1 Realising Project Benefits Staff Management Plan Version 1.0 (2/10/07) Inter Agency Policy and Projects Unit Department of Premier and Cabinet

2 Acknowledgements The contribution of the following individuals in preparing this document is gratefully acknowledged: Kathy Kuryl, Maria Jeffries, Kath Noyes DOCUMENT ACCEPTANCE and RELEASE NOTICE Version 1.0 of the Realising Project Benefits Staff Management Plan. The Staff Management Plan is a managed document. For identification of amendments each page contains a release number and a page number. Changes will only be issued as complete replacement. Recipients should remove superseded versions from circulation. This document is authorised for release once all signatures have been obtained. PREPARED: DATE: / / for acceptance Carol Bond, Project Manager) ACCEPTED: DATE: / / for release Kathy Kuryl, Project Sponsor, Realising Project Benefits, Staff Management Plan, Version 1.0 (2/10/07). Page 2 of 6

3 Realising Project Benefits Staff Management Plan 1 Purpose This document details the staff management plan for the Realising Project Benefits Project. 2 Scope The plan identifies the process and procedures used to manage staff throughout the Project s life. The plan describes the staff requirements and acquisition processes and staff transition arrangements. 3 Staff Management Approach 3.1 Staffing Assumptions and Constraints All project staff will be located on-site at the project There are staff within IAPPU available to transition-in to the project when required Project staff are willing and able to undertake training to develop the knowledge and skills required to undertake the project activities Where additional resources and/or specialist skills are required, these skills can be acquired externally via out-sourcing or contracting-in. 3.2 Staff Acquisition Project Staff will be drawn from the pool of operational staff within the Sharing Better Practice Team from Inter Agency Policy and Projects Unit. Staff assigned to the Project will operate under the direction and supervision of the Project Manager in relation to their responsibilities within the project. The Project Manager will regularly liaise and consult with the Program Manager (Sharing Better Practice) in relation to: Level of participation Level of availability relative to other commitments/assignments within IAPPU Issues relating to performance and leave. A full work breakdown structure for the resource development in Stage 2 of the Project will identify staffing requirements for specific Outputs including time allocations. Project staff comprise the Better Practice Services Team. The Team comprises five staff including: Admin Support 2 Senior Project Officers (pro rata as required) Project Manager (also a Senior Project Officer) Program Manager (Project Sponsor) Realising Project Benefits, Staff Management Plan, Version 1.0 (2/10/07). Page 3 of 6

4 3.3 Roles and Responsibilities The Project Manager is responsible for output delivery and will negotiate staff availability with the Program Manager, Better Practice. Once staff are assigned to a Project task the Project Manager will take full responsibility for supervision and quality assurance of the work. Planning and Project Establishment: Professional Development Series Project Manager Project Sponsor Project Team Project Manager Administrative assistant Coordinate and undertake planning documentation Approve planning documentation Input to project planning at scheduled meetings Negotiate content, dates and other requirements. Develop marketing information Book resources. Assist where required. Resource Development Project Manager Supervise Project Sponsor Project Team members including PM. Designate staff, approve content Develop content Website Project Manager Identify and develop content 3.4 Transition-in Project Sponsor Project Support and Administrative Officer Approve content Publish Project tasks and progress against tasks are included at fortnightly Sharing Better Practice Team meetings. Team members attend Project events, receive status reports and are kept abreast of issues with the Project on a regular basis. This ensures that all Sharing Better Practice Team members are prepared to transitioninto the Project as required. As new staff join the Sharing Better Practice Team, the Project Manager will provide an orientation in relation to the Project, outlining the following topics: Background of the Project Current status of the Project Specific responsibilities within the Project Overview of project processes. Realising Project Benefits, Staff Management Plan, Version 1.0 (2/10/07). Page 4 of 6

