1 CHANGES TO THE WAY STORMWATER MAINTENANCE IS BEING DELIVERED IN AUCKLAND I.W Peffers Downer NZ Ltd ABSTRACT Since the amalgamation of the Auckland Council s in 2010 and the separation of stormwater management from potable water and wastewater, much has changed in the way stormwater maintenance is now being delivered across the region. While some may have questioned the loss of the obvious synergies with wastewater it has created a range of new opportunities. Removing the artificial interface between the catchpit and downstream network has meant that the ownership and response to flood events couldn t be any more straightforward. For a multi-disciplined service provider like Downer, who commenced in the Central Auckland area (formerly Metrowater) on 1 st July 2013 it inspired the creation of a virtual delivery team under a dedicated Contract Manager. The approach has already proved to be very successful and resulted in higher productivity and resource utilisation than one could expect from a more traditional approach. Other benefits have included greater access to a higher level of expertise across the business which has resulted in some very innovative thinking. For example, traditional work methodologies are being challenged and activities such as confined space entry eliminated. In another example watercourse maintenance has been minimised through rehabilitation solutions. Ultimately Council and the ratepayers benefit from the improved customer service, service delivery and cost efficiencies. KEYWORDS Amalgamation, Customer Service, Efficiencies, Collaboration
2 1 INTRODUCTION This paper provides an outline of the changes made to the delivery of stormwater services in the Auckland region following the amalgamation of the previous Auckland Council s. It describes Council s approach and how Downer responded to the changes and how it successfully secured the maximum number of contracts allowable under the Council s new procurement strategy, reinforcing a theory that change really is a stimulus for innovation. In particular it looks at the delivery model and the creation of a virtual delivery team, job management, the importance of organisational alignment and collaborative working with the aim of enhancing customer service, maximizing efficiencies through some innovative thinking. 2 BACKGROUND In November 2010 the eight Auckland based Council s (Rodney District Council, North Shore City Council, Waitakere City Council, Auckland City Council, Manukau, City Council, Papakura & Franklin District Council s and the Auckland Regional Council) were amalgamated to form a single Auckland Council. Prior to the amalgamation, water services across the Auckland region were delivered through a single bulk provider (Watercare) and seven Local Network Operators (LNO s) represented by the various Council s. Without exception each of the LNO s engaged contractors to deliver all field based operations and maintenance activities. While considerable bundling had already taken place some activities such as planned CCTV surveys, watercourse maintenance continued to be managed under separate contract arrangements. Following amalgamation all water and wastewater services were transferred to Watercare with Auckland Council retaining responsibility for delivering stormwater services. During 2011 Auckland Council developed a procurement strategy that essentially divided the region into four main sectors, South, West, Central and North as highlighted in the adjacent map. In addition to creating the four sectors the Council also set about bundling and aligning contracts which had historically been delivered across their transportation and water service departments. Previously transportation was responsible for maintaining road drainage assets such as catchpits, catchpit leads, culverts and stormwater detention areas whereas the water services department was responsible for maintaining the downstream piped networks and water quality devices. Figure 1: Auckland Stormwater sectors (North, West, Central, South) The first of the new contracts (South) was competitively tendered and awarded in 2012 with the Central and West contracts awarded in 2013 and Northern awarded in early Downer was successful in securing both the Central and Northern contracts, the maximum number of contracts allowed.
3 3 PROCUREMENT For large value contracts procurement methods typically include an expression of interest, interactive workshops followed by a tendering stage based on lowest price conforming or a selection of weighted attributes. At the conclusion of the process a preferred tenderer emerges and goes on to negotiate the final contract with the Client. For the Stormwater contracts Auckland Council sought expressions of interest and shortlisted four submitters to submit a tender proposal for each of the four sectors. Proposals were then evaluated using the NZTA price quality method with a non price weighting of 12.5% carried forward from the expressions of interest stage, with 22.5% based on a detailed methodology and list of resources and the balance of 60% based on price. During the negotiation stage Auckland Council elected to negotiate with all tenderers in parallel in the knowledge that all were capable of delivering to the required levels of service at the conclusion of the expressions of interest stage. The focus during this final stage was therefore one of seeking value for money, minimizing risks and finalizing the commercial arrangements. The negotiation stage included feedback on individual line items that had been assessed as being outside the normal margins or error. This presented an opportunity to review and moderate costs to ensure that prices were reflective of the methodology and the required technical specification. As a Contractor this was a refreshing experience and we welcomed the opportunity to continue the dialogue and truly negotiate with Council which is not often the case under a more traditional approach. By negotiating with all tenderers the Council not only maintained but enhanced its buying leverage. Certainly the approach was in keeping with the Council motto of Make Every Interaction Count. Other key aspects of the contract were the inclusion of a target efficiency saving as well as a range of key result areas (KRA s) and key performance indicators (KPI s) with a link to contract longevity rather than a financial penalty which is often punitive and draconian in nature. The contract structure allows for up to two extensions of two years each in addition to the initial term of four years.
