1 PRE-FEASIBILITY REPORT FOR PROPOSED MANUFACTURING OF MANGANESE OXIDE & EXPANSION OF VARIOUS FERRO ALLOYS AT C-235, MIDC BUTIBORI, DISTRICT NAGPUR, (M.S.) M/s. D.S. Alloyd Pvt. Ltd. EIA Consultant: Pollution and Ecology Control Services (PECS), Nagpur (MS).
2 1.0 INTRODUCTION 1.1 PREAMBLE: Ferroalloy refers to various alloy of iron with a high proportion of one or more other elements such as manganese, aluminum, or silicon. They are used in the production of steels and alloys. The alloy impart distinctive qualities to steel and cast iron or serve important functions during production and are, therefore, closely associated with the iron and steel industry, the leading consumer of ferroalloys. The leading ferroalloy-producing countries in 2008 were China, South Africa, Russia, Kazakhstan and Ukraine, which accounted for 77% of the world production. World production of bulk chromium, manganese and silicon ferroalloys was estimated as 29.1 million tonnes (MT) in 2008, a 3% decrease compared with Ferro-alloys are among the essential inputs required for steelmaking. It improves the quality of steel, by controlling the harmful impurities and at the same time improves the mechanical properties of steel through alloying. Growth in Global as well as domestic steel industry directly drives the demand of Ferro-alloys. Since Indian steel industry is under massive expansion, there is a tremendous potential for investment in Ferro-alloy production. 1.2 PROJECT DESCRIPTION: The production details of the proposed project are given below Sr. No. Name Proposed 1. Manganese oxide 6000 MTPA By Thermite Process Ferro Titanium OR Low/Medium Carbon Ferro Manganese OR Ferro Molybdenum OR Ferro Vanadium OR Aluminium Ingots OR Ferro Phosphorous OR 2
3 Ferro Niobium OR Ferro Boron OR Ferro Tungsten OR Ferro Aluminium OR Calcium Molybdate OR Aluminum shots OR Ferro Nickel OR Inoculants OR Moly Oxide Briquettes The products are produced from highly acclaimed raw materials sourced from different corners of the domestic market. Located at a strategic location in the country, they procure the raw material from the nearby mines and also procure raw material from international markets. SITE DESCRIPTION: The plant of M\s. D. S. Alloyd Pvt. Ltd. is established to manufacture and process Manganese oxide and various Ferro Alloys. The factory is located 27 kms away from Nagpur city, at Plot No. C-235, MIDC Butibori, District Nagpur, (M.S.). The latitude and longitude of the proposed project are 20 56'11.25"N and 78 56'35.70"E respectively. SITE LOCATION: The factory is 27 Kms from Nagpur. The factory is in Butibori Industrial Area Plot no. C-235, Taluka:Hingna, District Nagpur. It is easily accessible throughout the year from Nagpur by Road, Nearest Railway Station and Airport of Nagpur.. It enables the speedy and convenient movement of our goods. The railway siding is only 8 K.m. away from the factory side 3
4 Nearest Airport is Dr. Babasaheb Ambedkar Airport, Nagpur is 26 kms away. Figure 1: Study Area 4
5 SOURCE & AVAILABILITY OF WATER: Water will be sourced from MIDC Butibori and the total water requirement will be 24 KLD. POLLUTION CONTROL MEASURES: The pollutants in the form of solids, liquids and gases are generated from various technological units and, if let out as such, will have hazardous effects on the environment. Pollution of the environment, not only adversely affects the flora and fauna, but also shortens the life of plant and equipment. This vital aspect, therefore, has been taken into account while planning the plant and equipment and adequate measures have been proposed to limit the emission pollutants within the stipulations of statutory norms. During construction only domestic waste shall be generate and will get treat in septic tank. Dust will be generated during transportation, storing of raw material and construction activities. The dust emission shall be mitigated by water spraying on the roads within the plant premises. Domestic / sewage effluent shall be sent to septic tank followed by soak pit. 2.1 INTODUCTION OF THE PROJECT AND BACKGROUND OF PROJECT PROPONENT Identification of the project and project proponent: DS Alloyd is headquartered in New Delhi and our plant is at MIDC Butibori, Nagpur in Maharashtra, India, strategically located at the center of the country. The production processes will be carried out at their well equipped unit in MIDC Industrial area Butibori Nagpur. The incorporation of latest technology and machines enables them to meet the upcoming production requirements and growing market needs. The company will be incorporated with the following main objects:- 5
