1 National Directorate for Fire and Emergency Management Guide to Works and Development Consents for Repairing Infrastructure Damaged in Storms or other Emergency Events Document Title Guide to Works and Development Consents for Repairing Infrastructure Damaged in Storms or other Emergency Events Document Version: 1.4 Date 28/02/14 Prepared By: Document Status NC/ CO R Final Draft Approved for Issue: SH Date 4/3/2014 1
2 GUIDE TO WORKS AND DEVELOPMENT CONSENTS FOR REPAIRING INFRASTRUCTURE DAMAGED IN STORMS OR OTHER EMERGENCY EVENTS FEBRUARY 2013 Introduction The storms over the winter of 2013/14 had a seriously damaging effect on a range of infrastructure including: Roads and bridges; Piers and harbours; Seaside amenity areas; and Coastal defences and embankments. The Government has committed substantial aid in funds to enable local authorities and other public bodies in moving swiftly to repair the damage and enable local areas and communities to get back to normal. This Guide has been prepared with the inputs of relevant Government Departments and Offices to provide information on how necessary repair works can proceed in a way that takes account of legal requirements in relation to planning, watercourse management and biodiversity protection. This Guide has been prepared as a general overview and not as detailed legal advice. It is issued as a working draft and may be updated through feedback to the National Directorate for Fire and Emergency Management. Through the National Co-ordination Group on Severe Weather, the relevant Departments including the Department of the Environment, Community and Local Government, the Department of Arts, Heritage and the Gaeltacht, the Department of Transport, Tourism and Sport, the Department of Agriculture, Food and the Marine and the Office of Public Works have come together to provide advice in relation to the co-ordination of repair works and to ensure that people, property and nature are all protected in those repair efforts and in compliance with all legal requirements. The Department of Environment, Community and Local Government wishes to acknowledge the contribution of the relevant Departments and Offices to the production of this Guide. Emergency Works In broad terms, any emergency repair to damaged public infrastructure such as roads and bridges, car parks, piers and harbours and coastal defences on a like for like basis can and should proceed in line with legislative provisions that have been made for such situations. Emergency works are time-critical works that are necessary for dealing urgently with a situation which the relevant county/city Manager considers is an emergency situation calling for immediate action. Local authorities will be aware that under Section 179(6) of the Planning and Development Act 2000 as amended, the requirements under Part XI relating to development by local authorities do not 2
3 apply in respect of proposed development which is necessary for dealing urgently with any situation which the Manager considers is an emergency situation calling for immediate action. At the same time, the critical nature of these works should not prevent public authorities from keeping a documentary record of the relevant legislative provisions that they understand authorise the works. Having such a documentary record is considered important should any query or legal challenge arise afterwards regarding actions taken and the vires (legal powers) of a local authority to undertake them. Relevant provisions from the Planning and Development Act 2000 that authorise an array of statutory and non-statutory undertakers as amended are summarised in Appendix 1 to this Guide. Public authorities proposing to undertake or authorise emergency repair works need to form a view as to whether such works are likely to have significant effects on the environment. The nature of the works decided upon and the manner in which they are undertaken will often permit such effects to be avoided or mitigated. In some cases, expert advice may be required. The Department of Arts, Heritage and the Gaeltacht s National Parks and Wildlife Service will endeavour, within its resources, to provide appropriate ecological advice to local authorities in this situation. General Repair Where general repairs to infrastructure damaged in the storms are necessary, these are permitted where the repairs seek to restore the infrastructure to the condition it was in, before it was damaged. However, it is important to remember that if such repairs significantly alter the nature and/or extent of the infrastructure that was there in the first place, then relevant consents may require to be obtained. This is particularly important in those instances where it is proposed to put in place more extensive hard engineering coastal defences to protect the infrastructure to be repaired, and