A Decade of Performance of FRP-Repaired Concrete Structures
|
|
|
- Nelson Hutchinson
- 10 years ago
- Views:
Transcription
1 A Decade of Performance of FRP-Repaired Concrete Structures Shamim A. Sheikh and S. Mukhtar Homam Department of Civil Engineering University of Toronto Toronto, Canada ABSTRACT During the last ten years, several concrete structures were repaired or strengthened with glass and carbon fibre reinforced polymers (GFRP and CFRP). These applications varied from a concrete platform in an oil refinery to bridge columns and bridge culverts along Canada s major highways to high-rise apartment and condominium buildings and a restaurant concrete structure located on the US West coast with its columns and beams submerged in the Pacific Ocean. The repaired components included slabs, beams and walls in addition to the columns. Most of the repairs were carried out to fix the damage caused by the combined effects of weather, environmental hazards such as chemical attacks and overloads. Strengthening was carried out to increase the load carrying capacity of the structural components either to resist the increased load or to compensate for the deficiencies in design and construction. Some of these structures were instrumented to measure deformations and the corrosion rate before and after the repair. Visual inspection was also carried out routinely over the years. All the structures have been found to behave in an excellent manner. No significant problems have been encountered in the performance of any of these structures. This paper describes brief details of repair of some of these structures and their performance and covers a period of about ten years. Sheikh, A Decade of Performance, 1/10
2 INTRODUCTION A vast inventory of damaged concrete structures around the world is in a dire need of repair for continued usage. The damage is caused by extreme environmental conditions, overload or simply as a result of routine aging. Environmental effects include exposure to chemicals such as chlorides, sulfates, acids, alkalis, etc., variations in temperature between freezing and thawing and changes in moisture contents. Corrosion of steel in reinforced concrete structures as a result of chloride ion ingress is one of the main reasons for concrete deterioration in areas where de-icing salt is used on roads. Design inadequacies, unsound construction practices, a lack of quality control combined with minimum maintenance have also been responsible for a substantial part of structural damage. Concrete structures discussed here include a platform in an oil refinery, bridge columns along Ontario highways, bridge culverts, and a high-rise apartment building. Eight reinforced concrete columns in a platform for a pre-heater unit in an oil refinery were damaged during construction and further deteriorated due to severe environmental conditions (Fig. 1). The columns, 610 mm square in cross-section, were first repaired with non-shrink grout and then wrapped with two layers of GFRP. Corners of the columns were rounded off to 35 mm radius before the wraps were applied. The structure is being inspected and monitored regularly. The wrapped columns have been subjected to severe environmental effects that include severe exposure to chemicals typical of an oil refinery for about 10 years and have not shown any deterioration. Several bridge columns were strengthened with carbon and glass FRP in and around Greater Toronto Area. Fig. 1 also shows a few of the repaired columns along Highway 401. In addition, bridge culverts along QEW in Burlington, also shown in Fig. 1, were upgraded with CFRP to enhance their load carrying capacity. HIGH-RISE BUILDING A high-rise building consisted of reinforced concrete slabs supported by reinforced concrete columns and walls and contained 14 floors of apartments and 4 levels of parking. At the second floor level, portions of walls and some of the columns were supported on transfer beams that extended outward to increase the width of the building at the ground floor and the parking levels (Fig. 2). The parking structure was approximately 80m long in the north-south direction and 30m wide in the east-west direction. One year after the construction was completed, cracking was observed in slabs, foundation walls, beams and columns. Some of these cracks were deemed to be structural in nature. A monitoring program was established that surveyed a total of 58 cracks for over two years. Three years after the completion of the building, maximum crack width in extensively cracked areas of slab was 0.6 mm (Fig. 3a). At several locations cracks in the suspended slabs and walls extended the entire 80m length of the building. The maximum Sheikh, A Decade of Performance, 2/10
3 (a) (b) (c) Figure 1: Structures repaired with FRP: a) oil refinery, b) highway bridge columns, and c) highway bridge culverts. Sheikh, A Decade of Performance, 3/10
