Project Assessment : SESAR WP3.1 Integration of ATM Initiatives and Programmes
|
|
- Marybeth Atkins
- 8 years ago
- Views:
Transcription
1 Project Assessment : SESAR WP3.1 Integration of ATM Initiatives and Programmes ATM Projects Meeting Brussels, 14 November 2007 Presented by: Gunnar Frisk LFV (O-level 3.1.3) L.J.M. Dullaart LVNL, Stephen Williams NATS, Pascal Dias Eurocontrol (R-level 3.1)
2 Presentation Purpose WP3.1 - Integration of ATM Initiatives and Programmes Objective of this presentation is to provide:! An overview of the approach taken in analysing current ATM initiatives! Our initial view of the alignment of the EC projects Results expected to be:! Help the EC & the Projects to understand WP3.1 results! Help projects understand how to align themselves! WP3.1 to get project feedback on results Page: 2
3 Agenda Introduction Data Collection, Assessment & Analysis General Conclusion & Recommendations EC project Assessment results Summary WP3.1 overview Page: 3
4 Sokrates The definition of terms is the beginning of Wisdom KPA = Key Performance Areas ConOps = SESAR Operational Concept OCE = Operational Concept Element (pieces of the ConOps) IPs = Implementation Packages IP1: Short term 2013 Not WP3.1 scope (WP3.2)! IP2: Mid-term 2020 IP3: Long-term date when full ConOps is implementation OIs = Operational Improvements DLT = Task Deliverable DLM = Milestone deliverable Page: 4
5 WP3.1 Objectives Ensure that on-going European ATM initiatives that are relevant in the context of SESAR can be exploited to the maximum possible extent. Contribution to SESAR phase 4 (D4) Objective 3 as described in MOP D4: To assess current plans and on-going initiatives against the mid- and long-term targets and identify: those which are aligned to these targets; those which are not and therefore require a modification of the scope to contribute to the SESAR master plan; any gaps for which new activities should be scoped and initiated. This will Contribute to avoiding duplication, ensuring focus, reorientation of on-going work, exploiting potential for cooperation and reuse (keywords: gaps, overlaps, alignment, reuse) Contribute to the development of the Master Plan! Deliverable (DLT) developed to help the Master Plan Builders (in phase D5, D6) Page: 5
6 WP3.1 The Team R-level: Pascal Dias (ECTL) O-level: Juan Carrasco (ECTL) European Initiatives Dave Young (EEC) Impacts of non-european initiatives Gunnar Frisk (LFV) Recommendations W-level: ANSPs (AENA, DFS, DSNA, ENAV, LFV, LVNL, NATS, NAV PT), Industry (Airbus, Indra), Airport (BAA), Airline (Iberia), Military (EUROAMID), Eurocontrol (HQ, EEC) SESAR: John Guy (CIT), Alain Bodenan (PD) Page: 6
7 WP3.1 Overview Work conducted from Feb-Nov 2007 in SESAR phase D4, in 3 phases: Data Collection using Questionnaires distributed widely, filled by Projects Assessment using agreed scoring against KPAs and OCEs (and more) Analysis against SESAR R&D Needs and IPs Scope: Mid to long-term R&D and implementation ( ), short-term R&D (-2013) Short-term implementation covered by WP3.2 T0 T0+1 T0+2 T0+3 T0+4 T0+5 T0+6 T0+7 T0+8 Step 1 Identify all current ATM R&D Projects Step 2 Initial assessment Data Collection Step 3 Describe on-going ATM Initiatives Step 4 Assessment Step 5 Analysis and Reporting M1 M3 M4 M5 M6 M7 M8 Page: 7 M2
8 Agenda Introduction Data Collection, Assessment & Analysis General Conclusion & Recommendations EC project Assessment results Summary Understanding the work process Page: 8
9 WP3.1 Summary of Approach: Data Collection Aiming at complete coverage over European ATM R&D initiatives including national, military etc. presently not covered (to any larger extent), e.g. by ARDEP Collated information on different initiatives via a questionnaire 351 initiatives Identified 174 initiatives returned Questionnaires and was therefore Assessed Responses were good but patchy. Not unexpected given the timescales. E.g.: 102 initiatives reported budget data Substantial amount of national or regional initiatives reported Validation infrastructure initiatives also identified from EATRADA Ref: See DLT annex 2 for complete list Initiatives grouped into: Most significant ATM initiatives Eurocontrol Initiative Other ATM initiatives (clustered into small ATM, Research Infrastructure Methodology Developments, Implementation Planning, FABs, Specialized Technology Based initiatives) Page: 9
10 WP3.1 Summary of Approach: Assessment Each European initiative assessed against contribution to OCE and KPA Scoring also against context, participation, urgency, dependencies & confidence Based on content in Questionnaire, individual assessment & reconciliation workshops (expert judgement) 174 initiatives times 11 KPAs & 14 OCEs - HEAVY work! Ref: Method & Scoring described in DLT section 2.2 and Annex 1 Ref: Results in Master Spreadsheet Non-European and military initiatives assessed separately (no scoring) Page: 10
11 Assessment: Sample general statistics Validation level (E-OCVM) Estimated deployment dates >2020 Total V0 - ATM needs 1 1 V1 - Scope V2 - Feasibility V3 - Integration V 4 - Pre-operational V5 - Implementation Total projects Reported Maturity level by Deployment date 4 = International / multi stakeholder 4% 1 = Local only 25% Project count by participation 3 = European / multi stakeholder 57% 2 = National / multi stakeholder 14% Page: 11
12 Assessment: KPA statistics Project count Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability Page: 12
13 Assessment: ConOps statistics Project count New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management Page: 13
14 WP3.1 Summary of Approach: Analysis Objective: Make observations to draw conclusions and form recommendations. Analysis were performed against: Assessment against Key Performance Areas (KPAs) & Operational Concept Elements (OCEs) SESAR R&D Needs: Operational Concept Architecture Technology Human Factors Implementation Packages (IPs), including sub-ips Page: 14
15 Analysis against R&D Needs Analysis against 158 R&D needs expressed in SESAR phase 3 (D3 DLTs): WP2.2 ConOps R&D Needs (86) WP2.4 Architecture R&D Needs (26) WP2.5 Technology R&D Needs (28) WP1.7 HF/HR R&D Needs (18) ID Title Definition NR New requirement No current R&D was identified for the specific topic RO Re-orientate One or more projects were identified as contributing to the SESAR R&D need but new elements introduced by SESAR would need to be addressed CR Co-ordination needed Several projects which together meet the R&D need but which require coordination to ensure the R&D need is met, including some elements of new work CO Covered The current initiatives meet the SESAR needs (i.e. an area where SESAR continues the previous requirements. There were few projects not mapping to any R&D need Caveat: The D3 R&D needs produced bottom up. To be complemented by top down analysis during D4/D5. Page: 15
16 Analysis against IPs Initiatives mapped against the 84 sub-ips Short-term (IP1) analysis passed to 3.2 (but retained also in 3.1 DLT) For each sub-ip: Identified the contributing initiatives Analyse reported deployment dates vs. SESAR timeframe (Context/Availability) Specifically analyse initiative with no mapping to any IP (IP1-81 initiatives) IP2-108 initiatives IP3-46 initiatives IP1a IP2a IP3 IP1b There were few projects not mapping to any IP IP2b IP1c Page: 16
17 Analysis of R&D Needs by IP Number of R&D Needs WP3.1 focused on midlong term (IP2 & IP3) IP1 IP2 IP3 Implementation Package CO: Covered CR: Coordination required RO: Re-orientate NR: New requirement Page: 17
