1 Status Report on Alignment Activities at SLAC Catherine LeCocq, Robert Ruland Budget Situation SSRL / SPEAR PEPII / Babar LCLS Instrumentation / Calibration 1

2 Alignment Activities for SPEAR Ring mapping Chicane installation in East pit BTS pipe set-up HLS installation for floor monitoring Insertion devices new undulator for BL12 new chamber but temporary ID for BL13 Beamline work New beamlines: BL12, BL13, BL14 Beamline relocation: BL4 and BL5 Beamline upgrades: BL2, BL7, BL8, BL9 and BL10 2

3 HLS installation for floor monitoring 3

4 Floor Motion Movie Real time data can be found here: 4

5 Preliminary Analysis Daily variations in the floor movements seem to be mainly influenced by the outside temperature of the SPEAR3 ring, correlated to the amount of sunshine. The interior temperature of the ring does not seem to have short term effects but seems to be responsible for the annual drift of the floor [G. Gassner]. Real time data can be found here: 5

6 PEPII IR2 vacuum chamber upgrades R3-R4-R5 mapping and moves R4 RF stations R10 for e-cloud chamber for ILC BaBar/IR2 mapping 6

7 Mapping IR2 / Babar 7

8 LCLS Injector, bunch compressor system installed in existing tunnels Systems commissioned, work very well 8

9 LCLS Down beam systems are installed in new tunnels and housings: Linac-to-Undulator Hall Undulator Hall E-beam dump Front End Enclosure Near Experimental Hall X-beam Transport Far Experimental Hall 9

10 10

11 LCLS: present and coming activities Started implementation of tunnel reference network in LTU, will soon have access to Undulator Hall, beam dump and FEE Presently, tunnel floors are being coated, will soon start laying-out component positions in parallel Support for Civil Engineering / Construction Coordinate systems QC of sensitive areas Support undulator fiducialization Support girder assembly / internal alignment Very tight alignment tolerances, e.g. 40microns vertical relative combination of height gauges, optical tooling, laser tracker and final alignment on large volume Coordinate Measurement Machine (CMM) 11

12 LCLS Monitoring Systems LCLS Stretched Wire System All 140 monitors received, electronics and cabling on order: ready for preassembly on girders in May LCLS HLS 80 out of 116 capacitive sensors received, being calibrated 40 ultra sound sensors received, being calibrated Piping material, cabling ready for preassembly 12

13 Instrumentation News Laser Scanner Upgraded to ZF Imager 5600 continue to be happy customers Acquired another Laser Tracker, Faro Xi V2 400m long portable stretched wire, see poster by G. Gassner, C. LeCocq Re-engineered Linac Laser Alignment system, see poster by C. LeCocq, R. Pushor, B. Fuss, G. Gassner 13

14 Calibration Vertical Level Rod Comparator is recognized as a national resource, National Geodetic Survey (NGS) requires contractors to have their equipment certified Laser Tracker horizontal angle measurement system test bench First results, test bench internal accuracy 0.2 arcsec More details in separate talk 14

15 End of Presentation 15

Design and Fabrication of a Power Supply House in Brazil

Design and Fabrication of a Power Supply House in Brazil Monthly Progress Report Stanford Synchrotron Radiation Laboratory July 2003 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 3 2. Cost Data 4 B. Design and Fabrication Reports 1.1 Magnets & Supports

More information

THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES

THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES R. Beunard, GANIL, BP 55027, 14076 CAEN, CEDEX 5, France Abstract The SPIRAL2* project, located at the GANIL** facility in Caen,

More information

FLS 2010 Storage Ring Working Group Session 4: Future ring technology and design issues

FLS 2010 Storage Ring Working Group Session 4: Future ring technology and design issues FLS 2010 Storage Ring Working Group Session 4: Future ring technology and design issues 10:45 11:10 Limits to achievable stability Glenn Decker, APS 11:10 11:35 Stability and alignment of NSLS II magnet

More information

Types of 3D Scanners and 3D Scanning Technologies.

Types of 3D Scanners and 3D Scanning Technologies. Types of 3D Scanners and 3D Scanning Technologies. There are many types of 3D scanners and 3D scanning technologies. Some are ideal for short range scanning while others are better suited for mid or long

More information

PRODUCT BROCHURE 7.10.7 SF. Shop-Floor Coordinate Measuring Machine

PRODUCT BROCHURE 7.10.7 SF. Shop-Floor Coordinate Measuring Machine PRODUCT BROCHURE 7.10.7 SF Shop-Floor Coordinate Measuring Machine HEXAGON METROLOGY 7.10.7 SF Quality Insight at the Point of Production The Hexagon Metrology 7.10.7 SF is like a machine tool for quality

