Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator
|
|
|
- Jocelyn Lee
- 10 years ago
- Views:
Transcription
1 Stacey Harrington, M.S, R.E.H.S. Napa County Environmental Management Coordinator
2 How many people view the Napa County regions:
3 How groundwater management folks see Napa County
4 Brief History During the drought in 1990, the Napa County Board of Supervisors and the Planning Commission became concerned about the approval of use permits and parcel divisions and their impacts on groundwater availability. As a result, water availability analyses were required for use permits and parcel divisions. In 1999, the Groundwater Conservation Ordinance was passed to minimize the dropping groundwater levels in the Milliken-Sarco-Tulocay Basin.
5 Water Availability Analysis In general, parcels located on the Valley Floor or in strong alluvial areas were assigned a threshold of 1 acre-foot per acre of land (an acre-foot of water is the amount of water it takes to cover one acre of land to a depth of one foot, or 325,851 gallons). Therefore, a 40- acre parcel will have an acceptable level of groundwater use of 40 acre-feet per year. The threshold for hillside parcels (primarily located in volcanic rock and soils) was 0.5 acre-feet per acre or 20 acre-feet per year for a 40-acre parcel.
6 Water Availability Analysis A simplified method for evaluating water availability in a cost effective manner, originally created with minimal groundwater data. Phase 1: If within 50% of the estimated threshold, a water meter may be required to verify actual use. If the project exceeds the threshold, water use can be reduced. Phase 2 and Phase 3: Not really used. Phase 2: An aquifer test to verify if the proposed wells impact neighboring wells. Phase 3 includes mitigation measures but is even more vague.
7 Water Availability Analysis (cont d) Phase 3: Determines possible actions that could be taken to moderate the immediate effects of groundwater pumping, including measures to reduce water consumption and/or the maximum pumping rate.
8 The Milliken-Sarco-Tulocay (MST) Groundwater Deficient Basin
9 The Milliken-Sarco-Tulocay (MST) Groundwater Deficient Basin
10 The MST USGS studies for decades showed declining groundwater levels 1999 BOS declares a groundwater deficient basin and passes Groundwater Ordinance requiring permitting of new uses and establishing Fair Share 2003 Latest USGS study shows continuing decline 2004 Planning Department adopts no net increase standard for discretionary permits under CEQA
11 The Groundwater Ordinance Designed to slow the problem, not fix it Established fair share concept based on calculated recharge/#acres (0.3 acre ft/acre/yr) Only applied to new development (does not regulate existing uses) Required discretionary permits for most new uses (allows a few ministerial uses) Most new projects required metering of wells, reporting to County and limited amount of water withdrawn based on the fair share
12 CEQA Joins the MST Party Additional requirement of no net increase added in 2004 (following 2003 USGS Study) to stay under cumulative impacts requirement of CEQA Essentially any discretionary project that increases groundwater use by any amount is cumulatively significant and requires an EIR As a practical reality approvals grind to a halt (unless you have an existing water using activity you can give up for a new but different water using activity)
13 What can be done in the MST? Exempt: Minor or convenience improvements to an existing well system (repairs/changes not intended to supply more water) Replacement of a failed well Expansion of an existing dwelling (add bedrooms but not a second unit) Ministerial: A residence, if no other development exists on the parcel (limited to 0.6 acre ft/year no matter the size of the parcel) Replants
14 More on the MST Discretionary: Everything else that uses groundwater There are a few ways to facilitate development: Trucked in water (only for agricultural uses) Giving up one use to allow for another Reducing water use in one area of the parcel to support development in another
15 Groundwater: What we know Napa County and other public agencies have been monitoring groundwater resources since mid-1900 s Groundwater Levels The Napa Valley Floor shows stable long-term trends and shallow depth to water Milliken, Sarco & Tulocay creek watersheds show historical declines but some areas have begun to stabilize
16 Groundwater: What we know Groundwater Quality Quality generally good on Napa Valley Floor Higher levels of salt and other constituents in northern Napa Valley Floor/Calistoga Salts, iron and other constituents are higher in southern Napa Valley Floor Groundwater Recharge Most recharge occurs in the Napa River watershed Almost 43% of the watershed has geology/soils with the greatest potential for recharge
17 The Current Plan Groundwater Outreach & Education Expanded Monitoring Program and Annual Reporting to ensure long-term sustainability (General Plan goal) Update of County s Water Availability Analysis and Groundwater Ordinance underway. March 2015 draft WAA maintains 1 ac/ft/yr for the valley floor and.3 ac/ft/yr for the MST area Because of the varying geology in other areas, a single number for water use isn t provided; it varies by parcel and well/spring interference must be considered Water use evaluated for discretionary permits Extending Recycled Water to the MST and Carneros Expanded Water Conservation Program Efforts
18 Voluntary Milliken-Sarco-Tulocay Recycled Water Project
19 Groundwater Sustainability Objectives Groundwater Sustainability (definition) Groundwater sustainability depends on the development and use of groundwater in a manner that can be maintained indefinitely without causing unacceptable economic, environmental, or social consequences, while protecting economic, environmental, and social benefits. As such, groundwater sustainability is both a goal and a process. Groundwater sustainability is a shared responsibility of everyone that lives and works in the County.
NAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee
City of Inglewood Well No. 2 Rehabilitation City of Inglewood Thomas Lee Project Location (Photos and location maps of the project) Project Description The City of Inglewood (City)receives its annual potable
North San Jose Neighborhoods Planning Taskforce
North San Jose Neighborhoods Planning Taskforce Key Topics Water Supply Flooding Related Topics Storm Water Storm Sewer Sanitary Sewer Water Conservation Treatment Plant Water Background Responsible Agencies
Chapter 4.0 - Impacts of the Proposed Project
Chapter 4.0 - Impacts of the Proposed Project 4.0 Impacts of the Proposed Project This section presents the baseline conditions and the analysis of the potential for the proposed Ridgecrest Sanitary Landfill
Municipal Water District of Orange County. Regional Urban Water Management Plan
Municipal Water District of Orange County Regional Urban Water Management Plan Municipal Water District of Orange County Water Reliability Challenges and Solutions Matt Stone Associate General Manager
COMMENTS ON THE CADIZ CONSERVATION, RECOVERY, AND STORAGE PROJECT DRAFT ENVIRONMENTAL IMPACT REPORT
March 13, 2012 Attn: Tom Barnes, ESA 626 Wilshire Boulevard, Ste. 1100 Los Angeles, CA 90017 Telephone: 213-599- 4300 Fax: 213-599- 4301 COMMENTS ON THE CADIZ CONSERVATION, RECOVERY, AND STORAGE PROJECT
BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT
BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT Butte County Water Advisory Committee Member John Scott Contact Information Phone Number: (530) 533-8394 Email Address: [email protected] Description
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
Irvine Ranch Water District Drought Response What Works and Plans for 2015
Irvine Ranch Water District Drought Response What Works and Plans for 2015 2015 Drought Response Workshop February 25, 2015 Fiona Sanchez Director of Water Resources Presentation Agenda IRWD Background
DOCKET NO. D-2004-008-2 DELAWARE RIVER BASIN COMMISSION. Southeastern Pennsylvania Ground Water Protected Area
This DRAFT docket has been prepared for the purposes of the scheduled public hearing and may be substantially modified as a result of the public hearing process prior to Commission action. 8/26/2013 4:17
APPENDIX G WATER SUPPLY ASSESSMENT
APPENDIX G WATER SUPPLY ASSESSMENT THIS PAGE INTENTIONALLY LEFT BLANK February 2013 BLYTHE MESA SOLAR PROJECT Water Supply Assessment PREPARED BY: 731 East Ball Road, Suite 100 Anaheim, CA 92805 (714)
Subject: YLWD Comments on the Mandatory Conservation Proposed Regulatory Framework
April 13, 2015 Felicia Marcus Chairperson, State Water Resources Control Board Attn: Jessica Bean 1001 I Street, 24 th Floor Sacramento CA 95814 Subject: YLWD Comments on the Mandatory Conservation Proposed
The Dungeness Water Exchange Mitigation Guidance Document. April 2013
The Dungeness Water Exchange Mitigation Guidance Document April 2013 Prepared by Washington Water Trust 1530 Westlake Avenue N, Suite 400 Seattle, WA 9810 Table of Contents- Dungeness Water Exchange Mitigation
Appendix E WATER SUPPLY ASSESSMENT
Appendix E WATER SUPPLY ASSESSMENT PO Box 1077 Truckee CA 96160 Berkeley Auburn San Rafael Santa Cruz Truckee balancehydro.com email: [email protected] April 25, 2012 Matt Fremont Helix Environmental
3.1.8 Utilities and Service Systems