5 3.5 Transition-out As staff exit the Project, the departing Project Officer will provide an update on the status of any incomplete tasks to the Project Manager. The Project Manager will assume or re-assign the departing Project Officer s responsibilities. 3.6 Project Closure Project staff will be reassigned to Better Practice Program work on completion of the Project. 4. Risks A project risk management strategy has been developed for the project. Risks to the Staff Management Plan include: Other IAPPU work priorities taking precedence resulting in delayed project timeframes for delivery of outputs, which will lead to a delay of project benefits. Sickness of Project team members may impact on ability to complete tasks on time. This may require that work is reassigned. In some cases the scope of work may need to be reconsidered. Better Practice Program staff may leave and their expertise may no longer be available. Where there is no staff member to take on the work the scope may need to be reconsidered. Conflict Resolution Processes. Project Team members will be encouraged to express disagreement and provide suggestions for improvement. Where people can freely express concerns and know they will be listened to can be a creative environment. Where conflict cannot be resolved by the team sharing its opinion and is of a personal nature i.e between team members the Project Manager will listen to the issues and attempt to resolve them. Where this is not possible, will be discussed with the Program Manager. The team member may be reassigned. Where conflict is between the Project Manager and a team member it will be referred directly to the Program Manager. The Departmental guidelines will be followed where a grievance exists. Team Building Processes The Project Team will be built on the strength of existing Better Practice Team. Regular Team meetings include reports and discussions about the Project. The Team will also be asked to attend specific Project brainstorming sessions. This will build the Team understanding and commitment to the Project. Team building exercises also include informal engagements to celebrate specific life and work events. Realising Project Benefits, Staff Management Plan, Version 1.0 (2/10/07). Page 5 of 6

6 Team Reward and Performance Management Team members will be acknowledged both personally and by the community of practice. This will occur mainly around the resource development, where team members will be directly involved. Contributions are acknowledged in documents produced by the Project on second page, as per this document. Departmental Performance Management processes will be undertaken. Team training needs are identified through this process. Realising Project Benefits, Staff Management Plan, Version 1.0 (2/10/07). Page 6 of 6

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Developing a Risk Management Plan Version: 1.4, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It

More information

EDMS Project Outcome Realisation Plan

EDMS Project Outcome Realisation Plan Outcome Realisation Plan Version 1.A (14 August 2008) Copy: Uncontrolled Corporate Support Department of Treasury and Finance DOCUMENT ACCEPTANCE and RELEASE NOTICE This is version 1.A of the Outcome Realisation

More information

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Document Control Version: 1.3, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that this

More information

Project Management Frequently Asked Questions:

Project Management Frequently Asked Questions: Project Management Frequently Asked Questions: Risk Management Version:1.4, November 2008 Inter Agency Policy and Projects Unit Department of Premier and Cabinet What are the benefits of risk management?

More information

To provide a procedure and associated guidelines to facilitate the management of project dependencies.

To provide a procedure and associated guidelines to facilitate the management of project dependencies. Management DEPENDENCY MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project dependencies. Overview Dependencies in this Phase are defined as actions,

More information

Payroll Officer Position Number 30025 Salary $49,753.60 - $58,298.24 per annum pro rata plus up to 15% Superannuation 54 hours per fortnight

Payroll Officer Position Number 30025 Salary $49,753.60 - $58,298.24 per annum pro rata plus up to 15% Superannuation 54 hours per fortnight Payroll Officer Position Number 30025 Salary $49,753.60 - $58,298.24 per annum pro rata plus up to 15% Superannuation 54 hours per fortnight If you are an energetic and customer focused person with a happy

More information

OE PROJECT CHARTER TEMPLATE

OE PROJECT CHARTER TEMPLATE PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,

More information

Ambulance Victoria Position Description

Ambulance Victoria Position Description Ambulance Victoria Position Description Position Title: Organisational Development Consultant Reports To: Senior Organisational Development Consultant / Manager Organisational Development (as applicable)

More information

Department of Health & Human Services

Department of Health & Human Services Department of Health & Human Services Position Description Senior Project Officer Data, Quality and Funding (Clinical Supervision / Simulation portfolio) The Senior Project Officer, Data, Quality and Funding

More information

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors Procurement guidance Engaging and managing consultants Includes definitions for consultants and contractors Procurement guidance: Engaging and managing consultants Page 2 of 17 Table of contents Table

