Chapter Impacts of the Proposed Project
|
|
|
- Homer Griffin
- 10 years ago
- Views:
Transcription
1 Chapter Impacts of the Proposed Project 4.0 Impacts of the Proposed Project This section presents the baseline conditions and the analysis of the potential for the proposed Ridgecrest Sanitary Landfill (Ridgecrest RSLF) Permit Revision Project (proposed Project) to cause significant impacts in the proposed Project study area from all components of the proposed Project, including: Amend the Kern County General Plan (GPA 2, Map 70); Apply for Conditional Use Permit (CUP 8, Map 70); Revise the Solid Waste Facilities Permit (No. 15-AA-0059); Petition for the exclusion of the Estray Ordinance for the project area; Construct a trans-load facility; Prepare a Joint Technical Document describing the facilities design and operations; Accept revised Waste Discharge Requirements; and Amend the Kern County and Incorporated Cities Integrated Waste Management Plan Non-Disposal Facility Element (NDFE) to include the expansion of the recycling programs being conducted at the facility. The above listed components constitute the proposed Project for this Draft Environmental Impact Report (DEIR). This Draft EIR has been prepared in accordance with California Environmental Quality Act (CEQA) statutes, the updated CEQA Guidelines (California Code of Regulations [CCR], 2009), and County of Kern s CEQA Implementation Document (Kern County Planning and Community Development Department, 2004a). The issue areas analyzed in the subsections that follow include: 4.1 Aesthetic Resources 4.2 Agricultural Resources 4.3 Air Quality 4.4 Biological Resources 4.5 Cultural Resources 4.6 Geology and Soils 4.7 Greenhouse Gas Emissions 4.8 Hazards and hazardous Materials 4.9 Hydrology and Water Quality Draft Environmental Impact Report 4.0-1
2 4.10 Land Use and Planning 4.11 Transportation and Traffic 4.12 Utilities and Service Systems Baseline/Existing Environmental Setting CEQA Guidelines Section requires that an EIR include a description of the physical environmental conditions of the project as they exist at the time the Notice of Preparation is published. Section states that this environmental setting will normally constitute the baseline physical conditions by which a lead agency determines whether an impact is significant. This section describes the general approach to the baseline in the DEIR, and summarizes the baseline used for all issue areas. Details regarding the relevant baseline for each potential environmental impact are presented in Sections 4.1 through 4.11 of this DEIR. In further explaining the principles found in CEQA Guidelines Section 15125, CEQA case law has confirmed that existing facilities or activities are considered part of the baseline even if they have been established or conducted without required permits or contrary to permits or codes (e.g., Riverwatch v. County of San Diego [1999] 76 Cal.App.4th 1428; Fat v. County of Sacramento [2002] 97 Cal.App.4th 1270; Eureka Citizens for Responsible Government v. City of Eureka [2007] 147 Cal.App.4th 357.) In addition, CEQA cases have acknowledged that environmental conditions may vary from year to year, and in some cases it is necessary to consider conditions over a range of time periods, including changes that occur during the time it takes to complete environmental review (e.g., Save Our Peninsula Committee v. Monterey County Bd. of Supervisors [2001] 87 Cal.App.4th 99.). For the same reason, cases have approved baselines for modifications to previously permitted projects or facilities based on the permitted use (e.g., Benton v. Board of Supervisors of Napa County [1991] 226 Cal.App.3d 1467; Fairview Neighbors v. County of Ventura [1999] 70 Cal.App.4th 238.). The Court of Appeal decision in Communities for a Better Environment v. South Coast Air Quality Management District ( CBE v. SCAQMD ) (2007) 158 Cal.App.4th 1336, concluded that the permitted level of activity could be used as the baseline only if it had undergone prior CEQA review. However, in 2010 the California Supreme Court reviewed the case and overturned the Court of Appeal decision, ultimately ruling that existing activities are required to be used as the baseline. Table below summarizes the baseline used to assess each environmental medium potentially affected by the proposed Project. In general, the Draft EIR strives to apply a baseline consisting of the physical environmental conditions as of February 17, 2009, the date the Notice of Preparation (NOP) was issued for the Project; however, the information available for each environmental medium is different. Even so, the baseline represents a good faith effort to present the environmental conditions approximately as they existed as of the NOP date, using reasonably available information. Draft Environmental Impact Report 4.0-2
