1 UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA
2 UPDATE ON MANAGEMENT OF LEGACY ENVIRONMENTAL ISSUES IN GHANA AUGUST 2015 AngloGold Ashanti acknowledges that there are some legacy environmental concerns to be addressed at both of its operations in Ghana Obuasi and Iduapriem. Although the majority of these issues resulted from historic operating practices prior to the merger with Ashanti Goldfields Corporation in 2004, the company has not only strived to develop action plans to mitigate these, but also implemented appropriate environmental standards and operating systems. Correcting such legacy environmental issues has taken time, however good progress has been made over the past decade. Environmental Management Plans (EMPs) are prepared every three years, (and updated when there is a significant change to operations) and submitted to the Ghana Environmental Protection Agency (EPA) for approval that results in the Agency issuing an Environmental Certificate for each mine. These plans contain information pertaining to the key aspects and impacts at each operation and the management commitments to addressing such impacts. Iduapriem: the Environmental Certificate expired on 6 October The EMP was submitted to the EPA in April 2014, 6 months prior to expiry, in line with the legal requirement. The EPA responded on 10 November 2014 by providing comments on the EMP which the mine addressed and subsequently re-submitted the final document on 9 January The mine has also paid the required processing and certificate fees to facilitate the issuing of the new permit which is still outstanding as at beginning of October Obuasi: the Environmental Certificate expired on 14 March The EMP was submitted to the EPA in September 2013, 6 months prior to expiry, in line with the legal requirement. In early 2014, AGA Ghana announced that there would be a review the future of the Obuasi Operation, based on many years of under-performance. This resulted in the intent to retrench the workforce and suspend underground operations to limit financial losses and by end of 2014 the mine was placed on a limited operation phase whilst work continues on the Feasibility Study into the mine s redevelopment. In response, the EPA requested an EMP that reflected the proposed future direction of the mine. In July 2014, AGA Ghana submitted an Amendment to the Programme of Mining Operations (APMO) to the Ministry of Lands and Natural Resources to cover the period October 2014 to December The Minister for Lands and Natural Resources subsequently approved the APMO in November 2014, which allowed AGA Ghana to complete the retrenchment of the entire workforce and to transition the operation into a Limited Operating Phase (LOP). The EPA has yet to approve this EMP and it has now been superseded by a EMP which reflects the resultant Feasibility Study project. EPA approval of the most recent EMP submitted in July 2015 is pending. From July 2014 to June 2015 a Feasibility Study was conducted to outline the redevelopment requirements and future potential of the Obuasi Gold Mine. The draft study was reviewed internally by AGA Corporate and presented to the AGA Executive and Board and to the Government of Ghana and key Stakeholders in June The optimisation of this Feasibility Study and further discussions in relation to project funding, development and approvals is ongoing with the intent to complete in Q
3 Numerous engagements have been held with the EPA during 2015 on the status of the programme to address the legacy environmental issues. AGA Ghana has focussed on a number of initiatives including: Reducing the lease area from 474km 2 to 201km 2 : well underway and sitting with the Minerals Commission to make a final submission to the Minister for approval Fencing the operational area: now complete with a 21km fence enclosing the bulk of the open pits and waste dumps, plus all required infrastructure. Housing estates fall outside this area, as does the operating South TSF and pipeline. Numerous legacy TSFs, open pits and waste dumps are also outside the fenced area. Detailed plans to address these have been prepared in the Feasibility Study Reduction of the mine infrastructure: this includes the demolition of Shaft infrastructure such as at Sansu in the far South of the 8km orebody strike length and Eton Turner Shaft (ETS) in the far North, plus the Pompora Treatment Plant (PTP) and other redundant or unusable infrastructure Undertaking test work on how best to treat and dispose of the stockpiled Arsenic Trioxide: this programme has been underway for 12 months and is nearing completion, with both a viable option and a viable alternative option identified Developing an integrated plan for tailings, backfill and water management: this is a key consideration in the Feasibility Study and there