18 Agenda Introduction Data Collection, Assessment & Analysis General Conclusion & Recommendations EC project Assessment results Summary Gives projects an idea of SESAR gaps, overlaps, mis-alignments to help align themselves Page: 18
19 General Recommendations: Management of R&D In total, over 20 general recommendations all summarised below. Focus on few marked!! A single management authority should co-ordinate R&D effort required to implement the entire SESAR ConOps, including any local adaptations required inline with the one size does not fit all principle.! Improve information dissemination and transparency within the ATM R&D community to foster greater cooperation and coordination.! Develop R&D Observatory (going beyond the scope of ARDEP) to monitor and disseminate the on-going status of R&D.! Adopt the use of E-OCVM for all relevant projects! Extend E-OCVM to include: Lifecycle management processes KPA assessment processes HF assessment processes Page: 19
20 General Recommendations: Management of R&D! Ensure that sufficient R&D budget is identified and preserved for long term and innovative research in support of ATM improvements beyond the 2020 target. Strengthen existing working level arrangements with the USA and the Federation of Russia and seek similar relationships with China and Japan. Investigate the benefits of a working level arrangement with India. The SESAR JU should agree mechanisms to ensure alignment of ATM R&D activities with the ATM Master Plan (D5) with all Members and other sponsors of ATM R&D The ATM Master Plan (D5) should include requirement to rationalise existing validation infrastructure and to develop new validation infrastructure required to validate the SESAR ConOps. Page: 20
21 IP2 Recommendations: Overview of R&D Needs 37 R&D gaps identified: 22 - Concept of operations, 6 - Architecture 3 - Technology 6 - HF/HR 11% IP2 33% 26% NR: New requirement RO: Re-orientate CR: Coordination required CO: Covered 30% Page: 21
22 IP2 (Mid-term) Recommendations! The SESAR JU should ensure that results of previous R&D projects are used to baseline new initiatives such that that they are more directed to implementation objectives. The R&D Strategy, implemented through the SESAR JU work programme, must strike the correct balance between the absolute need for stakeholder participation, stakeholder buy-in and the need for timely delivery of the required level of performance. The existing initiatives should be included in the SESAR R&D Plan and managed by the SESAR JU.! Rationalisation of existing ATM projects is required to align specific initiatives to the SESAR operational improvements and to reduce the number of initiatives in each defined area. Page: 22
23 IP2 Recommendations The scope of new R&D initiated by the SESAR JU is more closely aligned with the SESAR implementation aims. The ATM Master Plan should include activities to monitor relevant non-atm developments to ensure that aviation is able to benefit from non-aviation standards. The R&D Plan should include new items for the 55 R&D needs not covered by existing projects The ATM Master Plan should include activities to support the achievement of all KPAs identified in D2 The maturity and value of existing ATM projects should be assessed in detail by the SESAR JU.! All ATM system developments should be consistent with the SESAR Architecture. The R&D plan should include early actions to establish the required architecture framework. Page: 23
24 IP2 Unsupported or late IPs Our analysis of initiatives supporting IP2 concludes that there is no-ongoing work on: IP2c - OI3 Datalink-based auto-brake/brake to vacate All other OI steps are supported, however the majority of the initiatives supporting the following have reported deployment dates that are too late for IP2: IP2e OI2 OAT Routing Page: 24
25 IP3 Recommendations: Overview of R&D Needs 37 R&D gaps identified: 19 - Concept of operations, 3 - Architecture 6 - Technology 6 - HF/HR 8% IP3 43% 31% NR: New requirement RO: Re-orientate CR: Coordination required CO: Covered 18% Page: 25
26 IP3 (Long-term) Recommendations Generally there are less current initiatives aligned to IP3 R&D needs E.g. greater divergence from previous ConOps Very long cycles important to stimulate creativity and innovation which will develop the scientific knowledge for the longer SESAR time horizons Develop the relations with Academia A reasonable target if 10% of the overall investments of R&D should be preserved and dedicated to the Longer Term Research activities (PHARE) Ensure that UAV integration in European Airspace is covered in the right time-frame Page: 26
27 IP3 Unsupported or late OI-steps Our analysis of initiatives supporting IP3 concludes that there is either no ongoing work in the following areas or the current work predicts deployment dates that are insufficient for IP3: OI2 Pre-defined ATS routes only when and where required OI3 Use of Free Routing from Terminal Area Operations exit to Terminal Area operations entry OI6 Synthetic Vision for the pilot in low visibility conditions OI7 Self adjustment of Spacing Depending Upon Wake Vortices OI13 ACAS adapted to new separation modes OI14 STCA adapted to new separation modes OI15 Improved Compatibility between ground and airborne safety nets Page: 27
28 Overall conclusion on gaps, overlaps & alignment GAPS: New elements introduced by SESAR are clearly not covered by existing R&D, e.g. UDPP: User Driven Prioritization Process SOA/EA: Service Oriented Architecture & Enterprise Architecture See WP3.1 DLT (and D4 DLM) for complete list. OVERLAPS: Several overlaps (many or uncoordinated initiatives on same subject) ALIGNMENT: All current R&D requires some orientation to align to SESAR. We see needs and opportunities to realign. E.g.: Operational Concept: Ensure the collaborative elements of SESAR are fully taken on board Architecture: Use of SOA/EA principles (develop the ATM Reference Information Model, Business Process Model, EA Framework, SWIM services) Technology: Least affected, but new specific technology challenges, i.e. new functional requirements must be derived/verified for the new concept HF/HR: Take account of new Operational Concept Page: 28
29 Agenda Introduction Data Collection, Assessment & Analysis General Conclusion & Recommendations EC project Assessment results Summary Gives projects an idea of assessed mapping to SESAR to help align themselves Page: 29
30 EC project Assessment: Preparation for today Extracted project summaries from WP3.1 DLT Volume 2 Short textual description of the project Project data such as start/end dates, budget, deployment date Alignment/mapping to SESAR Implementation Packages (IPs) and Operational Concept Elements (OCEs) Specific alignment guidance and comments! Available as hand-out Extracted information on alignment with SESAR: Key Performance Areas (KPAs) Operational Concept Elements (OCEs) Implementation Packages (IPs - OI Steps) R&D Needs (for ConOps, Architecture & Technology)! Presented in the next slides (2 per project) Material based on content in Questionnaire, assessment & reconciliation workshops (expert judgement) Note: R&D Needs mapping refer to numbering that can be found in the WP3.1 DLT. Page: 30
31 EMMA 2 European airport Movement Management by A-SMGCS Phase 2 Operational Concept Elements (list of OCEs as it was used by WP3.1) New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X X X X X 10 elements Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 7 areas X X X X X X X Page: 31