More information

ICT Project Management

ICT Project Management THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE MANAGEMENT ICT Project Management A Step-by-step Guidebook for Managing ICT Projects and Risks Version 1.0 Date Release 04 Jan 2010 Contact

More information

Project Management Competency Standards

Project Management Competency Standards BSB01 Business Services Training Package Project Management Competency Standards CONTENTS BSBPM401A Apply scope management techniques...3 BSBPM402A Apply time management techniques...8 BSBPM403A Apply

More information

HealthConnect Tasmania Program Plan 2006-07

HealthConnect Tasmania Program Plan 2006-07 HealthConnect Tasmania Program Plan 2006-07 Department of Health and Ageing Department of Health and Human Services Version 1.a (September 2006) Acknowledgements The HealthConnect Program Management methodology

More information

Contract Management Guideline

Contract Management Guideline www.spb.sa.gov.au Contract Management Guideline Version 3.2 Date Issued January 2014 Review Date January 2014 Principal Contact State Procurement Board Telephone 8226 5001 Contents Overview... 3 Contract

More information

Recognition of Prior Learning (RPL) BSB41515 Certificate IV in Project Management Practice

Recognition of Prior Learning (RPL) BSB41515 Certificate IV in Project Management Practice Recognition of Prior Learning (RPL) BSB41515 Certificate IV in Project Management Practice What is RPL? RPL recognises that you may already have the skills and knowledge needed to meet national competency

More information

ICT (INFORMATION AND COMMUNICATION TECHNOLOGY) HELP DESK SUPPORT OFFICER

ICT (INFORMATION AND COMMUNICATION TECHNOLOGY) HELP DESK SUPPORT OFFICER ICT (INFORMATION AND COMMUNICATION TECHNOLOGY) HELP DESK SUPPORT OFFICER The ICT Help Desk Support Officer is the first point of contact for all ICT Support and utilises their knowledge, training and skills

More information

Change Management Office Benefits and Structure

Change Management Office Benefits and Structure Change Management Office Benefits and Structure Author Melanie Franklin Director Agile Change Management Limited Contents Introduction 3 The Purpose of a Change Management Office 3 The Authority of a Change

More information

The position reports directly to the Diversification Program Manager and indirectly to the Program Management Office (PMO)

The position reports directly to the Diversification Program Manager and indirectly to the Program Management Office (PMO) Position Description Employee: Position title: Location: Grade: Organisation: Project Manager Diversification Head Office Management The position reports directly to the Diversification Program Manager

More information

Code of Conduct, Statement of Corporate Purpose, Managing Unsatisfactory Performance, SES Performance Management

Code of Conduct, Statement of Corporate Purpose, Managing Unsatisfactory Performance, SES Performance Management Policy Name: Status: Staff Performance Management Policy and Framework Current Policy Number: 4 Version Number: 3 File reference: Compliance Level: Applies to: Category: Summary Related Policies: ADM/3132P02

More information

ESKITP7145.01 Manage IT service delivery performance metrics

ESKITP7145.01 Manage IT service delivery performance metrics Overview This sub-discipline covers the competencies required to manage the monitoring, analysis and communication of IT service delivery performance metrics. Monitoring service level performance is a

More information

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document

More information

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value

More information

SFJ EFSM14 Manage the performance of teams and individuals to achieve objectives

SFJ EFSM14 Manage the performance of teams and individuals to achieve objectives Manage the performance of teams and individuals to achieve objectives Overview This standard is about making the best use of your team and its members so that they can achieve your organisation's objectives.

