Commissioning of Mission Critical Facilities



Similar documents
Data Center Commissioning: What you need to know

Energy Design Resources Commissioning Plan Outline Template

Electrical Systems Commissioning

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

Guide Specification SECTION COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

Minimizing Impact of Electric Utility Outages with Backup Generation

Building Commissioning

Cx for Enhanced Healthcare Project Delivery. Presentation Format. Project features and timeline

D. Infrared scanning reports with pictures printed in a final report with any deficiencies and actions taken to rectify.

Design Guidelines for Facilities Construction:

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Denver International Airport Data Center Commissioning Plan

Is the Grass Greener on the other side? Examples of Cx south of the border. Jorge Torres Coto, Empirical Engineering

SECTION STANDBY GENERATOR TESTING AND COMMISSIONING

Electrical Systems. <Presenter>

The Building Commissioning Association

SCADA. The Heart of an Energy Management System. Presented by: Doug Van Slyke SCADA Specialist

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

Commissioning Plan Preparation Guide. Version 2.0 (Replaces Project Test Plans Preparation Guide, Version 1.0, September 2012)

Statement of Work. 3.0 Details of Service Pre Start-up Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

21 st Century Facilities

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

The Future in Fire Protection and Life Safety Cx. David J. LeBlanc, PE, FSFPE

Data Centre Testing and Commissioning

Predictive Maintenance

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN?

Sample - Existing Building Commissioning Plan

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

Data Centers. Data Center Commissioning

Demonstration of Data Center Energy Use Prediction Software

BUILDING ENVELOPE COMMISSIONING FOR THE EVERYDAY COMMISSIONING AGENT

The Life-Cycle of Commissioning for New Construction

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

Commissioning of Fire Protection and Life Safety Systems. Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA

WHAT IS INFRARED (IR) THERMOGRAPHY

Manage Deliverables - Construction Step 6. July 12, 2012

Cx for the Forgotten Resource: Water. Daniel Forino, PE, LEED AP BD+C

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Maintaining Fire Protection Systems

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Summary of Modifications/Changes in this Update

Toronto Public Library Disaster Recovery recommended safeguards and controls

CalMod Design-Build Electrification Services

Fire Alarm Systems Certification

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

Testing Automated Manufacturing Processes

Energy Efficiency and Availability Management in Consolidated Data Centers

Paralleling Switchgear

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

Preparing to Operate a New Data Center Facility. AFCOM October 3, 2012

Collaborative Laboratory Commissioning and Sustaining the Optimal Building. By E. Lon Brightbill, P.E Facility Dynamics

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Considerations for Building Controls

COMMISSIONING OF FIRE ALARM SYSTEMS

Commissioning and Maintenance: Two Sides of the Same Coin? Kristin Heinemeier, PE, PhD Principal Engineer UC Davis WCEC

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0

BCA-IDA Green Mark for New Data Centres Version NDC/1.0

Backup Fuel Oil System Decommissioning & Restoration Plan

COMMISSIONING OF HVAC SYSTEMS

National Grid Your Partner in Energy Solutions

DEMONSTRATION OF DATA CENTER ENERGY USE PREDICTION SOFTWARE

Establishing Commissioning Costs

DATA CENTER INCENTIVES

Electrical Engineering

Calculating Total Power Requirements for Data Centers

NFPA 3 and 4 Commissioning and Integrated Testing of Fire Protection and Life Safety Systems. Matt Klaus Senior Fire Protection Engineer NFPA

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS


Commissioning Your Data Center for Greater Availability, Safety and Efficiency While Reducing Costs Throughout the Life Cycle

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Project Test Plans Preparation Guide. Advanced Wastewater Treatment Plant. Version 1.0

Data Center Combined Heat and Power Benefits and Implementation. Justin Grau, Google Inc. Sam Brewer, GEM Energy

Better Budgeting: Roof Management Plans Help Estimate Costs

Chilled Water System Commissioning: Variable Primary Flow. John D. Villani, P.E. Associate Grumman/Butkus Associates

TECHNICAL DATA 50HZ MPMC POWERTECH CORP. DIESEL GENERATING SET

Scalable. Affordable. Flexible. Fast.

