1 Appendix 1 Denbighshire County Council PLANNING STRATEGY DEVELOPER GUIDANCE NOTE November 2015 SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Context This document provides guidance on the Council s requirements for supporting evidence and justification to be submitted, in the event that developers are considering the submission of planning applications for housing development on sites which are not allocated for housing development and are outside of the adopted LDP development boundaries on the basis of the Council s present housing land supply position. This does not mean that applications are invited. Sites covered by this Note This document relates to development proposals for housing (Use Class C3) outside of development boundaries as defined in the adopted Denbighshire Local Development Plan The LDP allows for windfall housing development within development boundaries, affordable infill plots, conversion of rural buildings; enabling development and rural exception sites for affordable housing outside of development boundaries. This document is not intended to relate to these types of sites. Status of this Note This note does not set policy it merely consolidates the advice in Planning Policy Wales and TAN 1 into a single note. It has been considered and endorsed by the Local Development Plan (LDP) Steering Group as well as approved by Planning Committee at its meeting on 11 th November It therefore takes immediate effect and applies to any applications currently with the Council as well as future ones yet to be submitted. Housing Development Proposals Outside of Adopted LDP Development Boundaries In the event of there not being a five year supply of housing land in Denbighshire according to the method of calculating housing land supply prescribed by the Welsh Government in Technical Advice Note 1 Joint Housing Land Availability Studies (TAN1); in accordance with paragraph of PPW Local planning authorities must ensure that sufficient land is genuinely available or will become available to provide a 5-year supply of land for housing judged against the general objectives and the scale and location of development provided for in the development plan. TAN1 sets out how an authority must act when it does not have a 5 year land supply: The housing land supply figure should also be treated as a material consideration in determining planning applications for housing. Where the current study shows a land supply below the 5-year requirement or where the local planning authority has been unable to undertake a study (see 8.2 below), the need to increase supply should be given considerable weight when dealing with planning applications provided that the development would otherwise comply with development plan and national planning policies. (Paragraph 6.2).
2 For the purpose(s) of both paragraphs of PPW and 6.2 of TAN1, reference to the development plan means the adopted Denbighshire Local Development Plan
3 In the event that a developer is considering submitting a planning application for housing development justified on the basis of a shortfall in housing land supply, the Council will expect to see comprehensive evidence to justify such an application, in relation to: 1. The need for the development proposed This should be set out in the context of the area local to the site, as well as Denbighshire as a whole. Regard should be had to the nature and function of the settlement within which the proposal is made; its role as part of the LDP spatial strategy; and, how the identification of the site fits in with the requirement for a search sequence as referenced in paragraph of PPW. This is to ensure that developers are following the same principles in terms of identifying sustainable sites as the Local Planning Authority was required to do in the preparation of the LDP. This is also to ensure that the spatial strategy in the LDP is not compromised by unjustified applications for housing development. Details of the LDP spatial strategy can be found in chapter 5 of the adopted LDP via the following link: 2. Full Application The Council will require the submission of a full planning application to allow the Council to properly assess the proposal in terms of the need to be met, the housing to be provided, and the deliverability of the scheme. Outline applications are not considered appropriate or acceptable to consider proposals for speculative development on the basis of a lack of housing land supply, as without full information it may prove difficult for the Council to be satisfied that the proposal represents a sustainable and deliverable form of development. If an outline application is submitted the LPA will request additional information by issuing an article 3(2) of the DMPO Order Directive. 3. Sustainability Appraisal A Sustainability Appraisal and Strategic Environmental Assessment (SA/SEA) is required to demonstrate why and how the site represents a sustainable form of development in relation to both the local and national policy context, the principles and objectives of which are set out in paragraphs and respectively of PPW. A template for sustainability appraisal is attached to this document as a guide to the minimum information that should be provided. 4. Viability Assessment A viability assessment is required in order to demonstrate that the site can be developed on the basis of accommodating all of the Council s policy requirements (e.g. affordable housing, open space, education, highways etc.), as well as providing all other necessary infrastructure required. This is to assist in assessing the deliverability of the proposal. 5. Housing Delivery Statement The Council requires the submission of this essential evidence by the developer in order to demonstrate how the development can deliver housing to help to reduce whatever is considered to be the identified shortfall in housing supply, within 5 years from the application date. This should clearly identify a timeline for the development including the expected start date, the annual completion rate, as well as the expected
4 completion date for the whole development. This should also clearly identify which developer(s) will be building the homes. This requirement is also to ensure compliance with advice in paragraph of PPW: This means that sites must be free, or readily freed, from planning, physical and ownership constraints, and economically feasible for development, so as to create and support sustainable communities where people want to live. Advisory Notes A failure or unwillingness to provide any/all of these essential requirements will leave the Council unable to adequately assess the sustainability of the proposed development. This is because speculative developments that do not otherwise comply with policy must clearly demonstrate their full sustainable development credentials. This is also why outline applications are not considered suitable or appropriate to make such exceptions cases. Whilst all sites are considered on their merits, development sites must also clearly show that they do not compromise the sustainable development strategy for the LDP. Any consent recommended will be time limited to commencement within two years. Any applications for renewal of such consents will need to be fully justified as the basis on which they were originally permitted i.e. as an exception based on an urgent need, should result in commencement first time around. Such application for renewal will be given careful consideration and will not automatically be renewed.
