AFRICAN DEVELOPMENT BANK, NIGERIA FIELD OFFICE, ABUJA, NIGERIA. LOT 2: VOL 4-2 MECHANICAL (HVAC SERVICES) DRAWINGS MAY 2013

Size: px
Start display at page:

Download "AFRICAN DEVELOPMENT BANK, NIGERIA FIELD OFFICE, ABUJA, NIGERIA. LOT 2: VOL 4-2 MECHANICAL (HVAC SERVICES) DRAWINGS MAY 2013"

Transcription

1 AFRICAN DEVELOPMENT BANK, NIGERIA FIELD OFFICE, ABUJA, NIGERIA. LOT 2: VOL 4-2 MECHANICAL (HVAC SERVICES) DRAWINGS Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House,Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: MAY 2013

2 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors Phase Building Zone Drawing Title CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Job Number 7352 Drawing Number Revision Scale Date Drawn Approved 1 : 150 JAN. 2012

3 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title Job Number 7352 Drawing Number Revision Scale Date Drawn Approved 1 : 150 JAN. 2012

4 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title Job Number 7352 Drawing Number Revision Scale Date Drawn Approved 1 : 150 JAN. 2012

5 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title Job Number 7352 Scale 1 : 150 Date JAN Drawing Number Drawn Revision Approved

6 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title Job Number 7352 Scale 1 : 150 Date JAN Drawing Number Drawn Revision Approved

7 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title Job Number 7352 Scale 1 : 150 Date JAN Drawing Number Drawn Revision Approved

8 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title Job Number 7352 Scale 1 : 150 Date JAN Drawing Number Drawn Revision Approved

9 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title Job Number 7352 Scale 1 : 150 Date JAN Drawing Number Drawn Revision Approved

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28 Notes CHILLER 1 CHILLER 2 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. T DRV FLOW HEADER P1 P RETURN HEADER T AIR ELIMINATOR FS FLUSHING TEE CAPPED DRV P P T T AAV DH AHU 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description 0 DEC-2012 ISSUED FOR TENDER RETURN HEADER HEADER [12 ]. 25 EXPANSION TANK. TYPICAL AHU COOLING COIL DETAIL FS LEGEND ISOLATING VALVE ELECTRICALLY OPERATED 2-PORT (MODULATING) VALVE FLOW SWITCH FLOW HEADER (6 ) 125 QUICK FILL CONNECTION DOUBLE CHECK VALVE LP HP DRV D CHEMICAL DOSING POT P P NRV FC FC P P NRV FC FC TYPICAL PUMP DETAIL INLET FLUSHING DRV P T AAV DH PRESSURE RELIEF VALVE PRESSURE GAUGE TEMPERATURE GAUGE TEST POINT DOUBLE REGULATING VALVE (WITH PRESSURE TAPPINGS) ELECTRICALLY OPERATED SHUT-OFF VALVE FLEXIBLE C0NNECTION DRAIN COCK WITH HOSE UNION AUTOMATIC AIR VENT STRAINER DOUBLE CHECK VALVE Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) BYPASS FC FLEXIBLE CONNECTOR. DRV DRV 50 AHU (GRD FLR) (ATRIUM) 125 AHU (5th FLR) (VENTILATION) DRV DRV AHU (5th FLR) (VENTILATION) WAY (ON/OFF) VALVE DRV AAV T T P P DH CHILLER D DRAIN COCK PRESSURE REDUCING VALVE Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone 125 TYPICAL CHILLER DETAIL Drawing Title MECHANICAL SERVICES AIRCONDITIONING AND VENTILATION SERVICES CHILLED WATER SCHEMATICS CHILLED WATER PUMPS ARE VARIABLE FLOW PUMPS Job Number Drawing Number Revision 7352 M401 0 Scale Date Drawn Approved NTS JAN AS ABS

29 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description 0 DEC-2012 ISSUED FOR TENDER TOILET TOILET EXTRACT DUCT CV2 Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) CONTROL SCHEMATICS FOR AIR-HANDLING UNITS (ATRIUM AHU) CONTROL SCHEMATICS FOR AIR-HANDLING UNITS (VENTILATION) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. DAMPER PLENUM Electrical KOA CONSULTANTS LTD. AHU CONFIGURATION (CANTEEN / KITCHEN) AHU CONFIGURATION (VENTILATION) Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title MECHANICAL SERVICES AIRCONDITIONING AND VENTILATION SERVICES CONTROL SCHEMATICS Job Number 7352 Drawing Number M403 Revision 0 Scale Date Drawn Approved NTS JAN AS ABS

