Planning and Designing Data Centres
|
|
|
- Nicholas Walker
- 10 years ago
- Views:
Transcription
1 ABSTRACT There are many schools of thought on data centre design and implementation. Each has its own benefits and challenges. Organisations will have to consider the specific business needs to come up with their requirements and designs for their data centres. Usually, these data centres are based on unique design concepts, taking into account industry best practices and infrastructure constraints. This article shares some of the design considerations and implementation approaches for data centres. Yee Keen Seng Wu Xianghua Lim Hwee Kwang Wong Marn Chee Ang Choon Keat
2 102 Planning and Designing INTRODUCTION Data centres house two of an organisation s most valuable assets data and IT systems. Well-designed data centres based on a robust strategy will enhance the availability and reliability of the IT services to the end users. This allows organisations to respond efficiently and effectively to business demands and challenges, which is a critical success factor for organisations. This article discusses some of the basic but key considerations for planning and designing data centres, which are dependent on the organisation s business needs, tolerance for failures and availability of budget. However, certain aspects of the data centre such as total space and structural loading cannot be changed without major redevelopment of the data centre and disruptions to day-today operations once it has been built. Thus, it is critical that these aspects are given due consideration during the planning phase. NEED FOR DATA CENTRE STRATEGY Some organisations use commercial data centres to host their IT systems while others prefer to build their own data centres for the purpose of security and control, among other reasons. As part of the organisation s overall IT masterplanning, a data centre strategy must be developed, including the decision Building Construction Components Single Data Centre Four Mechanical and Electrical (M&E) Systems Infrastructure IT Common Services Infrastructure (Transmission/Network, Security, Storage, etc) Usable Space for Business IT Systems (Assuming IT Infrastructure Common Services take up Y rack space) Assumed similar cost One Set One Set X Y Table 1. A comparison of infrastructure requirements on the number of data centres and their locations. For operational efficiency and cost effectiveness, it seems attractive to consolidate IT systems into a single data centre. When space, power and cooling capacities are optimised, developmental and operational costs of the data centre are reduced. Centralising the IT systems also minimises the human resources used for managing the IT systems. When operations are conducted in close proximity to one another, processes can also be streamlined more effectively. However, if the single data centre fails, the entire organisation may be brought to a halt. Distributing the IT systems over multiple data centres at different sites provides the required resiliency to the organisation. The organisation will not lose all of its operational capabilities should one of its data centres fail. Certain business units or functions may not be available but the rest of the organisation can continue with their daily operations. However, multiple data centres require IT infrastructure to be set up at multiple sites. More manpower may be required to conduct and coordinate operations at the various sites which would increase the developmental and operational costs. Table 1 illustrates the various considerations in deciding between building a single data centre and four smaller data centres. Assumed similar cost Four Sets Four Sets X 4Y It can be seen that the option of building four data centres requires an addition of three sets of M&E systems infrastructure and IT common services infrastructure. Space will also be taken up by the IT common services infrastructure built at each data centre, effectively reducing the total usable space for the business IT systems of the organisation. With four data centres, the M&E systems and IT common services infrastructure at each data centre may be smaller in capacity, but the total cost of ownership will be higher as compared to having a single data centre. To balance resiliency and cost, most organisations will have two to four data centres to support their business requirements, and a reliable disaster recovery plan for these data centres. SPACE The organisation has to determine the amount of space required for each data centre. Undersizing the data centre may result in it running out of space quickly and new data centres may need to be built frequently. This may go against the organisation s data centre strategy and incur additional costs. On the other hand, oversizing may lead to wastage of resources and space that could be put to better use. It is relatively easy for an organisation to know what it needs now and probably for the next three years. However, it is very difficult to forecast the requirements for the next years given the rapid changes in technology and business. One possible way of estimating the space requirement is to look at the historical IT growth of the organisation and assume the same rate of growth for the next years. However, this approach has a potential pitfall the focus and initiatives undertaken by the organisation in previous years may differ significantly from those of the next few years. In that case, there may be undersizing or oversizing of the data centre space requirements. Besides analysing the historical IT rate of growth, it is useful to review the initiatives that the organisation has carried out over the last few years and study its envisioned state of IT maturity. This will help to determine the future initiatives of the organisation, normalise the spikes and troughs of the IT requirements and give a better projection of the space required for the data centres. For example, if the organisation is planning to implement projects such as knowledge management or video content management, the data centre space will increase significantly due to large storage requirements of these projects. On the other hand, if the organisation is embarking on an IT consolidation or virtualisation