5 Sustainability Appraisal Template Site: Grid Ref: Assessment of the site Stage 1 Compliance with the Local Development Plan Strategy This stage tests whether the site broadly supports the agreed Plan Strategy. The Local Development Plan strategy looks to provide around 7,500 new dwellings between , This growth is focused at a Key Strategic Site at Bodelwyddan and then in the Lower Growth Towns of Rhyl, Prestatyn, St Asaph, Denbigh, Ruthin & Corwen. A series of villages have been identified (page 49 Adopted Plan) which have development boundaries within which development will be permitted. A series of Hamlets have also been identified (page 56 Adopted Plan) with areas of search within which affordable housing to meet local needs will be permitted up to the quota stated. Areas outside of those identified above are classed as open countryside where development will be restricted. You will need to demonstrate how the proposed site complies with the Local Development Plan Strategy. Any sites failing to demonstrate this, will be discounted at this stage. Is the site in compliance with the overall growth and spatial strategy as outlined above? Stage 2 Site Characteristics This stage considers any potential constraints to development in terms of physical, environmental and geological factors. Some sites may be subject to constraints that can be overcome by reasonable mitigation measures (such as moving a telegraph pole or rebuilding a stone boundary wall within the site), where reasonable mitigation cannot overcome constraints, then the site will be discounted and not considered further. The factors to be considered are: Flood Risk: TAN 15 identifies high flood risk areas, where vulnerable development (ie housing, hospitals, extra care homes etc) should be avoided. These areas are categorised as C1 and C2. Sites within C2 will not be permitted, in line with TAN 15, and sites within C1 areas will only be considered if the justification and acceptability criteria within the TAN 15 summary can be met: If you feel that the site may be suitable with mitigation measures then a detailed flood consequence assessment will be required. If you need to check whether your site falls into a flood risk area please check the Natural Resources Wales website: Is the site within a flood risk area? A Flood Consequence Assessment should be considered. World Heritage Site Pontcysyllte Aqueduct (including the Buffer Zone): This World Heritage Site (WHS) covers the Llangollen Canal. A Buffer Zone surrounds the WHS and its function is to protect the outstanding universal value of the designation. Sites within the WHS or Buffer Zone
6 will not be automatically discounted but will require careful assessment to ensure any potential developments do not detract from the key features of the WHS. The key features can be found at [UNESCO website] Is the site in the World Heritage Site or Buffer Zone? Clwydian Range and Dee Valley Area of Outstanding Natural Beauty: Nationally designated area for its high landscape quality (AONB). Sites within this area will not be automatically discounted as the area is home to a number of sustainable communities. Detailed assessments will be required to assess any potentially harmful impacts on the landscape. Further information can be found in the AONB Management Plan on Denbighshire Council s website. Is the site within the AONB? Is it likely to impact on the landscape character? Protected Habitats & Species: Statutorily designated sites are the most important for biodiversity and have legal protection. Any site falling within or in close proximity a designated site, and likely to have an adverse impact upon it will be discounted at this stage. Habitats and species listed in Local biodiversity action plans and Section 94 of the NERC Act will also be taken into account. All other sites will be assessed in terms of any potential impacts they have on nearby designated sites. Locally designated sites will not cause potential development sites to be discounted but there presence will be highlighted and will be a factor in any detailed proposals. The ability of sites to provide green corridors and linkages between wildlife habitats and species will also be a consideration. A list of protected sites and species can be found on the following website: Is the site in or adjoining any of the protected habitats or any known protected species on the site? Topography: The form of a site (i.e. slope) will be a consideration in assessing potential development sites. Any sites with very difficult terrain that cannot be overcome with reasonable mitigation measures will be discounted at this stage. The potential of a site to contribute to sustainable building management through its aspect etc will also be a consideration. Are the topographical characteristics of the site suitable for the proposed development? Best and Most Versatile Agricultural Land: It is a national imperative to protect and conserve the best and most versatile agricultural land. Is the land in agricultural use? Include the classification grade if you know it.
