1 The Future in Fire Protection and Life Safety Cx David J. LeBlanc, PE, FSFPE
2 AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of the Completion for both AIA members and non-aia members are available upon request. This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation. 2
3 Learning Objectives 1. Understand the NFPA 3 Cx process for Fire Protection and Life Safety Systems. 2. Understand the critical difference between Commissioning and acceptance testing for Fire Protection and Life Safety Systems. 3. Identify the role of the Fire Commissioning Agent (FCxA) and how they integrate with the full building commissioning team and Commissioning Authority (CxA). 4. Understand the difference between Commissioning (NFPA3) and Integrated Testing (NFPA 4) for Fire Protection and Life Safety Systems. SPEAKERS: Learning Objectives must indicate what attendees will do (not simply understand or learn ) with your information. Read About Learning Objectives Required for AIA Continuing Education Credit: 3
4 Overview Commissioning - NFPA 3 Terminology Integrated Testing - NFPA 4 ICC Commissioning Standard Importance of Cx F&LS Case Studies Lessons learned Re-Cx vs. Retro-Cx review Wrap-Up/Questions 4
5 NFPA 3 Commissioning and Integrated Testing of Fire Protection Systems Commissioning A systematic process that provides documented confirmation that building systems function according to the intended design criteria set forth in the project documents and satisfy the owner s operational needs, including compliance with applicable laws, regulations, codes, and standards. 5
6 Terminology Fire Protection Industry-term Commissioning utilized incorrectly. Acceptance Testing with Engineer or local Building/Fire Department is often incorrectly termed Commissioning. Commissioning is a systematic process not just a test. NFPA3 should help with Terminology. ACCEPTANCE TESTING COMMISSIONING Integrated Testing Agent (ITA) NFPA 4 new term 6
7 NFPA 3 & 4 Updates 2012 Edition NFPA 3 is Recommended Practice 2012 Edition NFPA 3 contains both Commissioning & Integrated Testing of Fire Protection and Life Safety Systems 2015 Edition of NFPA 3 only contains Commissioning New NFPA 4 (2015 Edition) is a Standard and only deals with Integrated Testing Future NFPA 3 moving to Standard 7
8 Key Stakeholders Owner Architect / Engineer Commissioning Agent (CxA) if overall building commissioning Fire Commissioning Agent (FCxA) Integrated Testing Agent (ITa) Contractor Subcontractors Registered Design Professionals (RDP) Authorities Having Jurisdiction (AHJ) 8
9 Key Documents Owner s Project Requirements (OPR) Basis of Design (BOD) Commissioning Plan Integrated Testing Plan Commissioning Record Document 9
10 NFPA 3 & 4 Qualifications Qualified FCxA and ITa required Advanced knowledge & experience in installation and operation of systems Advanced knowledge & experience in installation, operation, and interfaces between the various systems 10
11 NFPA 3 New and Existing Buildings Commissioning is done on new buildings or new systems. Re-commissioning (RE-Cx) is commissioning of existing systems that were previously commissioned. Retro-commissioning is commissioning of existing systems that were not previously 11
12 ICC Update ICC publishes the set of International Codes IBC & IMC ICC Draft ANSI Commissioning Standard ICC 1000 Public Comment Period Ended April 30, 2015 Current form ICC 1000 is vague, but covers all systems NFPA submitted Public Comment 12
13 Large F& LS Commissioning Projects 13
14 Importance of Commissioning Fire Protection and Life Safety Systems Many fire protection systems sit dormant until emergency conditions Life safety systems are essential in protecting occupants, contents of, and the building itself and notifying occupants during emergency conditions Owners are legally obligated to have properly functioning fire protection systems and to maintain and test these systems. The complex integration of fire protection systems is at an all time high Non-commissioned or improperly commissioned fire protection systems are a liability for owners and commissioning firms. 14
15 Case Study Existing High Rise Building with an Atrium Smoke Control System and Stair Pressurization System. Building occupied for years with areas of the building were getting renovated. Lack of documentation and no evidence it was commissioned resulted in a thorough test of the system to verify installation, operation, and performance. One test scenario was to simulate a transfer to emergency power for entire building during heavy load, including smoke control systems, fire pumps, and fire alarm systems all running under normal power to verify it continued to perform and that the transfer to emergency generator worked. 15
16 Result Under normal power systems activated properly, but on emergency power transfer all of the dampers closed, even though some were suppose to be open. Smoke control fans were on emergency power, but all the dampers were on normal power and failed safe close upon loss of power st NCBC Conference
17 Lessons Learned 1. Emergency/Standby power critical for fire protection and life safety systems. 2. Showcased importance of proper Commissioning and Retro- Commissioning 3. Highlighted importance of integrated test plans 4. Systems need to properly function in various conditions, not only ideal normal conditions. 5. Existing fire protection and life safety systems are many times not properly configured, coordinated, integrated, or commissioned st NCBC Conference