path, there may be a reduction in space requirements for IT infrastructure over time. ARCHITECTURAL The practice of architecture is primarily concerned with the principles of durability, functionality and human comfort. While the first two principles can be quantitatively satisfied, the solution to the third is not as straightforward. Designing a building for servers presents a unique challenge as it may not be intuitive to the architect, who designs spaces for humans instead of machines. In a data centre, optimal working environment of computer servers takes precedence over human comfort. Thus, M&E requirements drive the design of the data centre and its organisational principles. However, the needs of operators should not be neglected. The architectural design serves to complement the layout of the data centre in ensuring that circulation patterns are logical and conform to building codes and regulations. For example, circulation spaces can be designed to allow natural lighting this can relieve operators of the stress from working in a hermetic environment. It may be useful to separate administrative areas from data centre rooms as they have 103
3 104 vastly different spatial requirements. While the data centre rooms require a hermetic and closed environment with large slabto-slab heights, the administrative areas should be open to natural lighting without large vertical spaces. One possible way of resolving the different requirements is to consolidate all the administrative areas on a separate floor or in a wing. This strategy will also aid in compartmentalising the building according to use, security requirements and susceptibility to fire hazards. STRUCTURAL LOADING modification is made to the building structure. Today, a rack fully occupied with equipment such as blade servers and storage area networks may weigh 600-1,000kg. The structure must be adequate for supporting a loading of approximately 10-13kN/sqm. This is in contrast to the designed loading of 5kN/sqm adopted in many buildings. In the future, IT equipment is expected to be heavier due to the incorporation of more electronic components. This means that future data centres should have a structural loading higher than 13kN/sqm. New data centres built today are generally designed to support 15-25kN/sqm in structural loading. Tier Requirement Tier 1 Tier 2 Tier 3 Tier 4 Power Supply to Data Centre 1 1 M&E Systems Supporting IT Equipment (e.g. Generators, Chillers, UPS, CRAC Units) Downtime Required during Maintenance 2 (One Primary, One Backup) 2 (Both Primary) N N+1 N+1 2(N+1) Yes Yes No No Data Centre Availability 99.67% 99.74% 99.98% 99.99% Data Centre Downtime Per Year ~28.8hrs ~22.0hrs ~1.6hrs ~0.4hrs Relative Cost* Low Medium (~22 Tier 1s) High (~2 Tier 2s) Very High (~2 Tier 3s) The required loading on the structure of the data centre is an important consideration for the design of the data centre building. This is normally specified in terms of distributed floor loading and expressed in kilo Newtons per square metre (kn/sqm). The building structure must be adequate to support the weight of the equipment required in the data centre. Structural loading considerations are critical for the safety of the entire building where the data centre resides. Overloading the building structure may eventually render the building unsafe for occupancy. In the worst case scenario, it may even cause the building to collapse. Hence, it is important to consult a qualified structural engineer before placing an exceptionally heavy piece of equipment in the data centre during the operational phase. There are several methods to manage the scenario where the weight of equipment is heavier than the structural loading. One way is to load each rack with less equipment and increase the number of racks used. An alternative is to use spreaders usually a metal plate strong enough to hold the rack and equipment to distribute the weight over a wider area. These two methods will reduce the usable space for IT in the data centre. A qualified structural engineer will also need to be consulted before any POWER AND COOLING M&E systems can easily make up more than 60% of the total developmental cost of a new data centre and is thus a major cost component. M&E systems include electrical substations, chillers, backup generators, uninterrupted power supplies (UPS) and computer room air-conditioning (CRAC) units. Careful consideration of the power and cooling requirements is required to implement M&E systems of an appropriate size to avoid wastage of resources. The power and cooling capacities to cater for a data centre depend on the type of IT equipment to be deployed. A single rack can pack more blade servers providing more computing resources per rack than rack-mount servers. However, blade servers generally require higher power and cooling capacities than the rack-mount servers. More space may be required for cooling which in turn reduces the advantage of space efficiency when adopting blade servers. For instance, a standard IT rack can pack about 32 full-height blade servers or 64 halfheight blade servers, which require power and cooling capacities of approximately Kilowatts (kw) per rack. A similar rack can pack about 20 rack-mount servers, * Relative Cost is a general industry assessment and not part of the TIA-942 Standards. Table 2. Data centre availability tiers by the Uptime Institute requiring power and cooling capacities of approximately 10kW per rack. Thus, there is a two or three-fold increase in power and cooling requirements for racks of blade servers as compared to racks of rack-mount servers. To determine the right size of the power and cooling requirements for the data centre, it is important for the organisation to set a direction for the equipping of IT infrastructure. The organisation can chart the power and cooling requirements in phases over the life cycle of the data centre. However, when the data centre is first built, space needs to be provisioned for the amount of M&E systems to support the eventual power and cooling requirements. REDUNDANCY Although not mandatory, most of the data centres today adopt the TIA-942 Telecommunications Infrastructure Standards for Data Centre in their designs. Four data centre availability tiers, defined