Appendix 14 Traffic Management Plan



Similar documents
Traffic Management Issue 1.0 Revision: v2 October 2014

Environmental Management Plan TRAFFIC

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

TRAFFIC MANAGEMENT PLAN

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Construction Traffic Management Plan

THIS PAGE INTENTIONALLY LEFT BLANK

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/ Galloper Wind Farm Limited

Construction Phase Traffic Management Plan

Construction Traffic Management Sub-Plan

ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT

Traffic Management Plan

Health & Safety Management System Manual

BROKEN HILL OPERATIONS Rasp Mine Project Traffic Management Plan

TRAFFIC MANAGEMENT PLAN AND TRUCK DRIVER CODE OF PRACTICE

Construction Management Plan Template

Temporary Traffic Management

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Traffic Management Plan - Depot Procedure

SIGNING SEQUENCE IN ADVANCE OF VEHICLE INSPECTION. STATIONS (VIS & MIS) Page 1of 3

Traffic Management Plan. for the. Dargues Gold Mine

FOCUS MINERALS LIMITED

For personal use only

23 February Enfield Intermodal Logistics Centre

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT

Update on Heap Leach potential of the Murchison gold project

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Framework Traffic Management for Shared Zones in Large Private Estates AITPM 2014 National Conference

GUIDE TO THE PREPARATION OF TRAFFIC MANAGEMENT PLANS

Guide to the Preparation of a Traffic Management Plan

Lynwood Quarry Community Investment Fund Plan 2015 to 2019

Basements and Deep Building Construction Policy 2014

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

GRWF BOP TRAFFIC MANAGEMENT PROTOCOL

For personal use only

The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit

The Use and Application of the Benchmarking Assessment Tool for the Recovery and Recycling of Used Lead Acid Batteries in India

Northern Territory ROAD TRANSPORT FATIGUE MANAGEMENT

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS.

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

CR Tabs_Main:Layout 1 14/5/09 3:15 PM Page 13 Transport 13

Workplace Transport Safety Reversing Vehicles Information Sheet What are the dangers associated with reversing vehicles? Why is reversing a problem?

Release: 1. RIIOHS302A Implement traffic management plan

Transport Construction Authority Report for Auburn Stabling Project. Traffic Impact Assessment

Work time and logbooks. A basic guide to work time and rest time requirements and logbook standards for transport operators and drivers.

Traffic Management During Construction

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

Managing Public Use of Freeway Emergency Access Gates and Median Crossovers

Wonawinta Silver Project to be acquired; Mount Boppy development cost and risk cut back

UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

TRAFFIC MANAGEMENT IN WORKPLACES

FATIGUE MANAGEMENT MODULE STANDARDS

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK

Exploration and Development Activity

Pollution Incident Response Plan

Traffic Management Guidelines

Management Plan. Contractor Management

TABLE OF CONTENTS TABLES FIGURES

For personal use only

MOKOLO AND CROCODILE RIVER (WEST) WATER AUGMENTATION PROJECT TRAFFIC MANAGEMENT

Construction Traffic Management Plan

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

Site Layout & Traffic Plan

ALCYONE REPORTS JORC SILVER RESOURCES

Blast management plan template

Traffic Management Plan

CIVIL AND MINING CONTRACTORS

Principles of Traffic Management on sites / road network

Guide Document for Development of WHS Management Plans

Tomingley Gold Project. Traffic Management Plan

Fleet Management & Vehicle Maintenance Team Plan 2015/16

SUBMISSION Performance Benchmarking of Australian Business Regulation: Planning, Zoning and Development Assessments

1 / 6. Appendix-K. Traffic Management Plan. ESIA Report for Etlik IHCP Appendix-K Traffic Management Plan Project No.: 12/019.

Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos

PLANNING POLICY 3.3.5

TEMPORARY TRAFFIC MANAGEMENT Operate as a Traffic Controller (TC) for low volume and Level 1 roads

Goals & Objectives. Chapter 9. Transportation

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Construction Traffic Management Plan

SIBANYE GOLD MINERAL RESOURCES and MINERAL RESERVES UPDATE: FURTHER INCREASE IN GOLD AND URANIUM MINERAL RESERVES

Traffic Management Scheme

Fast Tracking to Production

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

Transcription:

Appendix 14 Traffic Management Plan

Toms Gully Underground Project

Table of Contents 1 Purpose... 3 2 Location & Production Overview... 3 3 Operations History... 3 4 Current Traffic Management & Traffic Flow... 4 5 Future Traffic Management & Traffic Flow... 4 6 Existing Site Entrance and Approach... 5 7 Traffic Management Risk Controls... 7 8 Management Plan Review... 7 Appendix A Photographs... 8 Page 2

1 Purpose Primary Gold Limited (Primary Gold) is proposing to develop a new underground mining phase at Toms Gully (Toms Gully Underground (TGU Project)). This document describes the key aspects of traffic management and controls associated with safe operation. As it is a gold operation, there will be minimal impact on regional traffic as ore will be processed on site and other traffic changes will be minor as demonstrated within this Traffic Management Plan (TMP). 2 Location & Production Overview Toms Gully is an existing, non operating mine, located within the Old Mount Bundey Station, approximately 90 km south east of Darwin. The mine was operational for periods from 1988 and has most recently been in care and maintenance since February 2011. Existing mine infrastructure comprises of an open pit and underground mine, access roads, 22 kv power reticulation, processing facility, two waste rock dumps (WRDs), two tails storage facilities (TSFs), two evaporation dams, drains and sumps, maintenance shed and lay down yard, stores shed and yards and administration offices. The proposed TGU Project comprises of the following works: Mining underground to the south of the existing underground workings; Extraction of up to 350,000 tonnes per annum (tpa) of ore over three to four years; Removal of approximately 720,000 tpa of waste rock, replaced underground or in the base of the existing pit (no external storage of waste rock); Conventional Carbon in Leach gold processing plant and ancillaries renovated and reused; Storage of approximately 830,000 t of tailings in a raised TSF; New 2.1 GL freshwater dam; Treatment of pit water, then storage in new dam to facilitate mine dewatering; and Clearing of approximately 84 ha of native vegetation (46 ha being for freshwater dam). 3 Operations History The Toms Gully gold deposit was originally discovered in 1986 by Carpentaria Exploration Company, a subsidiary of Mount Isa Mines. Toms Gully was developed by Carpentaria in 1988 as an open cut mine, with an associated ore treatment plant, and later extended to an underground operation by Renison Consolidated Mines. In addition to Carpentaria, Toms Gully has had several owners and operators including Kakadu Resources, Sirocco Resources who changed their company name to Renison Consolidated Mines, GBS Gold Australia, and Crocodile Gold Australia Operations, who then sold to Primary Gold in 2013. Currently the site is in care and maintenance. Page 3

4 Current Traffic Management & Traffic Flow With the site currently being in care and maintenance, the site entrance is occasionally being used by the pastoralist and for site visits by various technical consultants engaged by Primary Gold. Annual traffic data for Counter RDVDP007 published by the Department of Transport in conjunction with Territory Asset Management Services (TAMS) Pty Ltd is provided in Table 1 below to provide an indication of the level of traffic flow on Arnhem Highway in the vicinity of the TGU Project. Counter RDVDP007 is located on Arnhem Highway, 35 km northwest of the TGU Project site entrance. Table 1: Counter RDVDP007 Traffic Data Year 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Inbound Vehicles 451 474 481 529 520 541 485 620 577 694 Outbound Vehicles 466 481 506 553 574 605 584 629 689 702 Both Vehicles 917 955 987 1082 1094 1146 1069 1249 1266 1396 5 Future Traffic Management & Traffic Flow A workforce of approximately 100 people will be required for the TGU Project and will be sourced predominantly from the nearby towns. The town of Humpty Doo is approximately 60km from the TGU Project, Palmerston approximately 80km and the centre of Darwin approximately 100km. Primary Gold will offer a bus service to transport employees to and from work, thereby considerably reducing TGU Project traffic on the road. The proposed underground mining method will see mined ore trucked directly to the existing Toms Gully processing facility which is on site. The proposed processing capacity of 350,000 tpa is expected to produce 65,000 oz per annum (pa). This level of production is relatively small for mining operations and as such deliveries of consumables and reagents will be low. TGU Project traffic flow on and off site is estimated at an average of five delivery trucks per week, up to six bus trips daily and ten light vehicles daily. Three quarries located East of the TGU Project site (Boral Concrete, Ostojic Group and Halkitis Bros) have, up to mid 2015, been supplying rock to the Inpex project at a production rate exceeding 1.5 Mtpa. The completion of the Inpex project will see a reduction in excess of 80 road trains per day travelling past the TGU Project site entrance. Due to the limited numbers of TGU Project traffic expected and the removal of approximately 80 road trains from current traffic volumes, the TGU Project is not expected to adversely impact on current traffic flow in the TGU Project vicinity. Page 4

