1 CHEROKEE ELECTRC COOPERATVE P.. Box 155 Clarence Chesnut By-Pass Centre, AL 3596 Phone: Fax: CONTANS DRAWNGS AND NATONAL ELECTRC CODE REQUREMENTS, N ADDTON TO CHEROKEE ELECTRC COOPERATVE CONSTRUCTON GUDELNES Revised August 213
2 General Requirements for Power Connection All meter installations must be on the customer's own pole, NOT CEC's. The bare ground wire from the meter base must be attached to the structure. All wires must be continuous with no splices anywhere along the run. f using PVC conduit, it must be electrical grade schedule 4 PVC. An 8 foot ground rod, being copper clad or galvanized, must be installed. Must use a one-piece ground rod clamp to attach the ground wire to the rod. The ground wire must be at least #4 solid copper and attached in the grounding lug in the meter base. The center of the meter base, once installed, must be between 5 feet and 6 feet in height from the ground. f using a separate meter base and disconnect in combination, they must be connected by conduit and weather tight fittings. The main disconnect (breaker) must be large enough for the requirements of the structure. The energized wires extending from the meter base to the disconnect must be connected to one breaker that is capable of turning all power to the structure. Must ensure proper weather head configuration depending on entrance cable or conduit. The weather head must be a MNMUM of 12 feet from the ground. There must be a minimum of 3 straps attaching the entrance cable or conduit riser onto the structure. The following guide is for proper wire sizing of the main disconnect (breaker): Disconnect Size Copper Wire Aluminum Wire Conduit Size 6amp #6 #4 2" too Amp #2 #2 2" 2Amp 3 4 2" 4Amp 5MCM 5MCM * 6Amp 75MCM 75MCM * *Either 3", 3-112" or 4" conduit may be used
3 House Requirements for Power Connection Underground: When installing a separate disconnect adjacent to the meter base, the disconnect must be to the right of the underground approved meter base. A meter base and disconnect combination box is acceptable for use. The foundation that extends beyond the house at the meter base's location must be removed. Overhead: Any service entrance conduit that extends above the roof must be galvanized conduit. For installations not extending above the roof, a CEC furnished eye bolt must be installed through a framing member. For installations requiring a conduit extension, the splice must be on the meter base end and no longer than 4 feet in length. f the interior disconnect (switch box) is not located directly behind the meter base, an exterior disconnect must be mounted adjacent to the meter base. Mobile Home Requirements for Power Connection Any pole being used to mount the meter base and disconnect to must be 18 feet in height, at least 5 inches in diameter OR pressure treated 6 inch X 6 inch minimum. The pole must be set a minimum of 4 feet into the ground. The pole must be located to where the service drop to the pole will not cross over the roof of the structure (any questions should be directed to CEC engineering). All materials that the meter base and disconnect are attached to must be pressure treated. The meter base and disconnect must be attached to the pole by 2 inch lag bolts. t is required to have a fourth wire, minimum #6 stranded copper, connected from the exterior disconnect's grounding buss to the interior service panel's grounding buss. Any wiring that is above ground level must be in conduit. All wiring from the exterior disconnect to the mobile home must be approved for underground burial.
4 CamperTemporary Pole Requirements for Power Connection Any pole being used to mount the meter base and disconnect to must be 18 feet in height, at least 5 inches in diameter OR pressure treated 6 inch X 6 inch minimum. The pole must be set a minimum of 4 feet into the ground. The pole must be located to where the service drop to the pole will not cross over the roof of the camper (any questions should be directed to CEC engineering) The receptacle must be a Ground Fault nterrupt type or fed by a Ground Fault nterrupt breaker. The receptacle must be in a weatherproof box. The wiring from the disconnect to the receptacle must be in conduit.