ARC VIEW. Emerson Asset Optimization Business Breaks New Ground. Summary. A Business of Vital Strategic Importance.

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

Nuclear Power Plant Electrical Power Supply System Requirements

The Pros and Cons of Modular Systems

Provider: Conference for Catholic Facility Management

SECTION SYSTEMS INTEGRATION TESTING

Developing a Proper Scope of Work, Request for Proposal & Commissioning Specification

National Environmental Balancing Bureau 8575 Grovemont Circle Gaithersburg, MD ph: fax:

Capgemini UK Infrastructure Outsourcing

POWER GENERATION.

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES Fire Alarm Systems

AIA Provider: Colorado Green Building Guild Provider Number: Speaker: Geoff Overland

Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services

Transcription:

Commissioning of Mission Critical Facilities Terry L. Rodgers, CPE, CPMP VP of Sustainable Operations Primary Integration Solutions Paul Liesman SVP of FM & Commissioning Syska Hennessy Group

AIA Quality Assurance Learning Objectives 1. Prepare and execute a pre-certification script, helping to assure a smooth certification process 2. Establish a detailed Roles and Responsibilities Matrix that will document the activities and level of involvement of all personnel involved in the certification of the laboratory and its systems 3. Compare and contrast commissioning of critical facilities and commissioning of non-critical facilities 4. Relate the levels of commissioning as they relate to the basic commissioning strategy of indentifying and resolving issues as early as possible

Agenda: Mission Critical- What are we talking about? How does it differ from ordinary commissioning Levels of Mission Critical Commissioning Document the As-Built Facility Train the Staff Wrap up Thoughts

What Does Mission Critical Mean Failure of the facility would result in: Unacceptable loss of business operations Unacceptable customer inconvenience May result in: High economic losses Loss of competitive advantage Possible loss of life in the most critical applications

Mission Critical Facilities Data Centers Trading Floors Medical Life Support Systems Laboratory- Bio Safety Labs Air Traffic Control Electrical Power Distribution Railroad Traffic

Commissioning goals: Mission Critical facilities: Verify Performance- Ability to cool Ability to deliver at designed power levels Ability to control loads Ability to monitor systems PUE (Energy Efficiency) Verify Redundancies Component failure Maintainability while operational In 2N configurationsmore than double the effort verify interactions Facility Commissioning- Verify Performance Occupant comfort Lighting Energy Efficiency Verify Redundancies Reasonable tolerance to component failure Design intent is achieved

Commissioning Phases: (Enhanced Cx Items in Red) PLANNING PHASE CDocuments Plan Commissioning Process DESIGN PHASE Write specifications Develop commissioning plan Design review (indicate # of review cycles) Develop sequences of operation (if not well-developed by mech or controls contractor) CONSTRUCTION PHASE O&M TRANSITION PHASE Review submittals Construction observation Verification checks/prefunctional testing Functional testing Commissioning provider significantly involved in issue resolution Oversee training Review O&M manuals Develop systems manual/recommissioning manual Perform trend analysis Evaluate energy cost savings Final report Commissioning provider development of design intent

Mission Critical Commissioning Levels Mission Critical Acceptance Phase Details: Level 1 Factory Acceptance Testing Level 2 Component Start-Up Level 3 Equipment Level Testing Level 4 System Interface Level Testing Level 5 Integrated System Level Testing

Levels of Commissioning Definition of Levels: Testing occurs in five progressive levels with the successful completion of the previous step being a prerequisite activity to moving on to the next level. The five levels of testing are as follows: EXAMPLE- Standby Power System Level I- Factory Witness Testing Level I testing includes developing/approving and witness tests of components or pre-assembled systems performed in the factory. FWT is done to prevent un-repairable defects (particularly in long lead items like generators) in components from reaching the job site. Certain components tests may not be performable in the field. Level II -Component Start Up Level II typically includes field testing of: sensors, switchgear components, breakers, relays, transformers, etc. These testing and checkout activities are the standard construction and installation quality control and field testing using the specified codes and standard guidelines. This testing level will verify correct torque, grounding, insulation values, calibration and equipment controls and alarm points.

