1 PERPUSTAKAAN UMP ASSESSMENT OF FIRE DAMAGED CONCRETE STRUCTURE NUR AISHAH BINTI OMAR YAHYA Report submitted in partial fulfilment of the requirements for the award of Bachelor of Civil Engineering Faculty of Civil Engineering and Earth Resources UNIVERSITI MALAYSIA PAHANG N JUNE 2012 PERRUSTAKAANIt. UMVERSIfl MALAYSA PAHANG - No. Peojh.m.. No. Panggilan i.v rik 29 MAR 2013 C -
2 Vi ABSTRACT Forensic engineering is the application of science to the investigation of failure or performance problem. This project is about to study the effect and behaviour of concrete structure after exposed to fire and also to study about assessment of fire damaged concrete structure which is under the investigation of forensic engineering structure. This study involved the detail analysis of methodologies on assessment of fire damaged concrete structure which the information is from journal, book and article. Besides that, to know what the current method of assessment of fire damaged concrete structure, collaboration with a forensic engineering company, RNC Technology (M) Sdn. Bhd is conducted. From the collaboration, an interview was held with the experienced engineer and also two projects of fire damaged concrete structure were taken from their previous project to be the case study in this project. This study also discuss about the detail of the assessment including the testing method The case studies is discuss about the assessment of level of fire damage, whether the damage is slight damage, moderate damage or serious damage and also how the repair technique will be determine from the assessment of the investigation that made. The result shows that the different of case studies in term of different causes of fire and different level of damage of the concrete structure will apply different testing methods used and repair technique that used. Finally, based on the overall result of the case study, a general guideline of methodology's assessment of fire damaged concrete structure in forensic engineering investigation is proposed. This generai ' rnethodology is applicable for assessment of fire damaged concrete structure.
3 vii ABSTRAK Kejuruteraan forensik adalah aplikasi sains untuk menyiasat kegagalan atau masalah sesuatu struktur. Kajian mi adalah berdasarkan tentang kesan dan keadaan struktur konkrit yang terdedah kepada api dan juga tentang penilaian tentang kerosakan struktur konkrit oleh api yang mana kajian mi adalah penyiasatan di bawah kejuruteraan forensik. Kajian mi adalah berkenaan analisis terperinci tentang kesan api dan kéadaan struktur konkrit yang mana sumber yang diperolehi adalah dari jurnal, buku dan artikel. Selain daripada itu, untuk mengetahui cara semasa berkenaan kesan api kepada struktur konkrit, kolaborasi dengan satu syarikat kejuruteraan forensik, RNC Technology (M) Sdn. Bhd telah dibuat. Hasil daripada kolaborasi tersebut, temuduga telah dijalankan dengan jurutera berpengalaman dan syarikat tersebut dan dua projek tentang kerosakan api terhadap struktur konkrit dan syarikat itu telah diambil untuk dijadikan sebagai kajian kes dalam kajian mi. Kajian mi juga membincangkan tentang penilaian yang terperinci termasuklah ujian yang dijalankan. Kajian kes akan membincangkan tentang penilaian mengenai kerosakan struktur konkrit sama ada kerosakan tersebut adalah kerosakan teruk atau kerosakan tak teruk, bagaimana teknik membaiki struktur konkrit akan ditentukan dari penilaian yang dijalankan hasil daripada penyiasatan yang telah dilakukan. Keputusan menunjukkan kajian kes yang berbeza tentang api dan tahap kerosakan struktur konkrjt akan membabitkan berbeza ujian yang dijalankan dan juga teknik membaiki. Akhirnya, berdasarkan kepada keseluruhan keputusan daripada kajian kes, satu garis panduan umum tentang methodologi kes'an api terhadap struktur konkrit berdasarkan daripada penyiasatan kejuruteraan forensik dicadangkan. Garis panduan umum mi boleh digunakan untuk mana-mana penyiasatan kesan api terhadap struktur konkrit.
4 viii TABLE OF CONTENT PAGE SUPERVISOR'S DECLARATION STUDENT'S DECLARATION DEDICATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES iv vi vii viii-xii xiii xiv CHAPTER TITLE PAGE 1 INTRODUCTION 1.1 Introduction Research significant Problem statement Objectives Scope of study Expected outcome ' 4 2 LITERATURE REVIEW 2.1 Introduction Definition of fire damage General Assessment Process Assessment Of fire damaged Site Visit Visual Inspection 7-8
5 lx 2.7 Effect of Fire on Concrete Colour Spalling Crack Deformation Material Steel work and steel reinforcement Stone and brick masonry Aggregate Various Materials Level of Damage Temperature Effect of High Temperature Strength of Concrete Modulus Elasticity Fire Resistance Classification of Damage Test Method Semi and Non-destructive Testing Importance and Need of Non-Destructive Testing Non-Destructive Testing Rebound Hammer Test Detection of Reinforcement and Concrete Cover Ultrasonic Pulse Velocity Test Partially Destructive The Drilling Resistance Test Petrographic Examination Windsor Probe Test Pull-Out Tests Compressive Strength Test Destructive Testing Coring 26
6 x 2.14 Design and Repair Methods Purpose of repair/rehabilitation Temporary Support Removal of Damaged Concrete Structural Evaluation for Load Carrying Capacity 2.15 Repair of Concrete Structures Design and Implementation of Repairs 2.16 Report Reason for Writing 2.17 Conclusion METHODOLOGY 3.1 Introduction 3.2 Preliminary stage of study 3.3 Literature review 3.4 Case study 3.5 Information and data collection Interview Data analysis 3.6 Conclusion DATA ANALYSIS 4.1 Introduction 4.2 Interview Eyewitness Interview Fire Photograph Colour Cleaning Visual Inspection Crack Spalling Drawing
7 Xi Effect Fire to Concrete Structure Defects mapping Crack mapping Test method Damage Classification Repair method Case Study Case Study 1: Apartment unit on level Background Eyewitness Interview Photography Damage Testing Rebound Hammer Test Sample Removal Coring and Compressive Test Repair Investigation Methodology Flow Chart Case Study 2: Empire Subang Gallery Background Eyewitness Interview Damage Defect Mapping Test Rebound Hammer Test Ultrasonic Pulse Velocity (UPV) Petrographic Examination Coring Compressive Strength Test Design Check Repair Investigation Methodology Flow Chart Factual Report Discussion 56
8 xii 4.8 Conclusion DISCUSSION AND CONCLUSION 5.1 Introduction Methodology of Fire Damaged Concrete Structure Testing Technique Analytical Method Classification of Damage Repair Technique Discussion Conclusion Recommendation 64 REFERENCES 65-67