by the Uptime Institute, are incorporated into the TIA-942 guidelines which specify the redundancy and tolerable unplanned downtime for a data centre. Table 2 provides a summary of the four data centre availability tiers. Table 2 shows the various configurations for the design of M&E systems e.g. N+1. N refers to the minimum number of M&E equipment required to support all the operations of a data centre and + X means that there are X spare systems to back up the main systems. It is very expensive to set up a 2(N+1) configuration at Tier 4. M&E systems contribute significantly to the cost of a data centre. Unless there are very critical operations to support, most organisations will settle for a lower data centre requirement or just the N+1 configuration. The N+1 configuration means that maintenance of the M&E systems will be carried out one at a time. The single spare system will fill the gap while the maintenance is ongoing. This is feasible if the data centre is small. However, if the data centre is large with numerous units of M&E equipment, the entire maintenance process may spread over days, weeks or even months since only one system can undergo maintenance at a time. 105
4 106 Most importantly, the N+1 configuration means that the data centre cannot afford to fail during the maintenance of the M&E systems. During maintenance, when one of the M&E systems shuts down, the spare M&E system will be activated to take on the load of the inactive system. If the spare M&E system fails at this point in time, there will not be another M&E system available to activate and support the load from the IT systems. Hence, some IT systems will be affected. To overcome these potential shortcomings, many organisations design their data centres with N+2 or N+3 configurations. In case a failure occurs during maintenance, the second or third spare system can be activated to support the power and cooling loads. GREEN DATA CENTRE There is an increasing focus for data centres to be green. A green approach to design ensures that a building is environmentally friendly and resource-efficient throughout its life cycle from construction to demolition. Going green brings tangible savings to the organisation not only through reduced power consumption, but also in the form of greater durability and economical usage of natural resources. In addition, a green environment also benefits the occupants of the building. For example, maximising natural lighting in administrative office areas or using low volatile organic compound paints can lead to a more conducive working environment and increased productivity. Energy efficiency in server rooms can often be achieved with simple and inexpensive measures. For example, installing blanking panels in racks and arranging the racks into hot and cold aisles will improve the airflow dynamics and raise the cooling efficiency. In administrative areas, natural lighting can be used to lessen lighting loads. It is important to determine the right size of M&E systems to ensure requirements are met adequately. In anticipation of future needs, some organisations tend to oversize data centres while equipping M&E systems. Oversizing results in higher developmental costs when purchasing more and bigger M&E equipment, as well as higher operational and maintenance costs. During operations, higher energy consumption will be required to power the oversized M&E systems performing at an inefficient level. The higher energy consumption to support an oversized M&E system is a waste of energy. The organisation should adopt a modular approach and equip the M&E systems when required. With advancement of technologies and the manufacturers increasing focus on being environmentally friendly, most M&E systems and IT systems are designed for energy efficiency. For example, linking temperature sensors to smart CRAC units to vary the cooling capacity of the data centre can lead to substantial savings in energy consumption. Rainwater can be harvested to cool plant systems so as to conserve water. These technologies may incur slightly higher data centre developmental costs but great savings will be reaped in the life cycle operational costs. Thus, they should be deployed for the data centre as far as possible. The standards for green data centres are evolving, spearheaded by organisations like the Green Grid at the international level as well as the Building and Construction Authority (BCA), Infocomm Development Authority of Singapore (IDA) and SPRING Singapore on the local front. SPRING Singapore has published the Singapore Standard for Green Data Centre Energy and Environment Management Systems (SS 564 : 2010) in January 2011, enabling an organisation to plan, build, operate and maintain a green data centre, by establishing the systems and processes to manage and improve the data centre s energy performance. These standards should be considered for adoption if they do not compromise security or cardinal business requirements. SECURITY AND OPERATIONAL A well-designed data centre will consider not only the availability and reliability of the data centre facilities, but also security and operational requirements. Crucial organisational information is housed in the data centre. Thus, it is imperative that the data centre is kept secure to prevent data leakage and sabotage. Multi-layer security implementation is recommended. All personnel at the data centre including staff and visitors must be screened and cleared by the security department. Access to the data centre should be restricted such that only authorised personnel are allowed to enter the areas that they are required to work in or visit. All equipment in the data centre should also have security locks or equivalent safety measures to control physical access to them. Activities in critical operational areas of the data centre should also be monitored and recorded. In addition to these basic security measures, data centres should also consider implementing more advanced technologies, such as active radio frequency identification and sensors, to track the actual location of people in the data centre. It should come with an alarm system to detect people who have entered areas without authorisation. Some consultants may recommend triple authentication