1 CREATIVE POWER construction OF THERMAL POWER PLANTS

2

3 construction of Thermal Power Plants

4 2 Technopromexport

5 Construction of Thermal Power Plants construction of Thermal Power Plants Based on Steam-Power and Gas-Steam Cycle By rough estimate, due to tremendous growth of the rate of global economic development, growth of population, and other geopolitical and economic factors, power consumption in the world will at least double by the middle of the XXI century. So far, power engineering, without any alternative, has been the major driving force behind the world progress. Despite major breakthroughs in the field of technical innovations, and rapid development of alternative power sources, traditional power engineering (power plants using the steampower and gas-steam cycles) is still the basis of the world energy supply. According to different sources, 39 % of all electric energy in the world is produced with oil, 27 % with coal, and 24 % with gas. Advantages of traditional thermal power plants are obvious long-term experience of construction engineering, relative tie-in to the fuel deposit locations compared to other types of power plants, and also absence of seasonal fluctuations in power production. Traditional power engineering has been developing progressively. And although a few decades ago preferences were given to the building of power plants using steam power cycle, now the intensive search for higher efficiency has given rise to the development of gas-steam technologies, and the increase in the number of newly commissioned CCGT plants. Experience of the gas-steam technologies use in power plants has demonstrated substantial growth of efficiency factor. A combination of the gas-turbine and steam-turbine plants in one power-generating unit made is possible to raise the efficiency of the use of fuel to 60 %, i.e. up to the level, which other thermal machines cannot attain. The use of the CCGT installations also made it possible to improve ecological characteristics of the TPPs, in particular, due to lower emission of nitrogen oxides. All these obvious advantages have brought about a situation, where almost 70 % of commissioned power plants today all over the world use the combined-cycle installations. 3

6 Technopromexport TECHNOPROMEXPORT Since 1956, Technopromexport has successfully commissioned more than 160 thermal power plants in 35 countries of the world Technopromexport has gained significant experience in construction of thermal power plants. Reliable work of the TPP facilities of different complexity and power capacity implemented in the past 30 years in Bulgaria, Hungary, Poland, Germany, Vietnam, Iran, Iraq, China, Mongolia, Greece, India, Romania, Finland, countries of former Yugoslavia, and other countries is another proof of Technopromexport s success. Since 1956, Technopromexport has successfully put into operation more than 160 thermal power plants in 35 countries of the world with total power capacity exceeding MW. The range of commissioned capacities is rather wide: from 1.5 MW to the largest TPPs in the world, such as the TPP Boxberg, capacity 3520 MW, in Germany, the TPP Maritsa-East, capacity 2410 MW, in Bulgaria, the TPP Ramin, capacity 1890 MW, in Iran, and the TPP Suychzhun, capacity 1600 MW, in China. Among the facilities commissioned by Technopromexport in the past 20 years, special positions belong to the thermal power plants with power-generating units of 200, 300, 500 and 800 MW, including those using the supercritical steam parameters. Also, Technopromexport has experience in building the power installations, which use the most popular technologies of today the gas-steam cycle. Today the Company can offer potential Customers a whole variety of the state-of-the-art gas-steam plants, capacity varying from 39 to 450 MW, with various main equipment configurations and a variety of technological and design solutions. The complete set of equipment delivered by Technopromexport has high technical and economic characteristics, which meet the most stringent requirements of the world energy market. On the orders of Technopromexport, the equipment is manufactured by the world-renowned power machine-building plants in Russia, and also the largest companies in Germany, Switzerland, France, and other countries. Units with various options for configuration of the main equipment can be provided with the state-of-the-art process control systems based on hardware and software solutions, both Russian, and imported: SPPA-T3000 (Siemens) Ovation (Emerson) Industrial IT Extended Automation System 800 x A (ABB) OC 4000 (GE Energy) Metso DNA (Metso Automation MAX Controls) and others. 4

7 Construction of Thermal Power Plants Technopromexport has experience in construction the power installations based on the most popular technologies today the gas-steam cycle The world experience in power plant construction has shown that the most effective way for safeguarding the interests of the Customer during project implementation is to conclude the EPC/EPCM contracts or perform the turn-key building contracts. To build the power engineering installations, Technopromexport offers a complete package of services, including: Carrying out engineering surveys; Design and engineering of facilities; Development and delivery of the powergenerating equipment and the state-of-theart control systems; Delivery of auxiliary equipment, instrumentation, materials and tools; Building, installation, and adjustment of the process systems and commissioning of the facilities; Conducting of acceptance tests; Training of local personnel in the customer s country and in Russia; Comprehensive services of the commissioned installations including delivery of repair parts. of Technopromexport have prepared a series of standard solutions for building the TPPs, in particular: Three-shaft CCGT, capacity MW; Two-shaft and three-shaft CCGT, capacity MW; Three-shaft CCGT, capacity MW; Two-shaft CCGT, capacity MW; Three-shaft CCGT, capacity MW; Coal-based power-generating unit, capacity 225 MW, with the DeSox installation; Coal-based power-generating unit, capacity MW. Also, the company has vast experience in refurbishment of the existing power plants including with increase of capacity of the power-generating units. Work on refurbishment and reconstruction is carried out not only on the power engineering facilities put into operation by Technopromexport, but also on the facilities built by other companies. To minimize Customer s time and expenses pertinent to the developing of proposals to build power plants for various conditions, specialists 5