9 XIII LIST OF TABLES TABLE NO TITLE PAGE 2.1 Simplified visual concrete fire damage classification Summary of mineralogical and strength changes to concrete caused by heating Typical Grading Scheme for Damage Classification Physical Effects of temperatures on various materials Classification of damage Test method options for assessment of fire-damaged Structures Classification of defects mapping List of case study Classification of defects mapping Testing method of the case studies Analytical method of the case studies Classification of damage Repair technique used 62
10 xlv LIST OF FIGURES FIGURE NO TITLE PAGE 2.1 Process Flow Chart Spalling occur at the surface of concrete structure Crack ocuur Surface texture of the concrete samples exposed to different temperatures Condition of apartment damaged at kitchen Condition damaged at the room of apartment Cracks appear on the wall of the apartment Photos of fire damage concrete structure of the apartment Investigation methodology of fire damaged concrete structure on apartment at Tanjung Tuan Condition of the damaged building Picture of the damaged building Photos of fire damaged concrete structure of the Empire Gallery Subang Application of sprayed concrete to repair a floor slab soffit following removal of the fire damaged concrete Repairing element with guniting (sprayed concrete) Investigation methodology of fire damaged concrete Structure General methodology of fire damaged concrete structure Investigation 58
11 CHAPTER 1 INTRODUCTION 1.1 INTRODUCTION Forensic engineering is the application of the engineering sciences to the investigation of failures or performance problems. It is a highly specialized field of engineering practice requiring engineering expertise and knowledge of legal procedures. Forensic structural/civil engineers perform "autopsies" on components or full-sized buildings, bridges, and Other engineered constructed facilities/infrastructure in order to determine the causes and the level of damage. A secondary purpose is to determine method of repair, rehabilitation or replacement (Nguee Chin Seng, 2006) Concrete structure is the most important part or material to build up building or bridges of a construction in civil engineering. Nevertheless, it may be damage of many factors. One of the high risk factor is due to fire damage of concrete structure. The fire damage concrete structure maybe happens to old building or bridges, and it also can damage the concrete structure during the construction when it is exposed to fire. Generally, most of concrete structures exposed to fire could be retrieved and returned to service even after severe fires. In this process the damaged structural members must reach to a minimum strength, ductility and stiffness which they have Possessed before the fire. After heating concrete to the high temperatures, a series of physical and chemical reactions lead it to exhibit changes such as loss of moisture, deco mposition of aggregate particles and dehydration of cement paste. These
12 2 changes could strongly affect the structure of concrete members by reducing mechanical properties of concrete, namely the decrease in both strength and stiffness of the concrete. Also variation of brittleness of the softening behaviour is going to show more ductility with raising the temperature. To investigate and rehabilitate the mentioned structural members this point is crucial to have a good estimation on the effects of temperature on mechanical properties of concrete. Heating of concrete, due to fire or otherwise, may result in a variety of structural changes like cracking, spalling, debonding of aggregate and rebar, expansion, and chemical changes such as discoloration, dehydration, dissociation. When a concrete structure is exposed to fire, differential expansion and contraction of various components and constituents within the concrete take place. Fires has been cause of devastating structural collapses throughout history, most prominently in our mind is the failure of the World Trade Center Towers 1 and 2 in New York City on September 11, As a result of earlier catastrophic failures, building materials, such as steel, are typically insulted to protect from exposure to elevated temperatures, but concrete is commonly designed and built with no fireproofing (Buchanan, 2002) Once the concrete structure is exposing to fire, the insurer or owner may commission an investigation of the damage. These parties will often have a major interest in finding the most cost-effective solution for repairing the structure. In the most concise terms, the assessment, design and repair of fire-damaged structures consist of the following stages: i) Preliminary inspection ii) Assessment of damage iii) Testing and detailed assessment iv) Design of repairs to structural elements V) Implementation of structural repairs
13 3 1.2 RESEARCH SIGNIFICANT The effect of fire on the behaviour of concrete subjected to elevated temperatures has been widely research. This assessment on fire damage concrete structure is to determine and investigate the causes and effect of fire damage to concrete structure that exposed to fire burning or hot temperature that come from the expanding of material under the higher temperature of fire. The fire can rapidly damage the structure of the concrete when the material used is not durable to cover the concrete structure at high temperatures of fire. After a fire, the damage portions of buildings should be examined quickly and thoroughly. Once the degree of damage has been determined, damage should be assessed accurately so that rational restoration measures can be undertaken. 1.3 PROBLEM STATEMENT Concrete does not necessary perform as we would like. Even though concrete is one of the best fire-resistant and high strength products found in the construction of buildings and flatwork, once the concrete were exposed to high temperature or fire burning, the concrete structure will damage. Nevertheless, intensive heat not only affects concrete, it can weaken it to the point where the only solution without demolished or reconstruction is repair. The structure concrete will not strong which is it strength and not durable enough to stand and for the best solution is need further investigation and treatment. Assessment on the condition of the structure that damage is needed to determine whether the strength of the structure is remain the same or the strength of the structurë"js become weaker. The damage preliminary inspection and immediate measures is needed to determine the damage for securing public safety. Testing of the concrete structure is the method to determine the level damage of concrete structure whether the structure is extensive damage, slight damage or no damage.