access measures using cards, passwords and biometrics. However, the actual additional security achieved should be measured in the context of multi-layer security architecture. The cost incurred in implementation, security administration and operations should be balanced with the additional security achieved. Operational workflows have to be formulated around security policies and implementation. The internal data centre has to be designed to meet these operational workflows. Essentially, form should fit function. For example, areas outside servers should be created as service corridors to house CRAC units. Thus, CRAC service personnel do not need to have physical access to the servers during maintenance of the CRAC units. Printers and backup devices should be housed in separate rooms from the server areas. Such measures enhance operational workflows as the personnel servicing different subsystems do not need to share physical space and obstruct one another. Security measures and operational efficiency may not always be aligned. Depending on how crucial the data centre is to the organisation, different levels of security implementation may be needed. In all cases, the data centre design should give due consideration to the operations of the data centre. Where there are conflicts, security usually takes precedence over operational efficiency. VIRTUALISATION In addition to data centre design considerations, IT strategies and implementation plans also play an important role in enhancing the efficiency of a data centre in terms of space, power and cooling utilisation. Most servers are operating at a utilisation rate of only approximately 15-20% when running a single business application. Most servers also use approximately 40-50% of their power capacities when idle. An organisation can address this inefficient use of IT resources using virtualisation. With virtualisation, multiple business applications can run on a single physical server. This increases utilisation and power efficiency of servers. At the same time, it reduces the number of servers deployed, leading to fewer idle servers expending data centre power and cooling capacities, as well as better utilisation of space in the data centre. 107
5 108 PUTTING IT TOGETHER Organisations can consider starting with two data centres. It is not advisable to have just one data centre as its failure will affect the survivability of the organisation. Cardinal IT systems that house critical business applications and data can be split between two data centres. This will maintain at least 50% of the operations if one of the data centres fails. A modular build-up approach can be used to size data centres. M&E systems should be built and equipped based on anticipated requirements for the next five years. Sufficient space has to be catered for future expansion of the data centre. Assuming that future technologies have a smaller requirement for space as compared to current technologies, it is likely that future equipment can fit into the space reserved for expansion. This reserved space can be used as temporary offices or storage rooms until the need for data centre expansion arises. The challenge remains in the accurate estimation of power and cooling capacities. The increasing emphasis on being environmentally friendly may lead to the BIOGRAPHY emergence of future technologies with lower power and cooling requirements. However, it is more likely that smaller footprints would lead to more equipment packed into the data centre, leading to increased demand for power and cooling capacities. Fortunately, not every piece of equipment has high power and cooling requirements e.g. network equipment. Based on industry trends, many organisations are designing their data centres for an average power utilisation rate of 10kW per rack for current requirements and possibly provisioning for 20kW per rack for future requirements. CONCLUSION Given the large investments in data centres, organisations should plan their data centres properly, consider their available budget and tolerance for failures and disruptions. The organisation must anticipate its immediate and long-term business needs and align them with its IT strategy. REFERENCES Telecommunications Industry Association TIA-942 Telecommunications Infrastructure Standards for. Yee Keen Seng is a Senior Engineer (Infocomm Infrastructure). He is currently involved in planning, designing and developing the first purpose-built data centre for the IT systems of the Ministry of Defence (MINDEF) and the Singapore Armed Forces (SAF). He oversaw several best-sourcing projects including the provision of shared services and end-user IT support to MINDEF and the SAF. Keen Seng served in the SAF Chief Information Officer Office where he managed the development and governance of the SAF Enterprise Architecture Framework as well as pioneered the Ops-Admin Systems Integration initiative. Keen Seng is certified by Enterprise Products Integration (EPI) as a Data Centre Professional and a Data Centre Specialist. He holds a Bachelor of Science (Information Systems and Computer Science) degree from the National University of Singapore (NUS). Wu Xianghua is an Architect (Building and Infrastructure). He is working on the future expansion of the SAFTI Military Institute. Xianghua received his Bachelor of Architecture degree with First Class Honours, with a minor in Architectural History from Carnegie Mellon University. He also obtained numerous awards for his design work and for being the top graduate in the architecture programme. Lim Hwee Kwang is an Assistant Director (Infocomm Infrastructure). Working with MINDEF and the SAF, he strategises and develops the masterplan for key Infocomm infrastructure ranging from data centres to messaging infrastructure. He leads, directs and manages the development, implementation and engineering support of information infrastructure. Hwee Kwang co-developed the Civil Service-wide Secure Messaging System with the Infocomm Development Authority of Singapore. He also designed and implemented enterprise-wide Public Key infrastructure and authentication solutions. Hwee Kwang holds a Master of Science (Information Security) degree from Royal Holloway, UK and a Master of Science (Management of Technology) degree