ESSU ESKILSTUNA ESKILSTUNA AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
|
|
|
- Priscilla Summers
- 10 years ago
- Views:
Transcription
1 AIP SVERIGE/SWEDEN 14 NOV 2013 AD 2 ESSU 1-1 AD 2 AERODROMES ESSU 2.1 AERODROME LOCATION INDICATOR AND NAME ESSU ESSU 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD N E RWY 750 m S THR Direction and distance from (city) E 6 NM from Eskilstuna 3. Elevation/Reference temperature 139 ft/+19.0 C 4. Geoid undulation at AD ELEV PSN 85 ft 5. MAG VAR/Annual change 5 E 2015/+0.1 increasing 6. Administration, address, telephone, fax, AFS Eskilstuna Kommunföretag AB Eskilstuna flygplats SE Eskilstuna TEL: +46 (0) [email protected] AFS: ESSUZTZX Website: 7. Types of traffic permitted (IFR/VFR) IFR/VFR. Max RWY ref code 2C 8. - ESSU 2.3 OPERATIONAL HOURS 1. AD Administration AD Operating hours MON-FRI , ( , ) H24 2. Customs and immigration O/R 3. Health and sanitation - 4. AIS Briefing Office FPC H24, +46 (0) , 5. ATS Reporting Office (ARO) As ATS 6. MET Briefing Office FPC H24, +46 (0) , 7. ATS MON-FRI , ( , ) 8. Fuelling MON-FRI ( ) 9. Handling O/R 10. Security De-Icing Available 12. Increased charges outside AFIS HR of OPS AIRAC AMDT 6/2013
2 AD 2 ESSU NOV 2013 AIP SVERIGE/SWEDEN ESSU 2.4 HANDLING SERVICES AND FACILITIES 1. Cargo-handling facilities Forklift 2. Fuel/oil types Fuel 91/96UL, Jet A1, 100LL Oil - 3. Fuelling facilities/discharge capacity 91/96UL: 10,000 l Jet A1: 50,000 l 100LL: 50,000 l 4. De-icing facilities Available, Type I 5. Hangar space for visiting ACFT Available 6. Repair facilities for visiting ACFT Available 7. - ESSU 2.5 PASSENGER FACILITIES 1. Hotels In Eskilstuna 2. Restaurants In Eskilstuna 3. Transportation Taxis 4. Medical facilities In Eskilstuna 5. Bank and Post Office In Eskilstuna 6. Tourist Office In Eskilstuna 7. - ESSU 2.6 RESCUE AND FIRE FIGHTING SERVICES 1. AD category for fire fighting CAT 3, higher O/R 2. Rescue equipment By arrangement 3. Capability for removal of disabled aircraft By arrangement 4. - ESSU 2.7 SEASONAL AVAILABILITY CLEARING 1. Types of clearing equipment 3 Snowploughs, 2 Sweepers/blowers, 2 Snowslingers, 1 Spreader 2. Clearance priorities RWY, TWY, Apron 3. - AIRAC AMDT 6/2013
3 AIP SVERIGE/SWEDEN 14 NOV 2013 AD 2 ESSU 1-3 ESSU 2.8 APRONS, TAXIWAYS AND CHECK LOCATIONS DATA 1. Apron surface and strength Apron N Part ASPH PCN 36 F/B/X/T Apron S Part ASPH PCN 15 F/B/X/T 2. Taxiway width, surface and strength TWY A 15 m ASPH PCN 36 F/B/X/T TWY B 7.5 m ASPH PCN 15 F/B/X/T 3. ACL, location and elevation Apron 143 ft 4. VOR checkpoints - 5. INS checkpoints - 6. TWY B Only daylight VFR. ESSU 2.9 SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM AND MARKINGS 1. Use of aircraft stand ID signs, TWY guide lines and visual docking/parking guidance system of ACFT stands Stand positions and taxi guide lines 2. RWY and TWY markings and LGT RWY 18/36: Designator, THR, TDZ, CL, edges day marked. RTHL, REDL, RENL 3. Stop bars TWY A: CL, HLDG day marked. Edge lights, RGL. B: CL, HLDG day marked. RGL. ESSU 2.10 AERODROME OBSTACLES In Area 2 OBST ID/Designation OBST type OBST position ELEV/HGT Markings/ Type, colour Not available a b c d e f In Area 3 OBST ID/Designation OBST type OBST position ELEV/HGT Markings/ Type, colour Not available a b c d e f AIRAC AMDT 6/2013
4 AD 2 ESSU APR 2015 AIP SVERIGE/SWEDEN ESSU 2.11 METEOROLOGICAL INFORMATION PROVIDED 1. Associated MET Office STOCKHOLM/Arlanda 2. Hours of service MET Office outside hours 3. Office responsible for TAF preparation Periods of validity 4. Type of landing forecast Interval of issuance H24 TAF not produced Not issued 5. Briefing/consultation provided FPC H24, +46 (0) , 6. Flight documentation Language(s) used 7. Charts and other information available for briefing or consultation 8. Supplementary equipment available for providing information SIGMET, Upper air winds Swedish/English SWC, WC, Nordic SIGWX Chart, Low level forecast - 9. ATS units provided with information AFIS 10. Additional information (limitation of service, etc.) Flight planning room available ESSU 2.12 RUNWAY PHYSICAL CHARACTERISTICS Designations RWY NR True BRG and MAG BRG Dimensions of RWY (m) Strength (PCN) and surface of RWY and SWY THR coordinates RWY end coordinates THR geoid undulation THR elevation and highest elevation of TDZ of precision APCH RWY GEO 173 MAG 1886 x 35 PCN 36 F/B/X/T CONC+ASPH N E THR 129 ft GUND 85 ft GEO 353 MAG 1886 x 35 PCN 36 F/B/X/T CONC+ASPH N E THR ft TDZ 134 ft GUND 85 ft Slope of RWY-SWY SWY dimensions (m) CWY dimensions (m) Strip dimensions (m) OFZ Info not avbl x Info not avbl. 286 x x ESSU 2.13 DECLARED DISTANCES RWY Designator TORA (m) TODA (m) ASDA (m) LDA (m) Starter extension 286 m in daylight VMC ASDA 2172 m in daylight VMC. AIRAC AMDT 2/2015
