1 1 1 Sample software development project Start project Initiation phase Develop project charter Project charter approved Planning phase Product activities Manage scope definition Create scope document Scope document approved Manage requirements gathering Prepare research instruments Interview users Interview SHs Interview SMEs Draft requirements document Review requirements document Revise requirements document Requirements document approved Manage development planning Create development plan Development plan approved Manage test planning Create test plan Test plan approved Manage deployment planning Create deployment plan Deployment plan approved Manage maintenance planning Create maintenance plan Maintenance plan approved Manage acceptance Create acceptance criteria Acceptance criteria approved Project activities Manage scope / cost / schedule planning Develop project plan Create task list Create estimates Create network diagram (PERT) Create work breakdown structure (WBS) Create schedule (GANTT) Create milestone plan Create organization plan Create resource assignments Create budget Project plan approved Manage communications planning Develop communications plan 2003 Patricia Ensworth Page 1
2 Communications plan approved Manage quality planning Develop quality plan Quality plan approved Manage risk planning Develop risk management plan Risk management plan approved Manage procurement planning Develop procurement plan Procurement plan approved Manage HR planning Develop HR plan HR plan approved Manage integration planning Coordinate plans Execution phase Product activities Manage design Develop use cases Create data architecture Create hardware architecture Perform impact analysis Develop migration strategy Design product Design UI Design objects Design workflow Design rules Design middle tier Design database Design connectivity with other systems Design permissions Product design approved Design tests Design manual tests Design UI tests Design object tests Design workflow tests Design rules tests Design middle tier tests Design database tests Design connectivity tests Design permissions tests Design automated tests Design automated tests for functionality Design automated tests for performance Design beta test Design user acceptance test Test design approved 2003 Patricia Ensworth Page 2
3 Create design documentation Manage development Market to management Build prototype Demo prototype Coordinate with IT Develop training Develop user documentation Develop publicity Develop product Develop UI Develop objects Develop workflow Develop rules Develop middle tier Develop database Develop connections with other systems Develop permissions Develop migration scripts Create system documentation Product development complete Develop tests Develop unit tests Develop system tests Develop integration tests Develop environment tests Develop migraiton tests Create test documentation Test development complete Create build Build approved for testing QA environment approved for testing Execute tests Execute manual tests Execute automated tests Execute beta test Execute user acceptance test Analyze test results Compile test statistics Build approved by QA Version finalized Version approved for deployment Manage deployment Schedule release Schedule training Schedule user training Schedule Help Desk / TSA training Notify Change Control Rollout 2003 Patricia Ensworth Page 3
4 Back up databases Migrate data Install software on Web server Install software on desktop Conduct verification tests Confirm successful rollout Announce launch Publish press release Write article for newsletter Attend party Project activities Manage scope / cost / schedule Monitor product changes Monitor project changes Renegotiate scope / cost / schedule commitments Manage communications Implement communications methods and strategies Select tools Specify protocols Distribute information Attend status meetings Attend core management meeting Attend core team meeting Attend FM / SH / SME meeting Create status reports Document project procedures Resolve communications problems Manage quality Manage quality assurance Establish product standards and procedures Define quality criteria Define quallity assessment methods Establish project standards and procedures Establish requirements standards and procedures Establish change management standards and procedures Establish documentation standards and procedures Establish configuration management standards and procedures Establish source code control standards and procedures Establish version control standards and procedures Establish peer review standards and procedures Establish coding standards and procedures Establish code commentary standards and procedures Establish build standards and procedures Establish release standards and procedures Design technical infrastructure Build requirements repository Create requirements templates Implement requirements database Build change management repository 2003 Patricia Ensworth Page 4
5 Create change management templates Implement change management database Build documentation repository Create documentation templates Implement documentation database Implement configuration management database Implement source code database Implement version control database Configure project environment Configure development environment Configure test environment Configure unit testing environment Configure system testing environment Configure integration testing environment Configure automated testing envrionment Configure performance testing environment Configure international testing environment Configure beta testing environment Configure user acceptance testing environment Configure staging environment Configure production environment Select tools Select development tools Select testing tools Manage quality control Monitor product quality Analyze defects reported Analyze change requests submitted Analyze tests failed Analyze requirements revised Conduct SME focus groups Monitor project quality Perform audits Audit requirements repository Audit change management repository Audit documentation repository Audit configuration management database Audit source code database Audit version control database Audit peer review practices Audit coding practices Audit code commentary practices Audit build practices Audit release practices Audit project environment Perform maintenance Maintain requirements repository Maintain change management repository Maintain documentation repository 2003 Patricia Ensworth Page 5
6 Maintain configuration management database Maintain source code database Maintain version control database Maintain project environment Maintain tools Implement process improvements Manage risk Monitor risks Specify responses Manage procurement Identify procurement requirements Perform make-or-buy analysis Determine localized intl specifications Prepare RFPs Review proposals Evaluate bids Evaluate vendors Sign contracts All contracts signed Procure materials Manage HR Form project team Identify project HR requirements Select staff members Recruit consultants Hire new staff Project team formed Train project team Develop project training materials Attend business orientation Attend technical orientation Attend internal class Attend external class Adapt team Attend team-building activity Support remote/virtual/telecommuting work Reallocate roles and responsibilities Manage integration Update project plan Update communications plan Update quality plan Update risk management plan Update procurement plan Update HR plan Closing phase Product activities Manage maintenance Perform impact analysis Monitor user acceptance 2003 Patricia Ensworth Page 6
7 Monitor performance Monitor defects Resolve training and support issues Resolve technical problems Establish maintenance procedures Analyze statistics Gather requirements for enhancements Manage acceptance Demo product to SHs, SMEs and FMs Obtain confirmation of acceptance criteria Acceptance confirmed Project activities Manage scope / cost / schedule closure Create final version of project plan Manage communications closure Send thank-you messages Complete documentation Attend Lessons Learned meeting Create final status reports Manage quality closure Evaluate product quality Analyze change requests submitted Analyze customer complaints received Analyze tech support calls received Analyze processing errors Analyze data errors Conduct user focus groups Create product quality assessment Evaluate project quality Analyze estimates vs. actuals Analyze plans vs. realities Analyze compliance with standards and procedures Analyze process effectiveness Create project quality assessment Manage risk closure Identify future risks Specify risk responses Manage procurement closure Close out contracts All contracts closed out Manage HR closure Provide PE feedback to team members Provide PE feedback to team members' managers Provide PE feedback to vendors and consultants Project team disbanded Manage integration closure Consolidate and index documentation Create summary statistics for historical reference End project 2003 Patricia Ensworth Page 7
Using Microsoft SharePoint for Project Management
ASPE IT Training Using Microsoft SharePoint for Project Management A WHITE PAPER PRESENTED BY ASPE www.aspe-it.com 877-800-5221 Using Microsoft SharePoint for Project Management A modern Project Management
More informationPROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
More informationTHE COMPLETE WORKFLOW MANAGEMENT SOLUTION FOR ENTERPRISES
THE COMPLETE WORKFLOW MANAGEMENT SOLUTION FOR ENTERPRISES Employee On-Boarding Payroll Collaboration Intranet Employee Data Performance Training & Skills and Leave Comprehensive Hiring Appraisals & Performance
More informationRe: RFP # 08-X-39202 MOTOR VEHICLE AUTOMATED TRANSACTION SYSTEM (MATRX) FOR MVC ADDENDUM #10
State of New Jersey DEPARTMENT OF THE TREASURY JON S. CORZINE DIVISION OF PURCHASE AND PROPERTY BRADLEY I. ABELOW Governor PURCHASE BUREAU State Treasurer P.O. BOX 230 TRENTON, NEW JERSEY 08625-0230 September
More informationID Task Name Time Pred
0 UC Modernization Project Plan 1115 d 1 1 Phase I - Business Case Development and Competitive Procurement 205 d 2 1.1 Complete Initial Feasibility Study 55 d 3 1.2 Prepare and Issue LBR 30 d 2 4 1.3 Competitive
More informationProject Lifecycle Management (PLM)
Project Lifecycle Management (PLM) Process or Tool? Why PLM? Project Definition Project Management NEW REQUEST/ INITIATIVES SUPPORT (Quick fixes) PROJECT (Start Finish) ONGOING WORK (Continuous) ENHANCEMENTS
More informationPMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
More informationInput, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
More informationCompany A Project Plan
Company A Project Plan Project Name: Close Optimization Project Example Prepared By: David Done - Project Manager Title: John Doe -Project Manager Date: March 17, 2011 Project Plan Approval Signatures
More informationGuiding Principles that work Ruel L.A. Ellis
Guiding Principles that work Ruel L.A. Ellis Why E-Learning Rationale for E-Learning Why E-Learning Projects Fail Project Management Philosophy Stage 1: Defining the Project Stage 2: Planning the E-Learning
More informationState of Oregon. State of Oregon 1
State of Oregon State of Oregon 1 Table of Contents 1. Introduction...1 2. Information Asset Management...2 3. Communication Operations...7 3.3 Workstation Management... 7 3.9 Log management... 11 4. Information
More informationRFP Attachment C Classifications