18 Case Study Relatively new Low-rise large building with Atrium smoke control system. Actual fire outside of Atrium activated non-atrium sprinkler water flow in a remote area of building Atrium smoke control system activated in real life (not suppose to per basis of design and project/owner objective) st NCBC Conference
19 Result Smoke from remote area of building was dragged through the building causing extensive damage and clean-up. Improperly configured smoke control sequence did much more harm st NCBC Conference
20 Lessons 1. Improperly configured systems not only not helpful, can cause more problems. 2. Need comprehensive test scenarios and when systems should activate, but also when they should not activate. 3. Proper Commissioning of fire protection and life safety systems critical for proper orientation. 4. Non-Commissioned systems have significantly increased rate of not properly functioning and possibly doing more harm putting occupants, property, and the building at risk from fire and life safety st NCBC Conference
21 Case Study New High-Rise Hotel with Pressurized Stairs, Fire Pump, Fire Alarm System, Emergency Lighting, and other Systems on the Emergency Generator Emergency generator was tested prior to all the systems were completed and connected to the emergency generator and signed off. Generator was properly sized to accommodate load As part of life safety systems test a full load on emergency generator was done with the smoke control system, fire pump, fire alarm system, emergency lighting, and other systems running st NCBC Conference
22 Result During life safety test transfer to emergency generator the generator tripped out. All systems in the building went down with no power and dark no lighting (night test) Generator had capacity but not properly balanced and configured as other systems were added to the emergency generator load st NCBC Conference
23 Lessons Learned 1. Need to commission systems when they are first brought online, but also after other systems are finished. 2. Importance of Commissioning to identify and resolve problems st NCBC Conference
24 Importance of Commissioning Team Brought In Early New Construction Mixed-Use High Rise Project with A Smoke Control System Fire Protection Life Safety Commissioning Team brought in late to the project after much of the system were installed. Systems and smoke control shafts were constructed, sealed, and painted. Required duct leakage test was never conducted prior to sealing shafts st NCBC Conference
25 Results Smoke control system could not meet performance of.10 inch water gauge pressure differential. Leaky duct was the culprit, which would have been identified if the duct test was conducted. Had to take down the drywall shaft for entire building to fix the duct work, conduct duct test, and replace shaft and paint. Additional cost and schedule impact st NCBC Conference
26 Lessons Learned 1. Best to bring in Commissioning Team during the design phase. 2. Need to conduct commissioning testing and component verification at the proper installation point during construction. 3. Skipping Commissioning or improperly delaying steps most likely will cost you significantly more financially and impact schedule st NCBC Conference
27 David LeBlanc, PE, SFPE Vice President JENSEN HUGHES Thank You!
Commissioning of Fire Protection and Life Safety Systems. Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA Fire Protection Engineering s role in sustainability through Commissioning
Electrical Systems Commissioning
Electrical Systems Commissioning Catherine Melander, Questions & Solutions Engineering 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning Association is
NFPA 3 and 4 Commissioning and Integrated Testing of Fire Protection and Life Safety Systems. Matt Klaus Senior Fire Protection Engineer NFPA
NFPA 3 and 4 Commissioning and Integrated Testing of Fire Protection and Life Safety Systems Matt Klaus Senior Fire Protection Engineer NFPA 1 The Recommended Practice 2 Coming Soon 3 Overview What is
CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning
CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning Presentation To: Canadian Fire Alarm Association (CFAA) Alberta Technical Seminar
Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY
SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. HVAC Commissioning description. 2. HVAC Commissioning responsibilities. 1.2 REFERENCES A. American Society
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline
Fire Alarm Systems Level III Content Outline The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive listing. 3.1
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center [email protected] 402-559- 5301 402-630-
A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly
NFPA 91 1999 Edition. 2.1.9 Fire dampers shall be permitted to be installed in exhaust systems in the following situations:
NFPA 91 1999 Edition 2.1.9 Fire dampers shall be permitted to be installed in exhaust systems in the following situations: 1) Where ducts pass through fire barriers (2) Where a collection system installed
Energy Design Resources Commissioning Plan Outline Template
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?
