Reference: Escondido Ballpark Cultural Resources Survey (Affinis Job No. 2394)
|
|
- Martha Reeves
- 8 years ago
- Views:
Transcription
1 847 Jamacha Road, El Cajon, California tel: (619) fax: (619) October 13, 2010 Ms. Kim Baranek HELIX Environmental Planning 7578 El Cajon Boulevard, Suite 200 La Mesa, California Reference: Escondido Ballpark Cultural Resources Survey (Affinis Job No. 2394) Ms. Baranek: Affinis was contracted to conduct a cultural resources survey for the proposed Escondido Ballpark project in the City of Escondido. No cultural resources have been identified within or adjacent to the project area. Therefore, the project is expected to have no effect on known cultural resources; however, there is a potential for unknown buried resources in some areas, due to alluvial soils. This report summarizes the methods and results of the cultural resources survey. Project Location The proposed ballpark project is located in the City of Escondido, in northern San Diego County (Figure 1). The project area is east of Interstate 15 and south of W. Washington Avenue. The proposed ballpark is west of N. Quince Street, north of Norlak Avenue and the Escondido Creek channel, as shown in Figures 2 and 3. Dedicated parking areas would be developed along the west side of N. Spruce Street, as shown in Figure 3. The survey area, including the ballpark and associated parking areas, is shown in Figure 4. The project is in an unsectioned portion of Township 12 South, Range 2 West, on the USGS 7.5 Escondido quadrangle (Figure 2). Project Description The proposed project involves construction and operation of an approximately 9,000- seat triple-a (AAA), minor league baseball (MiLB) stadium (ballpark) on approximately 14.5 acres of land in the western portion of the City of Escondido (City) north of Norlak Avenue and south of W. Washington Avenue, on either side of N. Spruce Street (APN: , , , , , and ). The project also would include an associated surface parking lot to be located on approximately 10.3 acres of land on one parcel owned by the City on the south side of W. Washington Avenue (APN: ). 1
2 A number of infrastructure improvements would be made as part of the ballpark project, including street and utility realignments. The proposed ballpark would require the relocation of the southern segment of N. Spruce Street, as shown in Figure 3. Specifically, the southern 650-foot long segment of N. Spruce Street would be vacated and rerouted around the ballpark, north of its intersection with Norlak Avenue. In addition to rerouting the travel lanes around the ballpark, existing utilities beneath the road would be relocated. The proposed ballpark would require the demolition of some existing structures, including the City Public Works Administrative offices, a private business, a North County Transit Development (NCTD) bus storage facility, asphalt/concrete hardscape, and street-side landscaping. Environmental Setting Physical Environment The project area is in flat terrain along two fingers of Escondido Creek, at the base of ridge systems to the north and the south (Figure 2). Geologically, portions of the study area are mapped as Older (Pleistocene, younger than 500,000 years) alluvial river deposits; the remainder of the study area is mapped as Younger (Holocene, not active) alluvial flood plain deposit (Tan and Kennedy 1999). Soils mapped for the study area are: Ramona sandy loam, 2 to 5 percent slopes; Placentia sandy loam, 2 to 9 percent slopes; and Visalia sandy loam, 2 to 5 percent slopes (Bowman 1973). Native vegetation generally supported by these soil types includes annual grasses and forbs, chamise, buckwheat, live oak, and scrub oak (Bowman 1973). These vegetation types, along with the flat terrain and the presence of water, would have been a draw to the area for Native populations. Escondido Creek is now channelized in proximity to the project. This channelization is relatively recent, and there is a potential for buried archaeological deposits, due to some level of alluvial deposition. Cultural Environment The earliest accepted archaeological manifestation of Native Americans in the San Diego area is the San Dieguito complex, dating to approximately 10,000 years ago (Warren 1967). The San Dieguito complex was originally defined by Rogers (1939), and Warren published a clear synthesis of the complex in The traditional view of San Diego prehistory has the San Dieguito complex followed by the La Jolla complex at least 7,000 years ago, possibly as long as 9,000 years ago (Rogers 1966). The La Jolla complex is part of the Encinitas tradition and equates with Wallace's (1955) Millingstone Horizon, also known as Early Archaic or Milling Archaic. The Late Prehistoric period is represented by the Cuyamaca complex in the southern portion of San Diego County and the San Luis Rey complex in the northern portion of the county. The Cuyamaca complex is the archaeological manifestation of the Yuman forebears of the Kumeyaay people. The San Luis Rey complex represents the Shoshonean predecessors of the ethnohistoric Luiseño. The name Luiseño derives from Mission San Luis Rey de Francia and has been used to refer to the Indians associated with that mission, while the Kumeyaay people are also known as Ipai, Tipai, or Diegueño (named for Mission 2