5 AIP SVERIGE/SWEDEN 02 APR 2015 AD 2 ESSU 1-5 ESSU 2.14 APPROACH AND RUNWAY LIGHTING RWY Designator APCH LGT Type, LEN INTST THR LGT WBAR VASIS (MEHT) TDZ LGT LEN RWY Centre Line LGT LEN, Spacing INTST RWY Edge LGT LEN, Spacing INTST RWY End LGT WBAR SWY LGT LEN, Green APAPI Left/2.86 (49.9 ft) /60 m White Caution zone 600 m yellow LIL/LIH Red - 36 Calvert CAT I 900 m LIL/LIH Green APAPI Left/3.00 (49.9 ft) /60 m White Caution zone 600 m yellow LIL/LIH Red - 10 : RWY 18: TRID LIH. PCL LIL RWY and APCH on frequency MHz for 10 SEC. RWY 36: PCL LIL RWY and APCH on frequency MHz for 10 SEC. ESSU 2.15 OTHER LIGHTING, SECONDARY POWER SUPPLY 1. ABN/IBN location, characteristics and hours of operation 2. LDI location and LGT Anemometer location and LGT ABN at TWR FLG W/G 24/min lit DUR daylight and PCL Windsocks at RWY ends 600 m N THR TWY edge and centre line lighting Edge: TWY A CL: - 4. Secondary power supply/switch-over time Available/15 sec 5. - ESSU 2.16 HELICOPTER LANDING AREA RWY 18/36 to be used. ESSU 2.17 ATS AIRSPACE 1. Designation and lateral limits TIZ N E N E N E N E N E N E N E N E N E 2. Vertical limits TIZ 1500 ft AMSL GND 3. Airspace classification G 4. ATS unit call sign Language(s) INFORMATION Swedish/English 5. Transition altitude 5000 ft AMSL 6. TIZ established during hours of AFIS. AIRAC AMDT 2/2015
6 AD 2 ESSU APR 2015 AIP SVERIGE/SWEDEN ESSU 2.18 ATS COMMUNICATION FACILITIES Service designation Call sign Frequency Hours of operation AFIS INFORMATION MHz HO Primary FREQ VDF MHz HO VDF ESSU 2.19 RADIO NAVIGATION AND LANDING AIDS Type of aid CAT of ILS/MLS (for VOR/ILS/MLS give VAR) ID Frequency Hours of operation Site of transmitting antenna coordinates Elevation of DME transmitting antenna L 18 NN 362 khz H N E Range 15 NM LOC 36 ILS CAT I (5 E 2015) SU MHz H N E 420 m beyond THR 18 GP MHz H N E L 36 LX 402 khz H N E DME SU MHz H N E Angle 3.0 RDH 51 ft 250 m past THR 36 right side Range 25 NM 154 ft DME channel 46X ESSU 2.20 LOKALA TRAFIKFÖRESKRIFTER LOCAL TRAFFIC REGULATIONS 1. Skolflygning 1. School flight a) För all skolflygning gäller PPR, TEL MON FRI ( ). b) Upprepade start- och landningar, TGL, tillåts endast MON FRI , TUE och THU även ( ). a) All school flights are subject to PPR, TEL +46 (0) MON FRI ( ). b) Repeated touch-and-go landings,tgl, are permitted only MON FRI ( ), TUE and THU also ( ). 2. VFR-flygning 2. VFR flight a) För upprepade start och landningar, TGL under mörker gäller PPR, TEL MON FRI ( ). b) Upprepade start och landningar, TGL tillåts endast MON FRI ( ), TUE och THU även ( ) samt SAT, SUN och HOL ( c) TGL får inte utföras under nyårsdagen, långfredagen, påskafton, Kristi Himmelsfårdsdag, pingstafton, midsommarafton, midsommardagen, Alla helgons dag, julafton och juldagen. a) Repeated touch-and-go landings, TGL during darkness are subject to PPR, TEL +46 (0) MON FRI ( ). b) Repeated touch-and-go landings, TGL permitted only MON FRI ( ), TUE and THU also ( ) and SAT, SUN and HOL ( ). c) TGL is not permitted New Year s Day, Good Friday, Easter Eve, Ascension Day, Whitsun Eve, Midsummer Eve, Midsummer Day, All Saints Day, Christmas Eve and Christmas Day. AIRAC AMDT 2/2015
7 AIP SVERIGE/SWEDEN 14 NOV 2013 AD 2 ESSU 1-7 ESSU 2.21 MINSKNING AV BULLERSTÖRNING NOISE ABATEMENT PROCEDURES 1. Trafikvarvshöjd 1000 ft GND. 1. Altitude in aerodrome traffic circuit: 1000 ft GND. 2. Flygning över Kjula samhälle får ej ske under 2000 ft GND. 2. Overflight of the built-up areas of Kjula is not allowed below 2000 ft GND. ESSU 2.22 FLYGPROCEDURER FLIGHT PROCEDURES 1. Startprocedurer, omnidirectional 1. Omnidirectional departure procedures RWY Procedure 18 Climb straight ahead with MNM 350 ft/nm (5.6%) to MNM turning ALT 600 ft. Continue climb to appropriate MSA. 36 Climb straight ahead with MNM 360 ft/nm (5.9%) to MNM turning ALT 600 ft. Continue climb to appropriate MSA. Obstacle Significant obstacle Direction (GEO)/Dist (m) Elevation (ft) from THR Terrain /2250 Terrain (CIO) Terrain / /2450 ESSU 2.23 ÖVRIG INFORMATION 1. Förhandsmeddelande (PN) krävs för nedanstående flygverksamhet inom Stockholm TMA. a) Skol- och övningsflygning som omfattar airwork, flygning i väntläge och/eller upprepande instrumentinflygningar. ADDITIONAL INFORMATION 1. Prior notice (PN) is required for operations mentioned below within Stockholm TMA. a) School and training flights comprising airwork, holding, and/or repeated instrument approaches. b) Fotoflygning. b) Aerial photographing. c) Geologisk mätflygning och liknande. c) Geological survey flights and the like. d) Lyft av fallskärmshoppare. d) Lifting of parachutists. e) Förplanerad kontrollflygning (mätflygning) av navigeringsoch inflygningshjälpmedel. Innan färdplan lämnas in, skall förhandsmeddelande lämnas till skiftledaren vid Stockholm ACC TEL Undantag: om flygningen kommer att beröra sektor Västerås, skall tillstånd inhämtas från Västerås ATS TEL e) Non-urgent navaids and approach aids calibration flights. Before submitting the flight plan, the operator shall give prior notice of the flight to the Watch Supervisor. Stockholm ACC TEL +46 (0) Exception: if the flight will be conducted within Västerås sector, permission shall be obtained from Västerås ATS, TEL +46 (0) ESSU 2.24 TILLHÖRANDE KARTOR RELATED CHARTS AD chart ESSU 2-1 IAC NDB+DME+ILS 36 ESSU-5-1 IAC NDB+DME 36 ESSU-5-2 IAC NDB+DME 18 ESSU-5-3 VAC ESSU 6-1 Baksidan avsiktligt blank Reverse side intentionally blank AIRAC AMDT 6/2013
ESCM UPPSALA UPPSALA AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA HANDLING SERVICES AND FACILITIES
AIP SVERIGE/SWEDEN 11 DEC 2014 AD 2 ESCM 1-1 AD 2 AERODROMES ESCM 2.1 AERODROME LOCATION INDICATOR AND NAME ESCM ESCM 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESGR SKÖVDE SKÖVDE AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 27 JUN 2013 AD 2 ESGR 11 AD 2 AERODROMES ESGR 2.1 AERODROME LOCATION INDICATOR AND NAME ESGR ESGR 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESSK GÄVLE GÄVLE AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 28 MAY 2015 AD 2 ESSK 11 AD 2 AERODROMES ESSK 2.1 AERODROME LOCATION INDICATOR AND NAME ESSK ESSK 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESOW STOCKHOLM/VÄSTERÅS
AIP SVERIGE/SWEDEN 06 FEB 2014 AD 2 ESOW 1-1 AD 2 AERODROMES ESOW 2.1 AERODROME LOCATION INDICATOR AND NAME ESOW STOCKHOLM/VÄSTERÅS ESOW 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates
ESKM MORA/SILJAN. MORA/Siljan AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 12 DEC 2013 AD 2 ESKM 11 AD 2 AERODROMES ESKM 2.1 AERODROME LOCATION INDICATOR AND NAME ESKM MORA/SILJAN ESKM 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and
ESNG GÄLLIVARE GÄLLIVARE AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 02 APR 2015 AD 2 ESNG 11 AD 2 AERODROMES ESNG 2.1 AERODROME LOCATION INDICATOR AND NAME ESNG ESNG 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESGT TROLLHÄTTAN-VÄNERSBORG
AIP SVERIGE/SWEDEN 14 NOV 2013 AD 2 ESGT 11 AD 2 AERODROMES ESGT 2.1 AERODROME LOCATION INDICATOR AND NAME ESGT ESGT 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESMK KRISTIANSTAD KRISTIANSTAD AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 10 DEC 2015 AD 2 ESMK 1-1 AD 2 AERODROMES ESMK 2.1 AERODROME LOCATION INDICATOR AND NAME ESMK ESMK 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESUT HEMAVAN TÄRNABY HEMAVAN TÄRNABY AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 03 APR 2014 AD 2 ESUT 1-1 AD 2 AERODROMES ESUT 2.1 AERODROME LOCATION INDICATOR AND NAME ESUT ESUT 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESDF RONNEBY RONNEBY AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 06 FEB 2014 AD 2 ESDF 11 AD 2 AERODROMES ESDF 2.1 AERODROME LOCATION INDICATOR AND NAME ESDF ESDF 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESMT HALMSTAD HALMSTAD AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 10 DEC 2015 AD 2 ESMT 1-1 AD 2 AERODROMES ESMT 2.1 AERODROME LOCATION INDICATOR AND NAME ESMT ESMT 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESNX ARVIDSJAUR ARVIDSJAUR AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 03 APR 2014 AD 2 ESNX 1-1 AD 2 AERODROMES ESNX 2.1 AERODROME LOCATION INDICATOR AND NAME ESNX ESNX 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESNQ KIRUNA KIRUNA AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 20 AUG 2015 AD 2 ESNQ 11 AD 2 AERODROMES ESNQ 2.1 AERODROME LOCATION INDICATOR AND NAME ESNQ ESNQ 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
