1 Guideline: A risk assessment approach to development assessment in coastal hazard areas

2 Prepared by: Environment Planning, Department of Environment and Heritage Protection State of Queensland, The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 3.0 Australia (CC BY) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. For more information on this licence, visit Disclaimer This document has been prepared with all due diligence and care, based on the best available information at the time of publication. The department holds no responsibility for any errors or omissions within this document. Any decisions made by other parties based on this document are solely the responsibility of those parties. Information contained in this document is from a number of sources and, as such, does not necessarily represent government or departmental policy. If you need to access this document in a language other than English, please call the Translating and Interpreting Service (TIS National) on and ask them to telephone Library Services on This publication can be made available in an alternative format (e.g. large print or audiotape) on request for people with vision impairment; phone or <library@ehp.qld.gov.au>. April 2013

3 Contents Purpose...1 Background...1 What are coastal hazards?...1 Temporary inundation (storm tides)...1 Permanent inundation...1 What is risk?...2 What is risk mitigation?...2 Risk assessment Identify if the development site is affected by coastal hazards If the site is affected by coastal hazards then determine the nature and extent of the hazard Determine the impact of the inundation on the proposed development Identify potential mitigation measures Assess the viability of mitigation measures both onsite and offsite, taking into account environmental, social and financial factors Select preferred mitigation measures...7 iii

4 Purpose The draft State planning policy sets out the state interest for natural hazards that is, the risk of, and the adverse impacts from natural hazards are avoided, minimised or mitigated to protect people and property and enhance the community's resilience to natural hazards. This guideline has been prepared to assist local government in assessing development applications to addresses the coastal hazard(s) and associated risks to people, property, economic activity, social wellbeing and the environment. Background A high proportion of Queensland s urban development is located in the coastal zone, with some development located in areas vulnerable to coastal hazards. Coastal hazard areas are those areas that are at risk from coastal erosion or storm tide inundation. Coastal hazard risks are not new; however projected sea level rise will increase the risk from coastal hazards and cause the permanent inundation of low lying land. This increasing coastal hazard risk will occur over a long timeframe and significant changes are generally not projected to be experienced until 2030 or later. However, development decisions can have long-term implications and most urban development cannot easily be relocated. History has demonstrated that the conversion of land use from a lower to high intensity use is considered permanent and development is generally defended from hazard impacts. Projected sea level rise will challenge the financial and physical capacity of communities to continue to defend people and property. What are coastal hazards? Coastal hazards consist of temporary inundation from storm tides and permanent inundation as a result of shoreline erosion or sea level rise. Temporary inundation (storm tides) While storm tide inundation is an infrequent event, it is not rare in Queensland and the effects on life and property can be dramatic. Unlike coastal erosion and permanent loss of land from sea level rise, storm tides do not permanently inundate areas and inundation occurs over a period of hours or days. The frequency, depth and longevity of inundation changes with elevation above the highest astronomical tide level (HAT) in simple terms HAT is the highest point a tide reaches during a year. People and development located on land that is flooded to a depth of a metre or more during a defined storm-tide event are at significant risk. This is due to the water depth being sufficient to generate damaging waves and the strength of the tidal flows. Permanent inundation Permanent inundation as a result of sea level rise will be experienced as shoreline erosion events in which the original extent of the foreshore never recovers from an erosion event. While sea level rise is projected to accelerate over the next 100 years as a consequence of climate change, the permanent loss of land from a rise in sea level will become apparent as accelerated coastal erosion. Sea levels will not rise evenly. Without climate change, sea levels constantly vary as a result of processes such as slight changes in the orbit of the earth, associated tide changes and climate variability. Rising sea levels will be most noticeable during extreme sea level events such as king tides. This is because existing extreme events in sea level variability will be exacerbated by rising sea levels. Further information about the methodology used to determine coastal hazard areas, and guidance about determining areas at risk from coastal hazards can be found in the Coastal Hazards Technical Guide, available on the EHP website 1

5 What is risk? Risk can be described as the frequency of a hazardous event occurring relative to the consequences of the event. A risk assessment is the means used to evaluate risks associated with a specific hazard for a particular development in terms of the probability or likely frequency of occurrence, severity, exposure of an event and the consequences for the development. Risk = Frequency X Consequence To implement effective risk mitigation measures, the potential impact on a development as a result of being affected by a defined coastal hazard must first be appraised through identifying: Hazard identifying the nature, extent and likely frequency of the coastal hazard(s) Asset determining the nature and scale of the development that is at risk from the coastal hazard(s) Vulnerability evaluating the consequence of coastal hazard impacts on people, property and the operation of the development over its functioning life. What is risk mitigation? Coastal hazard risk mitigation is any sustained action taken to avoid the long-term risk generated by hazards to people, property, economic activity, social wellbeing and the environment. Risk mitigation actions can take many forms, including siting of structures, building design, protective works (erosion control structures), land use regulation and retention or enhancement of natural buffers. Image 1: Hurricane Floyd (1999) brought a 4.5m storm surge that damaged or destroyed hundreds of houses along Long Beach on Oak Island, NC (USA). Here is a prime example of mitigation working the elevated house on the right was still standing after the hurricane. The older, ground-level block foundation of the home on the left was crushed. Image credit: Dave Gately/FEMA News Photo. Risk assessment A coastal hazard risk assessment can be undertaken to evaluate the risk to a proposed development from coastal hazards. This can assist in determining the most appropriate mitigation measures for the development site. In accordance with the draft State Planning Policy, a coastal hazard risk assessment can be undertaken to evaluate whether: the development is compatible with the level of risk associated with the hazard(s) the development siting, layout and access responds to a potential coastal hazard and minimises risk to personal safety 2