where significant in-stream works are proposed in repairing a bridge or other infrastructure in or adjoining a river. Within the overall and necessary repair efforts, it is vitally important that works achieve the desired outcome and avoid creating new problems for land and property owners elsewhere, or contaminating or causing siltation of sensitive waters and the aquatic habitats of sensitive species, notably salmon and the freshwater pearl mussel. In the marine context, shorelines absorb wave energy through a variety of means including the redistribution of sediment. Interference with these natural dynamic processes (by attempting to slow down or stop them) can sometimes exacerbate erosion elsewhere in subsequent storm events. Therefore, while the natural inclination is to immediately repair any damage that may be caused by storm events, this may not be necessarily the most effective option, and so careful analysis leading to the selection of the best option is essential in responding to erosional events. New coastal defence works are not considered to be part of repair or emergency works as they will require detailed study and assessment to determine that they will achieve the intended goal and that any potential negative outcomes will be identified and mitigated. 3
4 The photograph above shows an instance of ad-hoc works that go beyond the nature and scope of the pre-existing, but now damaged, coastal protection infrastructure. Works of this nature are liable to result in further damage, including the acceleration of coastal erosion elsewhere. Issues of illegal dumping may also arise. To avoid well-intentioned but ultimately counter-productive interventions where homes and other private structures are under genuine threat, local authorities should monitor areas where such interventions might be likely and to work proactively with property owners giving advice on the most appropriate steps and relevant consent requirements. New Works Unfortunately, in some cases the storm damage to infrastructure such as coastal roads and footpaths, car parks, amenity areas and burial grounds has been so severe that they and the lands on which they stood were completely obliterated, damaged beyond repair or buried under significant amounts of shingle and sediment. In these cases, it may be some time before works can be undertaken to replace the lost infrastructure. Replacement of lost infrastructure requires careful evaluation with regard to the feasibility of its restoration, including the feasibility of re-locating the relevant facilities to a safer location in view of the possible recurrence of, and susceptibility of alternative sites to, future similarly severe storm events. In these cases, specific development consents will be required because they will probably involve land acquisition and also require new infrastructure projects such as in the case of relocation of a road further inland. Their potential impact on the environment, including on European sites, will require to be assessed as necessary. Biodiversity and European law Some of our coastal areas, rivers and streams are particularly sensitive and are within or near sites that have been selected for designation as Special Areas of Conservation (SACs) or Special Protection Areas (SPAs). Details of these areas can be found at 4
5 Many of these sites have experienced extensive changes as a consequence of the recent storm and flooding events. Because these changes are the result of natural, if extreme, processes, ecological evaluation over time of the resultant changes is necessary. Even where there has been apparent loss of habitats (such as mobile dunes) or species, that evaluation will be necessary to inform the management and regulation of interventions affecting sites so as not to jeopardise natural processes of succession and recovery, in the light of the sites conservation objectives. In some such areas, flooding of farmland or amenity lands has occurred as a result of exceptionally high groundwater levels and inundation from the sea; this is expected to resolve itself as water tables return to their normal levels, and it is unlikely that any immediate works would be necessary or appropriate. In some sites, removal of soil, mud, gravel, sand or minerals on a site may be an activity that requires NPWS consent. Local authorities should advise landowners and farmers that they should discuss proposed works with their local NPWS representatives before engaging in any significant works in, or that may affect, European sites, including notifiable actions such as in-stream works. Generally, the removal of debris such as recently-fallen trees that are impeding flow and causing localised flooding should not be a problem but it is recommended to check with NPWS for advice before works commence. Proposals for in-stream works such as dredging or