6 To Manufacture, Buy, Sell Exchange, Export, Import, Mining, & Building Construction. To carry on the business of manufacturer, Processors, Importers, Exporters and Dealers in all kinds of Ferro Alloys, such as Low, Medium, High Carbon, Ferro Manganese, Ferro Mollybdenum, Vanadium, Ferro Aluminum and other kinds of Ferro Alloys. To carry on the business of manufacturer, processors, Importers, Exporters and Dealers in all kinds of Ferrous and Non Ferrous metals meant for any industrial and non Industrial use whatsoever and to carry on the business in cold or hot rolling, re-rolling, Slitting, Edge Mining, Sheeting, Stamping, Dressing, Extruding, Forging, Drying, Flatting, straightening, Heat Treatment of all kinds of steel and other metals or any other kinds of strips, foils, tapes wire rods, plates and any other section shapes or form. Manufacturer, Processors, Importers, Exporters and Dealers. The satellite image showing project site is given below in figure no. 2. Figure 2 : Satellite Image 6
7 Figure 3: Land Use 2.2 JUSTIFICATION: The Industry s present capacity is around 5.15 Million Tonnes. The products covered are: Manganese Alloys (HC, MC and LC Ferro Manganese and Silico Manganese), Ferro Silicon, Chrome Alloys (HC,MC & LC Ferro Chrome, Silico Chrome and Charge Chrome), Noble Ferro Alloys (Ferro Molybdenum, Ferro Vanadium, Ferro Tungsten, Ferro Silicon Magnesium, Ferro Boron, Ferro Titanium, Ferro Aluminium, Ferro Silico Zirconium, Ferro Nickel Magnesium) etc. Thus, the Ferro Alloys Industry, considered to be a vital industry, needs to be encouraged. It is envisaged by the planners that the Industry should produce larger quantities of basic alloys, which are required for the growth of the Steel Industry at home and also to cater to the international market. 2.3 EMPLOYMENT GENERATION (DIRECT & INDIRECT): The proposed project creates direct indirect employment to 60 people. 7
8 3.0 PROJECT AT GLANCE 1. Name of the proposed unit : M/s. D S Alloyd Pvt. Ltd. 2. Location of the proposed unit : AT C-235, MIDC Butibori, District Nagpur, (M.S.) 3. Products to be manufactured: Sr. No. Name Proposed 1. Manganese oxide 6000 MTPA By Thermite Process Ferro Titanium OR Low/Medium Carbon Ferro Manganese OR Ferro Molybdenum OR Ferro Vanadium OR Aluminium Ingots OR Ferro Phosphorous OR Ferro Niobium OR Ferro Boron OR Ferro Tungsten OR Ferro Aluminium OR Calcium Molybdate OR Aluminum shots OR Ferro Nickel OR Inoculants OR Moly Oxide Briquettes 8
9 4. Raw Material Requirement : 1. Low / Med. Carbon Fe. Mn. Manganese Ore - 9,576 MT. Aluminium Scrap MT. Lime Powder/ Flourspar - 1,700 MT. Silico Manganese - 5,948 MT. 2. Ferro Titanium. Ilmenite - 13,104 MT. Aluminium Powder - 5,900 MT. Lime Powder MT. Iron Ore - 1,950 MT. 3. Ferro Molybdenum. Moybdenum Concentrate - 9,475 MT. Aluminium Powder MT. Lime Powder MT. Iron Scrap - 1,280 MT. Ferro Silicon - 2,641 MT. 4. Ferro Vanadium. Vanadium Pentoxide (flakes) - 9,687 MT. Aluminium Scrap - 5,000 MT. Flourspar MT. Iron Scrap - 5,000 MT. 5. Ferro Niobium. Niobium Concentrate - 13,000 MT. Aluminium Powder - 4,536 MT. Iron Scrap - 2,000 MT. Lime Powder MT. 6. Ferro Boron. Boric Acid - 5,500 MT Aluminium Scrap - 5,200 MT. Iron Scrap - 7,000 MT. 9
10 Lime Powder MT. 7. Ferro Tungsten. Tungsten Ore - 15,000 MT. Aluminium Powder - 3,080 MT. Iron Ore MT. Lime Powder MT. 8. Ferro Nickel. Nickel Scrap - 4,200 MT. Iron Scrap - 6,240 MT. 9. Ferro Aluminium. Aluminium Scrap - 4,200 MT. Iron Scrap - 6,240 MT. 10. Silico Manganese (Low Carbon). Manganese Ore - 8,542 MT. Ferro Silicon - 3,416 MT. Aluminium Powder - 1,623 MT. Lime Powder MT. 11. Aluminium Ingots / Shots / Notch bar Aluminium Scrap - 12,000 MT. 12. Moly Oxide Briquettes. Molybdenum Concentrate - 9,600 MT. Binding Material MT. 13. Inoculants. Ferro Silicon Alloy - 11,000 MT. 14. Calcium Molybdate. Molybdenum Concentrate - 9,000 MT. Lime Powder - 3,225 MT. 10
11 15. Manganese Oxide. (6,000 MT/annum) Manganese Ore /Di-oxide - 7,500 MT. Coal / Charcoal MT. 5. Power Requirement: The power required will be supplied by State Electricity Board. The power requirement for the proposed project will be 250 KVA. 6. Land Requirement: The land for the proposed project is 22,334.5 sq mt. A Shed of 6000 sq mt is in existing plant and it is sufficient for the proposed expansion and existing production. 7. Layout Plan: The site layout plan is given below in figure no. 4. Figure 2: Layout Plan 11