3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD LOS ANGELES REGION. February 12, 2015
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD LOS ANGELES REGION Resolution No. R15-001 Amendment to the Water Quality Control Plan for the Los Angeles Region to Incorporate Stakeholder-Proposed Groundwater
Water Conservation and the State s New Green Building Code for Residential Construction
Water Conservation and the State s New Green Building Code for Residential Construction Silver Sponsors Media Sponsors Certified Sponsors Solano County Water Agency Zone 7 Water Agency Founding Partners
INVENTORY AND ANALYSIS
WATER RESOURCES Water supply and quality are important considerations in planning for future growth. State law requires that Maricopa County address water resources by including an inventory of county
United States Department of the Interior Bureau of Reclamation Lower Colorado Region Phoenix Area Office FINDING OF NO SIGNIFICANT IMPACT
United States Department of the Interior Bureau of Reclamation Lower Colorado Region Phoenix Area Office FINDING OF NO SIGNIFICANT IMPACT PROPOSED TRANSFER OF 200 ACRE-FEET OF CENTRAL ARIZONA PROJECT WATER
Package Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
Alternative (Flexible) Mitigation Options Proposed Rule - Revised
Alternative (Flexible) Mitigation Options Proposed Rule - Revised NC Association of Environmental Professionals June 9, 2011 Background Purposes Update rules due to required changes from statutes Put all
WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10
WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta
INNOVATION IN FLOW RESTORATION AND WATER BANKING CASE STUDY: DUNGENESS WATER EXCHANGE
INNOVATION IN FLOW RESTORATION AND WATER BANKING CASE STUDY: DUNGENESS WATER EXCHANGE Amanda Cronin Washington Water Trust AWRA- Washington State Conference September 26, 2013 WASHINGTON WATER TRUST Washington
THE DUNGENESS WATER EXCHANGE. Washington Water Trust March 13, 2013 Sequim Realtors
THE DUNGENESS WATER EXCHANGE Washington Water Trust March 13, 2013 Sequim Realtors PRESENTATION OVERVIEW Who is the Washington Water Trust? What is the Dungeness Water Exchange? How does the Exchange provide
Addressing Declining Elevations in Lake Mead
Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station
San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission
San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 January
LR 314 Working Group 5 Final Report
LR 314 Working Group 5 Final Report I. Nebraska Department of Natural Resources Table 1. NDNR and NATURAL RESOURCES COMMISSION WATER/INTEGRATED MANAGEMENT PLANNING RELATED RESEARCH, STUDIES AND RELATED
Increasing water availability through juniper control.
Tim Deboodt, OSU Crook County Extension Agent 498 SE Lynn Blvd. Prineville, OR 97754 541-447-6228 [email protected] Increasing water availability through juniper control. Throughout the region
GROUNDWATER BANKING AN AGRICULTURAL SYSTEMS APPROACH FOR WATER SECURITY IN CALIFORNIA
GROUNDWATER BANKING AN AGRICULTURAL SYSTEMS APPROACH FOR WATER SECURITY IN CALIFORNIA Helen Dahlke Assistant Professor in Integrated Hydrologic Sciences LAWR, UC Davis FEBRUARY 13, 2015 EMAIL: [email protected]
Permanently preserving privately owned productive agricultural land ensures a stable land base for the future of the agricultural industry.