channel modification that alter the flow of water permanently will normally require more detailed assessments from an environmental and or biodiversity/habitat perspective because of the potential impact of such works on protected habitats or species. Where EIA or AA is required, planning consent will be necessary. Landowners in European sites have been notified of the requirement to obtain the consent of the Minister for Arts, Heritage and the Gaeltacht before undertaking certain works. This is generally achieved through contacting their local NPWS official. NPWS will endeavour to deal with such requests promptly. Arterial Drainage Works The OPW will be liaising closely with local authorities in relation to the performance of various rivers and watercourses in the recent floods. Local authorities have drawn up existing river basin catchment management plans. The OPW has developed a Catchment Flood Risk Assessment and Management (CFRAM) Programme, which is being delivered through the CFRAM Studies. The CFRAM Studies are comprehensive catchmentbased studies through which detailed flood maps are produced and flood risk management measures are assessed and taken to outline design. These measures will be prioritised and set out in a Flood Risk Management Plan (FRMP). The Local Authorities and the OPW are working together on the preparation of these flood risk management plans. In line with the National Flood Policy Review, the OPW is the lead authority in relation to the national programme for flood defences and also operates the Minor Works Scheme, whereby the OPW can provide funds to Local Authorities to undertake flood relief works (including channel clearance, where appropriate) to reduce flood risk. The national flood protection works programme, and the minor works scheme are focused on 5
6 reducing flood risk and are subject to the normal planning and environmental consents requirements. Further Information Any further queries in relation to this note should be directed, as appropriate, to: Planning Section, Department of the Environment Community and Local Government Custom House Dublin 1, Tel (01) ; National Parks and Wildlife Service, Department of Arts Heritage and the Gaeltacht, Ely Place Dublin 2, Tel (01) Office of Public Works Areterial Drainage Section, Hatch Street Dublin 2, Tel (046) Feedback on the Guide should be addressed to the National Directorate for Fire and Emergency Management, Department of the Environment Community and Local Government Custom House Dublin 1, Tel (01) ; 6
7 Appendix 1: Relevant Provisions of the Planning and Development Act 2000, as amended and Relevant Regulations made thereunder. (subject to corrections and update) Planning Legislation Relevant to Storm/Flood Damage Repair Measures and Reconstruction Exempted Developments General Planning legislation provides exemption from the requirement to apply for planning permission for local authorities, statutory bodies, statutory undertakers and private citizens and landowners in some measure across a broad spectrum of types of development. Section 4 of the Planning and Development Act provides general exemption for certain developers with regard to particular types and classes of development set out in Regulations. Exempted Developments Local Authorities Section 4 of the Planning and Development Act provides general exemption for works carried out by local authorities with one notable caveat: where a development requires environmental impact assessment (in accordance with the EIA Directive) or appropriate assessment (in accordance with the Habitats Directive). Section 4 provides exemptions for construction, maintenance or improvement of roads; sewers, mains, pipes, cables, overhead wires or other apparatus and including the excavation of street or other land for that purpose subject to conditions and limitations set out in Regulations, and subject to restrictions that may be imposed by a planning authority under article 9 of Regulations. Section 179 of the Act provides that a local authority may carry out development in accordance with the relevant Regulations (contained in Part 8), either on its own behalf or by an undertaker acting on behalf of, or in partnership with the local authority in accordance with procedures set out for public consultation and approval by the elected members by resolution; however, 179(6)(b) provides that the procedures may not apply where development is necessary for dealing urgently with any situation which the manager considers is an emergency situation calling for immediate action. Local Authority Developments: EIA and AA Section 175 of the Act provides that works carried out by the local authorities or an undertaker acting on its behalf of a type, scale or intensity that exceed the thresholds set out in Schedule 5 of the Regulations require the preparation of an EIS. The authority or undertaker is required to make an application for approval to the Board. Prior to this, the authority or undertaker is required to advertise the fact that an EIS has been prepared, that it intends to seek approval from the Board, will notify a transboundary State where there is any likelihood of significant effects on that State, and will invite submissions to the Board regarding the proposed development. Similarly, section 177AE provides that where local authority works require Appropriate Assessment the authority or undertaker is required to make an application for consent to the Board. It should be noted that the agreed text of the draft recasting of the codified EIA Directive provides that: 7