12 3.1 PROCESS DETAILS After receipt of material it is tested for its impurities. After getting full information s about its impurities following processes are followed to remove impurities and improve the purity of Manganese Ore. MANUFACTURING PROCESS OF MANGANESE OXIDE (A) After Raw Material receipt at the site it is tested for the contents of various elements and then the material is screened. After screening you get different sizes, which are jigged in automatic water jigging. (B) Then the material is dried and after Magnetic Separation it is feed to grinding Machine, where it is powdered in the required mesh size. (C) After grinding it is semi automatically packed in 25 kg/50 kg/ or 1000 kg HDPE Bags and kept ready for dispatch. PROCESS FLOW CHART OF MNO PRODUCTION RAW MATERIAL RECEIPT SCREENING WATER ZIGGING TESTING FURNACE TESTING MANGANETIC SEPARATON GRINDING PACKING STACKING AND READY FOR DESPATCH 12
13 FERRO ALLOYS / AND OTHER NOBLE FERRO ALLOYS TERMITE PROCESS Manufacturing of Ferro Alloys through Termite Process is very easy and simple. Following activities are carried on: (a) Powdering of different Alloys / Minerals. (b) Mixing in blender in the required proposition (c) Then a small fire is created (By aluminum powder) in the reaction vessel, where this blended material is added slowly. The powder starts melting inside the vessel and the Metallic contents are automatically separated which settles down and the sludge floats. (d) Metal and Sludge are separated by manual processes. (e) Metal is crushed and for some customer it is powdered in pulveriser. (f) The Metal is crushed and packed in bags and kept ready for dispatches. PROCESS FLOW CHART Raw ore Crushing on the pulveriser /Crusher Preheating for removal of moisture Aluminum Powder Reaction Vessel ( Aluminothermic Process) Suction Hood & Bag Filter Solidification and Cooling (12-24 hours) Breaking, Cleaning and packing of the finished goods Slag Testing/ storage and Dispatch Construction of Boundary Walls Land filling Tiles Manufacturing 13
14 4.0 SELECTION OF SITE & LOCATION OF PLANT Selection of the site for any project is the most important aspect for it s successful operation & better economic viability. Proximity to Raw material source, assured supply of fuel and other infrastructural support are required to be essentially examined while selecting the site of the plant. The following basic requirements are necessarily required to be fulfilled. i. Easy & nearer access to Raw Material such as Ores, Coke etc. ii. Availability of water from continuous source. iii. Power supply/ evacuation arrangement. iv. Nearer access through road. 4.1 LOCATION: The factory of M/s. D S Alloyd Pvt. Ltd. Ltd. is located 27 kms away from Nagpur city, at C-235, MIDC Butibori, District Nagpur, Maharashtra 4.2 TYPE OF THE PROJECT: The proposed expansion project involves manufacturing of Manganese oxide and installation of new unit to manufacture various Ferro Alloys along with following activities: Feed/Industrial Grade Manganese Oxide (MnO) Ferro Titanium OR Low/medium carbon ferro manganese OR Ferro molybdenum OR Ferro vanadium OR Aluminium Ingots OR Ferro Phosphorous OR Ferro Niobium OR Ferro Boron OR Ferro Tungsten OR Ferro Aluminium OR Calcium Molybdate OR Aluminum shots OR Ferro Nickel OR Inoculants OR Moly Oxide Briquettes 14
15 4.3 SITE ANALYSIS Land Use The existing land is industrial land. Topography The topography of the land is plain. Existing Land Use Pattern The existing land is industrial land. Existing Infrastructure All required infrastructure is prevailing in the site. Green Belt 33 % of total land Green belt will be developed as green belt. Social Infrastructure Social infrastructure will be developed as per need based in the Villages 4.4 Availability of Utilities For successful running of any unit most important factor is the availability of Raw Materials, as well as Utilities & Power, Water Connectivity which are required to efficiently run the Equipment.\ 5.0 WATER SYSTEM & PLANT UTILITIES: 5.1 Source of Water Water required for the plant will be sourced from MIDC Butibori. 15