4 4 DELIVERY MODEL A good delivery model aims to achieve the following outcomes: Provide excellent customer service Seamless delivery of services with clear lines of communication Sound technical capability with access to a ranges of resources Ability to manage a variety of risks Cost optimisation and value to the customer No deterioration to and/or improvement to the services or products Compliance with quality and all legislative requirement A traditional approach might look to establish a single delivery team geared to meet the base workload and augmented with a select number of subcontractors and specialist service providers as appropriate. However, given that the scope of work under the new stormwater contracts included a reasonably diverse range of activities such as cesspit cleaning, water quality device maintenance, pump station maintenance, treatment plant operations and maintenance, vegetation control, soakhole drilling, pipelaying, manhole construction, minor civil construction as well as road reinstatements for most tenderers a large number of subcontracts was inevitable. While some delivery models can be entirely based entirely on subcontractors is not desirable for a service based contract where response times are critical and communication lines need to be effective. It also creates a situation where margin is applied to margin making any offering potentially unattractive and uncompetitive. In addition to the above and as the incumbent provider of stormwater network services, road drainage maintenance, facility management and open space management services to the previous Council s, Downer needed to consolidate its position and develop a single delivery model across its business. Given the circumstances our approach has been to recognize the discrete and diverse work types involved rather than simply viewing as a stormwater contract. By drawing on our internal expertise within each field we have been able to refine methodologies and think outside the box on how we approach maintenance. It also gives the Council access to a much larger pool of resources. In developing the delivery model and associated organisational chart it become obvious that transferring part time equivalents into a new contract delivery team was not going to be practical and that each resource needed to stay within their respective business units if to be fully utilized and deliver optimal cost and value to the client. The idea of a virtual team began to emerge as an obvious solution that was clearly going to meet three of the four requirements for a good delivery model as described above. The approach was also well received by the various department heads that would have been reluctant to release resources to form part of a new contract specific team for which they would have had no further involvement or financial return from.
5 5 VIRTUAL DELIVERY TEAM The term virtual delivery reflects the variety of resources and expertise that Downer has drawn upon across its business in order to provide a complete stormwater maintenance solution. With the exception of a relatively small team dedicated to routine network maintenance and customer service requests the balance of resources sits within their core business units such as transportation, open space management, facility management and water. The virtual team recognizes individual expertise, the ability to self-perform while encouraging the creation of centre s of excellence with less emphasis on cost centre s, geographical and other potential barriers. The figure below outlines how the various parts of the Downer business are tied into a central planning function which is directly accountable to the operational management team. The structure allows the management team to focus on service delivery rather than having to deal with the day to day people and performance issues which the respective departments are responsible for. Figure 2: Delivery Team Structure The boxes highlighted in red indicate functions managed by Downer (transport) with the blue boxes managed by the Downer (water) business. Through an internal teaming arrangement (similar to a service level agreement or sub contract) the requirements and expectations under the contract are transferred. However, unlike an external agreement all direct costs are covered with the financial risks and rewards calculated across the entire contract and pro-rated accordingly. This ensures that all business units remain focused on service delivery rather than on the financial outcomes. Through combining workloads and creating economies of scale a much greater level of utilization is possible. Obviously the approach does rely on a critical mass within each of the various functions and is therefore a delivery option that will be limited to a larger and multi-disciplined organisation that has the appropriate leadership and systems in place to ensure success.