8 Member States may decide, on a case-by-case basis and if so provided under national law, not to apply this Directive to projects, or parts of projects, having as their sole purpose defence or projects having as their sole purposes, the response to civil emergencies, if they deem that such application would have an adverse effect on these purposes. Exempted Developments Statutory Bodies/Undertakers While section 4 of the Act provides generally for exemptions for statutory bodies and undertakers acting on their behalf, the Regulations set out particular classes of development with conditions and limitations imposed. These include: Office of Public Works; The ESB or other electricity undertakers; Bord Gais; Telecoms undertakers under Class 31 of Part 1, Schedule 2 of Regulations; Waterways Ireland; and Harbour Authorities. Exempted Developments Landowners Exemptions exist for landowners for general agricultural works under section 4. Landowners may also be subject to conditions and limitations provided for by articles: 8 (works specified in a drainage scheme), 8A (initial afforestation), 8B (field drainage for agriculture), 8C (land reclamation works), 8D (removal of field boundaries), 8E (works in Special Amenity Areas), 8F (replanting of forests or woodlands), and 8G (forest roads). Exempted developments in a European nature site may require the consent of the Minister for Arts, Heritage and the Gaeltacht under Regulation 30 of the European Communities (Birds and Natural Habitats) Regulations Where the Minister determines that Appropriate Assessment is required in relation to an exempted development, the matter will be referred to the planning system and planning permission will be required. Protected Structures Under section 59, where protected structures are endangered the planning authority may issue notice for specified works to be carried out to restore the structure within a period of not less than 8 weeks of the issue of the notice. Such a notice may be appealed to the District Court. 8
9 Legislation Potentially Relevant to Various Repair Works Affected Body/Agent Roads Bridges Piers/Harbours Coastal/River Defences Dredging/clearance of waterways Buildings/Houses Works on Land Local Authority S.4 (1) Note s.4(4) re EIA S.179 Regs Part 8 Note s.4(4) S.179 Regs Part 8 S.175 S.176 Part XAB S.53 Act Fifth Sch Regs a.8 Note s.4(4) S.179 Regs Part 8 S.53 S.175 S.176 Part XAB Act Fifth Sch Note s.4(4) S.179 Regs Part 8 S.175 S.176 Part XAB Act Fifth Sch Sch2/P3/Class3 Note s.4(4) S.179 Regs Part 8 S.175 S.176 Part XAB Act Fifth Sch Note s.4(4) S.58 S.59 S.79 S.252 Sch2/P1/Class50 Note s.4(4) S.252 Sch2/P1/Class36 /40/41/46/47/4 8 Sch2/P3/Class3 OPW Regs Part 9 Sch2/P1/Class51 Regs Part 9 Sch2/P1/Class5 1 Regs Part 9 Sch2/P1/Class5 1 Regs Part 9 Sch2/P1/Classes35/5 1 Regs Part 9 Sch2/P1/Classes35/5 1 Regs Part 9 Regs Part 9 Sch2/P1/Classes 36/51 9
10 Landowner S.58 S.59 S.79 S.7 S.4 Regs a.8/8a/8b/ 8C/8D/8E/8F/8G /9 Sch 2/P1/Class34 Sch2/P3/Classes 3/11/17/20 ESB Sch2/P1/Class26/ 27/28/29 Sch2/P1/Class 26/27/28/29 Sch2/P1/Class 26/27/28/29 Sch2/P1/Class 26/27/28/29 Sch2/P1/Class 26/27/28/29 Bord Gais Sch2/P1/Class25 Sch2/P2/Class 25 Sch2/P1/Class25 Sch2/P1/Class25 10
11 Telecoms undertaker Sch2/P1/Class31 Sch2/P1/Class31 Waterways Ireland Sch2/P2/Class35 Sch2/P2/Class35 Education Regs Part 9 S.4 (ref. Regs Sch 2/P1/Classes 20B/20C/57) Railway undertaker Sch2/P1/Class 23 Harbour Authorities Sch2/P1/Class 24 EPA S.7 Sch2/P1/Class46 /47 11
12 Dept. of Arts, Heritage and the Gaeltacht (NPWS) S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and 44. S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and 44. S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and 44 (where it is an exempted category of development and likely to require only a Notifiable Action consent or consent to an Activity Requiring Consent under the Regulations). 1 S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and 44. S.I. No. 477 of 2011, Reg. 27, 28, 29, 30, 42, 43 and An exempted development or an on-farm development that requires ARCs or Notifiable Activities consent is considered by D/AHG (NPWS) staff, and if it is determined that either EIA or Appropriate Assessment is required, then planning permission or the consent of the Minister for Agriculture, Food and the Marine must be sought if it is proposed to proceed with the works. Otherwise NPWS will provide consent for the proposed works. 12