7 Sensitive Built Environment: Denbighshire has a wealth of Listed Buildings and their settings, Scheduled Ancient Monuments, Conservation Areas and Historic Landscapes. Potential development sites that are likely to have a detrimental impact on the special architectural or historic interest of these will be discounted. Will there be an adverse effect on any of the above? Highways Capacity: An adequate access is required to the site or it will not be considered for development. To consider the adequacy of the existing road network to secure the free flow of traffic to and from the site. Is there an existing access to the site, is this adequate and safe, or can a suitable access be created? Will the road network be able to deal with any increased levels of traffic due to the development? Minerals Reserves: Reserves of primary and secondary aggregates and sand and gravel should be protected for future use. Potential development sites that may prevent their future extraction have been discounted at this stage. Are there any known mineral reserves in the area? Stage 3 Sustainability issues Community Facilities and Infrastructure: Preference will be given to potential development sites can be served by existing community facilities. These facilities may include: o Shop / Post office o School (Primary and Secondary) o Public house o Place of worship o Community meeting place. Potential development sites within settlements that do not have any of the above services or they are not within a reasonable walking distance, will be considered to be unsustainable and sites will be discounted at this stage. In addition there must be adequate presence and capacity of infrastructure such as water supply, sewage treatment works, electricity, telephone. It can be expensive to move or divert infrastructure from the site and this could hamper deliverability. Is there infrastructure in place locally? Are there sufficient local facilities to support the occupants of the proposed development? Do any of these pose a constraint on the site?
8 Accessibility: Every effort must be made to try to locate new developments so as to reduce reliance on the private car and promote other modes of transport such as walking, cycling and public transport. In some of the more remote areas of the County public transport provision is too inadequate to consider it as a viable alternative to the private car for daily use. The presence of a bus or rail service however does provide an alternative for some trips and will be considered. Settlements with no regular access to public transport and no community facilities will be considered unsustainable and potential development sites discounted at this stage. Is the site within walking distance to the public transport network (e.g. bus stops, railway station)? Welsh Language and Culture: The Local Development Plan seeks to retain the County s bilingual distinctiveness. Maintaining the Welsh language and culture through the whole of the County is part of the Plan vision. The Council recognises that the exact effect of an individual development on language over a period of time is a difficult issue to separate and analyse. The scale of development will determine the likely impact on community life. The issue can be addressed by viewing communities in a holistic manner, giving due regard to language as an element which is an integral part of community life and activities within it. How will the development, by virtue of its size and type, lead to increased in-migration and/or out- migration of certain age groups? Will it impact on existing businesses, jobs or local diversity? Can you envisage any potential social inequality within the Welsh speaking community? Consistency with national and regional planning policy, Sustainability Appraisal/ Strategic Environmental Assessment and Habitats Regulations Appraisal. This is a requirement of European regulations. You are advised to use the Local Development Plan Sustainability Appraisal (SA) Framework (see below) to test the sustainability impacts of the site. This Sustainability Appraisal Framework gives guide questions (Assessment Rationale) for each Sustainability Appraisal Objective on which you can base your response. There are 18 Sustainability Appraisal Objectives in total. A full version of the Sustainability Appraisal (Chapter 5 Sustainability Appraisal Framework) can be found on the Denbighshire website Sustainability Appraisal Framework Code SA Objective Guide Questions Assessment response 01 Ensure the housing needs of the community are met Will it increase or decrease the supply of homes appropriate to local needs? 02 Promote community health and well-being Would the homes be affordable? Will it directly improve access to health facilities? Will it indirectly improve health for all? Will it have indirect or longerterm effects upon health?
