ERTMS - National implementation plan
|
|
|
- Denis Arnold
- 10 years ago
- Views:
Transcription
1
2 ERTMS Page: 2 av 9 ERTMS - National implementation plan 00E First release KLY SKEI KJENSV Revision Reason for issue Date Created by Contr. by Appr. by Title: ERTMS - National implementation plan Pages: 9 Produced by: Prod.doc.no.: Replaces: Replaced by: Jernbaneverket Project: ERTMS Document-/drawing number: Revision: Area: National ERP-00-A E Operator s document number: Operator s rev.: NA NA
3 ERTMS Page: 3 av 9 Contents 1 Introduction Background Purpose Scope Financing Assumptions Migration strategy Rolling stock Infrastructure GSM-R network ERTMS plan... 8
4 ERTMS Page: 4 av 9 1 Introduction The Norwegian National Rail Administration (Jernbaneverket) intends to implement the European Rail Traffic Management System (ERTMS) on the Norwegian railway network. This document describes the planned ERTMS implementation. The sequence for roll-out is aligned with both the need for renewals of signalling systems and the need for new systems when new railway infrastructure is built. The planned implementation of ERTMS also includes fitting/retrofitting of trains with ERTMS. The whole Norwegian railway network will be in service with ERTMS by The speed of the rollout is aligned with the financing given in the National Transportation Plan (NTP). GSM-R has been in service on the complete network from Background The driving force for implementing ERTMS in Norway is the need for renewal of signalling systems more than the need for interoperability. When renewing old - or building new - signalling systems the European standard system ERTMS was chosen based on TSI requirements and cost/benefit analysis. 3 Purpose Norway has signed an agreement with the European Union named EEC (European Economic Community), which regulates the cooperation between Norway and EU. Through this agreement directives from the European Commission are implemented into Norwegian law. TSIs (Technical Specification for Interoperability) are part of EU directives. Implementation of ERTMS is in accordance with the technical specification for interoperability controlcommand and signalling (TSI CCS, Commission Decision 2012/88/EU changed by decision 2012/696/EU), implemented in Norwegian law with Forskrift om TSI-styring, kontroll og signal, jernbane. Jernbaneinfrastrukturforskriften states that new or rebuild signalling systems on the Norwegian railway network shall have interface to Class A systems (ERTMS). The implementation plan specifies both order and time period for the roll-out of ERTMS on the network. This document is an extract from Jernbaneverket s national signal plan the document Nasjonal signalplan (document number IUP-00-A-04278), which provides further details on the basis for the implementation plan. The implementation plan has been synchronized with the current Swedish ERTMS plan in order to facilitate interoperability. 4 Scope The target is to implement ERTMS on the complete national railway network. The plan presumes that ERTMS level 2 will be used, and that the existing GSM-R network will be used for communication between train and infrastructure.
5 ERTMS Page: 5 av 9 When ERTMS is implemented in Norway, the existing rolling stock will have to be modified. A total of approximately 600 vehicles of 83 types will have to be equipped. 5 Financing The total cost of the Norwegian ERTMS implementation is estimated to be between 1,7 and 2,2 billion Euros. In the period , a total of 6 billion NOK (750 million Euros) has been allocated in the National Transportation Plan to the ERTM implementation. The Norwegian implementation plan is not based on any EU subsidies. The existing rolling stock will have to be modified. The modification cost represents a burden for the railway companies. It is not yet decided how the financing of the modification work of the rolling stock will be done. 6 Assumptions The plan is built on the following assumptions: It is assumed that the ERTMS suppliers are able to meet Jernbaneverkets stated implementation scope, progress and cost targets given that contracts are signed in due time to deliver. The financing and contract/procurement strategy for on-board equipment are assumed not to influence the implementation order. Currently planned new infrastructure projects are carried out according to existing plans. 7 Migration strategy There are two possible strategies for implementing ERTMS. Either trains or infrastructure can be double equipped with both ERTMS and the national Class B system at the same time. The two strategies are named the rolling stock strategy and the infrastructure strategy. Jernbaneverket has concluded that the rolling stock strategy will be the most suitable and resource efficient solution for implementing ERTMS in Norway. 7.1 Rolling stock The rolling stock strategy has the impact that all trains that operate on a line equipped with ERTMS must be fitted with ERTMS. If the same trains also operate on lines equipped with the national Class B system, a Specific Transmission Module (STM) will be required in the train. The national Class B system in Norway is Ebicab 700. To ensure that lines can be put into service with ERTMS as planned, fitting/retrofitting of trains with ERTMS/STM and training of drivers has to be coordinated with this implementation plan.
