2 Dalnessie Wind Farm nvironmental Statement Preface Preface This document forms the non-technical summary (NTS) of the nvironmental Statement (S) that accompanies an application made by SS Renewables Developments (UK) Ltd ( the Applicant ) for consent under Section 36 of the lectricity Act 1989 for the construction and generation of electricity from the Dalnessie Wind Farm ( the Development ), and deemed planning permission for the same development under Section 57(2), of the Town and Country Planning (Scotland) Act 1997 (as amended by The Planning etc. (Scotland) Act 2006). The S comprises the following volumes: Volume I: Text; Volume II: Figures; Volume III A: Landscape and Visual Visualisations; Volume III B: Landscape and Visual Supplementary Information; and Volume IV: Technical Appendices. Additional documentation that will be submitted with the Section 36 application includes: Planning Statement; Design Statement; Pre-Application Consultation Report; and Non-Technical Summary. The S (Text, Figures and Technical Appendices) and associated documents will be available for viewing during normal business hours at the following locations: Lairg Service Point The Highland Council Headquarters Police Station Glenurquhart Road Main Street Inverness Lairg IV3 5NX Sutherland IV27 4DB The Highland Council Drummuie Golspie KW10 6TA The S will also be available for purchase, at 250 for paper copies and 25 for an electronic version on CD, from: SS Renewables Developments (UK) Ltd 1 Waterloo Street 5 th Floor Glasgow G2 6AY Paper copies of the NTS are available free of charge. Page i

3 Preface Dalnessie Wind Farm nvironmental Statement This page is intentionally blank Page ii

4 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary 1 Introduction Non-Technical Summary This non-technical summary (NTS) forms part of the nvironmental Statement (S) which accompanies an application by SS Renewables Developments (UK) Ltd ( the Applicant ) to the Scottish Government for consent under Section 36 of the lectricity Act 1989 for the construction and operation of Dalnessie Wind Farm ( the Development ). The Development will comprise 27 wind turbines and associated infrastructure with a total potential installed capacity of between 67.5 MegaWatts (MW) and 81MW. It is located approximately 13km north-east of Lairg in Sutherland in the Highlands as shown on Figure NTS 1. The Applicant is a company incorporated under the laws of Scotland and is a 100% owned subsidiary of the publically quoted company SS. SS is a FTS-100 company, formed in 1998 from the merger of Scottish Hydro lectric plc and Southern lectric plc. The company is headquartered in Perth, Scotland and employs around 20,000 people. Core activities include electricity generation, transmission distribution and supply; gas storage, distribution and supply; the operation of a telecoms network; utility contracting; and electrical and gas appliance retailing. The company has a market capitalisation of around 10 billion, and supplies around 10 million customers in Great Britain and Ireland under the Scottish Hydro-lectric, Southern lectric, Swalec and Atlantic and Airtricity brands. The company is co-owner of Scotia Gas Networks, which owns and operates the Scotland and South of ngland regional gas distribution networks. The gas network business employs around a further 5,000 staff. SS s power generation assets total around 11,375MW, comprising 4,467MW of gas and oil-fired capacity; 4,370MW coal-fired capacity and 2,538MW of renewable (including pumped storage, hydro, wind and biomass) capacity. SS Renewables Developments (UK) Ltd is the renewable energy development division of SS. SS has over 20 onshore wind farms in operation in Scotland and Ireland totalling around 910MW. Wind farms totalling 710MW are under construction and a further 300MW with consent for development. 2 IA Process and Methodology An nvironmental Impact Assessment (IA) is a process aimed to ensure that applications for developments with potentially significant effects on the environment are appropriately assessed and the environmental effects quantified. The assessment must be carried out following consultation with statutory consultees, other interested bodies and members of the public. The information that an applicant is required to submit as part of the IA process (as specified in Schedule 4 of the IA Regulations) is presented in the S. Consultation has formed an integral role throughout the IA process, including at the following key stages: Pre-Scoping - obtaining initial feedback on the draft Development; Scoping, public exhibitions, and meeting with key statutory consultees - identification of key issues; Technical Assessments - collecting baseline information through desktop assessment and environmental surveys on-site and confirming survey methodologies; and Page 1

5 Non-Technical Summary Dalnessie Wind Farm nvironmental Statement Informing site design - communication with the local community and statutory consultees. As part of the wider consultation process, public exhibitions were held during March 2011 and December 2011 in Lairg. The exhibitions provided members of the public the opportunity to learn more about the Development, feed in to the design process and to ask any questions. 3 Before the initial exhibitions a scoping opinion request was issued in June 2010 with the accompanying Scoping Report. This was submitted to the nergy Consents Unit alongside other consultees and interested bodies. All responses to the scoping report have been considered fully by each of the technical disciplines in their methodology and assessment. Further detail on the community consultation process is provided in a separate Pre- Application Consultation Report submitted to accompany the application. Renewable nergy Policy Context and Alternative Technologies In 2008 the uropean Commission published proposals for reducing the U s greenhouse gas emissions by 20% and increasing the proportion of final energy consumption from renewable sources to 20%. Both targets are to be achieved by For the UK, the uropean Commission s proposals include 16% reduction in UK greenhouse gas emissions by 2020 and for 15% of all energy consumed in the UK to come from renewable sources by The UK Renewable nergy Strategy (UKRS) sets out the means by which the UK can meet the legally binding target of 15% of energy consumption from renewable sources by This will mean a very substantial increase in the share of renewables in about a decade. The majority of this is expected to come from wind power, both on and offshore. The document makes it clear that the UKRS is an integral part of the Government s overall UK Low Carbon Transition Plan and that the Devolved Administrations have a leadership role to undertake. The Scottish Government is committed to promoting the increased use of renewable energy sources to help tackle climate change and to support economic growth in Scotland. In July 2011 the Scottish Government published the Routemap for Renewable nergy in Scotland ( the Routemap ). This document outlines Scotland s renewables ambition and paths to delivery and provides an increase in Scottish Government s renewable energy generation target to 100% by This is a significant increase in targets set in previous years. The Routemap specifically recognises the scale of the challenge that requires to be addressed to meet the revised 2020 targets and provides a summary of the main challenges that require to be addressed to meet the 2020 renewables targets, one of which is consents and planning. The mechanism introduced to achieve the UK and Scottish renewables targets is the Renewables Obligation, which aims to incentivise the further development of renewables. The Renewables Obligation obliges electricity supply companies to source prescribed proportions of their total supply from eligible renewable resources, or pay a buy out fee 1 This 15% figure compares to only 3% in 2009, as confirmed in the National Renewable nergy Action Plan for the UK, page 5, July Page 2