9 03 Promote safer neighbourhoods and contribute to a reduction in the fear of crime 04 Enhance existing and promote the development of high quality recreation, leisure and open space and provide opportunities for people to experience and respect the value of the natural environment 05 Improve accessibility to education, employment, health, homes and community services for all sectors of the community through modes of transport other than the private car Secondary consideration: reduce air pollution by travel and ensuring homes are of a decent standard. Will it engender a sense of safety, reduce crime, and fear of crime? (such as additional lighting, CCTV)? Will it seek to deliver an increase in the range and available community facilities (places to discourage incidences of antisocial behaviour and opportunistic crime)? Will it directly or indirectly improve the quality and range of recreation facilities, accessible countryside and greenspace, parks, open spaces and natural reserves through additional provision? Additionally will it improve community safety and security measures? Will it directly (through new or significantly enhanced provision) or indirectly (through improved transport links) increase accessibility to employment opportunities and the following public services (such as schools; health and social facilities; nurseries; further education). Will it promote sustainable modes of transport, or promote the use of such modes and restrict the use of cars? Will it reduce traffic levels in the County? Anti-poverty considerations; Adult poverty: Increase affordability of homes, reduce poor quality living, regeneration, employment opportunity, fuel poverty (to do with energy efficiency). 06 Protect and enhance the Welsh Language and culture, including Child poverty: Access to play space. Will it protect and enhance the Welsh language and cultural traditions (landscape, people, buildings, materials, statues,
10 the County s heritage assets. 07 Support County economic development and regeneration, including the provision of opportunities for rural diversification. 08 Maintain and enhance the vitality and viability of town and rural centres 09 Make the best use of previously developed land and existing buildings in locations served by sustainable transport modes 10 Safeguard soil quality and function and maintain long term productivity of agricultural land 11 Protect and enhance all international, national and locally designated nature conservation sites, protected species and geo-diversity sites and avoid their damage or fragmentation. Protect, enhance and create appropriate wildlife habitats in urban and rural areas thus enhancing biodiversity heritage assets (buildings, sites, artefacts)? Will it support maintaining and extending the range of wealth generating activities? (retail, leisure, recreation and tourism in addition to business and educational facilities) Will it encourage rural diversification and the overall quality and attractiveness of the area? Will it cope with climate change? Will it be successful in reducing the number of vacant retail units in town and rural centres as well as adding to the diversity of town and rural centres through new development? Does it consider adaptation or mitigation to climate change? Will it ensure the best use of land and buildings in locations served by sustainable transport modes? Will it indirectly effect improvement to accessibility since this can allow more intensive land uses? Does it consider the wildlife value of some Previously Developed Land? Will it reduce or increase the chances of soil contamination? Safeguard agricultural soil quality (particularly the best and most versatile land (grades 1, 2 and 3A in the national classification)? Reduce land-take? Will it have a positive or negative effect on internationally and nationally designated sites and locally important habitats and species (either through fragmentation, proximity or disturbance effects)? Will it have a positive or negative effect on geological sites? Will it have a positive effect on non-designated habitats and species (e.g. through increased
11 12 Preserve and enhance landscape character across the County, particularly the Area of Outstanding Natural Beauty. 13 Protect and improve the water quantity and quality of inland and coastal waters 14 Minimise the vulnerability to flooding and ensure new development does not increase flood risk 15 Protect and improve air quality 16 Contribute to a reduction in greenhouse gas emissions (especially connectivity or reduced disturbance). Will it directly or indirectly maintain and enhance the landscape quality of the County, including historic landscape features (e.g. field boundaries and hedgerows/hedge, banks). Will it impact on LANDMAP studies (landscape quality and quantity of areas)? (see Does it promote high quality design that reflects local distinctiveness and materials? Will it have positive or negative effects on maintaining and improving the quality of surface, ground and coastal waters? Is there adequate supply? Will it encourage a responsible approach to aspects such as surface water run-off from impermeable surfaces? Will it have positive or negative effects on tidal (sea) and fluvial (river) flood risk either; 1) directly through proximity within areas of flood risk, 2) indirectly through exacerbation of effects downstream. Will it result in an increase/decrease of flooding and other climate change effects e.g. by using sustainable drainage systems and reducing greenhouse gas emissions? Will it reduce or increases in traffic- and industry- derived pollutant concentrations. Will it promote the use of more sustainable modes of transport? Reductions in private vehicle use? Sustainable location of industrial activities (as near the workforce as possible)? Will it result in reductions or increases of greenhouse gas emissions? This includes a consideration of emissions
12 CO 2) by increasing energy conservation and efficiency in development and support increased provision and use of renewable energy 17 Protect mineral resources from development that would preclude extraction 18 Encourage waste reduction, reuse, recycling and recovery and regional selfsufficiency arising from buildings, land use change and transport. Will it directly reduce energy demand by encouraging energy efficiency? Will it directly encourage the use of renewable energy technologies in new developments and renewable energy generation? Will it prevent development from occurring that would preclude mineral extraction (lime or sand & gravel)? Will it directly reduce the generation of waste and increase recycling of waste, e.g. by providing recycling facilities within and near to homes? Will it consider construction waste reduction, re-use and recycling?
