Cryogenic Current Comparator Status at GSI/FAIR -

Size: px
Start display at page:

Download "Cryogenic Current Comparator Status at GSI/FAIR -"

Transcription

1 Cryogenic Current Comparator Status at GSI/FAIR -

2 Outline Overview and timeline of the FAIR project at GSI Cryogenic Current Comparators as German In-Kind to FAIR CCCs in HEBT section of FAIR CCC inside Collector Ring CR Testbed for CCC inside Results of the recent CCC beam tests see Febin s presentation

3 GSI and the FAIR Modularized Start Version Existing GSI facility: UNILAC & SIS18 as injectors p-linac: high current 70 ma, 70 MeV UNILAC: SIS100: Length: 120 Superconducting, m 100 Tm, Energy: MeV/u GeV/u, high current operation p to U p: , U 28+ : /pulse HEBT: fast & slow extraction, low & high currents HESR HEBT SIS100 and SIS300 S-FRS S-FRS: production of rare-isotope beams (RIB) CR SIS18: 100 m RESR CR: stochastic cooling of RIB and pbar Circumference: NESR 216 m HESR: storage and acceleration of pbar to 15 GeV/u Energy up to 2 GeV/u Not included in Modularized Start Version: acceleration of all ion species SIS300: 300 Tm, acceleration up to 30 GeV/u (protons to uranium) RESR: NESR: accumulation of pbar, deceleration of RIB versatile experimental ring for stable ions, RIB, pbar cooling, gas-target, e-a collider 3

4 Facility for Antiproton & Ion Research Nuclear Structure & Astrophysics (Rare-isotope beams) Hadron Physics (Stored and cooled 14 GeV/c anti-protons) p-linac SIS18 SIS100/300 QCD-Phase Diagram (HI beams 2 to 45 GeV/u) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) HESR Rare-Isotope Production Target Anti-Proton Production Target Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) CR & RESR Cryring Materials Science & Radiation Biology (Ion & antiproton beams) 100 m NESR Accelerator Physics Courtesy: Ingo Augustin 4

5 FAIR Experiments CBM APPA Super-FRS PANDA Courtesy: Ingo Augustin NuSTAR 5

6 Satellite s View Google Earth for FAIR Courtesy: Ingo Augustin 6

7 ...closing in Courtesy: Ingo Augustin 7

8 MSV Civil Construction Synchrotrons: 1.1 km HESR: 0.6 km With beamlines: 3.2 km Existing SIS 18 Total area > m 2 Area buildings ~ m 2 Usable area ~ m 2 Volume of buildings ~ m 3 Substructure:~ 1500 pillars, up to 65 m deep Courtesy: Ingo Augustin 8

9 ...with complex interior Central Switchyard Building down to 18 m below ground Courtesy: Ingo Augustin 9

10 Timeline MSV Submission of construction application 7 Start Site preparation 8 First civil construction contracts 9 Building of accelerator & detector components 10 Civil construction partly finished Start installing & commissioning accelerator and detector components Start commissioning with beam Courtesy: Ingo Augustin 10

11 Project planning work package structure 6 Machine projects GSI & FZJ (HESR) 102 Work packages 262 MSP project plans 5 MSP plans for buildings 4 Experiments 51 Work packages 30 MSP experiment plans In addition: 72 MSP department plans (general dep. tasks without PSP Code) Courtesy: O. Kester

12 Machines & Work Packages Courtesy: O. Kester

13 German Inkinds CCC as German Inkind assigned to GSI as German shareholder of the FAIR project.

14 IKRB-Decision, 20 Feb 2013 On GSI contributions to HEBT beam diagnostics: The IKRB recommends to the Council to assign the HEBT beam diagnostics components with the specified PSP codes (all from CB version 6.12) to the German Shareholder GSI as in-kind contribution: , , , , , , , , , , , , , , , , , , , , , For information: The corresponding in-kind contract is planned to be ready for signing during the 2nd quarter of 2015.

15 IKRB-Decision, 20 Feb 2013 On GSI contributions to S-FRS and CR beam diagnostics: The IKRB recommends to the Council to assign the S-FRS and CR beam diagnostics components with the specified PSP codes (all from CB version 6.13) to the German Shareholder GSI as in-kind contribution: , , , , , , , , , , , , , , , , , For information: The corresponding in-kind contract is planned to be ready for signing during the 4th quarter of 2015.

16 German In-Kind: CCC for HEBT, CR HEBT: 4 CCC installations foreseen for measurement of slowly extracted beams HEBT Cryo Current Comparator HEBT Cryo Current Comparator 4 HEBT Detector 4 HEBT Vacuum Chamber 4 HEBT Mechanics 4 HEBT Long Cables 4 HEBT Detector Gas / Cryogenics 4 HEBT Data Acquisition (per channel) 4 CR: 1 CCC for online intensity measurement of circulating beam CR Cryogenic Current Comparator CR Detector 1 CR Vacuum Chamber & Cryostat 1 CR Mechanics - Niobium Shield 1 CR Long Cables 1 CR Detector Gas / Cryogenics 1 CR Data Acquisition (per channel) 1

17 High Energy Beam Transport - HEBT

18 Technical System Design Tunnels and Buildings G017.1 T110 T112 G004A G004 T104 T113 G018 T101 T108N G050 G0 06C T103 T106 with HEBT Beamline T108S G0 07 with HEBT Supply Courtesy: F. Hagenbuck 18

19 Overview - HEBT beamlines- CCC SIS 18 SIS 100 HEBT A CBM SFRSTarg HEBT B HEBT C CCC HESR APPA PP PbarTarg CR Courtesy: F. Hagenbuck

20 HEBT System Design SFRS SIS100/300 DUMP SIS18 Transfergebäude Courtesy: F. Hagenbuck

21 Technical System Design SFRS SFRS DUMP DUMP SIS18 SIS100 SIS18 SIS18 CBM CBM CBM HESR PP/AP SFRSTarg PbarTarg SIS100/300 SIS100/300 CR SIS100/300 SIS100/300 Courtesy: F. Hagenbuck 21

