1 SEA Screening Report Louth County Core Strategy and Settlement Plans Planning and Development Acts 2000 (as Amended) Planning and Development (Strategic Environmental Assessment) Regulations 2004

2 Sept 2011 Revision

3 TABLE OF CONTENTS Page 1.0 SEA Legal Context Purpose of the Screening Report Louth County Core Strategy and Settlement Plans Louth County Settlement Hierarchy Environmental Background Data Need for SEA Natural 2000 sites located within a 20km radius of County Louth County Council Assessment Criteria for Determining Whether a Plan is Likely to Have Significant Effects on the Environment The Character of the plan Characteristics of the effects and of the area likely to be affected Initial Determination of Louth County Council Statutory Consultation Determination for an Appropriate Assessment Conclusion Recommendation 22 LIST OF TABLES Page Table 2.1 County Settlement Hierarchy as set out in the Louth County Development Plan Table 2.2 Population Targets for County Louth 5 Table 2.3 The Border Regional Population Breakdown Targets for 2016 & Table 2.4 Population Breakdown Targets for the Remaining Share 2016 & Table 3.1 Distribution of Existing and Projected Populations 7 Table 3.2 Potential Housing and Population Growth 8 within Settlements. Table 3.3 Residential Zoning in Category I Settlements Table 3.4 Special Areas of Conservation in County Louth 10 Table 3.5 Special Protection Areas in County Louth 12 Table 3.5 Natura 2000 sites located within a 20km radius from Louth County 14

4 FIGURE Figure 2.1 County Louth Settlement Structure and Hierarchy 4 LIST OF MAPS Map 3.1 Special Areas of Conservation within County Louth 11 Map 3.2 Special Protection Area within County Louth 13 Map 3.3 Natura 2000 Sites to be considered beyond the County Core Strategy area 15

5 1.0 Legal Context The European Union Strategic Environmental Assessment (SEA) Directive (2001/42/EC) requires an environmental assessment be carried out for all plans and programmes that are prepared for certain specified sectors, including land use planning. The following Regulations were introduced which transposed this Directive into Irish law: The European Communities (Environmental Assessment of Certain Plans and Programmes) Regulations 2004 (S.I. 435 of 2004) and Planning and Development (Strategic Environmental Assessment) Regulations 2004 (S.I. 436 of 2004). The SEA Regulations state that SEA is mandatory for certain plans while screening for SEA is required for other plans that fall below the specified thresholds. Where plans fall below or outside of the specified thresholds a screening report is required to be carried out to determine whether the making and implementation of a particular plan will or will not, lead to significant environmental consequences for the plan area. Article 14A (2) of Planning and Development (Strategic Environmental Assessment) Regulations 2004 states under 13k Where a planning authority proposes to make a variation of a development plan under section 13 of the Act, it shall, before giving notice under section 13(2) of the Act, consider whether or not the proposed variation would be likely to have significant effects on the environment, taking into account of relevant criteria set out in Schedule 2 A. The criterion against which this is required to be measured and screened is set out in Schedule 2A of the Planning and Development (Strategic Environmental Assessment) Regulations Purpose of the Screening Report Screening is defined as the process for deciding whether a particular plan, other than those for which SEA is mandatory, would be likely to have significant environmental effects, and would thus warrant SEA (Assessment of the Effects of Certain Plans and Programmes on the Environment, 2004, Guidelines for Regional & Planning Authorities, pg 12). The proposed variation of the Louth County Development Plan is to ensure compliance with the Border Regional Planning Guidelines which include population projections for a settlement hierarchy. The purpose of this screening report is to determine whether the Louth Core Strategy and Settlement Plans require a Strategic Environmental Assessment (SEA) on foot of this variation. Draft Settlement Plans have been prepared for the Category I Settlements - 13 villages in total. These will replace the local area plans for these settlements, all of which have expired. The settlements for which draft settlement plans have been prepared are Annagassan, 1

6 Castlebellingham/Kilsaran, Carlingford, Clogherhead, Collon, Dromiskin, Knockbridge, Louth Village, Omeath, Tallanstown, Tullyallen, Termonfeckin and Baltray. As already mentioned, the criteria for determining whether an SEA is required is set out in Schedule 2A of the Planning and Development (Strategic Environmental Assessment) Regulations This report has been prepared in order to determine whether the preparation of the Draft Louth County Core Strategy and Settlement Plans which will or will not have any likely significant environmental effects in terms of the SEA requirements. 2

7 Section 2.0 Louth County Core Strategy and Settlement Plans The purpose of this Core Strategy is to demonstrate that the Louth County Development Plan and its objectives are consistent, as far as practical, with the national and regional objectives set out in the National Spatial Strategy 2002 and the Regional Planning Guidelines for the Border Region The Strategy also seeks to provide consistency as regards the role and function of Gateways, Hub towns, county towns and villages and rural areas in the Border Region and to detail allocation of populations and land for housing to give effect to the settlement hierarchy as set out in the Louth County Development Plan Draft Settlement Plans have been prepared for the Category I Settlements - 13 villages in total. These will replace the local area plans for these settlements all of which have expired. The settlements for which draft settlement plans have been prepared are Annagassan, Baltray, Castlebellingham/Kilsaran, Carlingford, Clogherhead, Collon, Dromiskin, Knockbridge, Louth Village, Omeath, Tallanstown, Termonfeckin and Tullyallen 2.1 Louth County Settlement Strategy Settlement Hierarchy The settlement hierarchy for County Louth as detailed in chapter 4 (Louth county Development Plan and as set out in table 2.1 below, was prepared based on factors such as size of population, range of services, the extent and range of community and other facilities available. Table 2.1: County Settlement Hierarchy as set out in the Louth County Development Plan Level Settlements 1 Dundalk and Drogheda 2 Ardee and Dunleer 3 Annagassan, Baltray, Castlebellingham/Kilsaran, Carlingford, Clogherhead, Collon, Dromiskin, Knockbridge, Louth Village, Omeath, Tallanstown, Termonfeckin, Tullyallen 4 Ballapousta, Darver, Grange, Gyles Quay, Kilcurry, Kilkerley, Lordship, Mountbagnal, Ravensdale 1, Sandpit, Stabannon. 5 Ballagan, Bellurgan, Benagh, Dillonstown, Dromin, Faughart Lower, Fieldstown/Brownstown 1, Fieldstown/ Brownstown II, Grange Irish, Grangebellew, Glenmore, Greenore, Mansfieldstown, Muchgrange, Mucklagh, Philipstown (Collon), Rathcor, Ravensdale II Reaghstown, Sheelagh, Tinure, Willeville. 3