St Albans Local Development Framework. Core Strategy: Spatial Strategy Options
Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September
The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1
Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision
Sustainability Appraisal of the Lichfield Local Plan: Strategy
Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
City Plan Part 1 Sustainability Appraisal Summary February 2012
City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and
Carmarthenshire LDP Site Assessment Proforma
Carmarthenshire LDP Site Assessment Proforma 1. Site Details Ref: SC1/h1 Site Ref (where applicable): Location: Parc Puw, Drefach Felindre Site Area (Ha): Eisting Use* *if candidate site as proposed by
Site Alternative Deliverability Report. SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable. Local Development Plan
Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 034 Ty Nant, Groesffordd Resubmission: Deliverable SALT 034 Ty Nant Groesffordd (Llanfrynach) Existing
2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning
2 Integrated planning Chapter 2 Integrated Planning This chapter contains the following sections: Section No. Topic 2.1 Introduction to integrated planning 2.2 Transit s Integrated Planning Policy 2.3
Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms
Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable
approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners
Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils
National Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.
15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places
Site Alternative Deliverability Report. SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable. Local Development Plan
Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable SALT 033 Former Mid Wales Hospital
Advice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
Living & Working Managing Natural Resources and Waste
Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
NAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
2010 Salida Community Priorities Survey Summary Results
SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive
Provincial Policy Statement
2014 Provincial Policy Statement Under the Planning Act Ontario.ca/PPS For more copies of this document, in either English or French, please contact: Ministry of Municipal Affairs and Housing Provincial
Chapter 2 Spatial Portrait
15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take
LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION
1 LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION STATEMENT BY CROUDACE STRATEGIC LIMITED ISSUES 7 AND 8 STRATEGIC SITES (POLICIES SP5/SP6)
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789
National Planning Policy Framework
National Planning Policy Framework www.communities.gov.uk community, opportunity, prosperity National Planning Policy Framework March 2012 Department for Communities and Local Government Crown copyright,
Rural dwellings including bed and breakfast accommodation
MORNINGTON PENINSULA SHIRE COUNCIL - INTERIM POLICY - JUNE 2011 Rural dwellings including bed and breakfast accommodation This policy applies to the use and development of land for a dwelling, including
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
3.0 Planning Policies
3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-
CHANGE OF USE FROM AGRICULTURE TO A USE FOR CARAVAN STORAGE COMPOUND AND OPERATIONAL DEVELOPMENT.
2014/1898 BIRMINGHAM ROAD MERIDEN Application No: Ward/Area: Location: 2014/1898/S MERIDEN BIRMINGHAM ROAD MERIDEN Date Registered: 21/11/2014 Applicant: Proposal: MR VAUGHN WILLIAMS CHANGE OF USE FROM
PLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
Planning Policy Statement 2015
Planning Policy Statement 2015 Introduction It is just over 50 years since national planning legislation was first implemented in Ireland. The Government wishes to reaffirm its strong belief in the value
The NSS - Rural Development and Rural Settlement
The NSS - Rural Development and Rural Settlement Spatial Planning Unit, Department of the Environment and Local Government, February 2003 Introduction. This paper has three main parts that outline: (1)
23.1 RENEWABLE ENERGY
Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.
Proposed LDP Settlement Strategy Appraisal
APPENDIX B Proposed LDP Settlement Strategy Appraisal 1. Introduction This statement seeks to explain and justify the rationale for adopting the proposed settlement strategy in the South Ayrshire Proposed
Relaxation of planning rules for change of use from commercial to residential
Relaxation of planning rules for change of use from commercial to residential Summary of consultation responses and the Government s response to the consultation Relaxation of planning rules for change
Healthcare and New Housing Development
Healthcare and New Housing Development Supplementary Guidance SG11 Consultative Draft SG11 SG11 Supplementary Guidance A suite of supplementary guidance (SGs) is currently being produced by the Council.