ESMX VÄXJÖ/KRONOBERG
AIP SVERIGE/SWEDEN 11 DEC 2014 AD 2 ESMX 1-1 AD 2 AERODROMES ESMX 2.1 AERODROME LOCATION INDICATOR AND NAME ESMX VÄXJÖ/KRONOBERG ESMX 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates
LRSM AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRSM - SATU MARE / Satu Mare
AIP AD 2.121 25 JUL 2013 LRSM AD 2.1 AERODROME LOCATION INDICATOR AND NAME LRSM SATU MARE / Satu Mare LRSM AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 474212N
ESDF RONNEBY RONNEBY AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 28 MAY 2015 AD 2 ESDF 11 AD 2 AERODROMES ESDF 2.1 AERODROME LOCATION INDICATOR AND NAME ESDF ESDF 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
EDQD AD 2.1 Aerodrome Location Indicator and Name EDQD BAYREUTH. EDQD AD 2.2 Aerodrome Geographical and Administrative Data
LUFTFAHRTHANDBUCH DEUTSCHLAND AD 2 EDQD 11 31 MAR 2016 EDQD AD 2.1 Aerodrome Location Indicator and Name EDQD BAYREUTH EDQD AD 2.2 Aerodrome Geographical and Administrative Data 1 ARP coordinates and site
EDTY Schwäbisch Hall
LUFTFAHRTHANDBUCH DEUTSCHLAND AD 2 EDTY 1-1 AIP GERMANY 28 OCT 2004 EDTY AD 2.1 Aerodrome Location Indicator and Name EDTY Schwäbisch Hall EDTY AD 2.2 Aerodrome Geographical and Administrative Data 1 ARP
EHST STADSKANAAL EHST AD 2.1 AERODROME LOCATION INDICATOR AND NAME EHST AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP NETHERLANDS AD.EHST- 08 JAN 0 EHST STADSKAAL Note: the following sections in this chapter are intentionally left blank: AD., AD.8, AD.9, AD.0, AD., AD., AD., AD., AD., AD.9, AD.0, AD., AD.. EHST AD.
ESTA ÄNGELHOLM ÄNGELHOLM AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 28 MAY 2015 AD 2 ESTA 1-1 AD 2 AERODROMES ESTA 2.1 AERODROME LOCATION INDICATOR AND NAME ESTA ESTA 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
AIP AD 2 - VAKJ 1 INDIA 01JUNE 2009
AIP AD 2 - VAKJ 1 INDIA 01JUNE 2009 AD 2. AERODROMES VAKJ 2.1 AERODROME LOCATION INDICATOR AND NAME VAKJ- KHAJURAHO/ DOMESTIC VAKJ AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates
ESNZ ÅRE ÖSTERSUND ÅRE ÖSTERSUND AERODROME LOCATION INDICATOR AND NAME AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP SVERIGE/SWEDEN 13 NOV 2014 AD 2 ESNZ 1-1 AD 2 AERODROMES ESNZ 2.1 AERODROME LOCATION INDICATOR AND NAME ESNZ ESNZ 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates and site at AD
AD 2-LGML-1 GREECE 12 NOV 2015 LGML AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGML - MILOS
AD 2-LGML-1 GREECE 12 NOV 2015 LGML AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGML - MILOS LGML AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 364149N 0242837E
EGTR ELSTREE EGTR AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGTR AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
UNITED KINGDOM AIP AD 2.EGTR-1 8 Jan 2015 EGTR ELSTREE EGTR AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGTR ELSTREE EGTR AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site
EGHE SCILLY ISLES/ST MARYS
UNITED KINGDOM AIP AD 2.EGHE-1 EGHE SCILLY ISLES/ST MARYS EGHE AD 2.1 AERODROME LOCATION INDICATOR AND NAME EGHE SCILLY ISLES/ST MARYS EGHE AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates
TVSV KINGSTOWN/ E.T. Joshua (ST. VINCENT and THE GRENADINES)
AIP EASTERN CARIBBEAN AD 2. AERODROMES AD 2.9-3-1 17 MAY 01 TVSV AD 2.1 AERODROME LOCATION INDICATOR AND NAME TVSV KINGSTOWN/ E.T. Joshua (ST. VINCENT and THE GRENADINES) TVSV AD 2.2 AERODROME GEOGRAPHICAL
LTBD - AYDIN / ÇILDIR
AD 2 LTBD1 TURKEY 02 APR 15 LTBD AD 2.1 AERODROME LOCATION INDICATOR AND NAME LTBD AYDIN / ÇILDIR LTBD AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 374855N0275317E,
TLPL VIEUXFORT/ Hewanorra/ST. LUCIA
AIP AD 2.821 15 MAR 07 AD 2. AERODROMES TLPL AD 2.1 AERODROME LOCATION INDICATOR AND NAME TLPL VIEUXFORT/ Hewanorra/ST. LUCIA TLPL AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 Lat : 134356N
ESCF LINKÖPING/MALMEN
AIP SVERIGE/SWEDEN 11 DEC 2014 AD 2 ESCF 1-1 AD 2 AERODROMES ESCF 2.1 AERODROME LOCATION INDICATOR AND NAME ESCF LINKÖPING/MALMEN ESCF 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1. ARP coordinates
AIP VTBU AD 2-1 THAILAND VTBU AD 2. AERODROMES VTBU AD 2.1 AERODROME LOCATION INDICATOR AND NAME
AIP VTBU AD 21 23 JUL 15 VTBU AD 2. AERODROMES VTBU AD 2.1 AERODROME LOCATION INDICATOR AND NAME VTBU RAYONG / UTAPAO RAYONG PATTAYA INTERNATIONAL AIRPORT VTBU AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE
TKPK BASSETERRE/Robert L. Bradshaw ST CHRISTOPHER(ST. KITTS)
AIP AD 2. AERODROMES AD 2.7-1-1 13 MAR 08 TKPK AD 2.1 AERODROME LOCATION INDICATOR AND NAME TKPK BASSETERRE/Robert L. Bradshaw ST CHRISTOPHER(ST. KITTS) TKPK AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE
WMKI - IPOH/IPOH SULTAN AZLAN SHAH
WMKI AD 2-1 WMKI AD 2.1 AERODROME LOCATION INDICATOR AND NAME WMKI - IPOH/IPOH SULTAN AZLAN SHAH WMKI AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD LAT 043409N
TAPA ST. JOHN S/V.C. Bird (ANTIGUA)
AIP AD 2.2-3-1 05 JUL 07 AD 2. AERODROMES TAPA AD 2.1 AERODROME LOCATION INDICATOR AND NAME TAPA ST. JOHN S/V.C. Bird (ANTIGUA) TAPA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates
AD 2 LTBZ-1 TURKEY 12 DEC 13 LTBZ - ZAFER AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AIP AD 2 LTBZ1 TURKEY 12 DEC 13 LTBZ AD 2.1 AERODROME LOCATION INDICATOR AND NAME LTBZ ZAFER LTBZ AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 390641N0300749E
VTBS AD 2. AERODROMES VTBS AD 2.1 AERODROME LOCATION INDICATOR AND NAME VTBS BANGKOK / SUVARNABHUMI INTERNATIONAL
AIP VTBS AD 2-1 8MAR 12 VTBS AD 2. AERODROMES VTBS AD 2.1 AERODROME LOCATION INDICATOR AND NAME VTBS BANGKOK / SUVARNABHUMI INTERNATIONAL VTBS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP
WHICH AIR TRAFFIC CONTROLLER TO CONTACT
WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.
VTBD AD 2. AERODROMES
AIP VTBD AD 2-1 25 JUL 13 VTBD AD 2. AERODROMES VTBD AD 2.1 AERODROME LOCATION INDICATOR AND NAME VTBD BANGKOK/DON MUEANG INTERNATIONAL AIRPORT VTBD AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AD 2 LTAW-1 TURKEY 20 AUG 15 LTAW - TOKAT AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
AD 2 LTAW-1 TURKEY 20 AUG 15 LTAW AD 2.1 AERODROME LOCATION INDICATOR AND NAME LTAW - TOKAT LTAW AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 401842N-0362225E
TRIGGER NOTAM PERM AIP AIRAC AMDT 11/2015 WEF 12 NOV
NOTAM LIST STATE ENTERPRISE "ORO NAVIGACIJA" SERIES A Aeronautical Information Service Rodūnios kelias 2, Airport, LT-02188 Vilnius, Lithuania TEL: +370 706 94 613, Telefax: +370 706 94 614, AFS: EYVNYOYX,
EECL Tallinn/City Hall
AD.EECL- 0 ~~~eaip-amdt~~~ver-date-0-0-t0---0 APR AD KOPTERIVÄLJAKUD AD HELIPORTS EECL Tallinn/City Hall Märkus : Järgnevad lõigud selles peatükis on tahtlikult tühjaks jäetud: Note: The following sections
Tauranga, Bay of Plenty
19/12 720 NZZC Tauranga Aerodrome Airshow and Restricted Area NZR286 Effective: 28 to 29 JAN 12 PORTAVEX 2012 and CLAIC OF THE KY will be held at Tauranga AD during the period 27 to 29 JAN 12. This event
Familiarisation Briefing for Jet and Multiengine Aircraft Crews.
Familiarisation Briefing for Jet and Multiengine Aircraft Crews. 1 Index Version/lang. 1.8 Status: final Date of issue: 2010 20. December Author/unit: Tower, MT,BH,CM Owner/unit: Engadin Airport AG File:
3.1 Aerodrome information to be provided for a certified aerodrome
CHAPTER 3:AERODROME DATA 3.1 Aerodrome information to be provided for a certified aerodrome 3.1.1 Aerodrome chart. An aerodrome chart will contain the following information: a) layout of runways, taxiways
Oostwold Airshow 2015
Oostwold Airshow 2015 Briefing visiting aircraft 25 th May 2015 Dear pilots This document deals with procedures to be employed during the Oostwold Airshow day on May 25 th 2015 only. The following procedures
EECL Tallinn/City Hall
EESTI AIP Estonia AD.EECL- NOV 0 AD KOPTERIVÄLJAKUD AD HELIPORTS EECL Tallinn/City Hall Märkus : Järgnevad lõigud selles peatükis on tahtlikult tühjaks jäetud: Note: The following sections in this chapter
Training program for S2 (TWR) rating
Training program for S2 (TWR) rating Introduction This is the official Vatsim Scandinavia training program for students training for the TWR (S2) Rating. Each mentor is expected to take his student through
Düsseldorf RG Airports
Düsseldorf RG Airports Note: Not for real navigation! Dortmund-Wickede ( / DTM) Elevation 419 ft Effective: 12 DEC 201 (Changes are marked yellow) NAVAIDS: Communication: Station Freq. 06 109.15 / 061
ESNV. Runways: Runway 10 Takeoff length: 1502, Landing length: 1502 Runway 28 Takeoff length: 1502, Landing length: 1260
ESNV irport information: ountry: Sweden ity: oordinates: N 64 34.7', E016 50.4 Elevation: 1140 ustoms: Fuel: 100LL, Jet 1 RFF: T 4 during SKE TF, other times O/R hours: See NOTM Runways: Runway 10 Takeoff