16 5.2 Water Consumption Make up water requirement for the project will be about 2 KLD for the process. 5.3 Fire Protection System The fire fighting system will be designed in conformity with the recommendations of the Tariff Advisory Committee (TAC) of Insurance Association of India. While designing the fire protection systems for proposed facilities its extreme ambient conditions need special attention. Codes and Standards of National Fire Protection Association (NFPA) will be followed, as applicable. 6.0 ENVIRONEMENTAL MANAGEMENT PLAN 6.1 Sources of Pollution The major sources of pollution from proposed units can be classified under the following heads: Pollutants in the waste gases namely, suspended particulate matter (SPM), sulphur dioxide, NO X and Carbon monoxide, etc. Fugitive dust generated during vehicular movement Noise pollution Waste water and sewage Solid Waste Generation The various measures proposed to mitigate the impact of these pollution sources on the environment are discussed below: 6.2 Pollution Control Measures Air Pollution Proper care will be taken by installing Bag filters followed by Stack to control source emission. Hence there will not be any major deposition of pollutants into air, land and water. 16
17 To control fugitive dust emissions due to vehicular movement water sprinkling and spraying system will be installed. Internal roads will be asphalted Water Pollution It is estimated that total effluent generation from the proposed installation will be from zigging and air pollution control systems and as domestic effluent. The effluent from zigging and air pollution control systems will be treated in sedimentation tank and will be reused in the process. Sewage Line is provided by MIDC dept Zero discharge condition from the proposed plant will be maintained Noise Pollution There will no such high noise generate due to operation of proposed units, however Noise generation may occur due to handling of raw materials and finished products. For that Ear plugs/ ear muff will be provided to the workers working in noisy area Solid Waste Management Following are the solid waste generation due to operation of proposed units: b. Slag from Ferro Alloys Disposal of Slag from Ferro Alloys: Slag generated from manufacturing of Ferro manganese is use for land filling Plantation Apart from the aforesaid pollution control measures the Company has already planted 1000 no. of trees and proposed to plant 10,000 no. of trees in and around the premises. During plantation landscaping pattern will be considered. The plantation scheme covers the plantation of ornamentals plants and some local fruit bearing species. 17
18 Selection Criteria of plant species for Green Development Plant The selection of plant species for the development depends on various factors such as climate, elevation and soil. Area falls under the tropical region and thus the plants that area adapted to this condition should be selected. The plant should exhibit following characteristics in order to be selected for plantation. 1. The species should be fast growing and providing optimum penetrability. 2. The species should be wind firm and deep rooted 3. The species should form a dense canopy. 4. As far as possible, the species should be indigenous and locally available 5. Species tolerance to air pollutants like SPM, SO 2, and NO x should be preferred. 6. The species should be permeable to help create air turbulence and mixing within the belt. 7. There should be no large gaps for the air to spill through. 8. Tree with high foliage density, leaves with larger leaf area and hairy on both the surface. 9. Ability to withstand conditions like inundation and drought. 10. Soil improving plants (Nitrogen fixing, rapidly decomposable leaf litter). 11. Attractive appearance with good flowering and fruit bearing. 12. Bird and insect attracting tree spacing. *************************** 18
ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)
ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,
How To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
THE ROLE OF METALLURGY IN ENHANCING BENEFICIATION IN THE SOUTH AFRICAN MINING INDUSTRY
THE ROLE OF METALLURGY IN ENHANCING BENEFICIATION IN THE SOUTH AFRICAN MINING INDUSTRY Marek Dworzanowski, Presidential Address, SAIMM AGM, 22 August 2013 CONTENTS Introduction Definitions Phases of metallurgical
TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
EXTRACTION OF METALS
1 EXTRACTION OF METALS Occurrence ores of some metals are very common (iron, aluminium) others occur only in limited quantities in selected areas ores need to be purified before being reduced to the metal