The Green Belt A Guide for Householders
The Green Belt A Guide for Householders Introduction Much of Mole Valley lies within the Metropolitan Green Belt. This leaflet outlines the purpose, importance and characteristics of the Green Belt and
22.01 SETTLEMENT 24/04/2014 C73
22.01 SETTLEMENT 24/04/2014 C73 22.01-1 Urban Growth and Development 24/04/2014 C73 This policy applies to the urban areas and fringes of Portland, Heywood, Casterton, Dartmoor, Nelson, Cape Bridgewater,
Car Club Strategy. London Borough of Richmond upon Thames
Car Club Strategy London Borough of Richmond upon Thames December 2006 Page 1 of 16 Contents 1.0 Introduction 2.0 Policy Context 3.0 Sustainable Travel In Richmond 4.0 Car Clubs 5.0 Car Clubs in Richmond
SUBMISSION Performance Benchmarking of Australian Business Regulation: Planning, Zoning and Development Assessments
SUBMISSION Performance Benchmarking of Australian Business Regulation: Planning, Zoning and Development Assessments INTRODUCTION Cement Concrete and Aggregates Australia made a preliminary submission to
Adapting Northern Adelaide - Submission towards the new Climate Change Strategy for South Australia
16 October 2015 Adapting Northern Adelaide Project City of Salisbury and City of Playford Polaris Innovation Centre Mawson Lakes SA 5095 Climate Change Team, GPO Box 1047 Adelaide SA 5001 [email protected]
Decision Due Date: 18 April 2015
App.No: 150195 Decision Due Date: 18 April 2015 Ward: Devonshire Officer: Richard Elder Site visit date: 8 May 2015 Site Notice(s) Expiry date: 27 March 2015 Neighbour Con Expiry: 27 March 2015 Press Notice(s):
Carbon Management Plan
E-2015-02-02 Addendum Carbon Management Plan Date: 14 May 2014 Owners: Approval: K.W.Bullimore & M.Sackett A.Burrell Executive Summary This document sets out the Carbon Management Plan (CMP) for The Open
Rochdale Unitary Development Plan Review: 2001-2016: Inspector s Report
CHAPTER 11: LEISURE AND TOURISM G/LT/1 (Part One Policy) Leisure and Tourism Objections: 215/3 Sport England 215/4 Sport England 98/16 Countryside Agency North West Key Issues: should the policy be more
Draft Winchester District Local Plan Part 2. Recommended Responses to Issues Raised WALTHAM CHASE
Draft Winchester District Local Plan Part 2 Recommended Responses to Issues Raised WALTHAM CHASE 1. A summary of all the representations on the draft Local Plan directly relating to Waltham Chase was presented
Relating to Supplementary Guidance Rural Development (RD) 1 and Special Types of Rural Land (STRL) type 2.
PLANNING ADVICE 13/2012 HOUSING AND BUSINESS DEVELOPMENT IN THE COUNTRYSIDE AND GREENBELT Relating to Supplementary Guidance Rural Development (RD) 1 and Special Types of Rural Land (STRL) type 2. CONTENTS
3.0 Table of Development Note: This table must be read in conjunction with the explanation provided in Part 5, Division 1, Chapter 2 Using Domains.