AIP VYYY AD 2-1 MYANMAR 1 OCT 11 AD 2. AERODROMES
AIP VYYY AD 2-1 MYAMAR 1 OCT 11 AD 2. AERODROMES VYYY AD 2.1 AERODROME LOCATIO IDICATOR AD AME VYYY - YAGO / Yangon International VYYY AD 2.2 AERODROME GEOGRAPHICAL AD ADMIISTRATIVE DATA 1 ARP coordinates
NORWAY AIP AIRAC SUP 14/15 EFF 20 AUG 2015. TEL:...(+47) 815 30 550 E-mail:[email protected]
TEL:(+47) 815 30 550 E-mail:aim@avinorno NORWAY AERONAUTICAL INFORMATION MANAGEMENT PO BOX 150 NO-2061 GARDERMOEN AIP AIRAC SUP 14/15 EFF 20 AUG 2015 Publication date: 09 JUL 2015 14 ENTO - NYE INNFLYGINGSPROSEDYRER
Horaires SUM : -1 HR sauf indication contraire Timetable SUM : -1 HR unless otherwise specified
AIP FRANCE ~~~RIGHT~~~ AD-.LFQA~~~END~~~-1 ~~~eaip-amdt~~~a-015-1017 SEP 015 Horaires SUM : -1 HR sauf indication contraire Timetable SUM : -1 HR unless otherwise specified AD LFQA.1 Indicateur d'emplacement
EBBR - BRUSSELS / Brussels-National
03-MAR-2016 AD 2.EBBR-1 03-MAR-2016 EBBR - BRUSSELS / Brussels-National EBBR AD 2.1 Aerodrome Location Indicator and Name EBBR - BRUSSELS / Brussels-National EBBR AD 2.2 Aerodrome Geographical and Administrative
GDANSK, POLAND EPGD/GDN .RADAR.MINIMUM.ALTITUDES. KMI VOR KRT VOR DME (2140) (2790) (2630) (2300) FL100. .Eff.4.Jun.
EPG/GN LECHA WALESY Apt Elev 22 MAY 09 101R.Eff.4.Jun. GANSK, POLAN.RAAR.MINIMUM.ALTITUES. Alt Set: hpa (MM on req) Trans level: Trans alt: 6570' The MRVA values already include a correction for temperature
Mayhew, Richard P (FAA)
Mayhew, Richard P (FAA) 1 2 3 4 5 6 Mayhew, Richard P (FAA) 1 7 8 9 U.S. DEPARTMENT OF TRANSPORTATION PRINT DATE 482016 AIRPORT MASTER RECORD FEDERAL AVIATION ADMINISTRATION FORM APPROVED OMB 2120-0 >1
Airspace classification change
Airspace classification change With effect from 06 March 2014 the airspace classification and configuration of the Channel Islands Airspace will be changed: The Channel Islands Control Zone (CTR) will
SPECIAL RULES ZONE (SRZ) ON BEHALF OF THE TEXEL AIRSHOW 2007
AIP Supplement - 05/07 Page 1 Contact Post: Air Traffic Control the etherlands Aeronautical Information Service P.O. Box 75200 1117 ZT Schiphol The etherlands Tel: +31 (0)20 406 3521 Fax: +31 (0)20 406
AIP Supplement - 04/2015 Page 1 TEXEL AIRSHOW 2015 1 GENERAL 2 TEXEL AREA 3 FLOW CONTROL MEASURES
~~~eaip-amdt~~~ AIP Supplement - 4/5 Page Contact Post: Air Traffic Control the etherlands Aeronautical Information Service P.O. Box 75 7 ZT Schiphol The etherlands Tel: +3 () 46 35 Fax: +3 () 46 353 AFS:
AIP GEN 3.4-1 GREECE 19 SEP 2013 GEN 3.4 COMMUNICATION SERVICES (COM)
AIP GEN 3.4-1 GREECE 19 SEP 2013 GEN 3.4 COMMUNICATION SERVICES (COM) 3.4.1 Responsible service 3.4.1.1 The Hellenic Civil Aviation Authority is responsible for the provision of aeronautical telecommunication
OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE REFERENCE 4.0 DEFINITION
ORDER TCAA-O-OPS034A March 2013 OPERATING MINIMA FOR AEROPLANES AND HELICOPTER OPERATIONS PURPOSE 1. This Order gives guidance to the Authority s Operations Inspector on the procedures for approval of
LOCAL OPERATING PROCEDURES (LOP) LANDVETTER TWR (ESGG)
2011 LOCAL OPERATING PROCEDURES (LOP) LANDVETTER TWR (ESGG) Göteborg/Landvetter ESGG ESGG_TWR 118.600 / ESGG_GND 121.900 / ESGG_DEL 121.675 (VATSIM 121.670) Landvetter Tower / Landvetter Ground / Clearance
SWITZERLAND. AIP Services CH-8602 WANGEN BEI DÜBENDORF RMK
SWITZERLAND TEL: +41 (0) 43 931 61 68 FAX: +41 (0) 43 931 61 59 Telegraphic address: AFTN: LSSAYOYX E-mail: [email protected] AIP Services CH-8602 WANGEN BEI DÜBENDORF AIP Effective Date RMK Filing instruction:
Appendix E FAA ALP Sheet Checklist
Appendix E FAA ALP Sheet Checklist AC 150/5070-6B (incl. Chg. 1, 5/1/07) Airport Layout Plan Drawing Set The following list provides general guidelines in preparing the Airport Layout Plan set. The individual
LONDON SOUTHEND AIRPORT CLASS D CONTROLLED AIRSPACE GUIDE
CLASS D CONTROLLED AIRSPACE GUIDE Introduction From the 2 nd of April 2015 London Southend Airport (LSA) will be implementing Class D (CAS). This airspace is made up of a Control Zone (CTR) and Control
CAAP 89W-1(0) Guidelines on provision of obstacle information for take-off flight planning purposes
Civil Aviation Advisory Publication This publication is only advisory. It gives the preferred method for complying with the Civil Aviation Regulations (CAR 1988). It is not the only method, but experience
Airport Charges and Handling Fees. AIRPORT DEBRECEN Kft.