8 The settlement strategy and hierarchy are illustrated below. Figure 2.1: County Louth Settlement Structure and Hierarchy * Settlement Plans are being prepared in respect of the Category I Settlements as illustrated by Figure 2.1 above. 4

9 Population Projections and Future Population Distribution The Planning and Development Act 2010 requires that the Core Strategy is in compliance with and establishes the county development plan population target / allocation as derived from the Regional Planning Guidelines These are as illustrated in Table 2.2. Over the period of this Plan it is anticipated that the total population for the county will increase to 132,648. This represents an increase in the population of some 10,008 between 2010 and Table 2.2: Population Targets for County Louth Year Population/ projection Population increase , ,640 11, ,648 10, ,800 10,152 (Source: RPG ) The Regional Planning Guidelines distributes this target growth in population between Dundalk, Drogheda and the Remaining Share (Table 2.3). Table 2.3: The Border Regional Population Breakdown Targets for 2016 and 2022 County Dundalk Drogheda* Remaining Share ,267 35,085 30,303 45, ** 122,640 38,200 32,331 52, ,648 42,300 35,373 54, ,800 47,200 38,415 57,185 (Source: RPG ) *Excludes population targets for the environ of Drogheda within County Meath **Estimates The remaining share relates to the area of the County Development Plan and all the towns and, villages to which it refers. The RPGs estimate that the population in the Remaining Share in 2010 was 52,109 and that by 2016 it will increase by 2,866 to 54,975. As illustrated by table 2.4 this represents an increase of 13.6% on the 2006 population and a lesser projected population growth of 5.5% between 2010 and

10 Table 2.4 Population Breakdown Targets for the Remaining Share 2016 and 2022 Remaining Increase in % increase Share pop , ** 52,109 6, ,975 2, ,185 2,210 4 (Source: RPG ) The Census of Population Preliminary Results (June 2011) recorded the population in Louth in 2011 as 122,808. This figure is consistent with the Border Regional Authority Regional Planning Guidelines ( ) estimated population for 2010 of 122,640. 6

11 Section 3: Environmental Background Data. 3.1 Need for SEA The criteria for determining whether an SEA is required are set out in Schedule 2A of the Planning and Development (Strategic Environmental Assessment) Regulations With regard to Core Strategy and Settlement Plans the main topics considered are: Population: It is estimated that the population in the area covered by the County Development Plan (the Remaining Share as set out in the Border Regional Population Breakdown Targets for 2016 and 2022 in 2010 was 52,109 and that by 2016 it will increase by 2,866 to 54,975. This Strategy develops a population growth model based on the figures supplied by DECLG and the Border Regional Authority and outlines resultant housing demand in the remaining share of the county and how this demand will be distributed. The distribution of existing and projected population growth is illustrated in table 3.1. Table 3.1: Distribution of Existing and Projected Populations in the Settlement Hierarchy Population 2010² Projected Pop 2016 Increase in Pop Equivalent Residential Units Louth 122, ,648 10,008 3,695 Dundalk and 38,200 42,300 4,100 1,507 Environs Drogheda and Northern Environs 32,331 35,373 3,042 1,086 Ardee 4,500 4, Dunleer 1,830 1, Category I 13,280 14, Settlements Category II 2,949 3, Settlements Rural Areas 29,550 31,160 1, Core Strategy Dundalk and its Environs and Drogheda and its northern environs are the subject of separate core strategies. To manage the sustainable development of Ardee and Dunleer, residential development has been phased in their respective local area plans for 2010 to 2016, in line with the target population growth of these settlements and the resultant housing land requirement. The respective local are plans were the subject of SEA screening reports. 7

12 Table 3.2 sets out target population allocations, resultant housing requirements, existing land zoned for residential purposes and proposed zoning provision for settlements in the County and rural areas. Table 3.2 Potential Housing and Population Growth within Settlements Settlement Target Population Allocation 2016 Household Allocation Housing Land Required Aver Density Units/ ha Existing Land Zoned For Residential Use ² (Ha) It is an objective of the Strategy to facilitate orderly and sustainable development in Category I Settlements through the implementation of an overall phasing strategy as detailed in table 3.3. Excess (Ha) Dundalk and 4,100 1, Environs³ Drogheda and 3,042 1, Northern Environs Ardee Dunleer Category I Settlements Category II Settlements Rural Area 1, Total 10,009 3, ,463 1,331 Table 3.3 Residential Zoning in Category I Settlements Settlement Target Population Allocation Household Allocation Allocated Housing Land (Ha) Aver Density Units/Ha Existing Land Zoned for Residential Use Excess (Ha) Annagassan Baltray Carlingford Castlebellingham/ Kilsaran Clogherhead Collon Dromiskin Knockbridge Louth Village Omeath Tallanstown Termonfeckin Tullyallen Total

13 (i) Phase I residential comprises of residential development which forms part of mixed development in defined village centres (as zoned), additional residential land which facilitates the consolidation and organic growth of these settlements as identified in the land use maps contained within the Settlement Plans and infill development. (ii) Phase II (that is strategic reserve) land will be reserved to allow proper planning and sustainable development in the next plan period(s) Some 44 hectares has been identified as phase 1 residential land. The boundaries of the Category II Settlements are as set out in the Louth County Development Plan The development envelopes can easily accommodate the projected level of housing provision. The Core Strategy will manage population growth in these settlements over the period of this Plan. Sites of National or International Importance: - The plan area includes 24 Proposed National Heritage Areas (pnhas). (Appendix 1 and 2). It is anticipated that a number of proposed NHAs will be given full designated status prior to candidate sites of Geological interest. (Appendix 3) Local Natural Assets: The Council has made 4 Tree Preservation Orders and has listed 32 groups of Trees and Woodlands of Special Amenity Value (Appendix 4 and 5 respectively) Local Assets Architectural and Archaeological: There are currently 659 buildings listed on the Record of Protected Structure (RPS) in the Louth County Development Plan area. - 9 Architectural Conservation Areas have been designated (Appendix 6) - There are 11 Areas of Special Archaeological Interest (Appendix 7) Natura 2000 sites. The Natura 2000 sites are those which are afforded European protection under the Birds and Habitats Directive. County Louth contains six SAC s which are listed in table 3.3 and illustrated on map 3.1 and four SPA which are listed in table 3.4 and illustrated on map