RFP 1. Applications IT Architect Analyzes and designs the architecture for software applications and enhancements, including the appropriate application of frameworks and design patterns and the interrelationships
More informationRequest for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
More informationSOFTWARE DEVELOPMENT PLAN
SOFTWARE DEVELOPMENT PLAN This document outline is based on the IEEE Standard 1058.1-1987 for Software Project Management Plans. This is the controlling document for managing a software project, and it
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationKMS Implementation Roadmap
KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5
More informationUnderstand why, when and how-to to formally close a project
Project Closure Purpose: Understand why, when and how-to to formally close a project Audience: Project managers, project sponsors, team members and other key stakeholders Learning Objectives: Describe
More information70-646 R3: Windows Server 2008 Administration. Course Overview. Course Outline. Course Length: 4 Day
70-646 R3: Windows Server 2008 Administration Course Length: 4 Day Course Overview This course will prepare the student for Exam 70-646: Pro: Windows Server 2008, Server Administrator. Topics covered include
More information7 Practical insights for IT Asset Management
7 Practical insights for IT Asset Management Tauneel McKay Director Swiss Reinsurance Company Ltd Subbarao Chaganty Principal Consultant Infosys Ltd RELATE MANAGE.. Context KNOW. Consolidate the IT Asset
More informationT141 Computer Systems Technician MTCU Code 50505 Program Learning Outcomes
T141 Computer Systems Technician MTCU Code 50505 Program Learning Outcomes Synopsis of the Vocational Learning Outcomes * The graduate has reliably demonstrated the ability to 1. analyze and resolve information
More informationThe 10 Knowledge Areas & ITTOs
This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading
More informationDallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
More informationSoftware Development Standard Deliverables
Software Development Standard Deliverables Lifecycle Methodology Created By Rafael Soultanov Version 1.1 September 19, 20044 Development Lifecycle Methodology Document Control Change Record Date Author
More informationDevelop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
More informationAppeals Case Management System Project. Scope Management Plan. November 20, 2014
Appeals Case Management System Project Version 1.0 Health and Human Services Agency, Office of Systems Integration Template Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF
More informationManaging and Maintaining Windows Server 2008 Servers
Managing and Maintaining Windows Server 2008 Servers Course Number: 6430A Length: 5 Day(s) Certification Exam There are no exams associated with this course. Course Overview This five day instructor led
More informationPHASE 5: DESIGN PHASE
PHASE 5: DESIGN PHASE During the Design Phase, the system is designed to satisfy the requirements identified in the previous phases. The requirements identified in the Requirements Analysis Phase are transformed
More informationProject Management Plan Template
Abstract: This is the project management plan document for . This is a controlled document and should be maintained in a configuration environment. Project Management Plan Template Contents REVISION
More informationApplication Management Services (AMS)
Contents 1. AMS : An Overview 2. AMS : Models 3. Delivery Organization 4. Processes & Tools 5. Transition Methodology 6. Pricing Application Management Services (AMS) Enterprise Application Services Capability
More informationYour Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.
INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing
More informationChange Management Best Practices
General Change Management Best Practices Practice Area Best Practice Criteria Organization Change management policy, procedures, and standards are integrated with and communicated to IT and business management
More informationQuick Reference Guide Interactive PDF Project Management Processes for a Project
Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process
More informationProject Integration Management
Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform
More informationSystems Analysis and Design in a Changing World, Fifth Edition
Systems Analysis and Design in a Changing World, Fifth Edition Learning Objectives Explain the elements of project management and the responsibilities of a project manager Explain project initiation and
More informationTemplate K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
More information<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
More information44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
More informationIntroduction to the ITS Project Management Methodology
Introduction to the ITS Project Management Methodology In September 1999 the Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER) produced a report entitled Major Computer
More informationDepartment of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
More informationOptimos Enterprise Helpdesk Automation Solution Case Study
Optimos Enterprise Helpdesk Automation Solution Case Study IT Help Central National Science Foundation Optimos Incorporated 4455 Brookfield Corporate Drive Chantilly, VA 20151 Telephone: (703) 488-6900
More informationRelease Automation for Siebel
June 30 th 2015 Release Automation for Siebel Stefan Kures Agenda + Common Challenges + Automic s solution + Positive Outcomes + Customer Example 3 Property of Automic Software. All rights reserved Siebel
More informationThe Project Management Plan will be used to guide, communicate and coordinate project efforts.