6 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary per MWh of shortfall. In order to meet its obligation, the Applicant must develop eligible renewable energy sources on a large scale. The Applicant s renewable energy strategy to meet its Renewable Obligation is diverse and a wide range of alternative technologies has been considered. In all, SS now has 3,780MW of renewable energy capacity (onshore wind, offshore wind, hydro and dedicated biomass) in operation, under construction or with consent for development in the UK and the Republic of Ireland. The Development therefore forms part of a broader renewable energy strategy being implemented by the Applicant in response to UK and Scottish Government policy. 4 Design volution The Applicant s approach to site selection is an ongoing process where candidate sites are identified in accordance with national and local planning policy, government targets, Renewable UK guidance and a range of environmental and technical parameters. It is the Applicant s opinion that the site selection process and the detailed work undertaken for the IA has confirmed the Dalnessie site is an acceptable site for wind farm development. The design process is a balance between minimising negative environmental effects, achieving a technically viable site and maximising energy yield, and the wind farm layout has evolved throughout the duration of the IA. This iterative approach has allowed the findings of the public consultation exercise along with results from the IA to guide the evolution of the wind farm design and has allowed the Development to be modified in order to avoid, reduce or mitigate potential effects as far as reasonably practicable. Specific environmental drivers have been: Landscape and visual; Ornithology; cology; Hydrology; Cultural heritage; Noise; and Peat stability. The design process commenced with a preliminary layout which optimised wind yield and took account of topographical constraints and characteristics such as slope and watercourses. This layout comprised 35 turbines, however following consideration of the IA the layout was refined to result in the final design of 27 turbines and associated infrastructure. 5 Description of Development The operational Development would comprise: 27 wind turbines of up to 121m (to tip) height; Crane hardstandings for each turbine; Site entrance and upgraded access track from the public road (A836); New on-site access tracks between turbines, including passing bays and turning points; Two permanent meteorological masts nominal height 73.5m; On-site power collection system including turbine transformers, underground cables, electrical control building; Permanent drainage measures; Page 3

7 Non-Technical Summary Dalnessie Wind Farm nvironmental Statement Permanent signage; and Associated works. The proposed layout of the Development is shown in Figure NTS 2. In addition to the above components of the operational wind farm, the construction phase will involve the following associated components: One main temporary construction compound located adjacent to the site access track; Four on-site borrow pits; On-site concrete batching; Two temporary meteorological assessment masts (approved under separate planning applications); and Site signage. The land-take for all Development infrastructure is approximately 25.4ha. During the construction phase, further land on-site will be required and restored mainly for the construction compound, concrete batching plant and borrow pits. A peat landslide and hazard risk assessment has been undertaken and is included as Technical Appendix 5.1. The report provides an assessment of the peat stability conditions based on a desk study of available information and subsequent site studies, including a peat probing survey, to identify any evidence of peat instability. The overall conclusion is that there is a negligible to low risk of peat instability over most of the site with some limited areas of medium risk, where a hazard impact assessment was completed. Subject to the employment of appropriate mitigation measures outlined within the S all these areas can be considered as an insignificant risk. Further detailed surveys will be undertaken during the pre-construction phase and turbines, associated infrastructure and associated access tracks may microsited in any direction with the approval of on-site archaeologists, ecologists or any other relevant specialist supervising the works, or by up to 100m with the approval of the Planning Authority and appropriate consultees such as Scottish nvironment Protection Agency (SPA) and Scottish Natural Heritage (SNH). It is intended to utilise an existing section of track taken from the A836 up to Dalnessie. In order to accommodate abnormal load delivery this 6km section of track will require upgrading and widening. Approximately 4.5km of the A836 will require widening in places. Site access points and routes utilised during the operation and decommissioning phases are anticipated to be the same as those site access points and routes used during the construction phase. New access tracks will be constructed to provide routes to the turbine locations. The total length of new access tracks required would be approximately 20km. New access tracks will have a typical running width of 6m with passing places and turning circles. Based on available ground investigation data, it is anticipated that a floating track design would likely be required for approximately 14.5km of access tracks on-site. Where a floating track solution is considered inappropriate or where a suitable foundation horizon is typically less than 1m a cut track design will be used. This cut track design is anticipated for approximately 5.5km of tracks on-site. The access tracks will be retained throughout the operational life of the Development to enable maintenance of the turbines and Page 4

8 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary replacement of any turbine components. Access tracks may also be retained following decommissioning for use by landowners. It is estimated that approximately 195,000m 3 of stone will be required for construction of the Development. This includes suitable capping material to form a durable wearing surface on the access tracks.. A total of four search area locations for potential borrow pits have been identified. It is anticipated that the majority of stone will be sourced from on-site borrow pits in order to minimise haulage distances The Development has been designed to have an operational life of 25 years. At the end of this period the wind farm will either be decommissioned, or an application made for consent to extend its operational life. Therefore, unless a successful application is made for consent to extend its operational life it is estimated that the decommissioning phase of the Development will take approximately 18 months. 6 A Construction nvironmental Management Plan (CMP) has been submitted as part of the S (Technical Appendix 5.3). This outlines best practice methods which will be adhered to during constriction and which are treated as embedded within the Development design for the purposes of assessment. This will be refined, developed and streamlined as the project proceeds during the pre-construction phase in consultation with relevant statutory consultees and would be monitored by the relevant site project manager for compliance. Planning The Development, due to the electricity generation capacity exceeding 50MW, is submitted under the terms of Section 36 of the lectricity Act 1989 and Section 57 of the Town and Country Planning (Scotland) Act In considering the application under Section 36 of the lectricity Act 1989 the Scottish Ministers must also fulfil the requirements of Paragraph 3 of Schedule 9 to that Act. If Section 36 consent is granted the Scottish Ministers may also direct that planning permission for the development is deemed to be granted. It is necessary to provide a review of national, as well as local planning policy. There are a number of individual policies within the statutory Development Plans that are of potential relevance to the Development. The statutory Development Plan for the Development consists of the following Structure and Local Plan: The Highland Structure Plan (approved 2001); and The Sutherland Local Plan (adopted 2010). The relevant policies from the statutory Development Plan are set out within the planning chapter of the S. There is also a suite of national planning policy, Planning Advice Notes (PANs), an emerging Local Development Plan and draft Supplementary Guidance that are also of some relevance to the Development. These include: The National Planning Framework 2; Scottish Planning Policy; The Scottish Governments Web Based Renewables Guidance; The draft Highland Wide Local Development Plan; The Highland Renewable nergy Strategy and Planning Guidelines; and The Highland Council - Draft Supplementary Guidance: Onshore Wind nergy. Page 5