Part 5 Division 2 Chapter 2 Domains Domains Park Living 1.0 Intent The purpose of this domain is to provide a variety of opportunities for low density residential activity within areas of semi-rural landscapes,
Vote on for a: PUTTING PEOPLE FIRST
Vote on for a: PUTTING PEOPLE FIRST Guildford Borough Council Liberal Democrat Manifesto May 2015 A Fair Local Plan Liberal Democrat councillors aim to develop a fair Local Plan to raise the quality of
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
Key Themes for Langham s Neighbourhood Plan
2014 Key Themes for Langham s Neighbourhood Plan What is a Neighbourhood Plan? The concept of a Neighbourhood Plan was introduced via the Localism Act of 2011. It gives communities the right to shape the
FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT
FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT Canterbury City Council January 2008 1 APPLICATION OF THE PPS25 SEQUENTIAL AND EXCEPTION TESTS 1.0
SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
Site Specific Policies Local Plan
A N E W V I S I O N F O R D E V E L O P I N G W A K E F I E L D D I S T R I C T Site Specific Policies Local Plan Local Development Framework www.wakefield.gov.uk/ldf Site Specific Policies Local Plan
LONDON BOROUGH OF HAVERING
LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN 2015-2019 Sections LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN CONTENTS 1 Introduction and Context 2 Corporate Vision 3 Policy
Chapter 9: Transportation
Chapter 9: Transportation What is this chapter about? The goals and policies in this chapter convey the City s intent to: Create a coordinated, efficient, and more affordable multimodal transportation
73 MAIN STREET SHIRLEY SOLIHULL
2014/58/S 73 MAIN STREET SHIRLEY Application No: Ward/Area: Location: 2014/58/S BLYTHE 73 MAIN STREET SHIRLEY SOLIHULL Date Registered: 13/01/2014 Applicant: Proposal: WILLIAM HILL ORGANIZATION LTD CHANGE
BIDFORD PARISH NEIGHBOURHOOD PLAN NEIGHBOURHOOD DEVELOPMENT PLAN. Consultation Document on Draft Policies 25th May 2015 6th July 2015
BIDFORD ON-AVON PARISH NEIGHBOURHOOD PLAN NEIGHBOURHOOD DEVELOPMENT PLAN Consultation Document on Draft Policies 25th May 2015 6th July 2015 www.bidfordonavon-pc.gov.uk PLEASE FEEL FREE TO MAKE YOUR COMMENTS
Chapter 3: Settlement
Chapter 3: Settlement 3.1 This Chapter is concerned with the settlement pattern of Rutland i.e. the size, character and distribution of towns and villages. It considers the role of these settlements for
Appendix A. DM Document SA Report Appendix A
Document SA Report Appendix A Appendix A Potential conflicts between the SA framework objectives and the Development Management Policies DPD spatial planning objectives South Norfolk SA Framework Objective
Camden Development Policies
Camden Local Development Framework Camden Development Policies Adoption version 2010 1 CAMDEN LOCAL DEVELOPMENT FRAMEWORK CAMDEN DEVELOPMENT POLICIES Camden Development Policies 2010 Introduction 1. Location
State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015
State of Qatar Ministry of Environment Intended Nationally Determined Contributions (INDCs) Report November 19 th, 2015 State of Qatar is pleased to submit its Intended Nationally Determined Contributions
COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited
COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation
PLANNING & REGULATION COMMITTEE 16 JANUARY 2012
Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe ([email protected]) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK
PLANNING POLICY 3.3.5
PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family
How To Write A New Bill On Flood Management In Scotland
Scottish Environment LINK is the forum for Scotland's voluntary environment organisations representing a broad spectrum of environmental interests with the common goal of contributing to a more environmentally
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM 1. Applicant Details (See guidance note 1) 2. Agent Details Please complete if the applicant has an agent (See guidance note 2) * Title: * Forename:
2012 No. 767 TOWN AND COUNTRY PLANNING, ENGLAND. The Town and Country Planning (Local Planning) (England) Regulations 2012
STATUTORY INSTRUMENTS 2012 No. 767 TOWN AND COUNTRY PLANNING, ENGLAND The Town and Country Planning (Local Planning) (England) Regulations 2012 Made - - - - 8th March 2012 Laid before Parliament 15th March
Iowa Smart Planning. Legislative Guide March 2011
Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The
Planning Policy and Guidance on Flooding and Coastal Erosion
Planning Policy and Guidance on Flooding and Coastal Erosion James Hooker (MRTPI) Senior Planning Manager Welsh Government RTPI Cymru - Water and Flooding Seminar Tuesday 20 th November 2012 Overview
Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council
APPENDIX 1 Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council Introduction: The purpose of this guide is to set out some parameters for assessing planning applications
10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)
HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS
Renfrewshire Strategic Flood Risk Assessment
Background Report Renfrewshire Strategic Flood Risk Assessment 16 Renfrewshire Local Development Plan Main Issues Report December 2011 Renfrewshire Local Development Plan Background Report X Renfrewshire
The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles
The Roaches Asset Management Review Draft Objectives for External Consultation Fundamental Principles the area of land under review is the Roaches Estate and Gradbach Car Park as shown on the attached
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions
PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue
Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
Environmental Impact Assessment of Forestry Projects
Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer
Working towards a Core Strategy for Wiltshire Topic paper 11: Green infrastructure
Wiltshire Local Development Framework Working towards a Core Strategy for Wiltshire Topic paper 11: Green infrastructure Wiltshire Core Strategy Consultation January 2012 Wiltshire Council Information
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?