14 The Louth County Development Plan includes policies to resist development that would be harmful or that would result in a deterioration of habitats or disturbance to species in an SAC / SPA and to ensure that that an appropriate assessment is carried out of the implications of any proposed development on a SAC or SPA or development likely to impact on a SAC or SPA that is outside the designated area or any other SAC or SPA identified during the period of the plan, is undertaken in view of the site s conservation objectives. The National Parks and Wildlife Service (NPWS) has provided generic Conservation Objectives for Natura 2000 Sites as follows: To maintain the bird species of special conservation interest for which the SPA has listed, at favourable conservation status. To maintain Annex I habitats and Annex II species for which the Special Area of Conservation has been selected at favourable conservation status. To maintain the extent species richness and biodiversity of the entire site. To establish effective liaison and co-operation with landowners, legal users and relevant authorities. Table 3.4: Special Areas of Conservation in County Louth Site Site Name Site Characterisation Code Dundalk Bay Coastal/Estuarine Carlingford Mountain Mountain Carlingford shore Coastal Clogherhead Coastal Boyne Coast and Estuary Coastal River Boyne and River Blackwater Estuarine Map 3.1: Special Areas of Conservation within County Louth. 10

15 Table 3.5: Special Protection Areas in County Louth Site Site Name Site Characterisation 11

16 Code Dundalk Bay Coastal/Estuarine Carlingford Lough Coastal Boyne Estuary Coastal/ Estuarine Stabannan Braganstown Alluvial Plain Note; Detailed descriptions of the Natura 2000 Sites which lie within the boundary of the Louth County Council Plan area are set out in Annex 1. Map 3.2: Special Protection Areas within County Louth. 12

17 3.3 Natura 2000 sites located within a 20km radius from Louth County. 13

18 Detailed descriptions of the Natura 2000 Sites which lie beyond the boundary of Louth County Development Plan are set out in Annex 1. Table 3.5: Natura 2000 Sites located within a 20km radius from Louth county. Site Code Site Name Site Characterisation UK Eastern Mournes Mountain UK Derrylackagh Bogs UK Slieve Gullion Heathland UK Rostrevor Wood Dry Heath/ Blanket bog UK Carlingford Lough (County Down) Foreshore 14

19 Map 3.3: Natura 2000 Sites to be considered beyond the Louth Core Strategy. Section 4 15

20 4.0 Assessment Criteria for Determining Whether a Plan is Likely to Have Significant Effects on the Environment An assessment of the proposed Draft Louth County Core Strategy and Settlement Plans in terms of the criteria set out in Schedule 2A of the Planning and Development (Strategic Environmental Assessment) Regulations 2004 is set out as below. The assessment has been carried out in the order in which the criteria have been laid out in the above mentioned Schedule 2 A. 4.1 The character of the plan having regard, in particular, to i) The degree to which the plan sets a framework for projects and other activities, either with regard to location, nature, size and operating conditions, or by allocating resources; The Louth Core Strategy and Settlements Plans will set out a development framework for the planned, co-ordinated and sustainable residential development of Louth County and for the conservation and enhancement of its natural and man made environment. The Core Strategy will seek to provide guidance in the form of policies and objectives for the development of social, physical and environmental infrastructure in a sustainable manner for Louth and its settlement hierarchy. It is not proposed to include additional polices or objectives which conflict with the existing Louth County Development Plan ii) The degree to which the plan influences other plans, including those in a hierarchy; The strategy and settlement plans are set within the context of the Louth County Development Plan and may influence all future housing growth patterns within the County of Louth. It is not anticipated that the strategy or settlement plans will have a significant environmental effect on any other plans as it does not propose the zoning or allocation of additional lands for development it will only influence any future planning applications that may be prepared for designated lands within the county. ii) The relevance of the plan for the integration of environmental considerations in particular with a view to promoting sustainable development; The Strategy and Settlement Plans, as per the Louth County Development Plan , will be in accordance with the provisions set out in the Planning and Development Act 2000 (as amended) and therefore related to the proper planning and sustainable development of the area. The Core Strategy will set out a spatial strategy based on a settlement hierarchy for Louth County with strategic locations which are essential to the delivery of the strategy. It will include a written statement on the appropriate development and settlement strategy for County Louth. 16

21 The Strategic Objectives of the Settlement Plans are as set out in table XX below. Strategic Objectives OBJ 1 Protect and support Category I settlements as local service centres in the rural area and facilitate limited development that is commensurate with the nature and extent of the existing settlement and the availability of public services and facilities OBJ 2 Provide an improved quality of life for all the citizens by promoting the village s economic potential and protecting its natural and built environment. OBJ 3 Provide a high quality of design in private and public development, increasing the quality of the public realm while maintaining the form, character and settlement pattern of the village. OBJ 4 Promote an attractive, safe and accessible village particularly for those on foot, bicycle and public transport. OBJ 5 Zone sufficient land within the settlement to cater for the demand for housing, employment uses, community facilities and amenity uses. OBJ 5 Ensure the identification, assessment and mitigation of environmental consequences of this plan and subsequent developments. The strategy and settlement plans will have due regard to the specific needs and attributes of the area while conforming with the relevant environmental provisions of the various plans, legislation and guidance documents which will inform the making of the plan. Examples of these documents include, but are not limited to: SEA Directives and Guidelines National Development Plan National Spatial Strategy Water Framework Directive 200/60/EC Making Ireland Sustainable National Biodiversity Plan Border Regional Planning Guidelines Development Management Guidelines -June 2007 Development Plans Guidelines - June 2007 Landscape and Landscape Assessment and Appendices 2000 Retail Planning Guidelines for County Louth 2009 Strategic Environmental Assessment Directive and Guidelines Sustainable Rural Housing Guidelines 2005 Sustainable Urban Housing: Design Standards for Apartments - Guidelines for Planning Authorities 2007 Sustainable Residential Development in Urban Areas 2008 & companion document Urban Design Manual A Best Practice Guide

22 The Government White Paper Delivering a Sustainable Energy Future for Ireland National Heritage Plan National Sustainable Development Strategy Flood Risk Guidelines for Local Authorities Louth Heritage Plan Biodiversity Plan for County Louth Waste Management Plan for North East Region ii) Environmental problems relevant to the plan: The Strategy and Settlement Plans will not include any polices or objectives which will conflict with the Louth County Development Plan with regard to environmental decisions. It may set out specific requirements for any site specific issues to be addressed through the planning application process by way of mandatory Environmental Impact Statements in order to ensure future developments do not result in significant negative environmental impacts. iii) The relevance of the plan for the implementation of European legislations on the environment (e.g. plans linked to waste-management or water protection); Issues relating to European Union Legislation on the environment are provided for in the Louth County Development Plan This Core Strategy and Settlement Plans will be consistent with the policies and objectives of the Louth County Development Plan which itself was the subject of a Strategic Environmental Assessment. The Core Strategy and Plans will therefore be guided and informed by the relevant European legislation on the environment including; waste management and water protection policies and objectives as set out in the Louth County Development including the Neagh Bann River Basin Management Plan and the Eastern River Basin Management Plan. This Core Strategy and Settlement Plans will also be screened for an Appropriate Assessment at the draft plan stage, with the Environmental Authorities Characteristics of the effects and of the area likely to be affected, having regard, in particular to i) The probability, duration, frequency and reversibility of the effects; This Core Strategy, as detailed above, develops a population growth model based on the figures supplied by DoEHLG and the Border Regional Authority and outline resultant housing demand in the remaining share of the county and how this demand will be distributed in the remainder of the County. Within Category I Settlements, the subject of the Settlement Plans, it does not propose to zone additional lands. The land use assigned to existing zoning will be phased encompassing organic growth, projected population targets, availability of social and physical infrastructure and cognisance of the built and 18

23 natural environment. The Core Strategy and Settlement Plans will be supplementary documents and require a variation of the Louth County Development Plan. The lifetime of the strategy and Settlement Plans and will be that of the existing and will be reviewed in tandem with the Louth County Development All developments on zoned lands will be subject to various development plan policies which may, depending on the extent of the zoned land identified, require the preparation of master plans, and where relevant, environmental impact statements. It is considered that there will be no significant negative effects arising from implementing this strategy and Settlement Plans and that the strategy and Settlement Plans will have a positive contribution on the plan area as it will control the release of residential lands. It is expected that the positive effects would, in the main, be permanent and therefore irreversible. ii) The cumulative nature of the effects; The limited anticipated growth will occur in a manner in compliance with the Settlement Strategy of Louth County Development Plan It is considered that this strategic document will direct development in settlements in a sustainable manner. It is anticipated that the cumulative effects on the environment will be positive. Subsequently it is considered that there will not be any significant adverse cumulative effects on the environment. iii) The trans-boundary nature of effects; Likely significant trans-boundary effects have not been identified in relation to the Core Strategy for County Louth or the Settlement Plans. iv) The risks to human health or the environment (e.g. due to accidents); The County Development Plan includes a development strategy and mandatory objectives as stipulated in Part II, Section 10(2) (k) of the Planning and Development Act (as amended) in relation to the Seveso Agreement which mitigate impacts on human health and the environment caused by development. There are no SEVESO sites within the plan area and as such, possible risks to human health or the environment have not been identified. v) The magnitude and spatial extent of the effects (geographical area and size of the population likely to be affected): The Core Strategy and the Border Regional Planning Guidelines indicates that there is a requirement to accommodate an additional population of 2886 persons between 2010 and 2016 within the Core Strategy area. The Core Strategy table x details the resultant housing requirement and how these are to be distributed within the settlements and rural area in accordance with the Settlement Hierarchy as set out in the Louth County Development Plan

24 2015. The settlement hierarchy seeks to guide the sympathetic development of Ardee, Dunleer and rural settlements in a fashion which will promote sustainable forms of development, that is, consistent with the proper and sustainable development of the county. In this regard, the core strategy and settlement plans promote development within the towns and villages which is commensurate with their existing populations and does not result in excessive or a disproportionate level of development. vi) The value and vulnerability of the area likely to be affected due to: a) Special natural characteristics or cultural heritage; There are 10 Natura Sites located within the county development boundary, 24 proposed Natural Heritage areas and 34 candidate sites of geological interest. The Plan area contains details on cultural heritage in the form of Recorded Monuments, Areas of Special Archaeological Interest, Protected Structures and architectural conservation areas, all of which are listed for protection in the Louth County Development Plan It is the intention of the core strategy and settlement plans to preserve and/or enhance those buildings, structures, trees, open spaces, archaeological remains, views and other elements which contribute to the unique character of the area. All planning applications will be referred to the relevant bodies for comments as appropriate and will be dealt with to best practice standards. Policies and objectives to protect the area s cultural characteristics and the special natural characteristics will be included in the plan. b) Exceeded environmental quality standards or limit values; vii) It is anticipated that environmental quality standards will not be exceeded and that the value of the area will not be diminished as a result of the implementation of the core strategy. The policies and objectives contained within the Core Strategy and Settlement Plans will be set within the context of the Louth County Development Plan for which a full SEA was prepared and published. In assessing the suitability for development and recommending an optimal population for each settlement emphasis has been placed on the consolidation and organic growth of the villages in addition to Settlement function; capacity of environmental infrastructure (i.e. water supply, wastewater treatment, drainage); existing level of development and residential capacity of unoccupied dwellings; availability of community, social and commercial facilities, environmental constraints and accessibility. a) Intensive land-use; The Core Strategy and Settlement Plans do not propose the intensification of existing land uses in the development plan rather the implementation of a phasing regimen. It is considered appropriate that the Council provide policies which seek to reduce the potentially negative impact of increased land uses within the settlements which is achievable through appropriate phasing through the implementation of the Core Strategy and Settlement Plans. viii) The effects on areas or landscapes which have a recognised national, European Union or international protection status 20

25 There are 10 sites within the strategy area which have European Union designation and it is not intended that any of the proposals within the strategy will have any impact on these. Section Initial Determination of Louth County Council On the basis of the above assessment and consideration of the criteria as set out in Schedule 2A of the Regulations, it is the opinion of the planning authority that the proposed Louth Core Strategy and Settlement Plans will not have any significant likely effects on the environment and therefore do not require an SEA. The planning authority is satisfied that the Louth County Development Plan was carried in accordance with the principles of sustainable development and the commitment to the enhancement and protection of the natural and man made environment of the area. The Core Strategy and Settlement Plans do not propose to introduce any additional polices or objectives which would have a negative impact on the environment nor should it propose to include additional zonings in the plan area. Section Statutory Consultation The specified environmental authorities which are required to be consulted in accordance with Article 13A (4) of the Planning and Development (Strategic Environmental Assessment) Regulations 2004 are as follows: The Environmental Protection Agency (EPA) The Department of the Environment, Heritage and Local Government (DoEHLG) The Department of Communications, Energy and Natural Resources (DCMNR). Northern Ireland Environment Agency Department of the Environment for Northern Ireland, Strategic Planning Division The above bodies are currently being consulted. 6.1 Determination for an Appropriate Assessment. The DoEHLG Circular Letter SEA 1/08 & NPWS 1/08 relates to the requirement to screen Land Use Plans for any potential impacts on areas designated as Natura 2000 sites (normally called Special Areas of Conservation or Special Protection Areas). It will still be a requirement for the draft Core Strategy and Settlement Plans to be screened for an appropriate assessment as necessary once this plan is in draft format. 21

26 The circular states that an appropriate assessment means an assessment, based on best scientific knowledge, by a person with ecological expertise, of the potential impacts of the plan on the conservation objectives of any Natura 2000 site (including Natura 2000 sites not situated in the area encompassed by the draft plan or scheme) and the development, where necessary, or mitigation or avoidance measures to preclude negative effects. The potential impacts of policies outside Natura 2000 sites, but potentially impacting upon them (known as ex site impacts) must also be included in the assessment according to the Circular. Section Conclusion An SEA is not mandatory for the Louth County Core Strategy or the Settlement Plans as they are proposed as a variation of the Louth County Development Plan They do not include additional land use zoning. Louth County Council has carried out an assessment in accordance with the criteria set out in Schedule 2A of the Planning and Development (Strategic Environmental Assessment) Regulations 2004 and have initially concluded that the environmental effects of implementing the Core Strategy and Settlement Plans are unlikely to be significant and therefore an SEA will not be required for the draft strategy and draft settlement plans. The Louth Core Strategy and Settlement Plans will be carried out in accordance with the principles of sustainable development and the commitment to the enhancement and protection of the natural and man made environment as set out in the Louth County Development Plan which itself was the subject of an SEA. A final determination will not be made however until the specified environmental authorities have been consulted. Section Recommendation It is recommended that the specified environmental authorities as referenced under Section 5 above be consulted and a copy of this report forwarded to them for their consideration. 22

27 Appendix Page Appendix 1 List of pnha table 2.2 CDP 24 Appendix 2 Map of pnha map CDP 25 Appendix 3 Candidate sites of Geological sites table 2.3 in CDP 26 Appendix 4 Tree Preservation Orders table Appendix 5 Trees and Woodlands of Special amenity value Appendix 6 Architectural Conservation Areas as listed on page Appendix 7 Areas of special Archaeological Interest table

28 Appendix 1 List of pnha table Proposed Natural Heritage Areas Ref. NH1454 NH1801 NH1293 NH1957 NH1862 NH452 NH453 NH1458 NH1459 NH1461 NH1462 NH1856 NH 455 NH1806 NH1804 NH1451 NH1616 NH1464 NH1805 NH1828 NH456 NH1803 NH1468 NH1465 Location Ardee cutaway bog Barmeath Woods Blackhall Woods Boyne coast and estuary Boyne river islands Carlingford Lough Carlingford Mountains Castlecoo Hill Clogherhead Darver Castle woods Drumcah, Toprass and Cortial Loughs Dunany Point Dundalk Bay Kildemock Marsh King Williams Glen Liscarragh Marsh Louth Hall and Ardee Woods Mellifont Abbey Woods Ravensdale Plantation Reaghstown Marsh Stabannan- Braganstown Stephenstown Pond Trumpet Hill Woodland at Omeath Park 24

29 Appendix 2 Location and Extent of proposed Natural Heritage Areas 25

30 Appendix 3 Candidate sites of Geological Interest Ref. G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12 G13 G14 G15 G16 G17 G18 G19 G20 G21 G22 G23 G24 G25 G26 G27 G28 G29 G30 G31 G32 G33 G34 Location Oriel Brook, Collon Clogherhead Collon Quarry Tullyallen Quarry Mapastown Dunany Point Cooley Point Cloghmore Carlingford Port Lins Moraine, Dundalk Bay Rathmore Complex Drakestown Tullyallen Castlebellingham Shore Dundalk Bay Trumpet Hill Dromeena Quarry Salterstown Windy Gap at Carlingford Rampark Cooley Castle Quarry Clogher Head Lamprophyre Barnavave Hill Slieve Foy Barnavave Quarry Mullaghattin John s Castle Rosemount Quarry Templetown Raised Beach Greenore Ardee Moraine Ridges Castlebellingham Morainic Complex Bush Delta 26

31 Appendix 4 Trees and Woodlands of Special Amenity Value Ref. Location TP1 Townley Hall / King William s Glen TP2 Termonfeckin Village TP3 N1 at Aghnaskeagh TP4 N1 north of Greenore junction TP5 Trumpet Hill TP6 Monvallet east of ESB station TP7 Red House, Ardee TP8 Fox Covert, Ardee TP9 St. Joseph, Ardee TP10 Mullaghesh, Collon TP11 Barmeath Woods TP12 Blackhall Woods TP13 Darver Castle Woods TP14 Louth Hall TP15 Mellifont Abbey Woods TP16 Ravensdale Plantation TP17 Woodlands at Omeath Park TP18 Salterstown TP19 Drumcar TP20 Beaulieu TP21 Drogheda Baltray Road TP22 Newtown House TP23 Church at Milltown TP24 Lisrenny House, Tallanstown TP25 Rathbrist House, Tallanstown TP26 Corderry House, Readypenny TP27 Stephenstown Pond TP28 Ballymakenny Church TP29 South of Killineer TP30 Piperstown House TP31 North of Mount Oriel TP32 The Rectory, Ardee The locations of the above are illustrated on the below on map