has been good progress on the operation in the past 12 months to understand the water balance and to ensure that the closed water system functions properly, with all water discharged to the environment (due to the positive water balance) meeting EPA guidelines Risk/Uncertainty/Issue Mitigation Strategy Update (August 2015) 1 ENVIRONMENTAL STRUCTURE & STAFFING: Given the complexity of environmental issues at Obuasi and Iduapriem, the company should ensure that the Environmental Management Plan is supported by the appropriate structure and qualified staff. Develop the appropriate operational strategy and organisational structure, then staff with competent personnel. There have been no major changes with the environmental team at Iduapriem. At Obuasi, with the onset of the Limited Operating Phase (LOP) the Environmental function has been consolidated under the EHS Manager. There is a strong linkage between this team and the Feasibility Study team to ensure current activities align with the planned redevelopment work. The smaller team is working well and the Environmental management framework has been under constant review and refinement. Technical support to both operations is provided from the corporate office. 2 WATER MANAGEMENT: In the past, water management has been a significant risk for the business at both Obuasi and Iduapriem. Both Water Treatment Facilities: Develop water balance models, redesign the overall site water management infrastructure and install sufficient water treatment The water-positive environment at Obuasi continues to be catered for through the use of three water treatment plants which discharge compliant water to the environment. These plants have a combined maximum capacity to treat 890m 3 /hr. 2
4 mines have positive water balances. plant capacity at both operations. The water treatment plant at Iduapriem continues to operate optimally, even during the wet season. Underground water at Obuasi: Install flexibility to pump to either the water treatment plants or to the processing plant where it is used as process water or treated and discharged. The underground water system has been integrated into the site-wide water balance. Further test work is underway to identify water ingress points to underground with a view to minimising ingress where possible and to allow clean surface water to flow through the lease without being polluted. Return Water Dam at Obuasi: A new return water dam or process water dam is planned to provide water holding capacity. The Feasibility Study design has been completed to utilize Ponds 1 and 2 for the future Process Water and Return Water ponds respectively. The construction of these facilities will form part of the broader Implementation Phase following Project approval. Water Balance at Obuasi: Develop a predictive minewide water balance model which can cater for different stages in the operation including opening and closing TSFs and changes to water storage facilities. At Obuasi a mine wide water balance model (OPSIM) has been updated and calibrated to simulate the proposed operational periods through the life of mine. A suite of 24 flow meters were installed in 2014 to aid with the calibration. The same OPSIM model was used to develop and manage the Iduapriem water balance. Water Storage at Obuasi: Construct an additional pond for storage and re-use of process water. Ultimately decommission the existing ponds by treating the water and removing the silted material to enable ultimate use as a fresh water pond. In the updated water management strategy Ponds 1 & 2 will be utilised for process water containment. Pond 3 has now been isolated from the operational water circuit through the construction of a diversion channel. This Pond will provide make-up water to the operational requirement and will ultimately be remediated. The design and construction for all ponds has been included in the current Obuasi Mine Feasibility Study requiring Board approval for implementation 3 WASTE MANAGEMENT: Domestic and general waste in Obuasi town is In compliance with a 2010 directive from the Environmental Protection The mine continues to operate the landfill facility at a designated and permitted area. The EPA is yet to 3