6 the development is resilient to coastal hazard events by ensuring siting and design accounts for the potential risks of coastal hazards to property the development directly, indirectly and cumulatively avoids an unacceptable increase in the severity of the coastal hazard and does not significantly increase the potential for damage on the site or to other properties the development avoids the release of hazardous materials as a result of a coastal hazard event natural processes and the protective function of landforms and/or vegetation are maintained in coastal hazard areas. 1 A risk assessment can demonstrate that adverse coastal hazard impacts from the defined storm tide event and projected sea level rise that would otherwise affect the operational and structural integrity of the development are avoided, minimised or mitigated. This includes ensuring the development is able to continue to function and maintain its design lifespan without maintenance or repair beyond the normal requirements for a development of its type. The risk assessment can describe how these impacts are avoided through location, design, construction and operating standards including any existing coastal protection works. The detail included in a risk assessment will vary depending on the scale and complexity of development proposed. However this guideline recommends that a risk assessment be developed using the following steps: 1. Identify if the development site is affected by coastal hazards 2. If the site is affected by coastal hazards then determine the nature and extent of the hazard 3. Determine the impact of the inundation on the proposed development 4. Identify potential mitigation measures 5. Asses the viability of mitigation measures both onsite and offsite, taking into account environmental, social and financial factors 6. Select preferred mitigation measures. This process aligns with the Australian and New Zealand Risk Management Standards (AS/NZS ISO 31000). 1. Identify if the development site is affected by coastal hazards Establish whether the site is affected by coastal hazards. Local governments are encouraged to undertake local-scale coastal hazard assessment studies for urban and periurban areas. With respect to coastal erosion, EHP has declared erosion prone areas along the coast and this is generally suitable for consideration in assessment processes. Where local studies have not been undertaken, a development proponent or local government should use the Queensland Government coastal hazard area mapping as a basis to establish whether the site is likely to be affected by coastal hazards (refer to the example in Figure 1). The Queensland Government maps are indicative of the extent of Queensland s coastal areas projected to be at risk from coastal hazards at the year Each map shows: areas to be permanently inundated a result of either shoreline erosion or sea-level rise a defined storm-tide inundation area medium hazard and high hazard temporary inundation areas. In these maps storm tide inundation is based on default values of 1.5m above highest astronomical tide (HAT) for southeast Queensland and 2.0m above HAT for the remainder of the State. 1 In addition, for development in a coastal hazard area, erosion prone areas in a coastal management district are to be maintained as development-free buffers or where permanent buildings or structures exist, coastal erosion risks are avoided or mitigated. 3

7 Figure 1: Example of Queensland s coastal hazard area maps The coastal hazard area maps are available on the Department of Environment and Heritage Protection's (EHP) website at: Declared erosion prone area plans available on the EHP website at The digital data for coastal hazards can be obtained from the Queensland Government Information Service (QGIS) website Direction on undertaking local scale hazard studies is provided in the 'Coastal Hazards Technical Guide' available at 2. If the site is affected by coastal hazards then determine the nature and extent of the hazard Determine the nature of the hazard (temporary or permanent inundation) and the extent of inundation (depth and area) on the site. A survey of the site should be undertaken to create a property scale plan. The survey should be undertaken by a registered surveyor to determine the depths of inundation across the development site. The plan should include relevant contours showing the topography of the site at a scale necessary to identify potential inundation depths. This will assist in determining whether the development is compatible with the level of risk associated with the hazard. 3. Determine the impact of the inundation on the proposed development Consider the impact of the coastal hazard on the proposed development (its operation and structural integrity) and to people living or working onsite. The nature and extent of a coastal hazard is measured assuming no mitigation measures are employed. The measure of impact of the hazard on the development must consider its structural integrity over the life of the development, the safety and wellbeing of people, effect on short and long term operations and whether the development is an essential community service. In many cases, an event will expose the development to multiple hazards (e.g. inundation and erosion). The risk assessment should account for all the potential coastal hazards for a given event in order to accurately determine vulnerability. The vulnerability of a development to the impact of a coastal hazard will largely relate to the type, nature and extent of the development proposed. For example, a nursing home or hospital will be more vulnerable to coastal hazard impacts due to its occupants and services it provides when compared with an industrial area. Conversely, the inundation of industrial areas might result in inherent risks such as the escape of toxic or hazardous materials. For commercial development, the loss of stock or productive capacity should also be considered. 4