6 6 JOB MANAGEMENT Central to our delivery model is the planning and shared administration function which is supported by a reliable and integrated job management system. This allows for jobs to be scheduled in an efficient and effective manner, ensuring field crews are fully utilized. This also allows managers and supervisors to focus on work quality and other business activities rather than spending long periods on job planning. In our national Telco business Downer operates a single 24 x 7 call centre and dispatch function with job scheduling carried out using Clicksoftware. A case study carried out by Clicksoftware on a similar application in Anglian Water lists some impressive benefits which provides a good indication as to what could be achieved if service based contracts were to be amalgamated in the future. Figure 3: Benefits of Job Scheduling While the Downer callcentre and dispatch function is currently limited to supporting the Telco business it is only a matter of time that this service is extended to all its 24 x 7 maintenance contracts with the delivery of even greater efficiencies and savings to clients going forward. 7 COLLABORATIVE WORKING Collaboration is about working together to achieve shared goals and outcomes. The contract ethos is described as follows. The key goals for the collaborative style of working include. Quality and value for money
7 Effective and efficient delivery of the works Levels of service that reflect best practice in maintenance and customer service Accommodate changes in strategic direction Safety and sustainability Continuous improvement The strategic approach to meeting these goals is through strong leadership, a collaborative working charter and series of collaborative workshops. The contract leadership team comprises of senior managers made up from the Council and contractor. They are collectively responsible for setting objectives, managing long term capability and capacity requirements, agreeing high level performance targets and resolving issues that are escalated by the operations management team. The leadership team meets quarterly. The collaborative working charter defines the expected actions and behaviours of the Council and Contractor. It is also seen as an evolving document that will continue to generate initiatives as time goes on. The decision to submit this paper is an example of a collaborative working initiative that promotes the relationship beyond the contract. An initial collaborative workshop was held during the contract commencement period to ensure that there was a common understanding around the contract requirements and expectations. It was also aimed at developing key stakeholder relationships as well as covering off health and safety issues and has provided a framework for future workshops. The key outcomes of the workshop included. Financial- ensuring each party achieves it s spend, revenue, and strives to achieve year on year savings. Customer Response- ensuring the correct prioritisation of jobs by call centre and that response times are achieved by the Contractor, for example, all safety issues being a priority 1 and responded to within the hour. Planned Works- ensuring all jobs are assigned a completion time that is mutually agreed. Zero Harm- ensuring that a minimum of four joint field audits are undertaken each month by the respective management teams to ensure consistency and fairness and that expectations are met by both parties. Using feedback from these audits to feed into the continuous improvement of work procedures. For consistency and in the spirit of true collaboration these workshops have been attended by all of Council s stormwater contractors. Collaborative working is also a listed KPI which is measured against the above goals. An example of how collaboration can work to the benefit of all parties is in the collection of asset data. This information is collected by the Contractor and used by the Council to development the annual renewal programme. In turn the Contractor tenders or negotiates with Council over the capital delivery whereby adding further scale to the contract. By helping the Council create a robust work bank the Contractor can influence the continuity of forward work and therefore be in a better position to make savings that can be delivered back to the Council. If the workbank can be maintained it may be possible to lock in the efficiency gains through a term renewal contract or variation to the contract. Similarly meeting KPI s adds longevity to the contract which is a significant incentive for the Contractor.
8 8 BUSINESS ALIGNMENT In addition to good collaboration another key factor in maintaining a long term and successful business relationship is how well aligned the respective organizations are in terms of their strategic objectives, drivers, culture and values. Under the contract, Council established the following key drivers. Customer Satisfaction Service and Incident Response Staff and Stakeholder Health and Safety Financial Management Value for Money Environmental Protection Without exception all of the above directly align with Downer s strong commitment to Zero Harm, Operational Excellence, Client and Customer satisfaction as well as achieving a good financial result. Contracts that are not making a financial return are unlikely to achieve the non-financial goals and simply become unsustainable. The ability to address such issues during the negotiation stage as described under section 3 is therefore very important to the overall success. Downer values are also very strongly aligned to that of the contract and Council. These values help to establish the culture and drive behaviours within the team and provide common ground when dealing with the difficult issues to ensure they are resolved in a timely and professional manner. Figure 4: Downer Values
9 9 IMPROVED CUSTOMER SERVICE Customer Service has a 40% KRA weighting which is split into response and completion of customer service requests and stakeholder confidence. Since commencement of the Central contract on 1 July 2013 we have yet to receive a single complaint compared to two to three regular compliments per month. We have also achieved a very high response to customer service requests as indicated in the following graphs. Stakeholder confidence (which has a weighting of 35%) is measured through monthly customer surveys carried out by the Council. Notwithstanding the above results the bundling of road drainage maintenance such as cesspit cleaning with the downstream network maintenance activities has eliminated any uncertainty as to which asset owner and associated service provider is responsible for flood events. This ensures that immediate action is taken to alleviate or make the situation safe. We have also established close working relationships with community groups such as Friends of Oakley Creek and Friends of Meola. These groups have an intimate knowledge and vested interest in the maintenance and care of these environments, by working closely with them and obtaining their feedback on our maintenance schedules we can coordinate our weed control and removal of noxious weeds to fit with their planting and beatification activities. By sharing information in this way and working with the community we can not only work more efficiently but achieve a high level of customer and stakeholder satisfaction. 10 INNOVATIVE THINKING Innovative thinking is to go beyond the obvious and create something new. Having created a virtual team and introduced a range of experts from across the business not all things were obvious to all people. The interactions between our transport and water experts in particular resulted in a number of activities being viewed with a fresh pair of eyes and one that challenged traditional methodologies. The following two examples highlight the results of having those fresh pair of eyes take a look at some routine activities. 1. Since the commencement of the contract we have been working methodically clearing noxious plants, documenting sites and understanding the individual specifications of these water bodies. The clearance of these sites has identified a number of opportunities for a more proactive approach to the maintenance and the suitability for planting. Strategic planting and beautification of watercourses and ponds allows Council to minimise operational expenditure over the duration of the contract term in addition to reducing health and safety hazards such as accessing areas with limited access and steep embankments and boggy waterways. Some of the sites that we have identified include Meola Creek, Motat, Haileys Place, and Oakley Creek.