3 Table Summary of the Ridgecrest RSLF Baselines Topic Baseline Notes Aesthetic Resources Figures through The existing site is visibly distinct from the natural landscape due to the disturbed nature of the landfill s surface areas. The landfill is an existing facility; it has become an established and accepted part of the landscape. Agricultural Resources Reports and maps prepared by the The entire project is located within the Kern California Department of County Estray Ordinance area (Open Range) Conservation, the Kern County and is subject to the provisions set forth in Kern Department of Agriculture and County Ordinance Code: Title 7, Chapter 7.16 Measurement Standards, the Kern Estrays, Sections thru (Kern County Planning and Community County Planning and Community Development Development Department, and the Department, 2002). California Division of Land Resource Protection. Air Quality Emissions Baseline emissions were calculated using existing equipment, tonnage, and traffic totals that were experienced at the site at the time of the NOP (Appendix I). Emissions attributable to the existing operation are already incorporated into the air basin s existing emissions inventory through inclusion in the Kern County General Plan and in the Eastern Kern County Air Pollution Control District Emissions Inventory and the California Air Resources Board Statewide Emissions Inventory. Draft Environmental Impact Report 4.0-3
4 Odors Biological Resources Cultural Resources Topic Baseline Notes Odor complaints during the history of There have been no known odor complaints the Ridgecrest RSLF. that have been filed for the Ridgecrest RSLF. Surveys and reports prepared by Resource Management International (RMI) (1992a), and William Vanherweg (1996, 1997, 2000, and 2009). Comments from California Department of Fish and Game (CDFG) (1980a and 1980b) their own field survey on the impacts to wildlife resources at Ridgecrest are included. Surveys and reports prepared by various consultants including Resource Management International (1992b), and Three Girls and a Shovel, LLC (2008). In addition, a sacred lands search for the property was performed by the Native American Heritage Commission. Biological surveys were conducted prior to the NOP, and are located in Appendix B of the DEIR. Cultural surveys were conducted prior to the NOP, and are located in Appendix C of the DEIR. Draft Environmental Impact Report 4.0-4
5 Topic Baseline Notes Geology and Soils Information prepared by various Soil types at the site consist of coarse sands, consultants including EMCON intermixed with fine to medium gravel, and the Associates (1989 and 1991) and T.J. facility is not located on a floodplain or lake Cross Engineers (2004). In 2003, area. The Ridgecrest general area, like most of Geosyntec Consultants conducted Kern County, is considered to be seismically an investigation of faulting potential active. There are no identified active or at the Ridgecrest RSLF. In 2009, potentially active faults underlying the site or AMEC Geomatrix, Inc., prepared a adjacent areas. Faults considered to be water quality (AMEC, 2009a) and a presently active and near the landfill are the water supply (AMEC Geomatrix, Little Lake Fault zone, the Garlock Fault, and 2009b) assessment for the the Sierra Nevada Fault zone (Golder Ridgecrest RSLF (Appendix K and Associates, 2010). A technical study has Appendix L, respectively). In 2010, indicated that no Holocene fault has been Golder Associates (Golder) prepared identified within the landfill property boundary a geotechnical report for the (Geosyntec Consultants, 2003). The site is not Ridgecrest Recycling and Sanitary within an Alquist-Priolo Seismic Studies Zone. Landfill (Ridgecrest RSLF) The project area is outside of the 100-year (Appendix J). floodplain. Greenhouse Gas Emissions Kern County Waste Management Department Greenhouse Gas Emission Action Plan prepared by the Kern County Waste Management Department in December 2008 (Appendix H). This estimate is the most complete data available for the period nearest in time to the NOP date. As such, it generally approximates the inventory at the NOP date. Draft Environmental Impact Report 4.0-5