More information

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Steering Committee nuts and bolts Version: 1.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It

More information

Back to Basics. Managing the Audit Department: Resource Management

Back to Basics. Managing the Audit Department: Resource Management Back to Basics Managing the Audit Department: Resource Management In her article in the last newsletter, Bev Cole provided an overview and roadmap for managing the audit department and also provided more

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Insert CCG Logo. Flexi Time Scheme

Insert CCG Logo. Flexi Time Scheme 1 Insert CCG Logo Flexi Time Scheme Review Circulation Application Ratification Author Minor Amendments Supersedes Title 1 DOCUMENT CONTROL PAGE Flexi Time Scheme All previous CCG Flexi Time Policies

More information

NFSA Project Management Guidelines

NFSA Project Management Guidelines NFSA Project Management Guidelines Project Management Guide Purpose of this Guide This Guide outlines the NFSA Project Management Guidelines, and includes: NFSA Project Life Cycle Governance Roles and

More information

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000 Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE

More information

Managing IT Projects. Chapter 2 The PMI Framework

Managing IT Projects. Chapter 2 The PMI Framework Managing IT Projects Chapter 2 The PMI Framework The PMI Framework The Project Management Institute,USA is an internationally acclaimed organization Devoted to Creation & sharing of knowledge in the area

More information

Libraries and Educational Technologies Professional & Performance Development Form Library Faculty Self Evaluation

Libraries and Educational Technologies Professional & Performance Development Form Library Faculty Self Evaluation Libraries and Educational Technologies Professional & Performance Development Form Library Faculty Self Evaluation Name Job Title Personal Information Division: Libraries & Educational Technologies Performance

More information

CCAD Management Employee Performance Review

CCAD Management Employee Performance Review CCAD Management Employee Performance Review Employee Name: Title: Reviewing Manager: Department: Date: KEY RESULTS SECTION Instructions: In the spaces provided, provide pertinent comments concerning each

More information

White Paper. PPP Governance

White Paper. PPP Governance PPP Governance The Governance of Projects, Programs and Portfolios (PPP) (sometimes called project governance for convenience) is the sub-set of corporate and organisational governance 1 focused on assisting

More information

the Defence Leadership framework

the Defence Leadership framework the Defence Leadership framework Growing Leaders at all Levels Professionalism Loyalty Integrity Courage Innovation Teamwork Foreword One of the founding elements of Building Force 2030, as outlined in

More information

Project Management Guidelines

Project Management Guidelines Tasmanian Government Project Management Guidelines Version 7.0 (July 2011) Department of Premier and Cabinet Publisher and Editor: Office of egovernment Department of Premier and Cabinet Tasmania Acknowledgments:

More information

Association of Children s Welfare Agencies Position on the Case Management Policy in NSW

Association of Children s Welfare Agencies Position on the Case Management Policy in NSW Association of Children s Welfare Agencies Position on the Case Management Policy in NSW Introduction In August 2013, the Department of Family and Community Services (FACS) released an updated Case Management

More information

Recognition of Prior Learning (RPL) BSB40515 Certificate IV in Business Administration

Recognition of Prior Learning (RPL) BSB40515 Certificate IV in Business Administration Recognition of Prior Learning (RPL) BSB40515 Certificate IV in Business Administration What is RPL? RPL recognises that you may already have the skills and knowledge needed to meet national competency

More information

TUPE Redundancy Restructuring

TUPE Redundancy Restructuring Thinking the unthinkable TUPE Redundancy Restructuring Mark Makin Acas Senior Adviser Aims and objectives of today By the end of this session we will: provide an overview of the Transfer of Undertakings

More information

DUTY STATEMENT SECTION A: GENERAL INFORMATION

DUTY STATEMENT SECTION A: GENERAL INFORMATION DUTY STATEMENT SECTION A: GENERAL INFORMATION Title: Team Leader Mineral Tenement Systems Group: Resources and Energy Division: Mineral Resources Branch: Mineral Tenements & Exploration Occupant: HRMS

More information

Further information can be obtained by calling Glenn Shaw, Acting Manager Infrastructure and Waste Services on 9400 4353.

