1 Fire Resistant Aluminum Composite Material Building Panels (FR) Section Part 1 GENERAL 1.01 Summary A. Section Includes 1. The extent of panel system work is indicated on the drawings and in these specifications. 2. Panel system requirements include the following components: a. Aluminum-faced composite panels with mounting system. Panel mounting system including anchorages, furring, fasteners, gaskets and sealants, related flashing adapters and masking for a complete installation. b. Panel manufacturer recommends that system should include shop-installed aluminum stiffeners on all panels of 20 square feet or larger. Minimum stiffener recommendation is one per 20 square feet of panel area. c. Parapet coping, column covers, soffits, sills, border and filler items may be indicated as integral components of the panels system or as designed. d. All flashing metal required shall be provided by the panel manufacturer. e. System to be fabricated and installed per local code requirements. B. Related Documents 1. Drawings and general provisions of the contract, including general and supplementary conditions, division 1 specification sections and technical specification divisions 2 through 16, apply to this section. C. Related Work Specified Elsewhere 1. Section 05100: Structural steel 2. Section 06100: Backup walls 3. Section 07200: Insulation 4. Section 07600: Metal flashing, counter flashing and parapet coping 5. Section 07920: Caulking and sealants 6. Section 09200: Interior wall finishes 1.02 Quality Assurance A. Composite panel manufacturer shall have a minimum of 15 years architectural experience in the manufacture of this product and be located within the continental USA. B. It is recommended that fabrication and installation of composite panels shall be from a single source. If not single source, both panel fabricator and the installer must show proof of past successful collaboration. C. Fabricator shall be acceptable to composite panel manufacturer. D. Fabricator and installer shall have a minimum 5 years of experience in architectural metal panel work similar in scope and size to this project. E. Coordinate fabrication schedule with construction progress as directed by the contractor to avoid delay of work. F. Shop drawings shall show the preferred joint details providing a watertight and structurally sound wall panel system that allows no uncontrolled water penetration, on the inside face of the panel system as determined by ASTM E331. G. Maximum deviation from vertical and horizontal alignment of erected panels: 6 mm (1/4") in 6 m (20') non-accumulative. H. Panel fabricator and installer shall assume undivided responsibility for all components of the exterior panel system, including but not limited to, attachment to sub-construction, panel-to-panel joinery, panel-to-dissimilar-material joinery and joint seal associated with the panel system References A. American Society for Testing and Materials 1. E330: Structural Performance of Exterior Windows, Curtain Walls and Doors under the Influence of Wind Loads. 2. E283: Rate of Leakage through Exterior Windows, Curtain Walls and Doors. Section
2 3. D1781: Climbing Drum Peel Test for Adhesive Materials. 4. E84: Surface-Burning Characteristics of Building Materials. 5. E283: Air Performance of Exterior Windows, Curtain Walls and Doors. 6. D3363: Method for Film Hardness by Pencil Test. 7. D2794: Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact). 8. D3359: Methods for Measuring Adhesion by Tape Test. 9. D2247: Practice for Testing Water Resistance of Coatings in 100% Relative Humidity. 10. B117: Method of Salt Spray (Fog) Testing. 11. D822: Practice for Operating Light and Water Exposure Apparatus (Carbon-Arc Type) for Testing Paint, Varnish, Lacquer and Related Products. 12. D1308: Effect of Household Chemicals on Clear and Pigmented Organic Finishes. 13. D1735: Method for Water Fog Testing of Organic Coatings. 14. D1929: Standard Test Method for Determining Ignition Temperature of Plastics. 