6 ERTMS Page: 6 av Infrastructure Frequent changes between different operational modes (ERTMS/STM) should be limited to minimize stress on train drivers. The plan regards this by implementing ERTMS line by line and continuous. To minimize impact on the railways customers when putting ERTMS into service, a detailed migration plan will be made available.
7 8 GSM-R network ERTMS Page: 7 av 9 The Norwegian railway network in use is already equipped with GSM-R. The Norwegian GSM-R network is shown in Figure 1. Figure 1: The Norwegian GSM-R network.
8 ERTMS Page: 8 av 9 9 ERTMS plan The figure below shows the Norwegian ERTMS implementation plan. Figure 2: Norwegian ERTMS implementation plan.
9 ERTMS Page: 9 av 9 A more detailed time plan is shown in the table below. Due to the high level of detail, adjustments to this table must be expected. Railway line Section Ofotbanen Narvik - Bjørnfjell Nordlandsbanen N Mosjøen - Bodø Nordlandsbanen M (Steinkjer) - (Mosjøen) Nordlandsbanen S (Trondheim) - Steinkjer Dovrebanen N (Dombås) - Trondheim Dovrebanen S (Lillehammer) - Dombås Rørosbanen (Støren) - (Hamar) Eid Lhmr S Eidsvoll - (Kleverud) Eid Lhmr N Kleverud - Hamar Eid Lhmr N (Hamar) - Lillehammer Vestfoldbanen N (Drammen) - Nykirke Vestfoldbanen M (Nykirke) - Tønsberg Vestfoldbanen S (Tønsberg) - Skien Gjøvikbanen N (Roa) - Gjøvik Gjøvikbanen S Grefsen - Roa Bergensbanen Ø Roa/Hokksund - Ål Bergensbanen M Ål - (Myrdal) Bergensbanen V Myrdal - Bergen Sørlandsbanen Ø (Drammen) - Hokksund Sørlandsbanen M (Hokksund) - Kristiansand Sørlandsbanen V (Kristiansand) - Stavanger Kongsvingerbanen (Lillestrøm) - Charlottenberg Østfoldbanen N (Oslo) - Ski Østfoldbanen M (Ski) - Fredrikstad Østfoldbanen S (Fredrikstad) - Kornsjø Gardermobanen Lillestrøm - Eidsvoll Hovedbanen Bryn - (Lillestrøm) - (Eidsvoll) Oslo S Oslo S - Skøyen Askerbanen Lysaker - Asker Drammenbanen N (Lysaker) - (Sandvika) - (Asker) Drammenbanen S (Asker) - Drammen Spikkestadbanen (Asker) - Spikkestad
How To Travel From Port Harvold To Kronerheim
Feasibility Study concerning High-Speed-Railway-Lines in Norway Presentation Lillestrøm, 2007 11 05 Dipl.-Ing. Frank Schäfer 1 Market Study (Offer and Traffic Demand) Methodology and Principles of Planning
Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund
Concept for Railway and Transportation in Southern Norway High Speed Line with High Speed Line Oslo Trondheim / Ålesund DB International GmbH Ottmar Grein Gjøvik, 28.10.2011 Concept for Railway and Transportation
The Norwegian High Speed Rail Assessment Project 2010 2012
The Norwegian High Speed Rail Assessment Project 010 01 Tom Stillesby Project Manager Stavanger 9th. June 01 Content Main Objectives Assumptions Market Capital Costs Environment Appraisals Summary Main
PSC. Subsea. l Hydraulic Distribution Systems. Photo: Norsk Hydro/Statoil. l Terminations. l Hoses and fittings
PSC l Hydraulic Distribution Systems l Terminations l Hoses and fittings Photo: Norsk Hydro/Statoil PSC TESS at your service TESS was established in 1968 and is a company owned by its two Norwegian founders.