30 Notes 1. Dimensiions are to be read and not scaled. 2. All dimensiions and conditions are to be verified on site before proceeding. 3. Drawings from all consultants relating to the same area should be read in conjunction with one another. 4. Should the contractor discern any conflicting information written or drawn he is to notify the architect immediately. 5. This drawing is subject to world copyright and may not be reproduced in whole or in part for any purpose without prior written consent Interstate Architects Ltd. Revisions No. Date Description 0 DEC-2012 ISSUED FOR TENDER Project Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Ajao Estate. P.O. Box 1701, Marina, Lagos, Nigeria. Tel: (01) , , Fax: Abuja: 41 Colorado Close, Ministers' Hill, Maitama District, Abuja FCT, Nigeria. Tel: (09) Tel/Fax: (09) Structural IAA ASSOCIATES LTD. Mechanical KOA CONSULTANTS LTD. Electrical KOA CONSULTANTS LTD. Quantity Surveyors CONSTRUCTION ECONOMISTS PARTNERSHIP LTD. Phase Building Zone Drawing Title MECHANICAL SERVICES AIRCONDITIONING AND VENTILATION SERVICES DUCTWORK SCHEMATICS Scale Date Drawn CONTROLS FOR PRESSURISATION FANS CONTROLS FOR TOILET EXTRACT FANS Job Number NTS 7352 Drawing Number M402 Revision Approved JAN AS ABS 0

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

HVAC Processes. Lecture 7

HVAC Processes. Lecture 7 HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump

More information

AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the

More information

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project. DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly

More information

SAM HOUSTON STATE UNIVERSITY

SAM HOUSTON STATE UNIVERSITY PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB

More information

Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates

Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates Causes of High Relative Humidity Inside Air Conditioned Buildings Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates S. FLORIDA AVE. AMBIENT 91 F db / 78 F wb 16,000 HOURS ANNUALLY THAT wb

More information

COMMISSIONING OF HVAC SYSTEMS

COMMISSIONING OF HVAC SYSTEMS FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS

More information

Installation Manual. Rental Services. Air Handling Units CHS-SVN01A-EN. July 2008

Installation Manual. Rental Services. Air Handling Units CHS-SVN01A-EN. July 2008 Installation Manual Rental Services Air Handling Units July 2008 CHS-SVN01A-EN Copyright 2008 Trane All rights reserved This document and the information in it are the property of Trane and may not be

More information

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building. MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating

More information

Direct Fresh Air Free Cooling of Data Centres

Direct Fresh Air Free Cooling of Data Centres White Paper Introduction There have been many different cooling systems deployed in Data Centres in the past to maintain an acceptable environment for the equipment and for Data Centre operatives. The

More information

SECTION 15950 - TESTING, ADJUSTING, AND BALANCING

SECTION 15950 - TESTING, ADJUSTING, AND BALANCING SECTION 15950 - TESTING, ADJUSTING, AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

1.2 Refrigerant Equipment. General

1.2 Refrigerant Equipment. General Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or

More information

FILLING AND PURGING THE SYSTEM

FILLING AND PURGING THE SYSTEM FILLING INSTRUCTIONS FOR WATER HEATER OR CONDENSING BOILER (City Water) Safety tip: Before beginning, turn off power to boiler and circulator. FILLING AND PURGING Step 1: Close Return Manifold Isolation

More information

BACK TO PAGE ONE ANALYSIS OF SURVEY DATA

BACK TO PAGE ONE ANALYSIS OF SURVEY DATA TABLE OF CONTENTS TO-98-7-4 MAIN PAGE Maintenance and Service s of Commercial Building Ground-Source Heat Pump Systems Douglas Cane, P.E. Andrew Morrison, P.E. Christopher J. Ireland Member ASHRAE Associate

More information

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...