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
1.3 Properties of Coal
1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified
Iron and Steel Manufacturing
Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
ENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
Environmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:
Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be
Environment Impact Assessment of Thermal Power Plant for Sustainable Development
International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
PROPOSED TERMS OF REFERENCE
Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed
2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of
Introduction to Waste Treatment Technologies. Contents. Household waste
Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting
PART 6 SPECIAL CONTRACT RULES FOR METALS CONTENTS
PART 6 SPECIAL CONTRACT RULES FOR METALS * CONTENTS Contracts Page High Grade Primary Aluminium 6-1 Aluminium Alloy 6-5 Copper - Grade A 6-11 Standard Lead 6-13 Primary Nickel 6-15 North American Special
BHARAT PETROLEUM CORPORATION LIMITED
TERMS OF REFERENCE (TOR) FOR CARRYING OUT ENVIRONMENT IMPACT ASSESSMENT (EIA) FOR BPCL- KOCHI REFINERY MS BLOCK PROJECT AT KOCHI, KERALA PROPONENT: BHARAT PETROLEUM CORPORATION LIMITED 1.0 INTRODUCTION
Techno Economic Feasibility Report of M/s Bravo Sponge Iron Pvt Ltd. At: Mahuda P.O- Rukni in Purliya district of West Bengal
CHAPTER-1 INTRODUCTION M/s Bravo Sponge Iron Pvt. Ltd. has existing 1x95 TPD & 1x100 TPD DRI kiln producing 62,400 TPA Sponge Iron for sale village- Mahuda, P.O- Rukni, Puruliya District of West Bengal
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.
Project Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
TERMS OF REFERENCE FOR THE RAPID EIA STUDY
TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment
Sustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities
40/F, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong 香 港 灣 仔 告 士 打 道 5 號 稅 務 大 樓 40 樓 ACE-EIA Paper 2/2009 For advice Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS
PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:
NAS: A REFERENCE IN THE STAINLESS STEEL INDUSTRY
NAS: A REFERENCE IN THE STAINLESS STEEL INDUSTRY Cristobal Fuentes CEO of NAS Investor and Analyst s Day London, 8 th November 2011 Table of Contents I. Company Overview II. Raw Materials III. Integrated
This is Outokumpu Tornio Site
Investor visit, 7th October 2015 Hannu Hautala, SVP - Business Line Tornio This is Outokumpu Tornio Site October 7, 2015 1 October 7, 2015 2 We believe that all accidents are preventable. Our target is
Prepared and Submitted by
Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &
PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day
A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION
Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:
P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation
PLANT LOCATION AND LAYOUT
PLANT LOCATION AND LAYOUT The Location Of The Plant Can Have A Crucial Effect On The Profitability Of A Project, And The Scope For Future Expansion. Many Factors Must Be Considered When Selecting A Suitable
Environment Management Plan
Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY
ME 612 Metal Forming and Theory of Plasticity. 1. Introduction
Metal Forming and Theory of Plasticity Yrd.Doç. e mail: [email protected] Makine Mühendisliği Bölümü Gebze Yüksek Teknoloji Enstitüsü In general, it is possible to evaluate metal forming operations
Innovation For Cool Earth Forum (ICEF) 2 nd Annual Meeting
THE ROLE OF TECHNOLOGY & INNOVATION IN ENERGY SAVING AND CO2 REDUCTION IN INDIAN IRON & STEEL INDUSTRY Ministry Of Steel Government Of India Innovation For Cool Earth Forum (ICEF) 2 nd Annual Meeting 7-8
Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter
TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
PRE- FEASIBILITY STUDY REPORT
PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66
PRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur
Steel production. Furnace linings made from carbon and graphite are applied for the production of primary iron.
Steel production Furnace linings made from carbon and graphite are applied for the production of primary iron. Graphite electrodes and nipples (connecting pins) are applied for the production of steel.