from NUS. He further attained the Chief Information Officer Certificate as a Top Distinguished Graduate in the National Defense University, US in Wong Marn Chee is a Senior Engineer (Infocomm Infrastructure) and the Head of Defence Technology Tower Computer Centre. He oversees the development, engineering support and IT operations of the computer centre. Marn Chee plays a key role in the development of Enterprise Server Farms for MINDEF and the SAF. He has many years of experience in designing, architecting, implementing and managing the engineering support for the server farms and their common network services. Marn Chee received his Bachelor (Electrical Engineering) degree with Honours from Nanyang Technological University in Ang Choon Keat is a Senior Engineer (Building and Infrastructure) and works on planning, designing and managing protective building and infrastructure developments. He is a registered Professional Engineer (Civil) in Singapore. Choon Keat was previously Manager (Plans) at the Defence Research and Technology Office where he was involved in the management of the MINDEF Research and Technology portfolio. He graduated with a Master of Engineering (Civil Engineering) degree from Imperial College London, UK in 1999 under the DSTA Undergraduate Scholarship. He further obtained a Master of Science (Operations Research) degree from Columbia University, US in 2005 under the DSTA Postgraduate Scholarship. Choon Keat is currently pursuing a Doctor of Philosophy (Management of Technology) degree from NUS. 109
Server Room Thermal Assessment
PREPARED FOR CUSTOMER Server Room Thermal Assessment Analysis of Server Room COMMERCIAL IN CONFIDENCE MAY 2011 Contents 1 Document Information... 3 2 Executive Summary... 4 2.1 Recommendation Summary...
Office of the Government Chief Information Officer. Green Data Centre Practices
Office of the Government Chief Information Officer Green Data Centre Practices Version : 2.0 April 2013 The Government of the Hong Kong Special Administrative Region The contents of this document remain
Estimation Model for Integrated Logistics Support Cost and Annual Recurrent Expenditure in C3 Projects
Estimation Model for Integrated Logistics Support Cost and Annual Recurrent Expenditure in C3 Projects ABSTRACT In defence acquisition and development projects, the costs of Integrated Logistics Support
Airflow Simulation Solves Data Centre Cooling Problem
Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length
Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk
Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse
Building a data center. C R Srinivasan Tata Communications
Building a data center C R Srinivasan Tata Communications Introduction Data Center as defined by TIA 942 A building or a portion of a building whose primary function is to house a computer room and its
Enabling an agile Data Centre in a (Fr)agile market
Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
Energy Efficiency Best Practice Guide Data Centre and IT Facilities
2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits
Common mistakes in datacentre planning
Common mistakes in datacentre planning White Paper Last edited: March 2013 Document Control Document Information Title Author Common mistakes in datacentre planning Nick Ewing This document is based upon
TIA-942 Data Centre Standards Overview WHITE PAPER
TIA-942 Data Centre Standards Overview WHITE PAPER TIA-942 Data Centre Standards Overview For the past 20 years, cabling standards have been the cornerstone of ensuring proper design, installation, and
Colt Colocation Services. 2010 Colt Technology Services Group Limited. All rights reserved.
Colt Colocation Services 2010 Colt Technology Services Group Limited. All rights reserved. Award winning Colt Data Centre Solutions 2012: Modular Data Centre Solution of the year winner at 5 th Datacentre
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.
European Business Reliance Centres when Commodity serves Green IT
European Business Reliance Centres when Commodity serves Green IT www.ebrc.com www.trusteddatacentre.com www.trustedcloudeurope.com www.trustedmanagedservices.com ebrc COMPANY PROFILE 5 datacenters = 17.000
Jan Kremer s Data Center Design Consultancy
Jan Kremer s Data Center Design Consultancy Datacenter Design Jan Kremer has designed a Tier Level 3 Datacenter for one of the main banks in Saudi Arabia This included Floor Plans, Power Requirements,
Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems
NER Data Corporation White Paper Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems Introduction Data centers are
Case study: End-to-end data centre infrastructure management
Case study: End-to-end data centre infrastructure management Situation: A leading public sector organisation suspected that their air conditioning units were not cooling the data centre efficiently. Consequently,
Australian Government Data Centre Strategy 2010-2025
Australian Government Data Centre Strategy 2010-2025 Better Practice Guide: Data Centre Power June 2013 17/06/2013 4:12 PM 17/06/2013 4:12 PM Contents Contents 2 1. Introduction 3 Scope 3 Policy Framework
CarbonDecisions. The green data centre. Why becoming a green data centre makes good business sense
CarbonDecisions The green data centre Why becoming a green data centre makes good business sense Contents What is a green data centre? Why being a green data centre makes good business sense 5 steps to
MEDIA RELEASE Data Centres Have More Reasons To Go Green Singapore, 14 March 2013
MEDIA RELEASE Data Centres Have More Reasons To Go Green - Launch of the Green Mark for New Data Centres Scheme - Abbott Laboratories first winner of the BCA-IDA Green Mark for New Data Centres Singapore,
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. Equinix Telecity Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 [email protected] www.telecitygroup.se
Managing Cooling Capacity & Redundancy In Data Centers Today
Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS
State of the Art Energy Efficient Data Centre Air Conditioning
- White Paper - State of the Art Energy Efficient Data Centre Air Conditioning - Dynamic Free Cooling - Release 2, April 2008 Contents ABSTRACT... 3 1. WHY DO I NEED AN ENERGY EFFICIENT COOLING SYSTEM...