10 2. Maintenance of the various stormwater treatment devices such as Ecosols, Storm 360 Filters, Sand Filters and Hynds Downstream defenders have in the past been maintained by different contractors over the years but are all part of a single contract. Since commencing the Central contract last July we have been reviewing the various supplier methodologies that we have been working too. A common issue with many of these devices is that they require a confined space entry which adds a significant amount of risk and cost to the job. By saying no to confined space entries for all routine maintenance activities our supervisors and field staff were faced with developing alternative ways of working. To date this approach has eliminated 90% of confined space entries resulting in a significant reduction in risk to staff as well as time spent onsite. We are confident that by continually challenging the way we do things and applying innovative thinking further efficiencies can be achieved. 11 EFFICIENCY GAINS The contract allows for an annual rolling cost reduction target of 1.5% which provides a realistic and achievable target for the contractor to strive toward without it completely eliminating profit should sufficient reductions not be achieved. From Council s perspective it provides some cost certainty and counters the potential effects of inflation. To date the Central contract has achieved a 100% staff utilization rate. This is largely due to the fact that resources engaged under the virtual delivery model cannot allocate any non-productive time under the contract. While the majority of the financial gains were realized through the competitive tendering process when expectations are set around productivity and utilization rates we believe that moderate improvements can still be achieved. This is based on our experience in long term service contracts which become more efficient as time progresses as staff identify better ways of doing things. Where there is good collaboration with the Client this process can be accelerated. In addition to better utilization under the virtual team approach further reductions in overhead and margin can be achieved with the minimisation and elimination of sub contractor involvement. Having first secured the Central contract further savings were built into the Northern contract by proposing a single Contractors Representative for both contracts. The concept of using centre s of excellence with less emphasis on multi skilling also enables training requirements to be reduced as well as reducing the risk of poor quality work and rework. Further economies of scale have been realized through the ability and opportunity to carry out minor capital works which have led to more competitive rates as a result of better work continuity and use of permanent rather than contract staff.
11 12 CONCLUSIONS We have drawn the following conclusions from our involvement in the stormwater maintenance contracts to date. Bundling contracts and increasing scope by whatever means (i.e. capital works) provides economies of scale and the opportunity to make efficiency gains. Achieving a critical mass allows for better job planning and optimization. There are strong synergies between road drainage and stormwater network maintenance activities. Negotiating with all tenderers during the procurement process is likely to result in a better outcome. Virtual teams improve staff utilization, reduce overheads, promote centre s of excellence and allow contract managers and supervisors to focus on service delivery and customer service rather. The maximum benefits can be achieved if the virtual team exists within the same organization rather than as a series of sub contracts. Collaborative working, good working relationships and organisational alignment are all key success factors. Making changes without a solution in mind can stimulate new thinking, new ideas and alternative ways of working. ACKNOWLEDGEMENTS Jayesh Solanki & Phillip Johansen Stormwater Unit, Infrastructure and Environmental Services, Auckland Council Marcel de Leur Contract Manager, Stormwater, Downer REFERENCES RFP For the provision of Stormwater Maintenance Services Case Study Anglian Water Creates a Platform for Business Growth with ClickSoftware
6.0 Procurement procedure 1 Infrastructure
Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement
10.0 ASSET MANAGEMENT PRACTICES
10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal
Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting
Rebuilding Flood Damaged Roads in South East Queensland in the middle of the Coal Seam Gas Expansion/Explosion - A Local Governments Experience and Learning's David Pemberton [email protected] Mobile
10.0 ASSET MANAGEMENT PRACTICES
10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal
Water Mains Rehabilitation Framework (NI) Northern Ireland Water
PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million
Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future
Asset Management Strategy (2013-2017) A New Approach for a sustainable future Contents Introduction... 2 The Asset Management Vision, Policy Statement & Strategic Themes... 5 Part B The Asset Management
Six top tips for travel managers to create savings in 2015
Six top tips for travel managers to create savings in 2015 E-Guide 2 Introduction Savings remain a key focal point for Travel Managers in 2015 and through regular reviews and analysis, using management
Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process
CIPS takes the view that the outsourcing of services to specialist providers can often lead to better quality of services and increased value for money. Purchasing and supply management professionals should
Job Description Strategic Projects Team Leader
Strategic Projects Team Leader Department: Group: Direct Line Manager: Responsible For: Planning & Community Relations Manager - & Community Relationships Three (3) Strategic Project Drivers Delegations:
2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology
2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our
SCHEDULE A JOB DESCRIPTION
SCHEDULE A JOB DESCRIPTION Job Title: Work Unit: Responsible To: Responsible For: Position Purpose: Financial Delegated Authority: Pay Range: Assets & Business Efficiency Coordinator Corporate and Governance
Quick Guide: Meeting ISO 55001 Requirements for Asset Management
Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get
Job Description Asset Planning Engineer Senior
Asset Planning Engineer Senior Department: Business Unit Group: Direct Line Manager: Water Services Service Delivery Leader Direct Reports: Delegations: Primary Location: Job Summary and Purpose: House
Corporate Risk Management Policy
Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction
State Highway Maintenance and Operations Review consultation document
State Highway Maintenance and Operations Review consultation document The State Highway Maintenance and Operations Review was established to investigate options for improving efficiencies and outcomes
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM This ESIA has identified impacts (both positive and negative) to the physical, natural and socio-economic environments, as well as to community and worker
10.0 ASSET MANAGEMENT PRACTICES
10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal
Derbyshire Trading Standards Service Quality Manual
Derbyshire Trading Standards Service Quality Manual This Quality Manual has been developed to give a broad outline of how the Trading Standards Division s range of services comply with the requirements
MANDARIN ORIENTAL HOTEL GROUP REPORT SUMMARY
MANDARIN ORIENTAL HOTEL GROUP REPORT SUMMARY THE COMPANY Established in Hong Kong in 1963. Mandarin Oriental Hotel Group is an international hotel investment and management group operating ten hotels in
Commissioning Strategy
Commissioning Strategy This Commissioning Strategy sets out the mechanics of how Orkney Alcohol and Drugs Partnership (ADP) will implement its strategic aims as outlined in the ADP Strategy. Ensuring that
Overview of Future Purchasing s fundamental and advanced training workshops...
Performance Learning Presented by: Anna Del Mar - Director, Performance Learning Future Purchasing Overview of Future Purchasing s fundamental and advanced training workshops... Tailored excellence.. Our
Quality & Safety Manual
Purpose: This Quality & Safety Manual is intended to clarify and document the Quality and Health & Safety policies of GGS Oil and Gas Systems and to describe how the organization organizes its activities
Consultation and Engagement Strategy
Consultation and Engagement Strategy Contents: 1. Introduction 2 2. Purpose 3 3. Aims and Objectives 4 4. Key principles 5 5. Delivery of the Strategy 6 6. Action Plan 2011-12 7 Appendix 1 Understanding
Highway Asset Management Strategy
1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate
How the Ministry of Education managed the 2008 national school bus transport tender process. Report to the Ministry of Education October 2009
How the Ministry of Education managed the 2008 national school bus transport tender process Report to the Ministry of Education October 2009 Contents 1: Introduction... 3 What is school transport?... 3
TENDERS SUBCOMMITTEE
NOTICE OF MEETING TENDERS SUBCOMMITTEE I hereby give notice that a Meeting of the Tenders Subcommittee will be held on:- DATE: Friday 8 July 2005 TIME: 9.00 am VENUE: Civic Centre, 6 Waipareira Avenue,
4 Adoption of Asset Management Policy and Strategy
4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are
Disability Employment Services Quality Framework Advice V 2.0
Disability Employment Services Quality Framework Advice V 2.0 Disclaimer This document is not a stand-alone document and does not contain the entirety of Disability Employment Services Providers' obligations.