6 Topic Baseline Notes Hazards and Hazardous Materials Hazardous Materials Vectors Hazardous waste is not accepted for disposal at the landfill. There have been no citations in the past concerning vectors. The Kern County Recycling and Solid Waste Planning - Waste Characterization Study (HF&H Consultants, 2009) found that the concentration of incidental household hazardous waste in the County s overall municipal waste stream was quite low (approximately 0.14%). The control of vectors (rodents, flies and birds) is a requirement of state regulations and is monitored by the LEA. Control of vectors is an ongoing operation through use of daily cover and rodent eradication when warranted. Hydrology and Water Quality Ground Water Quality Reports prepared by EMCON Associates (1989, 1999), SECOR (2002), and ongoing monitoring performed by the Kern County Waste Management Department. In 2009, AMEC Geomatrix, Inc., prepared a water quality (AMEC, 2009a) assessment for the Ridgecrest RSLF, provided in Appendix K of this DEIR. Groundwater quality at the landfill has been monitored since 1989 when the first three monitoring wells were installed. Currently the groundwater monitoring system consists of seven operating monitoring wells: one background well (RD1-25), four compliance wells (RD1-06, RD1-10, RD1-11 and RD1-26), and two Evaluation Monitoring Program wells (RD2-01 and RD2-02). Draft Environmental Impact Report 4.0-6
7 Topic Baseline Notes Ground Water Supply AMEC Geomatrix, Inc., prepared a The Ridgecrest RSLF is located in an arid water supply (AMEC, 2009b) area that has received approximately 6.15 assessment for the Ridgecrest inches of rain per year over the last 10 years RSLF, provided in Appendix L to this DEIR. (California Data Exchange Center, China Lake Armitage station). Evapotranspiration in the vicinity of the City of Ridgecrest is approximately 72.2 inches per year (AMEC Geomatrix, 2009a). The groundwater depth in the water supply well is estimated at approximately 354 feet below ground surface, which is comparable to the groundwater depths that currently are observed in well RD2-02. Observed groundwater levels in the Ridgecrest RSLF water supply well have declined by an average of 1.5 to 1.6 feet per year. Land Use Land use plans and zoning as of the NOP date. Surrounding land uses were determined in part by examination of aerial photographs, taken prior to the NOP date, and confirmed by field investigations. Draft Environmental Impact Report 4.0-7
8 Transportation and Traffic Utilities and Service Systems The routes of the public self-haul and commercial vehicles as proposed by the Project. Consultations with the Kern County Roads Department and Caltrans (Appendix A) were also used to determine the transportation and traffic issues related to the proposed Project. Reports prepared by HF&H Consultants (Appendix N), AMEC Geomatrix, Inc. (2009b) (Appendix L) and review of state and federal laws and regulations that govern the various utilities and service systems as well as the specific energy conservation requirements of the CEQA Guidelines Appendix F. The Ridgecrest RSLF is permitted for 795 vehicles per day. However, in 2008, the actual vehicles per day at the project site averaged 219, which is equivalent to 438 trips per day. All intersections are currently operating at an acceptable level of service. The Ridgecrest RSLF is a Class III municipal solid waste sanitary landfill, permitted to operate under the provision of Title 27 California Code of Regulations. The site is identified in the CalRecycle s database as Solid Waste Information System (SWIS) number 15- AA-0059 and is operated in compliance with federal, state, and local statures and regulations. Periodic inspections by the Kern County Environmental Health Services Department (KCEHSD), acting as the Local Enforcement Agency (LEA), ensure that the facility is maintained in accordance with applicable statutes and regulations. The Project will use groundwater primarily for fugitive dust control and soil compaction. The gatehouse accounts for only a small portion of the daily water use. The water will be supplied by the on-site supply well which is completed in Draft Environmental Impact Report 4.0-8
9 the unconfined aquifer. Water usage at the facility is highest in the summer months with an estimated daily usage of 11,075 gallons per day (gpd). Total annual usage from the supply well is estimated to be 2,433,182 gallons or about 7.5 acre-feet per year (AFY). This amount represents 0.03 percent of the annual groundwater production (25,000 acre-feet per year) in the Indian Wells Valley Basin (AMEC Geomatrix, 2009b). [This Space Intentionally Left Blank] Draft Environmental Impact Report 4.0-9