Power and Cooling Capacity Management for Data Centers
Power and Cooling Capacity for Data Centers By Neil Rasmussen White Paper #150 Executive Summary High density IT equipment stresses the power density capability of modern data centers. Installation and
Which Data Center? Key factors in choosing who to trust with your IT Infrastructure
Which Data Center? Key factors in choosing who to trust with your IT Infrastructure Tarif Abboushi Vice-President of Data Center Infrastructure NTT America May, 2009 Which Data Center? Key factors in choosing
Green Data Centre Design
Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS
Introducing UNSW s R1 Data Centre
Introducing UNSW s R1 Data Centre R1-DC Our New High Density Data Centre Right here Right now - Welcome to our newest UNSW Data Centre R1-DC R1 Location on UNSW Randwick campus. Keeping it in the family
Australian Government Data Centre Strategy 2010-2025
Australian Government Data Centre Strategy 2010-2025 Better Practice Guide: Data Centre Structure August 2013 Contents Contents 2 1. Introduction 3 Purpose 3 Scope 3 Policy Framework 4 Related documents
Managing Data Centre Heat Issues
Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design
IBM Twin Data Center Complex Ehningen Peter John IBM BS [email protected]. 2011 IBM Corporation
IBM Twin Data Center Complex Ehningen Peter John IBM BS [email protected] Overview Profile IBM owned facility 6447 m² IT-Space Infrastructure concurrent maintainable (Tier Level 3) Feed-ins of Power
ICT and the Green Data Centre
ICT and the Green Data Centre Scott McConnell Sales Manager c/o Tanya Duncan MD Interxion Ireland Green Data Centres Our Responsibility Data centre greenhouse gas emissions are projected to quadruple by
Colocation Selection Guide. Workspace Technology Ltd
Colocation Selection Guide Workspace Technology Ltd Technology House 5 Emmanuel Court Reddicroft Sutton Coldfield West Midlands B72 1TJ Tel 0121 354 4894 Fax 0121 354 6447 www.workspace-technology.com
Analysis of data centre cooling energy efficiency
Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room
Specialty Environment Design Mission Critical Facilities
Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,
Reducing Data Center Energy Consumption
Reducing Data Center Energy Consumption By John Judge, Member ASHRAE; Jack Pouchet, Anand Ekbote, and Sachin Dixit Rising data center energy consumption and increasing energy costs have combined to elevate
7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
Our Cloud Offers You a Brighter Future
Our Cloud Offers You a Brighter Future Qube Global Software Cloud Services are used by many diverse organisations including financial institutions, international service providers, property companies,
Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group www.6dg.co.uk
Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. At we own and manage 30,000 square feet of highly available, geographically diverse
IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT
DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.
Data Centre Outsourcing a Buyer s Guide
Data Centre Outsourcing a Buyer s Guide The inside guide to deciding whether to outsource your data centre facility and operations and how to select an appropriate partner. This Guide will help you Determine
Dealing with Thermal Issues in Data Center Universal Aisle Containment
Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe [email protected] AGENDA Business Drivers Challenges
Data Centre Infrastructure Assessment
Data Centre Infrastructure Assessment Prepared for: ACME INC SAMPLE REPORT Attention: Mr DC Manager This report represents a generic sample data centre audit for a generic customer by Focus Group Technologies.
