Project Management Plan Template
|
|
|
- Mercy Webster
- 10 years ago
- Views:
Transcription
1 Abstract: This is the project management plan document for <project>. This is a controlled document and should be maintained in a configuration environment. Project Management Plan Template
2 Contents REVISION HISTORY... 1 INTRODUCTION... 2 EXECUTIVE SUMMARY OF PROJECT CHARTER... 2 SCOPE MANAGEMENT... 2 Scope management plan... 2 Project deployment plan... 2 Scope baseline... 2 REQUIREMENTS... 2 Issues and Concerns... 2 Assumptions... 2 Dependencies... 2 Unknowns... 2 CHANGE MANAGEMENT PLAN... 3 SCHEDULE MANAGEMENT... 3 High level schedule... 3 Release criteria... 3 Milestones and tentative release dates... 3 COST / BUDGET MANAGEMENT... 3 QUALITY MANAGEMENT... 3 RESOURCE MANAGEMENT... 4 Resources management plan... 4 Core Team and Organizational Structure... 4 Resource allocation... 4 Resource ramp up plan... 4 COMMUNICATIONS MANAGEMENT... 4 RISK MANAGEMENT... 5 PROCUREMENT MANAGEMENT... 5 PLAN SIGN-OFF / APPROVAL... 5 Revision History Date Description Author Version Comments
3 Introduction <This section should talk about, purpose of the project management plan, intended audience to this document > Executive Summary of Project Charter <This should outline objectives and summary of the approved project charter. Provide location reference of the project charter here. High level business needs expected to be addressed by the project are to be outlined. Make sure to outline any assumptions and constraints as mentioned in the project charter.> Scope Management <This paragraph should outline main high level requirements, references to the main requirement documents location. Work breakdown structure is to be highlighted here. Scope management plan <here should outline how scope is maintained and changes are managed. Project deployment plan <Also provide project deployment plan, project soft requirements (non-functional requirements such as performance, availability, maintainability etc. Scope baseline <Information such as Scope statement, WBS, WBS dictionary are mentioned, or reference to those documents is provided here.> Requirements High level requirements are mentioned, and link to the detailed requirements is provided here. Issues and Concerns Assumptions Dependencies Unknowns
4 Change management plan <Change management plan is highlighted here. Change control board, its members, their details, process of managing changes, frequency of meeting, and any other related information is outlined here.> Schedule Management <This section should the high level schedule, milestones, release criteria, release needs for milestones. Detailed schedule management plan also is mentioned here. Reference link to the project schedule also is provided. High level schedule Release criteria Milestones and tentative release dates Milestones Expected deliverables Estimated Completion > Cost / Budget Management <This section should outline Cost management plan here. Apart from it this section will reference Cost performance baseline information.> Quality Management <Quality management plan how quality is ensured on the project, is mentioned here. This section will outline the practices and processes around quality assurance and quality control. The quality management team, skillset needs for resources, dependencies on software or equipment, testing plan, test data, test beds, test scenarios and test cases management, quality metrics, metrics collection methods and frequency of collection, metrics analysis responsibilities, change management plan are all outlined here. Alternately reference to those documents where these are detailed can also be provided here.>
5 Resource Management Resources management plan < Human resource mix, skillset needs, attrition management plan, recognition and rewards, training needs and plans, team management and development plan are all outlined here.> Core Team and Organizational Structure Assigned Project Manager <Project manager is identified and assigned when this document is prepared. This section will also talk about the authorization and responsibilities given to the project manager. These will basically vary based on whether the organization is that of functional, matrixed, or Projectized.> Core Team <Core team required to kick-start the project, and team ramp up expected are mentioned in this section. Core team members identified at this juncture are mentioned as well.> Name Function Role Resource allocation < including people, equipment, tools, hardware/software needs are all listed here> Resource ramp up plan <How resources come into plan during project phases to maximize ROI on them, is mentioned here> Communications Management < Communication management plan is mentioned here. It should contain different communication needs are listed, stakeholders who need specific communication, their frequency, methods and mechanism in which communication happen.
