Cross-border Economic Cooperation András Rákóczi Managing president KIÚT Regional Development Association Chisinau, 25th of June, 2010.
STRATEGIC POSITION IN THE NEW EUROPE
STRATÉGIAI PONTOK AZ ÚJ EURÓPÁBAN: IMPORTANT BORDER CROSSING POINTS IN THE EUROPEAN UNION
PÁRATLAN ADOTTSÁGOK - STRATÉGIAI ELHELYEZKEDÉS OUTSTANDING ADVANTAGES - STRATEGIC POSITION ELHELYEZKE- DÉS: EGYIK LEGFONTOSABB KELET-NYUGATI KÖZLEKEDÉSI FOLYOSÓ MENTÉN (V. sz. Transz-Európai Folyosó) LOCATED ON A MAJOR TRANSPORT CORRIDOR (No.5 Pan- European corridor
ZÁHONY ENSURES EUROPEAN CONDITIONS IN THE NEIGHBOURHOOD OF THE EASTERN MARKETS
Railway on the border of HU-SK-UA
Vehicular heavy traffic in Záhony (trucks/year) 140000 120000 100000 80000 60000 40000 20000 0 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 belépő kilépő
Railway heavy traffic in Záhony The volume of the railway transit in Záhony 6000 5000 ezer tonna 4000 3000 2000 Bejövő Kimenő 1000 0
MULTIMODÁLIS LOGISZTIKA
150 thousand trucks/ year Trimodális logisztika
Logistic center
Why was the KIÚT Regional Development Association organized? 1990 year of changes, Comecon broke EU orientation in the economic connection. The railway transit between Hungary-Ukraine fell back 1990 15 million tons, 7000 person 2000 6 million tons, 2000 person We are searching for expedient from this economic situation.
The Association was organized on 10th of February 2000: 15 economic entity (Co. s & Ltd s) 3 Sub-regional association (31 local government) 21 individual Aims: developing of vehicular, regional development, logistic, economic, environmental and international relationship.
KIÚT REGIONAL DEVELOPMENT ASSOCIATION A fejlesztési terület The development Area
rail transport MODERN, INTEGRATED LOGISTIC SERVICES BY THE PRIVATE COMPANIES rail-rail and rail-road transhipment storage customs warehouse packaging ROLA terminal TRANSHIPMENT OF BULK GOODS RAKTÁROZÁS LOADING BY SMALL EQUIPMENT Distribution centres Row material processing HANDLING LIQUID CARGO LOADING BY CRANE WAREHOUSING SERVICES CHANGING OF AXLES
The competitive Záhony Geographical aptitude Záhony and its area includes 94 km 2 Functioning structure (wide gauge railway 150 km, european gauge railway 300 km) Qualified human resources Competitive transport fees Low lighterage Customs Other services (banks, insurance companies, service stations)
FEJLETT LOGISZTIKAI SZOLGÁLTATÁSOK LOGISZTIKAI KÖZPONT LOGISTIC CENTRE IPARI PARK INDUSTRIAL PARK FEJLETT ÜZLETI INFRASTRUKTÚRA ADVANCED BUSINESS INFRASTRUCTURE TERÜLET- FEJLESZTÉSI TÁRSASÁGOK REGIONAL DEVELOPMENT COMPANIES BANKI INFRASTRUKTÚRA BANKING INFRASTRUCTURE SZÁLLÍTMÁNYOZÓ CÉGEK TRANSPORTATION COMPANIES VÁMÜGYNÖK- SÉGEK CUSTOMS AGENT ACTIVITY
Configuration Plan
1. Establishment of an intermodal public industrial and logistical area It is necessary to establish a 160ha industrial and logistical park in the area of Fényeslitke Komoró in favor of the realization of the specific investor intentions (24 MILLION EURO) Goals of the project: Construction of wide-gauge and standard European-gauge railway tracks until the border of the site Drinking water and municipal sewage network Establishment of facilities to remove surface water Establishment of telecommunications network Construction of electricity and gas network
Actual stage of the project: The proprietary rights of the RFH co. ltd. is registered The public procurement procedure of the construction of municipal water supply facilities, internal transport infrastructure and electricity is closed Execution deadline: 29th August 2010 Industrial site The selection of the rail infrastructure building contractor is in progress Fullfilment deadline: 31st May 2010
2. a. Rail-tracks to be renewed Renewing of 43 km wide gauge railway 30 million euro
2. b. Renewal of traffic way - 27 km 85 million EUR
Záhony and its Area flagship project The elements of the project 3. Supporting the small and medium enterprises operating in the area Amount of state support: 3,1 billion Ft, the enterpreteneurs give 2 billion Ft own resources hereby 38 project were executed.
Záhony and its Area flagship project The elements of the project 4. Development of secondary and high-level education helping industrial-logistics and economic life, according to the needs of the measurable economic activities (2 million Euro)
Záhony and its Area flagship project The elements of the project 5. Complex international marketing, economic and trafficdiplomatic programme (3 million EUR)
Economic geography Worksla-Steel: Transport Poltava Ore processing Factory Worksla-Steel steel processing Factory Чоп Комсомольск Загонь Загонь Чоп Загонь Южный Дунай Transporting steel block to Zahony By railway via Csop By ship via Juzhnyi port forward to Duna-Tisza (Tisza is not shipped yet)
The sales markets of the products of the companies Eastern-southern- European countries, Ukraine, Turkey, Greece and other states are the markets of the products of the Worksla-Steel Hungary Using technological chain means advantage in the car, machine and ship fabricated factory at the Middle-east and the South-European companies. Загонь
Transportation ways and length of time Szállítási útvonalak és időtartamok
Záhony
Further development plans Establishing logistic center between Záhony and Tiszabezdéd (private investment) Variable gauge between Hungary-Ukraine Creating joint industrial park on the Hungarian- Ukrainian border Development of transport links in the Baltic and Black Sea regions
Effect of the study s examination to clearway of Záhony and its area M340 M34 M34 The joint Hungarian-Slovakian- Ukrainian Three border bridge variation is not Soluble economically (yellow line) M340 C D The C variation got into the development plans M34 38
Köszönöm megtisztelő figyelmüket! THANK YOU FOR YOUR ATTENTION! KIÚT Regional Development Association Address: 4625 Záhony, Európa square 20. Tel.: +36-45-525-633 Fax: +36-45-525-634 E-mail: kiutzh@axelero.hu Web: www.kiut.hu