8 4. Identify potential mitigation measures Identify potential measures for the development (including its operation) that addresses the coastal hazard and associated risks to people, property, economic activity, social wellbeing and the environment for the life of the use of the site. There may be different responses should the hazard be permanent inundation compared to temporary inundation. This may include siting, design and response options such as: filling land above the inundation level (or partial filling combined with other actions) habitable rooms 2 of the built structure being located above the assessed inundation level a safe refuge available for people within the development site (appropriate for a temporary inundation event) a safe evacuation route above the inundation level essential operational services (electricity switchboards; pumps; hot water systems) that are located so they are not inundated during a hazard event associated infrastructure such as roads are located or constructed so they are not permanently inundated. Table 1 summarises factors and possible mitigation measures that should be considered for addressing the coastal hazard and associated risks to people, property, economic activity, social wellbeing and the environment. Examples of mitigation measures are also provided in figures 2 and 3. Table 1: Summary of factors to consider for addressing coastal hazards and possible mitigation measures Possible factors to consider Possible mitigation measures Permanent inundation due to sea level rise. The impact of a defined storm tide inundation event on associated infrastructure such as roads, transport networks, educational or recreational facilities. More frequent overflows from stormwater networks. Rising groundwater in response to sea level rise. Increased erosion along foreshores which results in asset losses and damage. High demands on emergency relief agencies and the need for clear evacuation routes should the need arise. Losing beaches in front of coastal protection works. On-going maintenance costs for coastal protection works or beach nourishment. Capacity for coastal ecosystems to migrate landward as sea level rises. Location Design Construction Locate habitable buildings outside of, or as far landward of the coastal hazard area as possible (e.g. see Figure 2). Minimise the footprint of the development on that part of the site within the coastal hazard area. Allow for natural barriers or buffers on or adjacent to the site. Fill land above defined temporary or permanent inundation level. Design habitable buildings so that habitable rooms remain above the temporary inundation level (see e.g. Figure 3). Design the development so that operational components remain above the level of temporary or permanent inundation or waterproof components if located below temporary inundation level. Use landscaping to prevent water intruding into parts of the development that may be more vulnerable to inundation or guide water into areas where there are no vulnerable structures. This may include the use of natural vegetation barriers that can reduce the effect of a storm tide. Buildings or structures to be decommissioned, disassembled or relocated either on the site or to another site. Install and maintain on-site erosion control 2 Under the Building Code of Australia, 'habitable room' is a room used for normal domestic activities, and: a) includes a bedroom, living room, lounge room, music room, television room, kitchen, dining room, sewing room, study, playroom, family room, home theatre and sunroom; but b) excludes a bathroom, laundry, water closet, pantry, walk-in wardrobe, corridor, hallway, lobby, photographic darkroom, clothes drying room, and other spaces of a specialised nature occupied neither frequently nor for extended periods. 5

9 Possible factors to consider Possible mitigation measures structures. 3 Operating standards Identify or design evacuation routes above inundation level. Locate a safe refuge for people within the development site. Built structures to be operational during and after a coastal hazard event. The building assessment provisions under the Building Act 1975 provide the construction requirements for buildings and structures in Queensland. Under the Building Code of Australia, a building or structure must withstand the combination of loads and other actions to which it may reasonably be subjected. It is recommended that homeowners check with building certifiers or other buildings professionals for the building requirements applicable in coastal hazard areas. The document 'Rebuilding in storm tide prone areas: Tully Heads and Hull Heads' provides further information on housing construction and rebuilding in storm tide areas, available at Before After Townhouses are located outside the hazard area on the site Common garden and/or parking area is located in the hazard area on the site Figure 2: Example of built structures for accommodation or employment purposes being located outside of a coastal hazard area. 3 Under the State Planning Policy, development in a coastal hazard area ensures that coastal protection work is undertaken only as a last resort where erosion presents an imminent threat to public safety or property, and (i) the property cannot be reasonably be relocated or abandoned; (ii) the coastal protection work is located on private land to the maximum extent reasonable; (iii) the coastal protection work does not increase coastal hazard risk for adjacent areas. 6