32 EMMA 2 European airport Movement Management by A-SMGCS Phase 2 IP mapping: IP1: IP1d Improving Airports/TMA Safety and IP2: IP2c Augmenting Airports/TMA Safety and Efficiency IP3: N/A R&D needs: ConOps: 3, 8, 11 (study on the use of advanced, automated, aircraft systems such as auto-brake, controller workload reduction at airports, techniques for dynamic airspace management) Architecture: N/A Technology: 4, 16, 25 (coordinate at European level the evaluation, development, standardisation and validation of CNS technologies; cockpit moving map; Brake to Vacate & Airport Navigation and Surveillance technologies) HF/HR: N/A Page: 32
33 EPISODE 3 Operational Concept Elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X X X X X X X X X Key Performance Areas Cost Effectiveness Access & Equity Participation Interoperability all 14 elements Safety Environmental Security Efficiency Predicability Flexibility 7 areas X X X X X X X Page: 33
34 EPISODE 3 IP mapping: IP1: N/A IP2: All IP3: N/A R&D needs: ConOps: 30 R&D needs!!! Architecture: 12 (Logical architecture Validation) Technology: N/A HF/HR: N/A Page: 34
35 SOFIA (Safe Automatic Flight Back and Landing of Aircraft ) Operational Concept Elements 4 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 2 areas X X Page: 35
36 SOFIA IP mapping: IP1: IP1d Improving Airports/TMA Safety and IP2: IP2c Augmenting Airports/TMA Safety and Efficiency IP3: IP3a Maximising Benefits (Other initiatives) R&D needs: ConOps: N/A Architecture: 7 (Ground-Pilot System definition) Technology: 25 (Airport Navigation and Surveillance technologies to optimise approach, landing, and runway exit operations) HF/HR: N/A Page: 36
37 SWIM-SUIT (System Wide Information Management Supported by Innovative Technologies) Operational Concept Elements 10 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 9 areas X X X X X X X X X Page: 37
38 SWIM-SUIT IP mapping: IP1: N/A IP2: IP2a Improving predictability through Information sharing IP3: N/A R&D needs: ConOps: 50, 74 (Evaluation of the security issues associated with CDM and SWIM; The evaluation of assumption that a 4D contract is less fuel efficient than other separation modes) Architecture: N/A Technology: 6 (Expedite activities to build a harmonised ground-ground communication system) HF/HR: N/A Page: 38
39 ERAT (Environmentally Responsible Air Transport) Operational Concept Elements 4 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 4 areas X X X X Page: 39
40 ERAT IP mapping: IP1: IP1c Ensuring Environmentally Sustainable Operations IP2: IP2c Augmenting Airports/TMA Safety and Efficiency IP3: N/A R&D needs: ConOps: 33 (Evaluation of the use of shared airborne data) Architecture: 14 (ATM impact on the environment) Technology: N/A HF/HR: N/A Page: 40
41 NEWSKY (Networking the Sky for Aeronautical Communications) Operational Concept Elements 3 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability all 11 areas X X X X X X X X X X X Page: 41
42 NEWSKY IP mapping: IP1: N/A IP2: N/A IP3: N/A Maps to IP3 communications environment but reorientation to SWIM principles is required. R&D needs: ConOps: N/A Architecture: N/A Technology: N/A HF/HR: N/A Page: 42
43 ASSTAR (Advanced Safe Separation Technologies and Algorithms) This initiative was excluded from detailed assessment and analysis by WP3.1 due to early end date. Page: 43
44 ASPASIA (Aeronautical Surveillance & Planning by Advanced Satellite Implemented Applications) Operational Concept Elements 6 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 8 areas X X X X X X X X Page: 44
45 ASPASIA IP mapping: IP1: N/A IP2: N/A IP3: N/A R&D needs: ConOps: N/A Architecture: N/A Technology: 5, 9 (new air ground datalinks, and the necessary transport mechanism; determine the necessary satellite configurations to achieve the required integrity performance) HF/HR: N/A Page: 45
46 RESET (Reduced Seperation Minima) Operational Concept Elements New Separation Modes Maximise Utilisation of Improved Situational Awareness Improved Resilience X X X X X 5 elements Rationalization of the ATM network CDM Trajectory Management Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 4 areas X X X X Page: 46
47 RESET IP mapping: IP1: N/A IP2: IP2c Augmenting Airports/TMA Safety and Efficiency IP2d Augmenting En-route Safety and Efficiency IP3: Maximising benefits (Self separation in mixed modes) R&D needs: ConOps: 47, 60, 62, 63, 68, 80, 81 all separation related R&D needs Architecture: N/A Technology: N/A HF/HR: N/A Page: 47
48 ERASMUS (En Route Air Traffic Soft Management Ultimate System) Operational Concept Elements 7 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 6 areas X X X X X X Page: 48
49 IP mapping: ERASMUS IP1: N/A IP2: IP2a Improving predictability through Information sharing IP2b Trajectory management through information sharing IP2d Augmenting En-route Safety and Efficiency IP3: IP3a Maximising benefits (4D Contract for Equipped Aircraft with Extended Clearance) R&D needs: ConOps: 15, 16, 19, 21, 31, 74 (Automation topics; Evaluation of ground based de-confliction automation; Required accuracy of the FMS RTA function; All aspects of collaborative planning and agreement on 4D gate to gate trajectories; the impact of differential aircraft performance on the environmental and economic outcomes of ASAS spacing; The evaluation of assumption that a 4D contract is less fuel efficient than other separation modes) Architecture: 13 (Traffic complexity management) Technology: N/A HF/HR: 12 (The effects of automation on the different actors could be either reactive, complacent or have a reduced situation awareness) Page: 49
50 ART (Advanced Remote Tower) Operational Concept Elements New Separation Modes Maximise Utilisation of Improved Situational Awareness Improved Resilience X X X X X 5 elements Rationalization of the ATM network CDM Trajectory Management Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 6 areas X X X X X X Page: 50
51 ART IP mapping: IP1: N/A IP2: IP2c Augmenting Airports/TMA Safety and Efficiency IP3: N/A R&D needs: ConOps: 4, 8, 83, 86 (Evaluation of improvements to all weather operations ; Reduction of controller workload in towers; remotely operated aerodrome ATC; Investigate the types of sensors/ displays and controller support tools necessary to enable remote tower operation) Architecture: N/A Technology: N/A HF/HR: N/A Page: 51
52 i-fly (Safety, complexity and responsibility based design and validation of highly automated air traffic management) Operational Concept Elements 6 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 2 areas X X Page: 52
53 i-fly IP mapping: IP1: N/A IP2: N/A IP3: IP3a Maximising benefits (Self Separation in Mixed Mode) R&D needs: ConOps: 13, 15 (all aspects of the operation of UAS and their integration with other managed air traffic; Automation topics) Architecture: 13 (Traffic complexity management) Technology: N/A HF/HR: 3, 5 (Human Factors issues of early ASAS applications and retrofit ASAS solutions ; Human Factors issues in relation to airspace transition (with/without ASAS) Page: 53
54 MIME (Market Based Impact Mitigation for the Environment) Operational Concept Elements 1 element New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 5 areas X X X X X Page: 54
55 MIME IP mapping: IP1: IP1c Ensuring Environmentally Sustainable Operations IP2: N/A IP3: N/A R&D needs: ConOps: N/A Architecture: 14 (ATM impact on the environment) Technology: N/A HF/HR: N/A Page: 55
56 SINBAD (Safety and security Improved by New functionality for Better Awareness on airport and departure traffic Domain) Operational Concept Elements 2 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 3 areas X X X Page: 56
57 SINBAD IP mapping: IP1: N/A IP2: IP2c Augmenting Airports/TMA Safety and Efficiency IP3: N/A R&D needs: ConOps: N/A Architecture: N/A Technology: N/A HF/HR: N/A Page: 57
58 CATS (Contract based Air Transportation System) Operational Concept Elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience 9 elements Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 8 areas X X X X X X X X Page: 58
59 CATS IP mapping: IP1: N/A IP2: IP2a Improving predictability through Information sharing IP3: N/A R&D needs: ConOps: 7, 39, 64, 69, 79 (predictability of surface operations; appropriate scope of AMAN operations; Dynamic Route Allocation, 4D Contracts and ASAS-Self Separation in mixed mode environment ; Integration of ground calculated with air calculated 4D trajectory; Further development of the flight planning process) Architecture: N/A Technology: N/A HF/HR: N/A Page: 59
60 INOUI (Innovative Operational UAV integration) Operational Concept Elements 6 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 6 areas X X X X X X Page: 60
61 IP mapping: INOUI IP1: N/A IP2: IP2a Improving predictability through Information sharing IP2e Improving Operational Flexibility IP3: IP3a Maximising benefits (Two categories of airspace & Self Separation in Mixed Mode) R&D needs: ConOps: 13, 14, 15 (all aspects of the operation of UAS and their integration with other managed air traffic; impact of business trajectory ownership ; Automation topics) Architecture: 7 (Ground-Pilot System definition) Technology: N/A HF/HR: 21 (Examine human factors, recruitment, training, competence and staffing implications of UAS operators) Page: 61
62 SKY SCANNER (Development of an innovative LIDAR Technology for New Generation ATM Paradigms) Operational Concept Elements New Separation Modes Maximise Utilisation of Improved Situational Awareness Improved Resilience X X X X X 5 elements Rationalization of the ATM network CDM Trajectory Management Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 6 areas X X X X X X Page: 62
63 SKY SCANNER IP mapping: IP1: IP1d Improving Airports/TMA Safety and IP2: IP2c Augmenting Airports/TMA Safety and Efficiency IP3: IP3a Maximising benefits (Other initiatives) R&D needs: ConOps: N/A Architecture: N/A Technology: 25 (Integrated wake vortex detection and prediction technologies) HF/HR: N/A Page: 63
64 EPATS (European Personal Air Transportation System Study) Operational Concept Elements 2 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 3 areas X X X Page: 64
65 EPATS IP mapping: IP1: N/A IP2: N/A IP3: N/A R&D needs: ConOps: N/A Architecture: N/A Technology: N/A HF/HR: N/A This project is not strictly relevant to the core-sesar aims. However, few of the identified R&D needs address the role of General Aviation and Personal Transportation. Re-orientation to address Personal Transportation requirements in IP3 is recommended. Page: 65
66 Operational Concept Elements SUPERHIGHWAY (Development of an Operationally Driven Airspace Traffic Structure for High-Density High-Complexity areas based on the use of dynamic Airspace and Multilayered Planning) New Separation Modes Maximise Utilisation of 8 elements Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 4 areas X X X X Page: 66
67 SUPERHIGHWAY IP mapping: IP1: N/A IP2: N/A IP3: IP3a Maximising benefits (Other initiatives) R&D needs: ConOps: 66, 77, 80 (ASAS Separation procedures foresee flight crew being entrusted with separation provision tasks whilst retaining full situation awareness; prove that CDM processes put benefit into the ATM system; Elaboration of high density separation concepts) Architecture: N/A Technology: N/A HF/HR: N/A Page: 67
68 CREDOS (Crosswind reduced Separations for Departures) Operational Concept Elements 3 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 4 areas X X X X Page: 68
69 CREDOS IP mapping: IP1: IP1d Improving Airports/TMA Safety and IP2: IP2a Improving predictability through Information sharing IP2c Augmenting Airports/TMA Safety and Efficiency IP3: N/A R&D needs: ConOps: 8, 84 (reduction of controller workload at airports; innovative means to reduce dependency on Wake Vortex separation) Architecture: N/A Technology: N/A HF/HR: N/A Page: 69
70 SPADE 2 (Supporting Platform for Airport Decision-Making and Efficiency Analysis - Phase 2) Operational Concept Elements 8 elements New Separation Modes Maximise Utilisation of Rationalization of the ATM network CDM Trajectory Management Improved Situational Awareness Improved Resilience Environmental Management DCB Controller Task Load Reduction Automated Decision Support Information Management ATM Organization Airspace Management X X X X X X X X Key Performance Areas Safety Environmental Security Efficiency Predicability Flexibility Cost Effectiveness Access & Equity Participation Interoperability 8 areas X X X X X X X X Page: 70
71 SPADE 2 IP mapping: IP1: IP1a Generating (and unlocking latent) Network IP2: IP2a Improving predictability through Information sharing IP3: N/A R&D needs: ConOps: 1 (Study of airport processes associated with common understanding of a common planning process) Architecture: N/A Technology: N/A HF/HR: N/A Page: 71
72 Agenda Introduction Data Collection, Assessment & Analysis General Conclusion & Recommendations EC project Assessment results Summary Page: 72
73 Summary & Process of realignment WP3.1 was designed to support SESAR ATM Master Plan (D5) & Work Programme (D6) and is a step in realignment of current R&D to meet SESAR needs WP3.1 has generated specific conclusions on which current initiatives support which IPs (OI-steps) and R&D needs, indicating: Need and opportunities to realign ongoing initiatives Several gaps (as expected with the SESAR Performance Requirements and new ConOps) Several overlaps (too many or uncoordinated initiatives on same subject) During D5 and D6 the conclusions will be worked on to assess how best the mix of current projects for each area can be best aligned to achieve the SESAR objectives. This will lead to more detailed guidance on the need to re-align existing projects However: Ongoing initiatives could already now start working to demonstrate alignment in a better way, using SESAR D3&D4 deliverables, guided by the WP3.1 material Further analysis on the individual projects could be done based on the WP3.1 results The WP3.1 DLT proposes one way of using the 3.1 material to draw conclusions per project (section 2.3) We welcome comments on our findings to be considered for D5 Page: 73
74 Thank you for your attention! Contacts: Pascal Dias Eurocontrol - pascal.dias@eurocontrol.int (R-level 3.1) Gunnar Frisk LFV gunnar.frisk@lfv.se (O-level 3.1.3) L.J.M. Dullaart LVNL - L.J.M.Dullaart@lvnl.nl Stephen Williams NATS steve.williams@nats.co.uk
PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION
EUROPEAN COMMISSION PRESENTATION Patrick Ky Executive Director EUROPEAN COMMISSION WHY SESAR? EUROPEAN COMMISSION EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked
More informationTHE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking
THE SESAR CONCEPT AND SWIM David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking 1 Satellite based Communication & Navigation Advanced Flexible Use of Airspace Integrated Departure & Arrival
More informationWorkpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.