Further information can be obtained by calling Glenn Shaw, Acting Manager Infrastructure and Waste Services on 9400 4353. The City of Joondalup takes pride in being a Local Government that has been internationally recognised for providing outstanding services to the local community. To continue to set the standard in WA Local

More information

Grievance and Disputes Policy and Procedure. Document Title. Date Issued/Approved: 10 August 2010. Date Valid From: 21 December 2015

Grievance and Disputes Policy and Procedure. Document Title. Date Issued/Approved: 10 August 2010. Date Valid From: 21 December 2015 POLICY UNDER REVIEW Please note that this policy is under review. It does, however, remain current Trust policy subject to any recent legislative changes, national policy instruction (NHS or Department

More information

Utica College Performance Review Form for LEADERSHIP

Utica College Performance Review Form for LEADERSHIP Utica College Performance Review Form for LEADERSHIP EMPLOYEE NAME: DEPARTMENT: HIRE DATE: / / SUPERVISOR*: JOB TITLE: REVIEW PERIOD: *Supervisor is the person delivering the review From To INSTRUCTIONS

More information

A guide to helping people to succeed at work

A guide to helping people to succeed at work Coaching: Helping you to improve social outcomes A guide to helping people to succeed at work This guide is for anyone wanting to use coaching skills to help colleagues succeed. In particular, it is intended

More information

Introduction to the ITS Project Management Methodology

Introduction to the ITS Project Management Methodology Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer

More information

Gateway review guidebook. for project owners and review teams

Gateway review guidebook. for project owners and review teams Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and

More information

Revised Body of Knowledge And Required Professional Capabilities (RPCs)

Revised Body of Knowledge And Required Professional Capabilities (RPCs) Revised Body of Knowledge And Required Professional Capabilities (RPCs) PROFESSIONAL PRACTICE Strategic contribution to organizational success RPC:1 Contributes to the development of the organization s

More information

Informatics: The future. An organisational summary

Informatics: The future. An organisational summary Informatics: The future An organisational summary DH INFORMATION READER BOX Policy HR/Workforce Management Planning/Performance Clinical Document Purpose Commissioner Development Provider Development Improvement

More information

Project Assessment Framework Establish service capability

Project Assessment Framework Establish service capability Project Assessment Framework Establish service capability July 2015 Component of the Project Assessment Framework (PAF) This document forms part of the Project Assessment Framework, as outlined below.

More information

NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat. 2. BTC Change co-manager. Signature.

NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat. 2. BTC Change co-manager. Signature. NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE Position Type Organization Partner organization Duration Type of contract Human Resources Expert Coach Consultancy contract National Capacity Building

More information

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Developing a Work Breakdown Structure Version: 1.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities.

More information

This page was left intentionally blank.

This page was left intentionally blank. This page was left intentionally blank. Workforce Planning Model Steps What This Step Accomplishes 1. Define the Scope Determines our focus could be long or short term could be a specific business unit

More information

Draft Requirements Management Plan

Draft Requirements Management Plan BAO111: Core Competencies for the Business Analyst Draft Requirements Management Plan 1.0 INTRODUCTION 1.1 Purpose This document outlines requirements roles and responsibilities, presents a stakeholder

More information

ICAN Case Management Standards

ICAN Case Management Standards ICAN Case Management Standards The purpose of the standards will be to: Provide a framework/ tool to ensure that a minimum service is delivered across all schools, irrespective of service provider. Assist

More information

THE REPUBLIC OF UGANDA DPP

THE REPUBLIC OF UGANDA DPP THE REPUBLIC OF UGANDA DPP Staff Training and Development Policy 2014 TABLE OF CONTENTS 1.0 INTRODUCTION 3 1.1 Policy and Legal Framework 4 1.2 Principles/Guidelines of the Training and Staff Development

More information

Performance Management Policy

Performance Management Policy O & M Lesedi PV Plant Performance Management Policy REVISION DATE OF RELEASE PURPOSE Initial Draft December, 2014 Initial Release Revised Draft 1 February, 2015 Amended after MC comments Approvals: NAME

More information

Job description HR Advisor

Job description HR Advisor Job description HR Advisor Main purpose of job To work closely with colleagues in the HR Business Partner team along with the wider PDO directorate to ensure delivery of a first class, professional and

More information

Essential Elements for Any Successful Project

Essential Elements for Any Successful Project In this chapter Learn what comprises a successful project Understand the common characteristics of troubled projects Review the common characteristics of successful projects Learn which tools are indispensable

More information

Final. National Health Care Billing Audit Guidelines. as amended by. The American Association of Medical Audit Specialists (AAMAS)