22 Technical System Design SIS18 CBM SIS100/300 SIS100/300 Courtesy: F. Hagenbuck 22

23 CCC Installations in HEBT Beamline Location Extraction type T1S1 T1X1 T1D1 TFF1 SIS18- SIS100 SIS100 extraction SIS100 dump SFRS- Target slow, fast slow, fast slow slow Particle species ions, protons ions,protons ions, protons ions Stage FAIR Startversion (Modules 0-3) CCC CCC CCC T3C1 T3D1 SIS300 extraction SIS300 dump slow slow ions, protons ions, protons Phase B CCC CCC CCC For all 6 beam lines above: minimal Intensity: 10 4 pps maximal intensity: pps Ion p Maximum Beam Current [slow extraction, 1 s] 160 na U µa

24 Example: Slow Extraction to CBM Experiment Reference Production chain for operation in MSV Beam Parameters UNILAC SIS18 SIS100 The Au beam is produced in the following steps: UNILAC Au4+ is produced in the MEVVA source, Au25+ is produced in the UNILAC gas stripper at 1.4 MeV/u, Accelerated in UNILAC to 11.4 MeV/u, Stripping of Au25+ ions to Au65+ ions in the TK Stripper, 4 pulses are produced in ~1 s (2.7 Hz). SIS18 Accelerates each pulse to 1 GeV/u, Needs ~1.6 s for 4 batches (including pre- and postprocessing) as limited by ion source. HEBT transfer and stripping of Au65+ ions to Au79+ ions. SIS100 Injection of 4 batches from SIS18 needs ~1.1 s Acceleration to 11 GeV/u KO-Extraction, spill length 1-10 s Repetition Time ~3-13 s Ion types Au 25+ Au 25+ Au 79+ Time structure Slow extraction Number of ions per pulse Ref. energy [GeV/u] 4 Energy range [GeV/u] 2-11 Transverse emittance RMS [mm mrad] 3x3 Pulse length [s] na na 10 Momentum spread 10-5

25 Collector Ring - CR

26 Progress on the Collector Ring The Technical Design Report of the CR has been updated and approved in February In-kind Review Board (IKRB) meeting ( ) assigns a major part of the CR components (63 %) to Budker Institute of Nuclear Physics (BINP) Contract on transfer of the CR system responsibility to BINP is prepared. After Council decision it can be signed. BINP and GSI make good progress in design and procurement of CR components

27 CR and beam parameters Courtesy: O. Chorniy

28 BD components in CR and electronic room Location of beam diagnostic devices in tunnel Distribution of the DAQ for different components among available racks Courtesy: O. Chorniy

29 Official CR layouts from TDR CR and RESR rings in common building with stochastic cooling lines of the CR Schematic layout of the CR with major installations and its nomenclature. Courtesy: O. Chorniy

30 Collector Ring (CR) RF cavities Stochastic cooling Pick-Up Injection Kicker magnets Stochastic cooling Kickers Courtesy: A. Dolinskii

31 CCC in CR CR scheme and present location of CCC Particles distribution at the present location of CCC. Pbar optic mm diameter Courtesy: O. Chorniy

32 ESR

33 FRS GSI SIS ESR 11 MeV/u UNILAC ESR Courtesy: F. Herfurth GSI Helmholtzzentrum für Schwerionenforschung F. Herfurth "HITRAP GmbH and CRYRING - deceleration of HCI and p-bar"

34 FRS Timeline ESR Start of installations: Now Operation of ion source and injector: End 2014 GSI Complete ring installed: Mid 2015 First test runs with preliminary vacuum conditions: Fall 2015 Machine commissioning + vacuum improvement until spring 2016 first physics experiments SIS 11 MeV/u UNILAC Experiment section ESR Courtesy: F. Herfurth ESR

35 Extraction CRYRING Characteristics Injection Reconfigured from MSL setup Increased circumference ESR/2 = 54 m New injection and extraction schemes Magnetic rigidity: Tm Proton energy range: MeV Intensity range (from injector): <50 ma A/q max (from RFQ): 4 Vacuum: 10-9 (start) mbar (final) Beam pipe diameters: mm Courtesy: F. Herfurth 35

36 Summary & Outlook FAIR project progressing well (acc installation >= 2017) CCCs are part of German in-kind delivered by GSI 4 CCCs inside HEBT, 1 CCC inside CR CRYRING as testbed for CCC development Outlook: CERN-GSI collaboration agreement to be signed soon New partners inside future CCC collaboration (HIJ, IPHT, Supracon and others, mainly in/near Jena) Definition of responsibilies, work packages etc. required Proposal for BMBF-Project (Meeting on Verbundforschung on 8./9. September

37 Additional Slides...

38 Standard Flange NW200

39 Standard Flange NW150

Status And Future Plans. Mitsuyoshi Tanaka. AGS Department.Brookhaven National Laboratory* Upton NY 11973, USA INTRODUCTION

Status And Future Plans. Mitsuyoshi Tanaka. AGS Department.Brookhaven National Laboratory* Upton NY 11973, USA INTRODUCTION 6th Conference on the Intersections of Particle & Nuclear Physics Big Sky, Montana May 27-June 2, 1997 / BNL-6 40 4 2 c0,lvf- 7 70 5 The BNL AGS Accelerator Complex Status And Future Plans Mitsuyoshi Tanaka

More information

Activities at the University of Frankfurt (IAP)

Activities at the University of Frankfurt (IAP) Activities at the University of Frankfurt (IAP) Holger Podlech Ulrich Ratzinger Oliver Kester Institut für Angewandte Physik (IAP) Goethe-Universität Frankfurt am Main H. Podlech 1 Development of 325 MHz