10 [This Page Intentionally Left Blank] Draft Environmental Impact Report
3.1.8 Utilities and Service Systems
3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
SUNSHINE CANYON LANDFILL
SUNSHINE CANYON LANDFILL January 15, 2014 Mr. Gerry Villalobos SCL LEA Program Manager 5050 Commerce Drive Baldwin Park, California 91706 Subject: December 2013 Monthly Report (MRMP 46, 96, 119, & 125)
V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials
E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of
CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW
NAEP/AEP Conference Los Angeles CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW P RESENTED B Y : C URTIS E. ALLING, AICP G ARY D. JAKOBS, AICP A SCENT E NVIRONMENTAL, INC. A PRIL 2013 AEP CONFERENCE
State of Kansas Coal Combustion Residuals Part 256 Plan. Kansas Department of Health and Environment Bureau of Waste Management
State of Kansas Coal Combustion Residuals Part 256 Plan Kansas Department of Health and Environment Bureau of Waste Management 9/29/2015 Table of Contents Chapter 1 - Introduction...1 Chapter 2 - Compliance
NAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
National Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
4.7 HAZARDS AND HAZARDOUS MATERIALS
LSA ASSOCIATES, INC. MARCH 2008 FINAL ENVIRONMENTAL IMPACT REPORT YUCCA VALLEY RETAIL SPECIFIC PLAN The State defines hazardous material as any material that, because of its quantity, concentration, or
Package Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator
Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator How many people view the Napa County regions: How groundwater management folks see Napa County Brief History During the
San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission
San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 January
ON-SITE WASTEWATER TREATMENT SYSTEMS ACT
ON-SITE WASTEWATER TREATMENT SYSTEMS ACT Revised and reproduced by the Colorado Department of Public Health and Environment June, 2012 (PLEASE NOTE: This is an unofficial copy of this statute. The official
City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee
City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration
AGENCY SUMMARY NARRATIVE
AGENCY SUMMARY Mission Statement and Statutory Authority DEQ s mission is to be a leader in restoring, maintaining and enhancing the quality of Oregon s air, water and land. The Department of Environmental
North San Jose Neighborhoods Planning Taskforce
North San Jose Neighborhoods Planning Taskforce Key Topics Water Supply Flooding Related Topics Storm Water Storm Sewer Sanitary Sewer Water Conservation Treatment Plant Water Background Responsible Agencies
GOALS, OBJECTIVES AND POLICIES
GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.
GROUNDWATER CONDITIONS
GROUNDWATER CONDITIONS IN THE NORTHERN SACRAMENTO VALLEY LOCAL MANAGEMENT OF WATER RESOURCES IN THE NORTHERN SACRAMENTO VALLEY MEETING DECEMBER 16, 2011 KELLY STATON, SENIOR ENGINEERING GEOLOGIST, GROUNDWATER
Iowa Smart Planning. Legislative Guide March 2011
Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The
Office of. City Attorney. City of San Diego MEMORANDUM MS 59 (619) 533-5800 QUESTION PRESENTED
Office of The City Attorney City of San Diego MEMORANDUM MS 59 (619) 533-5800 DATE: TO: FROM: SUBJECT: Honorable Mayor and City Councilmembers City Attorney Climate Action Plan QUESTION PRESENTED Are the
City of Los Angeles CALIFORNIA ERIC GARCETTI MAYOR. November 6, 2014
DEPARTMENT OF CITY PLANNING 200 N. SPRING STREET, ROOM 525 LOS ANGELES, CA 90012-4801 AND 6262 VAN NUYS BLVD., SUITE 351 VAN NUYS, CA 91401 - CITY PLANNING COMMISSION DAVID H. J. AMBROZ PRESIDENT RENEE
INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
City of Bakersfield Public Works Department Sewer System Management Plan December 2014
City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
Town of Ware Board of Health. Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems
Town of Ware Board of Health Regulations for Percolation Tests, Soil Evaluations, Design, and Technical Review of Subsurface Sewage Disposal Systems Section 1: Authority- The Ware Board of Health adopts
2010 Salida Community Priorities Survey Summary Results
SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive
DEVELOPMENT DUE DILIGENCE CHECKLIST
