METER DATA MANAGEMENT (MDM) SYSTEM UPGRADE

Size: px
Start display at page:

Download "METER DATA MANAGEMENT (MDM) SYSTEM UPGRADE"

Transcription

1 METER DATA MANAGEMENT (MDM) SYSTEM UPGRADE Richard Zaworski Manager, Meter Data Management June 9, 2015

2 Overview MDM testing and market trials is nearing completion. We are currently in the final planning stages for deployment to production. A go-live date has not been established at this time. IESO will be providing participants a minimum of 4 weeks advanced notice of the go-live date. Deployment to production will be a hard cutover from MV-STAR/MV-WEB to Oracle LPS/MDD (i.e. there will not be parallel system operations). 2

3 Overview For a limited time, MV-STAR/MV-WEB will still be available post go-live for participant access to historical data. Oracle LPS/MDD will include 3 months of historical data. New data will only exist in Oracle LPS/MDD. There will be an opportunity for participants to perform parallel calculation comparison between both systems for the 3 month historical period available in both systems. Details will be provided as part of IESO s MDM golive communication to participants. 3

4 Overview The Oracle LPS MDM system includes new functionality. Some functionality will be available at golive while other functionality will be released post golive. New functionality available at go-live includes: Date effectiveness (MV-STAR) versus date/time effectiveness (Oracle LPS) of meter and totalization table attributes. Enhanced VEE processes. Directional MEC and Fixed Factor Losses (TLF). Ability to manage registration changes to compliance aggregation/meter disaggregation models. Post final calculations. Calculation methods. 4

5 Overview Additional functionality will be available post golive. This includes: Loss precedence methods Loss distribution methods Dynamic loss allocation Rollout of this functionality will be done via IESO s baseline change management process (TBD). 5

6 Calculation Design Differences between two systems For assumed method for Method 1 SSLA with service type Delta ; MV-Star uses a divisor of 3 when calculating per phase voltage and current Oracle LPS uses a divisor of 3 when calculating per phase voltage and current When calculating Method 1 SSLA; MV-Star uses 83 (1000/12) Oracle LPS uses (1000/12) When calculating Method 2 SSLA and meter data has 0 VAR values; MV-Star uses assumed method (kva=kw*pf) Oracle LPS uses actual quantities (i.e. kva=kw) When calculating Method 1 SSLA and flow exists on directional channels; MV-STAR calculates current (I) by directional flow Oracle LPS calculates current (I) by total flow These calculation design differences yield slightly different results (i.e. they are not exact in both systems). Differences are negligible from a Settlement perspective. 6

7 Conversion/Transformation Impacts In some instances, MV-Star master data was transformed during conversion to Oracle LPS. Transformation differences include: Voltage Codes and Loss Codes have been renamed in some cases. Summary Meter with a. in the name has been transformed with a. Totalization tables where a meter is mapped directly to a delivery point has been transformed with an intermediary summary meter (i.e. MP to SM to DP) Compliance Aggregation and Meter Disaggregation Models include Ratio Meter which is used to calculate apportionment ratio of dispatch instructions. These transformation differences will be reflected in the Site Registration Report (SRR). 7

8 Site Registration Report IESO will be issuing go-live SRR from Oracle LPS, one week prior to go-live. New SRR has same look and feel as existing SRR. Includes additional attributes and parameters based on system functionality (i.e. date/time effectiveness, MEC direction, ratio meter structure, etc.) 8

9 Meter Data Distribution (MDD) Publishing of meter data reports will be managed thru Online IESO and the new reporting web site. Reports will be pushed to participants based on role Profile. Participants also have the ability to submit ad-hoc requests. Meter data reports published using existing EDI-867 file format. Please refer to SE-113 Working Group for more details. 9

10 Go Live Activities Preparation of system for go-live is a 7 day pre go-live effort. IESO will be working with MSP s to implement Registration Freeze 7 days pre go-live and 3 days post go-live. This will be included as part of go-live communication to participants. 10