More information

AUTOMATION OF OPERATIONS ON THE VEPP-4 CONTROL SYSTEM

AUTOMATION OF OPERATIONS ON THE VEPP-4 CONTROL SYSTEM 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO1.072-7 (2005) AUTOMATION OF OPERATIONS ON THE VEPP-4 CONTROL SYSTEM A. Bogomyagkov, S. Karnaev,

More information

Reliability and Availability Aspects of. the IPHI Project

Reliability and Availability Aspects of. the IPHI Project Reliability and Availability Aspects of the IPHI Project Pierre-Yves Beauvais CEA/DSM/DAPNIA for the IPHI Team 18/02/2002 Pierre-Yves Beauvais, CEA Saclay 1 Table of contents Brief description of IPHI

More information

Development of on line monitor detectors used for clinical routine in proton and ion therapy

Development of on line monitor detectors used for clinical routine in proton and ion therapy Development of on line monitor detectors used for clinical routine in proton and ion therapy A. Ansarinejad Torino, february 8 th, 2010 Overview Hadrontherapy CNAO Project Monitor system: Part1:preliminary

More information

Results: Low current (2 10 12 ) Worst case: 800 MHz, 12 50 GeV, 4 turns Energy oscillation amplitude 154 MeV, where

Results: Low current (2 10 12 ) Worst case: 800 MHz, 12 50 GeV, 4 turns Energy oscillation amplitude 154 MeV, where Status Focus has shifted to a neutrino factory Two comprehensive designs of acceleration (liancs, arcs) Jefferson Lab, for Fermilab Study CERN (Keil et al.) Jefferson Lab study Low (2 10 12 ) charge per

More information

OVERVIEW OF PROTON DRIVERS FOR NEUTRINO SUPER BEAMS AND NEUTRINO FACTORIES*

OVERVIEW OF PROTON DRIVERS FOR NEUTRINO SUPER BEAMS AND NEUTRINO FACTORIES* FERMILAB-CONF-06-213-AD OVERVIEW OF PROTON DRIVERS FOR NEUTRINO SUPER BEAMS AND NEUTRINO FACTORIES* W. Chou #, Fermilab, Batavia, IL 60510, U.S.A. Abstract There has been a world-wide interest in Proton

More information

FCC 1309180800 JGU WBS_v0034.xlsm

FCC 1309180800 JGU WBS_v0034.xlsm 1 Accelerators 1.1 Hadron injectors 1.1.1 Overall design parameters 1.1.1.1 Performance and gap of existing injector chain 1.1.1.2 Performance and gap of existing injector chain 1.1.1.3 Baseline parameters

More information

10 Project Costs and Schedule

10 Project Costs and Schedule II-367 10 Project Costs and Schedule 10.1 Overview The investment costs given in this chapter include all components necessary for the baseline design of TESLA, as described in chapters 3 to 9. Not included

More information

Status of High Current Ion Sources. Daniela Leitner Lawrence Berkeley National Laboratory

Status of High Current Ion Sources. Daniela Leitner Lawrence Berkeley National Laboratory http://ecrgroup.lbl.gov Status of High Current Ion Sources Daniela Leitner Lawrence Berkeley National Laboratory October, 27th, 2003 1 Content Overview of available high current sources Requirements for

More information

MSU View of RIA R&D Priorities. R.C. York August 2003

MSU View of RIA R&D Priorities. R.C. York August 2003 MSU View of RIA R&D Priorities R.C. York August 2003 1 Guiding Principles Highest priority given to those technical issues that if unresolved pose a significant risk to project success as measured by:

More information

Large Systems Commissioning

Large Systems Commissioning Large Systems Commissioning, DESY CAS Vacuum in Accelerators Platja D`Aro, May 21, 2006 Special thanks to O. Gröbner 1 Outline Introduction Pump Down and Leak Check Components Check Bake Out Interlocks/Safety

More information

Status of Radiation Safety System at

Status of Radiation Safety System at Status of Radiation Safety System at Taiwan Photon Source Joseph C. Liu Radiation and Operation Safety Division National Synchrotron Radiation Research Center, Taiwan NSRRC layout 1.5 GeV, 120m, 400 ma

More information

Institute of Accelerator Technologies of Ankara University and TARLA Facility

Institute of Accelerator Technologies of Ankara University and TARLA Facility Institute of Accelerator Technologies of Ankara University and TARLA Facility Avni Aksoy Ankara University avniaksoy@ankara.edu.tr On behalf of IAT & TARLA Team Contents Brief history of TAC project Institute

More information

Damping Wigglers in PETRA III

Damping Wigglers in PETRA III Damping Wigglers in PETRA III WIGGLE2005, Frascati 21-22.2.2005 Winni Decking, DESY-MPY Introduction Damping Wiggler Parameters Nonlinear Dynamics with DW Operational Aspects Summary DESY and its Accelerators

More information

K O M A C. Beam Commissioning of 100-MeV KOMAC Linac. Korea Multi-purpose Accelerator Complex 양 성 자 가 속 기 연 구 센 터

K O M A C. Beam Commissioning of 100-MeV KOMAC Linac. Korea Multi-purpose Accelerator Complex 양 성 자 가 속 기 연 구 센 터 LINAC14, Geneva Beam Commissioning of 100-MeV KOMAC Linac Yong-Sub Cho for KOMAC accelerator team September 2, 2014 KOMAC, KAERI 0 Outline KOrea Multi-purpose Accelerator Complex Facility Introduction

More information

Study of electron cloud at MI and slip stacking process simulation

Study of electron cloud at MI and slip stacking process simulation Study of electron cloud at MI and slip stacking process simulation Alexandr S. Valkovich Purpose 1.Understand the slip stacking process which happens in the Main Injector. 2. Calculation of bunch distortion

More information

Mission: Cure, Research and Teaching. Marco Pullia Cnao design and commissioning

Mission: Cure, Research and Teaching. Marco Pullia Cnao design and commissioning CNAO design and commissioning Marco Pullia, CNAO Foundation What is the CNAO Foundation No profit organisation (Foundation) created with the financial law 2001 to build the national center for hadrontherapy