DEVELOPMENT DUE DILIGENCE CHECKLIST A. Title Condition. 1. Preliminary Title Reports. A current preliminary title report ( PTR ) for the Real Property. 2. Copies of Exceptions to Title. Copies of all documents
Water Conservation Measurement in California - A Guide
2010 URBAN WATER MANAGEMENT PLAN June 22, 2011 DEVELOPING I N N O V AT I V E DESIGN SOLUTIONS ELK GROVE WATER DISTRICT A DEPARTMENT OF THE FLORIN RESOURCE CONSERVATION DISTRICT 2010 URBAN WATER MANAGEMENT
Water Conservation and the State s New Green Building Code for Residential Construction
Water Conservation and the State s New Green Building Code for Residential Construction Silver Sponsors Media Sponsors Certified Sponsors Solano County Water Agency Zone 7 Water Agency Founding Partners
Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia
Georgia Department of Public Health Georgia Onsite Sewage Management Systems Background and Use of Onsite Wastewater Treatment Systems in Georgia Background On-site sewage management systems are designed
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
~xccuti\lc :Bcpertmcnt
~xccuti\lc :Bcpertmcnt ~tote of ~lifornia EXECUTIVE ORDER B-29-15 WHEREAS on January 17, 2014, I proclaimed a State of Emergency to exist throughout the State of California due to severe drought conditions;
NASA Stennis Space Center Environmental Resources Document
16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic
NOTICE OF PREPARATION
PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456
Element 3: OVERFLOW EMERGENCY RESPONSE PLAN
Element 3: OVERFLOW EMERGENCY RESPONSE PLAN The section of the SSMP discusses the City s overflow emergency response plan, which is included in full in Appendix B. This section fulfills the Overflow Emergency
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
Categorical Exclusion Determination Bonneville Power Administration Department of Energy
Categorical Exclusion Determination Bonneville Power Administration Department of Energy Proposed Action: Removal and Relocation of Equipment from Leased Area in Titan Data Center Project Manager: Molly
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s
Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,
Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework
TABLE OF CONTENTS. INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal...2 Vision...
MCKENZIE COUNTY COMPREHENSIVE PLAN TABLE OF CONTENTS INTRODUCTION...1 Purpose of a Comprehensive Plan...1 McKenzie County Comprehensive Plan...1 Definitions...2 Goal....2 Vision...3 ECONOMIC DEVELOPMENT...4
Chapter VI SOLID WASTE REGULATION
Solid waste is defined as follows: Chapter VI SOLID WASTE REGULATION The term solid waste means any garbage, refuse, sludge from a waste treatment plant, water supply treatment plant, or air pollution
https://orm.usace.army.mil/orm2/f?p=106:34:4198546103662037::no::
Page 1 of 6 APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers JD Status: DRAFT SECTION I: BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION
APPENDICES SAN FRANCISCO BAY TRAIL: PINOLE SHORES TO BAYFRONT PARK PROJECT ENVIRONMENTAL IMPACT REPORT
PUBLIC REVIEW DRAFT APPENDICES SAN FRANCISCO BAY TRAIL: PINOLE SHORES TO BAYFRONT PARK PROJECT ENVIRONMENTAL IMPACT REPORT STATE CLEARING HOUSE NUMBER 2010082043 July 15, 2011 This page left blank intentionally.
How To Get A Stormwater Discharge Permit In A City Of Scottsdale
Environmental Regulations Guide Section 4 Pollution Prevention 4. 0 Pollution Prevention The Pollution Prevention Act (PPA) focuses on source reduction, i.e. on reducing the amount of pollution through
Chapter 1 Introduction
Chapter 1 Section 1421 of SDWA tasks EPA with protecting USDWs for all current and future drinking water supplies across the country (see section 1.3 for the complete definition of a USDW). EPA s UIC Program
San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS
San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS Page No. 1.0 BACKGROUND...1 2.0 INTRODUCTION - SEPTAGE RECEIVING STATION...1
SUBJECT: NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE BERTHS 97-109 [CHINA SHIPPING] CONTAINER TERMINAL PROJECT
September 18, 2015 SUBJECT: NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE BERTHS 97-109 [CHINA SHIPPING] CONTAINER TERMINAL PROJECT The City of Los Angeles Harbor Department
SALT LAKE VALLEY HEALTH DEPARTMENT ENVIRNOMENTAL SERVICE DELIVERY PLAN ANNUAL REPORT FY2009 DRINKING WATER
SALT LAKE VALLEY HEALTH DEPARTMENT ENVIRNOMENTAL SERVICE DELIVERY PLAN ANNUAL REPORT FY2009 DRINKING WATER LHD will conduct sanitary surveys for reimbursement on the following systems: LHD will send all