4 width of the cracks in the walls was 1.4 mm. Of particular concern were the two horizontal cracks in each of the two north-south walls in parking levels P3 and P4. These cracks were located in the area of the maximum moment generated by the pressure from the retained soil (Fig. 3b). Initially the horizontal cracks were observed to vary from hairline to 0.1 mm in width but at about 30 months after Figure 2: Cross-section of the building construction, the crack widths at some shown the transfer beams on eat locations was measured to be 0.70 mm. and west sides Figure 3: Observed cracks in a) slab and b) foundation wall Sheikh, A Decade of Performance, 4/10
5 Several transfer beams were cracked but the beams (#1 in Fig. 2) located on two sides of the main entrance to the building showed extensive diagonal cracking (Fig.4). The maximum crack width in the beams was 0.7 mm when the building was less than four years old. Several columns supporting external ends of the beams displayed a number of horizontal cracks with width ranging up to 0.2 mm. In the tests carried out to simulate the behaviour of beams, walls and slabs, it was observed that steel crossing a 0.3 to 0.4 mm wide crack had yielded. The average tensile strain of steel was measured to be corresponding to a crack width of 0.4 mm in the slab tests (1). Figs. 5a and 5b show, respectively, changes in the width of a horizontal crack in a wall and a diagonal crack in a beam for about 600 days. The calculated change in the width of the wall crack as a result of temperature variation is plotted in Fig. 5c. It is obvious that the changes in crack widths in the wall and the beam do not correspond to changes in temperature indicating that these cracks are active and growing. From Fig. 5a and 5c, it can be seen that the wall crack grew by about 0.25 mm over a period of 600 days. Similar growth was also observed in beam cracks. Figure 4: Diagonal cracks in the beam Figure 5: Crack growth wall and beam Based on the condition survey, analysis of the building, design details and the construction record, the following were considered to be the main causes of structural distress (1,2,3): Differential settlement of the raft foundation, deficiency of shear reinforcement in beams, larger than specified cover to the main reinforcement in the foundation walls, smaller than specified thickness of walls, and clay backfill behind the walls instead of the specified well-graded granulated soil. The calculated applied moment on the walls exceeded the nominal flexural yield capacity and approached the ultimate capacity of as-built walls at several locations. The factor of safety against shear in the beams Sheikh, A Decade of Performance, 5/10
6 ranged between 0.45 and 1.28 while the required safety factor was approximately In addition to providing an additional support to one of the beams, retrofitting was required to strengthen the walls and the beams in the building. The primary factor in the selection of retrofitting technique was the minimization of interference in normal lives of the residents. Retrofitting with CFRP was selected as the preferred method. As mentioned above, full-scale tests were carried out on beams and slabs before carrying out the field applications. Sample results from two beams tests, shown in Fig. 6, clearly demonstrate the beneficial effects of retrofitting. The brittle shear failure was suppressed with one layer of one mm thick CFRP wrap around the section and the beam behaved in a very ductile flexural manner. The materials and techniques used in the laboratory tests were employed to retrofit beams and walls in the building. Fig. 7 shows a typical beam and a column just after wrapping with CFRP. Walls were retrofitted with 300 mm wide CFRP sheets at 300 mm clear spacing to act as flexural reinforcement. The repaired components have performed without any problems during about four years since repair. HIGHWAY BRIDGE COLUMNS Figure 6: Load-deflection behaviour control and retrofitted beam The second case study detailed here is related to a bridge on Highway 401 in Figure 7: Structure retrofitted with CFRP Toronto that was damaged primarily by the chlorides from the de-icing salt (Fig. 8). The columns are about 920 mm to 1010 mm in diameter. Most of the damage in the bridge was concentrated at the bents that are directly below the expansion joints where the joint sealant and other materials deteriorated due to extreme weather conditions and the chemicals from the de-icing salts. This allowed the water-ice-salts solution to pass through the joints to the reinforced concrete bents. As a Sheikh, A Decade of Performance, 6/10