10 Before After Habitable rooms are elevated above the temporary storm-tide inundation level (shown in red as the level of DSTE (defined storm tide event). Relevant outdoor utilities are elevated above the temporary inundation level (e.g. air conditioning units, electrical boxes, hot water systems). Figure 3: Example of habitable rooms in built structures for accommodation or employment purposes being located above the defined storm tide event level. 5. Assess the viability of mitigation measures both onsite and offsite, taking into account environmental, social and financial factors Assessing the viability of potential mitigation measures includes considering the impact of the options on the development itself, associated infrastructure, neighbouring land use and development and public amenity taking into account long-term environmental, social and financial considerations. For example, the environmental costs of protection works should be taken into account, particularly considering the effects of climate change and the preference to maintain natural coastal processes. In comparison, natural environmental features can protect and buffer communities and infrastructure from sea level rise and coastal inundation. Assessing the viability of potential mitigation measures should also consider the most cost-effective manner in which to mitigate the risk. Locating the development outside of a coastal hazard area may be the most costeffective mitigation measure. However this does not consider that many urban areas along the Queensland coast are already built up and already occur in coastal hazard areas. In this context, the cost of setting back the development, fill the development site, constructing coastal protection structures or building design measures should be weighed against the value, use and vulnerability of the development. Consideration must also be made to minimising any increase of shoreline erosion on areas adjacent to the development site and maintaining physical coastal processes outside the development area where erosion control structures are proposed. 6. Select preferred mitigation measures After assessing the viability of potential mitigation measures, the preferred option(s) are to be identified and described in the development application in order to avoid, minimise or mitigate coastal hazard risks to protect people and property and enhance the community s resilience to coastal hazards. 7

Quick Guide Make good obligations

Quick Guide Make good obligations Quick Guide Make good obligations September 2013 Prepared by: Energy Regulation and Implementation, Department of Environment and Heritage Protection State of Queensland, 2013. The Queensland Government

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

FLOOD INFORMATION SERVICE EXPLANATORY NOTES FLOOD INFORMATION SERVICE EXPLANATORY NOTES Part 1 About the flood maps Limitations of the mapping What the maps don t show Where to find more information Definitions of words used to describe flooding.

More information

CITY OF BELLEAIR BEACH, FLORIDA

CITY OF BELLEAIR BEACH, FLORIDA CITY OF BELLEAIR BEACH, FLORIDA FLOOD INSURANCE INFORMATION Important Information for City of Belleair Beach Residents and Property Owners Regarding Flood, Risk, Insurance, Preparation, Evacuation, Safety

More information

Planning Policy and Guidance on Flooding and Coastal Erosion

Planning Policy and Guidance on Flooding and Coastal Erosion Planning Policy and Guidance on Flooding and Coastal Erosion James Hooker (MRTPI) Senior Planning Manager Welsh Government RTPI Cymru - Water and Flooding Seminar Tuesday 20 th November 2012 Overview

More information

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

Why should communities invest in resiliency? What are the steps communities can take to become more resilient? Community Preparedness for Flood Resiliency Nina Peek, AICP New York Planning Federation Board of Directors Senior Technical Director AKRF, Inc. Focus of Today s Presentation Why should communities invest

More information

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model BY Dr. Leo Brewster, Director Coastal Zone Management Unit, Barbados Presented At UNFCCC Expert

More information

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property. 6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment

More information

Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier

Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier University of Maryland & National Oceanic and Atmospheric Administration

More information

ART Vulnerability and Risk Assessment Report September 2012 Appendix C. ART GIS Exposure Analysis

ART Vulnerability and Risk Assessment Report September 2012 Appendix C. ART GIS Exposure Analysis Adapting to Rising Tides GIS Exposure Analysis The aim of this appendix is to familiarize the reader with the data and methodology that was used to conduct an analysis of shoreline and community asset

More information

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project definition 5 2.1 Pre-design studies 7 3.0 Project brief 10 4.0 Accommodation

More information

Resolution XII.13. Wetlands and disaster risk reduction

Resolution XII.13. Wetlands and disaster risk reduction 12 th Meeting of the Conference of the Parties to the Convention on Wetlands (Ramsar, Iran, 1971) Punta del Este, Uruguay, 1-9 June 2015 Resolution XII.13 Wetlands and disaster risk reduction 1. RECALLING

More information

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1 City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration

More information

Coastal hazard risk management and adaptation planning guidelines

Coastal hazard risk management and adaptation planning guidelines CONTENTS Coastal zones are vulnerable to adverse impacts from inundation and erosion. The risk to the environment from climate change is influenced by the level of preparedness and response of the community

More information

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center

Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center To: BOS From: Joseph Michelangelo, P.E. Director of Public Works Re: CDBG-DR Pine Creek Culvert Upgrade Date: April 20, 2015 On June 19, 2014, the Town of Fairfield was awarded the above referenced project

More information

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Planning for sea level rise Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Table of contents Introduction 1 New flood levels for

More information

PLANNING POLICY 3.3.5

PLANNING POLICY 3.3.5 PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family

More information

NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS

NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS 23 NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS Turn page Northamptonshire Flood Toolkit This guidance has been developed to support applicants and developers who are required or encouraged to produce and

More information

Dwelling house guide

Dwelling house guide Dwelling house guide Contents 1.0 Introduction... 1 2.0 What is a dwelling house?... 1 3.0 What building assessment provisions apply to dwelling houses?... 1 4.0 What level of assessment applies to a dwelling

More information

Queensland Coastal Plan Great state. Great opportunity.