Workpackages This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage. CODE TITLE 03.00 Global Co-ordination and Management 03.01 Validation Infrastructure
More informationSESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014
SESAR Air Traffic Management Modernization Honeywell Aerospace Advanced Technology June 2014 Honeywell in NextGen and SESAR Honeywell active in multiple FAA NextGen projects ADS-B Surface Indicating and
More informationHow To Improve The Performance Of Anatm
EXPLORATORY RESEARCH IN ATM David Bowen Chief ATM 4 th May 2015 1 ATM Research in Europe HORIZON Transport Challenges smart, green and integrated transport FlightPath 2050 five challenges to aviation beyond
More informationESSIP OUTLINE DESCRIPTION FOR THE IMPLEMENTATION OF THE VOICE OVER INTERNET PROTOCOL IN ATM
ESSIP OUTLINE DESCRIPTION FOR THE IMPLEMENTATION OF THE VOICE OVER INTERNET PROTOCOL IN ATM DEFINITION & CONTEXT Topic Description Associated supporting material finalised? What is it? What has to be done?
More informationEuropean Air Traffic Management Master Plan Edition 1-30 March 2009
European Air Traffic Management Master Plan Edition 1-30 March 2009 EUROPEAN COMMISSION Foreword On March 30 th 2009, the European Council 1 has adopted a Decision though which the SESAR ATM Master Plan
More informationSESAR Studies & Demonstration Projects on RPAS & Cyber-Security
SESAR Studies & Demonstration Projects on RPAS & Cyber-Security Brussels, May 20 th 2014 2 Page 2 Rationale RPAS will generate the emergence of a new service sector RPAS limited by flight authorisations
More informationAdapting to air traffic growth in Europe
Comment volerons-nous en 2050?/ Flying in 2050 Conference Session VII Air Traffic Management Adapting to air traffic growth in Europe Pierre ANDRIBET EUROCONTROL SESAR and Research Deputy Director Comment
More informationANNEXE III. Risk Management Report 15 December 2011. 1 of 23
SJU-AB-020-11-DOC-01 ANNEXE III Management Report 15 December 2011 1 of 23 1 SJU Management In accordance with the SJU Internal Control Standard for Effective Operations 1 as well as the Council of Ministers
More informationThe SESAR programme: Making air travel safer, cheaper and more efficient
European Commission Directorate General for Energy and Transport MEMO November 2005 The SESAR programme: Making air travel safer, cheaper and more efficient The Single European Sky industrial and technological
More informationAir Traffic Management Services Plan 2012-2017
Air Traffic Management Services Plan 2012-2017 Airservices Australia 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process
More informationEUROCONTROL. Paving the way towards UAS ATM integration. Mike Lissone
EUROCONTROL Paving the way towards UAS ATM integration Mike Lissone European Organisation for the Safety of Air Navigation: EUROCONTROL To harmonise and integrate Air Navigation Services in Europe, aiming
More informationAustrian Participation in SESAR. Frequentis SESAR Head Negotiator: Johannes Gio Prinz
Austrian Participation in SESAR Frequentis SESAR Head Negotiator: Johannes Gio Prinz Frequentis AG Communication & Information Solutions by FREQUENTIS for a Safer World! We build highly reliable communication
More informationThe CREDOS Project. Human Machine Interface Design
The CREDOS Project Human Machine Interface Design Abstract This deliverable presents the first stage of the design and development of a Human Machine Interface (HMI) to support CREDOS operations. This
More informationTHE MASTER PLAN CAMPAIGN. Workshop RPAS (WS 03) 22 January 2015
THE MASTER PLAN CAMPAIGN Workshop RPAS (WS 03) 22 January 2015 Back-up The objectives of the campaign 2 Campaign objectives Following the endorsement from the PC, SPP and ADB of the PC Tiger Team recommendations
More informationSecond draft of the SESAR 2020 R&I Programme. Edition 0.21. 07 July 2014
Second draft of the SESAR 2020 R&I Programme Edition 0.21 This document is the second draft programme document, developed with the contribution from all existing SJU Members in view of the launch of the
More informationPCP Active ECAC FCM05 REG ASP MIL APO USE INT IND NM
PCP Active ECAC FCM05 REG ASP MIL APO USE INT IND Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well as
More informationBenefits of Highly Predictable Flight Trajectories in Performing Routine Optimized Profile Descents: Current and Recommended Research
Benefits of Highly Predictable Flight Trajectories in Performing Routine Optimized Profile Descents: Current and Recommended Research Environmental Working Group Operations Standing Committee 2009 Annual
More informationCS5 EAIMS Call For Interest Technical annexe
CS5 EAIMS Call For Interest Technical annexe 1. Purpose of the technical annexe This document provides information allowing the candidates who wish to express interest in the CS5 EAIMS (European ATM Information
More informationSESAR Definition Phase - Deliverable 5. SESAR Master Plan D5
SESAR Definition Phase - Deliverable 5 SESAR Master Plan D5 DLM-0710-001-02-00 2 SESAR Master Plan SESAR Definition Phase - Milestone Deliverable 5 Preface...006 Table Of Contents Executive Summary...007
More informationCOMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)
International Civil Aviation Organization WORKING PAPER 26/1/10 English and Spanish only 1 COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP) EIGHTH MEETING Montréal, 1 to 12 February 2010 Agenda Item
More informationPreliminary Cost Benefit Analysis CS#7 Network Infrastructure Performance Monitoring and Analysis
Preliminary Cost Benefit Analysis CS#7 Network Infrastructure Performance Monitoring and Analysis Alberto Varano Principal Director Resources 8 July 2013 CBA Method Preliminary CBA at feasibility stage
More informationAnnual Work Programme 2015. 11 December 2014. Page 1 of 66
Annual Work Programme 2015 11 December 2014 Page 1 of 66 Table of Contents 1. INTRODUCTION... 5 2. SESAR JOINT UNDERTAKING... 5 2.2. MISSION... 6 2.3. VISION AND OBJECTIVES... 7 2.4. SESAR 2020 THE WAY
More informationRemote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control
Remote Tower Solutions BY SEARIDGE TECHNOLOGIES AND NAVCANatm The cost-effective alternative for airport monitoring and control Advancing Current Methods of Operations Geographic location, low air traffic
More informationPerformance management Identification of metrics
WKSP/ASBU/NAIROBI/2013-PPT/10 Performance management Identification of metrics Air Navigation Bureau WORKSHOP ON ASBU FRAMEWORK: ALIGNMENT OF REGIONAL AND NATIONAL PERFORMANCE PLANS, PLANNING, 14 October
More informationThe Virtual Centre Model
1 - Introduction Since the late 1980 s the European ANS system has gradually become unable to cope with growing traffic demand. The Single European Sky initiative of the European Commission is meant to
More informationNEFAB Project Initiative 9 Commonality of CNS/ATM Systems
NEFAB Project Initiative 9 Commonality of CNS/ATM Systems Page 1 of 20 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 3 2. DESCRIPTION OF THE INITIATIVE... 4 3. RATIONALE AND PURPOSE OF THE INITIATIVE... 5
More informationIntegrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA)
Integrated surface management Herve Drevillon (DSNA) Airport safety support tools for pilots, vehicle drivers and controllers Nicolas Leon (DSNA) Integrated surface management Herve Drevillon (DSNA) Operational
More informationFirst ATC Support Tools Implementation (FASTI) Validation Plan
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL First ATC Support Tools Implementation (FASTI) Validation Plan Edition Number : 1.0 Edition Date : 01-12-2006 Status : Released Intended
More informationADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground.
ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground. New Air Traffic Surveillance Technology Air traffic service
More informationOverview of NM and CDM
Overview of NM and CDM EUROMED ATM Kick-off Meeting Brussels, 5-6 September 2012 Joe Sultana Chief Operating Officer EUROCONTROL/Directorate Network Management European Organisation for the Safgety of
More informationSafety scanning. The development of the Safety Scanning Tool is a cooperation of
Safety scanning The development of the Safety Scanning Tool is a cooperation of Where does it fit UniKs: O. Straeter Eurocontrol: H. Korteweg NLR: M.H.C. Everdij CAA-NL: J.W. Nollet Content What is Safety
More informationNEFAB ANSP Programme Business Plan 2016-2020. ANSCB meeting 12 October 2015
NEFAB ANSP Programme Business Plan 2016-2020 ANSCB meeting 12 October 2015 NEFAB ANSP Programme Business Plan 2016-2020 Introduction: 5 year business plan 2016 2020 Strategic roadmap in the 5 year period
More informationTrends in Aeronautical Information Management
Trends in Aeronautical Information Management AIXM 5 Public Design Review February 7-8, 2006 Washington DC 1 Our objective in this briefing is to tell you about an emerging standard for aeronautical data
More informationAir Traffic Management
Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of
More informationGENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS
GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS 1. INTRODUCTION Navigation technologies with precision approach and landing systems, for civilian and military purposes, enable aircrafts to perform their
More informationAir Traffic Management. Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013
Air Traffic Management Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013 Trajectory Operations: Transformation Procedural Based Control: Control on Where We Think the Aircraft
More informationSESAR. Luftfahrttechnologie - Auftaktveranstaltung zum 7. EU-Forschungsrahmenprogramm Wien, 4 Dezember 2006
Luftfahrttechnologie - Auftaktveranstaltung zum 7. EU-Forschungsrahmenprogramm Wien, 4 Dezember 2006 SESAR Christian Pusch EUROCONTROL Experimental Centre European page 1Organisation of 22 for the Safety
More informationWP2.2.2 Benefit Assessment
WP2.2.2 Benefit Assessment Lorenzo Castelli, Paola Pellegrini, Andrea Ranieri University of Trieste 2nd CATS Worksop - 26 Jan 10 Page: 1 CATS Benefit assessment The general objective of WP 2.2.2 is to
More informationAutomatic Dependent Surveillance Broadcast (ADS-B)
Automatic Dependent Surveillance Broadcast () Surveillance development for Air Traffic Management As air traffic is predicted to increase steadily over the coming years, there is a clear need to ensure
More informationCommunication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India
Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India CNS Officers Guild 1 Airports Authority of India (AAI) is entrusted with responsibility of providing
More informationAnnual SERC Research Review (ASRR)
Annual SERC Research Review (ASRR) Implementing the Next Generation Air Transportation System Victoria Cox Assistant Administrator for NextGen October 5, 2011 What is NextGen? NextGen is not a single program
More informationSESAR BENEFITS: TOMORROW STARTS NOW
1 SESAR BENEFITS: TOMORROW STARTS NOW Integrating Rotorcraft into future European ATM Concepts Fabio Mangiaracina - SICTA (ENAV Group), Philippe Rollet - EHA The European Helicopter Association (EHA) The
More informationSWIM Concept of Operations
SWIM Concept of Operations Document information Operational Requirements & Demands concerning organisation of the Project Title ATM Information Management within the scope of the European ATM Enterprise
More informationCDM@CDG 2010. User Forum EUROCONTROL s Brussels HQ. 18 January 2011 CDM@CDG
2010 CDM@CDG User Forum EUROCONTROL s Brussels HQ 18 January 2011 CDG AIRPORT OVERVIEW Surface area :3200 ha 4 RWYs : East / West 80 km Taxiways 8 ILS CAT 3 Statistic 2009 Airport trafic: 525 000 ops (ARR/DEP)
More informationThis document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2004R0552 EN 04.12.2009 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT
More informationWhat is NextGen? NextGen is more than just a. Single project It is the integration of many projects, concepts, and technologies.
Single project It is the integration of many projects, concepts, and technologies. Program plan It is the integration of many program plans, some new and some ongoing, to deliver new service capabilities
More informationIntegration of Drones in Civil Airspace
Integration of Drones in Civil Airspace «Game of Drones» Catherine Ronflé-Nadaud February 2016 www.developpement-durable.gouv.fr DGAC /DSNA /DTI French Air Navigation Service Provider is responsible for
More informationEUROCONTROL Training Activities 2013
EUROCONTROL Training Activities 2013 Address: EUROCONTROL Institute of Air Navigation Services 12, rue Antoine de Saint Exupéry L-1432 Kirchberg Luxembourg LUXEMBOURG Telephone: + 352 43 60 611 Fax: +
More informationComprehensive European Security Approaches: EU Security Programmes. Robert HAVAS EOS Chairman of the Board
Comprehensive European Security Approaches: EU Security Programmes Robert HAVAS EOS Chairman of the Board INTRODUCTION the EOS Programmes rationale Why implementing EU Security Programmes / ASPIDA approach?
More informationBlock 0: Capabilities within our Grasp
Block 0: Capabilities within our Grasp 1 ICAO Block Upgrades Assumptions and Constraints Current ATM infrastructure and procedures will not support forecasted traffic growth Implementation of major ATM
More informationThe International Scenario
National ADS-B Implementation Programme 1 The International Scenario The ADS-B implementation programme is carried out in an European context ü Related to SESAR Implementation Package 1 (IP1) 2008 2013
More informationPLANNIN WORKING PAPER. International. Theme 1: WORK. (Presented by SUMMARY. in this paper. feasibility of. system in the future.
International Civil Aviation Organization HLSC/15-WP/3 21/11/14 WORKING PAPER SECOND HIGH-LEV VEL SAFETY CONFERENCE 2015 (HLSC 2015) PLANNIN G FOR GLOBAL AVIATION SAFETY IMPROVEMENT Montréal, 2 to 5 February
More informationHow To Manage A Plane With A-Cdm
Business Intelligence & Situational Awareness UltraAPEX: What s in it for the Customer Have you ever asked yourself any of the following questions? How consistently is my operation performing? Can I proactively
More information17.1.2009 Official Journal of the European Union L 13/3
17.1.2009 Official Journal of the European Union L 13/3 COMMISSION REGULATION (EC) No 29/2009 of 16 January 2009 laying down requirements on data link services for the single European sky (Text with EEA
More informationCNS/ATM SYSTEMS IN INDIA
CNS/ATM SYSTEMS IN INDIA Presentation at ICG02 4 th Sept-7 th Sept 2007, Bangalore M.IRULAPPAN General Manager (GNSS) Over Indian Airspace (AAI) provides Air navigation services (ANS) infrastructure Air
More informationOpening the European Sky to UAS From military to civilian
Unmanned Systems Opening the European Sky to UAS From military to civilian applications Pablo González Aerodays 2011 /Madrid/31 de March 2011 INTRODUCTION From military to civilian applications Currently,
More informationSWAT Initial steps & thoughts in Europe
SWAT Initial steps & thoughts in Europe SWAT Meeting Washington DC 24 August 2015 Sam Van der Stricht EUROCONTROL Content Setting the scene Information Management Integration Access Metadata Towards Knowledge
More informationCAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS
CNS/ATM/SG/1 Appendix C to the Report on Agenda Item 4 4C-1 APPENDIX C CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS First Edition Rev 2.0 TABLE OF CONTENTS Page 1. INTRODUCTION... 2 1.1
More informationNextGen - SESAR Data Model Coordination Group (NSDMCG) ICAO AIRM Governance Considerations
NextGen - SESAR Data Model Coordination Group (NSDMCG) ICAO AIRM Governance Considerations 1 General 1.1 Mandate The NSDMCG Terms of Reference (dated 11 October 2011) specifies the following output: Recommendations
More informationCreating the Functional Airspace Block Europe Central
Creating the Functional Airspace Block Europe Central Feasibility Study Report Version: 2.0 Document summary Objective FABEC Feasibility Study Report (FSR) Author PMO and FPSG Audience All units and members
More informationAdvanced Data Link Infrastructure Solution for Next Generation of Air Traffic Management
Advanced Data Link Infrastructure Solution for Next Generation of Air Traffic Management The Air Navigation Service Providers (ANSPs) are primarily responsible for operational Communication (Data and Voice)
More informationTransport Spectrum Tune-Up 2009. Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009
Transport Spectrum Tune-Up 2009 Aviation Spectrum Issues Eddy D Amico, RF Spectrum Manager Airservices Australia November 2009 Overview Background Importance of radio spectrum for aviation Communications
More informationEuropean ADS-B Regulation
ADS-B Workshop SP/22 European ADS-B Regulation John Law Surveillance Programmes Manager EUROCONTROL Regulators Workshop Jakarta Aug 2010 European Regulation The European Organisation for the Safety of
More informationHow To Design An Airspace Structure
Network Manager nominated by the European Commission EUROCONTROL European Route Network Improvement Plan PART 1 European Airspace Design Methodology - Guidelines European Network Operations Plan 2013-2015
More informationFrom patchwork to network:
From patchwork to network: Implementing the Single European Sky July 2011 The ATM crunch: after the liberalization of air traffic in 1990s There was an unprecedented increase of delays Why? Ageing technologies
More informationReport commissioned by the Performance Review Commission. The impact of fragmentation in European ATM/CNS
Report commissioned by the Performance Review Commission The impact of fragmentation in European ATM/CNS Prepared by Helios Economics and Policy Services April 2006 BACKGROUND This Report has been commissioned
More informationProject Execution Guidelines for SESAR 2020 Exploratory Research
Project Execution Guidelines for SESAR 2020 Exploratory Research 04 June 2015 Edition 01.01.00 This document aims at providing guidance to consortia members on the way they are expected to fulfil the project
More informationThis document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2004R0550 EN 04.12.2009 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B REGULATION (EC) No 550/2004 OF THE EUROPEAN PARLIAMENT
More informationAGENDA. Need for PENS Business Case PENS Governance Current PENS Users
PENS Introduction PENS SYMPOSIUM, Brussels, 17th-18th October 2012 Prepared by Manuel Garcia (Chairman of PSSG) AENA Presented by Detlef Schultz (Vice-Chairman of PSSG) DFS October 2012 AGENDA Need for
More information( T A C T ) C A ) I A
Air Traffic Control (ATC) AIRCOM Services and System Solutions Portfolio The SITA ATC Datalink and Voice Solutions enable Air Navigation Service Providers to deliver safety and efficiency benefits to equipped
More informationTraffic Flow Management. December 2010
Traffic Flow Management December 2010 TRAFFIC MANAGEMENT CENTERS 2 3 CFMU (EUROCONTROL) 4 CCFMEX 5 BOGOTA ATFM 6 BRAZIL ATFM 7 JAPAN ATFM 8 9 Evolution of Traffic Flow Management 1960 s Ground stop programs
More informationThe 7 th International Scientific Conference DEFENSE RESOURCES MANAGEMENT IN THE 21st CENTURY Braşov, November 15 th 2012
The 7 th International Scientific Conference DEFENSE RESOURCES MANAGEMENT IN THE 21st CENTURY Braşov, November 15 th 2012 COMMUNICATION ISSUES OF UAV 1 INTEGRATION INTO NON 1 st. Lt. Gábor Pongrácz, ATM
More informationNetwork Manager Annual Report 2012
Network Manager Annual Report 2012 June 2013 Approved by the Network Management Board on 6 June 2013 I. Building the Network Manager The European Union established under the Single European Sky (SES)
More informationAeroMACS Briefing / Update
AeroMACS Briefing / Update European activities January 2016 Nikos FISTAS EUROCONTROL Agenda Why AeroMACS for aviation? Stakeholders Current Status Next Steps 2 Agenda Why AeroMACS for aviation? History
More informationCOMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document. Proposal for a COUNCIL REGULATION
EUROPEAN COMMISSION Brussels, 10.7.2013 SWD(2013) 258 final COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT Accompanying the document Proposal for a COUNCIL REGULATION on the
More informationSES Safety and ATM/ANS Regulations - EASA activities related to MET services
SES Safety and ATM/ANS Regulations - EASA activities related to MET services 13-14 October 2015 European Conference on Meteorology for Aviation Jussi MYLLÄRNIEMI Head of ATM/ANS & Aerodromes Department
More informationThe Total Economic Value. Its application to the Single European Sky 2nd Reference Period
The Total Economic Value Its application to the Single European Sky 2nd Reference Period 1. The idea of Total Economic Value. The Total Economic Value (TEV) is a term introduced officially into the Single
More informationILS Replacement. ACI World Safety Seminar. 18 19 November 2008 Kempinski Hotel Beijing Lufthansa Centre
ILS Replacement Xiaosong Xiao, PhD Tetra Tech, Inc. Orlando, USA Contents: Ground-Based Navigation ILS Approach GNSS/SBAS Approach Comparisons between ILS and GNSS Example: Cost Analysis Between LAAS and
More informationInternational Civil Aviation Organization PERFORMANCE MONITORING OF ADS-B EQUPPED AIRCRAFTS IN INDIAN AIRSPACE
ADS-B SITF/13 IP/12 International Civil Aviation Organization AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST SEMINAR AND THIRTEENTH MEETING OF PROVISIONAL AUTOMATIC DEPENDENT AGENDA SURVEILLANCE BROADCAST
More informationSafety Management Challenges for Aviation Cyber Physical Systems
Safety Management Challenges for Aviation Cyber Physical Systems Prof. R. John Hansman & Roland Weibel MIT International Center for Air Transportation rjhans@mit.edu, weibel@mit.edu Challenges Target Level
More informationADS-B NRA deployment by DSNA
Direction Générale Direction de la Technique et Systèmes bord de Présenté par DTI/SO/3ES ADSB NRA deployment by DSNA CASCADE Workshop ADSB implementation plans Operational implementation ADSB NRA in la
More informationSITA AIRCOM Service (VHF & Satellite)
SITA AIRCOM Service (VHF & Satellite) Safety in the Air 2009 Montego Bay, Jamaica, January 28-29, 2009 Adriana Mattos ATM Business Development Manager Latin America and Caribbean Agenda SITA Ground Network
More informationRTCA SC-214 / EUROCAE WG-78 Advanced Data Communication Baseline 2 Standards. Baseline 2 Tutorial. Melbourne (FL), March 2013
RTCA SC-214 / EUROCAE WG-78 Advanced Data Communication Baseline 2 Standards Baseline 2 Tutorial, March 2013 Objectives Provide tutorial on SC214/WG78 Baseline 2 To get operational feedback from Users
More informationSpace Applications and Technologies Expo Rome, Italy February 4 6, 2010
Space Applications and Technologies Expo Rome, Italy February 4 6, 2010 Overview of the EUROCONTROL UAS Integration Activity Anders Hallgren EUROCONTROL Manager ATM Procedures 1 European Organisation for
More informationSESAR RPAS R&D ROADMAP DEVELOPMENT
SESAR RPAS R&D ROADMAP DEVELOPMENT Integration of RPAS into European ATM System R&D Definition Phase #SESAR @WorldATM_now INTRODUCTION & SETTING THE SCENE Michael Standar SESAR JU #SESAR @WorldATM_now
More informationPolska Agencja Żeglugi Powietrznej Polish Air Navigation Services Agency
Agenda: Introduction, Rules and functions of PANSA, Legal status of UAS (Europe and USA), UAS/UAV integration to polish airspace, PANSA cooperation with military and civil operators, Required solutions,
More informationPerformance-based Navigation and Data Quality
ICAO APAC AAITF/8 Performance-based Navigation and Data Quality A Commercial Data Supplier View Bill Kellogg International Relations May 6-10, 2013 Ulaanbaatar, Mongolia Jeppesen Proprietary - Copyright
More informationATM Security. Emergent challenges and opportunities focusing on increasing automation and cyber-security. Antonio Nogueras
Emergent challenges and opportunities focusing on increasing automation and cyber-security Antonio Nogueras Civil-Military Coordination Unit SECONOMICS, 5 November 2014 The European Organisation for the
More informationSpace Based ADS-B. Transforming the Way you See the Sky March, 2015. ken.mclean@aireon.com COPYRIGHT 2014 AIREON LLC. ALL RIGHTS RESERVED.
Space Based ADS-B Transforming the Way you See the Sky March, 2015 ken.mclean@aireon.com Enabling Operational Performance Communication Performance Airspace / Environment Surveillance 2 Today s Oceanic
More informationEUROPEAN CIVIL RPAS OPERATORS FORUM
EUROPEAN CIVIL RPAS OPERATORS FORUM REMOTELY PILOTED AIRCRAFT SYSTEMS CIVIL OPERATIONS EUROCONTROL RPAS regulatory status in Europe Edgar Reuber EUROCONTROL DSS/CM Current Status Civ UAS Regulation in
More informationCS#7 Network Infrastructure Performance monitoring and analysis Service (NIPS) Eric Potier
CS#7 Network Infrastructure Performance monitoring and analysis Service (NIPS) Eric Potier CS7 Project Manager 21 October 2013 CS7 Context Communication Navigation Surveillance infrastructure Basic enabler
More informationPricing Framework July 2012
Pricing Framework July 2012 Contact us: Service and Pricing Team Airways New Zealand PO Box 294 Wellington New Zealand servicefeedback@airways.co.nz www.airways.co.nz Contents 1 Introduction 4 1.1 The
More informationEvolution in Regional Aircraft Avionics
Evolution in Regional Aircraft Avionics November, 2008 Agenda Evolution in Requirements from Takeoff to Touchdown Flight Deck Evolution Overview Communication Navigation Surveillance Displays and Situational
More informationMichael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August 10-11. Federal Aviation Administration
Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University Suspending Current Belief Current practices for air traffic control, procedures and separation will not
More informationEUROCONTROL COOPERATIVE NETWORK DESIGN
i EUROCONTROL COOPERATIVE NETWORK DESIGN Implementation of the 8.33 khz Voice Channel Spacing Safety Impact Assessment Report Ref: :8.33
More informationSESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS
SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS ALESSANDRO PRISTER PROGRAMME MANAGER ER, SJU ER CALL COORDINATOR List of topics covered Call
More informationUAS Safety in Non-segregated Airspace
30 UAS Safety in Non-segregated Airspace Alan Simpson, Vicky Brennan and Joanne Stoker Ebeni Limited United Kingdom 1. Introduction Unmanned Aerial Systems (UAS) are set to become part of everyday air
More informationEquipping Our Human Resources to work in a regional framework Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration
Equipping Our Human Resources to Towards Global ATFM Delivering ATM Ops Performance via Regional Network Collaboration 18 September 2014 Beijing, China Piyawut Tantimekabut Engineering Manager Network
More information