F.1 General Implementation Contractor Deliverables include critical system planning and development components. Sufficient deliverables have been identified at key steps in the project to guide the project
More informationCHAPTER 3: MANAGING IMPLEMENTATION PROJECTS
Chapter 3: Managing Implementation Projects CHAPTER 3: MANAGING IMPLEMENTATION PROJECTS Objectives Introduction The objectives are: Describe common problems that occur in implementation projects. Describe
More informationEMPLOYEE REFERRAL PROGRAM - US
EMPLOYEE REFERRAL PROGRAM - US Objective This policy aims to bring candidates with requisite qualification and skills to our organization. On successful placement of the candidate, the employee will receive
More informationNo man is wise enough by himself. -Plautus
Project Management Facilitation Skills No man is wise enough by himself. -Plautus This course is designed to help managers and facilitators better coordinate their project teams. Participants will learn
More informationManual Testing Online Training Concepts : Software Testing Manual Module 1: Testing fundamentals. Introduction:
Manual Testing Online Training Concepts : Software Testing Manual Module 1: Testing fundamentals Introduction: Why explicitly the s/w companies are recruited the test engineers: Who can do this Testing:
More informationProject Management Planning
Develop Project Tasks One of the most important parts of a project planning process is the definition of activities that will be undertaken as part of the project. Activity sequencing involves dividing
More informationValidating Enterprise Systems: A Practical Guide
Table of Contents Validating Enterprise Systems: A Practical Guide Foreword 1 Introduction The Need for Guidance on Compliant Enterprise Systems What is an Enterprise System The Need to Validate Enterprise
More informationDraft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing
STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the
More informationPrepared by: Rick Leopoldi November 22, 2003
RL Consulting Project Best Practices for the Application ment Process Prepared by: Rick Leopoldi November 22, 2003 Copyright 2003 RL Information Consulting LLC. All rights reserved. Duplication of this
More informationCDC UNIFIED PROCESS PRACTICES GUIDE
Purpose The purpose of this document is to provide guidance on the practice called Project Close-Out and to describe the practice overview, requirements, best practices, activities, and key terms related
More informationProject Management Plan for the VDI Data Center Project
Project Management Plan for the VDI Data Center Project Prepared by: Moe Yousof A paper submitted to the Project Management Training Program in partial fulfillment of the requirements for the Project Management
More informationA Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition
A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise
More informationAutomated Office Systems Support Quality Assurance Plan. A Model DRAFT. December 1996
Quality Assurance Plan A Model DRAFT United States Department of Energy Office of Nonproliferation and National Security Title Page Document Name: Publication Date: Draft, ontract Number: Project Number:
More informationProject Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationOCCUPATIONAL GROUP: Information Technology. CLASS FAMILY: Security CLASS FAMILY DESCRIPTION:
OCCUPATIONAL GROUP: Information Technology CLASS FAMILY: Security CLASS FAMILY DESCRIPTION: This family of positions provides security and monitoring for the transmission of information in voice, data,
More informationProgram Management Review
2020 Census Program Management Review High-level 2020 Census Life Cycle Schedule March 28, 2014 Kim Higginbotham Program Manager for Project Management, 2020 Census Research and Planning Office U.S. Census
More informationTesting Tools using Visual Studio. Randy Pagels Sr. Developer Technology Specialist Microsoft Corporation
Testing Tools using Visual Studio Randy Pagels Sr. Developer Technology Specialist Microsoft Corporation Plan REQUIREMENTS BACKLOG Monitor + Learn Development Collaboration Production Develop + Test Release
More informationAutomating Business Processes Using SharePoint Designer
Automating Business Processes Using SharePoint Designer Jeff MacKenzie Director of Technology Edgewater Technology www.edgewater.com jmackenzie@edgewater.com Contents What is a workflow? Types of SharePoint
More informationP-20 Longitudinal Data System Project Roles and Skills
P-20 Longitudinal Data System Project Roles and Skills Introduction This Solution Brief provides guidelines for the type of roles and skills a State Education Agency (SEA) should have in place for a successful
More informationProject Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
More informationImplementation Process Ensuring Effective Development and Deployment
Implementation Process Ensuring Effective Development and Deployment Highlights Our spiral process facilitates rapid and accurate development Iterative software deployment, which captures and incorporates
More informationSolovatSoft. Load and Performance Test Plan Sample. Title: [include project s release name] Version: Date: SolovatSoft Page 1 of 13
SolovatSoft Load and Performance Test Plan Sample Title: [include project s release name] Version: Date: SolovatSoft Page 1 of 13 Approval signatures Project Manager Development QA Product Development
More informationCrosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
More informationSECTION I PROJECT SUMMARY (TRW)
SECTION I PROJECT SUMMARY (TRW) Table I Summary Agency/Department Information TRW Information Executive Sponsor: Cynthia Lorenzo Received Date: Managers: Ron McCranie/Andy Loveland Status Meeting Date:
More informationCould your company benefit from automated workflow, and the power of R3?