Queensland Coastal Plan Great state. Great opportunity. Department of Environment and Heritage Protection Queensland Coastal Plan Great state. Great opportunity. Prepared by: Environment Planning Department of Environment and Heritage Protection GPO Box 2454

More information

Flooding in Brisbane

Flooding in Brisbane Flooding in Brisbane A guide for residents photo provided by Conan Whitehouse Brisbane is a thriving, world-class city, enjoyed by residents and visitors. Like many cities around the world, Brisbane has

More information

CONFEDERATION OF ASIA-PACIFIC CHAMBERS OF COMMERCE AND INDUSTRY (CACCI)

CONFEDERATION OF ASIA-PACIFIC CHAMBERS OF COMMERCE AND INDUSTRY (CACCI) CONFEDERATION OF ASIA-PACIFIC CHAMBERS OF COMMERCE AND INDUSTRY (CACCI) Policy Paper on Flexible Responses to Environmental Uncertainty and Infrastructure Resolved as of 3 rd October,. A. BACKGROUND 1.

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

MITIGATION STRATEGY OVERVIEW

MITIGATION STRATEGY OVERVIEW ALL-HAZARDS MITIGATION PLAN MITIGATION STRATEGY Code of Federal Regulations (CFR) Requirement 44 CFR Part 201.6(c)(3)(i): The mitigation strategy shall include a description of mitigation goals to reduce

More information

GUIDANCE FOR INCORPORATING SEA LEVEL RISE INTO CAPITAL PLANNING IN SAN FRANCISCO: ASSESSING VULNERABILITY, RISK, AND ADAPTATION (DRAFT)

GUIDANCE FOR INCORPORATING SEA LEVEL RISE INTO CAPITAL PLANNING IN SAN FRANCISCO: ASSESSING VULNERABILITY, RISK, AND ADAPTATION (DRAFT) GUIDANCE FOR INCORPORATING SEA LEVEL RISE INTO CAPITAL PLANNING IN SAN FRANCISCO: ASSESSING VULNERABILITY, RISK, AND ADAPTATION (DRAFT) Prepared by the Sea Level Rise Committee of SF Adapt for the San

More information

Miami-Dade County Roadmap for Adapting to Coastal Risk

Miami-Dade County Roadmap for Adapting to Coastal Risk Miami-Dade County Roadmap for Adapting to Coastal Risk Vulnerability Assessment & Planning Workshop Results & Recommendations Roadmap for Adapting to Coastal Risk Page 1 Introduction GreenPrint is Miami-Dade

More information

Oregon. Climate Change Adaptation Framework

Oregon. Climate Change Adaptation Framework Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate

More information

CASS COUNTY COMMISSION POLICY MANUAL 38.07 ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9

CASS COUNTY COMMISSION POLICY MANUAL 38.07 ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9 CASS COUNTY COMMISSION POLICY MANUAL 38.07 SUBJECT: ORDINANCE #1998-2 (FLOOD DAMAGE PREVENTION) ADOPTED DATE: FEBRUARY 2, 1998 PAGE 1 OF 9 NORTH DAKOTA COUNTY OF CASS ORDINANCE #1998-2 Be it ordained and

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Heritage Place Code. Heritage Place Code

Heritage Place Code. Heritage Place Code 1 Application This Code will apply in assessing building work (including demolition), reconfiguring a lot or operational work where: on a premises that includes a heritage place within a heritage precinct

More information

Hoboken Resiliency & Readiness Plan

Hoboken Resiliency & Readiness Plan Hoboken Resiliency & Readiness Plan Layers of Protection Mayor Dawn Zimmer Challenge: Hoboken was once an island outcrop. Surrounding tidal marshes were filled in, but City remains vulnerable to storm

More information

Chapter 6: Mitigation Strategies

Chapter 6: Mitigation Strategies Chapter 6: Mitigation Strategies This section of the Plan describes the most challenging part of any such planning effort the development of a Mitigation Strategy. It is a process of: 1. Setting mitigation

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

chapter 9 conduct a climate change

chapter 9 conduct a climate change CONDUCT A CLIMATE RESILIENCY STUDY The following chapters recommend how to reach CRC Milestone Two, Conduct a Climate Resiliency Study. 2 MILESTONE Chapter 8: Conduct a Climate Change Vulnerability Assessment

More information

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION

More information

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK...