More information

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com

More information

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same

More information

Evaluate, Clean, and Tune Guidance

Evaluate, Clean, and Tune Guidance Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system

More information

Mini-HYDRO TM Installation Manual

Mini-HYDRO TM Installation Manual Mini-HYDRO TM Installation Manual Zone Pump Version Zone Valve Version NOTICE: READ THESE INSTRUCTIONS CAREFULLY. FAILURE TO FOLLOW INSTRUCTIONS VOIDS WARRANTY. Introduction: The Mini-HYDRO (patent pending)

More information

HVAC Systems: Overview

HVAC Systems: Overview HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct

More information

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may

More information

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

ASTACEA4 Inspect complex/central air conditioning systems

ASTACEA4 Inspect complex/central air conditioning systems Overview This Unit covers the competences required to inspect complex/central air conditioning systems as defined by the CIBSE TM 44 Figure 1.1: Summary of system types and their component parts. The air

More information

Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. HVAC Commissioning description. 2. HVAC Commissioning responsibilities. 1.2 REFERENCES A. American Society

More information

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATETYPE REVIEW_ REVIEWER DRAWINGS REVIEWED EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON- APPLICABILITY (NA). A. GENERAL SECTION 7 PLUMBING

More information

Analysis of HVAC Control Strategies

Analysis of HVAC Control Strategies PUBLICATION DATE: Q1 2009 REF NUMBER: HVAC SWGII 006 03 HVAC SPECIAL WORKING GROUP Analysis of HVAC Control Strategies 06 Table of Contents 1 Introduction 2 2 Scope 3 3 Analysis 4 3.1 Strategy 1 4 3.2

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions System and Valve Basics: 1. Q: What is good cooling coil performance? A: The temperature range is controlled within +/- 0.5 F (0.28 C) off the cooling coil at set point or below.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Operating instructions

Operating instructions 6300 9681 02/2006 GB For the user Operating instructions Logano GE315 Boiler for oil-/gas-fired pressure jet burners Please read thoroughly before use. Operating instructions Logano GE315 Dear Customer,

More information

Flexibility, Efficiency In San Antonio Arena

Flexibility, Efficiency In San Antonio Arena 2005, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Reprinted by permission from ASHRAE Journal, (Vol. 47, No. 9, September 2005). This article may not

More information

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS Contents Page Ratings and Specifications..................... 2 Installation Requirements......................

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

MECHANICAL, ELECTRICAL, PLUMBING ASSESSMENT

MECHANICAL, ELECTRICAL, PLUMBING ASSESSMENT MECHANICAL, ELECTRICAL, PLUMBING ASSESSMENT PREPARED FOR: LANE COUNTY PUBLIC WORKS 3040 NORTH DELTA HIGHWAY EUGENE, OREGON 97408 July 2012 - Final SYSTEMS WEST ENGINEERS, INC. m e c h a n i c a l a n d

More information

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety

More information

Heating, ventilation and air conditioning zone controls

Heating, ventilation and air conditioning zone controls Technology information leaflet ECA762 Heating, ventilation and air conditioning zone controls A guide to equipment eligible for Enhanced Capital Allowances Contents Introduction 01 Background 01 Setting

More information

HVAC Simplified Approach Option

HVAC Simplified Approach Option HVAC Simplified Approach Option Part I Project Address: City: HVAC System Designer of Record: Date: Zip: Qualification The building is 2 stories or less in height and has a gross floor area is less than

More information

Building Services Engineering Technician

Building Services Engineering Technician Building Services Engineering Technician A competent Building Services Engineering Technician is expected to be able to demonstrate the following skills and competences: Systems design in the building

More information

Reduced Pressure Principle Assembly 3 Valve Procedure

Reduced Pressure Principle Assembly 3 Valve Procedure Reduced Pressure Principle Assembly 3 Valve Procedure A. Initial Setup 1. Flush test cocks by: a. opening test cock #4 to establish flow through the unit. (Leave this test cock open until others are flushed)

More information

Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances

Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances Heating, ventilation and air conditioning equipment A guide to equipment eligible for Enhanced Capital Allowances 2 Contents Introduction 03 Background 03 Setting the scene 03 Benefits of purchasing ETL

More information

Aurora Mall. Aurora (Denver), Colorado

Aurora Mall. Aurora (Denver), Colorado is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion

More information

B.C. Buildings Corporation. Mandatory Preventive Maintenance Standard. To Meet Section 4.78 of the WCB OH & S Regulation