RHODE ISLAND DIVISION OF STATE FIRE MARSHAL 1951 Smith Street, North Providence, RI 02911 Telephone: (401) 383-7717 Fax: (401) 383-8879 John E. Chartier, EFO, CFI State Fire Marshal Rhode Island State
Commissioning and Maintenance: Two Sides of the Same Coin? Kristin Heinemeier, PE, PhD Principal Engineer UC Davis WCEC
Commissioning and Maintenance: Two Sides of the Same Coin? Kristin Heinemeier, PE, PhD Principal Engineer UC Davis WCEC AIA Quality Assurance The Building Commissioning Association is a Registered Provider
SUPPLEMENTAL TERMS AND CONDITIONS TO STATE FORM SC-5.1TC ARCHITECT/ENGINEER AGREEMENT TERMS AND CONDITIONS DESIGN/BID/BUILD
ATTACHMENT 2 UNIVERSITY OF COLORADO BOULDER SUPPLEMENTAL TERMS AND CONDITIONS TO STATE FORM SC-5.1TC ARCHITECT/ENGINEER AGREEMENT TERMS AND CONDITIONS DESIGN/BID/BUILD Table of Contents, Exhibits Delete
Data Center Commissioning: What you need to know
Data Center Commissioning: What you need to know Course # CXENERGY1511 AIA Provider # 50111116 AABC Commissioning Group CxEnergy Conference Henderson, NV April 30, 2015 Presented by: Judson H. Adams, P.E.,
Amendments to the 2012 INTERNATIONAL FIRE CODE
Amendments to the 2012 INTERNATIONAL FIRE CODE 2012 Edition, International Fire Code. Section 101.1 Amend to read as follows. 101.1 Title. These regulations shall be known as the Fire Code of the City
SECTION 15950 - TESTING, ADJUSTING, AND BALANCING
SECTION 15950 - TESTING, ADJUSTING, AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
SECTION 16721 FIRE ALARM AND DETECTION SYSTEM
1. GENERAL 1.1. Related Documents: 1.2. Scope: 1.1.1. The general provisions of the Contract, including General and Supplementary Conditions and General Requirements apply to the work specified in this
FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL
FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL January, 2003 Environmental Health and Safety Florida Atlantic University 777 Glades Rd. Boca Raton, FL 33431 Phone: 561-297-3129 Fax:
ARE YOU READY FOR THIS RISK ASSESSMENT IN THE CODES?
ARE YOU READY FOR THIS RISK ASSESSMENT IN THE CODES? William E. Koffel, P.E., FSFPE President Koffel Associates, Inc. www.koffel.com [email protected] Expertly Engineering Safety From Fire OVERVIEW 2007
COMMISSIONING OF FIRE ALARM SYSTEMS
COMMISSIONING OF FIRE ALARM SYSTEMS OWNER FURNISHED The owner directly contracts an independent third party commissioning agent for this project. This Commissioning Plan has been included for reference
Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES
SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work
Commissioning of Mission Critical Facilities
Commissioning of Mission Critical Facilities Terry L. Rodgers, CPE, CPMP VP of Sustainable Operations Primary Integration Solutions Paul Liesman SVP of FM & Commissioning Syska Hennessy Group AIA Quality
Building Codes Update: The 2009 International Fire Code and the Apartment Industry
! Building Codes Update: The 2009 International Fire Code and the Apartment Industry Apartment operators and developers should be aware of organizational changes in the 2009 edition of the International
Understanding Fire Alarm Requirements & Inspections. Presented By Bill Conroy Technical Sales For Briscoe Protective Systems Inc
Understanding Fire Alarm Requirements & Inspections Presented By Bill Conroy Technical Sales For Briscoe Protective Systems Inc Introduction Fire Alarm Requirements are structured through a system of codes.