9 Non-Technical Summary Dalnessie Wind Farm nvironmental Statement 7 The Applicant has submitted a separate Planning Policy Statement which assesses, in detail, the Development in the context of the relevant Development Plan policies, national planning policy and advice, renewable energy policy, SPG and other material considerations. Landscape and Visual Assessment The purpose of the landscape and visual assessment is to identify and records the potential significant effects that the Development may have on physical elements of the landscape such as moorland ground cover; on landscape character; on areas that have been designated for their scenic or landscape-related qualities; and on views from various locations such as settlements, roads, hilltops and other sensitive locations. The potential effects of the Development on SNH Search Area for Wild Land and wildness qualities are also considered, as are cumulative effects that may arise from the addition of the Development to other wind farms. The principal effects of the Development on the landscape and visual resource will arise during the operational phase of the wind farm, although construction and decommissioning phases are also likely to result in some effects. The landscape and visual assessment is carried out across a study area that extends to a radius of 35km from the nearest turbine in the Development. The assessment has indicated that the Development will result in significant effects on the landscape and visual resource within this study area, as described below. There will be significant effects on the landscape character of the site and its surroundings up to a maximum distance of around 9km from the Development, although this will only be the case where there is notable visibility of the Development; there are extensive areas within this approximate radius that will have no effect or negligible effect due to lack of visibility or very limited visibility. The significant effects on landscape character result primarily from the level of visibility of the Development, the contrast of the Development with the generally undeveloped landscape, and the resulting influence that the Development will have on the landscape context. There will also be significant effects on parts of the proposed Ben Klibreck and Loch Choire Special Landscape Area (SLA), which lies to the north and east of the Development. The significantly affected areas of the proposed SLA are the elevated areas of ground and the south and south-west facing slopes that gain visibility of the Development; other areas will gain no or negligible visibility and will have a very limited effect. None of the other designated areas within the 35km radius study area will be significantly affected by the Development, including National Scenic Areas, Gardens and Designed Landscapes and four other proposed SLAs. The assessment of effects on views is informed by 20 viewpoints that have been selected, in agreement with SNH and The Highland Council, to represent visibility of the Development from sensitive locations throughout the study area. There will be significant effects on eight of these 20 representative viewpoints. The most distant of these is at Viewpoint 12 (Sallachy) 14.49km from the Development, where very specific circumstances result in the Development having a defining effect on the view. The other viewpoints that will have significant effects are the Right of Way to the south of the site; Ben Klibreck; Ben Armine; Loch Choire; Ben Armine; track to Ben Armine Lodge; Blarbuie; and Meall Dola. Page 6

10 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary These viewpoints lie at various distances and in various directions around the Development, and the significant effects arise largely as a result of the contrast that the Development will have with the baseline views that are available from these locations. There will be no significant effects on the routes (including the A836) or settlements (including Lairg) that have been included in the assessment due to the very limited visibility of the Development that is available. The Development will have a significant effect on part of an SNH Search Area for Wild Land, within which the Development lies. xtensive areas of wild land within the Search Area will however remain unaffected by the Development due to lack of visibility and these will remain as wild land. As well as assessing the effect of the Development itself, the landscape and visual assessment assesses the cumulative effect that the addition of the Development may have in conjunction with other operational, consented, application and relevant scoping stage wind farms. The cumulative assessment indicates that the consideration of the Development in conjunction with operational and consented wind farms (including Achany, Rosehall, Gordonbush, Lairg, Kilbraur and Kilbraur xtension) will result in very few significant cumulative effects. In relation to landscape character, these are found in some very small parts of the landscape character types around the Development and in one specific part of the proposed Ben Klibreck and Loch Choire SLA. There are also two viewpoints where a significant cumulative effect will arise; Viewpoint 13, Meall Dola, and Viewpoint 19, Hope Hill. These significant cumulative effects occur due to the relationship of the Development and the other wind farms. When other proposed wind farms are also considered, the cumulative effects vary. When the Development is considered in conjunction with Strathy North (an application stage wind farm at the time of the assessment) and Strathy South as well as well as operational and consented wind farms, it will not result in any changes to the significance of the cumulative effects. When the Development is considered in conjunction with Braemore as well as operational and consented wind farms, it will not result in any changes to the significance of the cumulative effects on landscape character receptors and the representative viewpoints, but will give rise to a significant cumulative effect on the A836. When Sallachy (which was at scoping stage at the time of the assessment) is considered as well as operational and consented wind farms, the Development will lead to additional significant cumulative effects on landscape character and will slightly increase the area of significant cumulative effect on the proposed Ben Klibreck and Loch Choire SLA. Viewpoint 6, Ben Klibreck summit, would also have a significant cumulative effect, as will Viewpoint 13, Beinn Sgeireach, and the A838. The increase in significant cumulative effects arising when Sallachy is also considered is due to the increased extent of wind farms around the settings of these elevated landscapes, viewpoints, and route. When all wind farms are considered (operational and consented, application and relevant scoping stage), the addition of the Development will result in significant cumulative effects on increased areas of landscape character and increased parts of the proposed Ben Klibreck and Loch Choire Special Landscape Area, as well as Viewpoint 6 (Ben Klibreck), Page 7

11 Non-Technical Summary Dalnessie Wind Farm nvironmental Statement Viewpoint 8 (Ben Armine), Viewpoint 13 (Ben Sgeireach), Viewpoint 15 (Meall Dola), Viewpoint 19 (Hope Hill), the A836 and the A838. The design of the Development has been considered throughout the assessment process, in relation to ten Design Principles that were established at the outset of the project (described in full in Appendix 7.6). The final design of the Development is considered to be the best possible solution in terms of these Design Principles, and can be summarised as follows: 8 The Development is a clear, ordered and compact feature that has a simple visual image when seen from key viewpoints. It relates to its landform setting, appearing as a contained, isolated feature, and is contained within a dip on the skyline when seen from key viewpoints and is of appropriate scale for the landform and landform context. The pattern of the landscape is maintained and the Development is associated with the large-scale, simple moorland rather than adjacent landscapes, maintaining a clear distinction; and The Development avoids the higher ground closer to Ben Klibreck and has a clear separation from this focal point in views. Notable vertical impact on the skyline close to Ben Klibreck and the psla as a whole is avoided, and effects on Loch Choire glen are minimised. Settlements and residential viewers will gain limited visibility of the Development, and there is also limited visibility from the A836. Ornithology The possible key ornithological effects relating to the Development are its potential to adversely affect the conservation status of bird populations (particularly those given the highest levels of statutory protection through inclusion in Annex I of the U Birds Directive and/or Schedule 1 of the Wildlife and Countryside Act 1981 (as amended)) through landtake, disturbance, displacement, collisions with the turbines and/or barrier effects. Some or all of these effects may occur as a result of construction activities, operation of the wind farm and decommissioning activities. The baseline gathering processes involved a combination of desk based studies, consultation and bird surveys to assess the potential impacts of the wind farm development on breeding and migrating birds. Potential impacts associated with construction and operation, together with the risk of bird collision with turbines were also assessed. All survey work and assessments followed the latest guidance provided by Scottish Natural Heritage. The Development site is of low conservation value in terms of breeding birds when considered in the context of the Caithness and Sutherland Peatlands Natural Heritage Zone (NHZ). Golden plover, dunlin and greenshank breed at low densities close to the proposed wind turbine area. Population reductions due to habitat loss are likely to be minimal. Habitat loss arising from track networks, borrow pits and turbine bases is unlikely to result in adverse impacts. Any impacts are likely to be low and have negligible significance. Impacts of direct habitat loss on breeding raptors such as golden eagles are likely to be minimal. Any impacts are likely to be low and have negligible significance. Page 8