Level III Equipment Testing Level III Start-up Testing typically includes: new diesel generator package and controls, new and existing paralleling switchgear modifications, new/modified substations, battery systems, fuel oil supply system modifications, BMS/power monitoring system modifications, fire protection and fire alarm systems modifications, and building envelope modifications. Typically load testing to nameplate ratings and thermal scanning will be performed during equipment start-ups. Instrumentation and controls checkout and BMS point to point and sequence of operation checkouts are also performed.

Levels of Commissioning - cont. Level IV System and Interface Level Testing Level IV testing typically includes verification that: substations are operating properly; the new generator heat run, generator step loading, generator alarms, shutdowns, and start-stop sequence controls are working and fuel supply are operating properly; the existing/modified paralleling switchgear is operating properly; the life safety systems such as fire protection and fire detection and alarm are functioning. Typically load testing and thermal scanning is performed during this test level. Level V -Integrated System Level Testing Level V testing is the highest level of testing whereby the combined Facility and installed systems are operated as an Integrated Facility configured to simulate its design performances and operating conditions to the maximum extent possible. The Integrated Tests are the acceptance tests to demonstrate that the Facility has met the overall performance and full compliance with the Design Intent as specified in the Project Design Manual, Specifications and Drawings. Typically, simulation tests of an outage and other failure mode tests verify the operation of all systems working in unison and validate that the redundancy design requirements are met and that integrated electrical, mechanical, and control systems confirm proper operation while interaction occurs.

Summary Basic Approach is Similar Skill sets are different Window of commissioning may not occur during normal business hours You are not commissioning a building, you are commissioning a system closely tied into your clients business process Functionally tying together building and electrical systems to ensure reliable operations per the Owner s system requirements UPS Module 1 UPS Module 1 Automatic Transfer Switch UPS 1B I/O Board UPS Module 2 UPS Module 2 UPS System 1 UPS Module 3 Service Switchboard C5 UPS Module 3 UPS 1A I/O Board Automatic Transfer Switch UPS Module 4 UPS Module 4 Critical Load UPS 1B Cross Tie (X-Tie) Critical Load UPS 1A BOA Fuel Oil Storage 60,000 Gallons 72 Hour Runtime at 100% Load Emergency Power 10,000kW Capacity N+1 Redundancy Critical Load UPS 2B Cross Tie (X-Tie) Critical Load UPS 2A UPS Module 1 UPS Module 1 UPS System 2 Automatic Transfer Switch UPS 2B I/O Board UPS Module 2 UPS Module 2 UPS Module 3 UPS 2A I/O Board UPS Module 3 Automatic Transfer Switch Service Switchboard C4 UPS Module 4 UPS Module 4 Six ConED 2000kVA Transformers 460V 3Ø, 4W Incoming Service 43 rd Street Vault

Document the As-Built Facility Documentation begins early Design Phase Owner s Project Requirements (OPR) EOR s Basis-of-Design (BOD) CxA s Commissioning Plan & Systems Operations & Maintenance Manuals (SOMMs) - Cx Plan is a Living Document describing how - Can form the basis of the Final Cx Report if properly organized, compiled & maintained throughout the project - SOMMs describe what Ultimate goal is to deliver comprehensive SOMMs

Document the As-Built Facility Documentation continues through construction Embellish the Commissioning Plan/Manual Include as much material as possible as the project progresses and organize as SOMMs OPR BOD Submittals Progress Reports Shop Drawings and Red-Lines Installation and O&M manuals