Sam Docknevich, PSP, Security Service Portfolio Manager. Are You Prepared? The impending impact of Code on Servicing Security Systems
Sam Docknevich, PSP, Security Service Portfolio Manager Are You Prepared? The impending impact of Code on Servicing Security Systems usa.siemens.com/infrastructure-cities Share current and upcoming standards
CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services
CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services 575 E. Flamingo Road, Las Vegas, NV 89119 (702) 455-7316 FAX (702) 455-7347 105.8a-6.1 TITLE: FIRE ALARM SYSTEM REQUIREMENTS SCOPE: This guideline
FIRE ALARM SYSTEM RECORD OF COMPLETION
FUNDAMENTALS OF FIRE ALARM SYSTEMS 72 33 FIRE ALARM SYSTEM RECORD OF COMPLETION To be completed by the system installation contractor at the time of system acceptance and approval. 1. PROTECTED PROPERTY
FIRE ALARM SYSTEM RECORD OF COMPLETION
FIRE ALARM SYSTEM RECORD OF COMPLETION To be completed by the system installation contractor at the time of system acceptance and approval. 1. Protected Property Information Name of property: Description
Denver International Airport Data Center Commissioning Plan
Denver International Airport Data Center Jefferson County School District Columbine High School Renovation Date July 25th, 2014 Prepared by Patrick Corrigan, QCxP Commissioning Engineer McKinstry McKINSTRY
Fire Alarm and Protection Impairment Policy and Procedures
1.0 Policy Statement The University of New Haven has developed a Fire Alarm and Protection Impairment Plan in accordance with the National Fire Protection Associations (NFPA) codes. Specific codes referenced
The Mission Critical Fire Protection Experts
The Mission Critical Fire Protection Experts Protection Systems Protection Systems HFC-227ea / FM200 / FE-227 FE-25 / ECARO-25 Novec 1230 Inergen / Argonite Halon Drop-in Systems High and Low Pressure
Winnipeg Fire Department Fire Prevention Branch
Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of
POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008
SOCIETY OF FIRE PROTECTION ENGINEERS (SFPE) NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS (NSPE) NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES (NICET) POSITION STATEMENT THE ENGINEER AND
Chilled Water System Commissioning: Variable Primary Flow. John D. Villani, P.E. Associate Grumman/Butkus Associates
Chilled Water System Commissioning: Variable Primary Flow John D. Villani, P.E. Associate Grumman/Butkus Associates AIA Quality Assurance Learning Objectives 1. History of chilled water system configurations
Module 4, Lesson 12 Fire Alarm Systems
Student Manual Module 4, Lesson 12 Fire Alarm Systems Performance Objectives At the conclusion of this lesson, you will be able to: Identify the components and functions of a fire alarm system and determine
COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9
COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 GUIDELINES FOR THE PREPARATION OF FIRE PROTECTION SYSTEM NARRATIVE REPORTS 780 CMR 903.1.1 State
Overview of Hotel Fire Safety Requirements
Overview of Hotel Fire Safety Requirements in the Fire Code Susan Clarke, P.Eng. Office of the Fire Marshal - January 10, 2012 1 Agenda Regulation History - Hotels Fire Code Overview (Parts 1 to 8) Defined
INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT
CITY OF SPRING LAKE PARK Code Enforcement Department 1301 81 st Avenue NE Spring Lake Park MN 55432 Business Phone 763-784-6491 Fax 763-792-7257 INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS
NEW YORK CITY FIRE DEPARTMENT
NEW YORK CITY FIRE DEPARTMENT Notice of Promulgation of two New Rules, 3 RCNY 104-02, entitled Professional Certification of Fire Alarm System Installations, and 3 RCNY 105-01, entitled Approval of Fire
FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM INSPECTION AND TESTING FORM
FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM INSPECTION AND TESTING FORM To be completed by the system inspector or tester at the time of the inspection or test. It shall be permitted to modify this form
Cx Contracts: Liability, Indemnity, Insurance. Bruce Pitts, CPMP, CSBA, LEED AP Ujjval Vyas, PhD, JD
Cx Contracts: Liability, Indemnity, Insurance Bruce Pitts, CPMP, CSBA, LEED AP Ujjval Vyas, PhD, JD AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES www.nicet.org 888-476-4238. Fire Alarm Systems
Fire Alarm Systems Level IV Content Outline Standard Model/CBT The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive
FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE
Page 1 of 10 FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE SYSTEM TESTING 1. Testing of the Fire Alarm and Fire Protection Systems 1.1. The Building Engineer, Electrician, Plumber (or
CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS
CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS PROPERTY ADDRESS (BRT Address Required) TESTING CONTRACTOR (Name and Address) License No. ANNUAL
DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION
Phone System Owner Phone System Engineered by: of Record Drawings: of System Manuals: of Test Reports: System Installer 1. GENERAL INFORMATION Phone Delaware License No: Certificate Holder No. System Supplier
Life Safety Code Enabling References
SUPPLEMENT 4 Life Safety Code Enabling References Editor s Note: Supplement 4 provides users of NFPA 72, National Fire Alarm and Signaling Code, with a summary of requirements from NFPA 101, Life Safety
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
A Guide to Renovation and Repair Contract Warranties
A Guide to Renovation and Repair Contract Warranties By Gerald A. Dalrymple, PE A fter being retained to review the merits of several major disputes involving the scope of warranties in renovation and
INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT
INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT FIRE EXTINGUISHERS,SPRINKLER SYSTEMS AND FIRE ALARMS Attachment #1 Inspection of Fire Extinguishers Fire Extinguishers must be tested according
908.7 (New) [IBC [F] 908.7 (New)], 4606.1 (New), Chapter 47 (IBC Chapter 35)
Page 20 ABOUT CODE CORNER CCFS would like to remind you to check with your local Authority Having Jurisdiction (AHJ) for questions and opinions concerning your local Fire and Building Codes. The information
Inspection, Testing and Maintenance
Page 18 ABOUT CODE CORNER CCFS would like to remind you to check with your local Authority Having Jurisdiction (AHJ) for questions and opinions concerning your local Fire and Building Codes. The information
The Life-Cycle of Commissioning for New Construction
The Life-Cycle of Commissioning for New Construction A Case Study at NGA Campus East Owner/Facility Manager: Dan Kailey and Matt Burkholder National Geospatial-Intelligence Agency (NGA) Commissioning Service
AETNA FIRE ALARM SERVICE CO., INC.
FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM INSPECTION AND TESTING FORM To be completed by the system inspector or tester at the inspection or test. It shall be permitted to modify this form as needed
Program No. 1.6.1. Section Heading
ENVIRONMENTAL HEALTH AND SAFETY EHS PROGRAM MANUAL Program Title 1.0 INTRODUCTION The New York City Fire Department (FDNY) is responsible for approving and/or inspecting fire alarm systems, buildings,
The Building Commissioning Association
Best Practices in Commissioning Existing Buildings Building Commissioning Association EXECUTIVE SUMMARY The Building Commissioning Association (BCA) defines Existing Building Commissioning (EBCx) as: a
Global Leaders in Fire Engineering. Company Overview. Finding simple solutions to complex problems.
Company Overview Finding simple solutions to complex problems. ON M9B 6H7 AB T2H 1Z9 339941 From our offices in,, and, we serve our national and international clients by providing cost-effective solutions
Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013
Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems April 2013 The National Multi Housing Council and the National Apartment Association (NMHC/NAA) have
2.4 Protected Elevators For Egress And Access During Fires In Tall Buildings
2.4 Protected Elevators For Egress And Access During Fires In Tall Buildings Richard W. Bukowski, P.E., FSFPE NIST Building and Fire Research Laboratory The events of September 11, 2001 have generated
1. The objective of this guideline is to provide minimum standards for design and installation of fire alarm systems for the University of Missouri.
GENERAL: 1. The objective of this guideline is to provide minimum standards for design and installation of fire alarm systems for the University of Missouri. 2. Fire alarm systems are Life Safety Systems
ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS
ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS In this document are the fire safety equipment maintenance requirements that are found in Division B of the Alberta Fire Code (AFC 2006) for
Fire Alarm and Detection Systems And Central Station Monitoring Plan Submittal Guidelines
Fire Alarm and Detection Systems And Central Station Monitoring Plan Submittal Guidelines Red Oak Fire Rescue Office of the Fire Marshal 547 N. Methodist Red Oak, TX 75154 Phone: 469-218-7713 Fax: 468-218-7719
1.0 General. Inspection, Testing, and Maintenance 1 of 8
1.0 General 1.1 Scope This specifications covers the minimum requirements for the inspection, testing, and maintenance of the existing Notifier fire alarm systems at Bergen Community College (BCC) campus
Design Guidelines for Facilities Construction:
Engineering Division Facilities Management Department Design Guidelines for Facilities Construction: DESIGN GUIDELINE DG01-9 General Commissioning Requirements Part 1 - GENERAL 1.1 SUMMARY A. Section includes
New York City Department of Buildings
The New NYC Building Code Chapter 10 Means of Egress New York City Department of Buildings Technical Affairs Fatma M. Amer, P.E. Copyright Materials This presentation is protected by US and International
Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited**
PHRC Webinar Series Tuesday, September 9, 2014 1:00 pm Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited** Presented by: Bryan Heitzmann Credit(s) earned on completion of
Certification. Kitchen Exhaust Cleaning and Certification Manual 2 ~ Certification. Table of Contents
Certification Table of Contents Phil Ackland Certification Protocol... 2 Preamble... 3 Purpose... 4 Certification Details... 4 Company "Qualification" Steps... 5 Company Qualification Application... 5
Cx for the Forgotten Resource: Water. Daniel Forino, PE, LEED AP BD+C
Cx for the Forgotten Resource: Water Daniel Forino, PE, LEED AP BD+C AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing
NFPA 72. Exception No. 1: Where ambient conditions prohibit installation of automatic smoke detection, automatic heat detection shall be permitted.