Safety Management Systems (SMS) guidance for organisations
Safety and Airspace Regulation Group Safety Management Systems (SMS) guidance for organisations CAP 795 Published by the Civil Aviation Authority, 2014 Civil Aviation Authority, CAA House, 45-59 Kingsway,
Role Description Leader, Security Systems Maintenance
Role Description Leader, Security Systems Maintenance Agency Division/Branch/Unit Location Department of Education and Communities Safety and Security Directorate Blacktown Classification/Grade/Band Clerk
INTRODUCTION. The Merlin Principles. The Elements of each Principle
0 INTRODUCTION The development of the Merlin Standard has been progressed as a joint exercise between the Department for Work and Pensions (DWP) and its providers operating in the Welfare to Work (W2W)
COMMUNICATION AND ENGAGEMENT STRATEGY 2013-2015
COMMUNICATION AND ENGAGEMENT STRATEGY 2013-2015 NWAS Communication and Engagement Strategy 2013-2015 Page: 1 Of 16 Recommended by Executive Management Team Communities Committee Approved by Board of Directors
City of Canning. Asset Management Strategy 2015 2018
City of Canning Asset Management Strategy 2015 2018 Document Control Version No Version Date Description TRIM Reference 1.0 11 December 2012 Asset Management Strategy D12/68776 2.0 23 September 2015 Updated
EPA Victoria Engagement Policy ENVIRONMENT PROTECTION AUTHORITY
EPA Victoria Engagement Policy ENVIRONMENT PROTECTION AUTHORITY The aspirations of the people of Victoria for environmental quality shall drive environmental improvement Environment Protection Act 1970
The Contract Scorecard
ARCHITECT ENGAGE OPERATE REGENERATE The Contract Scorecard Module 8 of the outsourcingtoolset outsourcingtoolset.com Contents 1 ABOUT THE OUTSOURCING TOOLSET AND THIS MODULE...1 1.1 THE OUTSOURCING TOOLSET...1
Shared service centres
Report by the Comptroller and Auditor General Cabinet Office Shared service centres HC 16 SESSION 2016-17 20 MAY 2016 4 Key facts Shared service centres Key facts 90m estimated savings made to date by
North Eastern Maintenance Alliance (NEMA) The Story Steve Brown Exec Director Regional Operations
North Eastern Maintenance Alliance (NEMA) The Story Steve Brown Exec Director Regional Operations NEMA The Story The background The framework Objectives Scope KRA s KPI s The selection process Achievements
Government Communication Professional Competency Framework
Government Communication Professional Competency Framework April 2013 Introduction Every day, government communicators deliver great work which supports communities and helps citizens understand their
Outsourcing. Knowledge Summary
Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best
Contract Management Framework
Contract Management Framework Contents Purpose and Scope... 2 The Contract... 2 The importance of the Contract... 2 Contract Management... 3 The Toolkits... 4 Outline of establishing a Contract Management
BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service
RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which
Further information can be obtained by calling Glenn Shaw, Acting Manager Infrastructure and Waste Services on 9400 4353.
The City of Joondalup takes pride in being a Local Government that has been internationally recognised for providing outstanding services to the local community. To continue to set the standard in WA Local
JOB DESCRIPTION. Work Unit: Responsible To: Corporate and Governance Corporate Information Manager
JOB DESCRIPTION Job Title: Work Unit: Responsible To: Position Purpose: Pay range: Team Leader Customer Services Corporate and Governance Corporate Information Manager This job exists to: Provide friendly,
National Standards for Disability Services. DSS 1504.02.15 Version 0.1. December 2013
National Standards for Disability Services DSS 1504.02.15 Version 0.1. December 2013 National Standards for Disability Services Copyright statement All material is provided under a Creative Commons Attribution-NonCommercial-
Achieve. Performance objectives
Achieve Performance objectives Performance objectives are benchmarks of effective performance that describe the types of work activities students and affiliates will be involved in as trainee accountants.
Competence Criteria for Member (MCIBSE)
Competence Criteria for Member (MCIBSE) FACTSHEET M21 The competence criteria for the Member grade of CIBSE (MCIBSE) is directly aligned to the Competence Statements issued by the Engineering Council,
Portland. Reducing Software Costs While Increasing Cost Predictability and Control. Abstract. Mikko Marttinen
White paper Reducing Software Costs While Increasing Cost Predictability and Control Mikko Marttinen Abstract Effective software procurement addresses contractual and overall cost of ownership through
Supply Chain Strategy. Edition 01-2014
Supply Chain Strategy Edition 01-2014 Contents Executive Summary Mutual Benefits of the Supply Chain 01 04 Subcontractor Relations Guidelines 05 Levels of Engagement 07 Introduction Tiered Supply The Chain
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
Digital Inclusion Programme Started. BL2a
PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects
Information Commissioner's Office
Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: [email protected] Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: [email protected]
Guideline for preparing an Environmental and Social Management Plan
Guideline for preparing an Environmental and Social Management Plan NZ Transport Agency www.nzta.govt.nz Version 1: April 2014 ISBN 978-0-478-41934-4 (online) Copyright information This publication is
An effective working relationship is required with the WP Group Board of Directors, Leadership Team members and the Operations team.