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability
GSM-R Transmission Planning Guidelines
00 Transmission Planning Guidelines (Erstatter GSM-00-M-00002) 20.02.06 Knut Bergem Per Danielsen Jon P. Lauvstad Revisjon Revisjonen gjelder Dato: Utarb. av Kontr. av Godkj. av Tittel Målestokk: Utarbeidet
Wastewater pipes in Oslo: from condition monitoring to rehabilitation planning
NORDIWA - 2013 Wastewater pipes in Oslo: from condition monitoring to rehabilitation planning R.M. Ugarelli, PhD, SINTEF, Norway, [email protected] I. Selseth, SINTEF, NORWAY J. Røstum, PhD, SINTEF,
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016. Nina Tveiten Norwegian National Rail Administration
(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016 Nina Tveiten Norwegian National Rail Administration The study has been conducted on behalf of: The Ministry of Transport and Communications The Municipality
Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll Agenda 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
WO Sandnes - Stavanger Request for quotation (RFQ) Norwegian Frame Contract Signaling System
Request for quotation (RFQ) Norwegian Frame Contract Signaling System 00B BL 3.0 09.11.1011 XSMISIL XDATR ESL Revision Reason for issue Date Created by Contr. by Appr. by Title: Pages: Sørlandsbanen, (Egersund)
Norway High Speed Rail Assessment Study: Phase III. Estimation and Assessment of Investment Costs Final Report. 25 January 2012
Norway High Speed Rail Assessment Study: Phase III Estimation and Assessment of Investment Costs Final Report 25 January 2012 Notice This document and its contents have been prepared and are intended solely
EIENDOMSVERDI. The housing market update July. Copyright Eiendomsverdi
EIENDOMSVERDI The housing market update July Executive summary The market cooled off further and fell by 1.1 percent. Seasonally adjusted this was a fall of 0.3 percent Volumes were low, in fact the lowest
NORWAY High Speed Railway Phase III Initial Option Testing. Atkins: Warwick Lowe
NORWAY High Speed Railway Phase III Initial Option Testing Atkins: Warwick Lowe Corridors 4 corridors and 6 routes: Trondheim Værnes Corridor North Oslo Trondheim Corridor South Oslo Stavanger Corridor
Søkerliste for lokalradiokonsesjon
Området 204 - Nesodden 301 - Oslo 302 - Oslo, Lørenskog, Skedsmo Side 1 av 5 Type idnr 3476 3478 3479 3520 3543 3548 3549 3544 3492 Radio Oslo AS 3531 3528 3512 3518 3519 3501 3468 3481 3482 Søker Right
Wages and Working Conditions in Norway
ENGLISH Wages and Working Conditions in Norway Information to employees from the Czech Republic, Estonia, Latvia, Lithuania, Poland, Slovakia, Slovenia and Hungary www.fellesforbundet.no Welcome as an
EIENDOMSVERDI. The housing market update October. Copyright Eiendomsverdi
EIENDOMSVERDI The housing market update October Executive summary Prices fell in every part of the country including Oslo the strongest region Volumes were low, in fact this was the lowest October volumes
Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View.
Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View. TRV 2013/13976 1 March 2013 Contributors to this document Trafikverket (Swedish Transport Administration) Transportstyrelsen
Network Statement 2016
VEDLEGG 1.3 Rettslig forankring VEDLEGG / ANNEX: 3.6.3.2 Network Statement 2016 3.6.3.2 Driftsbanegårder Marshalling Yards Gyldighetsperiode: 13. desember 2015 10. desember 2016 Validity Period: 13 December
3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND
RBC INTERFACE TO CURRENT INTERLOCKINGS IN FINLAND Laura Järvinen, M.Sc (Tech), VR Track Oy Lassi Matikainen, M.Sc. (Tech), VR Track Oy SUMMARY The signalling systems in Finland originate from many decades
EIENDOMSVERDI. The housing market update August. Copyright Eiendomsverdi
EIENDOMSVERDI The housing market update August Executive summary As is usual prices increase in August but the dichotomy between the oil region and especially Oslo widens further Volumes were slightly
How To Know How Many Major Transport Accidents In Norway
Major transport accidents in Norway: assessing long-term frequency and priorities for prevention Rune Elvik, Institute of Transport Economics, Oslo, Norway Problems to be discussed How many major transport
Signaling Programme. Signaling Programme - Laboratory Test. 05.05.2015 Gitte Oberbossel
Signaling Programme Signaling Programme - Laboratory Test 05.05.2015 Gitte Oberbossel 1 Agenda F-Banen signaling programme and migration strategy Simple solution overview of signaling programme and scope
National road user charging standards in Norway
National road user charging standards in Norway Road User Charging Tuesday, 11 March 2003: IEE, Savoy Place, London Arild Skadsheim ViaNova TransIT AS In co-operation with the Norwegian Public Roads Administration
ERTMS for a competitive railway
ERTMS for a competitive railway A joint cross-border traffic management system for railways Sweden and Europe need a competitive railway system. With the focus on this, EU decided in 1996 that a standardized
Banedanmark. TØF Jernbane i vækst. Signalprogrammet. Morten Søndergaard, Programme Director
Banedanmark TØF Jernbane i vækst. Signalprogrammet Juni 2010 Morten Søndergaard, Programme Director Agenda 1. Background 2. Total renewal principles 3. Roll out plans and time schedule 4. Procurement and
Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail
MAXIMIZING THE RETURN ON INVESTMENT FROM ETCS OVERLAY Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail SUMMARY ETCS Level 2 offers many benefits to rail from reduced infrastructure costs, through
EIENDOMSVERDI. The housing market update April. Copyright Eiendomsverdi
EIENDOMSVERDI The housing market update April Executive summary The housing market in Norway in April grew 1.4 percent, reaching a new all-time high level on a nominal basis Seasonally adjusted the market
COMMISSION IMPLEMENTING DECISION. of XXX
EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION IMPLEMENTING DECISION of XXX amending Commission Implementing Decision C(2014) 1921 as amended by Decision C(2015) 2192 establishing a Multi-Annual
Tendering of passenger rail traffic in Norway
Tendering of passenger rail traffic in Norway Rail passenger service tender 1: «Sør» Overview of current services and traffic Sørlandsbanen line Jærbanen line Arendalsbanen line Rail passenger service
ERTMS deployment challenges in a deregulated market. Björn Westerberg April 25, 2012
ERTMS deployment challenges in a deregulated market Björn Westerberg April 25, 2012 Agenda SJ AB Overview ERTMS Challenges 1 Service to Customer 2 OneCommonSystem 3 Finding a Business Case 2 SJ AB Operates
The TESS AS organisation International Knut Jølberg
FA C T S & F I G U R E S 2 0 1 4 / 1 S T H A L F 2 0 1 5 Sales record for TESS Sales in TESS for 2014 amounted to NOK 2,80 billion, representing the largest sales volume to date in TESS. Pre-tax profit
Keolis Group Safety organisation an example Fjord1 Partner in Bergen
Keolis Group Safety organisation an example Fjord1 Partner in Bergen OSLO, 7th November 2012 Thierry GUINARD Metro & Trams Head of Safety Trond Magne MALSNES - F1P - Head of Safety Topics cover Keolis
Annual Report 2006. The Norwegian Bone Marrow Donor Registry
Annual Report The Norwegian Bone Marrow Donor Registry ANNUAL REPORT THE NORWEGIAN BONE MARROW DONOR REGISTRY The Norwegian Bone Marrow Donor Registry (NBMDR) was established in 199 at the Institute of
Market Efficient Public Transport? An analysis of developments in Oslo, Bergen, Trondheim, Kristiansand, and Tromsø
TØI report 428/1999 Authors: Bård Norheim and Erik Carlquist Oslo 1999, 63 pages Norwegian language Summary: Market Efficient Public Transport? An analysis of developments in Oslo, Bergen, Trondheim, Kristiansand,
White Paper European Railway Traffic Management System - ERTMS
Kapsch CarrierCom White Paper European Railway Traffic Management System - ERTMS always one step ahead ERTMS: A common signaling and communication system. Railways operate in a competitive environment
The Transport Infrastructure Context of Northern Sweden
2009-09-30 Response from the European Forum of Northern Sweden, to the EC Communication (COM 2009/279): A sustainable future for transport: Towards an integrated, technology-led and user friendly system
Port of Narvik. The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR. No draft restrictions. Sheltered waters. Ice-free all year round
The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR Part of extension of the core EU TEN-T rail, port and road Network to neighboring countries. The Port: No draft restrictions Sheltered waters
April 2016. ABB in Norway. Power and productivity for a better world ABB. Slide 1
April 2016 ABB in Norway Power and productivity for a better world Slide 1 ABB today A global leader in power and automation technologies What (Offering) Power ~ 40 % of revenue Power & Automation Automation
New in Norway. Practical information from public agencies. new edition 2015
2015 New in Norway Practical information from public agencies new edition 2015 Welcome to New in Norway 2 How to use this booklet? 1 4 Do you have any questions about residence, work, school, health or
Norway High Speed Rail Assessment Study: Phase III
Norway High Speed Rail Assessment Study: Phase III Journey Time Analysis Final Report 25 January 2012 Notice This document and its contents have been prepared and are intended solely for Jernbaneverket
Energy efficiency in drivers training
D. of Security, Organization and Human Resources D. of Organization Training Division Energy efficiency in drivers training RENFE RESOURCES OVERVIEW Workforce Rolling stock Environment WORKFORCE. PROFESSIONAL
ATLAS. Proven Technology & Partnership For interoperability
ATLAS Trainborne ETCS solution Proven Technology & Partnership For interoperability TECHNOLOGY AND INTEGRATION EXPERTISE YOU CAN RELY ON The ERTMS (European Rail Traffic Management System) standard aims
Directive 2001/16 - Interoperability of the trans- European conventional rail system
01/16-ST02 part 2 version EN07 TSI-TAF origin EN Status NA Directive 2001/16 - Interoperability of the trans- European conventional rail system Draft Technical Specification for Interoperability "Telematic
Financing Public Transport
Financing Public Transport Oslo s long term funding commitment Viajeo PLUS, Rio de Janeiro, March 23rd 2015 Hanne Bertnes Norli, Development director, Ruter As Ruter: PT Authority for the Norwegian Capital
Biogas and waste management in Norway. IEA Bioenergy workshop UMB 19.04.2012 Henrik Lystad Assistant director Avfall Norge
Biogas and waste management in Norway IEA Bioenergy workshop UMB 19.04.2012 Henrik Lystad Assistant director Avfall Norge 2 Content Who is A view on waste treatment and biogas Biogas in Norway Production
CTCS Chinese Train Control System
CTCS Chinese Train Control System B. Ning, T. Tang, K. Qiu, C. Gao & Q. Wang Department of Control Engineering, School of Electronics and Information Engineering, Northern Jiaotong University, P. R. China
Business cycles, monetary policy and property markets Governor Svein Gjedrem Næringseiendom 2005 26 April 2005
Business cycles, monetary policy and property markets Governor Svein Gjedrem Næringseiendom 5 April 5 Projected consumer price inflation 5-year horizon. Annual rise. Per cent Employers organisations Employees
Approval of Software & Specification of Software Presentation at Banekonferencen 05-05-2015
Approval of Software & Specification of Software Presentation at Banekonferencen 05-05-2015 15-05-07 Background of the speaker Troels Winther, TÜV-SÜD Danmark, Software CV Year Company Program Role SW
Høyanger Upper Secondary School
Høyanger Upper Secondary School The Upper Secondary School is situated in the western part of Norway, along the Sognefjord, a 3 hours drive from Bergen, the second largest town in Norway. Our school has
HS line TSI Conformity Certification and Safety Assessment
Roma-Napoli HS line TSI Conformity Certification and Safety Assessment Roma, 16 December 2004 Carlo Carganico Rome Naples Certification: contents EU and Italian railway legislation RFI: role and responsibility
Hordaland på Børs Bergen - 13. august 2015
Hordaland på Børs Bergen - 13. august 2015 Tor Magne Lønnum, CFO Follow us on Twitter: @TrygIR Disclaimer Certain statements in this presentation are based on the beliefs of our management as well as assumptions
On track GLIMPSES OF JERNBANEVERKET'S ACTIVITIES IN 2015
On track GLIMPSES OF JERNBANEVERKET'S ACTIVITIES IN 2015 Jernbaneverket is adopting new technology and new working methods in an increasing number of fields. A Norwegian railway tunnel is now being bored
Nettpartner Group. Company Presentation
Nettpartner Group Company Presentation Vision and Mission Nettpartner the company all others in the industry want to emulate! Nettpartner shall be a leading supplier of innovative solutions linked to the
Entreprenørdagen 14. mars 2011
Entreprenørdagen 14. mars 2011 Program 1130 1200 Velkommen og litt å bite i Dagsorden 1200 Info om Fellesprosjektet v/ PL Taale Stensbye 1230 Entreprisene v/ Byggelederne 1330 Kontrakter/anleggsbetingelser
VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.
VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s. Railway Research Institute, j.s.c. www.cdvuz.cz Test Centre VUZ Velim Who we are A joint stock profit making company The shares are owned by Czech Railways, j.s.c. VUZ is
AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE
AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE Zeebrugge- Antwerp/Amsterdam/Vlissingen/Rotterdam/Duisburg-Basel-Milan-Genoa BETWEEN THE MINISTERS IN CHARGE OF TRANSPORT OF
NORGES LUFTFARTØYREGISTER NORWEGIAN CIVIL AIRCRAFT REGISTER
NORGES LUFTFARTØYREGISTER NORWEGIAN CIVIL AIRCRAFT REGISTER ENDRINGER - NOVEMBER-2009 (Amendments - November-2009) LUFTFARTØY SLETTET AV REGISTERET (Aircraft deleted from the Register) LN-AWE SG Finans
English. Trapeze Rail System. www.trapezegroup.com
English Trapeze Rail System www.trapezegroup.com Trapeze Rail System Enabling future railway, tram and metro transport The worldwide growth in demand for travel and increasing competition between all modes
Fit for the European Rail Market Training Competence - Certification
SIAFI Europe Seminar Paris, 29 September 2008 Fit for the European Rail Market Training Competence - Certification European Railway Agency Interoperability Unit n 1 EU Rail Policy: The Core Aim To adapt
List of translators and interpreters in NORWAY
List of translators and interpreters in NORWAY Prepared by British Embassy Oslo www.gov.uk The following list of translators and interpreters has been prepared by the British Embassy Oslo for the convenience
The results of this consultation will feed into the Commission impact assessment which will accompany the proposal on an EU coordinated approach.
Stakeholders' consultation on a proposal for an EU coordinated approach to R&I in the rail sector under Horizon 2020 in support to the completion of the Single European Railway Area This consultation asks
First step in future global sourcing. Extended partnership with Telenor: Strategic wins Application Services:
EDB Business Partner > slide 1 ENTERING 2007 AT HIGH SPEED First step in future global sourcing Acquiring Infopulse Ukraine with 300 employees Extended partnership with Telenor: IT Operations in Sweden;
Felix Mediaa Lenning - Born as Felix Rudolf Müller
Bygg Engineering AS 3015 Drammen Phone: ++47 98 43 330 Norway E-mail: [email protected] Curriculum vitae Felix Mediaa Lenning - Born as Felix Rudolf Müller Personal: q Date of birth: 26.01.1977 q Place