3 San Diego de Alcala). Escondido is in a transitional area between the traditional territories of the Kumeyaay (or Diegueño) and the Luiseño peoples. Methods and Results Archaeological Resources Affinis obtained a records search for the project area and a one-mile radius from the South Coastal Information Center at San Diego State University in September Fifteen archaeological sites and one isolate have been recorded within one mile of the project area; no sites are recorded within one-half mile of the project (Confidential Attachment A). As summarized in Table 1, three of the previously recorded sites are historic period resources, and for three sites no information is available other than location. Of the other nine recorded sites, all contain bedrock milling features. No artifacts were noted at five of these sites, the other four all contain flaked stone artifacts (flakes and tools), and at least two include ground stone artifacts. The isolate consists of a flake and a mano. Table 1. Previously recorded resources within one mile of project Site Number Site Description Recorder, Year (CA-SDI-#) 151 No information Treganza, n.d. 152 No information Treganza, n.d. 153 No information Treganza, n.d Bedrock milling feature True, Pauma complex site; scattered True, 1962 chipping waste, two bedrock milling features 5004 Bedrock milling, flakes and tools, Johnson and Easland, 1977 roasting pit 5210 Habitation site with bedrock milling, flakes and tools, biface, Chace, 1977; 1979; James, Briggs, Campbell, 1991 ground stone; two loci. Historic component, possibly a mid-20 th century schoolhouse 5505 Bedrock milling features, flakes Flower, Ike, and Roth, 1978 and tools, ground stone, fireaffected rock; two loci 6726 Bedrock milling features, no Bickford, 1978 artifacts observed 7785 Bedrock milling features, no Laylander, 1980 artifacts observed 9829 Remnants of single bedrock Chace, 1983 milling feature, no artifacts observed 9830 Bedrock milling features, no artifacts observed Chace,
4 Site Number Site Description Recorder, Year (CA-SDI-#) 12,528 Historic trash scatter James, Briggs, Campbell, ,529 Historic trash dump James, Briggs, Campbell, ,532 Historic structure, a small trash James, Briggs, Campbell, 1991 scatter, and light flake scatter Primary Number Site Description Recorder, Year (P-37-#) Isolate flake and mano fragment James, Bark, Cooley, 1996 Malcolm Rogers noted for a few of the sites in the area that, although they were in an excellent situation for habitation, there was not evidence of intensive use of these sites. He suggested that the sites were not intensively used due to their location along the boundary between Luiseño and Kumeyaay territories. Assessment reports are available for several of the sites in the vicinity. CA-SDI-5210 Locus A, CA-SDI-6726, and CA-SDI-7785 have all been assessed as not significant, due to their general lack of cultural material other than bedrock milling features, as well as past disturbance of the sites (see Chace 1979; Laylander and Chace 1980). No archaeological surveys have been conducted in the immediate vicinity of the project area. Archaeological and Native American monitoring were conducted during the grading for construction of the Lowe s property, a short distance north of the ballpark project area. No archaeological material was found during this monitoring program. The proposed ballpark project area, including proposed parking, was surveyed for cultural resources on September 21, 2010 (see Figure 4). The survey was conducted by Andrew Giletti of Affinis and Native American monitors Gabe Kitchen of Red Tail Monitoring and Research (Kumeyaay) and Cami Mojado of Saving Sacred Sites (Luiseño). All exposed ground in the survey area was examined. As shown in Figure 4, the vast majority of the survey area is covered with buildings, hardscape, or landscape. The only open ground is in the City storage yard, but this area has fill soils and spoils piles that also limited ground visibility. No archaeological material was identified during the survey. As previously noted, there is some potential for subsurface cultural resources, due to some alluvial deposition from Escondido Creek. In addition, the ground surface is generally obscured by buildings, hardscape, storage of equipment, and spoils piles. Native American Cultural Resources The Native American Heritage Commission (NAHC) was contacted for a Sacred Lands File search in September The Sacred Lands File search did not indicate the presence of Native American cultural resources within one-half mile of the proposed project site (APE). However, there are Native American cultural resources in close proximity to the APE. 4