Key Account Manager Role reports to: Group Commercial Director WP Group Overview WP Group is an integrated fuels and lubricants company focused on providing bespoke service solutions to its growing customer
Work Profile. Overview of Program
Work Profile Position Title: Marketing Coordinator Position Number: Responsible To: Council Program: Classification Level: Team Leader- Strategic Marketing Marketing & Creative Services L4 Overview of
Finance Effectiveness Efficiency
Business Unit Finance Effectiveness Efficiency An overview Agenda Page 1 Efficiency - An overview 1 2 Our services 7 3 Case study 14 Section 1 Efficiency - An overview 1 Section 1 Efficiency - An overview
Efficiency Review by Sir Philip Green
Efficiency Review by Sir Philip Green Key Findings and Recommendations The Government is failing to leverage both its credit rating and its scale 1 Introduction I was asked by the Prime Minister in mid
HEAD OF SALES AND MARKETING
HEAD OF SALES AND MARKETING Job details Reference number: GO-HOSM-2013 Job Title: Head of Sales and Marketing Supervisor: Managing Director Location: Kenya Job summary Reporting to the Managing Director,
Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO
Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr
QUALITY MANAGEMENT POLICY & PROCEDURES
QUALITY MANAGEMENT POLICY & PROCEDURES Policy Statement Cotleigh Engineering Co. Limited specialises in the recruitment of engineering & technical personnel in the oil & energy, rail, civil engineering,
TRANSPORT FOR LONDON CORPORATE PANEL
AGENDA ITEM 4 TRANSPORT FOR LONDON CORPORATE PANEL SUBJECT: EMPLOYEE ENGAGEMENT DATE: 17 NOVEMBER 2009 1 PURPOSE AND DECISION REQUIRED 1.1 The purpose of this report is to advise the Panel on TfL s approach
Health, Security, Safety and Environment (HSE)
Health, Security, Safety and Environment (HSE) Content: 1 Objective 2 Application and Scope 21 Application of HSE Directive with underlying documents 22 Scope of HSE Management system 3 Framework for our
Quality Assurance Manager Middlemore Central
POSITION DESCRIPTION Quality Assurance Manager Middlemore Central Date Produced/Reviewed: 25 th July 2014 Position Holder's Name: Position Holder's Signature:... Manager / Supervisor's Name: Manager /
Investors in People First Assessment Report
Investors in People First Assessment Report K.H.Construction Cambridge Assessor: Lesley E Ling On-site Date/s: 3 rd September 2008. Recognition Date: Contents 1. Introduction Page 2 2. Assessment and Client
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
QUALITY ASSURANCE POLICY
QUALITY ASSURANCE POLICY ACADEMIC DEVELOPMENT & QUALITY ASSURANCE OFFICE ALPHA UNIVERSITY COLLEGE 1. BACKGROUND The Strategic Plan of 2003-2005 E.C of Alpha University s defines the direction Alpha University
E. Specific requirements for innovation procurement (PCP/PPI) supported by Horizon 2020 grants
E. Specific requirements for innovation procurement (PCP/PPI) supported by Horizon 2020 grants The following requirements apply to PCPs and PPIs for which the tender preparation and/or the call for tender
- Internal distribution only. Corporate Real Estate and Facilities Cost Reduction
- Internal distribution only Corporate Real Estate and Facilities Cost Reduction Summary By moving from typical to best practice, organisations can improve value for money and reduce their real estate
Job Description. Barnet Band & scale range. No. of staff responsible for 0 Budget responsibility ( ) Purpose of Job
Job Title Barnet Band & scale range Reports to Service area No. of staff responsible for 0 Budget responsibility ( ) Purpose of Job Job Description Partnership Manager Commissioning Group The will support
Single Sourcing as Enabler for SAP Clients
Single Sourcing as Enabler for SAP Clients Gert Keuschnigg IBM Business Consulting Services Vienna, April 2005 Table Of Contents Initial Situations at Clients and Goals of Single Sourcing Approaches of
National Development Lead Catalogue and Master Data
Principles Vision Purpose Statement National Development Lead Catalogue and Master Data healthalliance Purpose, Vision and Principles healthalliance provides shared services to benefit NZ health organisations.
Housing Association Regulatory Assessment
Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing
FINDINGS AND RECOMMENDATIONS OF THE SURVEY OF ENGINEERING ENTERPRISE LEADERS GROUP ENERGY EFFICIENCY AND GREENHOUSE GAS REDUCTIONS
FINDINGS AND RECOMMENDATIONS OF THE SURVEY OF ENGINEERING ENTERPRISE LEADERS GROUP ENERGY EFFICIENCY AND GREENHOUSE GAS REDUCTIONS Contact: Lynne Reeder Senior Policy Analyst ph: 02 62706581 email: [email protected]
1. An overview of local authority communications p3. 2. New National Reputation Project p3. 3. Key aims of the Corporate Communications Strategy p4
Corporate Communications Strategy 2010-2015 Contents 1. An overview of local authority communications p3 2. New National Reputation Project p3 3. Key aims of the Corporate Communications Strategy p4 4.