14 4 1.4 OBJECTIVES The objectives of this study are: i) To study the effect of fire and behaviour of concrete after exposed to the fire. ii) To study the current method of assessment for fire damage to concrete structure. 1.5 SCOPE OF STUDY The main focus on this study is about the investigation of structural effect of fire damage concrete structure and also about determination of the behaviour of concrete structure after it is exposed to fire. In order to carry out the work, methods of assessment need to be establish. 1.6 EXPECTED OUTCOME Assessment is the detail investigation from analysis that made up for some cases. A good assessment is shown the best result of analysis from the investigation. The general of investigation of fire damaged concrete stricture will carry out from this study included the testing that can be used in determining the condition of the damaged concrete structure. Assessment of fire damage concrete structure is analyse to determine the type of damage and level of damage, so that the solution for the damage can be solve by the suitable repair technique for further work. A good and accurate assessment method will give a'nidea on what is the best repair technique to be used.
15 CHAPTER 2 LITERATURE REVIEW 2.1 INTRODUCTION Concrete today is widely used in construction work such as for road pavements, bridges and high-rise building structures. From the previous research, there are many investigators proved that the strength and durability of concrete will not remain the same when there are causes of fire damage to concrete structures. Many investigations have shown that concrete does not perform as well as it expected due to the effect of many factors which contribute to or cause the damage of concrete structures. The causes of fire damage and repair techniques are described and brief in this section. 2.2 DEFINITION OF FIRE DAMAGE Fire damage is refers to the damage or destruction goods and property cause by fire. In civil engineering, especially in construction work, fire damage will affect the structure of building, bridge, dam, or others. Fires occur in structures with a wide range of different types or combinations of materials for their structural members. Hence, the forensic investigator must understand the effect that heating has on a variety of different construction materials. (Jeremy Ingham, 2009)
16 6 2.3 GENERAL ASSESSMENT PROCESS Concrete structure that exposed to fire need to verify first whether the structure is safe to enter or not. There are several processes that consist in the determining of the structure safe or not. Those steps are representing in Figure 2.1: I Definition of assessment objective I Collection of background information and documents Perform Preliminary Site Visit: - Identify Follow-up Areas - Note Temperature Indicators - Determine Cleaning method Perform Detailed Evaluation: - Visual Inspection - Non-Destructive Testing - Partially-Destructive Testing Analysis: - Compare Allowable and Applied Stress - Identify Extent of Repairs Design Repairs: - Select Materials - Develop Details Final Conclusion J ^ [I Report Figure 2.1: Process Flow Chart
17 7 2.4 ASSESSMENT OF FIRE DAMAGED The aim of assessment of a fire damaged structure is to propose appropriate repair methods or to decide whether demolition of elements or the whole structure is more appropriate. 2.5 SITE VISIT The preliminary stage of assessment of fire damaged concrete structure is by visit the site which is exposed to fire damaged. During the site visit, investigation may involve in making observations and measurements on several sources, documenting existing conditions and interviewing eyewitnesses. 2.6 VISUAL INSPECTION The primary on site investigation technique is visual inspection, which records such features of collapse, distortion, deflections, degree of damage to materials and smoke damage. On site investigation of fire damaged concrete structures typically starts with visual inspection and hammer tapping, which identifies collapse, deflections, spalling, cracking, surface crazing and smoke damage. An example of a damage classification scheme suitable for fire damaged concrete structures is shown in Table 2.1.
18 Table 2.1: Simplified visual concrete fire damage classification (Jeremy Ingman, 2009) Class of damage Features observed Finishes Colour Crazing Spalling Reinforce- Cracks/ ment deflection (Decoration required) Uneffected Normal None None None None exposed 1 Some Normal Slight Minor None None (Superficial peeling exposed repair required) 2 (General Substantial Pink! Moderate Localised Up to 25% None repair loss red exposed required) 3 (Principal Total loss Pink/red Extensive Consider Up to 50% Minor! repair Whitish able exposed None required) grey 4(Major Destroyed Whitish Surface Almost Up to 50% Major/ repair grey lost total exposed distorted required)
19 9 2.7 EFFECT OF FIRE ON CONCRETE Concrete structure is the highest priority that will damage because concrete act as cover to protect steel from any other damage. Heating of a concrete in a fire causes a progressive series of mineralogical and strength changes that are summarised in Table 2.2. Table 2.2: Summary of mineralogical and strength changes to concrete caused by heating (Jeremy Ingham, 2009) Heating Changes cause by heating temperature ( C) Mineralogical changes Strength changes Dissociation of ettringite Minor loss of 105 Loss of physically bound water in aggregate strength possible and cement matrix commences, increasing (<10%) capillary porosity Decomposition of gypsum Oxidation of iron compounds causing Significant loss pink/red discolouration of aggregate. Loss of of strength bound water in cement matrix and associated commences at degradation becomes more prominent 3000C Dehydroxylation of portlandite. Aggregate calcines and will eventually change colour to white/grey 573 5% increase in volume of quartz(to-quartz- Concrete not transition) causing radial cracking around the structurally quartz grains in the aggregate useful after Release of carbon dioxide from carbonates heating in may cause a considerable contraction of the temperatures in concrete (with severe micro-cracking of the excess of element matrix) 600 C Dissociation and extreme thermal stress cause complete disintegration of calcareous constituents, resulting in whitish-grey concrete colour and severe micro-cracking Concrete starts to melt Concrete melted