5 managed by the municipality. The municipal waste disposal facility was poorly managed and had a significant environmental impact. Agency, Obuasi mine stopped using the municipal refuse facility for its domestic and general waste. The mine has an approved landfill facility. respond to an application for the extension of the use of the temporary landfill facility as the permanent landfill facility. Despite this not being a material risk given the reduction of waste volumes generated as a result of reduction in staff numbers, we continue to pursue the application for a permanent landfill facility. 4 TAILINGS MANAGEMENT: Operations at Iduapriem mine were suspended by the Environmental Protection Agency in February 2010 due to a lack of tailings storage deposition capacity. The previous environmental certificate at Obuasi (2011) was conditional on the decommissioning of the current tailings storage facility and commissioning of a new facility by December This deadline was extended by the EPA by one year to December Iduapriem: A new facility (Greenfields TSF) was built and deposition started in Obuasi: A new tailings management strategy is being developed at Obuasi, which will separate tailings into two streams: the BIOX stream (contain cyanide) which will be deposited within a new high-density polyethylene plastic lined facility and the floatation stream (does not contain cyanide) which will be utilised in underground backfill and deposited within either a clay-lined facility, on top of the South TSF to create the closure landform or in disused pits. The facility has received all of the progressive subsidiary permits from the EPA and is fully operational. During the Limited Operating Phase, legacy tailings are being cleaned up and processed, with tailings residue being deposited on the South TSF. This programme will finish by the end of 2015 to enable normal deposition to cease in accordance with the current EPA directive. As part of the Feasibility Study, AGA Ghana has designed a new doublelined facility immediately to the North of the South TSF which will be utilised for the BIOX stream. Though a separate Floatation Compartment has been designed, AGA Ghana is proposing to utilise relatively benign floatation tailings to deposit on the South TSF to create the closure landform (rather than truck up the equivalent volume from borrow pits). Furthermore AGA Ghana is now studying the merits of depositing this product into disused open pits which is a practice that has been used at both Obuasi and Iduapriem in the past. The Feasibility Study also proposes the use of Pastefill rather than Hydrafill for underground stope void filling which takes both the full floatation stream particle range and a higher percentage than the previous method, requiring less storage space on surface. 5 REHABILITATION: There are a significant number of pits and waste rock dumps, from Obuasi: There is an ongoing rehabilitation plan as per the submitted EMP which is being implemented. Obuasi: revegetation of Coral Snake waste rock dump is complete. Revegetation of Diawuoso Tailings is ongoing. 4
6 previous surface mining at Obuasi that should be rehabilitated to safe, stable and sustainable conditions which are approved by the Environmental Protection Agency. There are three decommissioned tailings facilities at Iduapriem that must be rehabilitated in the short term. Iduapriem: Rehabilitation plan includes the old pits that were backfilled using tailings (Blocks 1, 2 and 3) as well as the interim tailings storage facility. T2 pit, Adubirem pit and Sansu Waste Dump have been remediated. All are in care and maintenance. AGA is engaging the EPA towards relinquishment of pits and waste rock dumps which have been encroached on, and are being used by, the communities. The scope of the feasibility study includes optimisation of the rehabilitation plan for the mine. Rehabilitation of the Block 1 tailings storage facility was completed in Rehabilitation of Block 2 and the Interim tailings storage facility was completed in The western corner of Block 3 pit is being utilised for additional water storage as part of optimising the mine-wide water management. 6 POLLUTION RISKS AND IMPACTS: There is need to ensure that pollution risks at Obuasi mine are mitigated going forward, and that the legacy pollution impacts and sites are remediated. Effluent water discharge: The commissioning of new water treatment plants, clean-dirty water separation (diversion trenches), cyanide code compliance and building of a new process water dam are all projects being implemented to ensure that effluent water discharge is compliant with Environmental Protection Agency standards. See water treatment facilities response above. International Cyanide Management Institute (ICMI) compliance certificate for Obuasi remains valid. Iduapriem has achieved compliance with ICMI requirements at the TSF due to interventions in the slurry thickening process through the operation of the leach at a more suitable ph, and using a coagulant to settle fines (as opposed to settling through additional lime dosing ). Iduapriem has begun preparations for their first ICMI Certification Audit scheduled for the end of Ground water seepage (mainly from TSFs): Historically unlined tailings storage facilities have been identified as a potential source of groundwater seepage. At Obuasi the Feasibility Study addresses these risks. The final phase of the Diawuoso tailings re-mining is planned for completion by the end of Rehabilitation of the first phases has commenced. Planning for the closure of the South, Pompora and Kokoteasua TSFs is part of the Feasibility Study. The Environmental Impact Statement and design of the new Dokyiwa TSF 5