12 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary Surveys allowed for the collection of flight path data on species that may forage or simply fly over substantial parts of the site. Flight activity by species with high ornithological value comprised mainly golden eagles during the two year long surveys. Using a 500m diameter buffer around each turbine, flight maps were combined with survey effort and flight height to estimate the number of flights that were likely to pass within the at risk volume of the turbines during the course of a year. Collision risk assessments predicted the loss of approximately 2.4 golden eagles over the 25 year life of the wind farm. These potential losses alone, and in combination with other wind farms in the region, are not predicted to adversely affect the stability of the golden eagle population in the NHZ. 9 Potential impacts on birds arising from the construction and operation of the Development are predicted to be minimal. An ecologist will monitor all construction works undertaken during the bird breeding season (March to August) to ensure that disturbance to breeding birds is minimised by the implementation of specific mitigation measures such as the creation of temporary 'no-go' areas to protect ground nesting birds within the construction site. cology An ecological impact assessment has been carried out in accordance with the Institute of cology and nvironmental Management (IM) (2006) 2 Guidelines. This was based on data from a series of ecological surveys, consultations and desk based literature reviews that followed recognised ecological guidelines. The information was used to generate a picture of the ecological baseline and assess the effects of the Development on the ecological interests of the area. The desk-based assessment identified there are seven sites designated for nature conservation importance within 10km of the turbine development area, ranging from a distance of 0.4km away to 9.1km away. A further one designated site is located outwith 10km of the turbine development area but within 1km of an outlying borrow pit associated with the Development. No significant effects are anticipated on the features of these designations. Several of the habitats present on the site are protected under Annex I of the C Habitats Directive and the Habitats Regulations 1994 (as amended), including blanket bog, Northern Atlantic wet heaths, uropean dry heaths and alpine and boreal heaths. Many of the habitats present on the site have been impacted by management activities such as heavy grazing. As a result these habitats are not in pristine condition. Mitigation for habitat loss will be achieved on-site through the implementation of the CMP and habitat specific measures outlined within the Habitat Management Plan (HMP) (Technical Appendix 9.5). Mitigation details would be subject to agreement of the Council and SNH, in liaison with SS and the estate. Without mitigation, there are a number of protected species that could be affected by construction and operation of the wind farm: Otter through habitat loss, disturbance and pollution impacts; Bat species - through habitat loss, disturbance and pollution impacts as well as collision with turbines; 2 IM (2006) Guidelines for cological Impact Assessment in the United Kingdom (version 7 July 2006) Page 9

13 Non-Technical Summary Dalnessie Wind Farm nvironmental Statement Water vole - through habitat loss, disturbance and pollution impacts; and Pine marten - through habitat loss, disturbance and pollution impacts. There are 57 new and upgraded watercourse crossings proposed as part of the Development site. In addition, there is the potential to affect aquatic habitats, freshwater species, and to cause temporary disturbance to fish. The area of habitat loss associated with each crossing will be negligible. Without mitigation, the freshwater fish species that could be affected by construction and operation of the Development include: Atlantic salmon - through habitat loss, fragmentation, disturbance and pollution impacts; and Trout species - through habitat loss, fragmentation, disturbance and pollution impacts. During operation, the risk of pollution incidences from maintenance activities is low as these will be carried out infrequently and with the necessary preventative measures in place. A range of mitigation measures have been undertaken through the design of the Development for all stages of the project development, in order to minimise the potential for negative effects, including: Design e.g. minimising new tracks by utilising existing tracks, avoiding areas of deep peat and using bridge crossings to minimise the number of culverts, avoidance of areas of importance for protected species; Pre-construction pre-construction surveys to check and account for changes in baseline conditions (e.g. presence of protected species etc); Construction use of Construction Method Statements and a Construction nvironmental Management Plan (CMP) to control construction activities, an cological Clerk of Works (CoW) on site, application of best practice construction methods and best practice measures for protected species such as otters; Operation periodic checking of vehicle and equipment condition to prevent leaks and spills, and best practice maintenance activities, mitigation to enhance and protect habitats across the site; and Decommissioning similar measures to construction period. Providing the best practice and mitigation measures outlined in the CMP and HMP are fully implemented, the assessment has concluded that there will be no significant negative effects anticipated on any conservation site or locally occurring habitats or species of importance, and therefore no significant residual effects are expected. 10 Traffic and Transportation Halcrow were appointed to investigate the traffic effects associated with developing a new wind farm at Dalnessie in the Scottish Highlands. The S chapter has focused on the scope of the assessment, identifying the policy context, outlining the methodology used, establishing the baseline conditions and summarising the evaluation of the effects. Relevant planning policy and guidance has been considered including Scotland s Transport Future, published by the Scottish Government, Scottish Planning Policy (SPP), published by the Scottish Government in February 2010, Regional Transport Policy, and the Guidelines for nvironmental Impact Assessment produced by the Institute of nvironmental Management and Assessment (IMA). Page 10

14 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary The assessment has been undertaken in accordance with the Guidelines for the nvironmental Assessment of Road Traffic which have complemented professional judgement and the experience of trained assessors. The guidelines were used as a screening process to define the geographical boundaries of this assessment. Having identified the environmental effects to be considered and the road network to be included, the next stage of the assessment was to quantify the magnitude of the environmental effects and, critically, to identify the level of significance that such a change may have, taking into account an evaluation of the sensitivity and value of the receptors. To determine the baseline conditions a review of the roads hierarchy, a review of traffic count data and a site visit (to visually assess the general nature and condition of the routes around the site) were undertaken to help determine the best routes to site based on the most suitable routes in terms of hierarchy and traffic volume, to accommodate construction traffic. The routes identified have been chosen to allow travel to the site from the widest catchment area on the most appropriate types of road. The potential effects of the Development include severance, driver delay, pedestrian delay, pedestrian amenity, fear and intimidation and accidents and safety. A number of mitigation measures are proposed to reduce the adverse effects of the construction traffic and include: The careful consideration of the roads network to identify a preferred route or routes to and from the development access junctions; A suitable access junction from the A836 will need to be provided to accommodate the construction traffic including the abnormal load deliveries; Road widening of the single track section of the A836 (from the junction with the A838 to the site access); Traffic management measures including police escort abnormal load movements, abnormal loads escorting vehicles, regulated site working hours, additional warning and speed control signs, a construction liaison committee, and a driver s induction; Avoiding transit through rural communities at school arrival and departure times; A communications protocol to avoid delays with emergency vehicle traffic; A diary of proposed delivery movements to liaise with the communities to avoid key dates such as fetes etc; and Working with local businesses to ensure the construction traffic does not interfere with deliveries or normal business traffic. No mitigation measures during operation are envisaged as, during the operation of the wind farm, it is predicted that there will only be a very small number of vehicle movements per week for maintenance purposes. Based on existing traffic data, the estimated volume of construction traffic, the methodology outlined above and considering the potential effects, an assessment of the residual effect has been made. The assessment concludes that no significant effects are predicted. 11 Hydrology and Hydrogeology The Hydrology and Hydrogeology chapter assesses the effect of the Development on the hydrological, hydrogeological and geological environment. The assessment covers an area Page 11