Airport Charges and Handling Fees AIRPORT DEBRECEN Kft. Valid between 01 MAY, 2014 and 30 SEPTEMBER, 2014 Approved by Mr Tamás Sápi, Managing Director OLDAL: 1 / 22 LIST OF MODIFICATIONS Line number of
VISITING PILOT S BRIEF
VISITING PILOT S BRIEF All arrivals at RAF Halton are strictly PPR only; an approximate slot will be issued to you by the RAF Halton Operations Squadron (Ops Sqn). All non-halton based flying takes place
TP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT. for
TP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT for May, 2013 TABLE OF CONTENTS Report TAB 1 Map1: Runway 08-26 Extension TAB 2 Maps 2 & 3: Runway 08-26 Obstacle Assessment TAB 3 Canada Air
and Implementing Rules for Air Operations of Community Operators F. Cross Reference Tables
European Aviation Safety Agency 30 Jan 2009 NOTICE OF PROPOSED AMENDMENT (NPA) NO 2009 02F DRAFT OPINIONS OF THE EUROPEAN AVIATION SAFETY AGENCY, FOR A COMMISSION REGULATION establishing the implementing
NORWAY AIP AIRAC SUP 26/15 EFF 10 DEC 2015. TEL:...(+47) 815 30 550 E-mail:[email protected]
TEL:(+47) 815 30 550 E-mail:aim@avinorno NORWAY AERONAUTICAL INFORMATION MANAGEMENT PO BOX 150 NO-2061 GARDERMOEN AIP AIRAC SUP 26/15 EFF 10 DEC 2015 Publication date: 24 NOV 2015 26 ENEV NYE OG REVIDERTE
COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO)
388 COMMUNICATIONS GROUND COMMUNICATIONS OUTLET (GCO) An automatic, remotely controlled, ground to ground communications device. Pilots at non-tower airports may contact the local Air Traffic Control (ATC)
AIP-SVERIGE/SWEDEN 8 APR 2010 AD 2 ESSA-4-23. Common to all SIDs: Unless otherwise specified, climb to 5000 ft.
AIP-SVERIGE/SWEDEN 8 APR 2010 AD 2 ESSA-4-23 INITIAL CLIMB CLEARANCE Common to all SIDs: Unless otherwise specified, climb to 5000 ft. RWY 19 R Note 1. Note 2. Note 3. Note 4. Aircraft proceeding on SID
Performance-based Navigation and Data Quality
ICAO APAC AAITF/8 Performance-based Navigation and Data Quality A Commercial Data Supplier View Bill Kellogg International Relations May 6-10, 2013 Ulaanbaatar, Mongolia Jeppesen Proprietary - Copyright
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL Help AICM Manual Edition Number Help : 4.5 Edition Date Help : 17 October 2007 Status : Released Issue Intended for : General Public EUROPEAN
NAMIBIAN RADIO LICENSE VALIDATION
NAMIBIAN RADIO LICENSE VALIDATION Introduction This procedure is provided as a guide for applicants wishing to complete a Namibian Radio license validation, a requirement of a Namibian Pilot License Validation.
FACTUAL REPORT AVIATION
Location/Time Aircraft Registration Number: Most Critical Injury: Minor Investigated By: NTSB N911BL Nearest /Place Zip Code Local Time Time Zone Las Vegas NV 89032 1600 PDT Airport Proximity: On Airport/Airstrip
Safety Regulation Group CAP 168. Licensing of Aerodromes. www.caa.co.uk
Safety Regulation Group CAP 168 www.caa.co.uk Safety Regulation Group CAP 168 April 2011 Civil Aviation Authority 2011 All rights reserved. Copies of this publication may be reproduced for personal use,
ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation
ICAO Safety Management Systems (SMS) Course Handout N 5 Cuzco International Airport operation International Civil Aviation Organization Page left blank intentionally ICAO Safety management systems (SMS)
STOCKHOLM/ARLANDA AERODROME FMS/RNAV SID
AIP-SVERIGE/SWEDEN 60 00 VAR 3.5-4.5 E 2005 KOGAV 017 30 STOCKHOLM/ARLANDA AERODROME KOGAV 2 L (KOGA 2L) 304 (308.1 T) < 30.8 > 018 00 RESNA 2 L (RESN 2L) 003 (006.6 T) < 15.8 > SA417 AD 2 ESSA 4 47 RWY
AERODROME STANDARDS AERODROME DESIGN AND OPERATIONS
AERODROME STANDARDS AERODROME DESIGN AND OPERATIONS This Manual is based on ICAO Annex 14, Third Edition July 1999 and is fully compliant with that document. AMENDMENTS RECORD OF AMENDMENTS AND CORRIGENDA
Selfbriefing for Operational Procedures
Selfbriefing for Operational Procedures Arboga Open 2015 Revision A Selfbriefing Arboga Open 2015 1 Situation map ESQO Please note: maps are not to scale Selfbriefing Arboga Open 2015 2 Situation map Non
STOCKHOLM/ARLANDA AERODROME FMS/RNAV SID
AIP-SVERIGE/SWEDEN 60 00 VAR 3.5-4.5 E 2005 017 30 KOGAV STOCKHOLM/ARLANDA AERODROME KOGAV 3 C (KOGA 3C) 299 (302.7 T) < 26.2 > RESNA 018 00 RESNA 3 C (RESN 3C) 359 (003.4 T) < 31.2 > SA403 AD 2 ESSA 4
The Rebirth of Aviation and Air Transportation in Ohio
The Rebirth of Aviation and Air Transportation in Ohio On the implementation of the NextGen Air Traffic Management System to enhance air transportation safety, capacity, and environmental sustainability
PBN Aeronautical Charts and Procedure Design
PBN Aeronautical Charts and Procedure Design Raúl A. Martínez Díaz RO/AIM [email protected] ICAO NACC 05 May 2015 Topics 1. AIS/AIM 2. Data flow 3. ICAO PBN Documents 4. Procedures design 5. PBN Aeronautical
EKBI. Runways: Runway 09 Takeoff length: 3100, Landing length: 2950 Runway 27 Takeoff length: 2950, Landing length: 2950
EKBI Airport information: Country: Denmark City: Coordinates: N 55 44.5', E009 09.1 Elevation: 247 Customs: Customs Fuel: 100LL, Jet A1 RFF: CAT 7 hours: AD: 0500-2100, ATS H24, PPR outside stated hours.