More information

Results from first tests of TRD prototypes for CBM. DPG Frühjahrstagung Münster 2011 Pascal Dillenseger Institut für Kernphysik Frankfurt am Main

Results from first tests of TRD prototypes for CBM. DPG Frühjahrstagung Münster 2011 Pascal Dillenseger Institut für Kernphysik Frankfurt am Main Results from first tests of TRD prototypes for CBM DPG Frühjahrstagung Münster 2011 Pascal Dillenseger Institut für Kernphysik Contents Overview of the CBM experiment CBM-TRD General TRD requirements The

More information

HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON

HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON 18 th International Conference on Cyclotrons and their Applications, Sicily, 2007 Vasile Sabaiduc, Project Manager, RF Senior Engineer Advanced Cyclotron

More information

THE TESLA TEST FACILITY AS A PROTOTYPE FOR THE GLOBAL ACCELERATOR NETWORK

THE TESLA TEST FACILITY AS A PROTOTYPE FOR THE GLOBAL ACCELERATOR NETWORK THE TESLA TEST FACILITY AS A PROTOTYPE FOR THE GLOBAL ACCELERATOR NETWORK K. Rehlich, DESY, Hamburg, Germany Abstract The next generation of large accelerators facilities will be produced and operated

More information

The ithemba LABS Radioactive Beam Project. R A Bark

The ithemba LABS Radioactive Beam Project. R A Bark The ithemba LABS Radioactive Beam Project R A Bark Scientific Committee Local Committee Rob Bark Krish Bharuth-Ram Pete Jones Steve Karataglidis Kobus Lawrie Rudzani Nemutudi Rudolf Nchodu Paul Papka Carlos

More information

World-first Proton Pencil Beam Scanning System with FDA Clearance

World-first Proton Pencil Beam Scanning System with FDA Clearance Hitachi Review Vol. 58 (29), No.5 225 World-first Proton Pencil Beam Scanning System with FDA Clearance Completion of Proton Therapy System for MDACC Koji Matsuda Hiroyuki Itami Daishun Chiba Kazuyoshi

More information

& Tunnel Cross Section

& Tunnel Cross Section CLIC workshop Working group: Two beam hardware and Integration ti CLIC Civil Engineering Layouts & Tunnel Cross Section John Osborne TS-CE Acknowledgements : C.Wyss, J-L Baldy, N.Baddams 17 October 2007

More information

Development and Experimental Performance Evaluation of a Dose-Rate meter for Pulsed Beam.

Development and Experimental Performance Evaluation of a Dose-Rate meter for Pulsed Beam. 5 th International Workshop on Radiation Safety at Synchrotron Radiation Sources Development and Experimental Performance Evaluation of a Dose-Rate meter for Pulsed Beam. A. Vascotto 1, K. Casarin 1, S.

More information

THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES

THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES R. Beunard, GANIL, BP 55027, 14076 CAEN, CEDEX 5, France Abstract The SPIRAL2* project, located at the GANIL** facility in Caen,

More information

The Californium Source Upgrade

The Californium Source Upgrade The Californium Source Upgrade Based on Material presented at the ATLAS Operation s Review December 8-10, 2003 by Guy Argonne National Laboratory & University of Chicago A Laboratory Operated by The University

More information

Project X: A multi-mw Proton Source at Fermilab. Steve Holmes Extreme Beam Lecture Series

Project X: A multi-mw Proton Source at Fermilab. Steve Holmes Extreme Beam Lecture Series Project X: A multi-mw Proton Source at Fermilab Steve Holmes Extreme Beam Lecture Series June 11, 2009 Outline Strategic Context/Evolution of the Fermilab Complex Project X Goals and Initial Configuration

More information

CLIC accelerator and detector

CLIC accelerator and detector CLIC accelerator and detector CLIC/CTF3 accelerator R&D CLIC detector study http://cern.ch/clic-study http://lcd.web.cern.ch/lcd/ Many thanks to Anne Dabrowski, Jean-Pierre Delahaye, Frank Tecker and others

More information

STATUS OF THE SISjESR-FACILITY AT GSI-DARMSTADT

STATUS OF THE SISjESR-FACILITY AT GSI-DARMSTADT Particle Accelerators, 1990, Vol. 32, pp. 83-90 Reprints available directly from the publisher Photocopying permitted by license only 1990 Gordon and Breach, Science Publishers, nc. Printed in the United

More information

Storing and Analyzing Efficiently Big Data at GSI/FAIR

Storing and Analyzing Efficiently Big Data at GSI/FAIR Storing and Analyzing Efficiently Big Data at GSI/FAIR Thomas Stibor GSI Helmholtz Centre for Heavy Ion Research, HPC 8. Mai 2014 Overview GSI/FAIR p-linac SIS100/300 UNILAC SIS18 CBM HESR PANDA Rare Isotope

More information

Industrial Involvement in the Construction of Synchrotron Light Sources

Industrial Involvement in the Construction of Synchrotron Light Sources Industrial Involvement in the Construction of Synchrotron Light Sources M.S. de Jong, Canadian Light Source Inc. European Particle Accelerator Conference 2004-07-07 Introduction Large demand for synchrotron

More information

Beam Instrumentation Group, CERN ACAS, Australian Collaboration for Accelerator Science 3. School of Physics, University of Melbourne 4

Beam Instrumentation Group, CERN ACAS, Australian Collaboration for Accelerator Science 3. School of Physics, University of Melbourne 4 Prototype tests of a wide-band Synchrotron-Light based Beam Pattern Monitor for measuring charge-couple bunch instabilities in High-Energy Particle Accelerator Beams Sophie Dawson2,3, Mark Boland2,4, David

More information

BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN

BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN Abstract BEPC Group, presented by Yingzhi Wu Institute of High Energy Physics, Beijing 100039, P.R. China The luminosity upgrades of the BEPC are briefly reviewed.

More information

9 Project management and organisation

9 Project management and organisation 9 Project management and organisation 9.1 Introduction In accordance with the draft X-Ray Free-Electron Laser (XFEL) legal texts (Convention and Articles of Association): the construction and operation

More information

STUDY OF THE TRANSVERSE BEAM EMITTANCE OF THE BERN MEDICAL CYCLOTRON

STUDY OF THE TRANSVERSE BEAM EMITTANCE OF THE BERN MEDICAL CYCLOTRON Proceedings of IBIC15, Melbourne, Australia - Pre-Release Snapshot 17-Sep-15 1:3 MOPB41 STUDY OF THE TRANSVERSE BEAM EMITTANCE OF THE BERN MEDICAL CYCLOTRON K. P. Nesteruka,, M. Augera, S. Braccinia, T.

More information

Relativistic kinematics basic energy, mass and momentum units, Lorents force, track bending, sagitta. First accelerator: cathode ray tube

Relativistic kinematics basic energy, mass and momentum units, Lorents force, track bending, sagitta. First accelerator: cathode ray tube Accelerators Relativistic kinematics basic energy, mass and momentum units, Lorents force, track bending, sagitta Basic static acceleration: First accelerator: cathode ray tube Cathode C consist of a filament,

More information

The European X-ray Free-Electron Laser: A Truly European Project. Massimo Altarelli. massimo.altarelli@xfel.eu

The European X-ray Free-Electron Laser: A Truly European Project. Massimo Altarelli. massimo.altarelli@xfel.eu The European X-ray Free-Electron Laser: A Truly European Project Massimo Altarelli European X-ray Free-Electron Laser Facility 22607 Hamburg, Germany massimo.altarelli@xfel.eu Important dates in the history

More information

DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I

DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I A.S. Gerasimov, G.V. Kiselev, L.A. Myrtsymova State Scientific Centre of the Russian Federation Institute of Theoretical

More information

LEReC Engineering. J. Tuozzolo, C-AD Chief Mechanical Engineer (LEReC Project Engineer)

LEReC Engineering. J. Tuozzolo, C-AD Chief Mechanical Engineer (LEReC Project Engineer) LEReC Engineering J. Tuozzolo, C-AD Chief Mechanical Engineer (LEReC Project Engineer) Layout, Infrastructure, and Engineering IP 2:00 location - available. Engineering interface issues. Engineering support

More information

LHC MACHINE PROTECTION

LHC MACHINE PROTECTION LHC MACHINE PROTECTION Rossano Giachino, CERN, Geneva, Switzerland Abstract The energy stored in LHC magnets presents a considerable challenge for commissioning even before any beam is injected. Furthermore,

More information

The STAR Project: Southern european Thomson source for Applied Research

The STAR Project: Southern european Thomson source for Applied Research The STAR Project: Southern european Thomson source for Applied Research Dennis T. Palmer, INFN - Milano for the STAR Project Team Channeling 2014 09 Oct 2014 Outline of Talk Introduction Beam Dynamics

More information

Monitoring and Controlling Particle Beams in Real Time

Monitoring and Controlling Particle Beams in Real Time Monitoring and Controlling Particle Beams in Real Time Application Note High-performance digitizers enhance beam quality in advanced applications High-energy particle accelerators are helping researchers

More information

Zero Degree Extraction using an Electrostatic Separator

Zero Degree Extraction using an Electrostatic Separator Zero Degree Extraction using an Electrostatic Separator L. Keller Aug. 2005 Take another look at using an electrostatic separator and a weak dipole to allow a zero degree crossing angle a la the TESLA

More information

Overview of Proton Beam Cancer Therapy with Basic Economic Considerations

Overview of Proton Beam Cancer Therapy with Basic Economic Considerations Overview of Proton Beam Cancer Therapy with Basic Economic Considerations Wayne Newhauser, Ph.D. Proton Therapy Project, Houston Cyclotron 235 MeV 300 na Extraction Channel Radial Probe Energy Degrader

More information

How To Test Antimatter

How To Test Antimatter Dezső Horváth Antimatter FFK-2014, 1-5 December 2014, Dubna, Russia p. 1/24 Antimatter Experiments at CERN Dezső Horváth horvath.dezso@wigner.mta.hu Wigner Research Centre for Physics, Institute for Particle

More information

Status of the FERMI@Elettra Free Electron Laser

Status of the FERMI@Elettra Free Electron Laser Status of the FERMI@Elettra Free Electron Laser E. Allaria on behalf of the FERMI team Work partially supported by the Italian Ministry of University and Research under grants FIRB-RBAP045JF2 and FIRB-RBAP06AWK3

More information

Energy Deposition in MICE Absorbers and Coils

Energy Deposition in MICE Absorbers and Coils in MICE Absorbers and Coils November 2, 2003 Video Conference Page 1 An Application for G4Mice We would like to estimate how much energy is deposited in magnet coils and the hydrogen absorber. Most of

More information

RARE ISOTOPE ACCELERATOR (RIA) PROJECT*

RARE ISOTOPE ACCELERATOR (RIA) PROJECT* RARE ISOTOPE ACCELERATOR (RIA) PROJECT* R.C. York#, Michigan State University, East Lansing, MI 48824 U.S.A. Abstract The proposed Rare Isotope Accelerator (RIA) Project will provide world-class intensities

More information

V K Raina. Reactor Group, BARC

V K Raina. Reactor Group, BARC Critical facility for AHWR and PHWRs V K Raina Reactor Group, BARC India has large reserves of Thorium Critical facility Utilisation of Thorium for power production is a thrust area of the Indian Nuclear

More information

Running in 2011 - Luminosity. Mike Lamont Verena Kain

Running in 2011 - Luminosity. Mike Lamont Verena Kain Running in 2011 - Luminosity Mike Lamont Verena Kain Presentations Many thanks to all the speakers! Experiments expectations Massi Ferro-Luzzi Pushing the limits: beam Elias Métral Pushing the limits:

More information

L E A R. CERN s Low Energy Antiproton Ring. by GORDON FRASER

L E A R. CERN s Low Energy Antiproton Ring. by GORDON FRASER CERN s Low Energy Antiproton Ring L E A R by GORDON FRASER Beam transfer line ganglion at CERN. On the left are feeds from linacs towards the booster, and center, the antiproton ejection line from the

More information

MICE detectors and first results. M. Bonesini Sezione INFN Milano Bicocca

MICE detectors and first results. M. Bonesini Sezione INFN Milano Bicocca MICE detectors and first results M. Bonesini Sezione INFN Milano Bicocca I will speak of the installed beamline PID detectors (TOFes, CKOVs, KL) and only shortly of EMR (to be built)/ the trackers (tested

More information

SIMULATIONS OF ELECTRON CLOUD BUILD-UP AND SATURATION IN THE APS *

SIMULATIONS OF ELECTRON CLOUD BUILD-UP AND SATURATION IN THE APS * SIMULATIONS OF ELECTRON CLOUD BUILD-UP AND SATURATION IN THE APS * K. C. Harkay and R. A. Rosenberg, ANL, Argonne, IL 60439, USA M. A. Furman and M. Pivi, LBNL, Berkeley, CA 94720, USA Abstract In studies

More information

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Laboratory for Particle Physics SUPERCONDUCTIVITY AND CRYOGENICS FOR FUTURE HIGH-ENERGY ACCELERATORS

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Laboratory for Particle Physics SUPERCONDUCTIVITY AND CRYOGENICS FOR FUTURE HIGH-ENERGY ACCELERATORS EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Laboratory for Particle Physics Departmental Report CERN/AT 2007-4 SUPERCONDUCTIVITY AND CRYOGENICS FOR FUTURE HIGH-ENERGY ACCELERATORS Ph. Lebrun High-energy

More information

Machine Protection and Interlock Systems for Circular Machines Example for LHC

Machine Protection and Interlock Systems for Circular Machines Example for LHC Published by CERN in the Proceedings of the Joint International Accelerator School: Beam Loss and Accelerator Protection, Newport Beach, US, 5 14 November 2014, edited by R. Schmidt, CERN-2016-002 (CERN,

More information

Beam Dynamics Studies and Design Optimisation of New Low Energy Antiproton Facilities arxiv:1606.06697v1 [physics.acc-ph] 21 Jun 2016

Beam Dynamics Studies and Design Optimisation of New Low Energy Antiproton Facilities arxiv:1606.06697v1 [physics.acc-ph] 21 Jun 2016 Beam Dynamics Studies and Design Optimisation of New Low Energy Antiproton Facilities arxiv:606.06697v [physics.acc-ph] 2 Jun 206 Javier Resta-Lopez, James R. Hunt, Carsten P. Welsch Department of Physics,

More information

11th International Computational Accelerator Physics Conference (ICAP) August 19 24, 2012, Rostock-Warnemünde (Germany)

11th International Computational Accelerator Physics Conference (ICAP) August 19 24, 2012, Rostock-Warnemünde (Germany) Numerical Modeling of RF Electron Sources for FEL-Accelerators Erion Gjonaj Computational Electromagetics Laboratory (TEMF), Technische Universität Darmstadt, Germany 11th International Computational Accelerator

More information

Introduction to Hands-on 4 ~Digest of exercise ~

Introduction to Hands-on 4 ~Digest of exercise ~ March.2006, Geant4.v8.0p01 Introduction to Hands-on 4 ~Digest of exercise ~ Toyama National College of Maritime Tech. Tsukasa Aso Image of Hands-on example Z Very simple beamline components and a Target.

More information

FLS 2010 Storage Ring Working Group Session 4: Future ring technology and design issues

FLS 2010 Storage Ring Working Group Session 4: Future ring technology and design issues FLS 2010 Storage Ring Working Group Session 4: Future ring technology and design issues 10:45 11:10 Limits to achievable stability Glenn Decker, APS 11:10 11:35 Stability and alignment of NSLS II magnet

More information

The BESSY HOM Damped Cavity with Ferrite Absorbers. Review of prototype cavity test results, taperedwaveguidesvshomogenouswaveguides

The BESSY HOM Damped Cavity with Ferrite Absorbers. Review of prototype cavity test results, taperedwaveguidesvshomogenouswaveguides The BESSY HOM Damped Cavity with Ferrite Absorbers E. Weihreter / BESSY Review of prototype cavity test results, taperedwaveguidesvshomogenouswaveguides Design of a ferrite loaded ridged circular waveguide

More information

Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator

Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator R. Gupta and M.Harrison, Brookhaven National Laboratory A. Zeller, Michigan State University

More information

HITACHI Proton Beam Therapy System

HITACHI Proton Beam Therapy System HITACHI Proton Beam Therapy System Masumi Umezawa, M.S. Hitachi, Ltd., Hitachi Research Laboratory HITACHI Proton Beam Therapy System Contents 1. Overview of HITACHI 2. HITACHI Proton Beam Therapy and

More information

Status Overview The Australian Synchrotron. Steven Banks Control Systems Group

Status Overview The Australian Synchrotron. Steven Banks Control Systems Group Status Overview The Australian Synchrotron Steven Banks Control Systems Group Where Are We? Where Are We? Where Are We? The Building Development being managed by Major Projects Victoria (MPV) Budget is

More information

Development of a Low Frequency Superconducting RF Electron Gun. September 2010

Development of a Low Frequency Superconducting RF Electron Gun. September 2010 Development of a Low Frequency Superconducting RF Electron Gun Contract DE-FG02-07ER84861 07ER84861 Terry Grimm September 2010 Outline Collaboration Concept Scientific justification Design electromagnetic

More information

CABLE DESIGN AND RELATED ISSUES IN A FAST-CYCLING SUPERCONDUCTING MAGNETS

CABLE DESIGN AND RELATED ISSUES IN A FAST-CYCLING SUPERCONDUCTING MAGNETS CABLE DESIGN AND RELATED ISSUES IN A FAST-CYCLING SUPERCONDUCTING MAGNETS A.D.Kovalenko JINR, Dubna, Russia Abstract Hollow superconducting cables for a fast-cycling synchrotrons are discussed. The essential

More information

Projects and R&D activities

Projects and R&D activities Projects and R&D activities J.M. Jimenez On behalf of the Vacuum, Surface and Coatings Group (VSC) Vacuum, Surface and Coatings group* Mandate Design, construction, operation, maintenance and upgrade of

More information

LLRF. Digital RF Stabilization System

LLRF. Digital RF Stabilization System LLRF Digital RF Stabilization System Many instruments. Many people. Working together. Stability means knowing your machine has innovative solutions. For users, stability means a machine achieving its full

More information

Status of the SOLEIL project Commissioning from Linac to beamlines

Status of the SOLEIL project Commissioning from Linac to beamlines Status of the SOLEIL project Commissioning from Linac to beamlines On behalf of the commissioning team 2 D01-1-CX1/DT/DTC/absorption Y Axis Title 0-200 0 200 400 600 800 1000 1200 1400 X Axis Title 1 Site

More information

Catherine LeCocq, Robert Ruland. February, 2008

Catherine LeCocq, Robert Ruland. February, 2008 Status Report on Alignment Activities at SLAC Catherine LeCocq, Robert Ruland Budget Situation SSRL / SPEAR PEPII / Babar LCLS Instrumentation / Calibration 1 Alignment Activities for SPEAR Ring mapping

More information

MYRRHA Injector Design

MYRRHA Injector Design MYRRHA Injector Design Horst Klein Dominik Mäder, Holger Podlech, Ulrich Ratzinger, Alwin Schempp, Rudolf Tiede, Markus Vossberg, Chuan Zhang Institute for Applied Physics, Goethe-University Frankfurt

More information

Large Hadron Collider am CERN

Large Hadron Collider am CERN The CMS Silicon Tracker Lutz Feld 1. Physikalisches Institut, RWTH Aachen GSI Darmstadt, 18. 4. 2007 Large Hadron Collider am CERN proton proton quarks & gluons circumference 27 km 1200 superconducting

More information

Single photon detection with H8500 MAPMTs for the CBM RICH detector*

Single photon detection with H8500 MAPMTs for the CBM RICH detector* Single photon detection with H8500 MAPMTs for the CBM RICH detector* Christian Pauly for the CBM collaboration Introduction The CBM experiment The CBM RICH detector Single Photon detection with H8500 MAPMTs

More information

The European X-ray Free-Electron Laser Facility European XFEL Massimo Altarelli. www.xfel.eu

The European X-ray Free-Electron Laser Facility European XFEL Massimo Altarelli. www.xfel.eu The European X-ray Free-Electron Laser Facility European XFEL Massimo Altarelli European X-ray Free-Electron Laser Facility 22607 Hamburg, Germany www.xfel.eu The European XFEL 2 Undulator Tunnels First

More information

Status of EVOLVE boiling flow regime experiments

Status of EVOLVE boiling flow regime experiments Status of EVOLVE boiling flow regime experiments M.H. Anderson M.L. Corradini J. Murphy I. Sviatoslavsky M. Sawan APEX TASK IV APEX ELECTRONIC MEETING Feb. 7, 2002 U- Madison of Nuclear Systems Nuclear

More information

Towards large dynamic range beam diagnostics and beam dynamics studies. Pavel Evtushenko

Towards large dynamic range beam diagnostics and beam dynamics studies. Pavel Evtushenko Towards large dynamic range beam diagnostics and beam dynamics studies Pavel Evtushenko Motivation Linacs with average current 1-2 ma and energy 1-2.5 GeV are envisioned as drivers for next generation

More information

A Polarimetry concept for the EDM experiment at COSY

A Polarimetry concept for the EDM experiment at COSY A Polarimetry concept for the EDM experiment at COSY Paul Maanen JEDI Collaboration Physics Institute III B, RWTH Aachen University DPG Frühjahrstagung March 27, 2015 Outline Introduction Detector concept

More information

ESS Cost Book 2013. Affiliation Authors Johan Brisfors ESS Reviewers EPG, EMT ESS Approver James Yeck ESS

ESS Cost Book 2013. Affiliation Authors Johan Brisfors ESS Reviewers EPG, EMT ESS Approver James Yeck ESS Revision 1 (21) State ESS Cost Book 2013 Name Affiliation Authors Johan Brisfors ESS Reviewers EPG, EMT ESS Approver James Yeck ESS The ESS Cost Book 2013 is an annex to the ESS Cost Report April 2013.

More information

HIGH-ENERGY COLLIDER PARAMETERS: e + e Colliders (I)

HIGH-ENERGY COLLIDER PARAMETERS: e + e Colliders (I) 28. High-energy collider parameters 1 HIGH-ENERGY COLLIDER PARAMETERS: e + e Colliders (I) Updated in early 2012 with numbers received from representatives of the colliders (contact J. Beringer, LBNL).

More information

ACCELERATORS AND MEDICAL PHYSICS 2

ACCELERATORS AND MEDICAL PHYSICS 2 ACCELERATORS AND MEDICAL PHYSICS 2 Ugo Amaldi University of Milano Bicocca and TERA Foundation EPFL 2-28.10.10 - U. Amaldi 1 The icone of radiation therapy Radiation beam in matter EPFL 2-28.10.10 - U.

More information

Shielding and Radiation Measurements at ESRF

Shielding and Radiation Measurements at ESRF Shielding and Radiation Measurements at ESRF Radiation Safety Meeting SOLEIL Synchrotron, 18 October 26 P. Berkvens European Synchrotron Radiation Facility Radiation protection policy at the ESRF Storage

More information

Shock wave studies in solid targets

Shock wave studies in solid targets Shock wave studies in solid targets FAIR Super-FRS production targets Synergy with some targets for other accelerator facilities Chris Densham Engineering Analysis Group Layout of Super-FRS target area

More information

Physics and Technology of Particle Accelerators Basics, Overview and Outlook Simone Di Mitri, Elettra Sincrotrone Trieste University of Trieste, Dept. of Engineering 1 Prologue This seminar samples the

More information

Short overview of TEUFEL-project

Short overview of TEUFEL-project Short overview of TEUFEL-project ELAN-meeting may 2004 Frascati (I) Contents Overview of TEUFEL project at Twente Photo cathode research Recent experience Outlook Overview FEL Drive laser Photo cathode

More information

FACET First Beam Commissioning. Jerry Yocky For the FACET commissioning team 21-May-2012 IPAC 2012, New Orleans, LA

FACET First Beam Commissioning. Jerry Yocky For the FACET commissioning team 21-May-2012 IPAC 2012, New Orleans, LA FACET First Beam Commissioning Jerry Yocky For the FACET commissioning team 21-May-2012 IPAC 2012, New Orleans, LA Facility for Advanced accelerator Experimental Tests WHAT IS FACET? The FACET Facility

More information

Solutions Manufacturing Performance

Solutions Manufacturing Performance Solutions Manufacturing Performance Let s partner up for your project At RI Research Instruments we develop, design, manufacture and test high performance components and systems to the needs of our customers

More information

Firsts. A Year of. for US Delivery and Fabrication. December 2015. First Nuclear Grade Hardware Delivered

Firsts. A Year of. for US Delivery and Fabrication. December 2015. First Nuclear Grade Hardware Delivered December 2015 INSIDE: ITER Site Progress From the Project Manager Awards and Procurement Update Project Highlights 2015 Timeline A Year of Firsts for US Delivery and Fabrication US ITER achieved a number

More information

Technical Specification for the Cryogenic Testing of HTS Current Leads

Technical Specification for the Cryogenic Testing of HTS Current Leads Group Ref.: AT-MEL-CF EDMS No.: 44036 The Large Hadron Collider Project IT-3303/AT/LHC Technical Specification for the Cryogenic Testing of HTS Current Leads Abstract This specification concerns the testing

More information

RF SYSTEM FOR VEPP-5 DAMPING RING

RF SYSTEM FOR VEPP-5 DAMPING RING Ó³ Ÿ. 2006.. 3, º 7(136).. 60Ä64 Š 621.384.634.14 RF SYSTEM FOR VEPP-5 DAMPING RING Ye. Gusev, N. Kot, S. Krutikhin, I. Kuptsov, G. Kurkin, I. Makarov, N. Matyash, L. Mironenko, S. Motygin, V. Osipov,

More information

Coupling Impedance of SIS18 and SIS100 beampipe CERN-GSI-Webmeeting

Coupling Impedance of SIS18 and SIS100 beampipe CERN-GSI-Webmeeting Coupling Impedance of SIS18 and SIS100 beampipe CERN-GSI-Webmeeting 23 October 2011 TU Darmstadt Fachbereich 18 Institut Theorie Elektromagnetischer Felder Uwe Niedermayer 1 Contents Motivation / Overview

More information

The commissioning of the LHC: first the technical systems, then the commissioning with beam

The commissioning of the LHC: first the technical systems, then the commissioning with beam The commissioning of the LHC: first the technical systems, then the commissioning with beam Roberto Saban 4. Ulusal Parçacık Hızlandırıcıları ve Uygulamaları Kongresi 30 Ağustos 1 Eylül 2010, Bodrum -

More information

The LHCb Tracking System. Jeroen van Hunen

The LHCb Tracking System. Jeroen van Hunen The LHCb Tracking System Jeroen van Hunen The LHCb Experiment LHCb at Point 8 : a lot of activity! LHCb : a B-physics experiment that is being constructed for : Precision measurements of the CPviolation

More information

LIU CABLING & OPTICAL FIBRES STRATEGY. Georgi Minchev Georgiev EN-EL-CF

LIU CABLING & OPTICAL FIBRES STRATEGY. Georgi Minchev Georgiev EN-EL-CF LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF Summary 2. Strategy 3. Price optimization 1. LIU cabling works 4. LIU de-cabling/cabling roadmap 5.FAQ Georgi Minchev Georgiev EN-EL-CF

More information

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group Status of the Diamond Storage Ring RF Systems Morten Jensen on behalf of Diamond Storage Ring RF Group Content 1. General Operational Status 2. Main issues and causes of trips 3. 200 ma + operation Qext

More information

Cathode Ray Tube. Introduction. Functional principle

Cathode Ray Tube. Introduction. Functional principle Introduction The Cathode Ray Tube or Braun s Tube was invented by the German physicist Karl Ferdinand Braun in 897 and is today used in computer monitors, TV sets and oscilloscope tubes. The path of the

More information

How To Improve The Ganil Control System

How To Improve The Ganil Control System FR9800224 Extending the GANIL Control System for the SPIRAL Project L corche Eric Control Group GANIL BP5027 14076 Caen Cedex 5 France e-mail: lecorche@ganil.fr GANIL A 97 02 Extending the GANIL Control

More information

XFEL DAQ and control network infrastructure Minutes of the 27 th March 2008 meeting (Revised 3.4.2008)

XFEL DAQ and control network infrastructure Minutes of the 27 th March 2008 meeting (Revised 3.4.2008) XFEL DAQ and control network infrastructure Minutes of the 27 th March 2008 meeting (Revised 3.4.2008) 1. Present DESY-IT: Kars Ohrenberg, Thomas Witt, XFEL: Thomas Hott. WP76: Sergey Esenov and Christopher

More information