15 Non-Technical Summary Dalnessie Wind Farm nvironmental Statement larger than the site boundary to include the lower reaches of watercourses that are present within the Development site. The assessment has involved consultation with statutory consultees, detailed desk studies and assessment of effects taking into account specific receptor sensitivities. The assessment has also provided a detailed suite of measures to avoid and mitigate against identified adverse effects. Surface water hydrology and hydromorphology for the proposal has been described and mapped in the S. The Development lies within the catchments of the River Brora and the River Tirry. The Lairg and Strath Brora Lochs Site of Special Scientific Interest (SSSI) are located in the vicinity of the forestry commission track and associated borrow pits with several designated sites within 5km of the site boundary. The Development site is typical of an upland environment characterised by a complex hydrological network, with boggy areas and extensive areas of peat haggs formed as a result of fluvial erosion and weathering. Due to the underlying geology and the extensive peat deposits the site catchments display a flashy response to heavy rainfall. Water quality has been evaluated for the main watercourses in the vicinity of the Development, the majority of watercourses on the site have been classified as having good water quality. There is no Scottish Water assets present within the vicinity of the site. There is one private water supply, a groundwater borehole that is unlikely to be affected due to its depth and the distance from major excavations associated with the Development. There are also fishing interests throughout the study area, with the River Brora showing healthy populations of trout that indicate good long term water quality. The River Tirry is also considered to have a healthy population of fish species, namely brown trout. The geomorphology of the Development area has also been described in the S. Owing to the impermeable nature of the bedrock, peat and peaty soils dominate the area occupied by the Development. The vast majority of peat depths recorded are between 1.5 and 3m. The Development has been designed to avoid hydrologically sensitive areas and buffer zones have been adopted for watercourses and ephemeral drainage channels. Where access necessitates essential watercourse crossings, tracks have infringed on these buffers. A watercourse crossing assessment has been carried out for the 57 new and upgraded crossings identified and suitable crossing types suggested. An assessment has been carried out of the likely impacts of the Development on the hydrological and hydrogeological environment. The assessment has considered site preparation; borrow pit excavation, civil works during construction, operation and decommissioning of the Development. A comprehensive suite of mitigation and best practice measures has been incorporated into the design, including extensive buffer areas. A number of planning, design and construction proposals have been identified, full details of the assumed best practice construction management and mitigation measures are provided in Technical Appendix 5.3: Construction nvironmental Management Plan (CMP). Page 12

16 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary Assuming the successful design and implementation of mitigation measures the significance of construction effects on all indentified receptors is considered to be of minor or no significance. The assessment of predicted ongoing and operational effects has also determined that significance of effects on all receptors to be of minor or no significance. The significance of effects on the site hydrological and groundwater regime are not significant under the terms of the lectricity Works (nvironmental Impact Assessment) (Scotland) Regulations Cumulative ffects have been assessed and are expected to be minor. A programme of surface water quality monitoring has been provided and should include pre-construction monitoring to establish a baseline against which construction results can be compared. The monitoring will help to identify areas where infrastructure is having a negative effect on the peat and utilise the appropriate methods to prevent further deterioration and/or promote further enhancement. 12 Cultural Heritage and Archaeology The Cultural Heritage chapter has considered the potential effects of the Development upon cultural heritage assets, defined here as relict features predating the First dition Ordnance Survey map, selected later features of historic interest, such as wartime and industrial features, and all designated assets such as listed buildings and scheduled monuments. Potential effects upon the physical fabric and setting of assets have been considered. The assessment has been undertaken by CFA Archaeology Ltd, informed by scoping opinions and data provided by Historic Scotland and The Highland Council s Historic nvironment Team. The assessment was designed to identify any sites or features of cultural heritage interest present within proposed development areas and Delivery Route (A836 public road upgrade) through the examination of desk-based sources and field reconnaissance, and to identify any key receptors within 15km of the Development that could have their settings affected. The results of this work suggest that the archaeological potential within proposed Development areas is low to negligible. There are known prehistoric sites within the Development area: south-west of Dalnessie Farm, along the proposed site access track but the majority of the identified sites are of probable post-medieval date. The turbine area, at an altitude above 300m, contains no cultural heritage sites or features. Fifty-nine sites were identified within proposed development areas: either along the site access track, along the proposed Delivery Route, or along the forest road access to the borrow pits; none were found within the proposed turbine area. Two scheduled monuments along the site access track and seven along the access to the proposed borrow pits, containing prehistoric and post medieval remains, are of national importance and high sensitivity; one other site, a depopulated township, is of regional importance and medium sensitivity; and, the remainder are of either local or lesser importance and low or negligible sensitivity. The Development layout has been designed to avoid all known cultural heritage remains and no identified sites would receive any direct effect. Mitigation measures are proposed Page 13

17 Non-Technical Summary Dalnessie Wind Farm nvironmental Statement 13 Noise to ensure the protection of surviving remains that lie in close proximity to proposed Development works. There would be no significant indirect effects on the setting of any important heritage assets in the wider landscape from the Development, either alone or in combination with other operational, consented or proposed (applications or scoping) wind farms in the wider landscape. Noise will be emitted by equipment and vehicles used during construction and decommissioning of the wind farm and by the turbines during operation. The level of noise emitted by the sources and the distance from those sources to the receiver locations are the main factors determining levels of noise at receptor locations. An assessment of the effects of noise during construction and operation of the Development has been carried out. Construction Noise During construction, noise may result from the use of plant and machinery to carry out construction activities, the extraction of rock from borrow pits by blasting and mechanical means, upgrading of local roads to accommodate the deliveries of turbine components and from increased traffic on the local roads network. Noise levels resulting from construction have been predicted and assessed in accordance with the relevant British Standard (BS5228: Code of practice for noise and vibration control on construction and open sites). Due to the large distances between the nearest houses and the locations of most construction activities, the resulting noise levels would be within recommended limits and are therefore not considered to be significant. It will be necessary to carry out some upgrading works to the A836 between its junction with the A838 and the site entrance. There are some houses situated close to this section of road which may experience elevated levels of construction noise whilst these works are being carried out. It is unlikely that the noise levels would exceed recommendations for longer than one month, a duration which is defined as the minimum for effects to be considered as significant. Similarly, construction of access tracks to the site may cause elevated noise levels for a short period at Dalnessie, but this is not considered to be a significant effect due to its short duration. Best practice measures, as described in the Construction nvironmental Management Plan, would be employed in order to minimise the effects of construction noise as far as is reasonably practicable. The effects of increased traffic noise during construction have also been assessed and have been found to be not significant. A traffic management plan will be agreed with the local authority, which is likely to include restriction on the times that deliveries to site can take place. This will assist in minimising the effects of noise from construction traffic. It is likely that some blasting will be required to extract stone from borrow pits. Good practice guidelines will be followed during the setting and detonation of charges. Monitoring of vibration will be carried out, and small test charges will be used to establish safe upper limits for full charges. Page 14