32 Appendix 5 Trees and Woodlands of Special Amenity Value 28

33 Appendix 6 The following ACAs were designated in the previous plan: 1. Salterstown 2. Whitestown 3. Newtown Monasterboice 4. Collon (part of) 5. Ardee (part of) 6. Monasterboice Monastic site 7. Carlingford (part of) 8. Castlebellingham 9. Greenore Appendix 7 Areas of Special Archaeological Interest Ref. Location AR1 Ardee AR2 Collon AR3 Carlingford AR4 Dunleer AR5 Louth Village AR6 Termonfeckin AR7 Dromiskin AR8 Grange AR9 Castlering AR10 Castleroche AR11 Newtown Monasterboice 29

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

Chapter 3 Rural Development and Natural Resources

Chapter 3 Rural Development and Natural Resources Chapter 3 Rural Development and Natural Resources 3.1 Introduction Sustainable and diversified development in rural areas is key to keeping the countryside alive and prospering. The rural areas of the

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

Different Types of Marine Protected Area

Different Types of Marine Protected Area A protected area is defined by the IUCN as a clearly defined geographical space, recognised, dedicated and managed, through legal or other effective means, to achieve the long-term conservation of nature

More information

Sustainability Appraisal of the Lichfield Local Plan: Strategy

Sustainability Appraisal of the Lichfield Local Plan: Strategy Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

DECEMBER 2010 AGENDA / CLÁR OIBRE

DECEMBER 2010 AGENDA / CLÁR OIBRE AGENDA / CLÁR OIBRE 1. CONFIRMATION OF MINUTES Monthly Meeting held on 15 th November 2010 2. MINUTES For Information Environmental Services SPC 15/07/10 Housing SPC 18/10/10 Drogheda East & West Area

More information

Dréacht-Phlean Forbartha Chontae na Gaillimhe 2015-2021 Draft Galway County Development Plan 2015-2021

Dréacht-Phlean Forbartha Chontae na Gaillimhe 2015-2021 Draft Galway County Development Plan 2015-2021 Dréacht-Phlean Forbartha Chontae na Gaillimhe 2015-2021 Draft Galway County Development Plan 2015-2021 Comhairle Chontae na Gaillimhe Galway County Council Table of Contents Chapter 1 Introduction 1.1

More information

Local Area Plans. Planning Guidelines. Guidelines for Planning Authorities. Department of the Environment, Community and Local Government June 2013

Local Area Plans. Planning Guidelines. Guidelines for Planning Authorities. Department of the Environment, Community and Local Government June 2013 23 Local Area Plans Planning Guidelines Guidelines for Planning Authorities Department of the Environment, Community and Local Government June 2013 Government of Ireland 2013 Table of Contents Page 1.

More information

Charging for Pre-application Advice. WSCC Guidance Note

Charging for Pre-application Advice. WSCC Guidance Note Charging for Pre-application Advice WSCC Guidance Note Content 1. Introduction 1.1 Our Objectives 1.2 Development Team Approach 1.3 Areas of Advice 1.4 What We Expect of You 1.5 Benefits of Pre-application

More information

Environmental Impact Assessment of National Road Schemes A Practical Guide

Environmental Impact Assessment of National Road Schemes A Practical Guide Environmental Impact Assessment of National Road Schemes A Practical Guide Revision 1, 20 November, 2008 CONTENTS LIST OF BOXES...iii LIST OF TABLES...iv LIST OF FIGURES...iv 1.0 INTRODUCTION 1.1 Introduction...2

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012

Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 This Explanatory Memorandum has been prepared by the Environment and Sustainable Development Department and

More information

Carmarthenshire LDP Site Assessment Proforma

Carmarthenshire LDP Site Assessment Proforma Carmarthenshire LDP Site Assessment Proforma 1. Site Details Ref: SC1/h1 Site Ref (where applicable): Location: Parc Puw, Drefach Felindre Site Area (Ha): Eisting Use* *if candidate site as proposed by

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

The Strategic Environmental Assessment Directive: Guidance for Planning Authorities

The Strategic Environmental Assessment Directive: Guidance for Planning Authorities The Strategic Environmental Assessment Directive: Guidance for Planning Authorities Practical guidance on applying European Directive 2001/42/EC on the assessment of the effects of certain plans and programmes

More information

6 SETTLEMENT HIERARCHY

6 SETTLEMENT HIERARCHY 6 SETTLEMENT HIERARCHY The previous comparison of projected dwelling demand and Category A land supply (see Section 5) demonstrates that the LGA generally has sufficient zoned land, in overall terms, to

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

Sustainable Tourism Management - an overview -

Sustainable Tourism Management - an overview - of Sustainable Tourism Management - an overview - Dr. Head of Dept of Tourism Dublin Institute of Technology Who are we? Dublin Institute of of Technology 6 x Faculties Faculty of of Tourism and and Food

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

Establishing large-scale trans-boundaries MPA networks: the OSPAR example in North-East Atlantic

Establishing large-scale trans-boundaries MPA networks: the OSPAR example in North-East Atlantic Establishing large-scale trans-boundaries MPA networks: the OSPAR example in North-East Atlantic Introduction A pledge to establish a representative network of marine and coastal protected areas by 2012

More information

Guidelines for Planning Authorities. Development Plans

Guidelines for Planning Authorities. Development Plans 15 Guidelines for Planning Authorities June, 2007 Development Plans Government of Ireland BAILE ÁTHA CLIATH ARNA FHOILSIÚ AG OIFIG AN TSOLÁTHAIR Le ceannach díreach ón OIFIG DHÍOLTA FOILSEACHÁN RIALTAIS,

More information

EIS PROT. IPC WASTE DATE APP. FILE DEVELOPMENT DESCRIPTION AND LOCATION NUMBER RECD. TYPE APPLICANTS NAME RECEIVED STRU LIC.