5 Historic Resources Historic maps and aerial photographs were reviewed to assess the potential for historic archaeological resources, as well as historic structures. Historic maps included the 1948 USGS 7.5 Escondido quadrangle, Escondido quadrangle, and 1901 USGS 30 San Luis Rey quadrangle. Tax factor aerial photographs from 1928 were reviewed, as well as aerial photographs taken in 1947, 1953, and 1964 ( The 1901 topographic map and the 1928 aerial photographs show no buildings or structures within the project area. The railroad and much of the surrounding road grid are visible. On the 1942 topographic map, two buildings are visible in the southernmost portion of the project area, near Escondido Creek. Aerial photographs taken in 1947 and 1953 show a complex in this area, apparently a complex of agricultural buildings. By 1964, additional buildings/structures are visible to the north of the original complex; these are also visible on the current USGS map (Figure 2), from This area is now a City maintenance yard. A few of the extant buildings in the maintenance yard may be over 50 years old; however, none are architecturally or historically significant. Also present in the 1964 aerial photograph on the USGS map is a large building on the west side of North Quince Street. This building is the former Wickline Bedding Company office and factory. Wickline began manufacturing mattresses in 1949 to supply Strep s Warehouse, the furniture company owned by Vincent James Navarra that later became Jerome s Furniture. Wickline Bedding filed for bankruptcy and ceased operations in The building is not historically or architecturally significant. Although Wickline was in business in Escondido for many years, it did not make a substantial contribution to the history of the city. Therefore, the former Wickline building is not a significant historic resource. This building is within the study area, but it is outside the actual project footprint. Conclusions No archaeological resources have been identified within or adjacent to the project study area. No Native American cultural resources have been identified in proximity to the project. There are a few buildings that may be over 50 years old, but none are architecturally or historically significant. Therefore, the project is expected to have no effect on known cultural resources. However, there is a potential for unknown subsurface cultural resources, due to some alluvial deposition from Escondido Creek. Based on this, it is recommended that an archaeologist and Native American monitors representing both Kumeyaay and Luiseño tribes be present for initial ground-disturbing activities for the project (brushing, grubbing, and grading in the upper several feet). If cultural resources are discovered during construction monitoring, the monitors will have the authority to temporarily halt or redirect grading away from the area of the finds. Sufficient time and resources must be allowed for the archaeologist and the Native American monitor to assess the nature and significance of the finds, in consultation with 5
6 City staff. If significant resources are identified, appropriate mitigation measures must be developed and implemented. If you have any questions, please contact me at (619) extension 18 or Mary Robbins-Wade, RPA Director of Cultural Resources 6
7 References Bowman, Roy H Soil Survey, San Diego Area, California, Part I. United States Department of Agriculture, Beltsville, MD. Chace, Paul G An Archaeological Survey, Rock Springs West. Paul G. Chace & Associates, Escondido. Report on file at South Coastal Information Center, San Diego State University. HistoricAerials.com 2010 Historic aerial photographs. Electronic document, accessed September 1, Historic aerial photographs Laylander, Don, and Paul G Chace 1980 An Archaeological Assessment of the Concordia Development, City of Escondido. Paul G. Chace & Associates, Escondido. Report on file at South Coastal Information Center, San Diego State University. Rogers, Malcolm J Early Lithic Industries of the Lower Basin of the Colorado River and Adjacent Desert Areas. San Diego Museum of Man Papers No. 3. San Diego Museum of Man Ancient Hunters of the Far West. Union-Tribune Publishing Company, San Diego. Tan, Siang S., and Michael P. Kennedy 1999 Geologic Map of the Escondido 7.5 Quadrangle San Diego County, California: A Digital Database. Version 1.0. Digital database by Henry L. Hones and Kelly R. Ruppert. California Department of Conservation, California Geological Survey. Wallace, William J A Suggested Chronology for Southern California Coastal Archaeology. Southwestern Journal of Anthropology 11: Warren, Claude N The San Dieguito Complex: A Review and Hypothesis. American Antiquity 32:
8
9
10
11
Campo Road Sewer Replacement Project Cultural Resources Survey (HELIX Job No. RIC-11)
HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard La Mesa, CA 91942 619.462.1515 tel 619.462.0552 fax www.helixepi.com Christopher McGrath Rick Engineering 5620 Friars Road San Diego, CA 92110
More informationIV. Environmental Impact Analysis I.2. Cultural Resources Archaeological Resources
IV. Environmental Impact Analysis I.2. Cultural Resources Archaeological Resources 1. Introduction The following section addresses the potential for the Proposed Project to affect archaeological resources
More information4.4 Cultural Resources
4.4 CULTURAL RESOURCES The folowing discusion focuses on the project s relationship to existing cultural resources, potential impacts to these resources and mitigation measures required to reduce impacts
More informationROCK RINGS AND GRANARY BASES IN SAN DIEGO COUNTY
ROCK RINGS AND GRANARY BASES IN SAN DIEGO COUNTY Delman James Ogden Environmental & Energy Services 5510 Morehouse Dr. San Diego, California 92121 ABSTRACT A current topic of debate in Southern California
More informationCOUNTY OF SAN DIEGO REPORT FORMAT AND CONTENT REQUIREMENTS CULTURAL RESOURCES: ARCHAEOLOGICAL AND HISTORIC RESOURCES
COUNTY OF SAN DIEGO REPORT FORMAT AND CONTENT REQUIREMENTS CULTURAL RESOURCES: ARCHAEOLOGICAL AND HISTORIC RESOURCES LAND USE AND ENVIRONMENT GROUP Department of Planning and Land Use Department of Public
More informationAPPENDIX E. Cultural Resources Constraints Report
APPENDIX E Cultural Resources Constraints Report Cultural Resources Constraints Report for the Agua Hedionda South Shore Specific Plan for 85% Open Space and 15% Retail Carlsbad, California Prepared for:
More informationPLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON
PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON 1. INTRODUCTION The Washington State Department of Transportation (WSDOT)
More informationCRM TECH. April 2, 2012. Jason Ramsey, GIS Manager Sunlight Partners 4215 E. McDowell Road, Suite 212 Mesa, AZ 85215
CRM TECH 1016 E. Cooley Drive, Suite A/B Colton, CA 92324 April 2, 2012 Jason Ramsey, GIS Manager Sunlight Partners 4215 E. McDowell Road, Suite 212 Mesa, AZ 85215 RE: Historical/Archaeological Resources
More informationAPPENDIXD. Addendum to Historical/Archaeological Survey Report By CRM Tech, November 2006
APPENDIXD Addendum to Historical/Archaeological Survey Report By CRM Tech, November 2006 ADDENDUM TO HISTORICAL/ARCHAEOLOGICAL SURVEY REPORT SUPER CREEK QUARRY EXPANSION PROJECT White Water Area, Coachella
More informationData Sharing System (DSS) Data Entry Instruction for Archaeological Survey
Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey Introduction The following data entry guidelines are to be followed for new Data Sharing System (DSS) entries. When updating previously
More informationMITIGATION MONITORING AND REPORTING PROGRAM FOR THE BUENA OUTFALL FORCE MAIN PHASE III PROJECT. September 2014
MITIGATION ING AND REPORTING PROGRAM FOR THE BUENA OUTFALL FORCE MAIN PHASE III PROJECT September 2014 PROJECT NAME: Buena Outfall Force Main Phase III Project (CIP 8131) DESCRIPTION: The is proposing
More informationCRM TECH. September 17, 2009. Bill Gatlin, Vice President Tom Dodson and Associates 2150 North Arrowhead Avenue San Bernardino, CA 92405
CRM TECH 1016 E. Cooley Drive, Suite A/B Colton, CA 92324 September 17, 2009 Bill Gatlin, Vice President Tom Dodson and Associates 2150 North Arrowhead Avenue San Bernardino, CA 92405 Re: Historical/Archaeological
More informationROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning
More informationARchaeological Consultants CALIFORNIA 94110
bolrnoida550ciate5 ARchaeological Consultants "SINCE THE BEGINNING" 361S FOLSOM ST. CALIFORNIA 94110 SAN FRANCISCO, 41S/SSQ-7.2B(') Judy Shanley David J. Powers & Associates 1885 The Alameda San Jose,
More informationPrepared for: San Diego Gas & Electric Company Environmental Services 8315 Century Park Court - CP21E San Diego, California 92123.