13 13
An Irish Strategy for River Restoration: How it works on the ground. Karen Delanty
An Irish Strategy for River Restoration: How it works on the ground Karen Delanty River Restoration and EU Directives River Restoration in Ireland to-date; TAM (Tourism Angling Measure) Local small scale
How To Write A New Bill On Flood Management In Scotland
Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans
Improving the physical condition of Scotland s water environment A supplementary plan for the river basin management plans Contents Executive summary... 2 1. Introduction... 3 2. Vision... 4 3. Taking
London Borough of Merton Local Flood Risk Management Strategy
Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood
Aiding the Hydro-scheme development process. Web-links to useful information sources
Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation
Agricultural & Farm Development - The Planning Issues
Agricultural & Farm Development - The Planning Issues Generally, smaller developments of an agricultural or forestry nature are exempt, however, larger developments do require planning permission. In addition,
1 Introduction. 1.1 Key objective. 1.2 Why the South Esk
1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping
approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a
River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
2011 No. 1824 TOWN AND COUNTRY PLANNING. The Town and Country Planning (Environmental Impact Assessment) Regulations 2011
STATUTORY INSTRUMENTS 2011 No. 1824 TOWN AND COUNTRY PLANNING The Town and Country Planning (Environmental Impact Assessment) Regulations 2011 Made - - - - 19th July 2011 Laid before Parliament 26th July
SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
Local Area Plans. Planning Guidelines. Guidelines for Planning Authorities. Department of the Environment, Community and Local Government June 2013
23 Local Area Plans Planning Guidelines Guidelines for Planning Authorities Department of the Environment, Community and Local Government June 2013 Government of Ireland 2013 Table of Contents Page 1.
RESTORING streams to reduce flood loss
RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened
Environmental Impact Assessment of Forestry Projects
Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
Flood Protection & control works
Flood Protection & control works Whakamarumaru i ngā waipuke Environment Canterbury is the joint lead agency with territorial authorities for flood risk reduction. Under changes to the Local Government
GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act
Cape Cod Cranberry Growers Association GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cranberry Bogs and the Agricultural Exemption The Massachusetts Wetlands Protection Act (WPA)
PLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
THE NATIONAL PRELIMINARY FLOOD RISK ASSESSMENT (PFRA) OVERVIEW REPORT
THE NATIONAL PRELIMINARY FLOOD RISK ASSESSMENT (PFRA) OVERVIEW REPORT DRAFT FOR PUBLIC CONSULTATION AUGUST 2011 2019/RP/001/B FLOOD RELIEF & RISK MANAGEMENT DIVISION ENGINEERING SERVICES OFFICE OF PUBLIC
Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012
Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 This Explanatory Memorandum has been prepared by the Environment and Sustainable Development Department and
SCOTTISH EXECUTIVE Development Department PLANNING. Removal of Legal Impediments to E-Planning. Consultation Paper
SCOTTISH EXECUTIVE Development Department PLANNING Removal of Legal Impediments to E-Planning Consultation Paper August 2003 abcdefghijkl Victoria Quay Edinburgh EH6 6QQ Development Department Planning
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
Planning, Health and Environment Division
18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority
Designed and produced by geo-graphicsdesign.com DP 300 3/02
Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended
Number 27 of 2006 ARRANGEMENT OF SECTIONS. PART 1 Preliminary and General
Number 27 of 2006 PLANNING AND DEVELOPMENT (STRATEGIC INFRASTRUCTURE) ACT 2006 ARRANGEMENT OF SECTIONS PART 1 Preliminary and General Section 1. Short title, collective citation and commencement. 2. Definitions.
Newbiggin House Farm,
Newbiggin House Farm, Near Waberthwaite Flood Investigation Report 32 Flood Event 30/8/2012 Cumbria County Council Version Undertaken by Reviewed by Approved by Date Preliminary Colin Parkes Anthony Lane
Flood damaged road infrastructure: Can a rapid response be effected within the parameters of South Africa s environmental legislation?