Could your company benefit from automated workflow, and the power of R3? Continue to learn more. 1 :: Could your company benefit from automated workflow? Consider these questions Does your company utilize
More informationAbar Solutions Petroleum Consultancy & Training Qualified From KPC Training & Consulting Services Provider. Code Period Language Start End Location
Training Course : Project Management Skills & Estimation Development Training Course For One Week In Canada, Montreal, Hyatt Regency Montreal Which Be Held As Under Details : Tel. : 00965 22610021 99600277,
More informationProject Management Planning
The Project Plan Template The Project Plan The project plan forms the basis for all management efforts associated with the project. A project plan template is included in this document. The information
More informationITIL V3 Intermediate Capability Stream:
ITIL V3 Intermediate Capability Stream: RELEASE CONTROL AND VALIDATION (RC&V) CERTIFICATE SCENARIO BOOKLET Scenario One A global commercial IT service provider has three service desks that support internal
More informationProject Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
More informationHalton Regional Police Service Public Agenda Recommendation Report
Halton Regional Police Service Public Agenda Recommendation Report To: Chairman and Police Service Board Members From: Chief Stephen J. Tanner Subject: SINGLE SOURCE BUCHANAN TECHNOLOGIES Report #: P15-5-CPS-R-01
More informationComparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500
Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: office@sts.ch Phone:
More informationModel-Driven Software Produces Truly Agile Solutions
Model-Driven Software Produces Truly Agile Solutions IEEE STC 2014 Long Beach, California April 1, 2014 Steve Kruba Chief Technologist Product Strategy & Development NGIS Technical Fellow Model-Driven
More informationPlease Note: Temporary Graduate 485 skills assessments applicants should only apply for ANZSCO codes listed in the Skilled Occupation List above.
ANZSCO Descriptions This ANZSCO description document has been created to assist applicants in nominating an occupation for an ICT skill assessment application. The document lists all the ANZSCO codes that
More informationColorado Department of Health Care Policy and Financing
Colorado Department of Health Care Policy and Financing Solicitation #: HCPFRFPCW14BIDM Business Intelligence and Data Management Services (BIDM) Appendix B BIDM Project Phases Tables The guidelines for
More informationTMMi Case Study. Methodology. Scope. Use TMMi to do a gap analysis for an independent
TMMi Case Study TMMi Case Study Presentation Use TMMi to do a gap analysis for an independent testing organisation Involves 2 assessors for 5 days Objectives Determine how well the organisation is meeting
More informationKnowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs
HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing
More informationProject Plan Version 0.0
Software Development Templates Project Plan Version 0.0 DOCUMENT NO: VERSION: CONTACT: EMAIL: Authors Name xxx.xxx@xxx.xxx DATE: 15/07/2003 Unlimited distribution subject to the copyright. Project Plan
More informationTHE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
More informationADMINISTRATIVE SUPPORT AND CLERICAL OCCUPATIONS SIN 736 1
Following are the Contractor Site and Government Site Labor Categories for SIN 736-1, SIN 736-1, and SIN 736-5. Please do not hesitate to contact us at gsataps@amdexcorp.com if you have any questions ADMINISTRATIVE
More informationStatement of Work. Systems Center Configuration Manager. Prepared for School Board of Sarasota County Thursday, 12 June 2008 Version 1.3.