7 lined facility has been submitted to the EPA. Additional boreholes were drilled around these TSFs and monitoring has commenced. Polluted Land: Obuasi TSF footprints: Geochemical studies will be done to delineate polluted areas. Optimal clean up techniques are being studied. Stream Sediments: Complete the stream sediments de-silting. Geochemical studies on the TSF footprints have been completed and the immediate planned action is to fence off identified areas. Agreed closure options are to be implemented during next phase. Dredging of the Jimi Water Dam has been completed. A total volume of 100,000m 3 of silt was dredged from the dam and the EPA notified. 6
MANAGEMENT STANDARD CLOSURE PLANNING
AngloGold Ashanti Limited \ Reg. No.1944/017354/06 76 Jeppe Street \ Newtown \ 2001 \ PO Box 62117 \ Marshalltown \ 2107 \ South Africa Tel +27 (0)11 637 6000 \ Fax +27 (0)11 637 6624 \ Website: www.anglogoldashanti.com
Respecting the. environment. Environmental and natural resource stewardship. Our context. Focus areas. Water. Water management
Respecting the environment Our context Our mining operations share scarce resources with the communities which host us and responsible stewardship of these resources and of the environment is therefore
Environmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY November 2009 Completion Audit November 2009 Terms of Reference Environmental, Health and
This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.
11 ENVIRONMENTAL REHABILITATION PLAN The overall land use vision for the MR133 area is to ensure that the operations are safe, stable and non-polluting over the long-term in order to be integrated into
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost :
ABANDONMENT COST, FINANCIAL ASSURANCE AND PRESENTATION OF THE DOCUMENT. Abandonment cost : Determining the cost associated with closure and accruing these costs during the life of the mining operation
Tailings Management at Porgera
Tailings Management at Porgera The Porgera mine operates under a comprehensive permit issued by the Government of Papua New Guinea (PNG). Under this permit, the Porgera Joint Venture (PJV) is required
Mine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know!
Ontario Mining Act Fact Sheet Mine Closure Plans Your Right to Know! Part VII Rehabilitation of Mining Lands In Ontario, a mining company cannot (re)commence mining operations until a certified Closure
Proposed (Concrete Cutting And Drilling) Environmental Management Plan
SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part
Minerals Regulatory Guidelines MG5. Guidelines for miners: tailings and tailings storage facilities in South Australia
Minerals Regulatory Guidelines MG5 Guidelines for miners: tailings and tailings storage facilities in South Australia Mineral Resources Group Division of Minerals and Energy Resources Primary Industries
Construction Services
Construction Services Construction Turning innovative ideas into delivered solutions At Golder Associates we strive to be the most respected global company providing consulting, design, and construction
MINERALS LAW OF MONGOLIA June 5, 1997 Ulaanbaatar CHAPTER ONE. General Provisions
Article 1. Purpose of the law MINERALS LAW OF MONGOLIA June 5, 1997 Ulaanbaatar CHAPTER ONE General Provisions The purpose of this law is to regulate relations with respect to exploration, mining and related
INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
The Wismut Rehabilitation Project: Present State, Outlook and Lessons Learned
IAEA-Workshop: Regional Training Course on Remedation Infrastructure Development at a Test Site, Chemnitz, Germany, 3 7 December 2012 The Wismut Rehabilitation Project: Present State, Outlook and Lessons
GUIDE TO THE MINE APPROVAL PROCESS IN NEW BRUNSWICK
PROVINCE OF NEW BRUNSWICK DEPARTMENT OF NATURAL RESOURCES Minerals and Petroleum Development Branch GUIDE TO THE MINE APPROVAL PROCESS IN NEW BRUNSWICK TABLE OF CONTENTS 1. INTRODUCTION... 1 2. STANDING
2.0 Land Quality Programme
2.0 Land Quality Programme The Sellafield site has a legacy of ground contamination from its historical use as a Royal Ordnance factory and its subsequent development as a nuclear facility. The ground
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE LEGEND [GeoMine] = Technology Sites [Exploration-Geology-Reserves] = Edumine Courses [GEOCHEMISTRY] = State-of-the-Art Review (SOAR) 1 EXPLORATION [GEOMINE]
Oman Environmental Services Holding Company
Oman Environmental Services Holding Company Population 654,000 3 Schools with a total of 909 students 1970 Less waste generated 10 km of paved roads and 1,700km of unpaved roads 1 small Hospital with unreliable
Code of practice for wastewater overflow management
Code of practice for wastewater overflow management For further information please contact: Information Officer Environment Protection Authority GPO Box 2607 Adelaide SA 5001 Telephone: (08) 8204 2004
Basements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
Capability Statement for Project Consulting
Capability Statement for Project Consulting Company Profile SAFcomm and our Associate Partners provide practical, innovative and financially viable solutions that result in optimum project outcomes to
The Control of Major Accident Hazards Regulations (Northern Ireland) 2015
STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September
Monitoring Program Waste
Procedure Document No. 2792 Document Title Monitoring Program Waste Area HSE Issue Date Major Process Environment Sub Process Authoriser Darryl Cuzzubbo Asset President Version Number 14 TABLE OF CONTENTS
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation
Xtract Resources Plc (AIM:XTR) Chepica Gold Mine: Quarterly Results Presentation London 3 February 2016 Aerial view of Chepica Gold Mine Taken with Phantom 3 Professional Drone 2 We are xtracting significant
AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME
African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
Minerals production in Hungary 1990-2006 (Mtons) - source: Hungarian Office for Mining and Geology
MINING In the last twenty years the mining industry experienced dramatic changes. In the fossil fuel and metallic ores sector the big state-owned mining companies collapsed and/or transformed into private
Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014
Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,
Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project, Australia
Keras Resources plc / Index: AIM / Epic: KRS / Sector: Mining 14 January 2016 Keras Resources plc ( Keras or the Company ) Moving Towards First Production in Q2 2016 at Grants Patch Gold Tribute Project,
QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015
ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering
State of the Nation Report
State of the Nation Report Landfilling Practices and Regulation in Denmark Contents 1. Summary of Solid Waste Management Sector... 2 2. Overview of Landfill Practices... 5 3. Key Stakeholders in the solid
Environmental management framework 24
management framework 24 24.1 Introduction issues are managed at Olympic Dam in accordance with the operation s AS/NZS ISO 14001:2004 certified environmental management system (EMS). The proposed expansion
KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments
KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT Section 24.0 Summary of s VE51988 KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT SUMMARY OF COMMITMENTS TABLE OF CONTENTS TABLE OF CONTENTS... 24-I 24.0 SUMMARY
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
ALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS
Council November 28, 2011 2011 MAJOR PROJECTS UPDATE - EAST WELLFIELD EXPANDED HYDROGEOLOGICAL STUDY AND WASTEWATER TREATMENT PLANT ZERO IMPACT ANALYSIS ISSUE As a component of the Town s 2011 Major Projects
UNDERGROUND WASTE STORAGE FACILITY. sharing responsibility. for the future
UNDERGROUND WASTE STORAGE FACILITY sharing responsibility for the future Our underground waste storage facility is the only one of its kind in the UK. It is a safe, secure and permanent 170m storage site
Mining with Paste Fill
Mining with Paste Fill Mehmet Yumlu, Principal Mining Engineer AMC Consultants Pty Ltd AusIMM Cobar Mining Seminar AMC Con nsultants Pty Ltd Outline Introduction ti What is Paste Fill? Why Using Paste
Krasny license: Operational update September 2015
Kopy Goldfields AB (publ) Press release 15/2015 Stockholm, September 10, 2015 Krasny license: Operational update September 2015 Kopy Goldfields AB (publ) ( Kopy Goldfields or the Company ) hereby provides
Appendix 14 Traffic Management Plan
Appendix 14 Traffic Management Plan Toms Gully Underground Project Table of Contents 1 Purpose... 3 2 Location & Production Overview... 3 3 Operations History... 3 4 Current Traffic Management & Traffic
Expectations and Future Direction of MOP Guidelines Matthew Newton, Principal Officer Rehabilitation Standards Division of Resources & Energy
Expectations and Future Direction of MOP Guidelines Matthew Newton, Principal Officer Rehabilitation Standards Division of Resources & Energy Mine Rehab Conference 2014 Best Practice Ecological Rehabilitation
Section 25.2 provides an overview of the area of influence and reviews legal and other requirements relevant to closure (1).
25 Mine Closure 25.1 Introduction This chapter of the Simandou Mine SEIA addresses the closure of the Simandou Mine, including the cessation of operations, decommissioning of plant and equipment, rehabilitation
Types of Mining - Expert Table
See page 6 Minerals Downunder Teacher Guide (2002) - Activity 4a Types of Mining - Expert Table How to Jigsaw Information 1. Divide the class into Home Groups of five for the five different types of mining
Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa
Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In
Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.
Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION Cornerstone Principles for Conducting Business Active Treatment Systems, Inc. goes to great lengths to instill in every employee the importance of ethical
Water Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation.
Water Recycling in action in South Australia: a review of agricultural and municipal reuse schemes and innovation. S. Rinck-Pfeiffer * Veolia Water/United Water, Parkside, GPO Box 1875, Adelaide, South
INTEGRATED WASTE MANAGEMENT SERVICES
INTEGRATED WASTE MANAGEMENT SERVICES ENGINEERED SOLUTIONS GRO Golder Associates is a respected, employee-owned, global company providing consulting, design and construction services in our specialist areas
Report for the Quarter Ended 30 September 2015
Report for the Quarter Ended 30 September 2015 ASX: KIS Market Capitalisation $18.2 million Shares on Issue 165.3 million 52 Week High 16.5 cents 52 Week Low 8.9 cents Share Price Board of Directors Johann
Financial assurance under the Environmental Protection Act 1994
This guideline describes the arrangements for financial assurance under the Environmental Protection Act 1994. It has been prescribed under the Environmental Protection Regulation 2008. The publication
Antamina Closure Plan: A Top Level Practice. Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010
Antamina Closure Plan: A Top Level Practice Eng. Antonio Mendoza, M.Sc., MBA Environmental Manager 2010 Content Evolution of Environmental Regulation Closure Process Antamina Closure Evolution of Environmental
EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction
EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure
Construction Site Draina e
ProPECC PN 1/94 ENVIRONMENTAL PROTECTION DEPARTMENT PRACTICE NOTE FOR PROFESSIONAL PERSONS Construction Site Draina e Introduction The purpose of this practice note is to provide some basic environmental
NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission
NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission Background The U.S. Nuclear Regulatory Commission (NRC)
Concrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
REPUBLIC OF BOTSWANA GUIDELINES FOR PREPARING ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR MINING PROJECTS
REPUBLIC OF BOTSWANA GUIDELINES FOR PREPARING ENVIRONMENTAL IMPACT ASSESSMENT REPORTS FOR MINING PROJECTS Volume No. 1 September 2003 PREFACE This document has been prepared along the EIA Guidelines of
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating
Plan Requirement Guidance for Quartz Mining Projects
Plan Requirement Guidance for Quartz Mining Projects Executive Summary A quartz mining project requires the submission of environmental protection plans and operational plans for the development, operation,
Environmental Technology March/April 1998
Treating Metal Finishing Wastewater Sultan I. Amer, Ph.D. AQUACHEM INC. Environmental Technology March/April 1998 Wastewater from metal finishing industries contains high concentrations of contaminants
Preventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
Environmental risk managements of mine wastes (from planning to aftercare) Marja Liisa Räisänen ELY-centre for Kainuu
Environmental risk managements of mine wastes (from planning to aftercare) Marja Liisa Räisänen ELY-centre for Kainuu Mine wastes, what they are? Environmental characteristics, characterization How to
Short Course: Paste Fill System Design, Operation and Management
17th International Seminar on Paste and Thickened Tailings Short Course: Paste Fill System Design, Operation and Management Instructors Rob Brown, Principal,, Maureen McGuinness, Senior Process Engineer,,
Case Study: Zinc International
Case Study: Zinc International Sustainability in New Project Management Gamsberg, South Africa Sustainability in Mine Closure Lisheen, Ireland 1 July 2015 Deshnee Naidoo CEO, Zinc International Introduction
15 Guiding Principles
Health, Safety, Environment and Corporate Social Responsibility 15 Guiding Principles 2013 Message from President and CEO 0 New Gold has a complementary portfolio of assets in different countries and cultures
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
11.4.2006 EN Official Journal of the European Union L 102/15
11.4.2006 EN Official Journal of the European Union L 102/15 DIRECTIVE 2006/21/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 15 March 2006 on the management of waste from extractive industries and
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
IMPLEMENTING ISO 14001:2004. www.aecos.co.uk
IMPLEMENTING ISO 14001:2004 www.aecos.co.uk What is an Environmental Management System? A systematic framework to manage the immediate and long term environmental impacts of an organisation s products,
We make rational and conscientious use of our
28 Fraser and Neave, Limited & Subsidiary Companies Sustainability Report 2015 Environment Focus on Conservation Environmental conservation remains a key focus area for the Group. As one of the region
Application Form - Contracting Firm
Application Form - Contracting Firm This form is for civil construction and general contracting companies to apply for membership of Civil Contractors New Zealand Company s details CCNZ Branch you want
Slide 1. Enviros Consulting Ltd
Slide 1 Regulation of Waste Management Activities Past, Present and Future! Steve Bell Technical Manager Waste Management Thursday, 26 July 2007 Presentation Aims An insight of where we have come from
Rehabilitation of Wastewater Treatment Plant of Sakhnin City in Israel by Using Advanced Technologies
Rehabilitation of Wastewater Treatment Plant of Sakhnin City in Israel by Using Advanced Technologies Yasar Avsar 1, Hussein Tarabeah 2, Shlomo Kimchie 3, Izzet Ozturk 4, Hadi Naamneh 2 1 Yildiz Technical
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
Environmental Construction Operations Plan (ECO Plan) Framework
ALBERTA INFRASTRUCTURE AND TRANSPORTATION Environmental Construction Operations Plan (ECO Plan) Framework COPYRIGHT, MAY 2005 THE CROWN IN RIGHT OF THE PROVINCE OF ALBERTA, AS REPRESENTED BY THE MINISTER
MBJ Environmental Programmes
MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
CHAPTER 9- Waste management
CHAPTER 9- Waste management 9.1 Introduction... 268 9.2 Waste management legislation and requirements... 268 9.3 Waste management principles... 268 9.4 Waste management strategies... 269 9.4.1 Waste monitoring...
Waste Management Action Plan 2011-2015
Waste Management Action Plan 2011-2015 Approved on: 7 June 2011 Owner: Program Manager, 8203 7723 Trim Reference: ACC2011/77875 Next Review Date: June 2014 Executive Summary This Waste Management Action
Water Mains Rehabilitation Framework (NI) Northern Ireland Water
PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million
Works Approval Conditions 1 General
Works Approval Conditions 1 General 1.1 Interpretation 1.1.1 In the Works Approval, definitions from the Environmental Protection Act 1986 apply unless the contrary intention appears. 1.1.2 In the Works
Liquid Effluent Treatment Plant (LETP) Land Clean-Up
Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to
Exploration and Development Activity
For the period ending 30 June 2008 Exploration and Development Activity Over the last year, exploration and development work at the Company s Nullagine Gold Project in Western Australia s eastern Pilbara