Co-creation progress update and an invitation to respond. Overview of ideas from co-creation activities towards a Climate Ready UK... Department for Environment, Food and Rural Affairs Climate Ready Co-creation progress update and an invitation to respond July 2012 Contents Overview of ideas from co-creation activities towards a Climate

More information

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015 NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015 N a t i o n a l O c e a n i c a n d A t m o s p h e r i c A d m i n i s t r a t i o n ( N O A A ) C o a s t a l S e r v i c e s C e n t e r March

More information

Climate change adaptation through land use planning and disaster management: Local government perspectives from Queensland

Climate change adaptation through land use planning and disaster management: Local government perspectives from Queensland Climate change adaptation through land use planning and disaster management: Local government perspectives from Queensland Refereed paper presented at 17th Pacific Rim Real Estate Society Conference Climate

More information

EHP Financial Assurance Calculator. User guide

EHP Financial Assurance Calculator. User guide User guide Prepared by: Energy Regulation & Implementation, State of Queensland, 2014. The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright

More information

Section E2 Coastal Engineering: Reconstruction Management and Mitigation

Section E2 Coastal Engineering: Reconstruction Management and Mitigation 271 Section E2 Coastal Engineering: Reconstruction Management and Mitigation 272 Objectives To familiarize the assessor with the process that should be followed in organizing any reconstruction efforts.

More information

Climate Change Long Term Trends and their Implications for Emergency Management August 2011

Climate Change Long Term Trends and their Implications for Emergency Management August 2011 Climate Change Long Term Trends and their Implications for Emergency Management August 2011 Overview A significant amount of existing research indicates that the world s climate is changing. Emergency

More information

CHAPTER 2015-69. Committee Substitute for Committee Substitute for Committee Substitute for Senate Bill No. 1094

CHAPTER 2015-69. Committee Substitute for Committee Substitute for Committee Substitute for Senate Bill No. 1094 CHAPTER 2015-69 Committee Substitute for Committee Substitute for Committee Substitute for Senate Bill No. 1094 An act relating to the peril of flood; amending s. 163.3178, F.S.; specifying requirements

More information

Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine

Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine Geologic Site of the Month February, 2010 Using LIDAR to monitor beach changes: Goochs Beach, Kennebunk, Maine 43 o 20 51.31 N, 70 o 28 54.18 W Text by Peter Slovinsky, Department of Agriculture, Conservation

More information

A Plan Outline for Neonatal Intensive Care Unit Evacuation Institution. Draft 1

A Plan Outline for Neonatal Intensive Care Unit Evacuation Institution. Draft 1 A Plan Outline for Neonatal Intensive Care Unit Evacuation Institution Draft 1 Approval Form The plan described in this document has been approved by the following people: Plan Revisions: The Plan for

More information

MORNINGTON PENINSULA RATEPAYERS AND RESIDENTS ASSOCIATION INC and McCRAE ACTION GROUP

MORNINGTON PENINSULA RATEPAYERS AND RESIDENTS ASSOCIATION INC and McCRAE ACTION GROUP MORNINGTON PENINSULA RATEPAYERS AND RESIDENTS ASSOCIATION INC and McCRAE ACTION GROUP 31 March 2015 Reg No: A0034245B PO Box 4087 Rosebud Vic 3939 E-mail: alanne@ihug.com.au Central Coastal Board PO Box

More information

VCOSS Submission to the Draft Flood Management Strategy Port Phillip and Westernport July 2015

VCOSS Submission to the Draft Flood Management Strategy Port Phillip and Westernport July 2015 VCOSS Submission to the Draft Flood Management Strategy Port Phillip and Westernport July 2015 1 About VCOSS The Victorian Council of Social Service (VCOSS) is the peak body of the social and community

More information

Preparing for Climate Change: Insurance and Small Business

Preparing for Climate Change: Insurance and Small Business The Geneva Papers, 2008, 33, (110 116) r 2008 The International Association for the Study of Insurance Economics 1018-5895/08 $30.00 www.palgrave-journals.com/gpp Preparing for Climate Change: Insurance

More information

Integrated Local Flood Management and Drainage Strategy OVERVIEW

Integrated Local Flood Management and Drainage Strategy OVERVIEW Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure

More information

Coastal Risk Management Guide. Incorporating sea level rise benchmarks in coastal risk assessments

Coastal Risk Management Guide. Incorporating sea level rise benchmarks in coastal risk assessments Coastal Risk Management Guide Incorporating sea level rise benchmarks in coastal risk assessments Published by: Department of Environment, Climate Change and Water NSW 59 61 Goulburn Street PO Box A290

More information

Hurricanes and Storm Surge www.hcfcd.org/tropicalweather

Hurricanes and Storm Surge www.hcfcd.org/tropicalweather Hurricanes and Storm Surge www.hcfcd.org High-level winds fl ow outward Strong surface winds spiral inward EYE Calm, sometimes cloudfree, sinking air Air sinks in calm area at the storm s eye THUNDERSTORMS