INVENTORY OF THE CULTURAL RESOURCES ALONG SAN DIEGO GAS & ELECTRIC S PROPOSED SYCAMORE TO PEÑASQUITOS 230 kv TRANSMISSION LINE PROJECT SAN DIEGO COUNTY, CALIFORNIA Prepared for: San Diego Gas & Electric
More informationHopewell Archeology: The Newsletter of Hopewell Archeology in the Ohio River Valley Volume 6, Number 1, September 2004
Hopewell Archeology: The Newsletter of Hopewell Archeology in the Ohio River Valley Volume 6, Number 1, September 2004 5. New Discoveries Right in Our Own Front Yard: Preliminary Results of Recent Research
More informationAPPENDIX H: CULTURAL RESOURCES SUPPORT INFORMATION
APPENDIX H: CULTURAL RESOURCES SUPPORT INFORMATION APPENDIX H CULTURAL RESOURCES SUPPORT INFORMATION FIRST CONSULTATION LETTER TO THE NATIVE AMERICAN HERITAGE COMMISSION, DATED AUGUST 7, 2014 LETTER RECEIVED
More informationAPPENDIX B. Agency Correspondence
APPENDIX B Agency Correspondence Connecticut State Historic Preservation Office INTEGRATED HISTORIC PRESERVATION PLANNING June 29, 2012 Ms. Amanda Mayhew Northeast Utilities Service Company 107 Selden
More informationAPPENDIX E CULTURAL RESOURCE MANAGEMENT REPORT (CRM, 2013) Environmental Assessment Registration Document for Irish Cove Quarry Expansion
APPENDIX E CULTURAL RESOURCE MANAGEMENT REPORT (CRM, 2013) Environmental Assessment Registration Document for Irish Cove Quarry Expansion DEXTER CONSTRUCTION COMPANY LIMITED IRISH COVE QUARRY EXPANSION
More informationPrioritizing Riparian Restoration at the Watershed, Reach and Site Scales. Richard R. Harris University of California, Berkeley Cooperative Extension
Prioritizing Riparian Restoration at the Watershed, Reach and Site Scales Richard R. Harris University of California, Berkeley Cooperative Extension Issues Riparian communities provide multiple benefits
More informationEXHIBIT A LOCATION MAP AND LAND USE INFORMATION
EXHIBIT A LOCATION MAP AND LAND USE INFORMATION In accordance with Arizona Corporation Commission Rules of Practice and Procedure R14-3-219, Applicant provides the following location maps and land use
More informationMarch 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
More informationNOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration
More information4.2 Buena Vista Creek Watershed
Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately
More informationPhoenix Biological Consulting Providing proactive biological solutions throughout southern California
Phoenix Biological Consulting Providing proactive biological solutions throughout southern California PO Box 720949, Pinon Hills, CA 92372-0949; (949) 887 0859 cell (760) 249-5463 fax July 30, 2012 Mr.
More informationA 2,000 Year Old Milling Tool Kit from CA-SDI-10148, San Diego, California
A 2,000 Year Old Milling Tool Kit from CA-SDI-10148, San Diego, California Carolyn E. Kyle Abstract This study provides the results of an archaeological monitoring and subsequent data recovery program
More informationPrehistoric Hanging Canals of the Safford Basin
Prehistoric Hanging Canals of the Safford Basin By Don Lancaster and Synergetics http://www.tinaja.com The Gila Valley has a rich prehistory... Especially during the Late Classic period around 1350 CE.
More informationExecutive Director s Recommendation Commission Meeting: July 11, 2013
Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United
More informationDOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
More informationLOCAL ARCHAEOLOGICAL PRACTICES. Class Syllabus
Local Archaeological practices: LOCAL ARCHAEOLOGICAL PRACTICES Class Syllabus Indiana Jones archaeology as portrayed in Hollywood. Would Indiana Jones find lost treasures in California? Archaeologically
More informationTABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...
App. P-2 TABLE OF CONTENTS GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...4 SITE CONDITIONS... 4 Land Use and Zoning...
More informationFINAL PLAN OF REMEDIAL ACTION
FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation
More informationFERC No. 2157 Updated 1/2011 Page 2
for the This (UDP) details the procedures for the unanticipated discovery of human remains or archaeological resources within the Area of Potential Effects for the (FERC No. 2157). The Snohomish County
More information4.6 GEOLOGIC AND SEISMIC HAZARDS
4.6 GEOLOGIC AND SEISMIC HAZARDS This Section describes the current conditions relating to the geologic and seismic characteristics of the City of Cypress. This Section concludes with an analysis of geologic
More informationThe HIGH SPEED RAIL THREAT to LOS ANGELES DRINKING WATER
The HIGH SPEED RAIL THREAT to LOS ANGELES DRINKING WATER INTRODUCTION On December 2 nd, 2014, the High Speed Rail (HSR) Project released new maps showing recently proposed alternate rail routes that go
More informationBEAR DEN PHASE 2 PROJECT. Plan of Development. APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction
BEAR DEN PHASE 2 PROJECT Plan of Development APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction BEAR DEN PHASE 2 PROJECT Plan of Development Plan for
More informationSLOPE AND TOPOGRAPHY
SLOPE AND TOPOGRAPHY What are Slope and Topography? Slope and topography describe the shape and relief of the land. Topography is a measurement of elevation, and slope is the percent change in that elevation
More informationIf you require assistance in obtaining access to the presentations or have questions regarding the. 6300 or Glenn Young at (916) 341 6696.
These materials were developed by CalRecycle staff to address specific technical training areas and are posted as reference documents for the local l government and CalRecycle staff who work on closed,
More informationAppendix A: Affordable Housing Site Inventory
Appendix A: Affordable Housing Site Inventory Following is a brief summary of the various sites considered for the Affordable Housing Project. Each site is provided with a photo when available and a concise
More informationGeophysical Survey at MIMA, The Bull Tavern Site Lexington, MA 2010. Draft
Geophysical Survey at MIMA, The Bull Tavern Site Lexington, MA 2010. Draft By William A. Griswold, Ph.D., RPA Archeologist, National Park Service Northeast Region Archeology Program Heritage Preservation,
More informationMay 11, 2015. Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700. Dear Mr.