7 result of steel corrosion, the cover concrete in columns and girders was delaminated. The spiral steel was corroded severely but the longitudinal steel bars were relatively healthy. From the tests on half-scale models of the bridge columns, the damage similar to the one shown in Fig. 8 reduced the axial load carrying capacity by about 20%-22% (4) as shown in Fig. 9. The GFRP-repaired column was able to recapture the lost strength as well as enhance the ductility of the column exceeding the performance of the original companion specimen. The field columns were subsequently repaired using the schemes developed from the test series. Repair Schemes The entire bridge was repaired in Three columns were repaired using three different repair schemes and monitored over several years. Concrete cover had spalled off in all the columns. No attempt was made to remove the contaminated concrete from the columns. Only the loose concrete that could be removed without using any force was taken away from the columns. Fig. 1b shows steps during the repair operation. Figure 8: Damaged highway bridge Figure 9: Behaviour of control and retrofitted columns under axial load Column 1 was repaired with expansive concrete grout using steel formwork (5,6). The expansive cement used was developed for special applications and has the setting properties similar to those of Normal Portland cement thus avoiding the flash set typical of most available expansive cements. About twenty hours after grouting, the formwork was removed and the column was wrapped first in polyethylene sheet and then with two layers of GFRP with fibres aligned in the circumferential direction. The polyethylene sheets were installed to avoid direct contact between GFRP and fresh concrete in an effort to minimize the effects of alkali on glass fibres. Two days after the FRP application, the column was instrumented with six strain gauges in the circumferential direction installed on FRP. Three sets of two gauges each were 750 mm apart vertically in the middle of the column height. Sheikh, A Decade of Performance, 7/10
8 Column 2 was repaired using a non-shrink concrete grout that was pumped in place. Four days later, the steel forms were removed and the column was wrapped in polyethylene sheet and two layers of GFRP. Eight days after the application of the grout, the column was instrumented in a manner similar to that for Column 1. Column 3 was patched using a rheoplastic mortar. A protective epoxy coating was applied six days later followed by the GFRP wrapping and instrumentation similar to that in Column 1. The gauges were applied eight days after the grout application. Figure 10: Lateral strain in repaired columns Test Data The average compressive strength of wrapped cylinders of expansive concrete grout varied between 44 MPa at eight days and 50.5 MPa at 93 days. The cylinders failed by rupture of the FRP wrap at an axial strain of approximately at which point the cylinder was still showing positive stiffness. Comparable peak strain in unconfined concrete is in the range of to The maximum weight loss of the specimens (75 x 75 x 300 mm) subjected to 300 freeze-thaw cycles was under 8%. Lateral strain data from the field columns is shown in Fig. 10. As expected, column 1 with expansive cement cover showed substantial expansion, while no significant lateral strain was measured in FRP in the other two columns. The maximum expansion in column 1, approximately 0.16%, was observed ten days after grouting. Lateral strain in GFRP remained fairly constant at about 10% of its rupture strain for over a year when monitoring of this data was terminated indicating stable expansive cement behaviour and no significant creep of GFRP. Table 1 shows half-cell potential measurements of three repaired columns carried out over a period of six years. The potentials can be used along with Table 2 (7) to find the probability of corrosion activity in concrete at the time of measurement. If the potential over an area is more negative than 256mV, there is a greater than 90% probability that reinforcing steel corrosion is occurring; if it is in the range of 106 to 256mV, the risk is intermediate, but the probability of corrosion is unknown; and if it is less negative than 106 mv, there is a greater than 90% probability that no reinforcing steel corrosion is occurring. Sheikh, A Decade of Performance, 8/10
9 Table 1: Results of condition survey of Leslie Street bridge Corrosion Potential (Embedded Cells, Silver/Silver Chloride) Rel. Column 1 Column 2 Column 3 Temp Hum. Top Mid. Bot. Top Mid. Bot. Top Mid. Bot. Date ( C) (%) (mv) (mv) (mv) (mv) (mv) (mv) (mv) (mv) (mv) 19-Jul Sep NA Oct Jun Jun Aug Aug In 1996, based on the average of potential measurements at three locations along the height of each column, the risk of corrosion in repaired columns 1 and 2 was high, and in columns 3 it was intermediate. In 2002, the risk of corrosion in columns 1 and 2 was intermediate and in column 3 it was low. Table 2: Ag/AgCl potential for determination of probability of corrosion Measured potential Risk of corrosion <-256 mv High (90%) -106 mv to 256 mv Intermediate > -106 mv Low (10%) Visual inspection over ten years, and field data on strain and corrosion rate indicated a sound performance of the retrofit techniques for the columns. No distress or deterioration was observed in these columns after ten years of service, and the risk of future corrosion has been reduced. CONCLUDING REMARKS Monitoring plays an important role in maintaining the health of structures and providing help when indicated by the data collected. This paper presents case studies in which FRP retrofitting was carried out for repair, strengthening and life extension of a variety of structures. These structures included bridges, apartment buildings, and refinery structures. In most cases, structures were monitored for the extent of damage and model structures were tested in a laboratory to determine the most effective repair techniques. The non-traditional materials used in the repair included high potential expansive cement and Sheikh, A Decade of Performance, 9/10
10 glass and carbon fibre reinforced polymers. While all the repaired structures were inspected regularly, some were monitored for years. Based on the laboratory studies, it is concluded that the repaired structures will have significantly better performance compared with the original structures with respect to ductility and energy dissipation. ACKNOWLEDGMENTS The Research reported here was supported by an NSERC Strategic Grant. Additional financial assistances from Ministry of Transportation of Ontario (MTO), Fyfe and Company, R.J. Watson Inc., Road Savers, Premier Corrosion, and Petro Canada are gratefully acknowledged. Data presented in Table 1 was collected by MTO. REFERENCES 1. DeRose, David and Sheikh, Shamim A., (1997), The rehabilitation of a concrete structure using fibre reinforced plastics, Research Report, Department of Civil Engineering, University of Toronto, 177 p. 2. Sheikh, Shamim, A., (1998, 2000), Evaluation of structural safety of the AAP apartment building, Reports submitted to AAP Management. 3. Collins, M. P., and Bentz, E., (1997), An investigation into the structural safety of the AAP apartment building, Reports submitted to AAP Management. 4. Sheikh, S.A., Pantazopoulou, S.J., Bonacci, J.F., Thomas, M.D.A.T., and Hearn, N., (1996). "Repair of delaminated circular pier columns by ACM". Research Report submitted to the Ministry of Transportation of Ontario. 5. Sheikh, S.A., Fu, Y. and O'Neill, M.W., (1994), "Expansive cement concrete for drilled shafts", ACI Materials Journal, 91(3), pp Sheikh, S.A., Agarwal, A.C., Pinaca, F., (1997), Repair of the Leslie Street Bridge Columns Using Glass Fibre Wraps, Six International Colloquium on Concrete in Developing Countries, Jan 4-6, Lahore, Pakistan, Ed. S.A. Sheikh and S.A. Rizwan, pp Broomfield, J.P., (1997), Corrosion of Steel in Concrete, E&F Spon, London, UK, p. 45 Sheikh, A Decade of Performance, 10/10
The Original Carbon Fiber Reinforced Polymer System
Infrastructure The Original Carbon Fiber Reinforced Polymer System Phone: 52.292.39 Toll Free: 866.38.269 Fax: 52.48.5274 282 E. Fort Lowell Rd. Tucson, AZ 8576 www.dowaksausa.com Test results are supported
Chapter 5 Bridge Deck Slabs. Bridge Engineering 1
Chapter 5 Bridge Deck Slabs Bridge Engineering 1 Basic types of bridge decks In-situ reinforced concrete deck- (most common type) Pre-cast concrete deck (minimize the use of local labor) Open steel grid
Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete
Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete Ming-Gin Lee 1,a, Yi-Shuo Huang 1,b 1 Department of Construction Engineering, Chaoyang University of Technology,Taichung
SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 3279 SEISMIC UPGRADE OF OAK STREET BRIDGE WITH GFRP Yuming DING 1, Bruce HAMERSLEY 2 SUMMARY Vancouver
Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
beams columns blast walls slabs pipes protective coatings polymer concrete Solutions Looking for Problems...
beams columns blast walls slabs pipes protective coatings polymer concrete Solutions Looking for Problems... CarbonWrap Solutions Services Turnkey Innovative Solutions and Products CarbonWrap Solutions,
Experimental assessment of concrete damage due to exposure to high temperature and efficacy of the repair system
MATEC Web of Conferences 6, 06002 (2013) DOI: 10.1051/matecconf/20130606002 C Owned by the authors, published by EDP Sciences, 2013 Experimental assessment of concrete damage due to exposure to high temperature
APE T CFRP Aslan 500
Carbon Fiber Reinforced Polymer (CFRP) Tape is used for structural strengthening of concrete, masonry or timber elements using the technique known as Near Surface Mount or NSM strengthening. Use of CFRP
SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS
Fracture Mechanics of Concrete Structures Proceedings FRAMCOS-3 AEDIFICA TIO Publishers, D-79104 Freiburg, Germany SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS H.
Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile
Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile J. Sherstobitoff Ausenco Sandwell, Vancouver, Canada P. Cajiao AMEC, Vancouver, Canada P. Adebar University of British
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT
ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE Pei-Chang Huang 1, Graduate Research Assistant / MS Candidate Yao T. Hsu 2, Ph.D., PE, Associate
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
SEISMIC RETROFITTING OF STRUCTURES
SEISMIC RETROFITTING OF STRUCTURES RANJITH DISSANAYAKE DEPT. OF CIVIL ENGINEERING, FACULTY OF ENGINEERING, UNIVERSITY OF PERADENIYA, SRI LANKA ABSTRACT Many existing reinforced concrete structures in present
Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
Example Specification for Concrete using Current Building Code Requirements
Example Specification for Concrete using Current Building Code Requirements DISCLAIMER: This specification is an example that accompanies a seminar titled The P2P Initiative: Performance-based Specs for
Assessment of corrosion-damaged concrete bridge decks - a case study investigation. Amleh, L.; Lounis, Z.; Mirza, M.S.
Assessment of corrosion-damaged concrete bridge decks - a case study investigation Amleh, L.; Lounis, Z.; Mirza, M.S. NRCC-45402 A version of this document is published in / Une version de ce document
Prestressed Concrete Pipe Fitness for Service and Repair
Prestressed Concrete Pipe Fitness for Service and Repair Rasko Ojdrovic [email protected] 781-907-9231 IAEA - EPRI 15 October 2014 www.sgh.com SGH Pipeline Experience More than 25 years of research, analysis,
MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS
MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS May 29, 2013 Revision B Structural Guideline for Design and Installation Holes in Composite Floor Slab Terminal 3, Departure Level
GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION
GARDEN CITY SKYWAY SUBSTRUCTURE REHABILITATION Issam ElKhatib, P.Eng., Dennis Baxter, P.Eng. Totten Sims Hubicki Associates, Canada Abstract The rehabilitation history of the Garden City Skyway Bridge
Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System
Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System Luis Aguiar Miami-Dade Water & Sewer Department Anna Pridmore, PhD Structural Technologies PROJECT BACKGROUND Miami-Dade Water & Sewer Department
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
Condition assessment and repair of antenna towers concrete foundations
Condition assessment and repair of antenna towers concrete foundations I. Banjad Pecur, N. Stirmer & B. Milovanovic Department of materials, Faculty of Civil Engineering, University of Zagreb, Zagreb,
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
The Strength of Concrete
Chapter The Strength of Concrete.1 The Importance of Strength.2 Strength Level Required KINDS OF STRENGTH. Compressive Strength.4 Flexural Strength.5 Tensile Strength.6 Shear, Torsion and Combined Stresses.7
Shear Strengthening. Sika CarboDur Composite Systems
Solutions with Sika Systems Shear Strengthening Sika CarboDur Composite Systems Long term tested and approved systems High strength composite systems Corrosion resistant Easy application No maintenance
Structural Audit of Buildings
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 411-416 Research India Publications http://www.ripublication.com/ijcer.htm Structural Audit of Buildings
SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY
BS 40 M6 MuCis mono SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY LE CE LE type: "expansive binder which allows the production of extremely fluid concrete
Causes and Repair Method
Point Shilshole Condominium Building Concrete Deterioration Causes and Repair Method KAMRAN M. NEMATI, PH.D., P.E. CONSULTING CIVIL ENGINEER Copyright (2006) P.O. Box 95233 Seattle, Washington 98145-2233
The International Journal Of Science & Technoledge (ISSN 2321 919X) www.theijst.com
THE INTERNATIONAL JOURNAL OF SCIENCE & TECHNOLEDGE Retrofitting of Fire Affected Structural Member in Multistorey Buildings Chandrakant PG Scholar, Department of Civil Engineering S.D.M. College of Engineering
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
Seismic Retrofit of Reinforced Concrete Beam- Column T-Joints in Bridge Piers with FRP Composite Jackets
SP-258 1 Seismic Retrofit of Reinforced Concrete Beam- Column T-Joints in Bridge Piers with FRP Composite Jackets by C.P. Pantelides and J. Gergely Synopsis: The research described encompasses laboratory
Structural Retrofitting Process and Techniques
Structural Retrofitting Process and Techniques Md. Mostafizur Rahman Sr. Business Consultant Fosroc Chemicals (I) Pvt Ltd Brief over view of FOSROC Construction Products Supplier with Manufacturing facilities
Design and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
SEISMIC RETROFITTING OF EARTHQUAKE-DAMAGED CONCRETE COLUMNS BY LATERAL PRE-TENSIONING OF FRP BELTS. K. Nasrollahzadeh Nesheli 1 and K.