EIS PROT. IPC WASTE DATE APP. FILE DEVELOPMENT DESCRIPTION AND LOCATION NUMBER RECD. TYPE APPLICANTS NAME RECEIVED STRU LIC. TIME : 11:17:21 PAGE : 1 PLANNING APPLICATIONS FROM 18/04/15 TO 24/04/15 15/211 Réalt Na Mara School The P 20/04/2015 Permission for development to consist of 2 number Board of Management single storey

More information

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

Implementation of Regional Planning Guidelines Best Practice Guidance

Implementation of Regional Planning Guidelines Best Practice Guidance Implementation of Regional Planning Guidelines Best Practice Guidance December 2010 Contents Section Page No Minister s Foreword Chapter 1: Purpose of Regional Planning Guidelines 3 1.1 Background 1.2

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1 Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

Planning Policy Statement 2015

Planning Policy Statement 2015 Planning Policy Statement 2015 Introduction It is just over 50 years since national planning legislation was first implemented in Ireland. The Government wishes to reaffirm its strong belief in the value

More information

Healthcare and New Housing Development

Healthcare and New Housing Development Healthcare and New Housing Development Supplementary Guidance SG11 Consultative Draft SG11 SG11 Supplementary Guidance A suite of supplementary guidance (SGs) is currently being produced by the Council.

More information

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation

Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation Sites of Importance for Nature Conservation (SINCs). Guidelines for their Identification, Selection and Designation Isle of Wight Biodiversity Partnership August 2010 1. Introduction 1.1 This document

More information

Site Alternative Deliverability Report. SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable. Local Development Plan

Site Alternative Deliverability Report. SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable. Local Development Plan Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable SALT 033 Former Mid Wales Hospital

More information

Site Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan

Site Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable SALT 034 Ty Nant Groesffordd (Llanfrynach) Existing

More information

Dorset Green SANGs Report

Dorset Green SANGs Report Dorset Green SANGs Report April 2012 FARRELLS Contents 1.0 Introduction 1.1 Accessible Green Spaces 2.0 SANGs Objectives 2.1 Proposals 2.2 Ecology Park 2.3 Village Green 2.4 Country Heritage Park 2.5 Dorset

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

The NSS - Rural Development and Rural Settlement

The NSS - Rural Development and Rural Settlement The NSS - Rural Development and Rural Settlement Spatial Planning Unit, Department of the Environment and Local Government, February 2003 Introduction. This paper has three main parts that outline: (1)

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM 1. Applicant Details (See guidance note 1) 2. Agent Details Please complete if the applicant has an agent (See guidance note 2) * Title: * Forename:

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock. Persimmon Homes October 2013

Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock. Persimmon Homes October 2013 Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock Persimmon Homes October 2013 Contents Site Deliverability Statement Development at: Bridgnorth Road, Much Wenlock. 1.INTRODUCTION

More information

Protected Area Categories and Management Objectives

Protected Area Categories and Management Objectives Protected Area Categories and Management Objectives A protected area is defined as: An area of land and/or sea especially dedicated to the protection and maintenance of biological diversity, and of natural

More information

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007

Development Brief for New Lodge, Bank Mill Lane Berkhamsted. Adopted November 2007 Development Brief for New Lodge, Bank Mill Lane Berkhamsted Adopted November 2007 This publication seeks your opinions about the design, layout and requirements for new housing development at New Lodge,

More information

22.01 SETTLEMENT 24/04/2014 C73

22.01 SETTLEMENT 24/04/2014 C73 22.01 SETTLEMENT 24/04/2014 C73 22.01-1 Urban Growth and Development 24/04/2014 C73 This policy applies to the urban areas and fringes of Portland, Heywood, Casterton, Dartmoor, Nelson, Cape Bridgewater,

More information

Appendix A. DM Document SA Report Appendix A

Appendix A. DM Document SA Report Appendix A Document SA Report Appendix A Appendix A Potential conflicts between the SA framework objectives and the Development Management Policies DPD spatial planning objectives South Norfolk SA Framework Objective

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site

More information

2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011

2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 STATUTORY INSTRUMENTS 2011 No. 1824 TOWN AND COUNTRY PLANNING The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 Made - - - - 19th July 2011 Laid before Parliament 26th July

More information

What do we already know about Bradford-on-Avon community area?

What do we already know about Bradford-on-Avon community area? What do we already know about Bradford-on-Avon community area? Bradford-on-Avon is one of the smaller market towns in Wiltshire. It has good public transport connectivity and functions as a popular tourist

More information

Aiding the Hydro-scheme development process. Web-links to useful information sources

Aiding the Hydro-scheme development process. Web-links to useful information sources Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

Town of Chatham Department of Community Development

Town of Chatham Department of Community Development Town of Chatham Department of Community Development TOWN ANNEX 261 GEORGE RYDER ROAD 02633 CHATHAM, MA TELEPHONE (508) 945-5168 FAX (508) 945-5163 FEMA FLOOD MAP UPDATE & PROPOSED ZONING BYLAW AMENDMENT

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa Finance, Mining & Sustainability The Gamsberg Zinc Project South Africa Project Summary Discovered in 1971 Anglo American purchased 33% interest in 1974 and increased interest to 100% in 1998 Feasibility

More information

Site Specific Policies Local Plan

Site Specific Policies Local Plan A N E W V I S I O N F O R D E V E L O P I N G W A K E F I E L D D I S T R I C T Site Specific Policies Local Plan Local Development Framework www.wakefield.gov.uk/ldf Site Specific Policies Local Plan

More information

Kristina Veidemane, Baltic Environmental Forum Panevezys, 12.05.2015

Kristina Veidemane, Baltic Environmental Forum Panevezys, 12.05.2015 Priority 2 Protection and restoration of biodiversity and soil and promotion of ecosystem services, including through Natura 2000, and green infrastructure Kristina Veidemane, Baltic Environmental Forum

More information

1 2 3 4 Appendix A Appendix B Appendix C

1 2 3 4 Appendix A Appendix B Appendix C 1 2 3 4 Appendix A Appendix B Appendix C Introduction This chapter provides the foundation for the Comprehensive Plan, outlining why we plan, the planning process, Smart Growth Planning, and the planning

More information

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information

National Directorate for Fire and Emergency Management

National Directorate for Fire and Emergency Management National Directorate for Fire and Emergency Management Guide to Works and Development Consents for Repairing Infrastructure Damaged in Storms or other Emergency Events Document Title Guide to Works and

More information

Pre Application Advice Charging Scheme and Post Application Service Introduction (1 st February 2014)

Pre Application Advice Charging Scheme and Post Application Service Introduction (1 st February 2014) Pre Application Advice Charging Scheme and Post Application Service Introduction (1 st February 2014) The Development Control Service is responsible for providing planning advice, processing planning applications

More information

Redland City Council. 1. Recommendation. 2. Local government metrics. The Commission recommends:

Redland City Council. 1. Recommendation. 2. Local government metrics. The Commission recommends: 1. Recommendation The Commission recommends: (i) the existing local government area of Redland Shire Council remains unchanged; (ii) the local government be renamed Redland City Council; (iii) the local

More information

THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS

THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS What Forus will be CONTENTS WHY A JOINT PLAN FOR FORUS?... 3 WHAT IS A PLAN PROGRAMME?... 3 THE OBJECTIVES AND FRAMEWORK FOR THE DEVELOPMENT OF FORUS... 3 THE PLAN AREA... 4 THE LONG-TERM GOALS FOR FORUS...