Antonio Jose Cumbane (PhD) Maputo, 31 st May 2011
Environmental Health and Safety Aspects in the Cement Industry Antonio Jose Cumbane (PhD) Maputo, 31 st May 2011 Content The Mozambique Cement Industry Cement manufacturing Environmental Health and Safety
Planning, Designing, Monitoring and Inspection of Wastewater Treatment Systems of Industries
International Journal of Chemistry and Chemical Engineering. ISSN 2248-9924 Volume 3, Number 3 (2013), pp. 225-230 Research India Publications http://www.ripublication.com Planning, Designing, Monitoring
CHANDAM7AIL,P SAND DEPOSIT
1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub
ZERO WASTE ELECTRIC ARC FURNACE (EAF) STEELMAKING CHAPARRAL STEEL COMPANY TARGET
ZERO WASTE ELECTRIC ARC FURNACE (EAF) STEELMAKING CHAPARRAL STEEL COMPANY TARGET Libor F. Rostik ChaparraI Steel Company Midlothian Texas EPA Region III Waste Minimization/Pollution Prevention Technical
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Sri Krishna Phramaceuticals Ltd., (SKPL) Solapur has been incorporated with a main objective to manufacture Bulk Drug and Intermediates
Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements
Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Introduction Objective: to estimate the CO2 emissions produced by road surface construction
6 CONSIDERATION OF ALTERNATIVES
6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements
BRIEF PROJECT PROFILE ON WELDING ELECTRODE MANUFACTURING. Turn key project suppliers EUREKA SYSTEMS AND ELECTRODES PVT.LTD.
BRIEF PROJECT PROFILE ON ELECTRODE MANUFACTURING Turn key project suppliers EUREKA SYSTEMS AND ELECTRODES PVT.LTD. M A C H I N E R Y D I V I S I O N 11/15A, SELVARAJAPURAM, CHINTHAMANI PUDUR COIMBATORE
PRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING
Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust
Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,
Pre- FEASIBILITY REPORT
Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared
PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)
A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray
ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-
Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and
Opportunity for Investment. www.afarakgroup.com
Opportunity for Investment www.afarakgroup.com 1 2013 Introducing Afarak A vertically integrated ferroalloys producer from mine to customer Supplies specialist products to steel & stainless steel industries:
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri
Environment Management Plan
Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN
Physical flow accounts: principles and general concepts
Physical flow accounts: principles and general concepts Julian Chow United Nations Statistics Division 1 st Sub-Regional Course on SEEA 23-27 September 2013 Malaysia SEEA Conceptual Framework Outside territory
GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY
1 GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY August, 2012 Government of Pakistan Pakistan Environmental Protection Agency (Ministry of Climate Change) Islamabad 2
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
Project Details- Minor Minerals (Other Than Sand)
Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,
Self Assessment Exercise
Self Assessment Exercise Read the following extract of supporting documentation for Permit Application for Galvos plc galvanising facility and the accompanying tables. Decide if the proposed control techniques
John KW Hou, Ph.D. World- Wide Director, Industry Solutions Member of IBM Industry Academy IBM Corporation. José R. Favilla Jr
1 A Big Data Approach to Optimize Energy Efficiency in the Steel Industry John KW Hou, Ph.D. Manager, IBM Center of Competence, Metals IBM Corporation José R. Favilla Jr World- Wide Director, Industry
PROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra
(IV) Proposed Terms of Reference for EIA Studies
ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,
9/15/2011. Presented by: Jason Reason, CIH, CSP, CHMM Senior Industrial Hygienist Indiana Occupational Safety and Health Administration
OSHA Combustible Dust Inspections Presented by: Jason Reason, CIH, CSP, CHMM Senior Industrial Hygienist Indiana Occupational Safety and Health Administration Overview Background Information OSHA Combustible
WASTE WATER TREATMENT for surface treatment applications
WASTE WATER TREATMENT for surface treatment applications Effluent an important cost factor Effluent cannot be avoided Water and compound are essential for vibratory mass finishing. During the finishing
SINTERING AND PELLETISATION OF INDIAN IRON ORES