20 Colour Colour of concrete will change after it is exposed to fire. Changes of colour concrete are different due to the level temperature of the fire. For temperature above 300 0C the colour of siliceous aggregate normally change to pink or red especially temperature of fire in range C. For the fire temperature in range C, the colour of siliceous aggregate will turn to whitish grey and temperature of fire in range C will change to buff. The pink or red discolouration results from the presence of iron compounds, in fine or coarse aggregate, which is dehydrate or oxidise in the range of the temperature. (N.R Short, J.A. Purkiss& S.E. Guise, 2001) According to colour image analysis made by Omer Arioz, intensity of the yellow colour increased with increase in temperature and red colour appeared when the temperature increased to 800 C. Therefore, it seemed that the results of colour image analysis may also be used to assess the level of temperature to which the concrete subjected Spalling Spalling is the loss of larger pieces or flakes of concrete. Concrete spalling is caused by the exposure of the concrete to high temperatures. Spalling itself is actually the deterioration of the concrete causing chunks of the concrete to separate from the concrete structure. The most common concrete spalling is cause by fire. Spalling of the surface layers is 'a. common effect of fires and may be grouped into two or more types. Explosive spalling is erratic and generally occurs in the first 30 minutes of the fire. A slower spalling, referred to as 'sloughing off, occurs as cracks form parallel to the fire-affected surfaces leading to a gradual separation of C oncrete layers and detachment of a section of concrete along some plane of w eakness such as a layer of reinforcement. The thermal incompatibility of aggregates and cement paste causes stresses which frequently lead to cracks, Par ticularly in the form of surface crazing. Thermal shock caused by rapid cooling from fire-fighting water may also cause cracking. (Jeremy Ingman, 2009)
21 11 Spalling may be difficult to observe during the test but may be audible to the technician. If spalling occurs the following parameters must be reported: Time when spalling occurs (if detectable) Size of the spalled particles Area of spalling and maximum depth of spalling Amount of spalled material Layers of material which are loosened during the test are assessed and reported. For example, if steel fibres are used, some of the spalled particles are still connected by one fibre to the concrete. It is also possible that a protection. system has loosened from the construction. But for some reasons which depend on the construction of the sample or test furnace this layer is still in place. Figure 2.2: Spalling occur at surface of concrete structure Crack All concrete structures crack. Cracks in concrete have many causes. Crack in c oncrete that cause by fire is different at different temperature of the fire. The ser iousness of the cracks is determined by difference level of temperature. Higher temperature will cause the bigger crack of the structure. Especially when the samples have a high bending rate horizontal and vertical cracks may occur. If this can be
22 12 observed during the test, the time when it occurs should be noted. The location, number, width and spacing distance of these cracks shall be reported. Other than crack width, depth and spacing, crack density is an important parameter in determining the seriousness of deterioration. Crack with provide a valuable information in forensic investigations cracks less than about 0.1 mm (0.004 in) are difficult to see and are not normally a cause for concern. Cracks width above 0.5 mm (0.02 in) was clearly visible and many indicate serious problem (M. Yacub & Q.Z Khan, 2006). Figure 23: Crack occur
23 Deformation Deformation of structural members and associated materials can provide valuable information to develop a heat intensity map. Table 2.3: Typical Grading Scheme for Damage Classification (Mr. Parnam Singh) ember Location Severity Description of Damage Beams, Location 1 Local surface spalling surface grey or sooty, Columns, of grid spalled patches, brown or sooty, no cracks, no Floor, etc steel exposed. 2 Surface spalling in localised areas, surface, grey or sooty-slightly pink at edges, certain areas sound hollow, minor cracks, no steel exposed. 3 Extensive spalling, surface grey, slightly pink or slightly sooty, major vertical cracks, vertical strips sound hollow, only links exposed. 4 Spalling over 50% of surface, some spalling due to sudden cooling by water, surface grey, slightly pink, slightly sooty, spalled areas grey, slightly sooty-pink edges, major vertical cracks, extensive areas sound hollow, main steel exposed, no buckling in steel Material Steel Work and Steel Reinforcement Steel is use as reinforcement in concrete to make the structure become str onger. Its strength will decrease when the steel were exposed to fire. However,
24 14 recovery of yield strength after cooling is generally complete for temperatures up to 450 C for cold-worked steel and 600 C for hot-rolled steel. Above these temperatures, there will be a loss in yield strength after cooling. (Jeremy Ingman, 2009) The effect of fire to steel work and steel reinforcement consist of reduction in physical properties distortion, axial shortening of columns, and buckling. This is all because of the heating of concrete structure that cause by fire. To assess fire damage of steel reinforcement in concrete, the visual assessment is usually backed up by taking samples and doing laboratory testing. This typically comprises testing for yield, elongation and tensile strength with the results being compared with the relevant standard for the grade of steel concerned. (Jeremy Ingman, 2009) Stone and Brick Masonry Damage of fire to stone and brick masonry is depending on the type of the brick. Clay bricks can withstand in fire of temperature around 1000 C. Other type of brick usually will damage at temperature of fire C and the damage of the brick usually can be observe by the colour change of the brick. (Jeremy Ingman, 2009) Aggregate Types of aggregate will influence the level of damage of concrete structure that exposed to fire. Different aggregate compositions will make concrete behave differently at different temperature of fire. This is because most of aggregate expand at high temperatures.