5 , _ ----r- Member's Pole! i '.- i ; ;t.- 1 -,;.- _ _ l' l <::..t Weather-Head f- --- k l _ (,- <'------'. r \ ' 'r-l \ ' <:) ri:j \.J_!! j 'l l ) ',,_ : S.E. Cable or URD Type Stranded Cable in Gray Electrical Grade SCH 4 PVC Conduit l# :' Fault Protected ""-f! J Meter Socket rf, ll. i:d ---Staples '[ ' G dw" #4B c 1 r roun rre, are opper l_r1i... Mam Disconnect ' (6 amp min. breaker in rain-tight) Weather-proof Receptacle Box with Ground Fault nterrupt (GF) Campers Only d... ::E "" i i, **Not Required on Camper Poles** ,t'' "r-..- l \ V Ground Clamp (one piece)-----! f\: -=1 j 8' Gr ound Rod,V (Galv anized or Copper Clad) ' li J i '\. li. \ \) J \,Ground Clamw Temporary or Camper J Pole f Drawn ! Cherokee Electric Cooperativ 1 Revised r l
6 Ground Wire Ground Clamp Brick Veneer Construction Cherokee Electric Cooperative Drawn Revised
7 h Sheet Metal Flashing =======r;r::::;r-':'": -, x 4 Blocks, Solidly nstalled ' \ \ Hot Les Neutral ) 1 ""cr-=:)4----clamps with bolts thru wall Clamps spaced a max. of 32" apart 2" Galvanized Steel Conduit Ground Wire... Ground Wire N... ngros.i.!k -. d _ (Galvanized or Copper Clad) 1 [- Block _ 1 Construction J L herokee Electric Cooperative --ised -!! -=-== -=-==----=-_] Drawn J. :! ;
8 - ----, ( r--weather-head p l. \ \!. )\ ) K G '"' T 75 ( "'-- '-::>" _ -., \J 't, " --..._ -.. ">-... _ wr- '- "- 1. ' L :;;.. :-lj.:. ===--====== '='"\ Sheet Metal Flashing - -, :,>- 2 x 4 Blocks, Solidly k-\..:.11 - _j! 1 nstalled, \_ \ Hot Les Neutral!. ;! +----Clamps with bolts thru wall il i Clamps spaced a max. of 32" apart!!' r 2" Galvanized - Steel Conduit..,._n-1 tt-lh+-. - Electrical Panel '\) _ Meter and Base Ground Wire --- Ground Clamp (e piece) -----, Stud i L_Cnstruction J [ Cherokee Electric Cooperative! :::d ;:; ::::! ! L j
9 d... N ( '.. - \ \., '-, ' Clamps with bolts thru wall ''\ Clamps spaced a max. of 32" apart (()) \ \ \ Hot Leg) Neutral 2" Galvanized... s Steel Conduit ] Electrical Panel : J f-i... -, '" (Q) (!.) '" 1-< d \j... (j Ground Wire u ::E '" - ] tn \C rn Ground Wire a - N. "' Pr\'n ' 8 ' \ ' --L._... \ '--. Ground Clamp without going thru l the Roof ---i Drawn l 1 \ Cherokee Electric Cooperative Revised =] L ======----
10 Ground Wire Neutral Coupling!.,. Clamps with bolts thru wall Clamps spaced a max. of 32" apart 2" Galvanized Steel Conduit Meter and Base ><1.5 Cd 1+---Main Disconnect Ground Wire Ground Clamp (one piece) ") \... s ] u '-.. f-< -t!) C) ""' "'tj () t:: - i:i:... N ::::11 L-:_111=111=1 11=111=11 1: -H ll :::: =:CUC UE 11=11 n ll ti i J-lell 11 1:---1 =111=111 r = Ttnlod 18, cdiilvaiuzea'or Copper Clad).. ' ' M. m.,, j Service for Double \ Wide Mobile Home! Cherokee Electric Cooperative Drawn Revised _j
11 -.,r r--l Min. 18" Leads Out "- VofWeather-Head " rr :l+!--- Clamps (',1... l4+---service Entrance Cable or Stranded Hub with Rain-Tight Connector Conductors in 2" Electrical Grade o_r_p_ro_p_e_r P_v_c_A_d_a_p_te_r -- l'---'j SCH 4 PVC Conduit Hub with Threaded.s ::B lri \ -- r_ 1 l Main Disconnect = ---Conduit Nipple (rain-tight panel whh ampacity ----[] determined by the panel located n 3' -" Max. inside of the mobile home) i - --=J--l 2" Electrical Grade Ground Wire --- * SCH 4 PVC Conduit #4 Bare co _pe_r 1f-LL ::--r , Ground Clamp 1 : - - Bi l! j j (onepiece) ' 1 -lt ,.--lt-- :.- 1 UF Type Cable with 4th Wire Ground (min. #8 Copper) Run in Electrical Grade SCH 4 PVC Conduit '_-----t._. ' r[l(f' '. 8' Ground Rod (Galvanized or Copper Clad) Service For Single Wide. Mobile Home l \""-- **(also approved for Double Wide)** [ [_ h_er-_-o_kee_e _ ---1_ ---;-_c_c_o_op:._e_--_a_ti_v_e --,- --r':ct?_i;;! ---- _t-_--_--_-_- j ) 1
12 Ground Bus 2 AMP and 1 AMP Main Panels Cherokee Electric Drawn Revised
13 [.., < Y> l Hot Legs (out to mobile home) 4th Wire Ground (in from mobile home) (in from mobile home) l i l_ l rn -. '! Drawn Cherokee Electric Cooperative Revised L - 1 AMP Breaker Acting as Main Disconnect Alternate Method
NEW SERVICE INSTALLATION STEPS. Common Slow Downs. Other Necessary Steps
NEW SERVICE INSTALLATION STEPS Here is the step-by-step process required to fulfill your service installation request. Please take a few minutes to review the steps, become familiar with key milestones
More informationElectrical Code Regulation
Electrical Code Regulation St. Clair County has adopted the 2005 National Electrical Code in its entirety for the unincorporated areas of the county and all communities that have contracted with the county
More informationTYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE
TYPICAL WIRING OF METER SOCKET FOR SINGLE PHASE, THREE WIRE OVERHEAD SERVICE A. GENERAL NOTES: Service entrance line and load conductors, conduit straps, weatherhead, lock nuts, bushings, connectors, and
More informationELECTRIC METERING COMMERCIAL & INDUSTRIAL
ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS
More informationIRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
More informationElectrical Service Guidelines
Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4
More informationELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document
More informationBUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
More informationGENERAL ELECTRICAL REQUIREMENTS
GENERAL ELECTRICAL REQUIREMENTS RECEPTACLE SPACING Within 6-feet of the edge of any door HABITABLE Not more than 12-feet apart along wall ROOMS: At all wall spaces 24 or more wide Within 24 of edge of
More informationAll work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
More informationPlease check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
More informationGROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationSTREETLIGHT SYSTEM GROUNDING AND BONDING
Page: 1 of 8 STREETLIGHT SYSTEM GROUNDING AND BONDING 1. Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial
More information3. TYPES OF SERVICE AVAILABLE. 3.1 Scope
3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service
More informationElectrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
More informationMultiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained
Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase
More informationELECTRIC SERVICE HANDBOOK
ELECTRIC SERVICE HANDBOOK Revised July 2006 Table of Contents Electric Construction Title: Electric Service Handbook Page No. TOC Rev. July-06 Section 1: Introduction...1-010 Section 2: DP&L Offices...2-010
More informationUNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL
S 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 CUSTOMER RESPONSIBILITY FOR TOTAL TEMPORARY SERVICE 4.0 CUSTOMER RESPONSIBILITY FOR TEMPORARY SERVICE IN PERMANENT LOCATION 5.0 NVE RESPONSIBILITIES 6.0 GROUNDING
More informationMobile Home Pre-Inspection Checklist
Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING
More informationSERVICE ENTRANCE REQUIREMENTS MANUAL
SERVICE ENTRANCE REQUIREMENTS MANUAL 7th Edition 2012 TABLE OF CONTENTS BTU General Policies and Procedures... 3 SECTION 1: Temporary Construction Meter Poles... 5 Temporary Overhead Fed Meter Pole...
More informationPRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.
INTRODUCTION These rules are issued for use by Customers, builders, electrical contractors, architects, engineers, etc. The rules require the installation of safe and adequate wiring and electrical equipment,
More informationMETER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
More informationHow To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
More informationHyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationCONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION
Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED
More informationSERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp
SERVICE ENTRANCE - UNDERGROUND 07-01-15 PAGE 1 OF 6 USE: Arrangement of service equipment to supply electric energy to an underground, outdoor self contained meter installation. LATEST REVISION: PREVIOUS
More informationCity of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov PHOTOVOLTAIC PERMITTING GUIDELINES The information provided in this document is general and is intended only as a
More informationINSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
More informationElectric Service Standards
IV: 1 of 24 IV. SERVICE and METER CONNECTIONS A. Service Equipment 1. General The Customer should consult FPL at an early stage to verify availability of service (section II.C) and to determine the FPL
More informationOVERHEAD SERVICE. Table of Contents - Section 400
OVERHEAD SERVICE Table of Contents - Section 400 PARAGRAPH 400.0 OVERHEAD SERVICES (0-600 VOLTS)... 1 400.1 GENERAL... 1 400.2 IDENTIFICATION OF CONDUCTORS... 1 400.3 MAXIMUM SERVICE ENTRANCE CONDUCTOR
More informationChapter 9. Bonding and Grounding
Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and
More informationGUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS
GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS This guideline has been prepared to assist the owner/occupant of a single family dwelling with compliance to the requirements of the National Electrical
More informationSPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
More informationTemporary Power Outlet Panels
Power Outlet Panel Types Available ATTENTION PLEASE Siemens is proud to present our new line of temporary power products. This section describes our new product line that that will be available to order
More information2012 Edition Redbook 11.0 GENERAL DRAWINGS AND STANDARDS
2012 Edition Redbook 11.0 GENERAL DRAWINGS AND STANDARDS Minimum Vertical Clearances Above Ground and Roofs D1 Minimum Pool Clearances D2 Minimum Clearances of Wires Adjacent to Buildings and Other Structures
More informationGrounding & Bonding Why it is done And How to Install Properly
Grounding & Bonding Why it is done And How to Install Properly The technical information provided herein is to assist qualifi ed persons in planning and installing electric service to farms and residences.
More informationSOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
More informationElectric Service Standards
VI - 1 of 17 VI. METERING EQUIPMENT A. Equipment Furnished and Installed by FPL FPL provides and installs, at its expense, adequate metering instruments to measure the electric service used by the Customer.
More information2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationRequirements for the Attachment of Communication Cable Facilities on PPL Poles
Page 99 of 137 Requirements for the Attachment of Communication Cable Facilities on Replaces: URS-3002 URS-3004 URS-101C-304 A-157649 Page 100 of 137 Reference Notes for Drawings: General 1. The term communication
More informationSECTION 22 LIGHTNING PROTECTION SYSTEM
SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for
More informationThe Service Entrance. Technical Terms Drip loop Insulator Meter Meter enclosure
This sample chapter is for review purposes only. Copyright The Goodheart-Willcox Co., Inc. All rights reserved. 10 The Entrance Objectives Information in this chapter will enable you to: List the components
More informationMOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
More informationCounty of Riverside Building and Safety Department
County of Riverside Building and Safety Department Mike Lara Director Photovoltaic Permitting Guidelines The information provided in this document is general and is intended only as a guide. Each project
More informationConduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes
CANTEX INC. 301 Commerce Ste 2700 Fort Worth, Texas 76102 817-215-7000 Fax: 817-215-7001 Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes YOUR FULL
More informationRequirements for Electrical Installations
ARTICLE 110 Requirements for Electrical Installations INTRODUCTION TO ARTICLE 110 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS Article 110 sets the stage for how you ll implement the rest of the NEC. This
More informationBASIC NEC CODE RULES AND DESIGN PRACTICE
BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,
More informationElectric Service and Meter Installations Manual SCANA Corporation 2013
Electric Service and Meter Installations Manual SCANA Corporation 2013 Revised: June 2013 On file with South Carolina Public Service Commission Table of Contents Section 1: Introduction 1 Customer Call
More informationHow To Plan Out An Array Of Solar Panels
CITY OF DOWNEY COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 11111 Brookshire Avenue Downey, CA 90241 562.904.7142 (www.downeyca.org) B SECTION 01/01/2011 EFFECTIVE DATE PHOTOVOLTAIC 032 FORM NUMBER 2013
More information2012 Electrical Code Changes Module 2 Sections 6-16
2012 Electrical Code Changes Module 2 Sections 6-16 ETEL-11(02)-00 (2012-03-26) Table of Contents Section 6 Services and Service Equipment... 2 Section 8 Circuit Loading and Demand Factors... 6 Section
More informationCARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013
CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES EFFECTIVE MARCH 1, 1995 Revised 1/01/2013 CARROLL COUNTY ELECTRICAL DEPARTMENT 103 WEST PARIS ST. P. O. BOX 527 HUNTINGDON, TENNESSEE 38344 Telephone
More informationHomeowner Information Guide Electrical Safety. British Columbia Safety Authority
Homeowner Information Guide Electrical Safety British Columbia Safety Authority The following information should be carefully reviewed before performing any electrical work. The information contained in
More informationInstallation Guide (Typical) For Micro-Comm Radio Telemetry And Control Systems
Installation Guide (Typical) For Micro-Comm Radio Telemetry And Control Systems Project: Location: Micro-Comm Project Manager: NOTE: This Installation Guide is intended to be a Typical Installation reference
More informationELECTRICAL SAFETY Information Bulletin
ELECTRICAL SAFETY Information Bulletin January 2016 CEC-10 [rev-9] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current
More informationRESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:
RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: Signed completed Electrical Permit application form. Minnesota law requires all electrical work is to be performed by licensed,
More informationStep 1: Application Instructions
Step 1: Application Instructions CONTENTS Introduction Customer and Electrician Instructions Completing Section 1 or Section 2 Definitions INTRODUCTION Every effort has been made to provide clear instruction
More informationPLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 1, 2013. It is intended for information and reference purposes only.
More informationELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering
ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering Requirements Clearance Requirements August 2015 A current version
More informationTABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3
UNDERGROUND TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS... Page 1 NEW SERVICE QUESTIONNAIRE... Page 2 GENERAL... Page 3 TRENCHING SECONDARY (120/240 volts)... Page 3 CONDUITS FOR PUD-INSTALLED CONDUCTORS...
More informationDEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS
MIOSHA-STD-1313 (10/15) 6 Pages For further information Ph: 517-284-7740 www.michigan.gov/mioshastandards DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY STANDARDS
More informationSection 10 Electric Switchboards: 0 Through 600 Volts
Section 10 Electric Switchboards: 0 Through 600 Volts 10.1. Scope This section provides specific dimensions and details for service and meter equipment that is assembled by the manufacturer in freestanding,
More informationApproved Meter Sockets and Cabinets
Single Unit Residential Guide 1 PHASE, 120/240 VOLT S METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to center of meter ± 100 mm ( 4
More informationSECTION 15140 - PIPE HANGERS AND SUPPORTS
Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the
More informationTS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
More informationMISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power
More informationServices. Three Phase Service
Services Primary Service vs Secondary Service Overhead vs Underground Common Service Types Three Phase Wye Closed Open Delta Corner Grounded Center Tapped Open Single Phase Three Phase Service Wye Delta
More informationPHOTOVOLTAIC ARRAY WIRING HANDBOOK FOR STANDARD NOMINAL 6, 12, 24, AND 48 VOLT SYSTEMS. (for SX-60 series or smaller and MSX-120 solar modules)
PHOTOVOLTAIC ARRAY WIRING HANDBOOK FOR STANDARD NOMINAL 6, 12, 24, AND 48 VOLT SYSTEMS (for SX-60 series or smaller and MSX-120 solar modules) COPYRIGHT INFORMATION BP Solarex holds all copyrights for
More informationRequirements for the installation of. Electric Services. September 8, 2003. Specifications for Electric Installations
Requirements for the installation of Electric Services & Meters September 8, 2003 Specifications for Electric Installations TABLE OF CONTENT Section I - Introduction... 1 Section II - Definitions... 3
More informationSecurity Cameras, CATV, GPS & Satellite Protection. White Paper
Security Cameras, CATV, GPS & Satellite Protection White Paper Security Cameras, CATV, GPS & Satellite Protection Surge Protection Solutions for PTC 1 Security Cameras, CATV, GPS & Satellite Protection
More informationElectric Service Manual
Table of Contents SECTION 1... 5 INTRODUCTION... 5 SECTION 2... 7 DEFINITIONS... 7 COMPANY... 7 CUSTOMER... 7 OVERHEAD SERVICE DROP... 7 UNDERGROUND SERVICE DROP... 7 SERVICE ENTRANCE... 7 SERVICE EQUIPMENT...
More informationELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS COMMITTEE, EUSERC
ELECTRICAL SERVICE REQUIREMENTS ELECTRIC UTILITY SERVICE EQUIPMENT REQUIREMENTS COMMITTEE, EUSERC TABLE OF CONTENTS TITLE SECTION NO. List of Approved Electric Utility Service Equipment Requirements Committee
More informationBERTHOLD ELECTRIC GENERATOR CONNECTION CABINET
BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET Berthold Electric Company s Generator Connection Cabinet provides a quick and convenient station to connect a portable generator to a facility s main service
More information2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying
More informationFor 100 Amp Automatic Transfer Switch/Load Center Models: 10 Circuit, 12 Circuit and 16 Circuit. Installed with 7, 10, 13 and 16kW Generators.
INSTALLATION GUIDE For s Residential Power Systems For 100 Amp Automatic Transfer Switch/Load Center Models: 10 Circuit, 12 Circuit and 16 Circuit. Installed with 7, 10, 13 and 16kW Generators. This Automatic
More information0095.05 June 30. 2011 July 18, 2014 1 of 7
Standard Number: Superseding: Effective Date: Page: 0095.05 June 30. 2011 July 18, 2014 1 of 7 Pole Attachments, Automated Meter Reading and Cellular Phone Antennas 1. Scope 2. Application This standard
More informationElectric Service Requirements & Guidelines
Electric Service Requirements & Guidelines Montana Service Area September 2011 NORTHWESTERN ENERGY Montana Service Area ELECTRIC SERVICE REQUIREMENTS AND GUIDELINES CONTENTS I. GENERAL INFORMATION 1.01
More informationCLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.
CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front
More informationAT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding
AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of
More informationDYNAMIC MESSAGE SIGN WALK-IN
See Sheet 6 of 10 1. If no guardrail or barrier wall exists, structure shall be outside the clear zone. lear zone shall be measured to edge of the drilled shaft if drilled shaft is more than 4" above adjacent
More informationINDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions
More informationNo Phone Line II-48 System
Used in conjunction with an EntraGuard Telephone Entry System, the -48 provides No Phone Line communication and door or gate control through existing building telephone lines without the need to purchase
More informationElectric Service Rules
2016 Electric Service Rules GENERAL INFORMATION TEMPORARY SERVICES OVERHEAD SERVICES UNDERGROUND SERVICES DISTRIBUTED GENERATION METERING HUD MANUFACTURED HOMES FARM SERVICES UTILITY/CATV SERVICES PRIMARY
More informationPERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS
Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530)538-7601 Permit Center Phone (530)538-6861 Fax (530)538-7785 FORM NO DBP-71 PERMIT
More information18 AWG thru 8 AWG Not greater than 100/30 100/30. 6 AWG thru 1/0 AWG Not greater than 200/60 100/30
Commercial Products COMMERCIAL PRODUCTS: RIGID AND IMC FITTINGS s Used to support cables in vertical raceways or risers. Relieves the strain that would be placed on terminations, the interior of panels,
More informationB. Related Sections: 1. Section 26 05 33 - Raceway and Boxes for Electrical Systems.
SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes wall switches; wall dimmers; receptacles; multioutlet assembly; and device plates and decorative box covers. B. Related
More informationElement D Services Electrical
Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as
More informationELECTRICAL INFORMATION
ELECTRICAL INFORMATION 2014 NEC Edition MONTANA DEPARTMENT OF LABOR AND INDUSTRY BUSINESS STANDARDS DIVISION BUILDING CODES BUREAU PO BOX 200517 HELENA, MONTANA 59620-0517 (406) 841-2040 -- General Information
More informationSolar Panel Installations
Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.
More informationApplying For New or Revised Electric Service
Applying For New or Revised Electric Service Dear Customer: ComEd is happy to assist you in initiating new or revised electric service to your location. Please complete, sign and return the attached service
More informationCASE STUDIES OF RECENT ELECTRICAL FIRES
CASE STUDIES OF RECENT ELECTRICAL FIRES John E. Sleights Sr. Engineering Specialist Travelers Engineering Laboratory Abstract Accurate diagnosis of fires ignited due to electrical energy is frequently
More informationA TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS
A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS Insurance Inspection Report 1234 Main Street Tallahassee, Florida Report Prepared For: Charles Smith Report Prepared
More informationGenerator DoCKInG StatIonS
Generator DOCKING STATIONS TRYSTAR Portable Power Cable Cam to cam cable extensions 2000V, 100A-400A rated to NEC table 400.5 (B) All portable power cable sold is highly flexible and UL & C-UL or CSA Listed
More informationMAST ARMS & POLES. Ornamental Pole Top & Bases
Ornamental Pole Top & Bases Pelco s decorative pole top and bases help make the traffic signal aesthetically pleasing to the eye. Available for various pole diameters and multiple finish options. Ornamental
More informationRAY-MAX Integrated Solar Power Strip
RAY-MAX Integrated Solar Power Strip 600008, 600009, 600010, 600208, 600209, 600210 Owner s Manual NEXTRONEX, INC. Revision Date: 10/27/14 Contents 1. Safety Instructions... 3 2. General Equipment Warnings...
More informationSports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049
Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal
More informationELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
More information800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
More informationEARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
More informationModem. Backplane For Lanes 1 To 4 *
Speed/Classification Unit And Modem Furnished Separately 3.0 Note: Bracket shall be fabricated of.090-0.125 inch thick aluminum. Dimensions may vary depending on the manufacturer of the J1 receptacle being
More informationHow to estimate the cost of installing an Electrical Distribution Center (EDC)
How to estimate the cost of installing an Electrical Distribution Center (EDC) Candidate Number 0112233 June 2012 Table of Contents 1) Introduction 3 2) Types and Methods of Measurement 3 5 3) Specific
More information