More information

FACET First Beam Commissioning. Jerry Yocky For the FACET commissioning team 21-May-2012 IPAC 2012, New Orleans, LA

FACET First Beam Commissioning. Jerry Yocky For the FACET commissioning team 21-May-2012 IPAC 2012, New Orleans, LA FACET First Beam Commissioning Jerry Yocky For the FACET commissioning team 21-May-2012 IPAC 2012, New Orleans, LA Facility for Advanced accelerator Experimental Tests WHAT IS FACET? The FACET Facility

More information

Towards large dynamic range beam diagnostics and beam dynamics studies. Pavel Evtushenko

Towards large dynamic range beam diagnostics and beam dynamics studies. Pavel Evtushenko Towards large dynamic range beam diagnostics and beam dynamics studies Pavel Evtushenko Motivation Linacs with average current 1-2 ma and energy 1-2.5 GeV are envisioned as drivers for next generation

More information

TRIMBLE ATS TOTAL STATION ADVANCED TRACKING SYSTEMS FOR HIGH-PRECISION CONSTRUCTION APPLICATIONS

TRIMBLE ATS TOTAL STATION ADVANCED TRACKING SYSTEMS FOR HIGH-PRECISION CONSTRUCTION APPLICATIONS TRIMBLE ATS TOTAL STATION ADVANCED TRACKING SYSTEMS FOR HIGH-PRECISION CONSTRUCTION APPLICATIONS BY MARTIN WAGENER APPLICATIONS ENGINEER, TRIMBLE EUROPE OVERVIEW Today s construction industry demands more

More information

Mechanical Operation and Maintenance Vacuum Group

Mechanical Operation and Maintenance Vacuum Group Mechanical Operation and Maintenance Vacuum Group AES-MOM Vacuum Group UHV support and services APS Argonne National Laboratory National Laboratories The AES-MOM Vacuum Group at Argonne National Laboratory

More information

Sensor/Raft Metrology Status

Sensor/Raft Metrology Status Sensor/Raft Metrology Status Peter Z. Takacs Instrumentation Division Brookhaven National Laboratory 17 Oct 2005 1 Sensor/Raft metrology - current status Laboratory space preparation near completion. Optical

More information

THE TESLA TEST FACILITY AS A PROTOTYPE FOR THE GLOBAL ACCELERATOR NETWORK

THE TESLA TEST FACILITY AS A PROTOTYPE FOR THE GLOBAL ACCELERATOR NETWORK THE TESLA TEST FACILITY AS A PROTOTYPE FOR THE GLOBAL ACCELERATOR NETWORK K. Rehlich, DESY, Hamburg, Germany Abstract The next generation of large accelerators facilities will be produced and operated

More information

Introduction. Magnet Coordinate System

Introduction. Magnet Coordinate System 283 Fiducialization Procedures for the ALS Ring Magnets and the Booster Synchrotron Girders Jack Tanabe, Roderich Keller and Ted Lauritzen Lawrence Berkeley Laboratory, Berkeley, CA 94720, U. S. A. Introduction

More information

Figure 1: Lattice drawing for the APS storage ring.

Figure 1: Lattice drawing for the APS storage ring. PERFORMANCE OF THE ADVANCED PHOTON SOURCE Glenn Decker Advanced Photon Source, Argonne National Laboratory 9700 South Cass Avenue, Argonne, Illinois 60439 USA Abstract The Advanced Photon Source (APS)

More information

10 Project Costs and Schedule

10 Project Costs and Schedule II-367 10 Project Costs and Schedule 10.1 Overview The investment costs given in this chapter include all components necessary for the baseline design of TESLA, as described in chapters 3 to 9. Not included

More information

TPC laser calibration system

TPC laser calibration system TPC laser calibration system Børge Svane Nielsen Niels Bohr Institute ALICE Technical Board, CERN, 18 February 2002 Table of Contents System Goals 1 2 Spacial and angular precision 11 Production, installation

More information

Final 6MSD Weekly Scheduling Meeting. Wednesday @ 1:30, MCC Conference Room

Final 6MSD Weekly Scheduling Meeting. Wednesday @ 1:30, MCC Conference Room Final 6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room November 2, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 5 mins 2) Operations Recovery Status (A. Freyberger)... 5

More information

Differentiation of 3D scanners and their positioning method when applied to pipeline integrity

Differentiation of 3D scanners and their positioning method when applied to pipeline integrity 11th European Conference on Non-Destructive Testing (ECNDT 2014), October 6-10, 2014, Prague, Czech Republic More Info at Open Access Database www.ndt.net/?id=16317 Differentiation of 3D scanners and their