More information

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding

More information

& Q A. on Purchasing Coastal Real Estate in South Carolina. S.C. Sea Grant Extension Program S.C. DHEC/Office of Ocean and Coastal Resource Management

& Q A. on Purchasing Coastal Real Estate in South Carolina. S.C. Sea Grant Extension Program S.C. DHEC/Office of Ocean and Coastal Resource Management & Q A on Purchasing Coastal Real Estate in South Carolina S.C. Sea Grant Extension Program S.C. DHEC/Office of Ocean and Coastal Resource Management 1 Questions and Answers on Purchasing Coastal Real Estate

More information

Objective 4: Enhanced community education, flood awareness and preparedness

Objective 4: Enhanced community education, flood awareness and preparedness Objective 4: Enhanced community education, flood awareness and preparedness Understanding the extent and full impacts of flooding is essential for planning for potential future pressures on the drainage

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

House Code. House Code

House Code. House Code 1 Application This Code will apply in assessing material change of use and/or building work for a house. 2 Using this Code In using this Code reference should also be made to Section 1.1 How to use the

More information

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Flood Risk Assessment For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG Contents 1. Introduction 2. The Site 3. Flood Risk 4. Existing drainage 5. Proposed Development

More information

Repair of sheet metal roofs in cyclonic areas

Repair of sheet metal roofs in cyclonic areas Repair of sheet metal roofs in cyclonic areas Guideline - February 2015 Contents Contents...2 1. Introduction...3 Building approvals...3 What is a building approval?...3 Is a building approval required

More information

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014 Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors Recreational Boating Educational Conference December 11, 2014 Operators Face Change and Challenges Environmental Conditions Fluctuating

More information

APPENDIX B: PUBLIC PARTICIPATION SURVEY RESULTS

APPENDIX B: PUBLIC PARTICIPATION SURVEY RESULTS APPENDIX B: PUBLIC PARTICIPATION SURVEY RESULTS APPENDIX B: PUBLIC PARTICIPATION SURVEY RESULTS This section of the Plan includes a general summary of the results and findings of the Public Participation

More information

SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities Climate Resilience Sector Project (RRP TON 46351) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE 1. Sector Performance, Problems, and Opportunities 1. Tonga is being affected by climate change,

More information

Lake Macquarie City Council Community and Stakeholder Consultation Program for Lake Macquarie Waterway Flood Management Plan

Lake Macquarie City Council Community and Stakeholder Consultation Program for Lake Macquarie Waterway Flood Management Plan Lake Macquarie City Council Community and Stakeholder Consultation Program for Lake Macquarie Waterway Flood Management Plan Report Community and Stakeholder Consultation Program for Lake Macquarie Waterway

More information

Social impact assessment. Guideline to preparing a social impact management plan

Social impact assessment. Guideline to preparing a social impact management plan Social impact assessment Guideline to preparing a social impact management plan September 2010 Looking forward. Delivering now. The Department of Infrastructure and Planning leads a coordinated Queensland

More information

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and

Control filling, grading, dredging, and other development which may increase erosion or flood damage; and ARTICLE 16. FLOOD DAMAGE PREVENTION Section 16-1: Findings of Fact The flood hazard areas of the Town of Lillington are subject to periodic inundation which results in loss of life and property, health

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

J W Spencer School of Electrical Engineering, Electronics and Computer Science

J W Spencer School of Electrical Engineering, Electronics and Computer Science J W Spencer School of Electrical Engineering, Electronics and Computer Science To consider the electrical energy network and how it might be affected over the next 100 years and beyond to 2500. Coastal

More information

EPA s Climate Resilience Evaluation and Awareness Tool (CREAT): A Case Study

EPA s Climate Resilience Evaluation and Awareness Tool (CREAT): A Case Study EPA s Climate Resilience Evaluation and Awareness Tool (CREAT): A Case Study South Monmouth Regional Sewerage Authority (SMRSA) Serves 9 Townships 9.1 MGD Wastewater Treatment Plant 11 pump stations 11.

More information

ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III. HOUSES IN MULTIPLE OCCUPATION Space Standards

ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III. HOUSES IN MULTIPLE OCCUPATION Space Standards ENVIRONMENTAL HEALTH PROFESSIONAL PRACTICE VOL II CHAPTER III HOUSES IN MULTIPLE OCCUPATION Space Standards ADOPTED HOUSING STANDARDS:CATEGORY F HOUSES Houses within this category would be of a low priority

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters. Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,

More information

MICHIGAN S LANDSCAPE ARCHITECTS

MICHIGAN S LANDSCAPE ARCHITECTS MICHIGAN S LANDSCAPE ARCHITECTS protecting the health, safety, and welfare of our citizens site design land use planning master planning streetscape design brownfield redevelopment guidelines and regulations

More information

Physician s Residence. Historic Structure Report IV. Building Treatment Approach

Physician s Residence. Historic Structure Report IV. Building Treatment Approach Physician s Residence Historic Structure Report Building Treatment Approach IV. Building Treatment Approach IV A. Standards for the Treatment of Historic Buildings The Physician s Residence is listed as

More information

Presentation by Michael Wade. Old Library, Lloyd s

Presentation by Michael Wade. Old Library, Lloyd s Presentation by Michael Wade Old Library, Lloyd s 8 th December 2015 What are some of the roles for Government - funded by the Taxpayer - in regard to domestic flooding? To identify the risk and scope

More information

Community Emergency Planning Guide

Community Emergency Planning Guide Community Emergency Planning Guide Our district has experienced numerous events over past years. Evidence from previous emergencies has shown that communities that plan and manage their own needs before,

More information

10. Infrastructure and the Built Environment

10. Infrastructure and the Built Environment 151 152 10. Infrastructure and the Built Environment Maintaining safe and reliable infrastructure is critical for Washington s economy, environment, and way of life. This chapter addresses climate impacts

More information

Appendix B. Property Owner Questionnaire

Appendix B. Property Owner Questionnaire Appendix B Property Owner Questionnaire WEST WINDSOR TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT PROPERTY QUESTIONNAIRE DIVISION OF ENGINEERING As someone who owns and lives and/or works on a property

More information

2. The costs of natural disasters

2. The costs of natural disasters 2. The costs of natural disasters Key Points Without action, the forecast annual cost in real terms of natural disasters (across government, business and communities) in Australia is expected to reach

More information

Council Strategy DOC/15/86752

Council Strategy DOC/15/86752 Council Strategy Council strategy title: Council strategy owner: Adopted by: Date adopted: July 2015 Document Reference no: Drainage Upgrade Strategy Director Infrastructure Services Bayside City Council

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

Please see Section IX. for Additional Information:

Please see Section IX. for Additional Information: The Florida Senate BILL ANALYSIS AND FISCAL IMPACT STATEMENT (This document is based on the provisions contained in the legislation as of the latest date listed below.) BILL: CS/SB 1094 Prepared By: The

More information

TEMPORARY ACCOMMODATION

TEMPORARY ACCOMMODATION INTRODUCTION The City of Vincent is situated within close proximity to the Perth Central Business District, public transport networks, tourist attractions and education facilities. As such, it is well

More information

Climate Change in Coastal Florida: Economic Impacts of Sea Level Rise

Climate Change in Coastal Florida: Economic Impacts of Sea Level Rise Climate Change in Coastal Florida: Economic Impacts of Sea Level Rise CLIMTE CHNGE IN COSTL FLORID: ECONOMIC IMPCTS OF SE LEVEL RISE Context Global warming is expected to cause: Sea level rise Increased

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Operational policy. Commercial filming and photography in QPWS managed areas. Visitor Management. Policy issue. Background.

Operational policy. Commercial filming and photography in QPWS managed areas. Visitor Management. Policy issue. Background. Visitor Management Operational policies provide a framework for consistent application and interpretation of legislation and for the management of non-legislative matters by the. Operational policies are

More information

Insurance Questions: Clothes washers and dryers, food freezers and the food in them are covered if there is contents coverage.

Insurance Questions: Clothes washers and dryers, food freezers and the food in them are covered if there is contents coverage. Introduction: Floods occur when runoff from rain or snowmelt exceeds the capacity of rivers, stream channels or lakes and overflows onto adjacent land. Floods can also be caused by storm surges and waves

More information

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives

More information

Myths and Facts about the NFIP

Myths and Facts about the NFIP Chapter 4: After the Disaster How the NFIP Works Who needs flood insurance? Everyone. And everyone in a participating community of the National Flood Insurance Program (NFIP) can buy flood insurance. More

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)

More information

Please see Section IX. for Additional Information:

Please see Section IX. for Additional Information: The Florida Senate BILL ANALYSIS AND FISCAL IMPACT STATEMENT (This document is based on the provisions contained in the legislation as of the latest date listed below.) BILL: CS/SB 1094 Prepared By: The

More information

Home Insurance, Extreme Weather and Storms - The Australian Scenario

Home Insurance, Extreme Weather and Storms - The Australian Scenario Media Brief Buyers beware: home insurance, extreme weather and climate change 5 June 2014 Australia has always been a land of extremes. Now, the climate is changing, with extreme events such as fire, flood,

More information

Most informed people realize that cumulative impacts have had

Most informed people realize that cumulative impacts have had Welcome to the First Issue of Rivers & Coast! The goal of the new Rivers & Coast newsletter is to keep readers well informed of current scientific understanding behind key environmental issues related

More information

Implementing a Coastal Settlement Boundary

Implementing a Coastal Settlement Boundary Implementing a Coastal Settlement Boundary Planning Practice Note 36 AUGUST 2015 The purpose of this practice note is to provide guidance about implementing a coastal settlement in a planning scheme for

More information