Agility Logistics Datacenter Trends in Enterprises. Ben N. Hasnai VP IT Infrastructure and Operations
Agility Logistics Datacenter Trends in Enterprises Ben N. Hasnai VP IT Infrastructure and Operations Agility Business Globally Head office Revenue Market position Lines of business Operations Employees
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences November 2011 Powered by DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no
Energy Management Services
February, 2012 Energy Management Services Data centers & IT environments are often critical to today s businesses, directly affecting operations and profitability. General & Mechanical Services has the
GUIDELINE. on SERVER CONSOLIDATION and VIRTUALISATION. National Computer Board, 7th Floor Stratton Court, La Poudriere Street, Port Louis
GUIDELINE on SERVER CONSOLIDATION and VIRTUALISATION National Computer Board, 7th Floor Stratton Court, La Poudriere Street, Port Louis Introduction There is an ever increasing need for both organisations
How green is your data center?
Siemens Answers: Sustainable Future How green is your data center? Istanbul June 01, 2010 Agenda 1 Solution 2 Siemens Data Center Approach 2 Designing with multiple power density zones can reduce energy
Sovereign. The made to measure data centre
Sovereign D ATA C O N N E C T The made to measure data centre Prime Location Within touching distance of everything that s important. 2 Your Customer-Centric Data Centre For the vast majority of organisations
Data Center Equipment Power Trends
Green field data center design 11 Jan 2010 by Shlomo Novotny Shlomo Novotny, Vice President and Chief Technology Officer, Vette Corp. explores water cooling for maximum efficiency - Part 1 Overview Data
Data Center Trend: Distributed Power in the White Space
Data Center Trend: Distributed Power in the White Space By Jason Anderson Product Line Manager Eaton Executive summary Cloud computing vendors and colocation data centers make every effort to maximize
Overview of Green Energy Strategies and Techniques for Modern Data Centers
Overview of Green Energy Strategies and Techniques for Modern Data Centers Introduction Data centers ensure the operation of critical business IT equipment including servers, networking and storage devices.
Energy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.
Energy Efficient Data Centre at Imperial College M. Okan Kibaroglu IT Production Services Manager Imperial College London 3 March 2009 Contents Recognising the Wider Issue Role of IT / Actions at Imperial
Data Center Rack Systems Key to Business-Critical Continuity. A White Paper from the Experts in Business-Critical Continuity TM
Data Center Rack Systems Key to Business-Critical Continuity A White Paper from the Experts in Business-Critical Continuity TM Executive Summary At one time, data center rack enclosures and related equipment
Data Center Facility Basics
Data Center Facility Basics Ofer Lior, Spring 2015 Challenges in Modern Data Centers Management, Spring 2015 1 Information provided in these slides is for educational purposes only Challenges in Modern
DATA CENTRES UNDERSTANDING THE ISSUES TECHNICAL ARTICLE
DATA CENTRES UNDERSTANDING THE ISSUES TECHNICAL ARTICLE Molex Premise Networks EXECUTIVE SUMMARY The term data centre usually conjures up an image of a high-tech IT environment, about the size of a football
HPC TCO: Cooling and Computer Room Efficiency
HPC TCO: Cooling and Computer Room Efficiency 1 Route Plan Motivation (Why do we care?) HPC Building Blocks: Compuer Hardware (What s inside my dataroom? What needs to be cooled?) HPC Building Blocks:
EU Code of Conduct for Data Centre Efficiency
EU Code of Conduct for Data Centre Efficiency A Green Practice Accredited by British Computer Society (BCS) EU Code of Conduct for Data Centre Efficiency Local Organizer Practices in Data Centre Industry
Datacenter Efficiency
EXECUTIVE STRATEGY BRIEF Operating highly-efficient datacenters is imperative as more consumers and companies move to a cloud computing environment. With high energy costs and pressure to reduce carbon
Essential NCPI Management Requirements for Next Generation Data Centers
Essential NCPI Requirements for Next Generation Data Centers By Ted Ives White Paper #14 1 Executive Summary The management of physical infrastructure in data centers can no longer be considered independently
A Quick Primer on Data Center Tier Classifications
A Quick Primer on Data Center Tier Classifications What You Should Know Before Starting a Data Center Project White Paper Abstract Data center facility projects are often driven by the Uptime Institute
Capgemini UK Infrastructure Outsourcing
Together. Free your energies Capgemini UK Infrastructure Outsourcing Project Arthur Improved Data Centre Efficiency Paul Feeney Capgemini Tony Mills Spie Matthew Hall Project Arthur The Toltec data centre,
AIR-SITE GROUP. White Paper. Green Equipment Room Practices
AIR-SITE GROUP White Paper Green Equipment Room Practices www.air-site.com Common practices to build a green equipment room 1 Introduction Air-Site (www.air-site.com) is a leading international provider
Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency
A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency
Power and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
Increasing Energ y Efficiency In Data Centers
The following article was published in ASHRAE Journal, December 2007. Copyright 2007 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes
Strategies for Deploying Blade Servers in Existing Data Centers
Strategies for Deploying Blade Servers in Existing Data Centers By Neil Rasmussen White Paper #125 Revision 1 Executive Summary When blade servers are densely packed, they can exceed the power and cooling
Data center upgrade proposal. (phase one)
Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The
Modular Chiller Plants for data centers. Downtime isn t acceptable
Modular Chiller Plants for data centers Downtime isn t acceptable Reducing risk with Quick Start A direct solution to your most important challenge uptime. At Johnson Controls we protect our customers
Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore
Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Introduction Agenda Introduction Overview of Data Centres DC Operational
plantemoran.com {Data center. } Design standards
plantemoran.com {Data center. } Design standards IT systems have become critical for the day-to-day operations of today s organizations. {Data center.} Design standards IT systems are critical for the
ALWAYS ON GLOBALSWITCH.COM
ALWAYS ON GLOBALSWITCH.COM Data Centre Design Considerations Kelvin Fong Managing Director, Hong Kong ALWAYS ON GLOBALSWITCH.COM Agenda 1. Introduction to Global Switch 2. Customer Requirements 3. Development
Understanding Sage CRM Cloud
Understanding Sage CRM Cloud Data centre and platform security whitepaper Document version 2016 Table of Contents 1.0 Introduction 3 2.0 Sage CRM Cloud Data centre Infrastructure 4 2.1 Site location 4
Upgrading the PRS datacentres: space requirement. S. S. Mathur, GM-IT, CRIS
Upgrading the PRS datacentres: space requirement S. S. Mathur, GM-IT, CRIS PRS / UTS scenario: then and now Year 2000 PRS: 600 locations UTS: 0 locations Year 2008 PRS 1600 locations E-ticketing Passengers
Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME
Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME 2 AGENDA SESSION -1 What is Data Center? SESSION -2 Equipment and Components SESSION -3 Standard in designing Data Center
South Datacentre Studley
South Datacentre Studley Dedicated managed environment for mission critical services www.6dg.co.uk Our datacentres are the core of our business. With 15 years of continual operational life, the Studley
Premium Data Centre Europe - 2012 Pricing, Business Model & Services
Premium Data Centre Europe - 2012 Pricing, Business Models & Services Premium Data Centre Europe - 2012 Pricing, Business Model & Services Table of Contents A list of figures used in this report 5 Methodology
Energy-efficient & scalable data center infrastructure design
Seminar am 30. September 2010 in Wetzlar Nachhaltigkeit durch UPI (Unified Physical Infrastructure) Vortrag von Stefan Fammler: Energieeffiziente Strategien im Rechenzentrum Energy-efficient & scalable
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION The heat load in data centers is increasing rapidly, the adaptation of a cooling strategy is often necessary. Many data centers and server rooms use
OPTIMIZING SERVER VIRTUALIZATION
OPTIMIZING SERVER VIRTUALIZATION HP MULTI-PORT SERVER ADAPTERS BASED ON INTEL ETHERNET TECHNOLOGY As enterprise-class server infrastructures adopt virtualization to improve total cost of ownership (TCO)
Greening Commercial Data Centres
Greening Commercial Data Centres Fresh air cooling giving a PUE of 1.2 in a colocation environment Greater efficiency and greater resilience Adjustable Overhead Supply allows variation in rack cooling
Critical Environment Risk Management
DATA CENTRE SECTOR Critical Environment Risk Management for Data Centres Exceptional Service, Exceptional People Data centre experience Norland supports some of the world s leading enterprise data centres
Data Centre Basiglio, Milan Flexible, advanced and efficient by design.
Data Centre Basiglio, Milan Flexible, advanced and efficient by design. TelecityGroup Via Francesco Sforza 13 Milano 3 City 20080 Basiglio MI Italy Tel: +39 02 36679500 [email protected] www.telecitygroup.it
Addressing the Energy Challenge in Singapore s Data Centres
Addressing the Energy Challenge in Singapore s Data Centres Gain Singapore Green Data Centre Certifications and reduce energy costs by up to 30% with Schneider Electric s proven data centre lifecycle approach
How To Improve Energy Efficiency In A Data Center
Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice
Unified Physical Infrastructure (UPI) Strategies for Thermal Management
Unified Physical Infrastructure (UPI) Strategies for Thermal Management The Importance of Air Sealing Grommets to Improving Smart www.panduit.com WP-04 August 2008 Introduction One of the core issues affecting
Energy Efficiency and Availability Management in Consolidated Data Centers
Energy Efficiency and Availability Management in Consolidated Data Centers Abstract The Federal Data Center Consolidation Initiative (FDCCI) was driven by the recognition that growth in the number of Federal