Document the As-Built Facility Acceptance Test Phase Completed scripts provide Baseline performance, setup, & configuration data Collect reports for: Startup & Checklists Pre-Functional Tests Functional Tests Integrated Systems Tests Record actual values (vs. pass/fail) Use automated data collection technology (permanently installed + temporary)

Document the As-Built Facility Acceptance Test Phase Example Startup & Checklists reports Arc Flash, Fault Current, & Breaker Coordination Meggering, Grounding, Primary Injection Test reports Pressure & Leak tests, cleaning & flushing, & water quality Expansion Tanks, Backflow Preventer Certs, etc. Refrigerant Logs, Fuel Oil Tests VFD Programming & setup values

Document the As-Built Facility Acceptance Test Phase Example Pre-Functional Test reports Building Automation System (and other Monitoring & Controls) point-by-point, end-to-end tests Alignment & balancing reports Vibration analysis reports Test, Adjust, & Balance (TAB) reports Thermography (Infrared scan) during Load Banking ( Burn-In) Test equipment safeties and trip settings

Document the As-Built Facility Acceptance Test Phase Example Functional Test reports Performance trends using data recorders (BAS, SCADA, EPMS, PQM + temporary metering) - Stable operations (including efficiency verification) - Transient operations (including step-load responses) - IEEE Testing System-level Sequences-of-Operations - Normal operations - Normal switching operations - Failure scenarios (pumps, towers, chillers & thermal storage, gensets, UPSs, etc.)

Document the As-Built Facility Acceptance Test Phase Example Integrated Systems Test reports Integrated System-level Sequences-of-Operations - Normal switching operations» Utility to Gensets (closed transitions)» Mechanical to Economizer cooling (and return) - Failure scenarios» Loss of off-site electric utility (pull-the-plug)» Loss of municipal water supply

Document the As-Built Facility Final Cx Report and Systems Operations & Maintenance Manuals (SOMMs) The Final Cx Report describes the entire commissioning process as applied to the project SOMMs describe the as-built facility and infrastructure and are organized by system Use a consistent format, organization, and content Group information and systems in a logical manner (ex.: follow the CSI spec progression) - General site information and requirements - Trades (plumbing, mechanical, electrical, security, etc.)

Document the As-Built Facility SOMMs Content (for each system) System description narrative Single-line and/or shop drawings Sequences-of-Operations Approved (final) Submittals Related completed PFT, FT, and IST reports Standard Operating Procedures (normal, maintenance, emergency & recovery) Installation and O&M manuals, parts lists, etc. Warranties and Service Level Agreements

Train the Staff O&M Staff Training is a Deliverable! Start with a Training Plan (part of the Cx Plan) Design a Training Curriculum based on site specific needs and requirements Tailor the training to fit the O&M organization, duties, and responsibilities - Jack-of-all-Trades or Trade Specific? - O&M or Operations or Maintenance? - In-House or Out-Sourced? Use the SOMMs for training materials (so SOMMs must be completed early)

Train the Staff Start Training Early O&M staff can get valuable training during the construction and acceptance test phases FWTs Progress Inspections Vendor provided, equipment specific training Site-specific, systems-level training - PFTs, FTs, and ISTs Progress from classroom (academics) to field (demonstration & hands-on) Goal is to have fully trained staff on day-1!

Train the Staff Training is required over the life of the facility New hires and staff development Remedial training where performance justifies Continuous training (especially for infrequent and unusual scenarios) Facility upgrades, expansions, modifications So, training delivery should be repeatable and editable Record, document, and update

AIA Quality Assurance Portland Energy Conservation, Inc is a registered provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-aia members are available on request. This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Thank You & Questions??? Terry L. Rodgers, CPE, CPMP VP, Sustainable Operations Primary Integration Solutions, Inc. trodgers@primaryintegration.com 704-942-1185 Paul Liesman SVP, FM & Commissioning Syska Hennessy Group, Inc. pliesman@syska.com 212-556-3447