Statement of Work Systems Center Configuration Manager Prepared for School Board of Sarasota County Thursday, 12 June 2008 Version 1.3.1 Released Prepared by Dom Vila Program Manager dom.vila@microsoft.com
More informationRPL Candidate Self-Evaluation
Diploma of Information Technology Unit Typical tasks performed Please below if this is you Please provide further comments or examples I have managerial responsibility and have undertaken work to develop,
More informationCustom Software Development Approach
Custom Software Development Approach Our approach to custom software development combines benefits from several standard development process models. We tend to have a well-defined, predictable and highly
More informationConnecting the essential pieces to build a powerful information platform
Connecting the essential pieces to build a powerful information platform End-to-end SharePoint consulting Implementation, integration, migration, and custom development Access the leading SharePoint technical
More informationProject Implementation Process (PIP)
Vanderbilt University Medical Center Project Implementation Process (PIP).......... Project Implementation Process OVERVIEW...4 PROJECT PLANNING PHASE...5 PHASE PURPOSE... 5 TASK: TRANSITION FROM PEP TO
More informationCopyright 2014 Clarizen. All rights reserved. United States: United Kingdom: Israel: France: www.clarizen.com
Clarizen s Advanced On-boarding Program is designed to ensure new enterprise customers adopt and deploy the Clarizen platform as quickly and smoothly as possible. Through the program, you'll benefit from
More informationProject Human Resource Management. Overview of PMBOK Basics
Human Resource Management Overview of PMBOK Basics Michael R. Williams Ph.D. Professor - College of Business Administration Director Professional Sales Institute Illinois State University Campus Box 5590
More informationCertification Preparation Course LATVIKON (R.E.P.)Centre
PMP Certification Preparation Course LATVIKON (R.E.P.)Centre ABOUT THIS COURSE Your ability as a project manager to demonstrate best practices in Project Management both on the job and through professional
More informationChapter 6 Implementation Planning
Chapter 6 Planning Planning- Division into Work Packages The following are the recommended Work Packages Overall Change Programme Work Package 1 E-Cabinet Model Work Package 2 Security Policy Design Work
More informationThe Danwood Group Professional Services Offering DANWOOD
The Danwood Group Professional Services Offering DANWOOD Our Professional Services Our Professional Services department can provide you with a variety of services from Audit and Assessment to Technical
More informationReport of Audit OFFICE OF INSPECTOR GENERAL. Information Technology Infrastructure Project Management A-07-02. Tammy Rapp Auditor-in-Charge
OFFICE OF INSPECTOR GENERAL Report of Audit Information Technology Infrastructure Project Management A-07-02 Tammy Rapp Auditor-in-Charge FARM CREDIT ADMINISTRATION Memorandum Office of Inspector General
More informationAppendix A-2 Generic Job Titles for respective categories
Appendix A-2 for respective categories A2.1 Job Category Software Engineering/Software Development Competency Level Master 1. Participate in the strategic management of software development. 2. Provide
More informationAssumptions. It is assumed that:
It is assumed that: Assumptions 1. The State will establish a MICAM project steering committee to oversee the progress of the project. This steering committee will have representation from Contractor.
More informationHow To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
More informationThe Software. Audit Guide. ASQ Quality Press. Milwaukee, Wisconsin. John W. Helgeson
The Software Audit Guide John W. Helgeson ASQ Quality Press Milwaukee, Wisconsin Contents Preface Acknowledgments xv Xlx Part I Audit Fundamentals 1 Chapter 1 Introduction 3 1.1 Definitions 7 1.2 Process
More informationIntroduction. What is ITIL? Automation Centre. Tracker Suite and ITIL
1 Introduction The Information Technology Infrastructure Library (ITIL) aims to improve the management of IT services within the organization, for lowered costs, improved efficiency and productivity. But
More informationProduct Lifecycle Management (PLM) Service Providers. On Leading PLM Solutions
Product Lifecycle Management (PLM) Service Providers On Leading PLM Solutions Domain, Technology & Product Specific PLM Consulting Group Your Preferred Technology Consulting Partner Value Proposition One
More informationPHASE 8: IMPLEMENTATION PHASE
PHASE 8: IMPLEMENTATION PHASE The Implementation Phase has one key activity: deploying the new system in its target environment. Supporting actions include training end-users and preparing to turn the
More informationReMilNet Service Experience Overview
ReMilNet Service Experience Overview ReMilNet s knowledge across all functional service areas enables us to provide qualified personnel with knowledge across the spectrum of support services. This well
More information