18 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary Operational Noise During operation, wind turbines can generate noise from the machinery housed within the turbine and from the movement of blades through the air. Although the noise from wind turbines increases with wind speed, the background noise usually increases at a greater rate. Modern turbines are designed to minimise noise and planning conditions are used to ensure compliance with specified noise limits. Noise from operation of the wind turbines has been assessed following the guidance contained in STU-R-97 The Assessment and Rating of Noise from Wind Farms as recommended in Scottish Government planning advice. As the turbines are a large distance from the nearest houses, it has not been necessary to take existing background noise levels into consideration, as the predicted noise levels at the nearest houses from operation of the turbines would be much lower than the lowest limit recommended in the guidelines. Decommissioning Noise During decommissioning of the Development, noise generated is likely to be of a similar nature to that during construction, although both the magnitude and duration of effects are likely to be lesser than those during construction. 14 Socio-conomics, Tourism and Recreation The effect of the Development on socio-economic conditions and tourism and recreation has been assessed. The socio-economic assessment focused on establishing the potential employment and economic contribution of the Development on the study area defined as the Highland local authority boundary and Scotland. stimates of planned expenditure were used to estimate potential employment job years and Gross Value Added (GVA) generated by the Development. Knock-on effects on incomes and supply-chains were also taken into account. Given the uncertainties over economic effects, low and high cases were developed to provide a range of potential effects. The high case assumed a higher proportion of expenditure on the Development was retained within the study area and Scotland. The socio-economic assessment suggests that the Development has the potential to support between 135 (low case) and 315 (high case) job years of employment in the study area, and between 350 and 890 for Scotland. The suggested GVA contribution of the Development is between 23.5m (low case) and 37.7m (high case) in the study area, and between 79.3m (low case) and 100.2m (high case) in Scotland. Based on the scale of the economy in the study area, and the duration of effects, the assessment suggests that the Development will have a minor positive impact on social and economic conditions. However, it is worth noting that the economic benefit for the local area will be more pronounced than the Highland region, with the Development providing important opportunities for local employment and supply-chain benefits. The tourism and recreation assessment considered both direct and indirect effects of the Development on tourism and recreation including walking/mountaineering, cycling and riding and associated relevant land use issues. The assessment suggests that there are a limited number of tourism accommodation providers and visitor attractions that may be affected by the Development, and no major tourism attractions. No primary evidence is available that suggests that the visibility of the Development will reduce levels of Page 15

19 Non-Technical Summary Dalnessie Wind Farm nvironmental Statement walking/mountaineering, cycling or riding. Overall, the assessment suggests that the effects of the Development on tourism and associated recreation activities will be of minor impact with both negative and positive aspects. 15 Other Considerations Other considerations include: Telecommunications, aviation and other infrastructure; Land-use; Shadow flicker; Safety of structures in extreme weather; Driver distraction; and Climate and carbon emissions TLCOMMUNICATIONS, AVIATION AND OTHR INFRASTRUCTUR Due to their size and nature, wind turbines have the potential to interfere with electromagnetic signals. Infrastructure that could be affected includes civil and military aviation operations including impacts on radar, telecommunication links, and television reception. A desk based study and extensive consultation was undertaken in order to identify and assess existing telecommunications and utilities infrastructure and aviation facilities within a specific distance from the Development Aviation and Radar No civil aerodromes or aviation operations are likely to be affected by the Development Television and Telecommunications Structures such as wind turbines, and others with similar characteristics, have the potential to cause interference with television and telecommunication transmissions. The BBC Wind Farm Tool shows that no dwellings are likely to be affected by the Development. However once the Development is operational, the Applicant will undertake a television survey in the area surrounding the Development to determine the extent of any television reception effects On-site Utilities No on-site utilities have been identified LAND-US The Development encompasses a stag shooting estate, consisting of open ground, rough grazing for sheep and a number of lochans. The site rises in height from approximately 170m above ordnance survey datum (AOD) to 490m AOD. There are also a number of small watercourses on-site including tributaries to the River Brora and Loch Choire. Construction activities will accommodate existing land-use and shooting activities on-site. The Applicant will work with the landowner to ensure that they are able to continue to operate their activities during the construction phase with adequate control measures in place. These effects on land-use are considered to be not significant SHADOW FLICKR Shadow Flicker is an effect that can occur when the sun moves behind a wind turbine rotor and the shadow of a moving wind turbine blade passes over a small opening (window) within a property, briefly reducing the intensity of light within the room and causing a flickering to be perceived. The likelihood and duration of shadow flicker depends upon the Page 16

20 Dalnessie Wind Farm nvironmental Statement Non-Technical Summary positioning of the sun, turbine and window locations, turbine orientation, time of day, time of the year and weather conditions. Guidance states that only properties within 130 degrees either side of north relative to the turbines can be affected; as shadows are not cast to the south and that at distances greater than 10 rotor diameters the likelihood of flicker is very low. No dwellings were found to be within 10 rotor diameters and 130 degrees north of the proposed turbine locations, therefore no effects are predicted SAFTY OF STRUCTUR IN XTRM WATHR Due to the exposed nature of wind farm sites, wind turbines are designed to withstand extreme weather conditions. Wind turbines are equipped with features to safely deal with extreme weather conditions such as extreme winds, lightning strike and ice throw DRIVR DISTRACTION The closest public highway to the site is located approximately 8km south-west from the nearest turbine (turbine 5) and is an A classified road which passes from north to south CLIMAT AND CARBON MISSIONS The operation of wind farms offsets carbon from other forms of energy generation, but there are carbon costs associated with the construction of wind farms, especially where they are located in carbon rich soils such as peatlands. A carbon assessment has been undertaken in accordance with Scottish Government recommended methodology, the carbon calculator predicts an average carbon payback period of between 2.1 and 2.9 years depending on whether a fossil fuel mix or grid mix emissions factor is used for comparison. The Development will have a positive benefit on emission savings. very year of its 25 year operational life it would displace approximately 81,245 tonnes of CO 2 emissions (based on UK grid supply mix). Page 17

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

WELCOME TO THE BAD Á CHEÒ WIND FARM EXHIBITION

WELCOME TO THE BAD Á CHEÒ WIND FARM EXHIBITION WELCOME TO THE BAD Á CHEÒ WIND FARM EXHIBITION Thank you for taking the time to attend The purpose of this exhibition is to explain why we have identified this site for a potential wind farm development

More information

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC). Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

East Ayrshire Local Development Plan: Proposed Plan. Planning for wind energy. Draft Supplementary Guidance MARCH 2015