May 11, 2015 Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700 Dear Mr. Felder, The Coyote Valley Band of Pomo Indians hereby objects to the
More informationFinal Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
More informationHOLOCENE OCCUPATION IN SOUTHERN CALIFORNIA USING DATA DERIVED FROM CULTURAL RESOURCE MANAGEMENT STUDIES ON MARINE CORPS BASE CAMP PENDLETON
HOLOCENE OCCUPATION IN SOUTHERN CALIFORNIA USING DATA DERIVED FROM CULTURAL RESOURCE MANAGEMENT STUDIES ON MARINE CORPS BASE CAMP PENDLETON SAN DIEGO COUNTY, CALIFORNIA Thesis submitted for the degree
More informationGEOGRAPHIC INFORMATION SYSTEMS Lecture 11: Land Division Systems
GEOGRAPHIC INFORMATION SYSTEMS Lecture 11: Land Division Systems Land Division Systems - in many applications of GIS, land ownership is an important data layer and it is important for GIS users to be familiar
More information2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY
ENVIRONMENTAL MANAGEMENT PLAN SUMMARY TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DESCRIPTION OF ACTIVITY... 4 3. DESCRIPTION OF THE ENVIRONMENT... 4 4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT...
More informationHow To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska
APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED
More informationSPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division
More informationANTIQUITIES PERMIT APPLICATION FORM ARCHEOLOGY
TEXAS HISTORICAL COMMISSION ANTIQUITIES PERMIT APPLICATION FORM ARCHEOLOGY GENERAL INFORMATION I. PROPERTY TYPE AND LOCATION Project Name (and/or Site Trinomial) _C=o"-'u=n""'ty'-'R:...:.;o=a=d--'--=-..:...
More informationApplying GIS to Archaeological Site Prediction on Camp Pendleton, Southern California
Applying GIS to Archaeological Site Prediction on Camp Pendleton, Southern California Seetha Reddy and Alice Brewster Abstract Recent archaeological investigations on Camp Pendleton have applied geographic
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationAERIAL PHOTOGRAPHS. For a map of this information, in paper or digital format, contact the Tompkins County Planning Department.
AERIAL PHOTOGRAPHS What are Aerial Photographs? Aerial photographs are images of the land taken from an airplane and printed on 9 x9 photographic paper. Why are Aerial Photographs Important? Aerial photographs
More informationAPPENDIX E Cultural Resource Management Report (CRM, 2013) Environmental Assessment Registration Document for James River Quarry Expansion
APPENDIX E Cultural Resource Management Report (CRM, 2013) Environmental Assessment Registration Document for James River Quarry Expansion DEXTER CONSTRUCTION COMPANY LIMITED JAMES RIVER QUARRY EXPANSION
More informationRural Residential Buildable Lands Inventory
The Dalles Periodic Review, May 2013 Rural Residential Lands Inventory Contents Introduction and Summary... 1 Concerns related to the 2007 Analysis... 2 Rural Residential Capacity Summary... 2 Methodology...
More informationThe purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.
The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along
More informationMAPPING THE ST. FRANCIS DAM OUTBURST FLOOD WITH GEOGRAPHIC INFORMATION SYSTEMS
MAPPING THE ST. FRANCIS DAM OUTBURST FLOOD WITH GEOGRAPHIC INFORMATION SYSTEMS J. David Rogers Kevin James Department of Geological Engineering University of Missouri-Rolla St. Francis Dam was a 200-ft
More informationAbout Fact Sheets Contact Us Partners Products Site Map FAQ Help
About Fact Sheets Contact Us Partners Products Site Map FAQ Help Home Articles PLSS Article The Public Land Survey System (PLSS) What is the PLSS? History Commonly Used Terms Related Links What is the
More informationRe: Preliminary Permit Application for the Rose Creek Pumped Storage Project
September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached
More informationRELEASE TRACKING NUMBER 4-19466 December 2010. Prepared For: New England Gas Company P.O. Box 911 Fall River, Massachusetts 02722.
RELEASE ABATEMENT MEASURE COMPLETION REPORT REGULATOR DECOMMISSIONING AND WATER SERVICE LINE REPAIR 120 CHARLES STREET FALL RIVER, MASSACHUSETTS RELEASE TRACKING NUMBER 4-19466 December 2010 Prepared For:
More informationGuidelines for Archeological Review
Guidelines for Archeological Review The Maryland-National Capital Park and Planning Commission Adopted May 12, 2005 TABLE OF CONTENTS I. Introduction 2 II. Definitions 3 III. Development Review Process
More informationSECTION 4.11 HYDROLOGY AND WATER QUALITY
SECTION 4.11 HYDROLOGY AND WATER QUALITY This section describes federal, state and local regulations applicable to hydrology and water quality. It also describes the regional hydrologic setting, existing
More informationHistorical Resources Guidelines. San Diego Municipal Code Land Development Code
San Diego Municipal Code Land Development Code Historical Resources Guidelines Adopted September 28, 1999 Amended June 6, 2000 by Resolution No. R-293254-3 Amended April 30, 2001 by City Manager Document
More informationAppendix A. Monument Proclamation
Monument Proclamation Establishment of the Canyons of the Ancients National Monument June 9, 2000 BY THE PRESIDENT OF THE UNITED STATES OF AMERICA A PROCLAMATION Containing the highest known density of
More informationPreliminary Assessment
Preliminary Assessment Bonebrake Theological Seminary Site Dayton Unit III Dayton, Ohio Prepared by: U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207-3199 September 5,
More informationStacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator
Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator How many people view the Napa County regions: How groundwater management folks see Napa County Brief History During the
More informationGuidelines for Preparing Cultural Resources Management Archaeological Reports
Guidelines for Preparing Cultural Resources Management Archaeological Reports Submitted to the Historic Preservation Office July 2000 Reports must be submitted as individual documents for accessioning
More information(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.
Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing
More informationGUIDELINES FOR ARCHAEOLOGICAL INVESTIGATIONS IN PENNSYLVANIA. Revised November 2008. Bureau for Historic Preservation
GUIDELINES FOR ARCHAEOLOGICAL INVESTIGATIONS IN PENNSYLVANIA Revised November 2008 Bureau for Historic Preservation Pennsylvania Historical and Museum Commission Commonwealth Keystone Building, 2 nd Floor
More informationSTEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration
More informationGuide for the Management of Archaeological Resources. National Capital Commission February 2008
Guide for the Management of Archaeological Resources National Capital Commission February 2008 1 Ce document est aussi disponible en français. National Capital Commission 202 40 Elgin Street Ottawa, Canada
More informationCHAPTER 5.0 CONSULTATION AND COORDINATION
CHAPTER 5.0 CONSULTATION AND COORDINATION 5.1 LIST OF PREPARERS AND REVIEWERS Contributor Role Qualifications (Education/Years of Experience) 5.1.1 Bureau of Land Management, El Centro Field Office Daniel
More informationProposal to the Trinity Adaptive Management Working Group (TAMWG)
Proposal to the Trinity Adaptive Management Working Group (TAMWG) Request that the TAMWG recommend that the Trinity River Restoration Program fund BLM to purchase the Weigel parcel at Gold Bar (river mile
More informationCroft House Lodge Tree Removal and Building Relocation Mitigation Report. November 2010
Croft House Lodge Tree Removal and Building Relocation Mitigation Report November 2010 1 A site meeting was held on 24/05/2010 at the site of the proposed Croft House Lodge Respite Centre, Carleton Road,
More informationFloodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
More informationChapter 4.0 - Impacts of the Proposed Project
Chapter 4.0 - Impacts of the Proposed Project 4.0 Impacts of the Proposed Project This section presents the baseline conditions and the analysis of the potential for the proposed Ridgecrest Sanitary Landfill
More informationWhat Is Rehabilitation?
Location of Aggregate Operations Ready Mix Plant Locations Aggregate Locations Cement Terminal Locations What Is Rehabilitation? Rehabilitation is the treatment of land from which aggregate has been excavated
More informationWEST MISSION AVENUE SPECIFIC PLAN (Council Approved 11/5/03 - Resolution 2003-166-R)
WEST MISSION AVENUE SPECIFIC PLAN (Council Approved 11/5/03 - Resolution 2003-166-R) Section 1. Purpose and Intent The goal of the West Mission Specific Plan is to facilitate the revitalization efforts
More informationCreation of Soil Liquefaction Susceptibility Maps for San Luis Obispo & Marin Counties using Geographic Information Systems.
Creation of Soil Liquefaction Susceptibility Maps for San Luis Obispo & Marin Counties using Geographic Information Systems. Amelia M. Lowman December 2009 Dr. Lynn E. Moody Adviser Earth and Soil Sciences
More informationSUMMARY. for the. SCH No. 2006101028. Prepared for. University of California, San Diego 9500 Gilman Drive, MC 0074 La Jolla, California 92093
SUMMARY for the UNIVERSITY OF CALIFORNIA, SAN DIEGO UNIVERSITY HOUSE MEETING CENTER AND CHANCELLOR RESIDENCE FINAL ENVIRONMENTAL IMPACT REPORT SCH No. 2006101028 Prepared for University of California,
More informationFACE Veterinary Hospital Partners
FACE Veterinary Hospital Partners Our veterinary partners help FACE achieve our mission by generously discounting their services for qualified FACE cases by at least 25% - thank you to the hospitals listed
More informationAN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
More informationTwo Acres with House
9211 South Presa Street, San Antonio, Texas 78223 LOCATION Located in southeast San Antonio, north of Loop 410 and west of IH-37; MAPSCO 683F3 LAND SIZE AND FRONTAGE 2.0 AC; 87,120 SF 166 feet of frontage
More informationRisk Analysis, GIS and Arc Schematics: California Delta Levees
Page 1 of 7 Author: David T. Hansen Risk Analysis, GIS and Arc Schematics: California Delta Levees Presented by David T. Hansen at the ESRI User Conference, 2008, San Diego California, August 6, 2008 Abstract
More informationENVIRONMENTAL REVIEW SCREENING QUESTIONS
ENVIRONMENTAL REVIEW SCREENING QUESTIONS All applications to WHEDA are required to meet the Department of Housing and Urban Development s environmental compliance standards listed in 24 CFR Part 58. Your
More informationTABLE OF CONTENTS CURRICULUM AND LESSON PLANS
TABLE OF CONTENTS CURRICULUM AND LESSON PLANS Lesson 9: A Career in Archaeology.......................................96 Interview With An Archaeologist: Leonard Forsman..................... 99 Interview
More informationSan Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline
San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide
More informationPost-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
More informationHow To Manage Alfalfa
MANAGING ALFALFA NUTRITION BY SOIL ANALYSIS IN THE DESERT SOUTHWESTERN UNITED STATES By Aron A. Quist and Michael J. Ottman 1 Introduction: High producing alfalfa responds well to phosphorus and potassium
More informationD. CULTURAL RESOURCES
D. CULTURAL RESOURCES 2006 D.1. PALEONTOLOGICAL RESOURCES 1. INITIAL STUDY SCREENING PROCESS A. Initial Study Checklist Question V.c): Would the project directly or indirectly destroy a unique paleontological
More informationIowa Department of Transportation Concurrent NEPA / 404 Process
Iowa Department of Transportation Concurrent NEPA / 404 Process Project Name: County: Dallas County Project No.: HDP-8260(629) 71-25 Concurrence Point 2: PIN: N/A Public Land Survey System: Sections 16,21,22,23,26,27,28
More informationThe Watershed Model, Local Contexts, and Settlement Pattern Studies
The Watershed Model, Local Contexts, and Settlement Pattern Studies Steven McDougal (Pennsylvania Historical and Museum Commission) Chan Funk (Pennsylvania Historical and Museum Commission) Paper presented
More informationBenchmark Identify physical & human characteristics of places, regions in North America. Grade Level Indicator Describe, compare landforms, climates, population, vegetation, economic characteristics of
More information3.6 CULTURAL RESOURCES
3.6 CULTURAL RESOURCES 3.6 CULTURAL RESOURCES SECTION SUMMARY The San Ardo to Coalinga Heated Oil Pipeline Project could have a potentially significant impact on two Native American prehistoric archaeological
More information1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
More informationUsing LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine
Geologic Site of the Month February, 2010 Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine 43 o 20 51.31 N, 70 o 28 54.18 W Text by Peter Slovinsky, Department of Agriculture, Conservation
More information5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
More informationFWS Cultural Resource Management Planning
I. What is required? FWS Cultural Resource Management Planning A number of laws, regulations, and Fish and Wildlife Service policies address cultural resource management planning requirements and objectives.
More informationCULTURAL HISTORY The United States Public Land Survey System The Rectangular Grid By Neal McLain
CULTURAL HISTORY The United States Public Land Survey System The Rectangular Grid By Neal McLain In last month's column, I discussed the origin of the United States Public Land Survey System (USPLSS, or
More informationWHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies
More informationAppendix C: Phase 1 Cultural Resources Assessment, Opportunities and Constraints Report. Walnut Creek Habitat and Open Space Project City of San
Appendix C: Phase 1 Cultural Resources Assessment, Opportunities and Constraints Report. Walnut Creek Habitat and Open Space Project City of San Dimas and Los Angeles County, California (June 2011) PHASE
More informationGround Water in the Piedmont and Blue Ridge Provinces of North Carolina
Ground Water in the Piedmont and Blue Ridge Provinces of North Carolina Prepared by: R.L. Huffman Extension Agricultural Engineering Specialist Published by: North Carolina Cooperative Extension Service
More information