Proceedings of the 8 th U.S. National Conference on Earthquake Engineering April 18-22, 26, San Francisco, California, USA Paper No. 841 SEISMIC RETROFITTING OF EARTHQUAKE-DAMAGED CONCRETE COLUMNS BY LATERAL
FLEXURAL BEHAVIOUR OF HYBRID FRP-UHPC GIRDERS UNDER STATIC LOADING
Proceedings of 8 th International Conference on Short and Medium Span Bridge Niagara Falls, Canada 21 FLEXURAL BEHAVIOUR OF HYBRID FRP-UHPC GIRDERS UNDER STATIC LOADING Donna S. M. Chen Department of Civil
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
Structural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:
SEISMIC DESIGN Various building codes consider the following categories for the analysis and design for earthquake loading: 1. Seismic Performance Category (SPC), varies from A to E, depending on how the
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE
3.0 Causes and control of cracking: 3.1 Plastic Shrinkage Cracking: It occurs within 1 to 8 hours after placing, when subjected to a very rapid loss of moisture caused by a combination of factors, which
Bridge Structural Rehabilitation Using FRP Laminates
Bridge Structural Rehabilitation Using FRP Laminates South Santiam River Quartzville Road, Linn County Linn County Road Department 2011 Cooperative Partnerships Making Linn County a Better Place to Live
STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA
STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA College of Marin c/o Swinerton Management & Consulting P.O. Box 144003 835 College Avenue, Building MS-3 Kentfield, California
Measuring the Condition of Prestressed Concrete Cylinder Pipe
Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder
BRIDGE REHABILITATION TECHNIQUES
BRIDGE REHABILITATION TECHNIQUES Yogesh Chhabra, General Manager, The D S Brown Company, 57 Pioneer Road, Singapore 628508 Web www.dsbrown.com E-Mail [email protected] Ph. +6598444104, +6565588111
1.5 Concrete (Part I)
1.5 Concrete (Part I) This section covers the following topics. Constituents of Concrete Properties of Hardened Concrete (Part I) 1.5.1 Constituents of Concrete Introduction Concrete is a composite material
The Concrete Life Cycle: Maintain to Sustain. Fred Goodwin BASF Construction Chemicals (EB-N) Beachwood OH
The Concrete Life Cycle: Maintain to Sustain Fred Goodwin BASF Construction Chemicals (EB-N) Beachwood OH What is Concrete? Concrete: Instant rock -just add water to make a hard wet sponge. A composite
1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures
Prof. Oral Buyukozturk Massachusetts Institute of Technology Outline 1 1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures
Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps
Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning May 7th 2013: Dominique Deschamps Scope of the paper Presentation of the project Cause of cracks
Seismic performance evaluation of an existing school building in Turkey
CHALLENGE JOURNAL OF STRUCTURAL MECHANICS 1 (4) (2015) 161 167 Seismic performance evaluation of an existing school building in Turkey Hüseyin Bilgin * Department of Civil Engineering, Epoka University,
Current Status of Seismic Retrofitting Technology
CONTENTS Current Status of Seismic Retrofitting Technology Damages of Past Earthquakes Seismic Diagnosis Method Building Control Section Urban Building Division Bureau of Urban Development, TMG Seismic
Culvert Repair, Materials, and Structural Design 4.4-1
Culvert Repair, Materials, and Structural Design 4.4-1 4.4 Culvert Materials 4.4.1 General Culverts are primarily made with reinforced concrete, corrugated metal, and more recently, solidwall, profile
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
2009-12-23 ICS: 93.160. Strengthening retrofitting of reinforced concrete structures by gluing of fibre reinforced polymeric fabrics (FRP fabrics)
36888 ежглеяис тгс йубеямгсеыс (теувос еутеяо) 20091223 ICS: 93160 150114010801:2009 H HELLENIC CHNICAL SPECIFICATION (FRP ) Strengthening retrofitting of reinforced concrete structures by gluing of fibre
REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK
REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE Danijel Tenžera, Krešimir Futivić, Boris Ukrainczyk Summary Bridge structures deteriorate with years of use and exposure to adverse environmental
Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,
Volume, Special Issue, ICSTSD Behaviour of Steel Bracing as a Global Retrofitting Technique Miss S. S. Nibhorkar M. E (Structure) Scholar, Civil Engineering Department, G. H. Raisoni College of Engineering
ASHULIA APPARELS LTD. Client Summary Report
Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary
Chapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