East Ayrshire Local Development Plan: Proposed Plan. Planning for wind energy. Draft Supplementary Guidance MARCH 2015 East Ayrshire Local Development Plan: Proposed Plan Planning for wind energy Draft Supplementary Guidance 1 MARCH 2015 CONTENTS 1 Context and Purpose of Supplementary Guidance. 3 2 A Spatial Framework

More information

Planning and Environmental Policy Group

Planning and Environmental Policy Group Planning and Environmental Policy Group Planning Policy Statement 18 Renewable Energy August 2009 Planning Policy Statement 18: Renewable Energy Planning Policy Statements (PPSs) set out the policies

More information

Technical Appendix 4.1: Peat Management Plan for the T39 Layout

Technical Appendix 4.1: Peat Management Plan for the T39 Layout SSE Renewables Further Information Report, 2014 Strathy South Technical Appendix 4.1: Peat Management Plan for the T39 Layout ENVIRON 2014 UK12-17181 Issue: 4 ENVIRON Peat Management Plan T39 Layout Prepared

More information

Community and Renewable Energy Scheme Project Development Toolkit

Community and Renewable Energy Scheme Project Development Toolkit Community and Renewable Energy Scheme Project Development Toolkit Planning Module Contents How to use this toolkit... 2 The planning system... 2 Permitted development... 4 Planning and community groups...

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects REnescience Northwich Quality Management Prepared by: Tom Dearing Senior Environmental Consultant 02/10/15 Reviewed & checked by:

More information

Mark Hill Windfarm Extension

Mark Hill Windfarm Extension Mark Hill Windfarm Extension Our local presence ScottishPower Renewables leads the UK in development and operation of onshore wind energy. With more than 30 consented and operational projects, our turbines

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

National and Major Developments

National and Major Developments National and Major Developments An Agency Joint Statement on Pre-application Engagement A Joint Statement by Architecture and Design Scotland, Forestry Commission Scotland, Historic Scotland, Scottish

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Assessment. Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com. 7 th October 2010

Assessment. Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com. 7 th October 2010 Peat Stability Risk and Hazard Assessment Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com 7 th October 2010 What goes into a Peat Stability Risk Assessment? You will need: An understanding

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE

TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE RWE Innogy UK TRITON KNOLL ELECTRICAL SYSTEM CONSULTATION: QUESTIONNAIRE The Planning Act 2008 requires developers to undertake pre-application consultation before submitting an application for a Development

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

23.1 RENEWABLE ENERGY

23.1 RENEWABLE ENERGY Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.

More information

Wind turbines on your land. Renewable energy development for landowners

Wind turbines on your land. Renewable energy development for landowners Wind turbines on your land Renewable energy development for landowners Diversification By diversifying into wind energy, landowners have an opportunity to receive a regular, guaranteed income for up to

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Standardized Environmental Survey Protocols

Standardized Environmental Survey Protocols 14 Best Practices for Sustainable Wind Energy Development in the Great Lakes Region Great Lakes Wind Collaborative Best Practice #14 Standard environmental survey protocols should be developed by federal

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

Aiding the Hydro-scheme development process. Web-links to useful information sources

Aiding the Hydro-scheme development process. Web-links to useful information sources Aiding the Hydro-scheme development process. Web-links to useful information sources Web-pages are in bold. These pages aim at providing developers, land-owners, decision makers and advisors with a collation

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

SCOTTISH GOVERNMENT CONSULTATION PERMITTED DEVELOPMENT RIGHTS FOR MICROGENERATION EQUIPMENT ON NON DOMESTIC PROPERTIES

SCOTTISH GOVERNMENT CONSULTATION PERMITTED DEVELOPMENT RIGHTS FOR MICROGENERATION EQUIPMENT ON NON DOMESTIC PROPERTIES SCOTTISH GOVERNMENT CONSULTATION PERMITTED DEVELOPMENT RIGHTS FOR MICROGENERATION EQUIPMENT ON NON DOMESTIC PROPERTIES RSPB Scotland response to Consultation Paper October 2010 Name: Organisation: Address:

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

Sample Micro Hydro Initial Report

Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.

More information

Experience from the first large scale tidal turbine EIA in Europe. How do we work towards effective and proportionate EIA?

Experience from the first large scale tidal turbine EIA in Europe. How do we work towards effective and proportionate EIA? Independent, integrated thinking Experience from the first large scale tidal turbine EIA in Europe How do we work towards effective and proportionate EIA? Liz Foubister IEMA Webinar 30 th July 2014 What

More information

Gas to the West INFORMATION LEAFLET. gastothewest.com. info@gastothewest.com. www

Gas to the West INFORMATION LEAFLET. gastothewest.com. info@gastothewest.com. www Gas to the West INFORMATION LEAFLET 0800 975 2322 gastothewest.com @ info@gastothewest.com Gas to the West 1. INTRODUCTION This Gas to the West Project is a major energy infrastructure project to extend

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

Construction Phase Traffic Management Plan

Construction Phase Traffic Management Plan Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land

More information

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

Howsham fish passage Consultation document

Howsham fish passage Consultation document Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing

More information

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc.

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Environmental Assessment Approval Approval Date: ocr 2 8 zols Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Queens County, Nova Scotia The Liverpool Wind Farm (the Undertaking ), proposed

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

CONSTRUCTION SEQUENCE & PROGRAMME

CONSTRUCTION SEQUENCE & PROGRAMME CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone

More information

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW) Zorlu Plaza, 34310 Avcılar ISTANBUL / TURKIYE Tel: + 90 (212) 456-2300 Fax: +90 (212) 422-0099 www.zorlu.com.tr NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

Carmarthenshire LDP Site Assessment Proforma

Carmarthenshire LDP Site Assessment Proforma Carmarthenshire LDP Site Assessment Proforma 1. Site Details Ref: SC1/h1 Site Ref (where applicable): Location: Parc Puw, Drefach Felindre Site Area (Ha): Eisting Use* *if candidate site as proposed by

More information

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how

More information

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Planning Guidelines. Acknowledgements

Planning Guidelines. Acknowledgements Acknowledgements The Department of the Environment, Heritage and Local Government wish to acknowledge the following persons and organisations who assisted in the revision of these guidelines: - Sustainable

More information

Renewable Energy in Fife Planning customer guidelines

Renewable Energy in Fife Planning customer guidelines Renewable Energy in Fife Planning customer guidelines This guidance is an introduction to what we would look for if someone wanted to develop renewable energy projects in Fife. It s a guide to, but doesn

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Who is National Grid?