11 Summary Go-live planning is still underway Communication will be issued to participants once go-live date has been set. IESO will work with MSP s to coordinate Registration Freeze 11

2015 PROJECT ROADMAP. Bill Pettitt. April 16, 2015. Manager, Business Solutions, IESO

2015 PROJECT ROADMAP. Bill Pettitt. April 16, 2015. Manager, Business Solutions, IESO 2015 PROJECT ROADMAP Bill Pettitt Manager, Business Solutions, IESO April 16, 2015 Roadmap 2 Meter Data Management Replacement Replace the current Wholesale Meter Data Management application Participants

More information

PROCEDURE. Part 3.2: Meter Point Registration and Maintenance PUBLIC. Market Manual 3: Metering. Issue 26.0 MDP_PRO_0013

PROCEDURE. Part 3.2: Meter Point Registration and Maintenance PUBLIC. Market Manual 3: Metering. Issue 26.0 MDP_PRO_0013 PUBLIC MDP_PRO_0013 PROCEDURE Market Manual 3: Metering Part 3.2: Meter Point Registration and Maintenance Issue 26.0 This document describes the procedures for registering meter points and changes to

More information

Migration To MDM/R Production Mode. P.D Ferguson, P.Eng President Newmarket Tay Power Distribution Ltd.

Migration To MDM/R Production Mode. P.D Ferguson, P.Eng President Newmarket Tay Power Distribution Ltd. Migration To MDM/R Production Mode P.D Ferguson, P.Eng President Newmarket Tay Power Distribution Ltd. The Utility Two part service area Town of Newmarket Part of Township of Tay Newmarket Population density

More information

Ontario Smart Metering System Implementation Program (SMSIP) Bill Limbrick Vice President, IT&I Independent Electricity System Operator (IESO)

Ontario Smart Metering System Implementation Program (SMSIP) Bill Limbrick Vice President, IT&I Independent Electricity System Operator (IESO) Ontario Smart Metering System Implementation Program (SMSIP) Bill Limbrick Vice President, IT&I Independent Electricity System Operator (IESO) The Smart Metering System Implementation Program The Smart

More information

Market Manual Changes for Settlement of Capacity Based DR. Demand Response Working Group August 6, 2014

Market Manual Changes for Settlement of Capacity Based DR. Demand Response Working Group August 6, 2014 Market Manual Changes for Settlement of Capacity Based DR Demand Response Working Group August 6, 2014 Agenda Overview Market Manuals for DR Settlement Settlement Data Requirements M&V Baseline Methodology

More information

PHYSICS 111 LABORATORY Experiment #3 Current, Voltage and Resistance in Series and Parallel Circuits

PHYSICS 111 LABORATORY Experiment #3 Current, Voltage and Resistance in Series and Parallel Circuits PHYSCS 111 LABORATORY Experiment #3 Current, Voltage and Resistance in Series and Parallel Circuits This experiment is designed to investigate the relationship between current and potential in simple series

More information

ECR. Electronic Claims Reimbursement. EFT/ERA trends from the payer s perspective. Featured Solution Profile: InstaMed. www.paystreamadvisors.

ECR. Electronic Claims Reimbursement. EFT/ERA trends from the payer s perspective. Featured Solution Profile: InstaMed. www.paystreamadvisors. SOLUTION SURVEY PROFILE REPORT ECR Electronic Claims EFT/ERA trends from the payer s perspective Featured : www.paystreamadvisors.com Q4 2011 Electronic Claims Profile With decades of experience in the

More information

Get Ready for Smart Metering

Get Ready for Smart Metering Get Ready for Smart Metering For all its benefits, deploying a Smart Metering strategy is not without its challenges. For one, it s like turning on the The move towards Smart Metering technologies is changing

More information

Ontario Smart Metering System Implementation Program (SMSIP) Panel Discussion: Smart Metering the road ahead

Ontario Smart Metering System Implementation Program (SMSIP) Panel Discussion: Smart Metering the road ahead Ontario Smart Metering System Implementation Program (SMSIP) Panel Discussion: Smart Metering the road ahead Edward Arlitt Senior Business Analyst Independent Electricity System Operator (IESO) The Smart

More information

PROCEDURE. Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration PUBLIC. Market Manual 3: Metering. Issue 14.

