Construction Health & Safety Checklist 1
|
|
|
- Lenard Woods
- 9 years ago
- Views:
Transcription
1 Construction Health & Safety Checklist 1 DESCRIPTION yes no n/a comments Safe places of work.can everyone reach their place of work safely, eg are roads, gangways, passageways, passenger hoists, staircases, ladders and scaffolds in good condition?.are there guard rails or equivalent protection to stop falls from open edges on scaffolds, mobile elevating work platforms, buildings, gangways, excavations, etc?.are holes and openings securely guard railed, provided with an equivalent standard of edge protection or provided with fixed, clearly marked covers to prevent falls?.are structures stable, adequately braced and not overloaded?.are all working areas and walkways level and free from obstructions such as stored material and waste?.is the site tidy, and are materials stored safely?.are there proper arrangements for collecting and disposing of waste materials?.is the work adequately lit? Is sufficient additional lighting provided when work is carried on after dark or inside buildings? SCAFFOLDS yes no n/a comments.are scaffolds erected, altered and dismantled by competent persons?.is there safe access to the scaffold platform?.are all uprights provided with base plates (and, where necessary, timber sole plates) or prevented in some other way from slipping or sinking?.are all the uprights, ledgers, braces and struts in position?.is the scaffold secured to the building or structure in enough places to prevent collapse? Are there adequate guard rails and toe boards or an equivalent standard of protection at every edge from which a person could fall 2 m or more? Where guard rails and toe boards or similar are used:
2 Construction Health & Safety Checklist 2.are the toe boards at least 150 mm in height?.is the upper guard rail positioned at a height of at least 910 mm above the work area?.are additional precautions, eg intermediate guard rails or brick guards in place to ensure that there is no unprotected gap of more than 470 mm between the toe board and upper guard rail? Are the working platforms fully boarded and are the boards arranged to avoid tipping or tripping? Are there effective barriers or warning notices in place to stop people using an incomplete scaffold, eg where working platforms are not fully boarded? Has the scaffold been designed and constructed to cope with the materials stored on it and are these distributed evenly? Does a competent person inspect the scaffold regularly, eg at least once a week; always after it has been substantially altered, damaged and following extreme weather? Are the results of inspections recorded? POWER ACCESS EQUIPMENT yes no n/a comments Has the equipment been erected by a competent person? Is fixed equipment, eg mast climbers, rigidly connected to the structure against which it is operating? Does the working platform have adequate guard rails and toe boards or other barriers to prevent people and materials falling off? Have precautions been taken to prevent people being struck by the moving platform, projections from the building or falling materials, eg barrier or fence around the base? Are the operators trained and competent? Is the power supply isolated and the equipment secured at the end of the working day? LADDERS yes no n/a comments.are ladders the right means of access for the job?.are all ladders in good condition?
3 Construction Health & Safety Checklist 3.Are they secured to prevent them slipping sideways or outwards?.do ladders rise a sufficient height above their landing place? If not, are there other hand-holds available?.are the ladders positioned so that users don't have to over-stretch or climb over obstacles to work?.does the ladder rest against a solid surface and not on fragile or insecure materials? ROOF WORK yes no n/a comments.are there enough barriers and is there other edge protection to stop people or materials falling from roofs?.do the roof battens provide safe hand and foot holds? If not, are crawling ladders or boards provided and used?.during industrial roofing, are precautions taken to stop people falling from the leading edge of the roof or from fragile or partially fixed sheets which could give way?.are suitable barriers, guard rails or covers, etc provided where people pass or work near fragile material such as asbestos cement sheets and roof lights?.are crawling boards provided where work on fragile materials cannot be avoided?.are people excluded from the area below the roof work? If this is not possible, have additional precautions been taken to stop debris falling onto them? EXCAVATIONS yes no n/a comments.is an adequate supply of timber, trench sheets, props or other supporting material made available before excavation work begins?.is this material strong enough to support the sides?.is a safe method used for putting in the support, ie one that does not rely on people working within an unsupported trench?.if the sides of the excavation are sloped back or battered, is the angle of batter sufficient to prevent collapse?
4 Construction Health & Safety Checklist 4.Is there safe access to the excavation, eg by a sufficiently long, secured ladder?.are there guard rails or other equivalent protection to stop people falling in?.are properly secured stop blocks provided to prevent tipping vehicles falling in?.does the excavation affect the stability of neighbouring structures?.are materials, spoil or plant stored away from the edge of the excavation in order to reduce the likelihood of a collapse of the side?.is the excavation inspected by a competent person at the start of every shift; and after any accidental collapse or event likely to have affected its stability? MANUAL HANDLING yes no n/a comments.has the risk of manual handling injuries been assessed?.are hoists, telehandlers, wheel-barrows and other plant or equipment used so that manual lifting and handling of heavy objects is kept to a minimum?.are materials such as cement ordered in 25 kg bags?.can the handling of heavy blocks be avoided? HOISTS yes no n/a comments.is the hoist protected by a substantial enclosure to prevent someone from being struck by any moving part of the hoist or falling down the hoistway?.are gates provided at all landings, including ground level?.are the gates kept shut except when the platform is at the landing?.are the controls arranged so that the hoist can be operated from one position only?.is the hoist operator trained and competent?
5 Construction Health & Safety Checklist 5.Is the hoist's safe working load clearly marked?.if the hoist is for materials only, is there a warning notice on the platform or cage to stop people riding on it?.is the hoist inspected weekly, and thoroughly examined every six months by a competent person?.are the results of inspection recorded? CRANES AND LIFTING APPLIANCES yes no n/a comments.is the crane on a firm level base?.are the safe working loads and corresponding radii known and considered before any lifting begins? If the crane has a capacity of more than 1 tonne, does it have an automatic safe load indicator that is maintained and inspected weekly? Are all operators trained and competent? Has the banksman/slinger been trained to give signals and to attach loads correctly? Do the operator and banksman find out the weight and centre of gravity of the load before trying to lift it? Are cranes inspected weekly, and thoroughly examined every 14 months by a competent person? Are the results of inspections and examinations recorded? Does the crane have a current test certificate? PLANT AND MACHINERY yes no n/a comments Is the right plant and machinery being used for the job? Are all dangerous parts guarded, eg exposed gears, chain drives, projecting engine shafts? Are guards secured and in good repair? Is the machinery maintained in good repair and are all safety devices operating correctly? Are all operators trained and competent? TRAFFIC AND VEHICLES yes no n/a comments Have separate pedestrian, vehicle access points and routes around the site been provided? If not, are vehicles and pedestrians kept separate
6 Construction Health & Safety Checklist 6 wherever possible? Have one-way systems or turning points been provided to minimise the need for reversing? Where vehicles have to reverse, are they controlled by properly trained banksmen? Are vehicles maintained; do the steering, handbrake and footbrake work properly? Have drivers received proper training? Are vehicles securely loaded? Are passengers prevented from riding in dangerous positions? FIRE EMERGENCIES (GENERAL) yes no n/a comments Have emergency procedures been developed, eg evacuating the site in case of fire or rescue from a confined space?.are people on site aware of the procedures?.is there a means of raising the alarm and does it work?.are there adequate escape routes and are these kept clear? FIRE EMERGENCIES (FIRE) yes no n/a comments.is the quantity of flammable material on site kept to a minimum?.are there proper storage areas for flammable liquids and gases, eg LPG and acetylene?.are containers and cylinders returned to these stores at the end of the shift?.if liquids are transferred from their original containers are the new containers suitable for flammable materials?.is smoking banned in areas where gases or flammable liquids are stored and used?.are gas cylinders and associated equipment in good condition?.are other ignition sources also prohibited?.when gas cylinders are not in use, are the valves fully closed?.are cylinders stored outside?
7 Construction Health & Safety Checklist 7.Are adequate bins or skips provided for storing waste?.is flammable and combustible waste removed regularly?.are the right number and type of fire extinguishers available and accessible? HAZARDOUS SUBSTANCES yes no n/a comments.have all harmful materials, eg asbestos, lead, solvents, paints etc been identified?.have the risks to everyone who might be exposed to these substances been assessed?.have precautions been identified and put in place, eg is protective equipment provided and used; are workers and others who are not protected kept away from exposure? NOISE yes no n/a comments.are breakers and other plant or machinery fitted with silencers?.are barriers erected to reduce the spread of noise?.is work sequenced to minimise the number of people exposed to noise?.are others not involved in the work kept away?.is suitable hearing protection provided and worn in noisy areas? WELFARE yes no n/a comments.have suitable and sufficient numbers of toilets been provided and are they kept clean?.are there clean wash basins, warm water, soap and towels?.is suitable clothing provided for those who have to work in wet, dirty or otherwise adverse conditions?.are there facilities for changing, drying and storing clothes?.is drinking water provided?..is there a site hut or other accommodation where
8 Construction Health & Safety Checklist 8 workers can sit, make tea and prepare food?.is there adequate first aid provision?.are welfare facilities easily and safely accessible tc all who need to use them? PROTECTIVE CLOTHING yes no n/a comments.has adequate personal protective equipment, eg hard hats, safety boots, gloves, goggles, and dust masks been provided?.is the equipment in good condition and worn by all who need it? ELECTRICITY yes no n/a comments.is the supply voltage for tools and equipment the lowest necessary for the job (could battery operated tools and reduced voltage systems, eg 110 V, or even lower in wet conditions, be used)?.where mains voltage has to be used, are trip devices, eg residual current devices (RCDs) provided for all equipment?.are RCDs protected from damage, dust and dampness and checked daily by users?.are cables and leads protected from damage by sheathing, protective enclosures or by positioning away from causes of damage?.are all connections to the system properly made and are suitable plugs used?.is there an appropriate system of user checks, formal visual examinations by site managers and combined inspection and test by competent persons for all tools and equipment?.are scaffolders, roofers, etc, or cranes or other Dlant. workina near or under overhead lines? Has the electricity supply been turned off, or have other precautions, such as 'goal posts' or taped markers been provided to prevent them contacting the lines?.have underground electricity cables been located (with a cable locator and cable plans), marked, and precautions for safe digging been taken? PROTECTING THE PUBLIC yes no n/a comments.are the public fenced off or otherwise protected from the work?
9 Construction Health & Safety Checklist 9.When work has stopped for the day:.are the gates secured?.is the perimeter fencing secure and undamaged?.are all ladders removed or their rungs boarded so that they cannot be used?.are excavations and openings securely covered or fenced off?.is all plant immobilised to prevent unauthorised use?.are bricks and materials safely stacked?.are flammable or dangerous substances locked away in secure storage places?
CONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT
www.veritas-consulting.co.uk CONSTRUCTION SITE HEALTH AND SAFETY SELF AUDIT This checklist identifies some of the hazards most commonly found on construction sites. The questions it asks are intended to
Excavation Safe Working Practices
Excavation Safe Working Practices The Construction (Health, Safety and Welfare) Regulations 1996 under Excavations (Regulation 12) states that:- All practicable steps shall be taken where necessary to
Level 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
A: SIGNIFICANT RISKS Initial Risk Rating H/M/L B: KEY CONTROL MEASURES ACTION
ELECTRICAL CONTRACTOR RISK ASSESSMENT AND KEY CONTROL MEASURES CONTRACTOR NAME: AEC Automation Ltd. NAME OF CONTRACT: A: SIGNIFICANT RISKS Initial Risk Rating H/M/L Slips, trips and falls. Manual handling.
Tremline Pty Ltd trading as The Hills Bark Blower
JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of
Job safety analysis Installing wall frames and roof trusses on-site
Job safety analysis Installing wall frames and roof trusses on-site 1. Taking delivery: - unloading the truck - moving materials manually to the work area Body sprains and strains from lifting materials
SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
Construction OS&H Working at height
Construction OS&H Working at height Summary Common hazards with working at height General OS&H requirements when working at height Scaffolding Structural frames Demolition of above ground structures Roof-work
Contractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.
CONSTRUCTION SAFETY Introduction The following sections provide general guidelines and procedures for construction safety. This chapter covers the following topics: TOPIC PAGE General Construction Guidelines
Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details
Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details
Working at Height. Procedure
Procedure *All Forth Valley College Health, Safety and Welfare Procedures are covered under the overarching Health, Safety and Welfare Policy. Status: Date of version: Reviewed by: Author/Contact Person;
THE PONY CLUB RISK ASSESSMENT CHECK LIST - SUMMER CAMP
Start Date Finish Date Location Map Reference Access Road Dual Carriageway. Single Carriageway. Unclassified. Track. Warning signs. Post stewards. High visibility clothing. One way system. Police action.
Independent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
Work at Height / Falling Objects
Introduction This information sheet gives employers and employees practical advice on work at height and falling objects and how to eliminate or reduce the risk of harm or damage occurring. It will assist
How to carry out a risk assessment and create a safety statement
How to carry out a risk assessment and create a safety statement The Health and Safety Authority (HSA) provides the publication Guidelines on Risk Assessments and Safety Statements available to purchase
Safety and Health Office WORKPLACE SAFETY CHECKLIST
Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting
68 Metal Industry Guidelines for Safe Work
3 68 Metal Industry Guidelines for Safe Work section 3 high-risk 3 activities Metal Industry Guidelines for Safe Work 69 section 3 high risk activities 3.1 working at heights Falls from heights have been
Safety Training Needs Assessment
Safety Needs Assessment Form Instructions: Please review each question and either check YES or NO. If a question is checked YES you will be required to complete the training topic before initial assignment
Workshop Self Inspection Checklist WORK01
Workshop Self Inspection Checklist WORK01 General Mechanical Workshops Location Assessor Date This core checklist is provided by the Health and Safety Department as a template, which provides a basic framework
WORKING AT HEIGHT GUIDELINES. Version II
WORKING AT HEIGHT GUIDELINES Version II 21 st September 2011 WORKING AT HEIGHT GUIDELINES EXECUTIVE SUMMARY Working at height is where an individual is carrying out work in any place in the course of obtaining
TEMPLATE -PRINCIPAL CONTRACTOR CONSTRUCTION SAFETY & ENVIRONMENT MANAGEMENT PLAN
Note: Construction Safety Management Plan format may vary. Information must be clearly identifiable and easily found. It is the implementation of this plan that is important and audits of construction
Site inspection: Workplace transport checklist
Site inspection: Workplace transport checklist The following checklist is a guide to what employers should consider when assessing the risk from vehicles in the workplace. It may not be comprehensive for
HEALTH SAFETY & ENVIRONMENTAL WORKSITE AUDIT
Environmental & Occupational Health and Safety Unit HEALTH SAFETY & ENVIRONMENTAL WORKSITE AUDIT This health and safety audit report is advisory only. This information is not intended to be relied upon
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
EXCAVATOR SAFETY TRAINING
EXCAVATOR SAFETY TRAINING INSPECTION CHECKLIST INSPECTION AREA INSPECTION RESULTS Sat. Unsat. N/A Comments Carrier & Car Body Rotation system Tracks Rollers Frame, welds, bolts Drive system Upper Structure
Walking/Work Surfaces Fall Protection Program
Reviewed: 10-2006 Walking/Work Surfaces Fall Protection Program It is the responsibility of all supervisors and/or administrators to implement this safety program. Their responsibility includes yearly,
Workplace Health, Safety & Welfare
Relevant Legislation Workplace (Health, Safety and Welfare) Regulations 1992 Construction (Design & Management) Regulations 2015 Provision & Use of Work Equipment Regulations 1998 (PUWER) Lifting Operations
TEMPORARY EMPLOYEES SAFETY PROCEDURES
TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES
SUBSIDIARY LEGISLATION 424.06 BUILDING (SAFETY) REGULATIONS
BUILDING (SAFETY) [S.L.424.06 1 SUBSIDIARY LEGISLATION 424.06 BUILDING (SAFETY) REGULATIONS 4th March, 1969 LEGAL NOTICE 96 of 1968. 1. The title of these regulations is the Building (Safety) Regulations.
Fact Sheet: Slips, trips and falls
Fact Sheet: Slips, trips and falls Slips, Trips & Falls Slips, Trips and Falls are one of the highest causes of workplace injuries. They include those, which occur on the same level as a result of uneven
SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS
SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. Regulations: Comply with industry standards and applicable laws and regulations of authorities
Example risk assessment for a motor vehicle mechanical repair workshop
Example risk assessment for a motor vehicle mechanical repair workshop Setting the scene The garage manager did the risk assessment. The business employed 12 mechanics, including two apprentices who carried
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
Safety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
RRC SAMPLE MATERIAL WORKING AT HEIGHT- HAZARDS AND RISK CONTROL LEARNING OUTCOMES
Managing and Controlling Hazards in International Construction Activities WORKING AT HEIGHT- HAZARDS AND RISK CONTROL ELEMENT 10 LEARNING OUTCOMES On completion of this element, you should be able to demonstrate
ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
BSH Exhibition Sample Risk Assessment for exhibitors / contractors
BSH Exhibition Sample Risk Assessment for exhibitors / BSH Conferences Ltd have produced this risk assessment for its exhibitors to use as a template if they have not undertaken risk assessment before.
Managing the risk of falls while working on roofs in housing construction
Workplace Health and Safety Queensland Managing the risk of falls while working on roofs in housing construction Where the risk of falling is 3 metres or more (or roof slope over 26 ) Before you start
CAER Construction and Environmental Resource
CAER Construction and Environmental Resource OLD COLONY HABITAT FOR HUMANITY WORK CREW SAFETY: Construction Safety Policy INTRODUCTION Safety is everybody's concern and is always an important consideration
Master Workplace Inspection Checklist for General Shop Safety. MASTER WORKPLACE INSPECTION CHECKLIST General Shop Safety
Integrated Risk Management Master Workplace Inspection Checklist for General Shop Safety Document Type: Form Control Number: UIRM- FM_012_50 File Code: UIRM-001 Last Reviewed: March 2014 Department/Unit:
Unit Title: Unit purpose and aim
Unit Title: Preparing and Operating Telescopic Handlers to Lift and Transfer Loads in the Workplace Level: 2 Credit value: 25 Guided learning hours: 83 Unit expiry date: 31/10/2014 Unit purpose and aim
Section 14. Forklift Safety Contents 14.1 Operator Safety
Section 14. Forklift Safety Contents 14.1 Operator Safety... 14-1 14.2 Inspection and Maintenance... 14-2 14.3 Handling the Load... 14-3 14.4 Fueling Liquefied Petroleum (LP) Gas Forklifts... 14-3 14.5
Health and Safety Induction For Smaller Construction Companies
Health and Safety Induction For Smaller Construction Companies First Printed 2005 Reprinted 2009 The slides in this presentation are designed for a short (1/2 to 2 Hour) induction session for operatives
Working on roofs. Planning roof work
Health and Safety Working on a roof can be dangerous. Falls account for more deaths and serious injuries in construction than anything else and roofers account for 24% the biggest category of worker by
Fire Safety Risk Assessment Checklist for Residential Care Premises
Checklist for Residential Care Premises Name of Premises: Address of Premises: Name of Responsible Person: What area / location does the assessment cover? Does the assessment cover the whole site YES or
Example risk assessment for a warehouse
Example risk assessment for a warehouse Setting the scene The warehouse manager carried out a risk assessment of the warehouse. The warehouse employed 12 staff, some were part of a union. How was the risk
Warehousing and storage Keep it safe
Warehousing and storage Keep it safe This short guide is to help those involved in warehousing and storage to reduce the number of injuries and cases of occupational ill health. It contains simple advice
Safety signs and symbols
Safety signs and symbols These signs are those prescribed in the Health and safety (safety signs and signals) regulations 1996, or by the CHIP regulations. They are recognised throughout the European Union
Skanska Sweden s General Conduct and Safety Rules. Content
1 (8) Note In case of issues regarding interpretation of this document, the Swedish original document prevails. Content Our work environment 2 Risks at work 2 Safe behaviour 3 Information and qualifications
Procedural Guidance for Roof Access/Roof Work
University of Central Lancashire Safety, Health & Environment Section Procedural Guidance for Roof Access/Roof Work Document Number: FM/HSE 001 Revision Number: 2 Review Date: August 2005 Reviewed by:
Unit Title: Unit purpose and aim
Unit Title: Preparing and Operating Sideloader Forklifts to Lift and Transfer Loads in the Workplace Level: 2 Credit value: 16 Guided learning hours: 53 Unit expiry date: 31/10/2014 Unit purpose and aim
15GAL STEEL OIL DRAIN WITH 110V PUMP
15GAL STEEL OIL DRAIN WITH 110V PUMP OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety
Fire Risk Assessment Safety Checklist
Fire Risk Assessment Safety Checklist This checklist has been prepared to help you comply with The Regulatory Reform Fire Safety Order 2005 What is the Regulatory Reform (Fire Safety) Order 2005? The Regulatory
Forklifts, Battery Charging and Material Handling
Forklifts, Battery Charging and Material Handling 1. Identification of Workplace Hazard Forklift operations are relatively hazardous activities and, in relatively low-hazard commercial workplaces, may
Construction Safety Inspection Checklist
Texas Department of Insurance Construction Safety Inspection Checklist Provided by Workers Health and Safety HS95-063E(9/07) Construction Safety Inspection Checklist Company Name: Jobsite Address: Superintendent:
Risk Assessment & Management Plan
Risk Assessment & Management Plan The Proposed project encompasses the lives of a large number of people. It also involves installation of various structures and machineries that meet the comfort and needs
Which generic risk assessments are provided? Construction Risk. Assessments Plus. ervices
Which generic risk assessments are provided? Assessments Plus A01 Asbestos Containing Materials A02 Brick/Block Laying A03 Cable Pulling A04 Carpentry/Joinery A05 Concreting Operations A06 Confined Spaces
SITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
How To Prevent Accidents At Work
2 Preventing vehicle accidents Construction work is considered to be one of the most hazardous industrial activities in the EU. The rate of injury in the construction industry is higher than in other industries.
Working at height A brief guide
Working at height A brief guide Introduction This brief guide describes what you, as an employer, need to do to protect your employees from falls from height. It will also be useful to employees and their
7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS
ACTIVITY HAZARD ANALYSIS (AHA) 1. Contract Number: 2. Contractor Name: 3. Date prepared: 4. Title/Activity Performed: FIXED SCAFFOLDING 5. Location: 6. Estimated Date of Completion: 7. PRINCIPAL STEPS
San josé OWNER S MANUAL
San josé OWNER S MANUAL Assembling & operating manual San josé 30 mbar - PORTABLE GAS BARBECUE 1. 2. 3. Improper installation, adjustment, alteration, service or maintenance can injury or property damage.
Health and Safety: A code of practice for Approved Contractors
d. Buildings used as workshops or stores shall be steel or concrete framed structure clad with non-flammable materials eg metal sheeting, concrete panels, brick or blockwall. e. Buildings uses as portable
EVENT SAFETY CHECKLIST (SMALL TO MEDIUM SIZED OUTDOOR COMMUNITY EVENTS)
DUTY OF CARE, PLANNING AND PREPARATION Event organisers have a duty of care under the Victorian Occupational Health and Safety Act 2004 (the OHS Act) to provide a safe operational environment. Under this
Generic Risk Assessment: Working on Roofs (FMRA 0006)
Generic Risk Assessment: Working on Roofs (FMRA 0006) Only staff and contractors who are Authorised by Facilities Management are allowed to access roof areas. Those who need access who are not Authorised
CONSTRUCTION SAFETY POLICY
California Institute of Technology CONSTRUCTION SAFETY POLICY Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028
No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974
The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.
Bastille Court 2 Paris Garden London SE1 8ND Telephone: 020 7902 5314 Fax: 020 7902 5301 E-mail: [email protected] Web: http://www.thefpa.co.
Bastille Court 2 Paris Garden London SE1 8ND Telephone: 020 7902 5314 Fax: 020 7902 5301 E-mail: [email protected] Web: http://www.thefpa.co.uk Fire Risk Assessment Course Health & Safety at Work Inspectorate,
BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008
BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park
The Tomato Plant Company Ltd. Method Statement and Risk Assessment Loads requiring lifting
The Tomato Plant Company Ltd Method Statement and Risk Assessment Loads requiring lifting Generic method statement & risk assessment for the removal of portable accommodation units and/or shipping containers
WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS
Aug 2013 WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS As a small business operator, you need to be aware of your health and safety responsibilities, and identify risks
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
For ease of reference the clauses are arranged in 12 sections as follows:-
NASC TERMS The general NASC terms under which members carry out their work are normally set out in their Standard Terms of Trading, often found on the reverse of their quotation form and referred to as
Guidance Note GN049. Using portable ladders safely. WorkSafe Tasmania Department of Justice. Introduction and purpose
Guidance Note GN049 Using portable ladders safely Introduction and purpose The purpose of this guidance note is to answer the most common questions that WorkSafe Tasmania receives about using portable
CONTRACTOR INDUCTION HANDBOOK
CONTRACTOR INDUCTION HANDBOOK POLICY The health and safety of all school employees and contractor employees is a vital concern at the school. Contract personnel will be treated in a manner consistent with
Hazard Identification, Risk Assessment and Control (HIRAC) for Work at Height Risk, Health and Safety
Hazard Identification, Assessment and Control (HIRAC) for Work at Height, Health and Safety A. Introduction Hazard identification and safety risk assessments should be conducted prior to carrying out any
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
FIRE RISK ASSESSMENT. The Workplace Fire Precautions Legislation
FIRE RISK ASSESSMENT The Workplace Fire Precautions Legislation The Fire Precautions (Workplace) Regulations 1997 The Fire Precautions (Workplace)(Amendment) Regulations 1999 The Management of Health and
Site Induction Presentation
ABC Contracting Site Induction Presentation This presentation provides a mock site induction and serves to help those people in the process of preparing and delivering site inductions It is essential that
Safety regulations for working at KPN, T-Mobile and Vodafone locations. Working safely at mobile communication locations
Safety regulations for working at KPN, T-Mobile and Vodafone locations Working safely at mobile communication locations Contents Introduction 4 Why this booklet? 4 How to read this booklet 4 Health and
Description of the Task/Activity: General door/window fitting/replacement. Start Date/Time: Site Address/ Location: Finish Date/Time:
Method Statement This method statement is to be read in conjunction with the attached risk assessments and the Wembley Windows (SC) Ltd Health and Safety Policy and Procedures Manual. Description of the
Injury Prevention for the Construction Industry
Injury Prevention for the Workers in the construction industry encounter a variety of hazards, some of which can lead to serious injuries and fatalities. This fact sheet: Increases awareness of the primary
The Guide to Safer Scaffolds
The Guide to Safer Scaffolds A publication produced by The Victorian Scaffolding Safety Committee The Guide to Safer Scaffolds Foreword A key element of the employer duty to provide a safe place and system
E3902 Seeing Accidents Before They Happen Leader s Guide
E3902 Seeing Accidents Before They Happen Leader s Guide ERI PRODUCTIONS INC. SEEING ACCIDENTS BEFORE THEY HAPPEN This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
section 5 machine guarding and lockout
section machine guarding and lockout This section covers ways to physically protect people working in and around machinery. It includes information on: machinery guards lockout systems emergency stop confined
Buildings used for locations or temporary studios in film and television
Buildings used for locations or temporary studios in film and television HSE information sheet Introduction In this information sheet, must denotes a legal obligation. Words such as do, should etc are
Risk Assessment Tool (example only)
HAZARD IDENTIFICATION & RISK ASSESSMENT TOOL Hazard identification You have an obligation to identify, assess and control any foreseeable hazards that may result as a consequence of your actions. If it
Workplace Safety Inspections Adopt a systematic approach by inspecting 8 areas of safety:
Workplace Safety Inspections Adopt a systematic approach by inspecting 8 areas of safety: 1. MANAGEMENT - An indication that the safety management system is working effectively is a good starting point.
GEORGIA INSTITUTE OF TECHNOLOGY ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT
PURPOSE To protect the health and welfare of GEORGIA TECH employees in areas where there may be a risk of injury or exposure to hazardous substances or conditions employees who work in areas where physical
Question and answer brief for the construction industry on the Work at Height Regulations 2005
Question and answer brief for the construction industry on the Work at Height Regulations 2005 Introduction This question and answer brief includes some of the key issues about the new Work at Height Regulations
MODEL T-4 TRENCHER. Operators Manual
DO NOT THROW AWAY IMPORTANT MANUAL MODEL TRENCHER Operators Manual P.O.BOX 290 San Bernardino, CA. 92402 Phone (909) 478-5700 (800) 922-4680 Fax (909) 478-5710 E-mail: [email protected] www.groundhoginc.com
Welcome to the safe@work Automotive Module.
Welcome to the safe@work Automotive Module. Have you read the General Module, completed the test and gained your safe@work General certificate? The Automotive Module should be done AFTER the General Module
How To Ensure Safety On A Caravan Site
EAST CAMBRIDGESHIRE DISTRICT COUNCIL A Site Operators Guide to Health and Safety Introduction The Health and Safety at Work Etc. Act 1974 places a duty on all persons having control of a caravan site to
Curtain Guards Made of PVC and designed to protect the operator from the risk of airborne chips or tool fragments.
Two General Safety Rule for CNC Machines Never operate a CNC machine without proper training or consulting the specific operator's manual for that particular machine and control type. Never attempt to
Notes. Material 1. Tools the employee is expected to operate
OSHA Standard29 CFR 1910.211-.247, Subpart O, Machinery and Machine Guarding, and Subpart P, Hand and Portable-Powered Tools and other Hand- Held Equipment. Hand Tool Safety Preparation 1. Read Applicable
Example risk assessment for cold storage warehousing
Example risk assessment for cold storage warehousing Setting the scene Frozen Foods Ltd provide cold storage and distribution facilities (at temperatures between -18 and -30 C) at three locations. They