Who is National Grid? Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We

More information

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles The Roaches Asset Management Review Draft Objectives for External Consultation Fundamental Principles the area of land under review is the Roaches Estate and Gradbach Car Park as shown on the attached

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

GIANT S CAUSEWAY AND CAUSEWAY COAST WORLD HERITAGE SITE. Management Plan. Summary

GIANT S CAUSEWAY AND CAUSEWAY COAST WORLD HERITAGE SITE. Management Plan. Summary GIANT S CAUSEWAY AND CAUSEWAY COAST WORLD HERITAGE SITE Management Plan Summary FEBRUARY 2005 INTRODUCTION Background and Context The WHS Management Plan for the Giant's Causeway and Causeway Coast World

More information

1.0 THE PROPOSAL...2. Introduction 2 Project Description 2 2.0 THE APPLICANT...2 3.0 OUR APPROACH TO COMMUNITY CONSULTATION...2

1.0 THE PROPOSAL...2. Introduction 2 Project Description 2 2.0 THE APPLICANT...2 3.0 OUR APPROACH TO COMMUNITY CONSULTATION...2 CONTENTS 1.0 THE PROPOSAL...2 Introduction 2 Project Description 2 2.0 THE APPLICANT...2 3.0 OUR APPROACH TO COMMUNITY CONSULTATION...2 4.0 LEGISLATIVE REQUIREMENTS...3 5.0 THE CONSULTATION PROCESS...4

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Development Management Officer Report Committee Application. Summary

Development Management Officer Report Committee Application. Summary Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey

More information

SSE s criteria used for GHG emissions reporting

SSE s criteria used for GHG emissions reporting SSE s criteria used for reporting 1 Introduction This document details the annual greenhouse gas emissions reporting approach used by SSE Plc to report the tonnes of carbon dioxide equivalent (CO2e) during

More information

I refer to the application made by Aquamarine Power Ltd. ( the Company ), dated 17 th June 2011 for:

I refer to the application made by Aquamarine Power Ltd. ( the Company ), dated 17 th June 2011 for: Ms Megan Richardson Aquamarine Power Ltd. Elder House 24 Elder Street Edinburgh EH1 3DX 14 February 2012 Dear Ms. Richardson, CONSENT FOR THE CONSTRUCTION AND OPERATION OF AN OFFSHORE DEMONSTRATOR WAVE

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Wind farm Developments in South Australia: Select Committee Inquiry

Wind farm Developments in South Australia: Select Committee Inquiry Wind farm Developments in South Australia: Select Committee Inquiry Introduction REpower Australia is a leading provider of grid connected wind farms in Australia. We directly employ over 170 people, and

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

LANGHOPE RIG WINDFARM TRAFFIC MANAGEMENT AND HAULAGE ROUTE SCHEME

LANGHOPE RIG WINDFARM TRAFFIC MANAGEMENT AND HAULAGE ROUTE SCHEME LANGHOPE RIG WINDFARM TRAFFIC MANAGEMENT AND HAULAGE ROUTE SCHEME Rev No. : Revision Description : Date : 0 For Information 1 Draft Prepared for Scottish Borders Council (SBC) comments 2 Draft Post SBC

More information

REPORT TO: AUDIT AND PERFORMANCE REVIEW COMMITTEE ON 19 MARCH 2014 ACTING CORPORATE DIRECTOR (ENVIRONMENTAL SERVICES)

REPORT TO: AUDIT AND PERFORMANCE REVIEW COMMITTEE ON 19 MARCH 2014 ACTING CORPORATE DIRECTOR (ENVIRONMENTAL SERVICES) PAGE: 1 REPORT TO: AUDIT AND PERFORMANCE REVIEW COMMITTEE ON 19 MARCH 2014 SUBJECT: BY: RENEWABLE ENERGY ACTION PLAN ACTING CORPORATE DIRECTOR (ENVIRONMENTAL SERVICES) 1. REASON FOR REPORT 1.1 To inform

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

PRE-APPLICATION ADVICE FOR LOCAL DEVELOPMENTS COMHAIRLE RO-IARRTAIS DO LEASACHAIDHEAN IONADAIL

PRE-APPLICATION ADVICE FOR LOCAL DEVELOPMENTS COMHAIRLE RO-IARRTAIS DO LEASACHAIDHEAN IONADAIL PRE-APPLICATION ADVICE FOR LOCAL DEVELOPMENTS COMHAIRLE RO-IARRTAIS DO LEASACHAIDHEAN IONADAIL Our Pre-Application Advice for Local Developments service relates to proposals which are generally of a small

More information

New housing, settlement expansion and the natural heritage

New housing, settlement expansion and the natural heritage COMMISSIONED REPORT Commissioned Report No. 120 New housing, settlement expansion and the natural heritage (ROAME No. F04AA501) For further information on this report please contact: Alan Fay or Richard

More information

Our approach to the design and routeing of new electricity transmission lines

Our approach to the design and routeing of new electricity transmission lines Our approach to the design and routeing of new electricity transmission lines We own and manage the grid to which many different energy sources are connected. In Britain we run systems that deliver gas

More information

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102 CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm

More information

Hydro Power Projections Report. Jennifer Palmer

Hydro Power Projections Report. Jennifer Palmer Hydro Power Projections Report Jennifer Palmer Abstract- The purpose of this report is to assess the current and future role of hydro power in the UK energy supply market. The historical trends and barriers

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN

CONSTRUCTION TRAFFIC MANAGEMENT PLAN CONSTRUCTION TRAFFIC MANAGEMENT PLAN IN SUPPORT OF THE PROPOSED ERECTION OF A SINGLE WIND TURBINE WITH MAXIMUM BLADE TIP HEIGHT OF 67M, FORMATION OF NEW VEHICULAR ACCESS, ACCESS TRACK AND ASSOCIATED INFRASTRUCTURE

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

EXHIBIT A LOCATION MAP AND LAND USE INFORMATION

EXHIBIT A LOCATION MAP AND LAND USE INFORMATION EXHIBIT A LOCATION MAP AND LAND USE INFORMATION In accordance with Arizona Corporation Commission Rules of Practice and Procedure R14-3-219, Applicant provides the following location maps and land use

More information

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:

More information

PLANNING SERVICES UNIT

PLANNING SERVICES UNIT SUPPLEMENTARY PLANNING GUIDANCE DEVELOPMENT INVOLVING HORSES PLANNING SERVICES UNIT 1. INTRODUCTION 1.1 This document provides supplementary planning guidance on development involving horses, which is

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

How To Write A New Bill On Flood Management In Scotland

How To Write A New Bill On Flood Management In Scotland Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally

More information

Environmental damage: Extending the Environmental Liability Directive into marine waters

Environmental damage: Extending the Environmental Liability Directive into marine waters Environmental damage: Extending the Environmental Liability Directive into marine waters Consultation on amending the Environmental Liability (Prevention and Remediation) Regulations (Northern Ireland)

More information

Ardessie Hydro Electric Project

Ardessie Hydro Electric Project Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB Jacinta.macdermot@dhghydro.com 077 888

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

TRANSPORT ASSESSMENT GUIDANCE

TRANSPORT ASSESSMENT GUIDANCE TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4

More information

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF

AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF DC/2015/00494 AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF LAND AT ONEN, ADJACENT TO B4233, NP25 5EN. RECOMMENDATION: APPROVE Case Officer: Elizabeth Bennett Date Registered:

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information