PROCEDURE. Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration PUBLIC. Market Manual 3: Metering. Issue 14. PUBLIC MDP_PRO_0007 PROCEDURE Market Manual 3: Metering Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration Issue 14.0 This document provides an overview of the steps

More information

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1 PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public

More information

RANDOM HOUSE. EDI Implementation Guide. 850 Purchase Order X12 Version 4010

RANDOM HOUSE. EDI Implementation Guide. 850 Purchase Order X12 Version 4010 RANDOM HOUSE EDI Implementation Guide X12 Version 4010 Effective: 6-26-2006 Notes: The Random House EDI Implementation Guide for the 850 transaction documents only the segments and elements used by the

More information

Itron White Paper. Itron Enterprise Edition. Meter Data Management. Connects AMI to the Enterprise: Bridging the Gap Between AMI and CIS

Itron White Paper. Itron Enterprise Edition. Meter Data Management. Connects AMI to the Enterprise: Bridging the Gap Between AMI and CIS Itron White Paper Meter Data Management Itron Enterprise Edition Meter Data Management Connects AMI to the Enterprise: Bridging the Gap Between AMI and CIS Wendy Lohkamp Director, Meter Data Management

More information

Parallels SMB Cloud Insights TM. Singapore

Parallels SMB Cloud Insights TM. Singapore 2014 Parallels SMB Cloud Insights TM Singapore DEFINITIONS Cloud Services Categories This research is focused on the cloud services that matter most to SMBs: IaaS, web presence and web applications, unified

More information

MSATS PROCEDURE: MDM PROCEDURES

MSATS PROCEDURE: MDM PROCEDURES MSATS PROCEDURE: MDM PROCEDURES PREPARED BY: Electricity Metering & Settlements DOCUMENT NO: MT_MP1774v003.2 VERSION NO: 3.2 PREPARED FOR: National Electricity Market EFFECTIVE DATE: 6 th December 2010

More information

2011 NASCIO Nomination Business Improvement and Paperless Architecture Initiative. Improving State Operations: Kentucky

2011 NASCIO Nomination Business Improvement and Paperless Architecture Initiative. Improving State Operations: Kentucky 2011 NASCIO Nomination Business Improvement and Paperless Architecture Initiative Improving State Operations: Kentucky Kevin Moore 6/1/2011 Executive Summary: Accounts Payable was a time consuming, inefficient

More information

2. DATA VALIDATION, ESTIMATION AND EDIT

2. DATA VALIDATION, ESTIMATION AND EDIT 2. DATA VALIDATION, ESTIMATION AND EDIT Introduction After metering data is collected, it is checked for reasonableness by MV-90 before it is transferred to the settlements system. This metering data check

More information

Oracle Transportation Management Cloud in the Global Marketplace

Oracle Transportation Management Cloud in the Global Marketplace Oracle Transportation Management Cloud in the Global Marketplace Presented on February 4, 2016 OTM SIG, Malmo, Sweden Sushant Sawant Global Practice Leader Supply Chain and Logistics Isha Kashiva OTM Solution

More information

Vendor Invoicing EDI 810

Vendor Invoicing EDI 810 OVERVIEW General The Invoice (810) is used by the vendor to communicate information about charges and credits for purchase orders from General Mills Connectivity General Mills uses a VAN for vendor EDI

More information

Achieve IT Solutions ACQUISITION OF VISNOVA SOLUTIONS SUMMARY APRIL 2014

Achieve IT Solutions ACQUISITION OF VISNOVA SOLUTIONS SUMMARY APRIL 2014 Achieve IT Solutions ACQUISITION OF VISNOVA SOLUTIONS SUMMARY APRIL 2014 About Achieve IT Solutions Founded 1989 Employees: 30+ Customers: 200+ Offices: United States Gold Level SAP Partner SAP Business

More information

Oracle ClearTrial Cloud Service Service Descriptions and Metrics August 26, 2014. Metric Definitions... 2 Trial... 2 Instance... 2

Oracle ClearTrial Cloud Service Service Descriptions and Metrics August 26, 2014. Metric Definitions... 2 Trial... 2 Instance... 2 Oracle ClearTrial Service Descriptions and Metrics August 26, 2014 Table of Contents Metric Definitions... 2 Trial... 2 Instance... 2 Service Descriptions... 2 Oracle ClearTrial Track -Trial... 2 Oracle

More information

emeter- MDM General Overwiew April 19 th, CEER Workshop on Meter Data Management Alicia Carrasco, Regulatory Director

emeter- MDM General Overwiew April 19 th, CEER Workshop on Meter Data Management Alicia Carrasco, Regulatory Director emeter- MDM General Overwiew April 19 th, CEER Workshop on Meter Data Alicia Carrasco, Regulatory Director Copyright 2012 emeter, a Siemens Business. All rights reserved. Metering over the Years 1990 1995

More information

How To Implement An Enterprise Resource Planning Program

How To Implement An Enterprise Resource Planning Program ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing

More information

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321)

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321) Lab 4: 3-phase circuits. Objective: to study voltage-current relationships in 3-phase circuits; to learn to make delta and Y connections; to calculate and measure real, apparent, and reactive powers. Equipment:

More information

Interval Meter Rollout MSATS Implications

Interval Meter Rollout MSATS Implications National Electricity Market Management Company Limited ABN 94 072 010 327 Interval Meter Rollout Prepared by: Metering & Retail Development 28 February 2003 Reference: ESC Victoria, November 2002 Installing

More information

Indiana Michigan Power Company

Indiana Michigan Power Company Indiana Michigan Power Company Supplier Handbook April 2012 Version 1.3 Master Table of Contents CHAPTER 1 INTRODUCTION...3 CHAPTER 2 OVERVIEW...5 CHAPTER 3 SERVICE PROVIDER REQUIREMENTS...8 CHAPTER 4

More information

Managing Enterprise Devices and Apps using System Center Configuration Manager

Managing Enterprise Devices and Apps using System Center Configuration Manager Course 20696B: Managing Enterprise Devices and Apps using System Center Configuration Manager Course Details Course Outline Module 1: Managing Desktops and Devices in the Enterprise This module explains

More information

G8 - Contracts for Difference Metering

G8 - Contracts for Difference Metering PUBLIC G8 - Contracts for Difference Metering EMRS Guidance EMR Settlement Limited Version 1.0 12 October 2015 CONTENTS Change Amendment Record...4 1. Introduction...5 2. Purpose...5 3. What is the Electrical

More information

Best Practices for Implementing Software Asset Management

Best Practices for Implementing Software Asset Management Best Practices for Implementing Software Asset Management Table of Contents I. The Case for Software Asset Management (SAM)............................ 2 II. Laying the Groundwork for SAM............................................

More information

Demand Response Programs In Ontario. IESO Demand Response Working Group Public Session

Demand Response Programs In Ontario. IESO Demand Response Working Group Public Session Demand Response Programs In Ontario IESO Demand Response Working Group Public Session April 3, 2014 Outline of Presentation DR Program intent Evolution of DR programs in Ontario Program highlights Key

More information

Day-Ahead Commitment Process Implementation Overview - Settlement. January 12, 2006 Edward Arlitt, DACP Project Team

Day-Ahead Commitment Process Implementation Overview - Settlement. January 12, 2006 Edward Arlitt, DACP Project Team Day-Ahead Commitment Process Implementation Overview - Settlement January 12, 2006 Edward Arlitt, DACP Project Team Topics Summary Overview New Settlement Amounts Settlement amounts vs. charge types Market

More information

Migrating to AF and AF driven Power applications

Migrating to AF and AF driven Power applications Migrating to AF and AF driven Power applications Presented by Henryk Schneider SP-AusNet Steve O Donnell Realtime Results Agenda About Us Migration to PI System 2010 Projects Wiredown/SWER Events/BrownOuts

More information

Support Systems Overview

Support Systems Overview Support Systems Overview Environments Name Description Other Urgency Technology Database Server Web Server External Facing Dev UAT Pre-Prod Prod Components microfit Objective: Manage microfit applications

More information

Introduction. Automated Discovery of IT assets

Introduction. Automated Discovery of IT assets ORACLE DATABASE LIFECYCLE MANAGEMENT PACK ORACLE DATABASE LIFECYCLE MANAGEMENT PACK KEY FEATURES Auto Discovery of hosts and databases Inventory tracking and reporting Database provisioning Schema and

More information

MV-STAR. I/O Reference Guide 5.0.213.1

MV-STAR. I/O Reference Guide 5.0.213.1 T MV-STAR I/O Reference Guide 5.0.213.1 ii Identification TDR-0017-004 06/04 MV-STAR Release 5.0.213.1 Trademark Notice Itron is a registered trademark of Itron, Inc. Windows, Windows 95, Windows 98, Windows

More information

Data Migration/Conversion to SAP from Legacy systems - Our Strategy

Data Migration/Conversion to SAP from Legacy systems - Our Strategy By, WWW.101ERPTEAM.COM Data Migration/Conversion to SAP from Legacy systems - Our Strategy Project Implementation Team ---------------------------------------- SAP Consulting Services - Implementation,

More information

Energy Efficiency and Demand Response Programs in the United States

Energy Efficiency and Demand Response Programs in the United States Energy Efficiency and Demand Response Programs in the United States Structure, Operations, Accomplishments, Lessons Learned Claude Godin Director Energy Data Analytics Overview Introduction - Definitions

More information

DIRECT MAIL: MEASURING VOLATILITY WITH CRYSTAL BALL

DIRECT MAIL: MEASURING VOLATILITY WITH CRYSTAL BALL Proceedings of the 2005 Crystal Ball User Conference DIRECT MAIL: MEASURING VOLATILITY WITH CRYSTAL BALL Sourabh Tambe Honza Vitazka Tim Sweeney Alliance Data Systems, 800 Tech Center Drive Gahanna, OH

More information

BGE s Residential Smart Energy Rewards (SER) Program at NY REV: The Role of Time-Variant Pricing Forum. Wayne Harbaugh March 31, 2015

BGE s Residential Smart Energy Rewards (SER) Program at NY REV: The Role of Time-Variant Pricing Forum. Wayne Harbaugh March 31, 2015 BGE s Residential Smart Energy Rewards (SER) Program at NY REV: The Role of Time-Variant Pricing Forum Wayne Harbaugh March 31, 2015 1 Baltimore Gas and Electric Maryland s largest utility 200 years 1

More information

Frequently Asked Questions Navigating IBHIS for LA County DMH Contract Providers

Frequently Asked Questions Navigating IBHIS for LA County DMH Contract Providers DMH Resources Q: Where can I access DMH documents? A: You can find DMH documents by visiting the DMH site at http://lacdmh.lacounty.gov/hipaa/ibhis_edi_homepage.htm Q: We need additional EFT/SIFT extract

More information

Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England Business Models for Transactive Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England About ISO New England (ISO) Not-for-profit

More information

Best Practices for Deploying and Managing Linux with Red Hat Network

Best Practices for Deploying and Managing Linux with Red Hat Network Best Practices for Deploying and Managing Linux with Red Hat Network Abstract This technical whitepaper provides a best practices overview for companies deploying and managing their open source environment

More information

Parallels Mac Management v4.0

Parallels Mac Management v4.0 Parallels Mac Management v4.0 Deployment Guide July 18, 2015 Copyright 1999 2015 Parallels IP Holdings GmbH and its affiliates. All rights reserved. All other marks and names mentioned herein may be trademarks

More information

WEMS 3.12 Release Notes

WEMS 3.12 Release Notes WEMS 3.12 Release Notes (Build 3.12-871) 8 July 2015 Document control Author Function Business Analyst Name Winston Cheng Document approval Function Martin Maticka Name Group Manager, Operations and Technology

More information

New Features of ZigBee Smart Energy Delivering Energy Management to Consumers Today

New Features of ZigBee Smart Energy Delivering Energy Management to Consumers Today New Features of ZigBee Smart Energy Delivering Energy Management to Consumers Today April 11, 2012 Webinar 1 Agenda 1. Introduction to new features in ZigBee Smart Energy Stephen Johnson, Product Line

More information

Addendum 03. This is the Final Extension in response and due to the above received request:

Addendum 03. This is the Final Extension in response and due to the above received request: RFP 13-44 Questions 05-29-2013: Can the due date be extended 1 week? There is very little time between posting of answers and the proposal due date. We want to be sure we have sufficient time to prepare

More information

Reduce the Total Cost of Ownership (TCO) Using a Hosted (SaaS) Solution for Credit Cards Moukbel Mridan and Narayan Narsinghani

Reduce the Total Cost of Ownership (TCO) Using a Hosted (SaaS) Solution for Credit Cards Moukbel Mridan and Narayan Narsinghani [ Reduce the Total Cost of Ownership (TCO) Using a Hosted (SaaS) Solution for Credit Cards Moukbel Mridan and Narayan Narsinghani [ Introduction Speakers Moukbel Mridan Charles River Labs - [email protected]

More information

Key Features of Meter Data Management Systems

Key Features of Meter Data Management Systems Itron White Paper Meter Data Management Key Features of Meter Data Management Systems Sharelynn Moore Product Line Manager Meter Data Management Itron, Inc. 2006, Itron Inc. All rights reserved. 1 Introduction

More information

Settlement of Capacity Based DR Changes to Market Manual. Demand Response Public Session September 12, 2014

Settlement of Capacity Based DR Changes to Market Manual. Demand Response Public Session September 12, 2014 Settlement of Capacity Based DR Changes to Market Manual Demand Response Public Session September 12, 2014 Overview Settlement of Capacity Based DR Measurement & Verification Plan Demand Response Measurement

More information

Evolution of Meter Data Management

Evolution of Meter Data Management Evolution of Meter Data Management April, 2015 Agenda Global Deployment of Smart Meters MDM Revenue Forecasts How intelligent are Current Smart Meter Deployments? Evolution of Meter Data Management Competitive

More information

curbi for Schools Technical Overview October 2014

curbi for Schools Technical Overview October 2014 curbi for Schools Technical Overview October 2014 Background Overview School Requirements curbi Standard Mode curbi School Mode curbi4schools ipad app Device Enrolment Process Features Alerts Costs Parent

More information

Digital Assets & Brand Equity. The DAM System

Digital Assets & Brand Equity. The DAM System Scan for PDF Digital Assets & Brand Equity Digital assets take on many forms consisting of marketing brochures, video footage, audio files, product images, lifestyle photography and other branded material.

More information

Transforming Utility & Energy Sector with Dynamic CRM

Transforming Utility & Energy Sector with Dynamic CRM Transforming Utility & Energy Sector with Dynamic CRM INDUSTRY OVERVIEW The changing global energy market and regulatory environment have focused a harsh spotlight on operational risks, health, safety,

More information

More MDM Choices: A Hosted MDMS

More MDM Choices: A Hosted MDMS More MDM Choices: A Hosted MDMS Jackie Lemmerhirt Director, Product Management Aclara Software February, 2008 Aclara Software (formerly Nexus Energy Software) Founded 1997, offices in MA, AZ, CA, VA over

More information

Market Data Manager Overview

Market Data Manager Overview Market Data Manager Overview Reports Vendor Management Customers VARS Billing & Invoice Customer Management System VARS Management Vendor Management System Billing/Invoice System Utilities Reports View

More information

Attachment-VEE STANDARDS FOR VALIDATING, EDITING, AND ESTIMATING MONTHLY AND INTERVAL DATA

Attachment-VEE STANDARDS FOR VALIDATING, EDITING, AND ESTIMATING MONTHLY AND INTERVAL DATA Attachment-VEE STANDARDS FOR VALIDATING, EDITING, AND ESTIMATING MONTHLY AND INTERVAL DATA This Page Intentionally Left Blank Table of Contents SECTION A: CA INTERVAL DATA VEE RULES 1. INTRODUCTION...

More information

Priority Project Description Status and Milestone Deliverables

Priority Project Description Status and Milestone Deliverables 0 Billing System Corrections (Baseline) Status: Billing system problem resolution continues on a regular basis by a dedicated team of development staff. Once identified, billing issues are reviewed, solutions

More information

Openreach's UMSUG Application

Openreach's UMSUG Application Openreach's UMSUG Application 16 th April 2013 Phil Royal Openreach Purpose Application to obtain UMSUG approved charge codes for Openreach Superfast Broadband communication cabinets. About Openreach In

More information

SCHRODERS Q1 Interim Management Statement 2015 Conference Call. Michael Dobson: Thursday 30 April 2015 9:00 a.m. BST

SCHRODERS Q1 Interim Management Statement 2015 Conference Call. Michael Dobson: Thursday 30 April 2015 9:00 a.m. BST SCHRODERS Q1 Interim Management Statement 2015 Conference Call Michael Dobson Thursday 30 April 2015 9:00 a.m. BST Good morning. Thank you for standing by, and welcome to the Q1 interim management statement

More information

JUST THE MATHS UNIT NUMBER 1.8. ALGEBRA 8 (Polynomials) A.J.Hobson

JUST THE MATHS UNIT NUMBER 1.8. ALGEBRA 8 (Polynomials) A.J.Hobson JUST THE MATHS UNIT NUMBER 1.8 ALGEBRA 8 (Polynomials) by A.J.Hobson 1.8.1 The factor theorem 1.8.2 Application to quadratic and cubic expressions 1.8.3 Cubic equations 1.8.4 Long division of polynomials

More information

Software Audits Three Ways to Cut the Cost and Pain of a Software Audit

Software Audits Three Ways to Cut the Cost and Pain of a Software Audit BDNA White Paper Software Audits Three Ways to Cut the Cost and Pain of a Software Audit Introduction Software vendors frequently and without warning audit customers to ensure they are in compliance with

More information

Part 2.13: Change and Baseline Management

Part 2.13: Change and Baseline Management PUBLIC IMO_PRO_0039 Market Manual 2: Market Administration Part 2.13: Change and Baseline Management Issue 3.0 Public This document describes the Market Place Change Management and Market Design Baseline

More information

Preparing for the Meter Data Deluge An Intelligent Utility Reality Webcast

Preparing for the Meter Data Deluge An Intelligent Utility Reality Webcast Preparing for the Meter Data Deluge An Intelligent Utility Reality Webcast 10/15 10/29 June 2, 2011 1/28 Join the conversation on Twitter using #IUWebcasts and follow Intelligent Utility on Twitter @IntelUtil

More information

Memory Database Application in the Processing of Huge Amounts of Data Daqiang Xiao 1, Qi Qian 2, Jianhua Yang 3, Guang Chen 4

Memory Database Application in the Processing of Huge Amounts of Data Daqiang Xiao 1, Qi Qian 2, Jianhua Yang 3, Guang Chen 4 5th International Conference on Advanced Materials and Computer Science (ICAMCS 2016) Memory Database Application in the Processing of Huge Amounts of Data Daqiang Xiao 1, Qi Qian 2, Jianhua Yang 3, Guang

More information

ACCESSING THE PARAGON SYSTEM PARAGON WEBSITE ADDRESS: https://parmls.paragonrels.com

ACCESSING THE PARAGON SYSTEM PARAGON WEBSITE ADDRESS: https://parmls.paragonrels.com ACCESSING THE PARAGON SYSTEM PARAGON WEBSITE ADDRESS: https://parmls.paragonrels.com September 16, 2013 Do NOT add a www to the website address. You MUST enter the website address in the URL box at the

More information

Platform Architecture Evolution : SAP BO Enterprise XI (R2) to SAP BO Enterprise XI (3.1) to SAP BusinessObjects Business Intelligence Platform 4.

Platform Architecture Evolution : SAP BO Enterprise XI (R2) to SAP BO Enterprise XI (3.1) to SAP BusinessObjects Business Intelligence Platform 4. Platform Architecture Evolution : SAP BO Enterprise XI (R2) to SAP BO Enterprise XI (3.1) to SAP BusinessObjects Business Intelligence Platform 4.1 Overview Since 2005 there have been a number of major

More information

Building Customer Programs Through AMI and Effective Data Management

Building Customer Programs Through AMI and Effective Data Management Building Customer Programs Through AMI and Effective Data Management Steve Bell, Vice President, Business Development ElectSolve Technology Solutions & Services Inc. [email protected] (512) 656-0004

More information

Dale Pennington, Managing Director, Utiliworks Consulting LLC, New York, USA

Dale Pennington, Managing Director, Utiliworks Consulting LLC, New York, USA Dale Pennington, Managing Director, Utiliworks Consulting LLC, New York, USA Meter Data from Cradle to Grave, do you know where your Data is? Getting Started Create your project team such that all critical

More information

Lending Edge Technology IT, ebusiness, lean. The ERP Devils Triangle and the Impact of the Supply Chain. Ray Atkinson CEO Atko Global P/L

Lending Edge Technology IT, ebusiness, lean. The ERP Devils Triangle and the Impact of the Supply Chain. Ray Atkinson CEO Atko Global P/L Lending Edge Technology IT, ebusiness, lean The ERP Devils Triangle and the Impact of the Supply Chain Ray Atkinson CEO Atko Global P/L ERP Devils Triangle Impact on Supply Chain & Corporate Risk An Insight

More information

Agency Insight: EE1 Business Processes, Assets, and Projects October 9, 2014

Agency Insight: EE1 Business Processes, Assets, and Projects October 9, 2014 Agency Insight: EE1 Business Processes, Assets, and Projects October 9, 2014 Session Agenda Introduction Asset Lifecycle Management Managing Projects in SFS with ESA Business Process Impacts Question and

More information

Achieving high performance with smart meter data management systems. A leading practice approach for utilities

Achieving high performance with smart meter data management systems. A leading practice approach for utilities Achieving high performance with smart meter data systems A leading practice approach for utilities Contents Meter data systems: a critical enabler in smart grid implementations Core elements The five-level

More information

HADOOP ON ORACLE ZFS STORAGE A TECHNICAL OVERVIEW

HADOOP ON ORACLE ZFS STORAGE A TECHNICAL OVERVIEW HADOOP ON ORACLE ZFS STORAGE A TECHNICAL OVERVIEW 757 Maleta Lane, Suite 201 Castle Rock, CO 80108 Brett Weninger, Managing Director [email protected] Dave Smelker, Managing Principal [email protected]

More information

Informatica Data Replication: Maximize Return on Data in Real Time Chai Pydimukkala Principal Product Manager Informatica

Informatica Data Replication: Maximize Return on Data in Real Time Chai Pydimukkala Principal Product Manager Informatica Informatica Data Replication: Maximize Return on Data in Real Time Chai Pydimukkala Principal Product Manager Informatica Terry Simonds Technical Evangelist Informatica 2 Agenda Replication Business Drivers

More information