Claire Blanché Kim White Flood damaged road infrastructure: Can a rapid response be effected within the parameters of South Africa s environmental legislation? 1 WESTERN CAPE WEATHER Cabo das Tormentas
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result
Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note
Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Engineering Policy 146. Severe Weather Management Plans
Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...
ArcGIS Model Build. ArcGIS Geodatabase. Brian Beckett (Inland Fisheries Ireland) and Dr. Sally Cook (Supervisor, University of Ulster, Coleraine)
An evaluation of GIS for the predictive modelling and mapping of specific stream power, substratum particle size and potential juvenile lamprey habitat Brian Beckett (Inland Fisheries Ireland) and Dr.
Sec. 22a-1a page 1 (4-97)
Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination
Restoration Planning and Development of a Restoration Bank
Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM 1. Applicant Details (See guidance note 1) 2. Agent Details Please complete if the applicant has an agent (See guidance note 2) * Title: * Forename:
New environmental liabilities for EU companies
New environmental liabilities for EU companies The ELD applies to all businesses that operate within the EU, even if the parent company is located outside of the EU. The ELD applies to all businesses,
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING
ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING Barclays has a strong and longstanding commitment to managing the environmental and social risks associated with commercial lending. We recognise that
Stormwater harvesting
Stormwater harvesting How to collect and re-use stormwater from Sydney Water s stormwater system Most of the stormwater pipes and channels in the Sydney metropolitan area are the responsibility of local
Plumbing and Drainage Regulation 2012
Regulatory Impact Statement Subordinate Legislation Act 1989 Plumbing and Drainage Regulation 2012 A regulation under the Plumbing and Drainage Act 2011 April 2012 Enquiries to: NSW Fair Trading Policy
Integrated Restoration Prioritization
Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various
201[X] No. INFRASTRUCTURE PLANNING. The Network Rail (Ipswich Chord) Order
Regulation number: Regulation 5(2)(b) Document Ref: 5.1 Author Winckworth Sherwood LLP Date: 21 June 2011 Date of revision & version number: 1.0 21 June 2011 STATUTORY INSTRUMENTS 201[X] No. INFRASTRUCTURE
Section 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
Draft Catchment Flood Risk Management Plan
Draft Catchment Flood Risk Management Plan February 2010 Acknowledgements In early 2006, the Office of Public Works (OPW), Cork City Council and Cork County Council commenced work on a Catchment-based
Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects
Eligibility Checklist This Ecological Restoration Limited Project Eligibility Checklist guides the applicant in determining if their project is eligible to file as an Inland or Coastal Ecological Restoration
Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014
Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,
Statement of Community Involvement (SCI) March 2016
Statement of Community Involvement (SCI) Contents Section Page No. 1.0 What is a Statement of Community Involvement?... 1 2.0 Who can get involved in the planning process?... 3 3.0 Empowering disadvantaged
Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation
Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing
Community Emergency Planning Guide
Community Emergency Planning Guide Our district has experienced numerous events over past years. Evidence from previous emergencies has shown that communities that plan and manage their own needs before,
WHAT TO DO IN THE EVENT OF AN ESCAPE OF FISH FROM A FISH FARM
WHAT TO DO IN THE EVENT OF AN ESCAPE OF FISH FROM A FISH FARM Guidance on reporting an escape or suspected escape under Part 4A of the Aquatic Animal Health (Scotland) Regulations 2009 GUIDANCE September
Bolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
COMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
OWNER BUILDER AS AN WHAT ARE MY RESPONSIBILITIES UNDER THE DEVELOPMENT ACT 1993
AS AN OWNER BUILDER building work? What records should I keep? Is insurance required? W I need approval for? What do I need approval for? How do I obtain building work? How do I obtain approval? What records
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS
1. OBJECTIVE CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS August 2015 To provide direction and guidance for the management of pest animals on lands and waters managed by the Department
3. Given the geographic extent of the area, amendments have been made to the following regional planning documents
AMENDMENTS TO THE REGIONAL PLANS RELATING TO LAND REPAIR ON EARTHQUAKE DAMAGED RESIDENTIAL LAND UNDER s27 OF THE CANTERBURY EARTHQUAKE RECOVERY ACT 2011 1. This memorandum outlines the specific changes
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
Flood Risk & Surface Water Management. Page 1 of 20
Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of
Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...