More information

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

21.03 SETTLEMENT AND HOUSING

21.03 SETTLEMENT AND HOUSING 21.03 SETTLEMENT AND HOUSING 09/10/2014 C187Prop osed C189 21.03-1 Housing 09/10/2014 C187 This clause provides local content to support Clause 11 (Settlement) and 15 (Built Environment and Heritage) and

More information

BEST PRACTICE NOTE LANDSCAPE ASSESSMENT AND SUSTAINABLE MANAGEMENT 10.1 NZILA. Members Documentation

BEST PRACTICE NOTE LANDSCAPE ASSESSMENT AND SUSTAINABLE MANAGEMENT 10.1 NZILA. Members Documentation BEST PRACTICE NOTE LANDSCAPE ASSESSMENT AND SUSTAINABLE MANAGEMENT 10.1 NZILA Members Documentation Background In August 2008, the New Zealand Institute of Landscape Architects (NZILA) Education Foundation

More information

Potential Management Options

Potential Management Options MARINE CONSERVATION ZONES IN THE NORTHERN IRELAND INSHORE REGION Guidance on the Development of Conservation Objectives and Potential Management Options Document version control Version Date Author Comments

More information

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION 1 LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION STATEMENT BY CROUDACE STRATEGIC LIMITED ISSUES 7 AND 8 STRATEGIC SITES (POLICIES SP5/SP6)

More information

Development Brief Erskine Lodge Site, Great Whelnetham

Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Contents 1.0 Introduction 2.0 Site Context 3.0 Development Constraints 4.0 Whelnetham Context Analysis 5.0 Development Opportunities

More information

Table of Contents Part A Introduction 7. Part B Understanding the Resource 15

Table of Contents Part A Introduction 7. Part B Understanding the Resource 15 Table of Contents Part A Introduction 7 1.0 Introduction 8 1.1 Background 8 1.2 Report Objectives 8 1.3 Report Methodology, Structure and Terminology 9 1.3.1 Methodology 9 1.3.2 Structure 10 1.3.3 Terminology

More information

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles The Roaches Asset Management Review Draft Objectives for External Consultation Fundamental Principles the area of land under review is the Roaches Estate and Gradbach Car Park as shown on the attached

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

Community and Renewable Energy Scheme Project Development Toolkit

Community and Renewable Energy Scheme Project Development Toolkit Community and Renewable Energy Scheme Project Development Toolkit Planning Module Contents How to use this toolkit... 2 The planning system... 2 Permitted development... 4 Planning and community groups...

More information

Experiences in the application of Espoo Convention Spain

Experiences in the application of Espoo Convention Spain Environmental Impact Assessment in Spain Experiences in the application of Espoo Convention Spain Aurora Hernando Garcinuño Subdirección General de Evaluación Ambiental Ministerio de Medio Ambiente y Medio

More information

Chapter 3 Settlement Strategy

Chapter 3 Settlement Strategy Draft Kerry County Development Plan 2015-2021 Chapter 3 Settlement Strategy 21-44 3.1 Settlement Hierarchy 3.2 Housing 3.3 Rural Settlement Strategy 3.4 Urban Settlement Strategy Draft Kerry County Development

More information

No. 132. Land Use and Building Act (132/1999, amendment 222/2003 included) Chapter 1. General provisions. Section 1 General objective of the Act

No. 132. Land Use and Building Act (132/1999, amendment 222/2003 included) Chapter 1. General provisions. Section 1 General objective of the Act NB: UNOFFICIAL TRANSLATION FINLAND No. 132 Land Use and Building Act (132/1999, amendment 222/2003 included) In accordance with the decision of Parliament the following is enacted: Chapter 1 General provisions

More information

Implementing a Coastal Settlement Boundary

Implementing a Coastal Settlement Boundary Implementing a Coastal Settlement Boundary Planning Practice Note 36 AUGUST 2015 The purpose of this practice note is to provide guidance about implementing a coastal settlement in a planning scheme for

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

ENVIRONMENTAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT REPORT for Investment Proposal: BUILDING A NEW NUCLEAR UNIT OF THE LATEST CHAPTER 12: CONCLUSION OF THE TEAM AND TEAM LEADER PREPARING THE ASSESSMENT original copy PREPARED

More information

Planning Policy and Guidance on Flooding and Coastal Erosion

Planning Policy and Guidance on Flooding and Coastal Erosion Planning Policy and Guidance on Flooding and Coastal Erosion James Hooker (MRTPI) Senior Planning Manager Welsh Government RTPI Cymru - Water and Flooding Seminar Tuesday 20 th November 2012 Overview

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

BEMBRIDGE NEIGHBOURHOOD DEVELOPMENT PLAN

BEMBRIDGE NEIGHBOURHOOD DEVELOPMENT PLAN BEMBRIDGE NEIGHBOURHOOD DEVELOPMENT PLAN EVIDENCE BASE DOCUMENT FOREWOOD The Bembridge Neighbourhood Plan Working Group was formed on 28 February 2012 and comprised members of the local community drawn

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

DRAFT POLICIES COUNTY OF HALIBURTON OFFICIAL PLAN UPDATE

DRAFT POLICIES COUNTY OF HALIBURTON OFFICIAL PLAN UPDATE SETTLEMENT AREAS Introduction Urban Serviced DRAFT POLICIES These urban areas have either full or partial primary urban services, mainly water, sewage and roads. Functionally, they tend to service larger

More information