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
CHAPTER 4 ALTERNATIVES COMPARISON
CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections
IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL
IV. ENVIRONMENTAL IMPACT ANALYSIS L. UTILITIES AND SERVICE SYSTEMS 3. SOLID WASTE AND DISPOSAL ENVIRONMENTAL SETTING Within the City, solid waste management, including collection and disposal services
EMISSIONS INVENTORY FORECASTING IN CALIFORNIA. 2015 International Emissions Inventory Conference San Diego, California April 15, 2015
EMISSIONS INVENTORY FORECASTING IN CALIFORNIA 2015 International Emissions Inventory Conference San Diego, California April 15, 2015 Presentation Overview Need for emission inventory forecasts Emission
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division
AN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
2015 -- H 6042 S T A T E O F R H O D E I S L A N D
LC00 01 -- H 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO TOWNS AND CITIES -- RHODE ISLAND COMPREHENSIVE PLANNING AND LAND USE ACT Introduced
SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
NAPCS Product List for NAICS 54162: Environmental Consulting Services
NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,
1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment
1 INTRODUCTION The Office of Surface Mining Reclamation and Enforcement (OSMRE) is the regulatory authority for coal mining operations under the Surface Mining Reclamation and Control Act of 1977 that
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
ALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE
4-1-1 SHORT TITLE... 1 4-1-2 INTENT... 1 4-1-3 DEFINITIONS... 1 4-1-4 WATERING RESTRICTIONS... 4 4-1-5 WATER WASTE... 5 4-1-6 SPECIAL PERMITS... 6 4-1-7 VARIANCES, EXEMPTIONS AND APPEALS... 7 4-1-8 FEES;
1200 United Boulevard
MINISTRY OF ENVIRONMENT Thompson and Cariboo Regions 1259 Dalhousie Drive Kamloops BC V2C 5Z5 Telephone: (250) 371-6200 Fax: (250) 828-4000 OPERATIONAL CERTIFICATE FOR THE CACHE CREEK LANDFILL Under the
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits
Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.
A Guide for Used Oil Transporter Training Programs. Following are excerpts from laws and rules pertaining to Used Oil Transporter Certification
A Guide for Used Oil Transporter Training Programs Introduction An used oil transporter that transports over public highways more than 500 gallons of used oil annually, not including oily waste, must become
PC 23-11 Nate Lundgren-Auto Repair Business Conditional Use Permit 9/7/11 Applicants
PC 23-11 Nate Lundgren-Auto Repair Business Conditional Use Permit 9/7/11 Applicants Nate Lundgren Triple K Partnership Mankato 105 LeSueur Ave 320 Mallard Lane Eagle Lake, MN 56024 Mankato MN 560001 Request
Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act
CENTERSTATE NY INLAND PORT DRAFT SCOPING DOCUMENT FOR THE Draft Environmental Impact Statement PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act SEPTEMBER 30, 2015 INTRODUCTION
GENERAL PERMIT WMGM043
A. Description: The approval herein granted is for the acceptance, transfer, and processing prior to beneficial use of construction and demolition waste materials as follows: a. Processing by sorting,
REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013
REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013 CENTRAL NEW YORK REGIONAL PLANNING AND DEVELOPMENT BOARD 126 NORTH SALINA
2006 Standard Application Processing Time. 10 months. 14 months
Air and Radiation Management Administration General Permit to Construct - without expanded public review Air Quality Permit to Construct - with expanded public review but limited public interest 11 months
1 Overview introducing global issues and legal tools through local case studies. 2 Importance of legal protections for natural areas
Warren G. Lavey [email protected] University of Illinois (USA) Online Course 2015 Environmental Policy: Legal Protections for Overview of 16 Lessons Lesson Topic Three key messages Sources of case studies
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
MBJ Environmental Programmes
MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,
STAFF REPORT PLANNING COMMISSION REGULAR MEETING OF OCTOBER 20, 2015. Debbie Hill, Associate Planner [email protected] 9386-A1
STAFF REPORT PLANNING COMMISSION REGULAR MEETING OF OCTOBER 20, 2015 PREPARED BY: AGENDA ITEM & FILE NUMBER: PROJECT DESCRIPTION: PROJECT SIZE & LOCATION: GENERAL PLAN: ZONING: OWNER/APPLICANT: Debbie