Final. National Health Care Billing Audit Guidelines. as amended by. The American Association of Medical Audit Specialists (AAMAS) Final National Health Care Billing Audit Guidelines as amended by The American Association of Medical Audit Specialists (AAMAS) May 1, 2009 Preface Billing audits serve as a check and balance to help ensure

More information

Overview 3. Allocation of teacher work 3. A. Face-to-face teaching 4. B. Other professional responsibilities 5. C. Contextual factors 7

Overview 3. Allocation of teacher work 3. A. Face-to-face teaching 4. B. Other professional responsibilities 5. C. Contextual factors 7 CONTENTS Overview 3 Allocation of teacher work 3 A. Face-to-face teaching 4 B. Other professional responsibilities 5 C. Contextual factors 7 D. Voluntary/discretionary effort 7 Student supervision span

More information

Terms of Reference - Board Risk Committee

Terms of Reference - Board Risk Committee Terms of Reference - Board Risk Committee The Board Risk Committee is authorised by the Board to oversee the Group s risk management arrangements. It ensures that the overarching risk appetite is appropriate

More information

Benefits realisation. Gate

Benefits realisation. Gate Benefits realisation Gate 5 The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and Planning, January 2010. The Queensland

More information

PRINCIPLES OF CORPORATE GOVERNANCE FOR SUPERVISED INSTITUTIONS

PRINCIPLES OF CORPORATE GOVERNANCE FOR SUPERVISED INSTITUTIONS PRINCIPLES OF CORPORATE GOVERNANCE FOR SUPERVISED INSTITUTIONS Content of principles I. ORGANISATION AND ORGANISATIONAL STRUCTURE 1. 1 The organisation of a supervised institution should enable meeting

More information

National Commission for Academic Accreditation & Assessment

National Commission for Academic Accreditation & Assessment National Commission for Academic Accreditation & Assessment Standards for Quality Assurance and Accreditation of Higher Education Programs Evidence of Performance Judgments about quality based on general

More information

Banking Technical Systems Specialist Schematic Code 10723 (31000241)

Banking Technical Systems Specialist Schematic Code 10723 (31000241) Banking Technical Systems Specialist Schematic Code 10723 (31000241) I. DESCRIPTION OF WORK Positions in this banded class plan, examine, analyze, administer and monitor banking processes, operation systems

More information

Guidelines for State Agency Management of Volunteer Activity

Guidelines for State Agency Management of Volunteer Activity Guidelines for State Agency Management of Volunteer Activity June 2008 Department of Premier and Cabinet Contents Introduction... 3 Scope and Definitions... 4 Relationship between Agencies and Volunteers...

More information

HRM. Human Resource. Health Organizations. A Guide for Strengthening HRM Systems. Management Rapid Assessment Tool for

HRM. Human Resource. Health Organizations. A Guide for Strengthening HRM Systems. Management Rapid Assessment Tool for HRM Human Resource Management Rapid Assessment Tool for Public- and Private-Sector Health Organizations A Guide for Strengthening HRM Systems All rights reserved. Management Sciences for Health Telephone:

More information

Project Human Resource Management. Overview of PMBOK Basics

Project Human Resource Management. Overview of PMBOK Basics Human Resource Management Overview of PMBOK Basics Michael R. Williams Ph.D. Professor - College of Business Administration Director Professional Sales Institute Illinois State University Campus Box 5590

More information

Remuneration Policy BinckBank N.V.