B.C. Buildings Corporation. Mandatory Preventive Maintenance Standard. To Meet Section 4.78 of the WCB OH & S Regulation B.C. Buildings Corporation Mandatory Preventive To Meet Section 4.78 of the WCB OH & S Regulation Prepared by: BCBC WCB-IAQ Steering Committee Mandatory Preventive TABLE OF CONTENTS Page no. INTRODUCTION...1

More information

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating

More information

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design

More information

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client Order of Magnitude Mechanical Estimating Justin Apprill, P.E. Topics for Today Estimate Goals A Concept for Accurate Conceptual Estimating HVAC Systems Common System Types and Rules of Thumb Pricing Example

More information

RECON WATER HEATER INSTALLATION FORM

RECON WATER HEATER INSTALLATION FORM RECON WATER HEATER INSTALLATION FORM Please complete ONE (1) form for each SITE and return to AERCO for warranty validation within 30 days of start-up. After completion, e-mail this form to: STARTUP@AERCO.COM.

More information

Federation of European Heating, Ventilation and Air-conditioning Associations

Federation of European Heating, Ventilation and Air-conditioning Associations Federation of European Heating, Ventilation and Air-conditioning Associations Address: Rue Washington 40 1050 Brussels Belgium www.rehva.eu info@rehva.eu Tel: +32 2 514 11 71 Fax: +32 2 512 90 62 Use of

More information

NORSOK STANDARD H-001 Rev. 4, Nov. 2001. Heating, ventilation and air-conditioning

NORSOK STANDARD H-001 Rev. 4, Nov. 2001. Heating, ventilation and air-conditioning NORSOK STANDARD H-001 Rev. 4, Nov. 2001 Heating, ventilation and air-conditioning This NORSOK standard is developed by NTS with broad industry participation. Please note that whilst every effort has been

More information

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview Automated Commissioning for Energy (ACE) Platform for Large Retail Property $62,900 dollars of energy savings identified during the first 6 weeks Overview The ability to pull large amounts of complex data

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

Maintenance for Energy Efficiency

Maintenance for Energy Efficiency Maintenance for Energy Efficiency Institute of Hospital Engineering, Australia (IHEA) Seminar Asset Management & Energy Efficiency Exclusive Trane distributor Australia/New Zealand. The TRANE trade mark

More information

AABC Specifications for Testing and Balancing HVAC Systems

AABC Specifications for Testing and Balancing HVAC Systems AABC Specifications for Testing and Balancing HVAC Systems The Associated Air Balance Council (AABC) Total System Balancing Specifications for HVAC Testing, Balancing and Performance Verification TOTAL

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Why and How we Use Capacity Control

Why and How we Use Capacity Control Why and How we Use Capacity Control On refrigeration and air conditioning applications where the load may vary over a wide range, due to lighting, occupancy, product loading, ambient weather variations,

More information

FLEXCON EXPANSION VESSELS. Flamco FLEXCON 2-80. Flexcon. Expansion vessels FLEXCON 110 1000 FLEXCON M. Flamco FLEXCON V-B.

FLEXCON EXPANSION VESSELS. Flamco FLEXCON 2-80. Flexcon. Expansion vessels FLEXCON 110 1000 FLEXCON M. Flamco FLEXCON V-B. FLEXCON EXPANSION VESSELS Flamco 1 Flexcon Expansion vessels FLEXCON 2-80 FLEXCON 110 1000 FLEXCON M Flamco FLEXCON V- 2007 edition / UK Flamco Flexcon the first name in expansion vessels Flamco has over

More information

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems Fundamental Principles of Environmentally Responsible, Energy Efficient Buildings 1. Energy efficiency is

More information

CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS

CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS By: Michael J. Bitondo, Mark J. Tozzi Carrier Corporation Syracuse, New York August 1999 INTRODUCTION In December of 1998, the American Refrigeration Institute

More information

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs

More information

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager

More information

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS

International Telecommunication Union SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES IN PUBLIC NETWORKS International Telecommunication Union ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU Technical Paper (13 December 2013) SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF TELECOMMUNICATION CABLES