Department for Environment, Food and Rural Affairs Climate Ready Co-creation progress update and an invitation to respond July 2012 Contents Overview of ideas from co-creation activities towards a Climate
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011
KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]
The Planning System and Flood Risk Management
20 The Planning System and Flood Risk Management Guidelines for Planning Authorities November 2009 The Planning System and Flood Risk Management Guidelines for Planning Authorities Contents PAGE Ministers
January 2016. Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH
January 2016 Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH Pre-planning application advice service The city council is committed
Crown Land Management
Crown Land Management An introduction to Crown Land Management Fact Sheet 12 Updated December 2010 Approximately 93% of Western Australia s land area is Crown land (that is, not private land). The majority
Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction
Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Completeness checklist Introduction MassDEP Permit Applications, as well as Instructions & Support Materials, are
Creating the environment for business
1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,
Howsham fish passage Consultation document
Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing
Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc.
Environmental Assessment Approval Approval Date: ocr 2 8 zols Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Queens County, Nova Scotia The Liverpool Wind Farm (the Undertaking ), proposed
PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1
City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration
HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041
HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041 January 2014 Document control Document controller: Manager Environment & Sustainability Document number: EG0041 Rev Date Description
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
Activity Summary: Flood Protection and Control Works
Activity Summary: Flood Protection and Control Works Activity name Activity description Flood Protection and Control Works The Annual Plan 2014/2015 states that Flood Protection and Control Works covers
Self assessable codes temporary amendments extension Post flooding and cyclone impacts and fish habitat recovery 1 February 2013 31 October 2015
Self assessable codes temporary amendments extension Post flooding and cyclone impacts and fish habitat recovery 1 February 2013 31 October 2015 Temporary amendments extension to fisheries self assessable
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction
King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction Introduction Eminent domain refers to the power possessed by the state over all property within the
Living & Working Managing Natural Resources and Waste
Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN
Report No. ES15041 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Executive Date: 9 th September 2015 Decision Type: Non-Urgent Executive Non-Key Title: Contact Officer: Chief Officer: Ward:
Paragraph 9 Exemption The reclamation or improvement of land
The reclamation or improvement of land 1 INTRODUCTION This document provides guidance, definitions, operational policy and strategy with regard registering a paragraph 9 exemption under Schedule 1 of the
Welsh Government. Practice Guide. Realising the potential of pre-application discussions
Welsh Government Practice Guide Realising the potential of pre-application discussions May 2012 Digital ISBN 978 0 7504 7623 2 Crown Copyright 2012 WG 15424 (2) Table of contents 1 Introduction...3 Background...3
CITY OF SUBIACO. PLANNING POLICY 1.4 (September 2013) PUBLIC NOTIFICATION OF PLANNING PROPOSALS
CITY OF SUBIACO PLANNING POLICY 1.4 (September 2013) PUBLIC NOTIFICATION OF PLANNING PROPOSALS ADOPTION DATE: to be inserted AUTHORITY: TOWN PLANNING SCHEME NO. 4 STATE PLANNING POLICY 3.1 RESIDENTIAL
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)
THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating
Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth
Melbourne Water Principles for Provision of Waterway and Drainage Services for Urban Growth Contents About Melbourne Water 3 Principles for Creating Development Services Schemes 4 Preface 4 (Original)
MEMORANDUM OF UNDERSTANDING BETWEEN INSURANCE IRELAND AND THE OFFICE OF PUBLIC WORKS
MEMORANDUM OF UNDERSTANDING BETWEEN INSURANCE IRELAND AND THE OFFICE OF PUBLIC WORKS 24 March, 2014 1. Purpose of the Memorandum of Understanding (MOU) 1.1 Insurance Ireland (II) and the Office of Public