10.0 ASSET MANAGEMENT PRACTICES
10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal
A guide to our company and our services. www.phjones.co.uk
A guide to our company and our services www.phjones.co.uk NATIONWIDE COVERAGE local expertise Introduction Since it s formation in 1963, PH Jones has continued to grow through the provision of excellent
To provide administration support to an administration team.
The Role of Administration Officer Date: 1 September 2007 Central Administration and Finance Team Grade: Grade K Hours of work: 37 Flexible working hours: Yes Suitable for Job Share: Yes Purpose To provide
Engineering Policy 146. Severe Weather Management Plans
Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...
HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK
HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK July 2013 1 P age Contents Page 1.0 Definition 3 2.0 Context 3 3.0 Purpose and aim of the policy 4 4.0 Policy Statement 4 5.0 Framework for Performance Management
A Guide to the Design Build Process
A Guide to the Design Build Process Essential reading for anyone considering or undertaking building work We are an affiliation of Chartered Architects and Chartered Building Surveyors who together provide
building and sustaining productive working relationships p u b l i c r e l a t i o n s a n d p r o c u r e m e n t
building and sustaining productive working relationships p u b l i c r e l a t i o n s a n d p r o c u r e m e n t INTRODUCTION 1 1 THE GROWING INFLUENCE OF PROCUREMENT PROFESSIONALS 2 2 GUIDELINES FOR
Middlesbrough Manager Competency Framework. Behaviours Business Skills Middlesbrough Manager
Middlesbrough Manager Competency Framework + = Behaviours Business Skills Middlesbrough Manager Middlesbrough Manager Competency Framework Background Middlesbrough Council is going through significant
STRATEGIC ASSET MANAGER POSITION & PERSON DESCRIPTION February 2015
GENERAL Position & Person Descriptions form an important part of an integrated planning process to ensure that individual performance, and the required outputs and outcomes, align with the strategic and
Role Description Metro Operations, Data Analyst
Role Description Metro Operations, Data Analyst Cluster Agency Division/Branch/Unit Location Transport Transport for NSW Infrastructure & Services / Service Delivery & Performance / Metro Service Delivery
Position Description
Position Description Job title Group Section Responsible to Responsibility for staff Project Coordinator Natural Resource Operations Rotorua Lakes Protection & Restoration Programme Rotorua Lakes Business
ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU
ADVERT POSITION: SPECIALIST: CONTRACTS MANAGEMENT JOB LEVEL: 6 DURATION 3 YEAR CONTRACT LOCATION: NATIONAL OFFICE PORTFOLIO: DSU PURPOSE: To lead and facilitate effective organisation-wide contracts development,
Project Management Manual
Project Management Manual PM01 Introduction to the Project Management Manual Ref: PM01 (V7.01) - Uncontrolled once Printed Issued on 20 th December 2006 Manual Owner: James Couper Head of Project Management
Bawden Contracting Services Ltd Job Profile. Contracts Manager. Purpose of the Job
Contracts Manager Purpose of the Job As Contracts Manager you will manage all aspects of the Grounds Maintenance contracting business safely and efficiently, maximising profitability through the completion
Role Description Director ICT Governance, Security and Risk
Role Description Director ICT Governance, Security and Risk Classification/Grade/Band Band 1 Senior Executive Work Level Standards ANZSCO Code 262112 PCAT Code 1226892 Date of Approval 03 March 2014 Work
the role of the head of internal audit in public service organisations 2010
the role of the head of internal audit in public service organisations 2010 CIPFA Statement on the role of the Head of Internal Audit in public service organisations The Head of Internal Audit in a public
POSITION DESCRIPTION Number: PD:
POSITION DESCRIPTION Number: PD: The VALUES of The City of South Perth Customer Focus - To work together with our customers to achieve positive outcomes. Excellence - To develop a culture of flexibility,
Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention
Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation
Procurement Routes. Curtin University of Technology
Procurement Routes An Overview Curtin University of Technology Overview of Principal Routes Traditional / conventional design led Design and construct Management (Fee) Traditional Client appoints consultants
QUALITY MANAGEMENT SYSTEM (QMS) MANUAL
Printed QMS Documentation is Uncontrolled Page 1 of 19 QUALITY MANAGEMENT SYSTEM (QMS) MANUAL ISSUE/ REVISION DATE DESCRIPTION ISSUE HISTORY PREPARED/ APPROVED BY 09/04/2014 Initial issue G.Rees 11/04/2014
Zero Harm at Siemens Energy Service UK&I Presentation to IOSH - May 2013. Restricted Siemens AG 20XX All rights reserved.
Zero Harm at Presentation to IOSH - May 2013 Restricted Siemens AG 20XX All rights reserved. siemens.com/answers Zero Harm Energy Service UK&I Ken Anderson Head of EHS Who is and what do we do? Page 2