6 Stakeholder Message type Communication mechanism Frequency Responsibility - person Feedback Mechanisms > Risk Management Risk management plan goes in here. Types of risks, their rankings based on qualitative and quantitative analysis, risk responses are some of the information to be captured. Impact of different plans on risks and vice versa, the mechanism to effect changes to those plans based on risk assessment are also mentioned here. > Procurement Management If procurement is necessary on this project, this section mentions Procurement management plan. Information like methods to decide make-or-buy decisions, ways of floating Request-for-proposal from potential vendors, mechanism to select vendors, vendor management policies, payment terms, their performance measurement criteria are some of the things outlined in this section.> Plan Sign-off / approval Stage Submitted by Approved by Date Comments
Quick Reference Guide Interactive PDF Project Management Processes for a Project
Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process
Project Management Professional (PMP)
Project Management Professional (PMP) Duration: 5 days Course Objectives: PMI s Project Management Professional (PMP) credential is the most important industry-recognized certification for project managers.
Input, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) [email protected] 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
Project Integration Management
Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process
PROJECT MANAGEMENT PLAN <PROJECT NAME>
PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
Time Management. Herb Pollard III
Time Management A Small Business Perspective Herb Pollard III Project Manager for Time Management - Pollard PMI Slide 1 Introduction: Time Management - Pollard PMI Slide 2 Project Phases and the Areas
Certification Preparation Course LATVIKON (R.E.P.)Centre
PMP Certification Preparation Course LATVIKON (R.E.P.)Centre ABOUT THIS COURSE Your ability as a project manager to demonstrate best practices in Project Management both on the job and through professional
The 10 Knowledge Areas & ITTOs
This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading
Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs
HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: [email protected]
Agenda. 0 Agenda review 2 minutes. 0 Chapter of the week 50 minutes. 0 Q&A of chapter 10 minutes. 0 Break 10 minutes. 0 Exercises 25 minutes
Agenda 0 Instructor Introduction 3 minutes 0 Agenda review 2 minutes 0 Chapter of the week 50 minutes 0 Q&A of chapter 10 minutes 0 Break 10 minutes 0 Exercises 25 minutes 0 Round table 15 minutes 0 Closure
THE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
5.1 4.1 4.2 4.3 PROCESS GROUP: PLANNING PROCESS GROUP: INITIATION. Oracle Projects. PMBOK Oracle Mapping. Scope Planning. Develop Project Charter
Develop Project Charter Develop Preliminary Project Scope Statement Develop Project Management Plan Scope Planning PROCESS GROUP: INITIATION 4.1 The project charter serves as the input document for the
Frequently Asked Questions in Project Management
Frequently Asked Questions in Project Management 1. Question: What is Project Management? Answer: Project Management is the collection and application of skills, knowledge, processes, and activities to
IT Project Management Methodology. Project Scope Management Support Guide
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT
THE COMPLETE PROJECT MANAGEMENT METHODOLOGY AND TOOLKIT GERARD M. HILL CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an informa business
Project Management Professional (Certified by PMI)
Project Management Professional (Certified by PMI) PMI certified Project Management Professional credential is the most important industryrecognized certification for project managers. This recognition
1.3 What is Project Management? 1.4 Relationship Among Project Management, E-mail:[email protected]
1 Project Management Professional (PMP) is a credential offered by the Project Management Institute (PMI).The PMP Certification Exam assesses the adeptness of a professional in applying the knowledge,
Project Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
SCOPE MANAGEMENT PLAN <PROJECT NAME>
SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
Certification Exam Objectives: PK0-003
Certification Exam Objectives: PK0-003 INTRODUCTION The CompTIA Project + examination is designed for business professionals involved with projects. This exam will certify that the successful candidate
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1
PMP: Project Management Professional Exam Study Guide. 7th Edition
Brochure More information from http://www.researchandmarkets.com/reports/2505193/ PMP: Project Management Professional Exam Study Guide. 7th Edition Description: The ultimate package for preparing you
Using Your PMO to Drive Successful Organizational Change Management
Using Your PMO to Drive Successful Organizational Change Management Joe Saliunas, Booz Allen Hamilton 11 November 2012 1 Agenda Organizational change management overview Case studies PMBOK Guide processes
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading
Family Computer Centre
PMP - Project Professional 35 Contact Hours Comprehensive Training Program Designed on the basis of Project Body of Knowledge (PMBOK Guide) Family Computer Centre Ground Floor, Al Rayyan Complex P. O Box:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
<PROJECT NAME> PROJECT MANAGEMENT PLAN
PROJECT MANAGEMENT PLAN Version VERSION HISTORY [Provide information on how the development and distribution of the Project Management Plan was controlled and tracked.