Remuneration Policy BinckBank N.V. Remuneration Policy BinckBank N.V. This document is a translation of the Dutch original and is provided as a courtesy only. In the event of any disparity, the Dutch version shall prevail. No rights may

More information

Director of Human Resources

Director of Human Resources POSITION DESCRIPTON POSITION: Director of Human Resources STATUS: Contract 5 Years, commencing January 2014 TIME: LOCATION: VISION / CONTEXT: Part-time (0.8FTE averaged over the full year). Either full-time

More information

GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES

GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES Level 37, 2 Lonsdale Street Melbourne 3000, Australia Telephone.+61 3 9302 1300 +61 1300 664 969 Facsimile +61 3 9302 1303 GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES ENERGY INDUSTRIES JANUARY

More information

Before you begin. Topic 1: Research planning requirements 1. Topic 2: Develop human resource strategic plan 37

Before you begin. Topic 1: Research planning requirements 1. Topic 2: Develop human resource strategic plan 37 Contents Before you begin vii Topic 1: Research planning requirements 1 1A Analyse strategic plans to determine human resource strategic direction, objectives and targets 2 1B Undertake additional environmental

More information

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise

More information

Outsourcing. Knowledge Summary

Outsourcing. Knowledge Summary Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best

More information

Annual Staff Appraisal Guidance Notes

Annual Staff Appraisal Guidance Notes Annual Staff Appraisal Guidance Notes Annual Staff Appraisal Process It is a requirement that every member of staff is appraised on an annual basis. The review period will cover the previous 12 calendar

More information

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which must

More information

Wirral Council: Job Role Descriptor HR USE ONLY

Wirral Council: Job Role Descriptor HR USE ONLY Wirral Council: Job Role Descriptor Job Role: Service: Reports to: No. of Subordinates: Job Role Ref: Job Family: Grade: Senior ICT Technician ICT Services Team Leader/Group Leader 0 HR USE ONLY CSUP Corporate

More information

Appendix C Department of Information Resources Deliverables-Based Information Technology Services (DBITS) Contract Sample Statement of Work

Appendix C Department of Information Resources Deliverables-Based Information Technology Services (DBITS) Contract Sample Statement of Work Appendix C Department of Information Resources Deliverables-Based Information Technology Services (DBITS) Contract Sample Statement of Work Appendix C STATEMENT OF WORK (SOW) FOR DELIVERABLES-BASED INFORMATION

More information

Ambulance Victoria. Position Description

Ambulance Victoria. Position Description Position Description Position Title: Clinical Support Manager Division: Quality & Education Services Department: Clinical Operations Reports To: Manager Clinical Operations Direct Reports: Clinical Support

More information

Release: 1. BSBPMG510A Manage projects

Release: 1. BSBPMG510A Manage projects Release: 1 BSBPMG510A Manage projects BSBPMG510A Manage projects Modification History Not applicable. Unit Descriptor Unit descriptor This unit describes the performance outcomes, skills and knowledge

More information

Motor Vehicles - Use of Within NSW Health

Motor Vehicles - Use of Within NSW Health Policy Directive Motor Vehicles - Use of Within NSW Health Document Number PD2014_051 Publication date 18-Dec-2014 Functional Sub group Corporate Administration - Asset Management Corporate Administration

More information

People and Business Division comprises four directorates: Investment Services, Information Services, Customer Experience and People and Performance.

People and Business Division comprises four directorates: Investment Services, Information Services, Customer Experience and People and Performance. Role Statement TITLE OF POSITION: CLASSIFICATION LEVEL: Regulatory Compliance Officer OPS4 Organisation Overview The Department of Planning, Transport and Infrastructure (DPTI) serves the South Australian

More information

Black Hawk County Employee Performance Evaluation

Black Hawk County Employee Performance Evaluation Black Hawk County Employee Performance Evaluation Employee : Supervisor: Title: Program Manager School Nursing Dept: Health Dept Title: Evaluation Period: From: To Due Date: Black Hawk County Governing

More information

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs

Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing

More information

Certificate In Project Management (CIPM)

Certificate In Project Management (CIPM) Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Certificate In Project Management (CIPM) Course Overview The Certificate

More information

WORCESTERSHIRE MENTAL HEALTH PARTNERSHIP NHS TRUST GATEWAY POLICY

WORCESTERSHIRE MENTAL HEALTH PARTNERSHIP NHS TRUST GATEWAY POLICY WORCESTERSHIRE MENTAL HEALTH PARTNERSHIP NHS TRUST GATEWAY POLICY This policy should be read in conjunction with Worcestershire Mental Health Partnership NHS Trust Policy Data Unique Identifier: HR015

More information