More information

FCC 1309180800 JGU WBS_v0034.xlsm

FCC 1309180800 JGU WBS_v0034.xlsm 1 Accelerators 1.1 Hadron injectors 1.1.1 Overall design parameters 1.1.1.1 Performance and gap of existing injector chain 1.1.1.2 Performance and gap of existing injector chain 1.1.1.3 Baseline parameters

More information

Slice Emittance Measurements at the SLAC Gun Test Facility*

Slice Emittance Measurements at the SLAC Gun Test Facility* SLAC-PUB-954 September Slice Emittance Measurements at the SLAC Gun Test Facility* D. H. Dowell, P. R. Bolton, J.E. Clendenin, P. Emma, S.M. Gierman, C.G. Limborg, B.F. Murphy, J.F. Schmerge Stanford Linear

More information

Industrial Involvement in the Construction of Synchrotron Light Sources

Industrial Involvement in the Construction of Synchrotron Light Sources Industrial Involvement in the Construction of Synchrotron Light Sources M.S. de Jong, Canadian Light Source Inc. European Particle Accelerator Conference 2004-07-07 Introduction Large demand for synchrotron

More information

Status Overview The Australian Synchrotron. Steven Banks Control Systems Group

Status Overview The Australian Synchrotron. Steven Banks Control Systems Group Status Overview The Australian Synchrotron Steven Banks Control Systems Group Where Are We? Where Are We? Where Are We? The Building Development being managed by Major Projects Victoria (MPV) Budget is

More information

Digital vs. Analogue Control Systems

Digital vs. Analogue Control Systems Digital vs. Analogue Control Systems Presented at the 2011 Annual Meeting of the American College of Medical Physics, Chattanooga, TN, May 1, 2011 Ivan A. Brezovich, PhD, Dept. of Rad Onc, Univ of Alabama

More information

Projects and R&D activities

Projects and R&D activities Projects and R&D activities J.M. Jimenez On behalf of the Vacuum, Surface and Coatings Group (VSC) Vacuum, Surface and Coatings group* Mandate Design, construction, operation, maintenance and upgrade of

More information

Development of High Stability Supports for NSLS-II RF BPMS

Development of High Stability Supports for NSLS-II RF BPMS BNL-82316-2009-CP Development of High Stability Supports for NSLS-II RF BPMS B. Kosciuk, R. Alforque, B. Bacha, P. Cameron, F. Lincoln, V. Ravindranath, I. Pinayev, S. Sharma, O. Singh Brookhaven National

More information

Wind Direction Smart Sensor (S-WDA-M003)

Wind Direction Smart Sensor (S-WDA-M003) (S-WDA-M003) The Wind Direction smart sensor is designed to work with HOBO Stations. The smart sensor has a plug-in modular connector that allows it to be added easily to a HOBO Station. All sensor parameters

More information

PRODUCT BROCHURE SPATIAL ANALYZER. Powerful, traceable and easy-to-use metrology and analysis software

PRODUCT BROCHURE SPATIAL ANALYZER. Powerful, traceable and easy-to-use metrology and analysis software PRODUCT BROCHURE SPATIAL ANALYZER Powerful, traceable and easy-to-use metrology and analysis software SPATIAL ANALYZER SpatialAnalyzer (SA) is a powerful, traceable and easy to use metrology and analysis

More information

DMS 680. Universal length measuring system gauge inspection for»iso 9000«requirements

DMS 680. Universal length measuring system gauge inspection for»iso 9000«requirements DMS 680 Universal length measuring system gauge inspection for»iso 9000«requirements Universal length measuring system DMS 680 Wide range of applications For periodic inspection of gauges, reference gauges,

More information

Special Specification 6033 Computerized Transportation Management System

Special Specification 6033 Computerized Transportation Management System 6033 Special Specification 6033 Computerized Transportation Management System 1. DESCRIPTION Relocate computerized transportation management system (CTMS) equipment as shown on the plans and as described

More information

9 Project management and organisation

9 Project management and organisation 9 Project management and organisation 9.1 Introduction In accordance with the draft X-Ray Free-Electron Laser (XFEL) legal texts (Convention and Articles of Association): the construction and operation

More information

Integration Services

Integration Services Integration Services EXPERIENCED TEAM ADVANCED TECHNOLOGY PROVEN SOLUTIONS Integrations for large scale metrology applications Metris metrology to streamline your CAPABILITIES Advanced systems design Engineering

More information

PASSIVE INFRARED INTRUSION DETECTOR PASSIVE INFRAROOD DETECTOR DETECTEUR D INTRUSION PASSIF INFRAROUGE

PASSIVE INFRARED INTRUSION DETECTOR PASSIVE INFRAROOD DETECTOR DETECTEUR D INTRUSION PASSIF INFRAROUGE MODEL HAA51 PASSIVE INFRARED INTRUSION DETECTOR PASSIVE INFRAROOD DETECTOR DETECTEUR D INTRUSION PASSIF INFRAROUGE OPERATING MANUAL HAA51 PASSIVE INFRARED INTRUDER DETECTOR INTRODUCTION HAA51 Passive Infrared