SINTERING AND PELLETISATION OF INDIAN IRON ORES By SURESH KUMAR* & T.M. SRINIVASAN** 1 * Vice President, Mineral Enterprises Limited, Bangalore ** Managing Director, FerroGreen Technologies Pvt. Ltd. Bangalore
ALLOY C276 DATA SHEET
ALLOY C276 DATA SHEET //// Alloy C276 (UNS designation N10276) is a nickel-molybdenum-chromium-iron-tungsten alloy known for its corrosion resistance in a wide range of aggressive media. It is one of the
Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh
The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma
The India Thermit Corporation
The India Thermit Corporation World Leaders in Rail Welding Alumino - Thermic Welding Flash Butt Welding The Company The India Thermit Corporation (ITC) is the world's largest executor of rail welds. We
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
Environment Management Plan
Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
How To Make Calcium Carbide
11.4 Calcium Carbide Manufacturing 11.4.1 General Calcium carbide (CaC 2 ) is manufactured by heating a lime and carbon mixture to 2000 to 2100 C (3632 to 3812 F) in an electric arc furnace. At those temperatures,
ArcelorMittal Poland 03.06.2014
ArcelorMittal Poland 03.06.2014 ArcelorMittal Poland 6 locations 5 steel plants and the largest coke plant in Europe located in Zdzieszowice 70 per cent of Polish steel market potential Over 11.000 employees,
EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa
EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15
CHILLY AND TURMERIC POWDER
CHILLY AND TURMERIC POWDER 1.0 INTRODUCTION Spices are an integral part of the Indian diet since centuries and they are used in vegetarian and non-vegetarian food and snack preparations. They help enhance
HEAVY-DUTY HAND CUTTING TORCHES AND ACCESSORIES. Page 1 Version no.: V0-090902
Page 1 HEAVY-DUTY HAND CUTTING TORCHES AND ACCESSORIES Page 2 Heavy-Duty Hand Cutting Torch HCT 663: With lever-operated valve for cutting oxygen, for cutting duties involving high thermal loads on slabs,
AUSTENITIC STAINLESS DAMASCENE STEEL
AUSTENITIC STAINLESS DAMASCENE STEEL Damasteel s austenitic stainless Damascene Steel is a mix between types 304L and 316L stainless steels which are variations of the 18 percent chromium 8 percent nickel
A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour.
Did You Know? A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour. Nonrenewable Coal Coal Basics Coal Takes Millions of Years To Create Coal is a combustible
Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth
Lecture slides on rolling By: Dr H N Dhakal Lecturer in Mechanical and Marine Engineering, School of Engineering, University of Plymouth Bulk deformation forming (rolling) Rolling is the process of reducing
APPLYING DATA MINING METHODS TO PREDICT DEFECTS ON STEEL SURFACE
APPLYING DATA MINING METHODS TO PREDICT DEFECTS ON STEEL SURFACE 1 SAYED MEHRAN SHARAFI, 2 HAMID REZA ESMAEILY 1 Computer Engineering Department, Islamic Azad University, Najaf Abad Branch, Esfahan, Iran
STEEL MELT SHOP / SCRAP CONTROL & PREPARATION
THE COMPANY PROFILE Asil Celik was established in 1974 to produce special and alloyed steel mainly for the automotive industry, automotive components, machine tool manufacturing and defence industries.
FEATURES AND BENEFITS OF DIFFERENT PLATINUM ALLOYS. Kris Vaithinathan and Richard Lanam Engelhard Corporation
FEATURES AND BENEFITS OF DIFFERENT PLATINUM ALLOYS Kris Vaithinathan and Richard Lanam Engelhard Corporation Introduction There has been a significant increase in the world wide use of platinum for jewelry
A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS BPM 7/1 (2014)
A GUIDANCE NOTE ON THE BEST PRACTICABLE MEANS FOR ELECTRICITY WORKS (COAL-FIRED PLANT, GAS-FIRED GAS TURBINE, AND OIL-FIRED GAS TURBINE (PEAK LOPPING PLANT)) BPM 7/1 (2014) Environmental Protection Department
LIFE-CYCLE IMPACTS AND COSTS OF MANGANESE LOSSES AND RECOVERY DURING FERROMANGANESE PRODUCTION
LIFE-CYCLE IMPACTS AND COSTS OF MANGANESE LOSSES AND RECOVERY DURING FERROMANGANESE PRODUCTION L.A. Westfall 1, M.H. Cramer 1, J. Davourie 1, D. McGough 2 and M. Ali 1 1 Hatch Ltd., 2800 Speakman Drive,
Environment Management Plan
Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD
Introduction to JIGS AND FIXTURES
Introduction to JIGS AND FIXTURES Introduction The successful running of any mass production depends upon the interchangeability to facilitate easy assembly and reduction of unit cost. Mass production
Solid Waste Treatment Facility Solid Waste Permit Application
Part One: Fees A check or money order for the appropriate fees must be submitted with the permit application. If the required fees are not included, the permit application will be returned to the applicant.