Project Scope Management in PMBOK made easy
By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating
PMBOK 5. Chapters. 1. Introduction What is Project Management 2. Organizational Influences and Project Life Cycle 3. Project Management Processes
PMBOK 5 Chapters PMBOK 5 1. Introduction What is Project Management 2. Organizational Influences and Project Life Cycle 3. Project Management Processes Knowledge Areas 4. Project Integration Management
Crosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
Template K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
The purpose of this course is to provide practical assistance for defining and managing project scope.
Scope Definition and Scope Management Purpose - To provide practical assistance for defining and managing project scope. This course will focus on tips for creating a scope statement rather than a step-by-step
Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved
Description of Program Management Processes (Initiating, Planning) Topics Covered Program Management Process Groups salient features Description of all processes in Initiating Process Group: Initiate Program
PMP Exam Prep Training - 5 Days
PMP Exam Prep Training - 5 Days (Based on the PMBOK Guide, 5 th Edition) Course Length: 5 Days Course Abstract: This workshop has a primary and a secondary goal. The primary goal is to prepare participants
Positive Train Control (PTC) Program Management Plan
Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information
A Comparison of PMI s PMBOK Guide Versions 4 & 3
PM WORLD TODAY FEATURED PAPER MAY 2009 A Comparison of PMI s PMBOK Guide Versions 4 & 3 By Germán Bernate The Project Management Institute PMI announced on December 31, 2008 the availability of PMBOK Version
Ontario Institute for Studies in Education. Management of International Projects and Programs in Education
1 Ontario Institute for Studies in Education Management of International Projects and Programs in Education International projects and programs that support the development of education initiatives at
PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP
TSE015 PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP Course Outline I. Introduction and Course Objectives A. About PMI B. PMP and CAPM
Kathy Schwalbe, Ph.D., PMP Augsburg College. ; \ COURSE TECHNOLOGY *» CENGAGE Learning-
MA TECHNOL.0 Sixth Edition Kathy Schwalbe, Ph.D., PMP Augsburg College ; \ COURSE TECHNOLOGY *» CENGAGE Learning- Australia Brazil Japan Korea Mexico Singapore Spain United Kingdom United States IF @wf\
Project Management for Everyone
Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group System, Analytics & Insights Group Phone: (202) 994-6867 Email: [email protected] Objectives Basic
A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition
Brochure More information from http://www.researchandmarkets.com/reports/2326795/ A Project Manager's Book of Forms. A Companion to the PMBOK Guide. 2nd Edition Description: A compendium of ready made
PROJECT SCOPE STATEMENT
PROJECT SCOPE STATEMENT Note: Any work not explicitly included in this Project Scope Statement is implicitly excluded from the project. Create links to referenced documents (e.g., Link_To_ ) by using Insert
A COMPARISON OF PRINCE2 AGAINST PMBOK
Introduction This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the respective merits of the
ID Task Name Time Pred
0 UC Modernization Project Plan 1115 d 1 1 Phase I - Business Case Development and Competitive Procurement 205 d 2 1.1 Complete Initial Feasibility Study 55 d 3 1.2 Prepare and Issue LBR 30 d 2 4 1.3 Competitive
Module 2: The Project Initiation Stage
Overview Initiation stage is highly instrumental in the life cycle of a project as it defines the boundaries of the project gives clarity to all participants about the objectives, scope, cost timescale
PBL: Project Management. Competency: Project Definition
Competency: Project Definition 1. Define project management and the context of modern project management. 2. Describe how to manage projects throughout the five major process groups. 3. Define the characteristics
- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021
- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021 About this document this is a detailed description of typical Project Manager (PM) duties, responsibilities, and
Prepared by: Rick Leopoldi November 22, 2003
RL Consulting Project Best Practices for the Application ment Process Prepared by: Rick Leopoldi November 22, 2003 Copyright 2003 RL Information Consulting LLC. All rights reserved. Duplication of this
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
Program Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
Project Management Process. Prepared by Jay Knape
Project Management Process Prepared by Jay Knape PMI Project Project is... temporary endeavor undertaken to produce a unique products, service or result. UITS Project Definition For Columbus State University
Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage
output: communications management plan
Q1. (50 MARKS) A. List the nine PMBOK knowledge areas and give a one sentence description of the purpose of each knowledge area along with at least one output (document etc.) and its purpose. 1.Project
CDC UNIFIED PROCESS PRACTICES GUIDE
Purpose The purpose of this document is to provide guidance on the practice called Project Close-Out and to describe the practice overview, requirements, best practices, activities, and key terms related
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
SOFTWARE DEVELOPMENT PLAN
SOFTWARE DEVELOPMENT PLAN This document outline is based on the IEEE Standard 1058.1-1987 for Software Project Management Plans. This is the controlling document for managing a software project, and it
Making project management indispensable for business results. Project Management 101
Making project management indispensable for business results. Project Management 101 Donald E. Moore, MBA, PMP, President of PMI NB Kelly Barter, Chapter Manager of PMI NB AGM April 28, 2011 Topics of
ABC COMPANY Extended Accounting System (EAS) Project Charter Sample
ABC COMPANY Extended Accounting System (EAS) Project Charter Sample Prepared by: Document Details ABC Company IT Canada Inc. Business Services Department Information Technology Project: Extended Accounting
A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition
A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise
Assessment of NCTD Program Management Framework for Positive Train Control Program
Assessment of NCTD Program Management Framework for Positive Train Control Program Subtask 2: Analysis Gap Analysis Prepared for: Brad Hansen, M.S., PMP Director, PMO Capital Projects May 2013 0 icfi.com/transportation
Project Management Standards: A Review of Certifications/Certificates
Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in
PHASE 8: IMPLEMENTATION PHASE
PHASE 8: IMPLEMENTATION PHASE The Implementation Phase has one key activity: deploying the new system in its target environment. Supporting actions include training end-users and preparing to turn the
Expert Reference Series of White Papers. Intersecting Project Management and Business Analysis
Expert Reference Series of White Papers Intersecting Project Management and Business Analysis 1-800-COURSES www.globalknowledge.com Intersecting Project Management and Business Analysis Daniel Stober,
Principles of Execution. Tips and Techniques for Effective Project Portfolio Management
Principles of Execution Tips and Techniques for Effective Project Management Roadmap Develop A Shared Vision for Management Understanding the Difference between Project Management Reviews and Management
ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES
1. ROLE DEFINITIONS ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES The purpose of this section is to distinguish among the roles interacting with the SPM obtained through
<Company Name> <Project Name> Software Development Plan. Version <1.0>
Version [Note: The following template is provided for use with the Rational Unified Process. Text enclosed in square brackets and displayed in blue italics (style=infoblue)
The Plan s Journey From Scope to WBS to Schedule
The Plan s Journey From Scope to WBS to Schedule Presented by: Rick Clare, CBAP, PMP, OCP, CSM PM Centers USA, LLC. 2013 Company Background Consulting and Training (Virtual, Public and Private Training)
Project Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997
Why a Project Check List? A good way to ensure that all start-up tasks are completed prior to actually starting the project is to develop a start-up check list. The check list can be developed and then
Project Management Concepts, Methods, and Techniques
Project Management Concepts, Methods, and Techniques Claude H. Maley Uffi\ CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Croup, an Informa
Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500
Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: [email protected] Phone:
MANAGING INFORMATION TECHNOLOGY PROJECTS
MANAGING INFORMATION TECHNOLOGY PROJECTS Kathy Schwalbe, Ph.D., PMP Augsburg College ; \ COURSE TECHNOLOGY»% CENGAGE Learning- Australia Brazil Japan Korea Mexico Singapore Spain United Kingdom United
PMI Certified: PMP - Project Management 5 Days
www.etidaho.com (208) 327-0768 PMI Certified: PMP - Project Management 5 Days Course Description This PMP certification training class is designed for individuals who have on-the-job project management
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
PROJECT PLAN FOR. Project Name Here
PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project
ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 5 PROJECT CLOSEOUT PHASE Table of Contents Introduction... 3 Project Closeout Phase... 3 Activities and Documents in the Closeout Phase... 4 Project Closeout Task...