SPAM FILTERING USING BAYESIAN TECHNIQUE BASED ON INDEPENDENT FEATURE SELECTION MASURAH BINTI MOHAMAD
SPAM FILTERING USING BAYESIAN TECHNIQUE BASED ON INDEPENDENT FEATURE SELECTION MASURAH BINTI MOHAMAD A project report submitted in partial fulfillment of the requirements for the award of the degree of
Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units
Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Thomas Kline Director- Concrete Repair Solutions STRUCTURAL TECHNOLOGIES, LLC Houston, Texas USA November
Fire and Concrete Structures
Fire and Concrete Structures Authors: David N. Bilow, P.E., S.E., Director, Engineered Structures, Portland Cement Association 5420 Old Orchard Road, Skokie, IL 60077,Phone 847-972-9064, email: [email protected]
STRESS EFFECT STUDY ON 6 DIFFERENT PATTERN OF TYRES FOR SIZE 175/70 R13 SYAHRIL AZEEM ONG BIN HAJI MALIKI ONG. for the award of the degree of
STRESS EFFECT STUDY ON 6 DIFFERENT PATTERN OF TYRES FOR SIZE 175/70 R13 SYAHRIL AZEEM ONG BIN HAJI MALIKI ONG A report submitted in partial fulfilment of the requirements for the award of the degree of
PRODUCTIVITY IMPROVEMENT VIA SIMULATION METHOD (MANUFACTURING INDUSTRY) HASBULLAH BIN MAT ISA
PRODUCTIVITY IMPROVEMENT VIA SIMULATION METHOD (MANUFACTURING INDUSTRY) HASBULLAH BIN MAT ISA Thesis submitted in fulfillment of the requirements for the award of the degree of Bachelor of Mechanical Engineering
4.1. Fire damaged structures
4.1. Fire damaged structures Y. C. Wang University of Manchester, United Kingdom F. Wald, J. Vácha Czech Technical University in Prague, Czech Republic M. Hajpál ÉMI, Budapest, Hungary 4.1.1. INTRODUCTION
IMPROVING SERVICE REUSABILITY USING ENTERPRISE SERVICE BUS AND BUSINESS PROCESS EXECUTION LANGUAGE AKO ABUBAKR JAAFAR
IMPROVING SERVICE REUSABILITY USING ENTERPRISE SERVICE BUS AND BUSINESS PROCESS EXECUTION LANGUAGE AKO ABUBAKR JAAFAR A project report submitted in partial fulfillment of the requirements for the award
Building Diagnostic Tests as Assessment Tools 診 斷 樓 宇 狀 況 的 測 試 : 樓 宇 檢 驗 的 評 估 工 具
Building Diagnostic Tests as Assessment Tools 診 斷 樓 宇 狀 況 的 測 試 : 樓 宇 檢 驗 的 評 估 工 具 presented by Ir Samson K.Y. WONG Senior Accreditation Officer, Hong Kong Accreditation Service, Innovation and Technology
Experimental assessment of concrete damage due to exposure to high temperature and efficacy of the repair system
MATEC Web of Conferences 6, 06002 (2013) DOI: 10.1051/matecconf/20130606002 C Owned by the authors, published by EDP Sciences, 2013 Experimental assessment of concrete damage due to exposure to high temperature
TABLE OF CONTENTS. SUPERVISOR S DECLARATION ii STUDENT S DECLARATION iii DEDICATION ACKNOWLEDGEMENTS v ABSTRACT LIST OF TABLES
ACKNOWLEDGEMENT I would like to express my gratitude and appreciation to all those who gave me the possibility to complete this report. A special thanks to our final year project coordinator, Mr. Zamri,
Structural Audit of Buildings
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 411-416 Research India Publications http://www.ripublication.com/ijcer.htm Structural Audit of Buildings
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007
PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT November 2007 PURPOSE OF INVESTIGATION Determine possible locations of moisture intrusion into and through facade. Determine cause of horizontal and vertical
1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures
Prof. Oral Buyukozturk Massachusetts Institute of Technology Outline 1 1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures
MODELING AND SIMULATION OF SINGLE PHASE INVERTER WITH PWM USING MATLAB/SIMULINK AZUAN BIN ALIAS
MODELING AND SIMULATION OF SINGLE PHASE INVERTER WITH PWM USING MATLAB/SIMULINK AZUAN BIN ALIAS This thesis is submitted as partial fulfillment of the requirement for the award of the Bachelor Degree Electrical
By Narendra K. Gosain, Ph.D., P.E., Ray F. Drexler, P.E., and Dilip Choudhuri, P.E.
Structural Forensics investigating structures and their components Evaluation and Repair of Fire-Damaged Buildings By Narendra K. Gosain, Ph.D., P.E., Ray F. Drexler, P.E., and Dilip Choudhuri, P.E. A
JOB AGENT MANAGEMENT SYSTEM LU CHUN LING. A thesis submitted in partial fulfillment of. the requirements for the award of the degree of
JOB AGENT MANAGEMENT SYSTEM LU CHUN LING A thesis submitted in partial fulfillment of the requirements for the award of the degree of Bachelor of Computer Sciences (Software Engineering) FACULTY OF COMPUTER
BISKUT RAYA INVENTORY MANAGEMENT SYSTEM (BRIMS) NURUL AMIRAH BINTI ROSLAN THESIS SUBMITTED IN FULFILLMENT OF THE DEGREE OF COMPUTER SCIENCE
BISKUT RAYA INVENTORY MANAGEMENT SYSTEM (BRIMS) NURUL AMIRAH BINTI ROSLAN THESIS SUBMITTED IN FULFILLMENT OF THE DEGREE OF COMPUTER SCIENCE FACULTY OF COMPUTER SYSTEM & SOFTWARE ENGINEERING UNIVERSITI
Car Rental Management System (CRMS) Lee Chen Yong
Car Rental Management System (CRMS) Lee Chen Yong This report is submitted in partial fulfillment of the requirement for the Bachelor of Computer Science (Database Management) FACULTY OF INFORMATION AND
Evaluating. A Case Study
A Case Study Evaluating by Richard B. Stoddard, Washington State Department of Transportation In December 2002, a railroad tanker collision caused a fire under a prestressed concrete girder bridge crossing
Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
Construction Materials Testing. Classes of Test
Construction Materials Testing Classes of Test February 2014 Copyright National Association of Testing Authorities, Australia 2014 This publication is protected by copyright under the Commonwealth of Australia
AdMaS centre Structure of the centre: Development of Advanced Building Materials Development of Advanced Structures and Technologies
AdMaS centre (Advanced Materials, Structures and Technologies) is modern science centre and complex civil engineering research institution affiliated to the Faculty of Civil Engineering, Brno University
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
Structural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
A Study on the Flexural and Split Tensile Strengths of Steel Fibre Reinforced Concrete at High Temperatures
A Study on the Flexural and Split Tensile Strengths of Steel Fibre Reinforced Concrete at High Temperatures 1 P. Jyotsna Devi, 2 Dr. K. Srinivasa Rao 1,2 Dept. of Civil Engg, Andhra University, Visakhapatnam,
REVISION OF GUIDELINE FOR POST- EARTHQUAKE DAMAGE EVALUATION OF RC BUILDINGS IN JAPAN
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska REVISION OF GUIDELINE FOR POST- EARTHQUAKE DAMAGE EVALUATION OF RC
A STUDY OF SECURITY LIMITATIONS IN VIRTUAL LOCAL AREA NETWORK IMPLEMENTATION
A STUDY OF SECURITY LIMITATIONS IN VIRTUAL LOCAL AREA NETWORK IMPLEMENTATION By ARUMUGAM BALASUNDARAM Thesis Submitted to the School of Graduate Studies,, in Fulfillment of the Partial Requirements for
Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS
Fracture Mechanics of Concrete Structures Proceedings FRAMCOS-3 AEDIFICA TIO Publishers, D-79104 Freiburg, Germany SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS H.
EXPERIMENTAL ANALYSIS OF PASSIVE BANDWIDTH ESTIMATION TOOL FOR MULTIPLE HOP WIRELESS NETWORKS NURUL AMIRAH BINTI ABDULLAH
EXPERIMENTAL ANALYSIS OF PASSIVE BANDWIDTH ESTIMATION TOOL FOR MULTIPLE HOP WIRELESS NETWORKS NURUL AMIRAH BINTI ABDULLAH THESIS SUBMITTED IN FULFILLMENT OF THE DEGREE OF COMPUTER SCIENCE FACULTY OF COMPUTER
Metropolitan Builders Association Masonry & Concrete Standard
Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.
3 Masonry and Manufactured Stone (Interior and Exterior)
3 Masonry and Manufactured Stone (Interior and Exterior) 3.1 Efflorescence (a whitish crystalline powder) is present on masonry surfaces. Efflorescence commonly occurs on masonry surfaces. This is not
PERFORMANCE GUIDELINES
1. Foundation/Basement 17 PERFORMANCE GUIDELINES 1. FOUNDATION/BASEMENT 1.1 Efflorescence on concrete or masonry surfaces Efflorescence is the formation of a white crystalline or powdery deposit on the
MOHD KHALIL BIN ABDUL KADJR
CONSTRUCTION PLANNING AND SCHEDULING: A CASE STUDY OF "CADANGAN MEMBJNA DAN MENYIAPKAN KEJLL1YYAH SAINS UNTUK UNIVERSITI ISLAM ANTARABANGSA MALAYSIA" MOHD KHALIL BIN ABDUL KADJR A final year project report
Assessment of post-fire reinforced concrete structures: Determination of depth of temperature penetration and associated damage
Concrete Repair, Rehabilitation and Retrofitting II Alexander et al (eds) 2009 Taylor & Francis Group, London, ISBN 978-0-415-46850-3 Assessment of post-fire reinforced concrete structures: Determination
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
LIGHTNING AS A NEW RENEWABLE ENERGY SOURCE SARAVANA KUMAR A/L ARPUTHASAMY UNIVERSITI TEKNOLOGI MALAYSIA
LIGHTNING AS A NEW RENEWABLE ENERGY SOURCE SARAVANA KUMAR A/L ARPUTHASAMY UNIVERSITI TEKNOLOGI MALAYSIA LIGHTNING AS A NEW RENEWABLE ENERGY SOURCE SARAVANA KUMAR A/L ARPUTHASAMY A project report submitted
Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
Composite Design Fundamentals. David Richardson
Composite Design Fundamentals David Richardson Contents A review of the fundamental characteristics of composites Stiffness and Strength Anisotropic Role of fibre, matrix and interface Composite failure
NON-DESTRUCTIVE METHODS. CE 165: Concrete Materials and Concrete Construction
NON-DESTRUCTIVE METHODS NON-DESTRUCTIVE METHODS Purpose: quick assessment of the structure Non-Destructive Techniques Many industrialized nations currently dedicate a considerable portion of the construction
PRE INSTALLATION MANUAL
REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502)
Fame Design Ltd (10295) Plot # A-115/116,BSCIC Hosiery I/A, Narayangonj, Bangladesh (+ 23.623412, +90.478442) 18.June.2014
Fame Design Ltd (10295) Plot # A-115/116,BSCIC Hosiery I/A, Narayangonj, Bangladesh (+ 23.623412, +90.478442) 18.June.2014 Identified Priority 1 Concerns 1 st Priority 1 Concern This column was checked.
DEVELOPING AN ISP FOR HOTEL INDUSTRY: A CASE STUDY ON PUTRA PALACE HOTEL
DEVELOPING AN ISP FOR HOTEL INDUSTRY: A CASE STUDY ON PUTRA PALACE HOTEL A report submitted to the Graduate School in partial fulfillment of the requirement for the Degree Master of Science (Information
CLIENT SERVER APPLICATION FOR SERVER FARM PERFORMANCE MONITORING ABDIRASHID HASSAN ABDI
ii CLIENT SERVER APPLICATION FOR SERVER FARM PERFORMANCE MONITORING ABDIRASHID HASSAN ABDI A project submitted in partial fulfillment of the requirements for the award of the degree of Master of Computer
PROPERTIES OF MATERIALS
1 PROPERTIES OF MATERIALS 1.1 PROPERTIES OF MATERIALS Different materials possess different properties in varying degree and therefore behave in different ways under given conditions. These properties
Current Status of Seismic Retrofitting Technology
CONTENTS Current Status of Seismic Retrofitting Technology Damages of Past Earthquakes Seismic Diagnosis Method Building Control Section Urban Building Division Bureau of Urban Development, TMG Seismic
HELP DESK SYSTEM IZZAT HAFIFI BIN AHMAD ARIZA
HELP DESK SYSTEM IZZAT HAFIFI BIN AHMAD ARIZA A thesis submitted in fulfillment of the requirement for the awards of Bachelor of Computer Science (Computer Systems & Networking) with Honours Faculty of
Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
BEHAVIOUR OF HIGH STRENGTH REINFORCED CONCRETE BEAM WITH METAKAOLIN UNDER STATIC LOADING AMER BIN YUSUFF @ MD YUSOFF UNIVERSITI TEKNOLOGI MALAYSIA
BEHAVIOUR OF HIGH STRENGTH REINFORCED CONCRETE BEAM WITH METAKAOLIN UNDER STATIC LOADING AMER BIN YUSUFF @ MD YUSOFF UNIVERSITI TEKNOLOGI MALAYSIA BEHAVIOUR OF HIGH STRENGTH REINFORCED CONCRETE BEAM
Chapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
SECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
Repair and Rehabilitation of Nehru Memorial College of K.V.G. Group of Institutions at Mangalore - A Case Study
Repair and Rehabilitation of Nehru Memorial College of K.V.G. Group of Institutions at Mangalore - A Case Study Surresh Chandra Pattanaik ab, E. Gopal Krishnan b and Mohan Kumar c a School of Civil Engineering,
A STUDY ON MOTIVATION TO START UP A BUSINESS AMONG CHINESE ENTREPRENEURS
A STUDY ON MOTIVATION TO START UP A BUSINESS AMONG CHINESE ENTREPRENEURS A master project submitted to the Graduate School in partial fulfillment of the requirements for the degree Master of Business Administration,
The Strength of Concrete
Chapter The Strength of Concrete.1 The Importance of Strength.2 Strength Level Required KINDS OF STRENGTH. Compressive Strength.4 Flexural Strength.5 Tensile Strength.6 Shear, Torsion and Combined Stresses.7
MASTER S PROJECT REPORT SUMMARY
MASTER S PROJECT REPORT SUMMARY LEVEL OF SERVICE (LOS) FOR MULTILANE HIGHWAY AND ROAD ACCIDENT INFORMATION SYSTEM DEVELOPMENT OF BATU PAHAT AREA (LORIS) Prepared by: Mohd Ezree Bin Abdullah Master of Engineering
SEISMIC RETROFITTING OF STRUCTURES
SEISMIC RETROFITTING OF STRUCTURES RANJITH DISSANAYAKE DEPT. OF CIVIL ENGINEERING, FACULTY OF ENGINEERING, UNIVERSITY OF PERADENIYA, SRI LANKA ABSTRACT Many existing reinforced concrete structures in present
Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete
Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete Ming-Gin Lee 1,a, Yi-Shuo Huang 1,b 1 Department of Construction Engineering, Chaoyang University of Technology,Taichung
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE
3.0 Causes and control of cracking: 3.1 Plastic Shrinkage Cracking: It occurs within 1 to 8 hours after placing, when subjected to a very rapid loss of moisture caused by a combination of factors, which
Simulation for the Collapse of WTC after Aeroplane Impact
Simulation for the Collapse of WTC after Aeroplane Impact LU Xinzheng & JIANG Jianjing Department of Civil Engineering, Tsinghua University, Beijing, 100084 Abstract: Mechanical simulation and parameter
Hydrophobe VII., Lisbon
Hydrophobe VII., Lisbon The water repellent treatment of building materials in thermal baths Debrecen, Hungary The geothermal potential in EU János Major University of Debrecen, Faculty of Thermal baths
DEVELOP AND DESIGN SHEMATIC DIAGRAM AND MECHANISM ON ONE SEATER DRAG BUGGY MUHAMMAD IBRAHIM B MD NUJID
DEVELOP AND DESIGN SHEMATIC DIAGRAM AND MECHANISM ON ONE SEATER DRAG BUGGY MUHAMMAD IBRAHIM B MD NUJID A report in partial fulfillment of the requirements For award of the Diploma of Mechanical Engineering
September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
The International Journal Of Science & Technoledge (ISSN 2321 919X) www.theijst.com
THE INTERNATIONAL JOURNAL OF SCIENCE & TECHNOLEDGE Retrofitting of Fire Affected Structural Member in Multistorey Buildings Chandrakant PG Scholar, Department of Civil Engineering S.D.M. College of Engineering
Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)
Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.) Gyproc Plasters The cracks in cement sand plaster are an inherent feature which cannot be completely prevented but can only be controlled and
Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E)
Revision: issue 1 Date: 11 June 2014 Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E) 24 th May 2014 Structural Inspection Report Observations
Minor Cracks in Horizontal Surfaces
Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.