More information

LOCATION DEPENDENCY OF POSITIONING ERROR IN A 3-AXES CNC MILLING MACHINE

LOCATION DEPENDENCY OF POSITIONING ERROR IN A 3-AXES CNC MILLING MACHINE th International & 26 th All India Manufacturing Technology, Design and Research Conference (AIMTDR 214) December 12 th 14 th, 214, IIT Guwahati, Assam, India LOCATION DEPENDENCY OF POSITIONING ERROR IN

More information

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force

More information

Data-analysis scheme and infrastructure at the X-ray free electron laser facility, SACLA

Data-analysis scheme and infrastructure at the X-ray free electron laser facility, SACLA Data-analysis scheme and infrastructure at the X-ray free electron laser facility, SACLA T. Sugimoto, T. Abe, Y. Joti, T. Kameshima, K. Okada, M. Yamaga, R. Tanaka (Japan Synchrotron Radiation Research

More information

Industrial Robotics. Training Objective

Industrial Robotics. Training Objective Training Objective After watching the program and reviewing this printed material, the viewer will learn the basics of industrial robot technology and how robots are used in a variety of manufacturing

More information

Somero SiteShape System

Somero SiteShape System Somero SiteShape System www.somero.com info@somero.com Somero Enterprises, LLC Corporate Office: 82 Fitzgerald Drive Jaffrey, NH 03452 603 532 5900 - phone 603 532 5930 - fax The Somero SiteShape System

More information

Ultraprint 2000 HiE. Ultraprint 2000 HiE Features MODULAR DESIGN ENSURES SUPERIOR ADAPTABILITY

Ultraprint 2000 HiE. Ultraprint 2000 HiE Features MODULAR DESIGN ENSURES SUPERIOR ADAPTABILITY Ultraprint 2000 HiE Since its introduction, the Ultraprint 2000 HiE has become the industry choice for high performance, reliable automated stencil printing. A key factor in its immediate worldwide acceptance

More information

Vibration Suppression R&D at University of British Columbia. Tom Mattison UBC

Vibration Suppression R&D at University of British Columbia. Tom Mattison UBC Vibration Suppression R&D at University of British Columbia Tom Mattison UBC Overview Approaches to the final quad stability problem The Optical Anchor concept Results from the SLAC Optical Anchor program

More information

Specifying Laser Scanning Services. A Quantapoint White Paper

Specifying Laser Scanning Services. A Quantapoint White Paper A Quantapoint White Paper ABSTRACT Specifying Laser Scanning Services to Help Ensure Trusted and Accurate Results As-built documentation created using laser scanning is rapidly being adopted as the tool

More information

Halls A, B, and C 6 Month Down. PEPPo, FEL, 6GeV Acc Maint/Ops, FML, Validation Meeting (23 Feb 2011)

Halls A, B, and C 6 Month Down. PEPPo, FEL, 6GeV Acc Maint/Ops, FML, Validation Meeting (23 Feb 2011) Halls A, B, and C 6 Month Down Resource Validation Update PEPPo, FEL, 6GeV Acc Maint/Ops, FML, ESH&Q 6 Month Down Resource Validation Meeting (23 Feb 2011) W. Oren, D. Napier 24 Feb 2011 Halls A, B, C

More information

installation guide ACTIV-1

installation guide ACTIV-1 installation guide ACTIV- Base foot. Leg x columns - right & left Motor unit. Work surface supporting bracket (Cantilever) x Control. box Base foot x Handset 4. Phase Motor unit Materials and Tools Hardware

More information

ROTALIGN Ultra is The intelligent System for Machinery Alignment

ROTALIGN Ultra is The intelligent System for Machinery Alignment ROTALIGN Ultra is The intelligent System for Machinery Alignment 2 sensalign improves the quality of your alignment XXL HD PSD (Ultra-large High Definition Position Sensitive Detector) At a glance Real

More information

Length, Finland, MIKES (VTT Technical Research Centre of Finland Ltd, Centre for Metrology / Mittatekniikan keskus)

Length, Finland, MIKES (VTT Technical Research Centre of Finland Ltd, Centre for Metrology / Mittatekniikan keskus) absolute mise en pratigue: mise en pratigue: absolute absolute Level or Range 633 633 nm 0.04 fm 2 95% No 1 474 474 THz 24 khz 2 95% No 1 532 532 nm 0.08 fm 2 95% No 50 563 563 THz 0.08 MHz 2 95% No 51

More information

Subminiature Load Cell Model 8417

Subminiature Load Cell Model 8417 w Technical Product Information Subminiature Load Cell 1. Introduction... 2 2. Preparing for use... 2 2.1 Unpacking... 2 2.2 Using the instrument for the first time... 2 2.3 Grounding and potential connection...

More information

Path Finder. CMA Engineering Designing & Consulting Inc. Miami, Florida

Path Finder. CMA Engineering Designing & Consulting Inc. Miami, Florida Path Finder CMA Engineering Designing & Consulting Inc. Miami, Florida Table of Contents I. General Purpose II. III. Contents of the Path Finder Box Path Finder I. General Purpose This QA Tool for beam

More information

40-6680 5 Beam Laser Pointer Service Manual

40-6680 5 Beam Laser Pointer Service Manual 40-6680 5 Beam Laser Pointer Service Manual Contents Item Description Pages 1.0 Introduction 2 2.0 Overall Instrument Dis-assembly 2 2.1 Body module Dis-assembly 3 2.2 Core Module Dis-Assembly 4-5 2.3

More information

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group Status of the Diamond Storage Ring RF Systems Morten Jensen on behalf of Diamond Storage Ring RF Group Content 1. General Operational Status 2. Main issues and causes of trips 3. 200 ma + operation Qext

More information

How To Use A Ds340 (Dsp)

How To Use A Ds340 (Dsp) Ideal for monitoring dust levels in the exhaust gas of industrial combustion or air filtration processes. Innovative Dynamic Detection Principle (DDP) measurement technique Immune to gradual reductions

More information

LHCC TOTEM STATUS REPORT

LHCC TOTEM STATUS REPORT LHCC TOTEM STATUS REPORT Status of Roman Pot Consolidation & Upgrade Program Physics Analysis Highlights 4/9/2013 LHCC TOTEM 13.3.2013 CERN J. Baechler 1 TOTEM Status of Roman Pot Consolidation & Upgrade

More information

Zero Degree Extraction using an Electrostatic Separator

Zero Degree Extraction using an Electrostatic Separator Zero Degree Extraction using an Electrostatic Separator L. Keller Aug. 2005 Take another look at using an electrostatic separator and a weak dipole to allow a zero degree crossing angle a la the TESLA

More information

[see Figure 3 below] Ferrite tile walls and ceiling RF Absorber parcel walls and ceiling Removable floor section to make fully anechoic

[see Figure 3 below] Ferrite tile walls and ceiling RF Absorber parcel walls and ceiling Removable floor section to make fully anechoic Test Room ID: R21F Description: SEMI ANECHOIC SHIELDED TEST ENCLOSURE Primary Testing Uses: FCC, CE Mark Dimensions: 9.75m x 6.10m x 5.49m (32ft. x 20ft. x 18ft.) [see Figure 3 below] Construction: Galvanized

More information

Shielding and Radiation Measurements at ESRF

Shielding and Radiation Measurements at ESRF Shielding and Radiation Measurements at ESRF Radiation Safety Meeting SOLEIL Synchrotron, 18 October 26 P. Berkvens European Synchrotron Radiation Facility Radiation protection policy at the ESRF Storage

More information

Development of Virtual Accelerator Environment for Beam Diagnostics *

Development of Virtual Accelerator Environment for Beam Diagnostics * Development of Virtual Accelerator Environment for Beam Diagnostics * Gu Duan, Zhang Meng, Gu Qiang, Huang Dazhang, Zhao Minghua (Shanghai Institute of Applied Physics, Chinese Academy of Sciences, Shanghai

More information

3 LEVELLING & SURVEYING

3 LEVELLING & SURVEYING 3 LEVELLING & SURVEYING 3.1 General The primary reference at water-level recording stations is a set of stable bench-marks, installed in locations where their level should not change. Upon initial set-up

More information

LEReC Engineering. J. Tuozzolo, C-AD Chief Mechanical Engineer (LEReC Project Engineer)

LEReC Engineering. J. Tuozzolo, C-AD Chief Mechanical Engineer (LEReC Project Engineer) LEReC Engineering J. Tuozzolo, C-AD Chief Mechanical Engineer (LEReC Project Engineer) Layout, Infrastructure, and Engineering IP 2:00 location - available. Engineering interface issues. Engineering support

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Trimble Field Link Software

Trimble Field Link Software Trimble Field Link Software This document explains how to quickly begin using Trimble Field Link software. Trimble Field Link software enables you to easily lay out your projects with a task-based workflow.

More information

Making Your Home Ready For Solar Water Heating

Making Your Home Ready For Solar Water Heating Making Your Home Ready For Solar Water Heating During construction or a major renovation, making a home ready to use solar energy can be easy and inexpensive. When the time comes to install your solar

More information

Status of Radiation Safety System at

Status of Radiation Safety System at Status of Radiation Safety System at Taiwan Photon Source Joseph C. Liu Radiation and Operation Safety Division National Synchrotron Radiation Research Center, Taiwan NSRRC layout 1.5 GeV, 120m, 400 ma

More information

END OF LINE SYSTEM TRUCKCAM FACTORY

END OF LINE SYSTEM TRUCKCAM FACTORY END OF LINE SYSTEM TRUCKCAM FACTORY INTRODUCING: END OF LINE SYSTEM THE TRUCKCAM END OF LINE system is based on a centerline measurement principle. The measures are carried out with a patented camera technology

More information

Status of the FERMI@Elettra Free Electron Laser

Status of the FERMI@Elettra Free Electron Laser Status of the FERMI@Elettra Free Electron Laser E. Allaria on behalf of the FERMI team Work partially supported by the Italian Ministry of University and Research under grants FIRB-RBAP045JF2 and FIRB-RBAP06AWK3

More information

TI GPS PPS Timing Application Note

TI GPS PPS Timing Application Note Application Note Version 0.6 January 2012 1 Contents Table of Contents 1 INTRODUCTION... 3 2 1PPS CHARACTERISTICS... 3 3 TEST SETUP... 4 4 PPS TEST RESULTS... 6 Figures Figure 1 - Simplified GPS Receiver

More information

E3T Miniature Photoelectric Sensors

E3T Miniature Photoelectric Sensors E3T Miniature Photoelectric Sensors Ultra-Compact with Visible Red Beam»» Ultra slim to fit and perform where others won't»» Visible red beam for simple set-up»» Five different sensing methods E3T Miniature

More information

BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN

BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN Abstract BEPC Group, presented by Yingzhi Wu Institute of High Energy Physics, Beijing 100039, P.R. China The luminosity upgrades of the BEPC are briefly reviewed.

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

Compliance Test Results. of Independently Manufactured. Automotive Replacement Headlamps. To FMVSS 108. Study II. May 13, 2004

Compliance Test Results. of Independently Manufactured. Automotive Replacement Headlamps. To FMVSS 108. Study II. May 13, 2004 Compliance Test Results of Independently Manufactured Automotive Replacement Headlamps To FMVSS 108 Study II May 13, 2004 Prepared By Certified Automotive Parts Association 1518 K Street NW, Suite 306

More information

Measurement of RF Emissions from a Final Coat Electronics Corrosion Module

Measurement of RF Emissions from a Final Coat Electronics Corrosion Module Engineering Test Report No. 37802-02 Rev. A Measurement of RF Emissions from a Final Coat Electronics Corrosion Module For : Canadian Auto Preservation, Inc. 390 Bradwick Drive Concord, Ontario CANADA

More information

Spray Height Control System

Spray Height Control System Spray Height Control System Hagie 2100/2101/284/dts Installation Manual Improving the competitiveness of Industry and Agriculture through Precision Measurement Printed in Canada Copyright 2005-08 by NORAC

More information

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes TM Engineered Material Handling Overhead Bridge Overhead and Gantry Bridge Cranes and Gantry Cranes Custom Engineered Crane Systems Gantry Cranes EMH builds a complete range of gantry cranes including

More information

PLANE DEFORMATION MONITORING NETWORK AND COMPUTATIONAL METHOD OF THE NSRL STORAGE RING

PLANE DEFORMATION MONITORING NETWORK AND COMPUTATIONAL METHOD OF THE NSRL STORAGE RING PLANE DEFORMAION MONIORING NEWORK AND COMPUAIONAL MEHOD OF HE NSRL SORAGE RING Xiaoye He Guicheng Wang Shenguan Lu Xingzhou Wang * National Synchrotron Radiation Laboratory, USC, Hefei, P.R.China *Wuhan

More information

In Association With. Introduces. TPT Contractor

In Association With. Introduces. TPT Contractor In Association With Introduces TPT Contractor Software for Contractors with TENSIONMETERS Table of Contents Capabilities 4 Setup and Use 7 The Dashboard 12 Tower Setup Form 18 Measurement or Inspection

More information

FLASH Commissioning and Startup

FLASH Commissioning and Startup FLASH Seminar 8-May-2007, DESY FLASH Commissioning and Startup email: siegfried.schreiber@desy.de Commissioning Startup Accelerator/FEL Studies Main Commissioning Tasks Modules: RF/LLRF warm/cold coupler

More information

Environment-Laboratory Ambient Conditions

Environment-Laboratory Ambient Conditions ISSUE 3.0: MADE MINOR CLARIFICATION CHANGES. FOR CLIENT LABS Purpose To assure laboratory conditions are stable during the performance of testing and data collection. Why this requirement is important?

More information

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump

More information

3D SCANNERTM. 3D Scanning Comes Full Circle. s u n. Your Most Valuable QA and Dosimetry Tools A / B / C. The 3D SCANNER Advantage

3D SCANNERTM. 3D Scanning Comes Full Circle. s u n. Your Most Valuable QA and Dosimetry Tools A / B / C. The 3D SCANNER Advantage 3D SCANNERTM 3D Scanning Comes Full Circle Relative 3D Dosimetry offering the easiest setup, most objectivity, and best consistency available The 3D SCANNER Advantage Advanced Design Ring and diameter

More information

1-4 kg/m3. Long in-line calibration cycles of the gamma density systems may improve measurement accuracy, but this is often not practical subsea.

1-4 kg/m3. Long in-line calibration cycles of the gamma density systems may improve measurement accuracy, but this is often not practical subsea. Generating Greater Accuracy and Robustness from Subsea Multiphase Meters By Finn Erik Berge, Emerson Process Management Subsea multiphase meters have faced a growing number of challenges linked to the

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

Cathode Ray Tube. Introduction. Functional principle

Cathode Ray Tube. Introduction. Functional principle Introduction The Cathode Ray Tube or Braun s Tube was invented by the German physicist Karl Ferdinand Braun in 897 and is today used in computer monitors, TV sets and oscilloscope tubes. The path of the

More information

Solutions Manufacturing Performance

Solutions Manufacturing Performance Solutions Manufacturing Performance Let s partner up for your project At RI Research Instruments we develop, design, manufacture and test high performance components and systems to the needs of our customers

More information

Service Bulletin Trucks Date Group No. Page

Service Bulletin Trucks Date Group No. Page Volvo Trucks North America, Inc. Greensboro, NC USA Replaces Service Bulletin 601 06 dated 03.98. Service Bulletin Trucks Date Group No. Page 9.2000 601 006 1(8) Wheel Alignment Steer and Drive Axles VN,

More information

3D Laser Scanning Technology. Rugged hardware and powerful software combined with streamlined survey workflow

3D Laser Scanning Technology. Rugged hardware and powerful software combined with streamlined survey workflow 3D Laser Scanning Technology Rugged hardware and powerful software combined with streamlined survey workflow Maptek specialises in the research, development and application of 3D laser scanning technology.

More information

source at CERN G.McMonagle AB/RF

source at CERN G.McMonagle AB/RF 12 GHz Stand alone power source at CERN G.McMonagle AB/RF Objectives Install a 12GHz power source at CERN as soon as possible to allow high gradient structure testing independent from the CTF3 machine

More information

Press Release. Superior bending

Press Release. Superior bending Superior bending An array of new features makes TRUMPF s new TruBend Series 5000 more productive and user-friendly than ever before. Using a new control concept, the machines are amazingly easy to operate.

More information

Tube Control Measurement, Sorting Modular System for Glass Tube

Tube Control Measurement, Sorting Modular System for Glass Tube Tube Control Measurement, Sorting Modular System for Glass Tube Tube Control is a modular designed system of settled instruments and modules. It comprises measuring instruments for the tube dimensions,

More information

Technical specification for the ALBA area radiation monitor network and detectors

Technical specification for the ALBA area radiation monitor network and detectors ALBA Project Document No: Page: 1 of 21 Radiation Safety ALBA Project Document No: EDMS Document No. Created: 15.02. 2007 Page: 1 of 21 H&S-HS-RS-0704 Modified: 04.04.2007 Rev. No.: 2.0 Technical specification

More information

ALIGNMENT FOR NEW SUBARU RING

ALIGNMENT FOR NEW SUBARU RING ALIGNMENT FOR NEW SUBARU RING Chao ZHANG 1), Sakuo MATSUI 1) and Satoshi HASHIMOTO 2) 1) Japan Synchrotron Radiation Research Institute (JASRI), Sayo-gun, Hyogo 678-5198, Japan 2) Himeji Institute of Technology,

More information

B098N USERS: MACHINE MANUFACTURERS DRAUGHTSMEN OPERATORS MAINTENANCE WORKERS ANY OTHERS

B098N USERS: MACHINE MANUFACTURERS DRAUGHTSMEN OPERATORS MAINTENANCE WORKERS ANY OTHERS INSTRUCTION MANUAL TRAVELLING BEAM DEVICE MANUAL CODE B098N USERS: MACHINE MANUFACTURERS DRAUGHTSMEN OPERATORS MAINTENANCE WORKERS ANY OTHERS REV. DESCRIZIONE REDATTO/GESTITO APPROVATO COD. IDENT. PAGINE

More information

IRB 2600ID-15/1.85 Simple integration, high performance

IRB 2600ID-15/1.85 Simple integration, high performance Per Lowgren, Product Manager, Medium robots IRB 2600ID-15/1.85 Simple integration, high performance February 9, 2011 Slide 1 Overview of main features General purpose robot for integrated dressing solutions.

More information

2. To set the number of data points that will be collected, type n.

2. To set the number of data points that will be collected, type n. Force and Motion In this experiment, you will explore the relationship between force and motion. You are given a car with tabs, a string, a pully, a weight hanger, some weights, and the laser gate you

More information

THE OPTICAL CMM 3D SCANNERS FOR INDUSTRIAL APPLICATIONS

THE OPTICAL CMM 3D SCANNERS FOR INDUSTRIAL APPLICATIONS METROLOGY SOLUTIONS THE OPTICAL CMM 3D SCANNERS FOR INDUSTRIAL APPLICATIONS PORTABLE 3D MEASUREMENT SOLUTIONS The arm-free handheld MetraSCAN 3D line-up of optical CMM 3D scanning systems and the C-Track

More information

Total Station Setup and Operation. Sokkia SET Total Station

Total Station Setup and Operation. Sokkia SET Total Station Total Station Setup and Operation Sokkia SET Total Station Parts of the SET Total Station Parts of the SET Total Station Sokkia SET 550 Total Station Keys/Screen SET 550 Menu Pages SET 550 Menu Pages Leveling

More information

GE Lighting Solutions. Albeo LED Luminaire. Modular High & Low Bay Lighting. (ABHX - Series) imagination at work

GE Lighting Solutions. Albeo LED Luminaire. Modular High & Low Bay Lighting. (ABHX - Series) imagination at work GE Lighting Solutions Albeo LED Luminaire Modular High & Low Bay Lighting (ABHX - Series) imagination at work Product Features The award winning Albeo ABHX-series LED Luminaire utilizes innovative heat-sinking

More information

V K Raina. Reactor Group, BARC

V K Raina. Reactor Group, BARC Critical facility for AHWR and PHWRs V K Raina Reactor Group, BARC India has large reserves of Thorium Critical facility Utilisation of Thorium for power production is a thrust area of the Indian Nuclear

More information

Electrical tests on PCB insulation materials and investigation of influence of solder fillets geometry on partial discharge

Electrical tests on PCB insulation materials and investigation of influence of solder fillets geometry on partial discharge , Firenze, Italy Electrical tests on PCB insulation materials and investigation of influence of solder fillets geometry on partial discharge A. Bulletti, L. Capineri B. Dunn ESTEC Material and Process

More information

Chesapeake Section AWWA Symposium

Chesapeake Section AWWA Symposium PRESTRESSED CONCRETE CYLINDER PIPE (PCCP) Chesapeake Section AWWA Symposium HANSON PRESSURE PIPE Steve Smith January 16,2014 Interpace Projects with Problems INTERPACE 45 MILLION FEET 11,500 PROJECTS Slide

More information

Project Management Plan

Project Management Plan Linac Coherent Light Source (LCLS) An X Ray Free Electron Laser Project Management Plan PMD 1.1 001 r3 October 2007 Prepared for the US Department of Energy under contract numbers: SLAC DE AC02 76SF00515

More information

Status of EVOLVE boiling flow regime experiments

Status of EVOLVE boiling flow regime experiments Status of EVOLVE boiling flow regime experiments M.H. Anderson M.L. Corradini J. Murphy I. Sviatoslavsky M. Sawan APEX TASK IV APEX ELECTRONIC MEETING Feb. 7, 2002 U- Madison of Nuclear Systems Nuclear

More information

Evaluating the Field Performance of Windows and Curtain Walls of Large Buildings

Evaluating the Field Performance of Windows and Curtain Walls of Large Buildings Best2 Airtightness of Buildings Session WB6-2 Evaluating the Field Performance of Windows and Curtain Walls of Large Buildings Mario D. Gonçalves, Patenaude-Trempe and Robert Jutras, Air-Ins Introduction

More information

The process components and related data characteristics addressed in this document are:

The process components and related data characteristics addressed in this document are: TM Tech Notes Certainty 3D November 1, 2012 To: General Release From: Ted Knaak Certainty 3D, LLC Re: Structural Wall Monitoring (#1017) rev: A Introduction TopoDOT offers several tools designed specifically

More information

SE05: Getting Started with Cognex DataMan Bar Code Readers - Hands On Lab Werner Solution Expo April 8 & 9

SE05: Getting Started with Cognex DataMan Bar Code Readers - Hands On Lab Werner Solution Expo April 8 & 9 SE05: Getting Started with Cognex DataMan Bar Code Readers - Hands On Lab Werner Solution Expo April 8 & 9 Learning Goals: At the end of this lab, the student should have basic familiarity with the DataMan

More information