6 Existing Site Entrance and Approach A layout of the existing site entrance is illustrated in Figure 1. Past operations have used this entrance without incident and therefore no modifications are proposed to the entrance as part of the TGU Project. 8 M Toms Gully 38 M Arnhem Highway 23 M Figure 1: Project Site Entrance Layout Page 5

Figure 2 illustrates the North and South direct line of sights along Arnhem Highway from the TGU Project site entrance. Arnhem Hwy 800M Toms Gully Intersection Visibility 400M Visibility Toms Gully Intersection Arnhem Hwy Figure 2: Direct Line of Sight on Arnhem Highway The section of Arnhem Highway adjacent to the site entrance consists of a two lane road with an approximate paved width of 8 m. This section of road is subject to a speed limit of 110 km/hr. As illustrated above, there is a direct line of sight from the entrance to the North of 800m and to the South of 400m. Sight distance requirements are given in Austroads Guide to Road Design Part 4A: Unsignalised and Signalised Intersections. The required distances assuming a reaction time of 2.5 seconds and a travelling speed of 110 km/hr are: Safe Intersection Sight Distance (SISD) (value for trucks at night has been used) 385m; Approach Sight Distance (value for trucks has been used) 293m; and Minimum Gap Sight Distance (MGSD) 305m for a right turn (this is the maximum distance given in Austroads). The available distances are all greater than the direct line of site distances and are therefore acceptable. Photographs of the approach roads and TGU Project site entrance are provided in Appendix A. Page 6

7 Traffic Management Risk Controls To mitigate the risks associated with TGU Project traffic, Table 2 identifies the management measures proposed to be implemented to minimise any adverse impacts: Table 2: Traffic Management Measures Action Timing Responsibility All drivers shall have the appropriate driving licences in place Life of TGU Project EH&S Manager All drivers on site shall have their competency confirmed through Life of TGU Project EH&S Manager competency based training or verification of competence All drivers on site shall undertake the TGU Project site induction Life of TGU Project EH&S Manager which shall contain a section on driving requirements A bus shall be made available to transport employees to and from Life of TGU Project EH&S Manager the TGU Project site Road signage shall be installed on the Northern and Southern approaches of Arnhem Highway warning of the mine entrance and the potential for entering and exiting vehicles. This signage shall be in accordance with Austroad requirements and to the satisfaction of the Northern Territory Department of Transport Prior to commencement of TGU Project EH&S Manager Signage shall be installed along the site entrance road warning of the upcoming intersection with the Arnhem Highway. A stop sign shall also be installed on the entrance road at the intersection point The site access road shall be regularly maintained and sprayed with water to minimise dust generation. Vehicle speed limits shall be set and signposted within the TGU Project site On site demarcation of heavy equipment, light vehicles and pedestrians shall be implemented where appropriate and practicable Prior to commencement of TGU Project Life of TGU Project Life of TGU Project Life of TGU Project EH&S Manager EH&S Manager EH&S Manager EH&S Manager All vehicles shall be regularly serviced and maintained Life of TGU Project EH&S Manager All loads shall be safely secured prior to departure and regularly Life of TGU Project EH&S Manager checked Transport, storage, handling, and use of hazardous materials shall Life of TGU Project EH&S Manager be in accordance with relevant Northern Territory legislation Traffic incidents for TGU Project related traffic shall be managed in accordance with the Project Incident Reporting and Management System Life of TGU Project EH&S Manager 8 Management Plan Review This TMP shall be reviewed if a number of traffic near misses and/or incidents are recorded. Upon review, the document shall be revised where appropriate and consultation undertaken with the Northern Territory Department of Transport where required. Page 7

Appendix A Photographs Figure 3: Site entrance West side of Arnhem Highway looking South Figure 4: Site entrance West side of Arnhem Highway looking North Page 8

Figure 5: East side of Arnhem Highway looking West along site access road Figure 6: Site entrance East side of Arnhem Highway looking South Page 9

Figure 7: Site entrance East side of Arnhem Highway looking North Figure 8: Arnhem Highway North of entrance looking South Page 10

Figure 9: Arnhem Highway South of entrance looking North Page 11