Reinforced Concrete Design
FALL 2013 C C Reinforced Concrete Design CIVL 4135 ii 1 Chapter 1. Introduction 1.1. Reading Assignment Chapter 1 Sections 1.1 through 1.8 of text. 1.2. Introduction In the design and analysis of reinforced
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
THE EAGLE RIVER BRIDGE SUPERSTRUCTURE REPLACEMENT
Proceedings of 8 th International Conference on Short and Medium Span Bridges Niagara Falls, Canada 2010 THE EAGLE RIVER BRIDGE SUPERSTRUCTURE REPLACEMENT Biljana Rajlic Hatch Mott MacDonald, Canada Philip
REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE
Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the
EVALUATION OF THE PERFORMANCE OF THE PROTECTIVE SURFACE COATINGS FOR CONCRETE
EVALUATION OF THE PERFORMANCE OF THE PROTECTIVE SFE COATINGS FOR CONCRETE Haimoon CHEONG * Hwangu YU *2 Taesong AHN *3 Byunghwan OH *4 ABSTRT: Chloride penetration into concrete is the main cause of the
OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES
ROAD PAVEMENTS FORUM TWENTY-FIFTH MEETING 7 May 2013 OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES Michael Roux (CSIR Built Environment) Acknowledgements SANRAL Team Members:
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
Hardened Concrete. Lecture No. 14
Hardened Concrete Lecture No. 14 Strength of Concrete Strength of concrete is commonly considered its most valuable property, although in many practical cases, other characteristics, such as durability
Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units
Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Thomas Kline Director- Concrete Repair Solutions STRUCTURAL TECHNOLOGIES, LLC Houston, Texas USA November
Project Report. Structural Investigations Hotel del Sol Yuma, Arizona
Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,
Numerical modelling of shear connection between concrete slab and sheeting deck
7th fib International PhD Symposium in Civil Engineering 2008 September 10-13, Universität Stuttgart, Germany Numerical modelling of shear connection between concrete slab and sheeting deck Noémi Seres
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
Seismic Risk Prioritization of RC Public Buildings
Seismic Risk Prioritization of RC Public Buildings In Turkey H. Sucuoğlu & A. Yakut Middle East Technical University, Ankara, Turkey J. Kubin & A. Özmen Prota Inc, Ankara, Turkey SUMMARY Over the past
Repair and Rehabilitation of Nehru Memorial College of K.V.G. Group of Institutions at Mangalore - A Case Study
Repair and Rehabilitation of Nehru Memorial College of K.V.G. Group of Institutions at Mangalore - A Case Study Surresh Chandra Pattanaik ab, E. Gopal Krishnan b and Mohan Kumar c a School of Civil Engineering,
Strengthening of Brick Masonry Walls against Earthquake Loading
International Journal of Advanced Structures and Geotechnical Engineering ISSN 2319-5347, Vol. 01, No. 01, July 2012 Strengthening of Brick Masonry Walls against Earthquake ing KHAN SHAHZADA, MUHAMMAD
REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE
Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE
September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900
September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation
The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.
QUALITY INSIDE When it comes to long life piping for drinking water, sewage, industrial water or gas, there is one name that continues to lead the way - ECOPUR by vonroll. Delivering precision-engineered
THE EFFECT OF STIRRUPS AND HOOKED STEEL FIBERS INSTEAD ON MOMENT-ROTATION CAPACITY OF BEAM-COLUMN CONNECTIONS
THE EFFECT OF STIRRUPS AND HOOKED STEEL FIBERS INSTEAD ON MOMENT-ROTATION CAPACITY OF BEAM-COLUMN CONNECTIONS Assist. Prof. Dr. S. KamilAkın 1, Assist. Prof. Dr. Nail Kara 1, 1 Department of Civil Engineering,
Building Foundation and Structure
Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original
External Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902
External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
How To Repair A Steel Pier With A Watertight Frame
INNOVATIVE FRP PILING REPAIR WITHOUT THE USE OF COFFER DAMS Steve Bazinet, Larry Cercone, Franz Worth Air Logistics Corporation Field-Applied Composite Systems Group Pasadena, California 91107 ABSTRACT
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Early-Age Repair Material Properties & Early Age Repairs Fred Goodwin Fellow Scientist BASF Construction Systems
Early-Age Properties of Repair Binders (Lab, Field and Test Methods) Tuesday, April 16, 4:00 PM -6:00 PM, C-101 D Early-Age Repair Material Properties & Early Age Repairs Fred Goodwin Fellow Scientist
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary