1 Annex 1: Landslides and planning Contents Foreword...2 Introduction...3 Purpose Of The Guidelines...4 Problems Due To Unstable Slopes...5 Causes And Distribution Of Landslides...6 Strategies For Dealing With The Problems...9 Planning Control...12 Conclusions...15 Appendix 1A - Landslide Recognition And Hazard Assessment...16 Appendix 1B - The Slope Stability Report...21 Appendix 1C - References...25
2 Foreword Planning Policy Guidance Note 14 set out the broad planning and technical issues in respect of development on unstable land. This annex to PPG 14 aims to take that guidance forward with particular reference to problems caused by landslides and unstable slopes and should be read in conjunction with it. This guidance advises: how local planning authorities can identify areas where landsliding is taking or has taken place or is a potential problem; and that within these areas, policies should seek to minimise the impact of landslides on development by controlling or restricting development where appropriate; policies should outline the consideration which will be given to landsliding, including the criteria and information requirements which will be used in determining planning applications; and where appropriate, planning applications should be accompanied by a slope stability report which demonstrates that the site is stable or can be made so and will not be affected by or trigger landsliding beyond the boundaries of the site. Appendices outline an incremental method of landslide hazard assessment with two examples developed in specific areas which may be more widely applicable; and guidance on the preparation, content and format of slope stability reports to accompany planning applications.
3 Introduction 1. The full and effective use of land may be difficult to achieve because of the problems caused by unstable slopes. Such instability may include slips and flows of material and falls of rock or soil. It affects slopes ranging from gently sloping to vertical or even overhanging. Landslides and rock falls may damage or destroy existing buildings and structures and threaten public safety. In coastal areas, landsliding may lead to physical loss of land as well as risks to coastal assets. Landslides occurring during construction result in increased costs or even the abandonment of development. It is also the case that, due to their unstable nature, landslide areas are often undeveloped or uncultivated and may thus represent a significant opportunity to retain and increase the ecological resources of the wider area. 2. Identification of the problems in advance allows appropriate strategies to be adopted for dealing with them, helping to maintain a physically safe environment. Land which is potentially unstable can thus be put to a suitable use, contributing to the Government's broad objectives for economy and efficiency in the use of land and the protection of the environment.
4 Purpose Of The Guidelines 3. The purpose of these guidelines is to advise local authorities, landowners and developers on the exercise of planning controls over land use and development on or adjacent to slopes which are actually or potentially unstable. They are intended to help to ensure that:- the occurrence of and potential for slope instability is recognised at the earliest possible stage; appropriate strategies are adopted for dealing with the problems arising thus preventing the unnecessary sterilisation of land; due account is taken of the constraints imposed by slope instability at all stages of the planning process; development does not proceed in certain areas of instability or where treatment proposed is ineffectual; development is suitable and will not be threatened by landslides or cause instability of surrounding slopes; expensive protection or remedial works, which may be publicly funded, are not needed after a site has been developed; the environmental value of unstable land is assessed and due account taken of managing the resource in terms of sustainability requirements; and any necessary protection or remedial works will not lead to significant adverse environmental effects at the site or elsewhere. 4. These guidelines form an Annex to and should be read in conjunction with Planning Policy Guidance Note 14 "Development on unstable land", which sets out the wider planning and administrative issues, and with PPG 20 which deals with the issues specifically relevant to Coastal Planning. Separate Mineral Planning Guidance on "Stability in quarrying" is being prepared which will also have wider relevance in terms of significant earth moving developments such as excavation of slopes and deposition of tips and related structures.
5 Problems Due To Unstable Slopes 5. Landsliding is a common but largely unrecognised occurrence in Britain. PPG 14 Appendix A (A43-A48, Fig. A5 and Table A1) illustrates the different types of landslides and the processes involved. Loss of life is infrequent (probably 2 or 3 per year due to cliff falls along the coast or to falls of ground from quarry faces or other excavations) but damage to and destruction of property and economic loss due to disruption of transport and other activities are common, as well as delays to development. Some examples of developments which have been affected by landslides both during and after construction are shown in Table The impact of such events varies enormously and is difficult to quantify in total. Table 2 illustrates the range of effects which contribute to the costs which may arise due to landsliding in Britain. It also illustrates the benefits which may result. In most cases, the potential for landsliding can be identified by appropriate investigations. Many of these costs are, therefore, avoidable. Generally, the costs of investigation and precautionary or remedial measures are greatly offset by the savings in terms of construction costs, damage, disruption or destruction that would otherwise arise.
6 Causes And Distribution Of Landslides 7. Landslides occur when the gravitational forces acting on the material comprising a slope exceed the resisting strength of those materials. Movement may be initiated by natural or human-induced changes in either of these controls. Once movement has occurred, the slope geometry may change to a more stable configuration but the resisting strength is reduced permanently. Further movement may be more likely if there is any adverse change in conditions. Water is particularly important since it increases the weight, and therefore the forces tending towards failure. Since the strength which is effective in resisting landsliding is reduced by water pressure, water is also important from this point of view. As might be expected, the rapidity of landsliding and the mobility of debris is increased by the presence of water. Table 1: Some examples of damage caused by landslides - in 1966, work on the A21 Sevenoaks Bypass was halted and the road realigned when construction works reactivated an ancient landslide system. - in , completion of the M4 motorway near Swindon was delayed when construction works reactivated an ancient landslide system. - in 1978, a 350,000 service reservoir in the Malverns was abandoned at a cost of 250,000 when excavations reactivated an ancient landslide. - in 1979, the A625 cross-pennine road was permanently closed following continuing instability at Mam Tor. - in 1988, 4 houses were lost at Luccombe Village in the Isle of Wight following reactivation of an ancient landslide at this cliff top site; the village had been constructed at this site in the 1930s following the destruction of the earlier fishing village of Luccombe by landsliding. - during 1993, several houses in Bolsover were damaged and subsequently demolished following reactivation of an old landslide after a prolonged period of rainfall. - in June 1993, part of the four star Holbeck Hall Hotel collapsed and the remainder was demolished after the cliff top receded by over 60m in a new first-time landslide after a period of prolonged rainfall. - in January 1994, excessive rainfall after a particularly wet year led to widespread cliff falls and landslides on the Ventnor undercliff, Isle of Wight; at Blackgang Chine two houses were destroyed, a road cut and a caravan/chalet site had to be abandoned; elsewhere a number of houses were threatened, their gardens lost and footpaths blocked or destroyed. Table 2: Range of costs and benefits commonly associated with landslides in Great Britain Personal Costs Immediate Costs Fatal Accidents; Injuries; Psychiatric problems. Mobilisation of relief workers and emergency services; Evacuation and provision of temporary or replacement housing and other buildings;
7 Loss of land and property; Loss of industrial or agricultural production; Transport delays; Construction delays; Costs of investigation to determine appropriate response; Cost of repair to damaged buildings and structures. Indirect Costs Increased insurance premiums or withdrawal of cover; Depreciated property or land values; Costs of legal actions; Costs of public inquiries into causes and responsibilities. Costs Of Prevention Research into nature and extent of landslide problems; Formulation of planning policies related to development on unstable land; Coastal protection schemes; Design and construction of preventive measures including drainage and regrading; Costs of monitoring potentially and actually unstable slopes. Benefits Sites of Special Scientific Interest for their national or international importance for research, training and education; Regionally Important Geomorphological Sites for their educational, research, historical and aesthetic importance; Maintenance of exposure of faces of geological interest and importance; Large areas of environmentally valuable and diverse habitats not formally designated by English Nature; Provision of material directly to beaches and to longshore drift supplying beach material to other areas, thus inhibiting coastal erosion and enhancing protection against flooding; Improved stability and security of property and land if stabilisation is carried out. Figure 1: Distribution of the 8835 recorded landslides in the National Landslides Database (after Jones and Lee, 1994) 8. Figure 1 shows the distribution of the 8835 landslides recorded in the national landslide database resulting from research for the Department of the Environment. An interpretation of this data is presented in PPG 14 Appendix A (A49 and Fig. A6). Together these give a broad general picture of the widespread nature of landsliding in Great Britain and of some of the areas where landslides are more likely to cause problems. The picture is not complete, however, since it only features landslides which have been recorded in the published literature. It is likely, for example, that more landslides have been recorded where they have been encountered by or caused by development. Thus there are generally, but not always, fewer records in areas of low population density. In addition, some areas have been investigated thoroughly but others have not. There are undoubtedly many more landslides than are recorded in the database. 9. Landslides involve the movement of large volumes of material in a relatively short time. Once movement has occurred, the normal erosion processes are slow and ineffective in removing the evidence. As a result, landslides accumulate in the landscape. The survival time of landslide form and deposits and the shear surface on which movement took place is very long. They thus remain in the landscape as a hazard for perhaps thousands of years. The majority of inland landslides are a legacy of the past. New landslides do occur but, fortunately, they are rare. On the coast, a mixture of repeated first-time failures and pre-existing landslides occur. 10. Even landslides which occurred a long time ago, when environmental conditions may have been different than now, are still present as a potential hazard to development. Over time, the
8 surface form may have all but disappeared due to erosion but the shear surface remains beneath the surface as a weak zone which may be reactivated easily by both natural and human interference. 11. Some present-day processes (eg weathering, coastal or river erosion, change in drainage patterns or change in groundwater regime due to abnormal or prolonged rainfall) can cause or contribute to landsliding, as they have done in the past. However, the main cause of slope instability over the last 100 years or so, especially in inland areas, has undoubtedly been the disturbance of ancient landslide areas by various human activities such as mining, highway construction and topographic reprofiling as a consequence of industrial and urban development. 12. Figure 2 illustrates the range of human influences on slope instability in the valleys of the South Wales coalfield. Whilst this example is specific to that area, many of the activities shown or similar ones take place elsewhere in Britain. The range of activities which may contribute to slope instability includes:- the placing of fills and other superimposed loads for construction purposes or the disposal of wastes; excavation, especially into old landslides, but also into slopes previously unaffected by landsliding; mineral extraction beneath slopes; leakage of water-retaining structures, including canals, reservoirs, ponds, swimming pools, water supply pipelines and sewers; uncontrolled disposal of water, including soakaways and the diversion of natural drainage courses; and changes in land use, such as deforestation or ploughing of grassland. The effects of changing the distribution of loading on a slope and, especially, of changing the water regime are evident.
9 Strategies For Dealing With The Problems 13. A number of possible responses to the problems of slope instability, which have been used variously in other countries, are shown in Table 3. Whilst all may be appropriate in different circumstances, a strategy of controls on development and land use through the Building Regulations and the operation of the planning system is probably the most effective in Britain. Building Regulations 14. Engineering controls tend to be specific to particular structures. They are designed to make them better able to withstand the effects of hazards. The Building Regulations 1991 specify in Requirement A2 of Schedule 1 that:- "The building shall be constructed so that ground movement caused by -... landslip... in so far as the risk can be reasonably foreseen, will not impair the stability of any part of the building." 15. However, these Regulations relate only to buildings and controlled services or fittings and some buildings are exempt. In addition, a wide range of development activities which may affect the stability of slopes, particularly by increasing the passage of water into the ground, may not require approval under the Building Regulations. Examples include the removal of trees, creation of hardstanding, terracing a site, creation of sports fields and facilities or swimming pools and storage of materials. It is also generally accepted that the regulations cannot be used to enforce maintenance of a property, however essential that may be for slope stability. Figure 2. Some human influences on slope stability in the South Wales coalfield (after Halcrow, 1993)
10 Table 3: Responses to problems of slope instability Emergency Response And Crisis Management Planning For Losses Modify The Hazard Control The Effects dealing with the problems only after they arise - Planning for emergency procedures may be needed where development has already taken place without reference to the stability of slopes; this response involves avoidable costs and may be unacceptable where public safety is at risk. spreading the losses by insurance, statutory compensation or fiscal measures - the risk of losses may need to be accepted where development has already occurred on unstable slopes; this response involves avoidable costs and may be unacceptable where public safety is at risk. by prevention or correction - slope stabilisation measures, rock fall protection structures, good practice in property maintenance and restrictions on certain engineering activities may help to prevent or reduce the losses arising from landsliding; this response may be justified where there is significant risk to public safety or buildings and structures; implementation may be constrained by economic or land ownership considerations. by avoidance: - the identification of landslides and the use of hazard assessment in planning control may enable the effects to be avoided altogether by not developing in landslide areas; by engineering controls
11 - planning and building controls may enable losses to be avoided or reduced through design and construction measures. 16. Thus, whilst the consideration of landslip has been introduced into the Building Regulations since the publication of PPG 14, they do not cover all aspects relevant to slope stability. The situation remains, therefore, that the Building Regulations cannot be used as a safety net to ensure that slope stability issues are taken into account before development takes place. Planning responses are required, therefore, to ensure that adequate consideration is given to the issues of slope stability and landslides in considering development and the use of land. Planning 17. Planning responses may be specific to individual developments or to wider areas of land. In some circumstances the planning repsonse may be to seek to divert development away from areas of hazard, ie an avoidance strategy, as indicated for certain coastal areas in PPG 14 and PPG 20. Whilst often the most cost-effective strategy, avoidance will not always be possible. The planning response must seek, therefore, to take due account of the hazard presented by unstable slopes to ensure that adequate precautionary or remedial measures are undertaken in an environmentally acceptable manner. This requires an improved understanding of landslide hazards and their identification for forward planning and to enable them to be considered fully when planning applications are determined. The developer's responsibility 18. It is the responsibility of developers to ensure that their developments will not initiate instability or will not be affected by instability originating outside the area of a development. Developers should therefore seek appropriate technical and environmental expert advice about the likely consequences of proposed developments on sites where landsliding is known or may be reasonably foreseen. They should also procure any necessary investigations to ascertain that their sites are and will remain stable or can be made so as part of the development works. As well as being in the developer's interests, this information may be required by a local planning authority in determining an application for planning permission and, if building work is involved, to meet the requirements of the Building Regulations. 19. It is important that investigations are not limited to the development site. A site needs to be assessed in the context of surrounding areas where landsliding could threaten the development within its anticipated life or damage neighbouring land or property. This is essential since the feasibility of development may be severely curtailed where a site is threatened by landslides originating in neighbouring areas to which the developer has no right of access to carry out investigations or remedial measures or for which there are no cost-effective engineering solutions. For these reasons, at least a preliminary assessment of slope stability should be carried out at the earliest possible stage before a detailed design is prepared. Only on the basis of such a geomorphological and engineering geological assessment, comprising a desk study of available information, including aerial photographs, and a ground inspection, can the need for further investigations to ascertain the true extent of the hazard and any necessity for precautionary or remedial measures be determined.
12 Planning Control 20. The planning system acts to control development in the public interest. "This Common Inheritance" (Cm 1200, September 1990) identified the maintenance of a physically safe environment as one of the priorities, which should be weighed in the public interest in determining policies for land use. The planning system should assist in ensuring that proper precautions are taken against the risks which might be posed by physical hazards. Since landsliding may threaten public safety, the built environment and economic activities, it is a material planning consideration. It should be considered as one of the factors in drawing up development plans as well as in decisions on planning applications. 1. Development Plans 21. PPG 14 (Paragraphs 25-30) outlines the approach that local planning authorities should follow in dealing with land instability issues in their development plans. It may be appropriate, where the relevant information is available, to identify any specific areas where particular consideration of landsliding or the potential for landsliding will be needed. This may be done using a constraints map or by narrative description within the local plan or in supplementary planning guidance. 22. Appendix 1A describes a step-by-step approach to landslide identification and hazard assessment. Two examples of more detailed assessments which have been developed in specific areas but which are likely to be more generally applicable are described. An appraisal by survey of the environmental value of landslide areas may also be needed to provide an information base for policy formulation. 23. Policies may be needed to control or restrict development in specific areas. Where slope instability cannot be overcome satisfactorily or where it provides other environmental benefits a presumption against development may be appropriate. In other areas, built development may not be appropriate unless adequate and environmentally acceptable slope stabilisation measures are included in the development proposal. PPG 20 and PPG 14recommend the avoidance of eroding cliff lines. 24. Since even apparently minor development can, in certain circumstances, be the final factor which initiates landsliding, consideration may need to be given in some circumstances to the use of Directions under articles 4 or 7 of the Permitted Development Order 1995 to control permitted development. In areas of active landsliding, this could usefully complement an avoidance strategy, though it is not likely to be needed in more than a few limited situations. 25. Local Plan development proposals should ensure that land use is appropriate in the light of any known landslide risk. As well as the consideration needed for new development, where there are risks to existing development, proposals may include specific action on land stabilisation or coast protection to reduce those risks or to enable appropriate beneficial use of unstable slopes. 26. As indicated in PPG 14 (paragraph 27), local plans should set out the criteria and information requirements which will be used in determining planning applications in areas of actual or potentially unstable slopes. These might include the situations and types of development for which a slope stability report would or would not normally be required (eg small developments, see paragraph 29 below) and the form and content of a slope stability report (see Appendix 1B). Although most authorities will not need to do so, where slope stability considerations are likely to be common in an area, it may be appropriate to prepare supplementary guidance notes for applicants (eg as in the
13 Rhondda landslip potential study - Halcrow, 1993) or to amend the application form to include specific questions on slope stability. 2. Development Control 27. General guidance for the handling of individual applications for development on land which is known or suspected to be unstable or potentially unstable is given in PPG 14. Figure 3, which derives from the Ventnor study described in Appendix 1A outlines the general procedure. Figure 4, from the Rhondda study also described in Appendix 1A, illustrates the planning responses which may be appropriate depending on the perception of landslide risk. Particular attention is given here to the requirements for reporting of information to enable decisions to be taken which take due account of the potential for slope instability and to the need for liaison with the Building Regulations authority. The slope stability report 28. Where there are grounds for believing that there is active or potential landsliding which would affect a proposed development reservations can be overcome in an environmentally acceptable manner. This may require the application to be accompanied by a slope stability report prepared by a competent person, which demonstrates that the site is stable or can be made so and will not be affected by or trigger landsliding beyond the boundaries of the site. Guidance on the preparation, content and format of slope stability reports is contained in Appendix 1B. Failure to satisfy the local planning authority on slope instability considerations may be grounds for refusing an application. Where recommendations are made for any remedial, preventive or precautionary measures, it may be appropriate for conditions specifying such measures to be attached to the planning permission. 29. It is recognised that a large proportion of planning applications are for minor extensions to existing buildings and for garages and for changes of use. Where such "small developments" are situated on potentially unstable slopes, as identified in the landslide assessment, they would normally require a slope stability report. Since these are largely situated adjacent to existing property and generally unlikely to pose a significant threat to slope stability, it may be appropriate, in considering an application for planning permission, for them not to be subject to this requirement provided that there is no evidence of current instability and that the site is not to be significantly disturbed, ie that: cuts and fills are limited in depth and any deep temporary excavations for surface or foul drains or other services are limited to short lengths across the slope; provision is made for free drainage of groundwater within the slope and for inspection and facility for future works for maintenance of flows; surface drainage is not restricted or diverted; drainage from the proposed development is collected and conveyed in flexible piped systems; and any existing retaining walls are not removed or altered. However, the need to satisfy the Building Regulations that landsliding, in so far as it can reasonably be foreseen, shall not threaten the security of a building may require the submission of a slope stability report to the building control authority. 30. Whilst a local planning authority is entitled to rely on the expert advice provided by a developer in relation to slope instability, it is recommended that a check development is that of the developer,
14 the decision on the planning merits may not require the local planning authority to check design assumptions and calculations. However, there will remain a need for the local authority or an approved inspector to check designs submitted for approval under the Building Regulations and the highways authority will need to approve any retaining structures close to a highway. Figure 3: Procedures for review of planning applications with respect to land stability issues (after Geomorphological Services Ltd, 1991) Figure 4: An example of the planning response options to the potential for landsliding (after Halcrow, 1993) 31. There are clear benefits to local planning authorities in maintaining indexed central records of slope stability reports. Their existence should be noted and made known on request to subsequent enquirers, who should be directed to the commissioners of the report for specific information. Liaison with building control authority 32. Since landsliding is now clearly recognised as a material consideration under both the planning system and the building regulations, there are advantages in attempting to achieve a coordinated response between the two controlling authorities whether they are different departments of the same local authority or different authorities, eg county/district councils and approved inspectors under the Building Regulations. A common recording system of applications allows easy crossreference. 33. Where consideration is given independently to a development proposal under the Town and Country Planning Acts and the Building Regulations, any requests for slope stability reports should be communicated to ensure that consideration is on a common basis. Slope stability reports submitted to one authority should be provided to the other, together with any drawings showing proposed remedial, preventive or precautionary measures. Both controlling authorities can thus draw on their relevant expertise and enable any necessary checks on compliance during inspections of the works.
15 Conclusions 34. The considered assessment of landslides and their consideration when determining planning applications will help to reduce the impact of undesirable consequences such as risks to public safety, property damage, avoidable costs to development, personal distress to those affected, degradation of the physical environment and loss of environmental resources. 35. The investigation and evaluation of slope stability here recommended is consistent with current good practice. It will thus not lead to additional costs to responsible developers and is likely to enable savings in avoidable costs which might arise if the investigation falls short of this standard. 36. The specific policies and practices to be adopted by local planning authorities are for them to decide in the light of circumstances pertaining within their area. It is recognised, however, that the identification and assessment of landslides recommended to assist in the implementation of PPG 14 is more detailed than previous common practice. There will, therefore, be resource implications for some local planning authorities. However, the incremental method of assessment which is recommended will enable these costs to be spread over a period of time. There is also a possibility of some compensatory savings over the long term in respect of the costs of local authority developments and the implications for local authorities arising from unforeseen landslide events.
16 Appendix 1A - Landslide Recognition And Hazard Assessment 1A1. Local planning authorities wishing to assess landsliding within their areas should use a stepby-step approach, adding further information and refinement as time and resources permit. 1A2. Of primary importance is the need to establish the extent and distribution of actual landslides within the plan area. For many authorities such a landslide inventory will provide sufficient information to determine where specific consideration of landsliding is needed. In rural areas, initial costs could be reduced further by concentrating efforts on identifying landslides in areas where movements could threaten settlements and infrastructure. 1A3. In some cases, dependent on the extent and nature of landsliding, a more deterministic approach which considers the factors contributing towards slope instability may be appropriate. The method used in the Rhondda valleys of South Wales is described below. Alternatively, where substantial existing development is affected by landsliding, the ground behaviour approach adopted at Ventnor, Isle of Wight, may be used. 1A4. A first step in preparing a landslide inventory is through the information collected as part of the DOE's Review of research on landsliding in Great Britain which is summarised in Figure 1. The national landslides database contains details of 8835 landslides recorded in the published literature and these are shown on county maps at 1:250,000 scale together with interpreted "possible areas of extensive ancient landsliding". Whilst the coverage of this database is far from comprehensive and it is on a smaller scale than is usually appropriate for planning purposes, it does provide a useful starting point. 1A5. Consultation of the original records from which the database was compiled may allow mapping at a scale more appropriate for planning. The geological maps at 1:10,000 and 1:50,000 scale produced by the British Geological Survey are an important source of information since they show foundered strata and landslips. The Survey also operates a commercially available Ground Hazards Assessment Service, which is based on the geological maps and other geological information held by the Survey. Further searches of eg local authority, highways authority, British Rail and British Waterways records and local press reports will often provide additional information on the location of landslides and the situations in which they have occurred. In coastal areas the information held by the Coastal Defence Groups and providing the basis for shoreline Management Plans should also be consulted. 1A6. The use of aerial photographic interpretation, supplemented as necessary by field inspection and reconnaissance geomorphological mapping has proved to be a highly effective and relatively cheap means of identifying the presence and defining the extent of landslides. This provides a further refinement of the landslide inventory which would in most cases provide sufficient information for policy formulation and implementation. 1A7. Slopes on stiff fissured clays which have been affected by periglacial solifluction (at around the end of the last glaciation some 10-13,000 years ago) are widespread in Britain, particularly in its southern parts. These are particularly hazardous as they are often smooth and featureless, thus revealing little under aerial photographic examination, and low-angled (typically between 12 and as little as 2-3 ), hence suggesting an absence of stability problems. However, because of the presence of numerous shear surfaces at residual strength and generally high groundwater levels, such slopes are easily reactivated by relatively modest cuts or fills and such failures in Britain lead to large unforeseen losses. The depths of such periglacial solifluction deposits are generally small (typically 1-3m) and any development brief on slopes where they are suspected should include
17 provision for trial trenching. Relatively low angle slopes can also be subject to slow downhill creep of material and detailed mapping and/or trenching may be necessary to identify this hazard. 1A8. Consideration of the factors which contribute towards slope instability will also assist in refining the assessment of landslide hazard. Slope steepness is, perhaps, the most obvious and the easiest to determine and particular requirements according to the steepness of slopes may be appropriate in some circumstances, though this may not be straightforward, as indicated in paragraph 1A7. Other factors, such as the disposition and nature of both superficial and solid rock deposits and the importance of water in the slope may also need to be considered in particular circumstances. 1A9. The methods, described below were developed by DOE research to assess the potential for landsliding and to incorporate it in land use planning in the South Wales coalfield and at Ventnor, Isle of Wight. Whilst these methods were developed in the particular circumstances of the South Wales coalfield and a large coastal undercliff, they could be applied with suitable modification to other areas. However, most local planning authorities will not need to develop an assessment in this detail. 'The landslide inventory will be sufficient for their purposes, though a more detailed assessment could be considered when preparing a development brief for a particular site or area. Landslip potential assessment: South Wales 1A10. A method of quantifying landslip potential for use by planners was developed initially in 60km 2 of the Rhondda valleys in the South Wales coalfield. It was subsequently extended to the whole of the administrative area of Rhondda Borough. 1Al l. The methodology involves the derivation of ratings which reflect the degree of association between landsliding and the physical attributes and composition of the landscape. Ratings for each attribute are then combined to define "landslip potential" as a number. Ranges of landslip potential are then portrayed on a map, at 1:10,000 scale, customised for use by the local planning authority. The basic mapping units used were regular 50m by 50m elements which permitted computerised methods of data storage, manipulation and plotting. The maps are based on a synthesis of geological, geomorphological geotechnical and hydrogeological data but are presented in a nontechnical manner. 1A12. The initial step was to carry out a landslide inventory. Landslides were mapped from existing published sources of information and various archival sources. The main effort was concentrated on new mapping of landslides, both to confirm known boundaries and to locate previously unknown landslides. This was done using aerial photographic interpretation verified by field surveys. Landslides were classified according to their type and activity. 1A13. Factors which were considered to influence the location of landslides and for which existing data sources were capable of providing information are listed in Table 1A1. For each factor, a map was produced showing variations in the attributes of that factor, by dividing the map into factor zones. 1A14. The analysis of the association between landslides and factors was based on a comparison of the relative areas of landsliding in factor zones and in the area as a whole. Analyses were carried out in two stages. Firstly, the location of known landslides in each factor zone was compared to their overall incidence in order to derive a rating for each factor zone. Secondly, the ratings were combined in various ways to define the landslip potential of each element.
18 1A15. Initially, the ratings for all the factors listed in Table 1A1 were used to derive an assessment of landslip potential. Further analysis indicated that factors with a small range of ratings could be omitted without adversely affecting the relative landslip potential of the elements. Various combinations of factors were then tried to promote an optimum correlation and it was found that a combination of slope angle, superficial deposit type, superficial deposit thickness and groundwater potential gave the best results for South Wales. Other factors may prove to be more important elsewhere according to the local conditions and landslide controls. 1A16. Four categories were defined initially by appropriate ranges of landslip potential, which represented the best fit between high values of landslip potential and landsliding whilst maintaining as large an area as possible in the lower two categories. Following testing of the likely impact of using the maps on existing procedures within the local planning authority, their final format portrays four zones: areas of active landsliding; areas of dormant landsliding; areas of some landslip potential corresponding to the two categories of greatest landslip potential initially defined; and areas of little or no landslip potential corresponding to the two categories of least landslip potential initially defined. 1A17. Prior to their use in the planning department of Rhondda Borough Council, a comprehensive legend was added which explains the methods used to prepare the maps and their limitations, explanations of each zone and the procedures for using the maps. A trial period in which the maps were used by the local planning authority has validated the procedures and presented few problems with their use. The maps continue to be in everyday use by the local planning authority. Coastal landslip potential assessment - Ventnor, Isle of Wight 1A18. In the South Wales coalfield, the identification of landslides and potentially unstable areas enables them to be avoided by future development, or developed only if appropriate engineering measures are adopted. In contrast, the whole of the town of Ventnor lies within an ancient landslide complex. The problems relate to the control of the nature of development in parts of the town which may be susceptible to ground movement rather than being simply a matter of identifying landslides. The Ventnor study aimed to develop a method of landslip potential assessment which was applicable to this situation and, more widely, to similar coastal problems. 1A19. The work undertaken involved a thorough review of available records, reports and documents followed by a programme of detailed field investigation comprising geomorphological and geological mapping, photogrammetric analysis, a survey of damage caused by ground movement, a land use survey and a review of local building practice. 1A20. A geomorphological map of Ventnor was produced which summarises the surface form of the landslide complex and the surrounding area. This map shows the relative positions of the main geomorphological units that occur in the area and identifies the nature and extent of individual landslide units. Table 1A1: Basis for zonation of factor maps in landslip potential assessment : South Wales (after Halcrow, 1993) Factor Name Number Basis Of Zonation
19 Of Factor Zones Slope aspect 9 Slopes defined by compass beating in 45 sectors and areas of no slope. Slope angle 11 Portrayed in increasing 5 increments. Lithostratigraphic units Superficial deposit type Superficial deposit thickness Dip of bedrock versus ground slope Argillaceous, arenaceous, mixed lithologies and stratigraphic units. Glacial soils, alluvium, peat; residual soils and colluvium types assessed from primary mapping; location on slope and underlying lithologies. Thickness contours prepared from geomorphological considerations and many data sources. Dip direction of solid rock strata (derived map) compared with slope aspect. Faulting 3 Proximity to fault and size of fault. Groundwaterpotential 6 Location of points of groundwater emergence, together with an evaluation of potential groundwatercatchments. Erosion potential 3 Mining strains 6 Mining tilt 6 Presence or absence of erosion and rivet--trained areas. Severity of tensile strains from a total extraction (derived) map. Relationship of tilt direction (from total extraction map) to ground slope direction. Excavation and filling 5 Types of activity and location. 1A21. Detailed knowledge of the size and frequency of ground movement events over the last 200 years and an understanding of the geomorphology allowed the production of a 1:2,500 scale map of ground behaviour. This summarises the nature and extent of the different landslide processes that occur in the area and their impact on the community. This understanding of landslide behaviour, together with a knowledge of the vulnerability of different types of construction and the property risk in different areas was used to formulate a range of outline management strategies designed to reduce the impact of future movements. These strategies include: effective planning control to avoid unsuitable areas and to control the nature of development; modifying the hazard to the community by means of environmentally appropriate engineering works, coastal protection, improved building practice etc;
20 improving the understanding of landslide behaviour; mitigating the costs of landsliding through insurance etc; and coordinating community responses to the problems. 1A22. A planning guidance map was produced at 1:2,500 scale which relates categories of ground behaviour to forward planning and development control. This map indicates the need for different areas of the landslide system to be treated in different ways for both policy formulation and development control. Areas are recognised which are likely to be suitable for development, along with areas which are either subject to significant constraints or mostly unsuitable. Advice was also provided on the level of stability information which should be presented with planning applications in different areas. 1A23. Following the publication of the Ventnor study in 1991, the local authority involved, South Wight Borough Council, has developed and is implementing a landslide management strategy which takes account of the recommendations from the study. This has included the extension of the landslip potential assessment from the original DOE study area to the remainder of the built-up area within the Ventnor Undercliff landslide complex. Whilst this has not prevented all problems in Ventnor, it has undoubtedly reduced and will continue to reduce the impact of landsliding on land use and development in the area.
21 Appendix 1B - The Slope Stability Report 1B1. A slope stability report maybe required to be submitted to the local planning authority before determining an application or to the building control authority. 1B2. In order to satisfy a local planning authority, slope stability reports should demonstrate: an adequate appreciation of ground and groundwater conditions and any other relevant factors influencing stability based on desk studies, aerial photographic interpretation, geomorphological and engineering geological mapping of the site and appropriate subsurface investigation, laboratory testing and monitoring where necessary; this appreciation must include a statement on whether or not the site or surrounding areas are affected by earlier landsliding or periglacial deposits and, if so, a definition of their extent in plan and section; that the site is stable and has an adequate margin of stability, or can be made so as part of the development works, for the foreseeable conditions which will operate at the site; that the site is not likely to be threatened or affected by reasonably foreseeable slope instability originating outside the boundaries; and that the development is not likely to result in slope instability which will affect either the development or nearby property. 1B3. Slope stability reports should be prepared by a "competent person" able to demonstrate relevant specialist experience in the assessment and evaluation of slope stability. A competent person would normally be expected to be a Corporate Member of a relevant professional institution such as the Institution of Civil Engineers or the Geological Society. In this context, a competent person would be a geotechnical specialist as defined by the Site Investigation Steering Group of the Institution of Civil Engineers. 1B4. To assist prospective developers in identifying a relevant specialist, they should be advised to consult the British Geotechnical Society's Geotechnical Directory, which lists 125 firms and gives details of 700 geotechnical practitioners operating in the United Kingdom. 1B5. The competent person should undertake such inspections and investigations as are considered necessary to allow an opinion to be made on the stability of the development and its surrounding area. Investigations should be designed and executed in accordance with relevant British Standard Codes of Practice, including: BS5930:1981 Site investigations; BS1377:1991 Parts 1-9 Methods of test for soils for civil engineering purposes; BS8002:1994 Earth retaining structures; BS6031:1981 Earthworks; and BS8004:1986 Foundations. 1B6. A desk study examination of relevant published and any available unpublished information and a site reconnaissance should be carried out to obtain general information about the siting of the proposed development, its relation to existing structures and services and other relevant ground and surface features. Detailed information on ground conditions should be recorded, including: the morphology of the area;
22 the geological sequence and structure, with particular emphasis on superficial deposits and rockhead, including the dip and dip direction of larger rock masses; landslide features such as back scars, tension fissures and lateral shears and evidence of soil creep; seepage lines and wet areas which might indicate groundwater emergence; vegetation types indicative of a high water table or changes in soil type and condition; evidence of movement in existing structures and trees; evidence of past movement indicated by discrepancies between locations of features and field boundaries and those on past editions of Ordnance Survey maps or aerial photographs; evidence of movement due to mining or natural underground cavities; and evidence of previous changes to the structure of the site by infilling, man-made embankments or tips and cuttings eg for canals, reservoirs, roads, railways, quarries, mines etc. IB7. A comprehensive desk study and field reconnaissance represents the minimum investigation which should be carried out by a competent person in order to prepare a slope stability report. Where an adequate margin of stability can reasonably be assured, these two operations may be sufficient to support an opinion on the stability of a site. However, the competent person would normally be expected to carry out or to procure appropriate subsurface investigations. 1B8. Specific requirements for the scope and content of a ground investigation depend on the individual characteristics of each site and the development proposed. They should therefore be designed with regard to: the extent and nature of the development; the location of any features indicative of slope instability within the site boundary and in surrounding areas where relevant; the consequences of failure; the sequence, structure and depth of soils and of underlying strata which have a bearing on stability; understanding the ground water conditions, eg the depth and fluctuations of the water table and the possible presence of potential aquifers or confining layers; and the requirements for analysis and evaluation of remedial measures. 1B9. It will be necessary to establish: the location in plan and section of any existing or potential zones of movement; water pressures within the slope and likely fluctuations in adverse conditions; representative engineering parameters of the materials within the slope on which stability calculations can be based; and the configuration of critical slopes by survey for subsequent stability calculations. 1B10. In preparing the slope stability report, the competent person should consider all the factors which might influence the stability of the site and its surrounding area in relation to its suitability for the proposed development. The report should therefore contain:
23 a factual record of all investigations carried out; a description and engineering interpretation of relevant ground and groundwater conditions; an account of any stability calculations; conclusions on the stability of the site and the influence of the proposed development; and any recommendations for remedial, preventive and precautionary measures, site inspections and monitoring. 1B11. For ease of assessment by the local planning authority, there are advantages in slope stability reports being prepared to a standard format. A suggested structure and content of a slope stability report are contained in Table 1B1. 1B12. An essential element of the slope stability report is the opinion of the competent person on the stability of the slope. Where recommendations are made for any remedial, preventive or precautionary measures, it is in the developer's interests for the development proposals to be made available to the competent person before submission to the local planning authority. The competent person should countersign the plans only if satisfied that the recommendations made in the slope stability report have been incorporated into the design. Table1B1: Reporting Requirements For a Slope Stability Report in Support of a Planning Application Introduction Describe for whom the work was done, the nature and scope of the investigation, its general location, its purpose and the period over which it was carried out. Description Of Site History Describe the site in detail based on observations made during desk studies, aetrial photograp hic interppeetation and site reconnaissance, referenced to plan of site showing national grid coordinates at 1:2,500 scale or larger. Describe history of the site and its environs, previous uses, proximity to manmade structures such as highway, railway, canal embankments/cuttings and evidence of previous landslide events. Investigations Ground Conditions Refer to information consulted during desk study and list as appendix. Describe fieldwork with full records of boreholes, trial pits or other exploratory methods as appendix and their locations shown on a plan. Describe site tests and laboratory tests and methods with their results included. Describe ground and groundwater conditions based on desk studies, aerial photographic interpretation, geomorphological and engineering geological reconnaissance and mapping of the site and appropriate subsurface investigation monitoring and laboratory testing. Interpret their relevance to the stability of the site and the surrounding area, illustrated as necessary by plans and sections. Items discussed should include: Whether or not the site is affected by earlier landslides and/or periglacial deposits; Geological sequence and structure of soils and rocks within the relevant area of the site;
24 Mining and its effects with respect to collapse of workings and potential groundwater drainage paths and the relevance of pillars and colliery boundaries; Hydrogeology including springs, issues and wet areas related to geology and main aquifers and aquicludes identified, any influence of mining and results of any monitoring of water pressures; Material properties of relevant soils and rocks with reference to summary tables and charts of any laboratory tests, including an assessment of the reliability of data. Evaluation Of Stability Conclusions And Recommendations Appendices Signature Of Competent Person Evaluate the stability of the site and relevant adjacent area with respect to proposed development and the assessment of ground conditions. State methods of analysis and parameters used for any stability calculations and illustrate on cross-sections. The stability calculations should evaluate the existing situation and the impact of the development and any proposed stabilisation measures with particular attention to gradients of cut slopes and tills, drainage measures, retaining structures and failure mechanisms and design criteria applied. Summarise main conclusions of the investigation and list recommendations to ensure long-term stability of the site, taking account of the anticipated life of the development, and in the short term whilst construction proceeds. It is essential that all information consulted during the desk study is listed, together with full records of boreholes, trial pits and other exploratory methods. The Competent Person should sign and and date the Slope Stability Report and indicate his/her professional qualifications.
25 Appendix 1C - References Jones, D.K.C. and E.M. Lee, Landsliding in Great Britain. London, HMSO, 361pp. (ISBN ) Halcrow, Sir William, And Partners, Rhondda landslip potential assessment Summary report. Cardiff, Sir Wm Halcrow & Ptnrs, 67pp. (Available from Halcrows Cardiff office at Newport Road, Cardiff CF2 IAB) Geomorphological Services Ltd, Coastal landslip potential assessment: Isle of Wight undercliff, Ventnor: Technical report. Milton Keynes, Geomorphological Services Ltd, x + 68pp. (out of print) Geomorphological Services Ltd, Coastal landslip potential assessment : Isle of Wight undercliff, Ventnor. Technical annexes. Report to Department of the Environment, 312pp. (open-file publication, may be consulted at DOE, London, by arrangement) Geomorphological Services Ltd, Ground movement in Ventnor, Isle of Wight - a summary of the study of landslide problems in Ventnor carried out for the Department of the Environment. Milton Keynes, Geomorphological Services Ltd, vi + 68pp. (out of print) Rendel Geotechnics, The undercliff of the Isle of Wight: a review of ground behaviour. Cross Publishing, 68pp. (available from Engineering & Technical Services Dept, Isle of Wight Council, County Hall, Newport, IOW P030 IUD) Geomorphological Services Ltd, 1986/1987. Review of research into landsliding in Great Britain. Reports to the Department of the Environment, 14 volumes + county maps at 1:250,000 scale. (open-file publication, may be consulted at DOE, London, by arrangement) Site Investigation Steering Group, Without site investigation, ground is a hazard. London, Thomas Telford, 45pp.
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
London Borough of Merton Local Flood Risk Management Strategy
Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood
Guidance Notes: GARDEN FLOODING
Page 1 of 7 Guidance Notes: GARDEN FLOODING If you are unsure about anything within these notes then please contact the Flood Risk Management (FRM) team using the details at the end of this document. Water
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies
Assessment. Ian Uglow Technical Director, SLR Consulting [email protected]. 7 th October 2010
Peat Stability Risk and Hazard Assessment Ian Uglow Technical Director, SLR Consulting [email protected] 7 th October 2010 What goes into a Peat Stability Risk Assessment? You will need: An understanding
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared
London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document
LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS
GEOTECHNICAL ISSUES OF LANDSLIDES CHARACTERISTICS MECHANISMS PREPARDNESS: BEFORE, DURING AND AFTER A LANDSLIDE QUESTIONS FOR DISCUSSIONS Huge landslide Leyte, Phillipines, 1998 2000 casulties Small debris
Basements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES
FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-
approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile
Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014
Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,
Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
1. Purpose and scope. 2. SEPA's role in hydropower and planning
Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire
Jackson Gulch Outlet Canal Rehabilitation Project
Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County
CIVL451. Soil Exploration and Characterization
CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
Groundwater Flooding: a UK Perspective
Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition
CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES WATER RESOURCES MANAGEMENT DIVISION Water Investigations
(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.
Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing
environment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.
GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
DAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS
DAMAGE TO FOUNDATIONS FROM EXPANSIVE SOILS J. David Rogers, Robert Olshansky, and Robert B. Rogers Expansive soils in many parts of the United States pose a significant hazard to foundations for light
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
HOMEOWNER S GUIDE. to LANDSLIDES. and MITIGATION RECOGNITION, PREVENTION, CONTROL, Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J.
HOMEOWNER S GUIDE to LANDSLIDES RECOGNITION, PREVENTION, CONTROL, and MITIGATION Compiled by Dr. Scott F. Burns Tessa M. Harden Carin J. Andrew Federal Emergency Management Agency Region 10 If you are
PLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
Homes and Environment Scrutiny Committee. (Environment & Transport)
REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)
CROSSRAIL INFORMATION PAPER C2 OPERATION OF THE NATIONAL COMPENSATION CODE
CROSSRAIL INFORMATION PAPER OPERATION OF THE NATIONAL COMPENSATION CODE This paper sets out the main provisions of the national compensation code. It will be of particular relevance to those whose land
Bolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
The Control of Major Accident Hazards Regulations (Northern Ireland) 2015
STATUTORY RULES OF NORTHERN IRELAND 2015 No. 325 HEALTH AND SAFETY The Control of Major Accident Hazards Regulations (Northern Ireland) 2015 Made - - - - 26th August 2015 Coming into operation - 28th September
Advice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
London Borough of Croydon Local Flood Risk Management Strategy
London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has
A GIS BASED GROUNDWATER MANAGEMENT TOOL FOR LONG TERM MINERAL PLANNING
A GIS BASED GROUNDWATER MANAGEMENT TOOL FOR LONG TERM MINERAL PLANNING Mauro Prado, Hydrogeologist - SRK Consulting, Perth, Australia Richard Connelly, Principal Hydrogeologist - SRK UK Ltd, Cardiff, United
MANAGING LANDSLIDE HAZARDS FROM THE WHAKATĀNE AND ŌHOPE ESCARPMENTS
MANAGING LANDSLIDE HAZARDS FROM THE WHAKATĀNE AND ŌHOPE ESCARPMENTS Summary - Landslide Risk Study & Management Options www.whakatane.govt.nz July 20 13 INTRODUCTION 2 SUMMARY 3 GEOLOGY AND LANDSLIDE FORMATION
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure
IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation
Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.
Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.
Tool 2.3.1: General information on the causes of rainfall-induced landslides
Impacts of Climate Change on Urban Infrastructure & the Built Environment A Toolbox Tool 2.3.1: General information on the causes of rainfall-induced landslides Author G. Dellow Affiliation GNS Science,
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM
MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM 1. Applicant Details (See guidance note 1) 2. Agent Details Please complete if the applicant has an agent (See guidance note 2) * Title: * Forename:
(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf
Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska
APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
VENTNOR UNDERCLIFF LANDSLIDE COMPLEX -AN OVERVIEW, ISLE OF WIGHT, UK
GEOTECHNICAL STUDY AREA G1 VENTNOR UNDERCLIFF LANDSLIDE COMPLEX -AN OVERVIEW, ISLE OF WIGHT, UK Plate G1 Isle of Wight Undercliff looking West INTRODUCTION TO THE ISLE OF WIGHT INSTABILITY STUDY AREAS
Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-57 Requirements for an Excavation and Lateral Support Plan Building
1 Introduction. 1.1 Key objective. 1.2 Why the South Esk
1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
Recommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
Building over or close to a public sewer
Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Essex County Council Flood Investigation Report
Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd
THE CALIFORNIA SOLAR RIGHTS ACT
THE CALIFORNIA SOLAR RIGHTS ACT The Solar Rights Act comprises the following California sections of law: California Civil Code Sections 714 and 714.1, California Civil Code Section 801, California Civil
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY
ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW
SURFACE REMEDIATION AND MANAGEMENT OVERVIEW Giant Mine Remediation Project Environmental Assessment Public Hearings September 10-14, 2012 Adrian Paradis (AANDC) Mike Nahir (AANDC) Bruce Halbert (Technical
Natural Disasters & Assessing Hazards and Risk. Natural Hazards and Natural Disasters
Page 1 of 9 EENS 3050 Tulane University Natural Disasters Prof. Stephen A. Nelson Natural Disasters & Assessing Hazards and Risk This page last updated on 19-Aug-2014 Natural Hazards and Natural Disasters
BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY
BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SSDP 000748 ) Kevin Robinson ) FINDINGS, CONCLUSIONS ) AND DECISION For a Shoreline Substantial Development ) Permit
SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
DPAC- DLGSEM and MRT. Landslide planning matrix
DPAC- DLGSEM and MRT Landslide planning matrix Thank you to MRT, council planners, and the TPC for their support in this work DPAC- DLGSEM and MRT Process thus far Regional workshops (April May) Follow
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Guideline: A risk assessment approach to development assessment in coastal hazard areas
Guideline: A risk assessment approach to development assessment in coastal hazard areas Prepared by: Environment Planning, Department of Environment and Heritage Protection State of Queensland, 2013. The
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide
Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Renew provides multidisciplinary engineering services to maintain and develop UK infrastructure focused in
How To Check For Scour At A Bridge
Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
Sec. 22a-1a page 1 (4-97)
Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination
Keynote 2: What is Landslide Hazard? Inventory Maps, Uncertainty, and an Approach to Meeting Insurance Industry Needs
Keynote 2: What is Landslide Hazard? Inventory Maps, Uncertainty, and an Approach to Meeting Insurance Industry Needs Jeffrey R Keaton Richard J Roth, Jr Amec Foster Wheeler Los Angeles, USA Consulting
There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
Exploration. Exploration methods
Exploration Activities related to establishing a mineral deposit through geological, geophysical and geochemical methods. It is preceded by Prospecting and followed by Planning & Development. Geological
Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1)
Engineering Geological Asset Management for Large Dams Yasuhito SASAKI (1) (1) Geology Research Team, Public Works Research Institute, Japan E-mail:[email protected] Abstract Comprehensive inspection
The correct answers are given below. Some talking points have been added for the teachers use.
Natural Resources Canada 2011: Lesson Plan Grades 11 and 12 Landslide activity 5b: Landslides in Canada quiz Description: This is an independent study activity for grades 11 and 12. Students will read
Planning for Bushfire Risk Mitigation General Code
Planning for Bushfire Risk Mitigation General Code March 2008 Contents 0H1. Introduction 14H1 1H1.1 Purpose... 2H1.2 Aim... 3H2. Principles 17H2 4H2.1 Shared Responsibility... 5H2.2 Prevention, Preparedness,
Planning Policy and Guidance on Flooding and Coastal Erosion
Planning Policy and Guidance on Flooding and Coastal Erosion James Hooker (MRTPI) Senior Planning Manager Welsh Government RTPI Cymru - Water and Flooding Seminar Tuesday 20 th November 2012 Overview
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1
CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction
WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10
WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta
Environmental Impact Assessment of Forestry Projects
Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer
RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES
RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES GOVERNMENT ACCOUNTING SECTION DEPARTMENT OF FINANCE MARCH 2004 Risk Management Guidance CONTENTS Pages List of guidelines on risk management
Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH
Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the
Tunnelling & Underground. Specialists
Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering
Maryland Emergency Operations Plan
Maryland Emergency Operations Plan Purpose The purpose of the Maryland Emergency Operations Plan (EOP) is to outline an approach and designate responsibilities intended to minimize the consequences of
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this
3. Given the geographic extent of the area, amendments have been made to the following regional planning documents
AMENDMENTS TO THE REGIONAL PLANS RELATING TO LAND REPAIR ON EARTHQUAKE DAMAGED RESIDENTIAL LAND UNDER s27 OF THE CANTERBURY EARTHQUAKE RECOVERY ACT 2011 1. This memorandum outlines the specific changes
National Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
Landslides & Mudflows
1 2 - What is a Landslide? - Geologic hazard Common to almost all 50 states Annual global Billions in losses Thousands of deaths and injuries 3 1 - What is a Landslide? - Gravity is driving force Some
Macro water sharing plans the approach for unregulated rivers
Macro water sharing plans the approach for unregulated rivers Access and trading rules for pools Leading policy and reform in sustainable water management Publisher NSW Office of Water Level 18, 227 Elizabeth