F A R M L A N D P R E S E R V A T I O N Permanently preserving privately owned productive agricultural land ensures a stable land base for the future of the agricultural industry. Farmland preservation,
AQUIFER STORAGE RECOVERY
AQUIFER STORAGE RECOVERY This continuing education unit has been created to acquaint the reader with the topic of Aquifer Storage Recovery. The International School of Well Drilling gratefully acknowledges
Calculating Area and Volume of Ponds and Tanks
SRAC Publication No. 103 Southern Regional Aquaculture Center August 1991 Calculating Area and Volume of Ponds and Tanks Michael P. Masser and John W. Jensen* Good fish farm managers must know the area
4. Priority Areas of Conservation
4. Priority Areas of Conservation A. SIGNIFICANT RESOURCE AREAS This Open Space and Farmland Plan identifies the key issues facing open space and agricultural resources in the Town, highlights the location
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration
Building Resilient Infrastructure for the 21 st Century
Building Resilient Infrastructure for the 21 st Century 1 Maria Mehranian Cordoba Corporation & Los Angeles Regional Water Quality Control Board October 19, 2014 24 th Annual Lake Arrowhead Symposium:
GROUNDWATER CONDITIONS
GROUNDWATER CONDITIONS IN THE NORTHERN SACRAMENTO VALLEY LOCAL MANAGEMENT OF WATER RESOURCES IN THE NORTHERN SACRAMENTO VALLEY MEETING DECEMBER 16, 2011 KELLY STATON, SENIOR ENGINEERING GEOLOGIST, GROUNDWATER
BUDGET GLOSSARY. Acre-Foot/Acre-Feet (AF). A unit of measure equivalent to 325,851 gallons of water.
BUDGET GLOSSARY Accounts Receivable. The Agency extends credit to customers/purveyors in the normal course of operations. Management deems all accounts receivable as collectible at fiscal year-end. Accrual.
General Frost-Freeze FAQs
General Frost-Freeze FAQs Groundwater Pumping: 1) Why do farmers use water to protect their crops during frost-freeze events? a. During frost-freeze events, farmers spray water onto their crops to protect
Basements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.
6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.
ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells
ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS Before discussing the uses and importance of long-term water-level data, it is useful to review essential components of a water-level monitoring
CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN
CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,
Community Level Planning: Lessons Learned NIDIS NDMC EPC Workshop June 8, 2011 Chicago Jeff Brislawn and Courtney Peppler
Community Level Planning: Lessons Learned NIDIS NDMC EPC Workshop June 8, 2011 Chicago Jeff Brislawn and Courtney Peppler COLORADO MUNICIPAL DROUGHT MANAGEMENT PLAN Guidance Document 2 2010 Update to Drought
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
ARIZONA DEPARTMENT OF WATER RESOURCES
ARIZONA DEPARTMENT OF WATER RESOURCES WATER MANAGEMENT REQUIREMENTS FOR SOLAR POWER PLANTS IN ARIZONA ADWR CONTACT: Jeff Tannler, Statewide Active Management Area Director Arizona Department of Water Resources
LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15
LDPCSD Water Supply Emergency Response Plan Status Update 2-4-15 1 EMERGENCY OVERVIEW The Lake Don Pedro Community Services District (LDPCSD) provides domestic potable water service to 1450 connections
Foothill Municipal Water District Recycled Water Project
Foothill Municipal Water District Recycled Water Project Update to Incorporate a Watershed Approach Introduction This paper will describe the Foothill Municipal Water District (FMWD) Recycled Water Project,
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION 6.2 AUTHORITY FOR THE ELEMENT 6.3 KEY THEMES AND VISION FOR GENERAL PLAN
Chapter 6 INFRASTRUCTURE ELEMENT 6.1 INTRODUCTION Public infrastructure is an important support network for the City. Well-designed and maintained infrastructure systems are critical to the community s
Landslide Briefing to City Council April 28, 2014
Landslide Briefing to City Council April 28, 2014 OEM: Barb Graff DPD: Susan Chang, P.E. SPU: Nancy Ahern SDOT: Lawrence Eichhorn SFD: Chief A. D. Vickery Landslide Planning and Response History of landslides
Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia
Georgia Department of Public Health Georgia Onsite Sewage Management Systems Background and Use of Onsite Wastewater Treatment Systems in Georgia Background On-site sewage management systems are designed
Hydrogeology Experiment on Surface-Groundwater Interactions: How Do Our Actions Affect Water Quantity and Quality?