More information

Fundamentals of HVAC Control Systems

Fundamentals of HVAC Control Systems ASHRAE Hong Kong Chapter Technical Workshop Fundamentals of HVAC Control Systems 18, 19, 25, 26 April 2007 2007 ASHRAE Hong Kong Chapter Slide 1 Chapter 5 Control Diagrams and Sequences 2007 ASHRAE Hong

More information

Heating, ventilation and air conditioning (HVAC) equipment. A guide to equipment eligible for Enhanced Capital Allowances

Heating, ventilation and air conditioning (HVAC) equipment. A guide to equipment eligible for Enhanced Capital Allowances Heating, ventilation and air conditioning (HVAC) equipment A guide to equipment eligible for Enhanced Capital Allowances 2 Contents Boost Introduction your cash flow 03 1. Background Check it s on the

More information

HVAC SYSTEMS ACOUSTICAL, COST & ENERGY STUDY

HVAC SYSTEMS ACOUSTICAL, COST & ENERGY STUDY HVAC SYSTEMS ACOUSTICAL, COST & ENERGY STUDY Prepared for the Los Angeles Unified School District Facilities Services Division June 6, 2005 By Maroko & Shwe, Inc., Professional Engineers With Schaffer

More information

C-Bus Application Messages & Behaviour Chapter 25 Air Conditioning

C-Bus Application Messages & Behaviour Chapter 25 Air Conditioning C-Bus Application Messages & Behaviour Chapter 25 Air Conditioning Document Number: CBUS-APP/25 Comments on this document should be addressed to: Engineering Manager Clipsal Integrated Systems PO Box 103

More information

ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014

ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014 ASHRAE Boston Chapter Meeting Designing AC Refrigeration Systems Lessons Learned February 11, 2014 Explanation of the refrigeration cycle. Compressors. Benefits and operating characteristics. -Reciprocating

More information

Operating instructions

Operating instructions 6302 6959 02/2006 GB For the user Operating instructions Logano G215 WS Oil and gas-fired boilers Please read thoroughly before use. Overview Regulations and directives Installation: 90/396/EEC gas appliance

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

HOT WATER SYSTEMS CONTENTS

HOT WATER SYSTEMS CONTENTS HOT WATER SYSTEMS CONTENTS MECHANICAL CONSIDERATIONS.............................................. 3 Code Considerations..................................................... 3 Boiler Selection Considerations..............................................

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

Example Retrocommissioning Measure: Opening Throttled Discharge Valves Opening Throttled Discharge Valves This 21-story building, constructed in 1997, is located in Oregon and contains 589,000 gross square feet of mostly office occupancy. The HVAC system includes six large

More information

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers COMMERCIAL HVAC CHILLER EQUIPMENT Air-Cooled Chillers Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They

More information

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency Randy Mead, C.E.M, CMVP Introduction Chilled water plant efficiency refers to the total electrical energy it

More information

SPECIFICATION DIVISION 22 SECTION DESCRIPTION DIVISION 22 PLUMBING SECTION 220519 - THERMOMETERS, PRESSURE GAUGES, AND ACCESSORIES

SPECIFICATION DIVISION 22 SECTION DESCRIPTION DIVISION 22 PLUMBING SECTION 220519 - THERMOMETERS, PRESSURE GAUGES, AND ACCESSORIES ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning Load Calculation Criteria PART 1 - GENERAL 1.01 OVERVIEW A. This section includes requirements for calculating HVAC cooling and heating loads. B. Load calculations must be performed in accordance with

More information

HVAC Systems in Schools & Commercial Buildings and Radon

HVAC Systems in Schools & Commercial Buildings and Radon HVAC Systems in Schools & Commercial Buildings and Radon References US EPA Radon Prevention in the Design and Construction of Schools and Other Large Buildings http://www.epa.gov/ordntrnt/ord/nrmrl/pubs/1993/air/

More information

PLBG/GAS SAFETY Information Bulletin

PLBG/GAS SAFETY Information Bulletin PLBG/GAS SAFETY Information Bulletin November 2012 P/G-08-02-PLBG/GAS [Rev 3] Page 1 of 11 SUBJECT: REQUIREMENTS FOR COMBINATION HEATING SYSTEMS: DUAL PURPOSE WATER (POTABLE) HEATER (COMBO UNIT) Safety

More information

Cover Page page 1. Table of Contents page 2. Section 1 Introduction page 3. Section 2 Variable Air Volume System Components page 4