C O N S U L T A N T S RESUME
C O N S U L T A N T S RESUME Ed Bove, P.E. SUMMARY OF EXPERIENCE Mr. Bove possesses 28 years experience in the civil engineering field. He has been involved with investigation, design, analysis, and quality
Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
PART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia
DESIGN OF SLABS Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia Introduction Types of Slab Slabs are plate elements
Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual
BR BO-01-02 Effective from June 1, 2000 Revision: March 26, 2002 Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual (Unofficial Manual) Technical Appraisal Department, Building
16. Beam-and-Slab Design
ENDP311 Structural Concrete Design 16. Beam-and-Slab Design Beam-and-Slab System How does the slab work? L- beams and T- beams Holding beam and slab together University of Western Australia School of Civil
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS
MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS May 29, 2013 Revision B Structural Guideline for Design and Installation Holes in Composite Floor Slab Terminal 3, Departure Level
Fire-resistant barriers: background on requirements and determination method. Reading guide for test reports.
Fire-resistant barriers: background on requirements and determination method. Reading guide for test reports. Report number C 1395-1E-RA-003 d.d. May 14, 2014 Fire-resistant barriers: background on requirements
MASONRY RESTORATION Lime Putty Mortar Repointing Guide
1.0 Preparation for Lime Putty Mortar Pointing 1.1 Tools & Approach A. Grinding - When used in a controlled way, angle grinders with diamond-impregnated metal blades with a maximum 1/8-inch-thickness and
NOOR HANIRA BINTI MAHIDIN
A STUDY OF THE IMPLEMENTATION OF PROCUREMENT MANAGEMENT SYSTEM TO A PROJECT SUCCESS IN MEGA PROJECT CONSTRUCTION IN MALAYSIA: A CASE STUDY OF KUALA LUMPUR INTERNATIONAL AIRPORT 2(KLIA2) NOOR HANIRA BINTI
738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
THE APPLICATION OF EARNED VALUE MANAGEMENT IN EVENT PROJECT MANAGEMENT INDUSTRY YEOH XIN HAO
THE APPLICATION OF EARNED VALUE MANAGEMENT IN EVENT PROJECT MANAGEMENT INDUSTRY YEOH XIN HAO Thesis submitted in fulfilment of the requirements for the award of the degree of Bachelor of Project Management
STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
Design and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE
Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the
Exterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
DEPARTMENT OF ESTATE -MANAGEMENT FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING UNIVERSITI TEKNOLOGI MARA
DEPARTMENT OF ESTATE -MANAGEMENT FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING UNIVERSITI TEKNOLOGI MARA FACILITY MANAGEMENT AT HOSPITAL SULTANAH BAHIYAH, ALOR STAR This dissertation is submitted in
Ultrasonic Detection Algorithm Research on the Damage Depth of Concrete after Fire Jiangtao Yu 1,a, Yuan Liu 1,b, Zhoudao Lu 1,c, Peng Zhao 2,d
Advanced Materials Research Vols. 368-373 (2012) pp 2229-2234 Online available since 2011/Oct/24 at www.scientific.net (2012) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.368-373.2229
A Decade of Performance of FRP-Repaired Concrete Structures
A Decade of Performance of FRP-Repaired Concrete Structures Shamim A. Sheikh and S. Mukhtar Homam Department of Civil Engineering University of Toronto Toronto, Canada ABSTRACT During the last ten years,
Basics of Reinforced Concrete Design
Basics of Reinforced Concrete Design Presented by: Ronald Thornton, P.E. Define several terms related to reinforced concrete design Learn the basic theory behind structural analysis and reinforced concrete
Condition assessment and repair of antenna towers concrete foundations
Condition assessment and repair of antenna towers concrete foundations I. Banjad Pecur, N. Stirmer & B. Milovanovic Department of materials, Faculty of Civil Engineering, University of Zagreb, Zagreb,
The Concrete Life Cycle: Maintain to Sustain. Fred Goodwin BASF Construction Chemicals (EB-N) Beachwood OH
The Concrete Life Cycle: Maintain to Sustain Fred Goodwin BASF Construction Chemicals (EB-N) Beachwood OH What is Concrete? Concrete: Instant rock -just add water to make a hard wet sponge. A composite
Exploring Primary and Secondary School Students Perception towards Online Mathematics Tuition: A Case Study
Malaysian Journal of Distance Education 13(2), 61 74 (2011) Exploring Primary and Secondary School Students Perception towards Online Mathematics Tuition: A Case Study Ooi Chin Yit 1 and Lim Chap Sam 2*
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
CONSULTANCY & MATERIAL TESTING FACILITY
CONSULTANCY & MATERIAL TESTING FACILITY (CIVIL ENGINEERING DEPARTMENT) JAYPEE UNIVERSITY OF ENGINEERING & TECHNOLOGY A.B. ROAD, P.B. NO-1, RAGHOGARH, DIST: GUNA (M.P.) - 473226 Phone: 07544-267051, 267310-314,
Structural Forensic Engineering Case Study : MRR2 Project. Prof. Dr. Azlan Abdul Rahman Forensic Engineering Universiti Teknologi Malaysia
Structural Forensic Engineering Case Study : MRR2 Project Prof. Dr. Azlan Abdul Rahman Forensic Engineering Universiti Teknologi Malaysia All information and data presented in these slides are strictly