NFPA 72 3.3.7.2 3.3.7.2 False Alarm. Activation or reporting of an alarm for which no such alarm condition, fire or emergency actually exists. Additionally, False Alarm is the willful and knowing initiating
Miami Beach Building Department
Miami Beach Building Department Documents Required To Be Signed and Sealed By A Design Professional (FLORIDA BUILDING CODE) GENERAL CONTRACTOR: If the plans are prepared by a design professional that is
Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE
Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE CHAPTER 420-5-22 SUBMISSION OF PLANS AND SPECIFICATIONS FOR HEALTH CARE FACILITIES TABLE OF
BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS
DCD-0304 Identification # Rev. 9/08 County Date of Inspection NAME OF OPERATION BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS ADDRESS TELEPHONE: CITY STATE ZIP BUILDING INSPECTORS CERTIFICATE
to Commissioning The Strategic Guide Report from the ASHRAE Presidential Ad-Hoc Committee Building Performance Alliance on Commissioning
The Strategic Guide to Commissioning Report from the ASHRAE Presidential Ad-Hoc Committee Building Performance Alliance on Commissioning Presented to ASHRAE Board of Directors June 24, 2014 The Building
FIRE-FIGHTING DESIGN BRIEF REPORT
P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM
HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings
SUCCESS WITH 2012 IECC DELAWARE Recommended Practices for Optimized Energy Savings for Builders & Trades COPYRIGHT 2015 ADVANCED ENERGY. ALL RIGHTS RESERVED VERSION 2015.1.0 CHECKLIST: JOB READY 1. 2.
LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.
LIFE SAFETY UPDATE FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc. The purpose of this update is as follows: Remind all state
Fire Alarm System Plans Submittal Guidelines For New and Existing Systems
Fire Alarm System Plans Submittal Guidelines For New and Existing Systems SCOPE The Temecula Fire Prevention Bureau (TFPB) has established the following requirements for the submittal of all fire alarms,
EXHIBIT A SCOPE OF WORK
EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,
Code Requirements for Existing Buildings
Code Requirements for Existing Buildings Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS)
Fire-Rated Glass and Glazing START
Fire-Rated Glass and Glazing START www.pilkington.com/fire Fire-Rated Glass and Glazing Pilkington Fire Protection Glass North America 946 Kane Street, Suite A Toledo, OH 43612 Provider Number: J200 Course
FIRE SPRINKLER SYSTEM DESIGN, ENGINEERING EXEMPTION POLICY FOR (Effective April 1, 2006)
State of Tennessee Department of Commerce and Insurance Board of Architectural and Engineering Examiners 500 James Robertson Parkway Nashville, TN 37243 1142 800 256 5758 615 741 3221 (Nashville Area)
Fighting Fire in Sprinklered Buildings. Student Guide
Fighting Fire in Sprinklered Buildings Student Guide Fighting Fire in Sprinklered Buildings Student Guide Table of Contents Purpose........................................................... 3 Instruction
HERNANDO COUNTY FIRE ALARM GUIDELINES
HERNANDO COUNTY FIRE ALARM GUIDELINES To be used for all commercial building fire alarm system plan review. The procedures set forth in this document are the minimum requirements necessary to ensure a
NATIONAL FIRE ALARM AND SIGNALING CODE
GAP.11.1.1.0 A Publication of Global Asset Protection Services LLC NATIONAL FIRE ALARM AND SIGNALING CODE INTRODUCTION National Fire Protection Association (NFPA) documents describe a level of fire protection
SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS
SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS I. APPLICATION AND DEFINITIONS 1.01 Authorization for Standards 1.02 Application of Standards 1.03 Definitions
Jeff Sloan, P.E., McKinstry Co. Wednesday, April 29
AABC Commissioning Group AIA Provider Number 50111116 Exploring ASHRAE 90.4P, Energy Standard for Data Centers & Telecommunications CXENERGY1534 Jeff Sloan, P.E., McKinstry Co. Wednesday, April 29 Credit(s)
City of Columbus Department of Building and Zoning Services
City of Columbus Department of Building and Zoning Services Introduction This manual is designed to provide you, the contractor, owner or design professional with a step-by-step guide to our process, beginning