Cover Page page 1. Table of Contents page 2. Section 1 Introduction page 3. Section 2 Variable Air Volume System Components page 4 How to Estimate the Cost of a VAV Reheat HVAC System Table of Contents: Cover Page page 1 Table of Contents page 2 Section 1 Introduction page 3 Section 2 Variable Air Volume System Components page 4 Section

More information

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations

More information

Enclosed Football Stadium Design History and Lessons Learned

Enclosed Football Stadium Design History and Lessons Learned Enclosed Football Stadium Design History and Lessons Learned Robert L. Towell, P.E., LEED AP, QCxP btowell@cxegroup.com CxE Group LLC St. Louis, Missouri 314-436-6543 With thanks to the St. Louis Convention

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

The Secret of Hydraulic Schematics. BTPHydraulics www.iranfluidpower.com

The Secret of Hydraulic Schematics. BTPHydraulics www.iranfluidpower.com The Secret of Hydraulic Schematics BTPHydraulics www.iranfluidpower.com www.iranfluidpower.com Table of Contents The Secret to Reading and Interpreting Hydraulic Schematics... 1 Hydraulic System Schematics...

More information

Scope of Work. See www.sei.ie for resources available

Scope of Work. See www.sei.ie for resources available HVAC SWG Summary Background Pool energy-efficiency knowledge Increase cost-competitiveness Develop resources aimed at assisting in reducing HVAC energy consumption Address barriers to energy-saving HVAC

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center hansenkl@unmc.edu 402-559- 5301 402-630-

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system AURETU004 Application Competency Field Unit Sector Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system 2. Diagnose air conditioning and

More information

Electric Flow Boiler

Electric Flow Boiler Electric Flow Boiler EHC offer the most comprehensive range of electric boilers in the market and with our wealth of knowledge and technical expertise we have designed the Slim Jim Electric Flow Boiler

More information

Containment Challenges & Engineering Solutions for Low Containment. National Centers for Animal Health Ames, Iowa Dennis Jones, Facility Engineer

Containment Challenges & Engineering Solutions for Low Containment. National Centers for Animal Health Ames, Iowa Dennis Jones, Facility Engineer Containment Challenges & Engineering Solutions for Low Containment National Centers for Animal Health Ames, Iowa Dennis Jones, Facility Engineer 1 NCAH Missions Conduct basic and applied research on selected

More information

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Presentation Outline Mechanical Overview Chillers and Pumps Pipework and Ancillaries In Row Cooling Units

More information

Lessons Learned from Commissioning 15 Schools

Lessons Learned from Commissioning 15 Schools Lessons Learned from Commissioning 15 Schools Erik A. Jeannette, PE; John C. Wood, PE; Michael J. Holtz, AIA Architectural Energy Corporation Synopsis School building commissioning projects have challenges

More information

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23 COMMERCIAL REPORT / STOCK CONDITION SURVEY For Sydenham Hill Estate Sydenham Hill London SE 23 Submission Prepared by Gas Advisory Services Limited Date: 4 th June 2013 Gas Advisory Services Limited Phoenix

More information

IDENTIFICATION FOR PIPING AND EQUIPMENT

IDENTIFICATION FOR PIPING AND EQUIPMENT IDENTIFICATION FOR PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to identification for HVAC, Plumbing and Fire Protection Systems. 1.2 Provide labeling for all piping, ductwork and

More information

BEC 2012 Vs BEC 2015 - Summary of Major Amendments

BEC 2012 Vs BEC 2015 - Summary of Major Amendments - Summary of Major Amendments Note: 1. The following summary table includes the major amendments, with requirements tightened in general for enhanced energy efficiency. Please refer to BEC 2015 for the

More information

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model GENUS PREMIUM FS CUENOD. R8216470-01EN - Edition 01-26/10/2009

SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model GENUS PREMIUM FS CUENOD. R8216470-01EN - Edition 01-26/10/2009 Instantaneous Gas Water Heaters Storage Gas Water Heaters SPARE PARTS EXPLODED VIEW GAS WALL BOILERS Model R8216470-01EN - Edition 01-26/10/2009 Boilers CUENOD Renewable 3121488 12 EAA1...... 3124527 25

More information

Steam System Best Practices Condensate System Piping

Steam System Best Practices Condensate System Piping Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum

More information