Name: Period: Hydrogeology Experiment on Surface-Groundwater Interactions: How Do Our Actions Affect Water Quantity and Quality? Purpose/Objective: Students will learn how groundcover influences surface
CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW
NAEP/AEP Conference Los Angeles CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW P RESENTED B Y : C URTIS E. ALLING, AICP G ARY D. JAKOBS, AICP A SCENT E NVIRONMENTAL, INC. A PRIL 2013 AEP CONFERENCE
Arizona s Large Fires Suppression vs. Restoration. WESTCAS Fall 2011 Meeting Bruce Hallin Manager, Water Rights and Contracts October 27, 2011
Arizona s Large Fires Suppression vs. Restoration WESTCAS Fall 2011 Meeting Bruce Hallin Manager, Water Rights and Contracts October 27, 2011 THE PROBLEM Unhealthy Forests Since 2000, at least 1,501,654
Agricultural Water Conservation and Efficiency Potential in California
issue brief june 2014 IB:14-05-F Agricultural Water Conservation and Efficiency Potential in California Agriculture uses about 80 percent of California s developed water supply. As such a large user, it
CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES FREQUENTLY ASKED QUESTIONS (FAQ) REGARDING ORANGE S PROPOSED WATER RATES AND CHARGES
CITY OF ORANGE PROPOSED INCREASE OF WATER RATES AND CHARGES On Tuesday March 27, 2012, the Orange City Council will hold a public hearing to consider a rate adjustment for water service rates and charges.
2015 -- H 6042 S T A T E O F R H O D E I S L A N D
LC00 01 -- H 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO TOWNS AND CITIES -- RHODE ISLAND COMPREHENSIVE PLANNING AND LAND USE ACT Introduced
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS. SECTION DESCRIPTION Page
STEAMBOAT LAKE WATER AND SANITATION DISTRICT PETITION FOR AMENDMENT TO SERVICE PLAN TABLE OF CONTENTS SECTION DESCRIPTION Page 1 Executive Summary / Brief History 2 2 Services Provided / Administration
River Basin Management in Croatia
River Basin Management in Croatia 2. INTERNATIONAL RIVER BASIN MANAGEMENT HIGH LEVEL SYMPOSIUM Cappadocia/NEVŞEHİR, Turkey 16-18 April 2013 2 Water sector responsibilities are shared among: Croatian Parliament
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
Securing California s Water Future
T H E M E T R O P O L I TA N W AT E R D I S T R I C T O F SOUTHERN CALIFORNIA Securing California s Water Future John Arena, Business Outreach Program Manager Presented to SAME Orange County Post February
Water Conservation Measurement in California - A Guide
2010 URBAN WATER MANAGEMENT PLAN June 22, 2011 DEVELOPING I N N O V AT I V E DESIGN SOLUTIONS ELK GROVE WATER DISTRICT A DEPARTMENT OF THE FLORIN RESOURCE CONSERVATION DISTRICT 2010 URBAN WATER MANAGEMENT
7.0 Stream Restoration
7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational
How To Manage Water Resources In The Yakima Basin
Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:
Industrial Water Use in the United States. U.S. Department of the Interior U.S. Geological Survey
Industrial Water Use in the United States Methods, Status, t and Trends U.S. Department of the Interior U.S. Geological Survey Water withdrawals by category Livestock Self-Supplied Supplied Domestic Public
Why does Kittitas County want to form a Flood Control Zone District?
KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Kirk Holmes, Director What is a Flood Control Zone District (FCZD)? A Kittitas County Flood Control Zone District (FCZD) would be a special-purpose government
A. Flood Management in Nevada
Nevada Division of Water Planning A. Flood Management in Nevada Introduction Flooding has been a concern for Nevada communities since the first settlers moved to the territory in the mid-1800 s. Fourteen
Forecasting Water Demand in the Humboldt River Basin: Capabilities and Constraints
Forecasting Water Demand in the Humboldt River Basin: Capabilities and Constraints Prepared By: Humboldt River Basin Water Authority c/o P.O. Box 2008 Carson City, Nevada 89702 August 2007 Introduction
Use of Regional Detention Basins for Stormwater Quality Management
Use of Regional Detention Basins for Stormwater Quality Management Las Vegas Valley Municipal Separate Storm Sewer System (MS4) Permit Andrew Trelease, PE, CFM Clark County Regional Flood Control District