Project Management Fundamentals. Office of the Senior Associate Vice President for Finance
Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,
Appendix E Program Management Plan Template
Appendix E Program Management Plan Template Version 2 March 7, 2005 This page is intentionally left blank. Version 2 March 7, 2005 Title Page Document Control Panel Table of Contents List of Acronyms Definitions
Organization. Project Name. Project Overview Plan Version # Date
Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents
Project Processes. Media Snapshot. Project Management Process Groups
Project Processes PROJECT LIFECYCLE A project normally requires a number of processes. A process is a series of actions directed toward a particular result Project management can be viewed as a number
The Fast Track Project Glossary is organized into four sections for ease of use:
The Fast Track Management Glossary provides a handy reference guide to the fast track management model, encompassing the concepts, steps and strategies used to manage successful projects even in the face
Ellucian Implementation Methodology. Summary of Project Management and Solution Delivery Phases
Ellucian Implementation Methodology Summary of Project Management and Solution Delivery Phases Rev. 5/10/2013 Table of Contents Overview 3 Project Management Initiation 4 Planning 5 Execution 6 Monitor
PMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
Project Management Concepts and Strategies
Project Management Concepts and Strategies Contact Hours: 24 Course Description This series provides a detailed examination of project management concepts and strategies. It discusses the seven components
Chapter 4: Planning Projects, Part I (Integration, Scope, Time, and Cost Management) Slide 1
Chapter 4: Planning Projects, Part I (Integration, Scope, Time, and Cost Management) Slide 1 Introduction to Project Management Learning Objectives Describe the importance of creating plans to guide project
Project Management Professional Training
Training Course Course Language Course Duration Project Management Professional Training PMP Project Management Professional Exam Preparation based on PMBOK 5 th Edition ( 35 PDUs) English Total Number
Project Management Professional PMP PMBOK 5
Project Management Professional PMP PMBOK 5 What are the Course Objectives? By the end of this training you will: Acquire the relevant knowledge and skills required to clear the PMP certification exam
Managing IT Projects. Chapter 2 The PMI Framework
Managing IT Projects Chapter 2 The PMI Framework The PMI Framework The Project Management Institute,USA is an internationally acclaimed organization Devoted to Creation & sharing of knowledge in the area
VoteCal Statewide Voter Registration System Project. Master Project Management Plan. Version 1.2
VoteCal Statewide Voter Registration System Project Master Project Management Plan Version 1.2 October 2010 October 2010 i REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF CHANGES 0.1 3/12/2009
Project Management. Willis H. Thomas, PhD, PMP, CPT. Training Project Management Office (TPMO) Willis H. Thomas, PhD, PMP, CPT
Re-defining the Training & Development Structure Project Leadership Project Management Topics What we will cover during our discussion 1 2 What is the value of the TPMO? Why would an organization establish
California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814
IT Project Status Report For an MHSA-Funded IT Project Please send the Signed Original to the following address: California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9
Perform Business Analysis Professionally. c o m p e t e n c e f o r g r o w t h
Perform Business Analysis Professionally R PMCC c o m p e t e n c e f o r g r o w t h 01 REGISTER 02 ENGAGE 03 CERTIFICATION Demand is growing for Professional Business Analysis SM The PMI-PBA highlights
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor