NORTH RIVER NAMIB LEAD / ZINC PROJECT FEASIBILITY STUDY. Volume 1

Size: px
Start display at page:

Download "NORTH RIVER NAMIB LEAD / ZINC PROJECT FEASIBILITY STUDY. Volume 1"

Transcription

1 NORTH RIVER NAMIB LEAD / ZINC PROJECT Volume 1 Power Supply Distribution Earthing Proprietary Information This document has been prepared by and remains the sole property of. It is submitted solely for use in conjunction with the submission for which it has been prepared and is to be held proprietary to. The recipient agrees by receipt and/or use of this document to return it to upon request, and not to reproduce, copy, lend or otherwise disclose or dispose of the contents, directly or indirectly, and not to use it for any purpose other than intended for.

2 Power Supply Distribution Earthing Page: 2 of 13 TABLLE OF CONTENTS 1 OVERVIEW General Design Philosophy Standards and Codes Power System Power System Components and Equipment Plant Earthing and Lightning Protection System Substations and Transformer Enclosures Construction Power Supply Contractors Camp Power Supply...13

3 Power Supply Distribution Earthing Page: 3 of 13 1 OVERVIEW The previous Namib Lead Zinc operations made use of a dedicated 22kV transmission line for power supply. This existing line is not a viable technical option considering the critical condition that it s in, and the local Power supplier/authority (Erongo Red), have declared that the backbone network requires upgrading. The upgrade of network power line is in the planning phase, and the plant power will be carried by a 33kV line which will t-off from the upgraded network line, approximately 7,5km from the site. Erongo Red has confirmed the availability of grid power to the Namib Lead Zinc site. It has also stated that it is the CLIENT s responsibility to refurbish and upgrade the old 22kV transmission line which will provide dedicated power to the site. This cost has been included in the estimate. 1.1 General Design Philosophy The plant will be designed for reliable, safe, low maintenance operation in accordance with the project engineering strategy. The equipment will be designed to comply with the following basic criteria: Safety of personnel Safety of equipment Suitable for purpose (focused on most economical solution) Operability and compatibility with process requirements under the site conditions Maintainability

4 Page: 4 of 13 Minimisation of overall capital and operating costs Automated operating philosophy Reliability and continuity of supply and electrical operation at rated output for desired lifetime Possibility of future expansion Minimisation of spares holding 1.2 Standards and Codes The design and installation shall comply with all statutory regulations and will be subject to approval by the regulatory authorities where appropriate. The following standards shall be applicable as appropriate: South African National Standards (SANS) International Electrotechnical Commission (IEC) The following legislation (as amended) shall be complied with: Mine Health and Safety Act (Act 29 of 1996) Occupational Health and Safety Act (Act 85 of 1993) Minerals Act (Act 50 of 1991) See Electrical Design Criteria and equipment specifications for detailed lists of applicable standards and regulations. 1.3 Power System

5 Page: 5 of Power System Design The power system design is based on calculations with a view to ensuring: Correct current rating of cables, electrical equipment, etc. Correct kva sizing of transformers, Correct short time withstand current rating of equipment Correct voltage levels in the system during normal run and start-up of heavy motors The following computer aided studies will be conducted during the project execution stage: Load flow Fault study Protection relay settings (protection grading) Power Supply It is estimated that the total amount of electrical power required by the plant will be 1.8 MW maximum. The average load using diversity factor of 0.8 is estimated at 1.4 MW. The power required will be obtained from Nampower grid via a dedicated 33 kv Overhead Line constructed by THE CLIENT Plant Power Reticulation and Distribution

6 Page: 6 of 13 The power supply voltage of 33 kv will be stepped down to 525V. 525 V power will be used for plant reticulation as well as to supply electrical motors throughout the plant. It will be further stepped down to 400/230 V to supply small power and lighting as required. Ref. Appendix 1 Main Overall Power Distribution. Single Line Diagram. Drwg. No E Emergency Power Supply There are only 3 small motors that require emergency power in the plant. A 75 kva diesel generator is envisaged to supply emergency power for these loads as well as to instrumentation UPS and MCC control power supply UPS. All plant emergency light fittings will be provided with battery packs and will not be backed-up by diesel generator. The change-over between diesel generator and grid power will be manual. The above measures are based on cost savings but the diesel generator rating is sufficient to provide power to emergency lights if required (additional costs). It will also be possible to upgrade the system for the automatic change-over (additional costs).

7 Page: 7 of Power System Components and Equipment MV Switchgear There is no MV Switchgear within the plant area V Motor Control Centre Motor Control Centre (MCC) will be installed to provide starting facilities and power supply to the low voltage loads. Due to its size the MCC will require two 12 m containers. The two parts of MCC will be connected by busbars. The MCC will be installed in the containers at the place of manufacture. The MCC will be front access to minimise space requirements. The enclosure degree of protection will be IP42 minimum. The MCC will include a cubicle incorporating control interface equipment. All the motor starters installed in MCC will be of direct-on-line (DOL) starting type or VSDs for motors up to and including 90 kw. The motor starters will be equipped with moulded case circuit breakers, earth leakage protection and intelligent relays Simocode or equivalent. Motor running, stopped, tripped indication on motor starter door will be provided. The MCC will also incorporate feeders to VSDs for motors rated at above 90 kw, welding plugs and other 525 V loads. Where applicable, 525/400 V transformers will be fed from the MCC to provide power to lighting and small power consumers in the area. The transformers will be dry type and installed in the MCC containers.

8 Page: 8 of Transformer A 33/0.55 kv transformer supplying power to the plant will be oil immersed, two winding, core type transformer suitable for outdoor installation. The transformer rating will be 2500 kva. The transformer will be provided with padlockable off- load tap changer (OCTS) Miniature Substations There are no miniature substations within the plant area Medium Voltage Motors There are no MV motors required for the plant Low Voltage Motors The motors will be supplied from 525V, 3-phase, 3 wire, 50Hz power system. The motors will be of the totally enclosed fan cooled (TEFC) construction and provided with: IP55 rated enclosures Anti-condensation heaters where required Class F wiring insulation grade PT 100 temperature sensors embedded in the stator winding and bearings where required All the LV motors will be supplied by equipment suppliers as part of their scope.

9 Page: 9 of Variable Speed Drives The VSD s will afford at least IP20 degree of protection and their enclosures at least IP42. Each VSD will be equipped with a suitable port for control and monitoring via an associated PLC. All VSDs for motors rated at up to 90 kw will be installed in MCC cubicles. VSDs for larger motors will be installed in floor standing cubicles MV Cables There are no MV cables required within the Plant LV Cables The LV cables will be rated at 600 / 1000V. The cables will be PVC insulated, PVC bedded and PVC sheathed, fire retardant. Multi core cables will be steel wire armoured and single core cables aluminium wire armoured. Cables between secondary side of the distribution transformer and incoming terminals of 525V MCC will be XLPE insulated, PVC bedded and PVC sheathed, fire retardant, and unarmoured to reduce the number of cables required and ensure easy termination. All cables will have copper conductors Cable Racks Cable racks and accessories will be of a heavy duty industrial type, hot dip galvanised.

10 Page: 10 of 13 Cable racks will generally be routed along pipe racks where possible or attached to the buildings and structural steelwork in other cases. Where this is not possible the racks may be supported on uprights made out of steel profiles. The racks will preferably be mounted in a vertical plane (edge on) unless practically not possible. All cable racks shall be provided with sun shields (covers) protecting cables against direct exposure to solar radiation. Up to 20% of spare space on racks has been provided for future expansion Lighting and Small Power The 400 / 230V lighting and small power distribution circuits will be supplied from 525/400 V transformers as suitable. The lighting and small power distribution boards will be provided to supply small power and lighting loads throughout the plant. Lighting and small power cabling will be run on cable racks, in conduit or clipped directly to walls or structural steel where adequately protected. The electrical distribution in offices, control rooms and other personnel areas will be done by means of electrical wires run in under plaster conduits. Plant lighting will generally be provided in accordance with the following philosophy: Low ceiling internal fluorescent high ceiling internal and external high bay, high pressure sodium plant areas bulkhead, high pressure sodium, area lighting flood lights, high pressure sodium installed on high masts, poles, buildings or steel structures

11 Page: 11 of 13 Lighting will be designed to achieve the illumination levels in compliance with the relevant regulations 230V socket outlets will be protected by 30mA earth leakage units. Where they are located in plant areas these sockets will be housed in IP65 rated enclosures. 525V, three phase outlets (welding plugs) will be installed in strategic areas of the plant. They will be rated at 63A, provided with neutral and earth connections, housed in IP65 rated enclosures and protected individually by 30mA earth leakage units Power Factor Correction / Harmonic Suppression Not applicable. 1.5 Plant Earthing and Lightning Protection System Earthing The earthing system design will be such as to provide a uni-potential system with all equipment effectively being at a single earth potential. This will be achieved by tying together all earthing systems including structure, electrical equipment and instrumentation earth system. The interconnection of earth system will be radial to prevent the possibility of providing the routes for circulating currents. The detailed type of earthing system will be established upon conducting a soil resistivity survey on site.

12 Page: 12 of 13 Major electrical equipment such as the main transformer, MCC, etc. will be earthed directly to the earth mat by means of dual copper earth conductors. 525V motors will generally be earthed by means of the fourth cable core for the cables up to 50 mm 2 and by means of an external 50 mm 2 conductor for the motors supplied via larger cables. All earthing conductors within the plant area will be PVC insulated Lightning Protection The lightning protection system (where required) will be designed to protect the personnel and equipment against dangerous effects of the direct and indirect lightning discharge or induction from a passing charged cloud. 1.6 Substations and Transformer Enclosures Substations and MCC Rooms LV MCC will be located in specially prepared containers. All MCC containers will be ventilated (pressurised) by filtered forced-air systems. Air conditioning will be provided where required. The containers will be provided with the fire detection and protection systems and will have enough space to allow the future extensions of switchboards by at least two tiers and also enough space for access, maintenance and repairs.

13 Page: 13 of 13 The MCC containers will be provided with all safety notices, operating equipment, personal protection equipment, fire detection and protection equipment in accordance with relevant regulations Transformer Enclosures The main transformer will be located within outdoor enclosures located adjacent but not closer than 2 m from MCC Room. The transformer bay will comprise a concrete plinth for supporting the transformer, and a concrete or masonry bund wall at least 300mm above finished ground level, filled with crushed stone to a depth of 150mm. In addition transformer enclosure will have a brick wall on three sides extending at least 300 mm above the highest point of the transformer. The gate to the transformer enclosure will be padlockable and provided with all the required safety notices. 1.7 Construction Power Supply There is no construction power included in the Scope of Work (SOW). 1.8 Contractors Camp Power Supply Not included in the SOW.

LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE

LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE 380/415/690 Volt AC 50/65/80/100 ka 1. Product Guide Low Voltage Motor Control Centre CONTSTRUCTION Continuous "poured in place" gasket

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Modular Systems, PPMV, 2014 UniPack-G Glass Fiber Reinforced Polyester Compact Secondary Substation

Modular Systems, PPMV, 2014 UniPack-G Glass Fiber Reinforced Polyester Compact Secondary Substation Modular Systems, PPMV, 2014 UniPack-G Glass Fiber Reinforced Polyester Compact Secondary Substation Index News Introduction Applications & Segments Main Components Applicable Standards Technical characteristics

More information

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS Meher Capacitors offers reliable and innovative products and solutions in the fields of Reactive Power Compensation, Power Quality and Energy

More information

Mureva Assembly surface mounted wiring devices

Mureva Assembly surface mounted wiring devices 1.0 Waterproof Assembly surface Switches P124543 P124547 External dimensions : 72 x 72 x 47 mm.. Assembly surface rockers become illuminated using bulbs and indicators in option. They can carry a label

More information

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

EARTHING AND BONDING AT SECONDARY SUBSTATIONS DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the

More information

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV 1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled

More information

Heating and Hot Water Services Controls General Technical Specification

Heating and Hot Water Services Controls General Technical Specification Construction Services Heating and Hot Water Services Controls General Technical Specification Version 1.0 Environment Heating and Hot Water Services Controls General Technical Specification Contents 1.

More information

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application Product overview brochure ABB Medium Voltage Products Our one-stop approach for every medium voltage application Overview ABB meets every need for reliable, safe and energy-efficient medium voltage switchgear,

More information

Session 14 Cable Support Systems

Session 14 Cable Support Systems Session 14 Cable Support Systems Cable Support Systems in the IEC World A new IEC Standard, IEC61537 2001 has been developed If full details of the cabling layout are available then the likely cable load

More information

ScottishPower Distribution Cables & Equipment. Metal Theft

ScottishPower Distribution Cables & Equipment. Metal Theft ScottishPower Distribution Cables & Equipment Metal Theft April 2012 As an aid to deterring to metal theft this booklet has been put together to help identify the types of utility power cables and associated

More information

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Presentation Outline Mechanical Overview Chillers and Pumps Pipework and Ancillaries In Row Cooling Units

More information

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services SpecialistS IN ELECTRICAL SUPPORT SERVICES TO MINING, UTILITIES & industry Ampcontrol is committed to supporting our customers to maintain efficient

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

Electrical Practices for Construction Work

Electrical Practices for Construction Work 1. Purpose Electrical Practices for Construction Work The purpose of this Code is to provide practical guidance and set minimum safety requirements for electrical practices on all construction sites in

More information

REVIEWED BY CAPITAL PROJECTS MANAGER (DAN REDDY) GENERAL MANAGER EQUIPMENT ENGINEERING & ASSET MANAGEMENT (HAMILTON NXUMALO)

REVIEWED BY CAPITAL PROJECTS MANAGER (DAN REDDY) GENERAL MANAGER EQUIPMENT ENGINEERING & ASSET MANAGEMENT (HAMILTON NXUMALO) SA Port Operations DOCUMENT TYPE: REFERENCE EEAM-Q-014 (ORIGINAL SPECIFICATION HE8.2.3 Ver5) REVISION 0 SPECIFICATION TITLE: SPECIFICATION FOR ELECTRICAL MOTORS AND GENERATORS PAGE 0 of 07 COMPILED BY

More information

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured. SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation

More information

Power Plant Electrical Distribution Systems

Power Plant Electrical Distribution Systems PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com

More information

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H. POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Metering and Monitoring. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Metering and Monitoring. Basis of Design Basis of Design This section applies to the design, installation and integration of metering and monitoring equipment, including: hardware installed in the electrical service and distribution equipment,

More information

Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time

Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to

More information

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4 CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,

More information

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER. Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the

More information

Paper on Basbar Trunking System for Electrical Supply to Industrial & commercial Installation

Paper on Basbar Trunking System for Electrical Supply to Industrial & commercial Installation IOSR Journal of Engineering (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 04, Issue 01 (January. 2014), V6 PP 01-12 www.iosrjen.org Paper on Basbar Trunking System for Electrical Supply to Industrial

More information

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV

MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES MEDIUM VOLTAGE SUBSTATION PRACTICES Medium Voltage (MV) is defined as: 1000V< MV 44kV MEDIUM VOLTAGE SUBSTATION PRACTICES This presentation covers some safety aspects

More information

21.1 Functions, Basic Configuration, and Interfaces

21.1 Functions, Basic Configuration, and Interfaces 21 (6.2.M) Site Services Building 21.1 Functions, Basic Configuration, and Interfaces 21.1.1 Functions The primary functions performed by the site services building are to house, support, provide a suitable

More information

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS 4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE

More information

APPLICATION ORIENTED DESIGN OF CABLES

APPLICATION ORIENTED DESIGN OF CABLES APPLICATION ORIENTED DESIGN OF CABLES Mrs. Rohini Bhattacharyya, Dubai cables Ltd.P. O. Box 11529,Dubai. rohinib@ducab.com Mr. Nawaf Ahmad Al Mohaideb Dubai Cables Ltd. P. O. Box 11529, Dubai. Nawaf@ducab.com

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

SECTION 16461 DRY-TYPE TRANSFORMERS

SECTION 16461 DRY-TYPE TRANSFORMERS SECTION 16461 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Furnishing and installation of and testing of cast resin dry type MV/LV distribution transformer in accordance with specifications and drawings. Any

More information

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements

NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems. Safe energy distribution that meets the highest industrial requirements NATUS NES / NES-H Draw-out Type Medium Voltage Switchgear Systems Safe energy distribution that meets the highest industrial requirements NATUS switchgear systems your advantages minimal use of insulant

More information

Medium Voltage Products. ZN1 12 kv arc-proof air-insulated switchgear for primary distribution

Medium Voltage Products. ZN1 12 kv arc-proof air-insulated switchgear for primary distribution Medium Voltage Products ZN1 12 kv arc-proof air-insulated switchgear for primary distribution ZN1 an innovative switchgear for power distribution requirements ABB ZN1 primary distribution switchgear is

More information

Regulations for the Installation of Electrical Wiring, Electrical Equipment and Air Conditioning Equipment

Regulations for the Installation of Electrical Wiring, Electrical Equipment and Air Conditioning Equipment Regulations for the Installation of Electrical Wiring, Electrical Equipment and Air Conditioning Equipment Qatar General Electricity & Water Corporation KAHRAMAA Customer Services Department State of Qatar

More information

Corporate Profile ROYAL. MODERN ROYAL ELECTRIC Ideal Power Solution MRE ELECTRICAL, INSTRUMENTATION & COMMUNICATION SYSTEMS

Corporate Profile ROYAL. MODERN ROYAL ELECTRIC Ideal Power Solution MRE ELECTRICAL, INSTRUMENTATION & COMMUNICATION SYSTEMS Corporate Profile MODERN ROYAL ELECTRIC Ideal Power Solution ROYAL MRE ELECTRICAL, INSTRUMENTATION & COMMUNICATION SYSTEMS MAJOR STOCKIST >>> CATHODIC PROTECTION CABLES >>> LOW VOLTAGE CABLES >>> MEDIUM

More information

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Reprint from Aluminium World 2009, Volume 2 Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Emirates Aluminium (EMAL), a joint venture between Abu Dhabi s

More information

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132

More information

Table of Contents. TransformerIQ FAQs 1

Table of Contents. TransformerIQ FAQs 1 [12/12] FAQs Table of Contents FAQ 1. What size transformer will TransformerIQ monitor?... 2 FAQ 2. Are there different TransformerIQ versions?... 2 FAQ 3. How are the units powered?... 2 FAQ 4. What is

More information

The complete guide to Low Voltage switchgear

The complete guide to Low Voltage switchgear The complete guide to Low Voltage switchgear The complete guide to low voltage switchgear Contents 4-7 Merlin Gerin LV Switchgear An introduction to the Merlin Gerin low voltage range of switchgear, and

More information

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED CCG Facilities Integration Incorporated

More information

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education

More information

Gulf Cable & Electrical Ind. Co.

Gulf Cable & Electrical Ind. Co. CONTENTS INTRODUCTION PRODUCT RANGE I PRODUCT DATA TABLES XLPE INSULATED 600/1000V CABLES Two Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 1 Three Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 2 Four Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC

More information

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions

More information

Circuit Electrical Testing

Circuit Electrical Testing Safe Isolation Procedure Circuit Electrical Testing Site Safety Management It is essential from the outset that effective management and control of the system, apparatus and equipment used on site is achieved

More information

The Intelligent AX1 Switchgear for Medium Voltage

The Intelligent AX1 Switchgear for Medium Voltage The Intelligent AX1 Switchgear for Medium Voltage Leif Lundin, Manager of Research and Development, Division Medium Voltage and Compact Substations, ABB Distribution, Sweden Abstract The newly launched

More information

Sizing conductors and selecting protection devices

Sizing conductors and selecting protection devices Sizing conductors and selecting protection devices 04 PowEr guide 2009 / BOOk 04 INTRO Careful selection of the sizes of the conductors in wiring systems and the characteristics of protection devices will

More information

The electrical energy produced at the gen

The electrical energy produced at the gen 300 300 Principles of Power System CHAPTER CHAPTER 12 Distribution Systems General 12.1 Distribution System 12.2 Classification of Distribution Systems 12.3 A.C. Distribution 12.4 D.C. Distribution 12.5

More information

4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters

4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters 8 Appendix 4 of BS 7671 by Mark Coles Appendix 4, Current-carrying capacity and voltage drop for cables and flexible cords, has seen significant changes with the publishing of BS 7671:2008. This article

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

Customer Substation Manual 08/05/02

Customer Substation Manual 08/05/02 Customer Substation Manual Table of Contents Section Page 2 of 85 Description 0 Preface 010.00 General 010.10 Information Required for the Review of New Customer Substations 010.20 New Customer Substation

More information

AIR-CONDITIONER SPLIT TYPE

AIR-CONDITIONER SPLIT TYPE FILE NO. A08-016 SERVICE MANUAL AIR-CONDITIONER SPLIT TYPE RAS-M10PKVP-E, RAS-M13PKVP-E, RAS-M16PKVP-E, RAS-M18PKVP-E / RAS-M10PKVP-ND, RAS-M13PKVP-ND, RAS-M16PKVP-ND, RAS-M18PKVP-ND / RAS-3M26GAV-E1,

More information

NATIONAL COIR RESEARCH AND MANAGEMENT INSTITUTE (NCRMI) KUDAPPANAKUNNU.P.O, THIRUVANANTHAPURAM NOTICE INVITING LIMITED QUOTATION

NATIONAL COIR RESEARCH AND MANAGEMENT INSTITUTE (NCRMI) KUDAPPANAKUNNU.P.O, THIRUVANANTHAPURAM NOTICE INVITING LIMITED QUOTATION NATIONAL COIR RESEARCH AND MANAGEMENT INSTITUTE (NCRMI) KUDAPPANAKUNNU.P.O, THIRUVANANTHAPURAM NOTICE INVITING LIMITED QUOTATION NCRMI/LIB/ELE001/15 4.09.2015 Competitive sealed quotations are invited

More information

HYDROMATRIX Jebel Aulia - Sudan

HYDROMATRIX Jebel Aulia - Sudan HYDROMATRIX Jebel Aulia - Sudan www.andritz.com HYDROMATRIX - Concept Jebel Aulia - Sudan HYDROMATRIX is a new concept of hydraulic energy generation, which has been developed by an American engineer in

More information

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) DETAILS OF THE CLEINT Client and address ADDRESS OF THE INSTALLATION Installation

More information

Screened cable and data cable segregation

Screened cable and data cable segregation December 2007 Screened cable and data cable segregation Can an armoured power cable be considered a screened cable and how does this relate to power and data cable segregation? The short answer is yes;

More information

Modular Systems wind portfolio overview Power Collection and Grid Connection products

Modular Systems wind portfolio overview Power Collection and Grid Connection products Modular Systems wind portfolio overview Power Collection and Grid Connection products Slide 1 Modular Systems wind portfolio Wind power - definition A wind turbine is a device that converts kinetic energy

More information

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points

Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points Outdoor 33.6W Dual Port Passive Power-over-Ethernet Midspan For External Security Cameras and Wireless Access Points Features SELV Compliant No Detection Passive Injector Gigabit Compatible Full Protection

More information

Design of electrical power system for a 1000MW nuclear power generating station

Design of electrical power system for a 1000MW nuclear power generating station Design of electrical power system for a 1000MW nuclear power generating station K Raja, K Yesunadam Dept. of Electrical & Electronics Engineering, Lingaya s Institute of Management & Technology, Vijayawada,

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS 1. Standards BOS Item / System I ii iii TECHNICAL SPECIFICATIONS Applicable BIS /Equivalent IEC Standards / Applicable MNRE Specifications Standard Description Standard Number Crystalline Silicon Terrestrial

More information

Cables, Cable Laying & Accessories Manual

Cables, Cable Laying & Accessories Manual Distribution Business Cables, Cable Laying & Accessories Manual Database ref: File Ref: Title Page & Revision Log For Cables & Access v4 - Nov 2003.doc Manual Name: Cables & Accessories Manual Version

More information

Doc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Doc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM D400E Data Module (60Hz) The EDGE D400E is designed to meet high power density requirements for both the HPC and Web Scale environments while

More information

ESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants. Installation instructions ESP M1/M1R mains protectors

ESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants. Installation instructions ESP M1/M1R mains protectors ESP 120 M1, ESP 208 M1, ESP 240 M1, ESP 415 M1, ESP 277 M1, ESP 480 M1 and M1R variants Installation instructions Contents Key points of installation Before installation Installation Installation check

More information

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast. RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER tgood.com Energy. Fast. TGOOD is a world leading manufacturer of prefabricated renewable energy substations PRODUCT CONCEPT ENVIRONMENTAL

More information

1. Electrical Equipment A) Transformer

1. Electrical Equipment A) Transformer Standards and Basic Equipment Date : 15 November 2010 1. Electrical Equipment 2. Terminology 3. Code & Standard 1. Electrical Equipment A) Transformer A1) One Transformer and 11kV Switchgear in High Rise

More information

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Submit shop drawings for equipment provided under this section Shop drawings shall indicate: Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,

More information

1 Introduction. 2 Hazards From Electricity

1 Introduction. 2 Hazards From Electricity Risk Assessment Application to Electrical Rigs A guide to assist the Competent Named person who will verify the safety of rigs consisting mainly of electrical equipment. 1 Introduction Every employer shall

More information

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE

More information

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw 4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and

More information

Pressure monitoring equipment for oil-sf 6. bushings, type GOEK

Pressure monitoring equipment for oil-sf 6. bushings, type GOEK Pressure monitoring equipment for oil-sf 6 bushings, type GOEK Installation and maintenance guide 5693 827-6 en, Rev. 3, 2002-01-30 This document must not be copied without our written permission, and

More information

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to

More information

Fault location on power cables. Fault location on power cables

Fault location on power cables. Fault location on power cables Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 01. Introduction Fault location on communication and power cables

More information

How To Choose A Transformer

How To Choose A Transformer Consider open loop MV network as an example source 1 source 2 NC NC NC or NO main MV switchboard A B Detail design of substation NC NC NC NO NC NC switchboard 1 switchboard 2 switchboard 3 MV MV MV LV

More information

Electrical Grounding. Appendix C

Electrical Grounding. Appendix C Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment

More information

FEDERAL ELECTRICITY & WATER AUTHORITY

FEDERAL ELECTRICITY & WATER AUTHORITY UNITED ARAB EMIRATES FEDERAL ELECTRICITY & WATER AUTHORITY SPECIFICATION FOR 433 VOLTS SWITCHGEARS (LVAC BOARD) LVAC SWITCHBOARDS I N D E X CLAUSE TITLE 1. GENERAL 2. TEMPERATURE RISE 3. BUSBARS 4. CONSTRUCTION

More information

Electrical Shore Connections / Cold Ironing

Electrical Shore Connections / Cold Ironing STANDARD FOR CERTIFICATION No. 2.25 Electrical Shore Connections / Cold Ironing JULY 2014 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version

More information

Comparative study for cables and busbars

Comparative study for cables and busbars Comparative study for cables and busbars Preliminary considerations To compare the prices of two categories of product as different as traditional cables and busbars, it is necessary to make some preliminary

More information

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation

RVH/BCH Data Centres Proposals for Surge Protection and Ventilation REPORT Proposals for Surge Protection and Ventilation BELFAST HEALTH AND SOCIAL CARE TRUST ROYAL GROUP OF HOSPITALS GROSVENOR ROAD BELFAST BT12 6BA Rev. 01 6th September 2013 Table of Contents 1.0 Ventilation

More information

N O W A V A I L A B L E

N O W A V A I L A B L E N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina S P E C I F I C A T I O N S Contact Doug Hollidge for more information

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60076-11 First edition 2004-05 Power transformers Part 11: Dry-type transformers This English-language version is derived from the original bilingual publication by leaving out

More information

HV Submarine Cable Systems Design, Testing and Installation

HV Submarine Cable Systems Design, Testing and Installation HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications

More information

Element D Services Electrical

Element D Services Electrical Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as

More information

P 602. This generator set has been designed to meet ISO 8528 regulation. This generator set is manufactured in facilities certified to ISO 9001.

P 602. This generator set has been designed to meet ISO 8528 regulation. This generator set is manufactured in facilities certified to ISO 9001. This generator set has been designed to meet ISO 88 regulation. This generator set is manufactured in facilities certified to ISO 900. This generator set is available with CE certification. Enclosed product

More information

ECOCIAT. Domestic hot water heat recovery unit

ECOCIAT. Domestic hot water heat recovery unit Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse How the National Grid System Operates Chris Gorman Lead Account Executive Syracuse 2 Parts of the Electric System Parts of the Electric System 1. Generating Station: Produces Electricity. 2. Transmission

More information

David O Brien, CMP Products (David.OBrien@cmp-products.com)

David O Brien, CMP Products (David.OBrien@cmp-products.com) David O Brien, CMP Products (David.OBrien@cmp-products.com) 1) Main Function of Cable Glands 2) Common Issues with Cable Glands 3) Compliance / Standards, changing times 4) How do we select Cable Glands?

More information

Electrical Safety Tips. Help us keep you safe

Electrical Safety Tips. Help us keep you safe Electrical Safety Tips Help us keep you safe To help you stay safe when using electricity, ActewAGL has compiled these electrical safety tips. For natural gas safety tips please see ActewAGL s natural

More information

INTERNATIONAL POWER DISTRIBUTION CONGRESS CIDEL ARGENTINA 2002

INTERNATIONAL POWER DISTRIBUTION CONGRESS CIDEL ARGENTINA 2002 INTERNATIONAL POWER DISTRIBUTION CONGRESS CIDEL ARGENTINA 2002 NEW GAS INSULATED SWITCHGEAR (GIS) FOR ALL MEDIUM VOLTAGE APPLICATIONS H. Fink, ABB Calor Emag Mittelspannungs GmbH; M. Hyrenbach, ABB Calor

More information

32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw

32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw ,1'8675,$/#*(16(7 6HULHV#'9#448 32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw Generator set consisting of engine and alternator mounted

More information

Standards. www.nordx.com 5 ANSI/TIA/EIA-569-A (CSA T530)

Standards. www.nordx.com 5 ANSI/TIA/EIA-569-A (CSA T530) The primary focus of this standard is to provide design specifications and guidance for all building facilities relating to telecommunications cabling systems and components. This standard identifies and

More information

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application

33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application 33.6W Power over Ethernet Waterproof Adapter PoE Plus Single Port Injector for Outdoor Application Features Compliant with the IEEE802.3at Standard -40 to +60 C Temperature Range Diagnostic LEDs Full Protection

More information

Chapter 1. Network Structures

Chapter 1. Network Structures Chapter 1 Network Structures Definition Standard IEC 60038 defines voltage ratings as follows: Low voltage (): for a phase-to-phase voltage of between 100 V and 1,000 V, the standard ratings are: 400 V

More information

Secondary Unit Substations

Secondary Unit Substations 14 SWITCHGEAR Secondary Unit Substations Overview Siemens offers a wide variety of unit substation designs to meet customer requirements. A unit substation consists of one or more transformers mechanically

More information

Low Voltage Switchboards The Best Technical Solution for Your Ship

Low Voltage Switchboards The Best Technical Solution for Your Ship The Best Technical Solution for Your Ship Wärtsilä SAM Electronics Optimal Power Distribution The uninterrupted supply of power to systems and consumers onboard modern ships is an extremly important matter.

More information

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013

Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Best Practices, Benefits and Economics of Load Testing IEEE PES Fort Worth, TX Chapter July 16, 2013 Mark Siira ComRent International 1 8/1/2013 Agenda Introduction Overview of Load Bank Testing Benefits

More information

Addendum #2 Contract UK-11-13

Addendum #2 Contract UK-11-13 Addendum #2 Contract UK-11-13 Utilities Kingston Purchase and Replacement of Switchgear at Kingston Hydro Substation MS11 March 25, 2011 Delivered to: All RFP recipients Total number of pages: Nine (9)

More information

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract The methods for cable penetrations into modular industrial substations are

More information