Grove Village, IL

Data Center Infrastructure & Managed Services Outline

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

How To Visit An Internet Data Center

Pacnet Hong Kong CloudSpace2 Technical Specifications. Upholding the Principles of Efficiency and Sustainability in Data Center Design

Specialty Environment Design Mission Critical Facilities

Enabling an agile Data Centre in a (Fr)agile market

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

NY2 21 CRITICAL MEGAWATTS 280,000 SQUARE FEET

MISSION CRITICAL FACILITIES DESIGN UPS BATTERY ROOM ENVIRONMENT CRITICAL DESIGN CONSIDERATIONS

AT&T Internet Data Center Site Specification Dallas Area (Allen, Tx)

LEVEL 3 DATA CENTER SERVICES IN SAN FRANCISCO HOUSE POWER-INTENSIVE APPLICATIONS AND SUPPORT BUSINESS CONTINUITY

AFS Center. Data Center Info. Arizona Facility Services 2331 West Alameda Dr Tempe, AZ (602) Main (602) Fax

Data Center Due Diligence List

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

March/April Tour the. PhoenixNAP. See Inside.

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

Structuring Data Center Leases and Service Level Agreements

Secure I Reliable I Flexible COPT DC Hornbaker Road, Manassas, Virginia

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013

POWERING A CONNECTED ASIA. Pacnet Hong Kong CloudSpace1 Technical Specifications. Asia s Pioneering Facility with Direct Subsea Cable Access

DataCenter.BZ. Background. Case Summary. & dark fiber solutions

Building a data center. C R Srinivasan Tata Communications

Digital Chicago. 600 south FeDeraL - chicago grand ave - FranKLin ParK 350 east cermak - chicago

Sovereign. The made to measure data centre

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX VAZATA.COM

Data Center Site Qualification Program. Executive Summary

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

X-tier Data Facility. Prepared by X-tier SAE Corporation

REQUEST FOR PROPOSALS PINE CREST DEVELOPMENT CORPORATION COLOCATION DATA CENTER OPERATOR

Establishment of State s Second Data Center. Business Continuity and Disaster Recovery. North Carolina. Office of Information Technology Services

Data Centre Infrastructure

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

Protecting datacenters & mission critical facilities - using IP based systems. Presented by: Jeffrey Lam RCDD Director, Global Accts, Asia ANIXTER

Datacentre South London Data sheet

Zone B: comprises of NOC room, reception area, Help Desk area, Call Centre, Testing/Monitoring room. This zone requires approximately 1500 sq. feet.

DATA CENTRE DATA CENTRE

Venema Advies Nigeria Limited West Africa Data Center Limited. Datacenter Sustainability

RAGINGWIRE. THE WORLD S MOST TECHNOLOGICALLY ADVANCED DATA CENTERS!

TIA-942 Data Centre Standards Overview WHITE PAPER

Data Center Site Qualification Program. Executive Summary

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

Datacenter Assessment

PAYGO for Data Center -- Modular Infrastructure

DATA CENTRE DATA CENTRE MAY 2015

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

colocation. perfected.

IBM Twin Data Center Complex Ehningen Peter John IBM BS 2011 IBM Corporation

COMMODITIZING THE DATA CENTER MARKET

Data Centre Outsourcing a Buyer s Guide

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

disaster recovery - the importance of having a plan

1301 Fannin. Houston Data Center & Office Facility

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

The Pros and Cons of Modular Systems

Transcription:

Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant, ready to occupy Tier III Data Center facility. The Data Center requirements are as follows: Single-tenant, standalone data center facility 14,000 square feet of IT space 5,000 square feet of office space 19,800 square feet of support space 38,800 square feet of total space 20,000 square foot utility yard 75-100 Parking Spaces 800KW-2.1MW of IT electrical power Please refer to the detailed instructions and specifications for more information. All submissions must document compliance with the County s detailed specifications. Any questions regarding this notice can be directed to Acquisitions at (213) 974-4300 or Leaseacquisitions@ceo.lacounty.gov. Submissions will only be accepted through July 15, 2015 at the following email: Leaseacquisitions@ceo.lacounty.gov. It is important to note that this Property Search does not bind the County of Los Angeles to any property, broker, or term sheet. Only the County Board of Supervisors can bind or commit the County to any of the aforementioned obligations. CEO-RED receives commissions, if applicable, on any County-related real estate transaction. Si no entiende esta noticia o si necesita más información, favor de llamar a este numero (213) 974-4300.

Property Search for Ready to Occupy Tier III Data Center in LA Basin 29 June, 2015

Page 2 1.0 Overview The County of Los Angeles is performing a data center search for the purchase of a vacant and ready to occupy Tier III data center within the Los Angeles basin. The data center requirements are as follows: Single-tenant, standalone data center facility 14,000 square feet of IT space 5,000 square feet of office space 19,800 square feet of support space 38,800 square feet of total space 20,000 square foot utility yard 75-100 Parking Spaces 800KW-2.1MW of IT electrical power Please refer to section 3.0 for detailed specifications. 2.0 Instructions and Timeline Please respond to this Property Search by providing a list of available ready to occupy Tier III data centers along with details of whether these available data center facilities comply with the specification outlined in Section 3.0 and any pertinent pricing/cost information. Please provide your response no later than Wednesday, July 15. It is important to note that this Property Search does not bind the County of Los Angeles to any property, broker or term sheet. Only the County Board of Supervisors can bind or commit the County to any of the aforementioned obligations. The County of Los Angeles, Chief Executive Office, Real Estate Division receives commissions, if applicable, on any County-related real estate transaction. 3.0 Specifications 3.1 General Requirements 1. Sites located within Los Angeles County are strongly preferred. Sites in adjacent counties may also be considered, but are not preferred. 2. Data center shall be ready for occupancy, free of tenants and any binding contracts. 3. Data center shall comply with TIA-942-A (2012) Tier III specifications and be able to pass formal certification if so desired by the County. Further description of the TIA-942-A standards are provided in the Appendix.

Page 3 4. Building shell shall comply with the International Building Code (IBC) Essential Facilities specifications and be designed in accordance with seismic Zone 4 requirements. Here is a link to the 2012 IBC: http://publicecodes.cyberregs.com/icod/ibc/2012/ 5. Building shall be a single tenant standalone data center facility. 6. The data center electrical and mechanical infrastructure must have at least 10 years of useful life before any major upgrades are needed and must be energy efficient. (A power usage effectiveness (PUE) of 1.4 or better is desired). A. Power Usage Effectiveness (PUE) measures the efficiency of a data center s energy usage. It is the ratio of the total amount of energy consumed to the energy delivered to the computer equipment. It is calculated using the following equation: PUE = Total Facility Energy / IT Equipment Energy 3.2 Site Considerations In compliance with TIA 942-A, Data center site should comply with the following: 1. The site should not be located in a 100-year flood plain, near an earthquake fault (to the extent that this is possible in Los Angeles County or an Adjacent County), on a hill subject to slide risk, or downstream from a dam or water tower. 2. The building should not be nearby other buildings, aerial towers or other similar structures that could create falling debris during an earthquake. 3. The building should not be in the flight path of any nearby airports. 4. The building should be no closer than 0.8 km (½ mile) from a railroad or major interstate highway to minimize risk of chemical spills and other similar disruptions. 5. The building should not be within 0.4 km (¼ mile) of an airport, research lab, chemical plant, landfill, river, coastline, or dam. 6. The building should not be within 0.8 km (½ mile) of a military base. 7. The building should not be within 1.6 km (1 mile) of a nuclear, munitions, or defense plant. 8. The building should not be located adjacent to a foreign embassy or gas-station. 9. The building should not be located in high crime areas 10. The building should be located in an area where there is good access to utilities such a power, water and fiber optic telecommunication connections from the major telecom carriers.

Page 4 11. Facility shall provide a minimum of 3 concentric rings of security before access to the computer room or any critical power and cooling infrastructure is gained (see picture below). 12. Minimum of two layers of security shall be provided for any equipment installed in a utility yard. 13. Property and building access must be fenced or have space to be fenced. 14. Building must have at least a 50 setback from any parking spaces and 100 setback from roads. 15. There should be parking available for 75 100 cars. 3.3 Space requirements Preliminary list of required spaces and their size estimates for data center is shown in the table. This is not a comprehensive list but is intended to provide reasonable guidance. No Space Size (Sq. Ft.) 1 Computer Room (SF) 14,000 2 Operations Center 1,000 3 Staging Room 800 4 Tape Storage 700 5 Electrical Rooms 4,000 6 Battery Rooms 1,700 7 Mechanical Rooms 4,000 8 Mechanical Galleries for Air Handlers 1,500 9 Loading and Receiving 450 10 Parts and Storage 1,000 11 Ramps, Corridors, Lobby 3,000

Page 5 12 Hotel Office Space 1,000 13 Conference Rooms 650 14 Total Support Areas (SF) 19,800 15 Office Area (SF) 5,000 16 Total Gross Square Footage (SF) 38,800 17 Utility Yard (SF) 20,000 3.4 Electrical Requirements Electrical requirements are as follows: 1. Electrical systems shall be designed for day 1 usable capacity between 800 KW, expendable in a modular design to 2.1MW. Initial capacity greater than 800 KW is acceptable. The system shall be designed to support expansion to 2.1 MW without outage to the operating data center. 2. Computer room shall be designed to support rack densities of up to 24KW 3. Electrical systems shall be designed with two active power pathways to each IT equipment downstream of the Utility Service Entrance. 4. The electrical distribution system to all IT and Mechanical equipment shall be concurrently maintainable. 5. The electrical distribution system supporting IT and Mechanical loads shall not include any single points of failure. 6. Permanent load banks should be installed for testing of generator and UPS systems. 7. Unconditioned house power outlets shall be provided throughout the computer room and facility for tools. 8. Lightening protection shall be provided. 9. Transient voltage surge suppression (TVSS) should be used throughout the power distribution system. 10. Grounding and Signal Reference Grid (SRG) should be provided for all IT equipment 3.5 Mechanical Requirements 1. The power distribution system for all HVAC and mechanical equipment shall be concurrently maintainable. 2. Computer room air handler redundancy should be able to be N+2. 3. Electrical, UPS, and battery room HVAC system shall be able to be N+1 redundancy

Page 6 4. Efficiency of HVAC system should support a target Power Usage Effectiveness (PUE) of 1.4 or less. 5. All HVAC air handlers should use VFD or EC motors for maximum efficiency 6. Use of a chilled water (CW) system is not a requirement, but if present the following additional requirements shall be met: a. Minimum redundancy of N+1 for all chillers, primary pumps, secondary pumps, cooling towers, and condenser pumps or ability to add components to achieve N+1 redundancy b. Chilled water and condenser water loops must be concurrently maintainable by use of either 2N configuration or double ended lines and isolation valves or have the ability to add components to achieve 2N redundancy. 3.6 Additional Requirements 1. There should be office space available for 25-50 people include general office needs (bathrooms, break room, etc.) 2. There should be access security and video surveillance already in place 3. In addition to compliance with local code and National Fire Protection Association (NFPA) 75, the following fire detection and suppression requirements should be met: a. VESDA smoke detection system or a similar early warning device should be deployed in the computer room. b. Double interlock pre-action sprinkler system shall be used as a substitute for wet sprinkler system c. Use of gracious fire suppression system such as FM200 or Inergen is recommended, but optional. d. All handheld fire extinguishers shall be CO2, FM200, or Inergen

Page 7 Appendix: Summary of TIA 942-A Tier I: Basic Tier II: Some Redundant Components Tier III: Concurrently Maintainable Tier IV: Fault Tolerant Description (TIA 942-A) Single points of failure exist which can result in unscheduled outages. Single path for power and cooling distribution will require scheduled outages for maintenance No redundant components, therefore replacement of parts can prolong outage Redundant components can reduce time to recovery Not all single points of failure are eliminated, therefore unexpected outages are still possible Single path for power and cooling distribution will require scheduled outages for maintenance Multiple power grids or continuous on-site generation capability Multiple power and cooling distribution paths, but only one path may be active Redundant components and distribution paths are configured as concurrently maintainable, thereby eliminating any scheduled outage for maintenance. Multiple power grids or continuous on-site generation capability Multiple active power and cooling paths Redundant components are concurrently maintainable and fully fault tolerant. Common Usage Models Non critical systems Test and development Disaster recovery High Performance and Scientific Computing where downtime can be tolerated Applications that are distributed among multiple data centers such as internet search engines Critical systems that are active/active at more than one DC Disaster recovery Engineering and product development Local manufacturing sites Satellite data centers Mission critical applications E-Commerce sites Co-location and managed services with contractual SLAs Primary corporate or government data centers Global centers where downtime cannot be scheduled Extensive financial transactions Large financial institutions Insurance industry Some co-location and managed services providers