15. D635: Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in Horizontal Position. B. Underwriters Laboratories 1. UL 1715: Room Fire Test Standard for Interior of Foam Plastic Systems. C. American Architectural Manufacturers Association 1. AAMA Superior Performance of Organic Coatings on Aluminum. D. National Fire Protection Association (excludes face fastened solution) 1. NFPA 285: Standard Method of Test for the Evaluation of Fire Propagation Characteristics of Exterior Non-Load Bearing Wall Assemblies Containing Combustible Components Submittals A. Submittals shall be in conformance with section. B. Samples 1. Panel assembly: Two samples of each type of assembly, 304 mm (12 ) x 304 mm (12 ) minimum. 2. Two samples of each color or finish selected, 76 mm (3") x 102 mm (4") minimum. 3. Custom-color samples will contain drawdown lines. Sizes for custom-color samples are limited. C. Shop Drawings: Submit shop drawings showing project layout and elevations; fastening and anchoring methods; detail and location of joints, sealants and gaskets, including joints necessary to accommodate thermal movement; trim; flashing; and accessories. D. Manufacturer s literature shall certify that material meets specifications. E. Fabrication Tickets: Submit fabrication drawings showing location and type of aluminum-extruded stiffeners at typical panels and at corner panels, if required. F. Documents showing product compliance with the local building code shall be submitted prior to the bid. These documents may include evaluation reports, test reports, supporting document and drawings, and manufacturer s data. The architect must approve alternate material prior to bid date Warranty A. The fabricator and installer will warrant the wall system for a period of 1 year that the fabrication and installation workmanship will be free from defects. B. The aluminum composite material manufacturer shall warrant for a period of 30 years against Max 5 fade based on ASTM D2244 and Max 8 chalk based on ASTM D4212 and delamination of the paint finish Packaging, Shipping and Handling A. Follow manufacturer's recommendations. B. Store material in accordance with panel manufacturer's recommendations. Part 2 Products 2.01 Panels Section
3 A. Composite Panels 1. Panels shall be Reynobond Fire Resistant (FR) Aluminum Composite Materials Reynobond (ACM) as manufactured by Alcoa Architectural Products, 50 Industrial Boulevard, Eastman, Georgia Contact Eastman plant at or or at 2. Other manufacturers are acceptable as long as they meet the same criteria as Reynobond in thickness, panel weight, bond integrity, fire rating, paint color and finish. ACM must be manufactured in the USA. B. Fire Resistant Core (FR) C. Panel Thickness: RB160 (4 mm) = ; RB240 (6 mm) = D. Panel Weight: RB160 (4 mm) = 1.5 lbs/ft 2 ; RB240 (6 mm) = 2.0 lbs/ft 2 E. Product Performance 1. Bond integrity When tested for bond integrity, in accordance with ASTM D1781 (simulating resistance to panel delamination), there shall not be an adhesive failure of the bond a) between the core and the skin or b) cohesive failure of the core itself below the following values. 2. Peel Strength 100 N mm/mm (22.5 in lb./in.) As manufactured 100 N mm/mm (22.5 in lb./in.) After 21 days soaking in water at 70 F 3. Fire Performance ASTM E84 Passed Class A F. Panel Finishes Coil-coated Kynar 500 or Hylar 5000 based polyvinylidene fluoride (PVDF). Alcoa Architectural Products shall be Colorweld 500 a fluoropolymer coating utilizing 70% Kynar 500 resins. 1. Color: To be chosen from Alcoa Architectural Products, Reynobond standard series one, two or three colors. 2. Coating: Shall be factory applied on a continuous-process paint line. Coating shall consist of a 0.2 mil (approx.) prime coat and a 0.8 mil (approx.) finish coat containing 70% Kynar 500 resins. (If Colorweld 500XL, coating shall consist of a 0.2 mil (approx.) barrier prime coat, a 0.80 mil (approx.) color coat, containing 70% Kynar 500 resins and a 0.5 mil (approx.) clear coat containing 70% Kynar 500 resins.) Nominal dry film thickness is 1.50 mils. 3. Gloss: ASTM D523 standard at 60º shall be Pencil hardness: ASTM D3363 shall be F-2H minimum. 5. Flexibility T-Bend: ASTM D4145 shall be 0-2T-Bend; no pick-off. 6. Adhesion: ASTM D3359 reverse impact 1/16" crosshatch shall show no cracking or adhesion loss. 7. Reverse Impact: ASTM D x metal thickness aluminum shall show no cracking or adhesion loss. 8. Acid Resistance: ASTM D1308, 10% muriatic acid, 24 hrs, shall show no effect. 20% sulfuric acid, 18 hrs, shall show no effect. 9. Acid Rain Test: Kesternich SO2, DIN , 10 cycles min. No objectionable color change. 10. Alkali Resistance: ASTM D1308, 10%, 25% NaOH, 1 hr., shall show no effect. 11. Salt Spray Resistance: ASTM B117, 5% salt fog at 95 F. Pass 4,000 hrs. less than 1/16" average creep from scribe; up to a few #8 blisters. 12. Humidity Resistance: ASTM D714 & ASTM D % relative humidity at 95ºF, shall pass 4,000 hrs, # 8 blisters. 13. Exterior Exposure: 10 years at 45º, South Florida. ASTM D2244 shall be Max. 5 fade and ASTM D4214 shall be Max. 8 chalk. 14. Paint system shall meet the requirements of AAMA specifications. 15. (FEVE) Megaflon, Coraflon, Valflon or any Lumiflon -based paint systems are not acceptable. 16. Paint system shall have more than 20 years of architectural field use Panel Fabrication A. Fire Resistant ACM is comprised of two sheets of aluminum sandwiching a solid core of extruded thermoplastic material formed in a continuous process using no glues or adhesives between dissimilar materials. The core shall be free of voids and/or air spaces and not contain foamed insulation materials. The bond between the core and the skins shall be a chemical bond. Products laminated sheet by sheet in a batch process using glues or adhesives between materials shall not be acceptable. B. Aluminum Face Sheets 1. Thickness: 0.020" 2. Aluminum alloy shall be 3000 series or equivalent. Section
4 C. Tolerances 1. Panel Bow: Shall not exceed 0.8% of panel overall dimension in width or length. 2. Panel Dimensions: Field fabrication shall be allowed where necessary, but shall be kept to an absolute minimum. All fabrication shall be done under controlled shop conditions when possible. Panel dimensions shall be such that there will be an allowance for field adjustment and thermal movement. 3. Panel Lines: Breaks and curves shall be sharp and true, and surfaces free of warps or buckles. 4. Flatness: Panels shall be visually flat. 5. Panel Surfaces: Shall be free of scratches or marks caused during fabrication. D. System Characteristics 1. Plans, elevations, details, characteristics and other requirements indicated are based upon standards by one manufacturer. It is intended that other manufacturers, receiving prior approval, may be acceptable, provided their details and characteristics comply with size and profile requirements, and material/performance standards. 2. System must not generally have any visible fasteners, telegraphing or fastening on the panel faces or any other compromise of a neat and flat appearance (excludes face fastened solution). 3. Fabricate panel system to dimension, size and profile indicated on the drawings based on a design temperature of 68ºF (20ºC). 4. Fabricate panel system to avoid compressive skin stresses. The installation detailing shall be such that the panels remain flat regardless of temperature changes and at all times remain air- and watertight. 5. The finish side of the panel shall have a removable protective film applied prior to fabrication, which shall remain on the panel during fabrication, shipping and erection to protect the surface from damage. E. System Type (select from the following) 1. Rout-and-Return Wet System: Fabricator and installer must provide an engineered system including clips, fasteners, anchors, spacers, trim, flashings, sealant, etc. 2. Rout-and-Return Dry System: Fabricator and installer must provide an engineered pressure relief system including extruded perimeter frame; drainage gutter; all extrusions, clips, fasteners, anchors, spacers, trim, flashings, gaskets, sealant, etc. 3. Continuous Edge Grip System: Fabricator and installer must provide an engineered pressure relief system including extruded perimeter frame; drainage gutter; all extrusions, clips, fasteners, anchors, spacers, trim, flashings, gaskets, sealant, etc. 4. Face Fastened Solution: Fabricator and installer must provide an engineered system including fasteners, anchors, spacers, trim, and flashing. Fabricator and installer can purchase necessary extrusions, braces, fasteners, and necessary tools from manufacturer. F. System Performance 1. Composite panels shall be capable of withstanding building movements and weather exposures based on the following test standards required by the architect and/or local building codes: a. Wind Load If system tests are not available, under the direction of an independent third-party laboratory, mockups shall be constructed and tests performed to show compliance to the following minimum standards: i. Panels shall be designed to withstand the design wind load based upon the local building code, but in no case less than 20 pounds per square foot (psf) and 30 psf on parapet and corner panels. Wind-load testing shall be conducted in accordance with ASTM E330 to obtain the following results. ii. Normal to the plane of the wall between supports, deflection of the secured perimeter-framing members shall not exceed L/175 or 3/4", whichever is less. iii. Normal to the plane of the wall, the maximum panel deflection shall not exceed L/60 of the full span. iv. Maximum anchor deflection shall not exceed 1/16". At 1 1/2 times design pressure, permanent deflections of framing members shall not exceed l/100 of span length and components shall not experience failure or gross permanent distortion. At connection points of framing members to anchors, permanent set shall not exceed 1/16". b. Air/Water System Test Without backup waterproof membrane. If system tests are not available, under the direction of an independent third-party laboratory, mockups shall be constructed and tests performed to show compliance to the following minimum standards: i. Air Infiltration When tested in accordance with ASTM E283, air infiltration at 1.57 psf must not exceed 0.06 cubic feet per minute per square foot of wall area. ii. Water Infiltration Water infiltration is defined as uncontrolled water leakage through the exterior face of the assembly. Systems not using a construction sealant at the panel joints (i.e., Dry Systems) shall be designed to drain any water leakage occurring at the joints. No water infiltration shall occur in any system under a differential static pressure of 6.24 psf after 15 minutes of exposure in accordance with ASTM E331. The above tests are on panel systems that do not include a waterproof membrane behind panels. Section
5 2.03 Accessories A. Extrusions, formed members, sheet and plate shall conform with ASTM B209 and the recommendations of the manufacturer. B. Panel stiffeners, if required, shall be structurally fastened or restrained at the ends and shall be secured to the rear face of the composite panel with silicone of sufficient size and strength to maintain panel flatness. Stiffener material and/or finish shall be compatible with the silicone. C. Sealants and gaskets within the panel system shall be as per manufacturer's standards to meet performance requirements. D. Fabricate flashing materials from 0.040" minimum thickness aluminum sheet provided by panel manufacturer to match the adjacent curtain wall/panel system where exposed. Post-painted spray-applied flashings are not acceptable. Provide a lap strap under the flashing at abutted conditions and seal lapped surfaces with a full bead of non-hardening sealant. E. Fasteners (concealed/non-corrosive): Fasteners as recommended by system fabricator and installer. Part 3 Execution 3.01 Inspection A. Surfaces to receive panels shall be even, smooth, sound, clean, dry and free from defects detrimental to work. Notify contractor in writing of conditions detrimental to proper and timely completion of the work. Do not proceed with erection until unsatisfactory conditions have been corrected. B. Surfaces to receive panels shall be structurally sound as determined by a registered engineer Installation A. Erect panels plumb and level. B. Attachment system shall allow for the free vertical and horizontal thermal movement due to expansion and contraction for a material temperature range of -20ºF (-29ºC) to +180ºF (+82ºC). Buckling of panels, opening of joints, undue stress on fasteners, failure of sealants or any other detrimental effects due to thermal movement are not permitted. Fabrication, assembly and erection procedure shall account for the ambient temperature at the time of the respective operation. C. Panels shall be erected in accordance with an approved set of shop drawings. D. Anchor panels securely per engineering recommendations and in accordance with approved shop drawings to allow for necessary thermal movement and structural support. E. Conform to panel fabricator's instructions for installation of concealed fasteners. F. Do not install component parts that are observed to be defective, including warped, bowed, dented, scraped and broken members. G. Do not cut, trim, weld or scrape component parts during erection in a manner that would damage the finish, decrease strength or result in a visual imperfection or a failure in performance. Return component parts that require alteration to shop for refabrication, or for replacement with new parts. H. Separate dissimilar metals; use appropriate gaskets and fasteners to minimize corrosive or electrolytic action between metals Adjusting and Cleaning A. Remove and replace panels damaged beyond repair as a direct result of panel installation. After installation, panel repair and replacement shall become the responsibility of the general contractor. B. Repair panels with minor damage. C. Remove masking film (if used) as soon as possible after installation. Masking intentionally left in place after panel installation on an elevation shall become the responsibility of the general contractor. D. Any additional protection, after installation, shall be the responsibility of the general contractor to remove. E. Make sure weep holes and drainage channels are unobstructed and free of dirt and sealants. F. Final cleaning shall not be part of the work of this section. End of Section Section Version
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,
SECTION 07 42 13 METAL WALL PANELS
Mitsubishi Plastics Composites America, Inc. 401 Volvo Parkway Chesapeake, VA 23320 Phone: (800) 422-7270 Fax: (757) 436-1896 E-mail: [email protected] www.alpolic-northamerica.com This MANU-SPEC utilizes
Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023
Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural
SECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,
MOCK-UP TEST REPORT. Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up
MOCK-UP TEST REPORT Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up Report No: 85616.01-120-32 Test Completion Date: 01/15/09 Report Date: 02/11/09 Record Retention End Date: 01/15/13
PROPOSED SPECIFICATION FOR ALUCOBOND PLUS Aluminium Composite Panel Cladding System Fixed Watertight Cassette Panel System - 4mm thick
1. SCOPE OF WORK The scope of work includes the design, supply fabrication and installation of Alucobond PLUS aluminium composite panel cladding, complete with all necessary sub-structures, anchors, hardware
SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
City of San Diego, CWP Guidelines
PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,
SECTION 07400 STANDING SEAM METAL ROOF
SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and
GUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced
JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs
JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs SECTION 085113 ALUMINUM WINDOWS This suggested guide specification has been developed using the current edition
Metal Wall Panels. Colorweld 300 Architectural Finishes
Metal Wall Panels Colorweld 300 Architectural Finishes Metal Wall standard architectural finishes These products are protected and colored with high-performance Colorweld 300 coatings ensuring precise
SECTION 07410 METAL ROOF & WALL PANELS
This document specifies Metal Roofing Systems prefinished factory formed metal roofing marketed as MRS System 2500 steel and aluminum roofing systems and includes MRS flashing and Trim. MRS finish is a
A. Double lock standing seam, single element, metal roof panels.
Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions SECTION 07 41 13 METAL ROOF PANELS Morin Metal Panels Double Lock Standing Seam Metal Roof Panels PART 1 - GENERAL 1.1
SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS
Page 1 of 5 SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS Guarda Security Window Screens in this specification are appropriate for use in windows, storefronts, curtain walls, vents, and any other applications
SECTION 07 4243 METAL COMPOSITE MATERIAL WALL PANELS
Use this section when specifying C.R. Laurence DWS Series 200 Deluxe Wet Seal for Aluminum-faced, stainless steel, copper, or titanium Composite Material Wall Panel System. This Specification Section is
INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS
INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS 1. Paragraph 1.02 Provide solid surface countertops at sinks locations. Provide solid surface window sills at drywall framing walls.
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
SECTION 07411 STANDING SEAM METAL ROOFING
PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Standing-seam metal roof. 2. Metal gutters. 1.2 DEFINITIONS A. Metal Roof Panel Assembly: Metal roof panels, waterproofing membrane (underlayment),
SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS
PART 1 GENERAL SCENIC VIEW SV 10 SECTION 08 87 13 SOLAR CONTROL FILMS 1.1 SUMMARY A. Optically clear dual reflective, neutral sputtered and aluminum metallized polyester film for solar control. 1.2 RELATED
Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.
PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standing-seam metal roofing, custom fabricated. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Show installation
Standing Seam Roof Systems
Standing Seam Roof Systems REAL PEOPLE. REAL PRODUCTS. REAL SOLUTIONS. www.a-s.com Building Benefits You Can Expect From A&S Materials Standing Seam roof panels weigh a relatively modest 11/2 pounds per
Assessing Curtain Walls
Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC [email protected] What is a Curtain Wall System? A curtain wall system is an outer covering of a building
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
EDD-401. Stationary Louver Dual Drainable Blade. Application and Design. Standard Construction
Application and Design is a weather louver designed to protect air intake and exhaust openings in building exterior walls. Design incorporates a drainable head member and stationary horizontal blades to
238T Standing Seam Metal Roof System (SSMRS)
238T Standing Seam Metal Roof System (SSMRS) Text in red are instructions to the specifier and should be deleted. Text in blue are choices that need to be made, with those not selected, deleted. McElroy
WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS:
WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS: BY WILLIAM D. SMITH Figure 1 Four Corporate Center, Franklin, TN. Architect: Little & Associates,Charlotte, NC. Gen. Contractor: Ray Bell Const. Co., Nashville,
CENTRIA FORMABOND Metal Composite Wall System
CENTRIA FORMABOND Metal Composite Wall System CENTRIA FormaBond is the only true metal composite panel wall system designed, manufactured and fabricated by a single, reliable national manufacturer and
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1
C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor
INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW
Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.
Preformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
SECTION 07 95 00 EXPANSION CONTROL
SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
INNOVATIVE. ADAPTABLE. ENERGY EFFICIENT.
INNOVATIVE. ADAPTABLE. ENERGY EFFICIENT. awipanels.com From freezing, sub-zero temperatures to Contents dry heat or high humidity, Mother Nature continually tests the limits of building envelopes. That's
SECTION 08560 SERIES 1500 VINYL PATIO DOORS
SERIES 1500 VINYL PATIO DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Patio Doors 1.2 RELATED SECTIONS A. Section 05450: Cold Formed Metal Framing. B. Section 06100: Rough Carpentry. C. Section 06200: Finish
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
TEST REPORT. Rendered to: TFC A DIVISION OF CENTURION INDUSTRIES, INC. Garrett, Indiana
Architectural Testing TEST REPORT Report No.: D0162.02-201-44 Rendered to: TFC A DIVISION OF CENTURION INDUSTRIES, INC. Garrett, Indiana PRODUCT TYPE: Pressure Equalized Rainscreen SERIES/MODEL: 4 mm Composite
foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS
DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including general and supplementary conditions and other Division 1
Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems
Method of Test Committee Approval Product Group Approval Approved via 5/21/15 MOT CC Out for Ballot (#805-15) PUBLICATION NO. AAMA 501.2-XX DRAFT #2 DATED 5/21/15 Quality Assurance and Diagnostic Water
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design
Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)
PERFORMANCE TEST REPORT. Rendered to: BAMCO INC. PRODUCT TYPE: ACM Wall Panel Systems
PERFORMANCE TEST REPORT Rendered to: BAMCO INC. PRODUCT TYPE: ACM Wall Panel Systems Summary of Results Title Test Specimen #1 Test Specimen #2 Air Infiltration
FEBRUARY, 2016 2500 UT Unitwall System 1 EC 97909-074 084413 GLAZED ALUMINUM CURTAIN WALLS Guide Specs
FEBRUARY, 2016 2500 UT Unitwall System 1 EC 97909-074 084413 GLAZED ALUMINUM CURTAIN WALLS Guide Specs Kawneer Company, Inc., 2015 SECTION 084413 GLAZED ALUMINUM CURTAIN WALLS This suggested guide specification
Sun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012
RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012 Commercial rooftops represent the most available, sustainable and secure real estate for new
VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation
Colorado State University. Durrell Center Roof Repair
Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon
ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24, 2014 06610-1
ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING January 24, 2014 06610-1 SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS MOLDED GRATING PART 1 - GENERAL 1.1 SCOPE OF WORK A. The CONTRACTOR
7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME
7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved
PERFORMANCE TEST REPORT. Rendered to: UNITED STATES ALUMINUM CORPORATION. SERIES/MODEL: 450 Center Glaze PRODUCT TYPE: Aluminum Curtain Wall
Architectural Testing PERFORMANCE TEST REPORT Rendered to: UNITED STATES ALUMINUM CORPORATION SERIES/MODEL: 450 Center Glaze PRODUCT TYPE: Aluminum Curtain Wall Title Summary of Results Air Infiltration
Avoiding Air Barrier Pitfalls
Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great
07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying
TEST REPORT. Report No.: A9814.01 109 44. Rendered to: BAMCO INC. Middlesex, New Jersey. PRODUCT TYPE: Wall Cladding System SERIES/MODEL: Dry Concept
Architectural Testing TEST REPORT Report No.: A9814.01 109 44 Rendered to: BAMCO INC. Middlesex, New Jersey PRODUCT TYPE: Wall Cladding System SERIES/MODEL: Dry Concept AAMA 508 07, Voluntary Test Method
INSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
SECTION 07 21 16 - PRE-ENGINEERED BUILDING BLANKET INSULATION
PROJECT ARCHITECT RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.
Introduction...COMB-2 Design Considerations and Examples...COMB-3
SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150
THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction
GigaCrete Specification PlasterMax
GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application
STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS
ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the
SECTION 07410 METAL ROOF SYSTEM
SECTION 07410 METAL ROOF SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and other Division 1 Specification Sections, apply to
Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
STANDING SEAM SHEET METAL ROOFING
STANDING SEAM SHEET METAL ROOFING GENERAL INFORMATION 1.1 For all standing seam metal roofing work consult Columbia University Facilities Exteriors and Historic Preservation group. 1.2 Fabricator is responsible
INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
SECTION 08 53 13 VINYL WINDOWS. A. The General Conditions, Supplementary Conditions, and Division 01 - Requirements apply.
SECTION 08 53 13 VINYL WINDOWS PART 1 - GENERAL 1.1 CONDITIONS AND REQUIREMENTS A. The General Conditions, Supplementary Conditions, and Division 01 - Requirements apply. 1.2 SECTION INCLUDES A. Double
EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS
EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS 1. SCOPE 1.1 This specification covers the type, physical properties and dimensions of Expanded Polystyrene Insulation Board intended for use
A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.
POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,
TARRANT COUNTY DETAIL STANDARDS
TARRANT COUNTY DETAIL STANDARDS 1. Standard Coping 2. Coping at End Wall 3. Standard Sheet Metal Engagement Details 4. Gravel Guard 5. Gravel Guard Wall Termination 6. Gravel Guard, Gutter, and Downspout
COLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:
CHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
FIRESTOPPING & SMOKE SEALS
SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of
ASTM E 1886 / ASTM E 1996 AND ASTM E 283, ASTM E 330, ASTM E 331 TEST REPORT. Rendered to: BEKAERT SPECIALTY FILMS, LLC
ASTM E 1886 / ASTM E 1996 AND ASTM E 283, ASTM E 330, ASTM E 331 TEST REPORT Rendered to: BEKAERT SPECIALTY FILMS, LLC SERIES/MODEL: Panorama 8-mil Film PRODUCT TYPE: Fixed Window with Applied Film This
application instructions
application instructions ARCHITECTURAL COLLECTION PRIMED BOLD PROFILE 120 SERIES LAP SIDING (D5, T4, D8, T5, Q4) General At the time of manufacture, siding meets or exceeds the performance standards set
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product
September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES
ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES PART 1 - GENERAL 1.1 SCOPE OF WORK SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS PULTRUDED SQUARE TUBE LADDER
Roof Inspection. Summary Report
www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
SECTION 07411 PREFORMED METAL ROOF PANELS
SECTION 07411 PREFORMED METAL ROOF PANELS PART 1 GENERAL 1.01 SECTION INCLUDES A. Roofing system of preformed aluminum panels. B. Fastening system. C. Underlayment. D. Accessories and miscellaneous components.
Section 08520 - Aluminum Windows (4600 Series Specifications)
Section 08520 - Aluminum Windows (4600 Series Specifications) I. GENERAL: 1.01 Scope of Work A. Furnish all necessary materials, labor, and equipment for the complete installation of aluminum windows for
PERFORMANCE TEST REPORT
PERFORMANCE TEST REPORT CCLW JOB #08-5152-1 DATES OF FORMAL TESTING SEPTEMBER 19 & 23, 2008 TEST LOCATION CONSTRUCTION CONSULTING LABORATORY WEST 4751 WEST STATE STREET, SUITE B ONTARIO, CA 91762 PH: 909-591-1789
THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS
THERMOTEK SELF ADHESIVE MEMBRANE +G OVER DESCRIPTION SELF ADHESIVE OVER (8YR) BS-SA/CS 1 0 No 0. SUBSTRATE 1. BASE SHEET G FIBER GLASS BASE. THERMOTEK SELF ADHESIVE 3.0 FP GRANULE COMPONENTS AND WEIGHTS
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER DESCRIPTION TORCH OVER (15,17,19 YR) TH/BS-TH/CS 2 1 0 No 0. SUBSTRATE 1. THERMOTEK USA 2.0 FV TORCH SMOOTH 2. THERMOTEK USA PRO FP TORCH GRANULE COMPONENTS
metal Duil~ing manufacturers Association
metal Duil~ing manufacturers Association ApplicatiDns metal Building Systems Conventional Buildings Retrofit Roofing Projects l~e Perfect Cover.One of the most important technological advances in building
SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS
1 SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and
Sun Vinyl New Construction Windows Homeowner's Warranty
Sun Windows Sun Vinyl New Construction Windows Homeowner's Warranty Vinyl Sun Windows, Inc. warrants for a period of 2 years that the quality of workmanship and materials of vinyl items shall be free from
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
Basement Window Installation Guide Hopper and Sliding
Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant
Code of Standard Practice for Timber Frame Structures
TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
AAMA/WDMA/CSA 101/I.S.2/A440-05 TEST REPORT. Rendered to: EAGLE WINDOW & DOOR COMPANY
Architectural Testing AAMA/WDMA/CSA 101/I.S.2/A440-05 TEST REPORT Rendered to: EAGLE WINDOW & DOOR COMPANY SERIES/MODEL: Series 01 Axiom Clad One-Piece Casement Fixed 6060 PRODUCT TYPE: Aluminum Clad Fixed
The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems
The Butler MR-24 Standing Seam Roof Difference A comparison between metal roof systems Roof Systems Necessities Weathertight (don t leak!) Low maintenance Weathertightness Roof clips, seams, panel alignment
MANCHESTER SERIES(SGD-R35) SLIDING GLASS DOOR 5 5/8 FRAME DEPTH
MANCHESTER SERIES(SGD-R35) SLIDING GLASS DOOR 5 5/8 FRAME DEPTH FEATURES 1.) Available Configurations -Sliding Glass Door -Geometric shapes -OX, XO, OXO, OXXO, XOO, OOX (as viewed from exterior) 2.) Main