JEPPESEN AIRLINE CHART SERIES JEPPESEN AIRLINE CHART SERIES
JEPPESEN AIRLINE CHART SERIES FEATURES Extensive global chart library To-scale approach chart depiction of Minimum Sector Altitude (MSA) displayed in the plan view and heading for increased situational
Pilot Briefing Stockholm/Arlanda
Pilot Briefing Stockholm/Arlanda INTRODUCTION Thank you for taking time to read the briefing for Stockholm/Arlanda Airport. The purpose of this document is not to teach pilots basic procedures and how
Final Report No. 1926 by the Aircraft Accident Investigation Bureau
Büro für Flugunfalluntersuchungen BFU Bureau d enquête sur les accidents d aviation BEAA Ufficio d inchiesta sugli infortuni aeronautici UIIA Uffizi d'investigaziun per accidents d'aviatica UIAA Aircraft
NOTAM. Pilots from Aboard. Flight Information Service
Pilots from Aboard - You must file a flightplan, check if your flightplan is closed in at operations corner in the big white tent. - Customs is available during operations hours - Pilots coming from NON-Schengen
> Current Operations & Business Context. Bankstown Airport Master Plan 2004/05. Bankstown Airport / Master Plan > 29
Bankstown Airport Master Plan 2004/05 Bankstown Airport / Master Plan > 29 8.1 Bankstown Airport s Role in the Sydney Basin Bankstown Airport is the premier GA airport in NSW. In addition to servicing
AVIATION TRAINING ACADEMY
ATNS ATA Private Bag X 1 Bonaero Park South Africa 1622 Tel nr: +27(11) 961-0100; Fax nr: +27(11) 392-3868; Website: www.atns.co.za. AVIATION TRAINING ACADEMY AERODROME FLIGHT INFORMATION SERVICE COURSE
FIR GMMM - CASABLANCA FIR
KINGDOM OF MOROCCO DGAC NOTAM LIST Series: A AERONAUTICA INFORMATION SERVICES 04 JAN 2016 THE FOLLOWING NOTAM SERIES A WERE STILL VALID AT 09:45 ON 04 JAN 2016 NOTAM NOT INCLUDED HAVE EITHER BEEN CANCELLED,
Airport Information. Details for INNSBRUCK. State/Province
Airport Information Details for City State/Province Country AUT Latitude N 47 15' 37.00" Longitude E 11 20' 38.00" Elevation 1907 Longest Runway 6500 Magnetic Variance E 2.0 Fuel Type 100 Low Lead (LL)
ENR 0.6 TABLE OF CONTENTS TO PART 2 - ENR
AIP Australia 26 MAY 16 ENR 0.6-1 PART 2 - EN ROUTE (ENR) ENR 0. ENR 0.1 PREFACE - Not applicable ENR 0.2 RECORD OF AIP AMENDMENTS - Not applicable ENR 0.3 RECORD OF AIP SUPPLEMENTS - Not applicable ENR
SAFETYSENSE leaflet 26
SAFETYSENSE leaflet 26 VISITING MILITARY AERODROMES Part 1 Visiting during normal operating hours 3 PRE-FLIGHT 4 APPROACHING OR PASSING THE AERODROME 5 INSTRUMENT APPROACHES 6 CIRCUIT PROCEDURES 7 BARRIERS
Ministry of Civil Aviation ECAR Part 139 Egyptian Civil Aviation Authority. Certification and Operations of Land aerodromes
Ministry of Civil Aviation ECAR Part 139 Part 139 Certification and Operations of Land aerodromes Issue 5, Rev. 8 Dated Jan., 2016 Page 1 ECAR Part 139 TABLE OF CONTENTS Ministry of Civil Aviation ITEM
DEBRECEN INTERNATIONAL AIRPORT. Prepared by Tamás Sápi Technical Director
DEBRECEN INTERNATIONAL AIRPORT Prepared by Tamás Sápi Technical Director Location of the Debrecen Airport Debrecen International Airport Abandoned Russian military airport The Municipality took over the
CTAF PROCEDURES GUIDE
CTAF PROCEDURES GUIDE First Edition Updated on 02 December 2010 to correct minor errors. Information contained within this document is intended for simulation use only and should not be applied to real
Minimum Safety Requirements for temporary Helicopter Landing Areas.
GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 4 - AERODROME STANDARDS & AIR TRAFFIC SERVICES SERIES