8

9 POWER-GENERATING UNITS WITH STEAM POWER CYCLE

10 Technopromexport Power-Generating Units of 210, 215, 225 MW Considering the global process of buildup of generating capacities, company Technopromexport offers construction of the TPPs with power-generating units, capacity 210, 215 and 225 MW, having increased steam parameters. Implementation of such projects provides solution to two major closely interrelated problems: raising the power plant efficiency and reducing the harmful emissions of SO 2 and NO x into the atmosphere. Depending on the natural environment, the type of fuel, and the construction site specifics, Technopromexport offers different sets of equipment and types of configuration for the TPP of specified parameters. Depending on the type of fuel and the operating conditions, we manufacture and deliver to the facilities with high-pressure power-generating units, capacity of 210, 215 and 225 MW, one-drum-type steam generators with natural circulation, gas-tight, with steam reheating, to be installed in the boiler room of the TPP main building or on the open site under the tent. Together with the steam generator, the following boiler auxiliaries are delivered: smoke exhausters, forced-draught fans, smoke exhausters for recirculation of the smoke gases, and so forth. The steam turbines with turbine generator sets arranged either transversely or longitudinally are installed in the power house of the main building of the power plant. The turbine-generator set bay accommodates: the exhaust-steam feed heater, the oil system, the condensate and feed pumps, and other auxiliaries, which are providing operation of the turbine-generator set and the entire power-generating unit. Reliability is a characteristic feature of the turbine-generator sets of the TBB series with hydrogen and water cooling delivered with the generating units, capacity 210, 215 and 225 MW. They feature high efficiency, maneuverability, reliability, improved vibrating conditions, higher heat stability, they are convenient in maintenance and operation under various environmental conditions, and provide a possibility for operation in reactive power consumption modes. Design features of the turbine-generator sets of the TBB series: 8

11 Construction of Thermal Power Plants stator winding cooling direct, with water running in hollow conductors; rotor winding cooling direct, hydrogen, self-ventilation type, with gas take-in from the stator-to-rotor gap; stator active steel cooling hydrogen; improved design of the stator winding water cooling manifold; stator winding insulation continuous, thermosetting, heat resistance class F; rotor winding insulation based on fiber glass and heat resistant varnish, heat resistance class F; improved design of the stator core face zone. with steam reheating, are modifications of the К type (К , К and К ) with the HPC reactive bucket design and elevated parameters of steam temperature of up to С. Turbines of this type feature high reliability, maintainability, and also high stability of technical and economic parameters, which makes it possible to have practically unchanging estimate of economic parameters throughout the power plant s life cycle. Each generator unit has a three-phase stepup transformer, capacity 250 MVA, type ТДЦ , installed in the unit. The house transformers are provided for auxiliary power supply. The steam turbines delivered by Technopromexport for the power-generating units of 210, 215 and 225 MW, three-cylinder, one-shaft, 9

12 10 Technopromexport

13 Construction of Thermal Power Plants TPP Siddirganch (1 х 210), Bangladesh Steam generator ТГМЕ 206 Nominal steam capacity, t/h Outlet pressure, MPa: working steam... 13,8 reheat steam Temperature, 0 С: working steam reheat steam feed water exhaust gases Efficiency factor (gross), guaranteed, % Type of fuel... gas Configuration...П-shaped Turbine generator set ТГВ 200 MW Active power, kw Total power, kva Capacity factor Voltage, V Frequency, Hz...50 Rotational speed, r/min Efficiency factor, % Total weight, t Rotor weight, t Stator weight, t Unit transformer ТДЦ /220Т1 Steam turbine К Nominal capacity, MW Initial steam conditions: pressure, MPa temperature, 0 С Maximum working steam flow, t/h Number of steam extractions for regeneration... 7 Feed water temperature, 0 С Cooling water temperature, 0 С: nominal...30 maximum...36 Cooling water flow through condenser, m 3 /h Length of turbine, m Main Parameters of Steam Boilers Parameters 210 MW Units 215 MW Units 225 MW Units 1. Nominal capacity, t/h Working steam outlet pressure, MPa Working steam temperature, 0 С

14 Technopromexport Power-Generating Units of 300, 330, 350 MW When constructing thermal power plants (TPP) with power-generating units of 300, 330 or 350 MW company Technopromexport offers equipment for operation at supercritical parameters of steam: pressure 24 MPa and temperature С. For presented thermal power plants Technopromexport also offers different modifications of layout and configuration of basic power equipment. Technological structure of TPP with powergenerating units of 300, 330 or 350 MW has the most simplicity and the least cost of systems of main pipelines. Owing to optimal length and also minimum quantity of fittings and welded joints in system of pipelines there is achieved essential reduction of energy loss and significant growth of operational reliability of unit as a whole. Depending on kind of fuel and operating conditions the steam generators for power-generating units of supercritical pressure of power 300, 330 or 350 MW are supplied, as a rule, in oncethrough, gas-proof, with steam reheat, singlecasing modifications of Т- or П-shaped layout. Steam generators work on natural gas, fuel oil, coal and lignites. As a part of power-generating units of 300, 330 or 350 MW Technopromexport supplies turbogenerators of series ТВB with direct hydrogen cooling of rotor winding, water cooling of stator windings and thyristor static excitation system. Installed in the unit with each generator is three-phase double-winding transformer of power 400 MW of type ТДЦ /220 or ТДЦ /400. For power supply of auxiliaries of power plant provision is made for installation of package house transformers. The most widespread models for operation at supercritical parameters of steam are modernized modifications of turbine К (К and К ) three-cylinder, single-shaft, with steam reheat and nozzle governing. During operation of TPP there is an opportunity of controlling turbine power by method of sliding pressure, both for load variation mode, and for modes of starting-up and stoppage of power-generating unit. Duration of starting-up and stoppage of unit at sliding parameters is minimum, at that losses of heat and condensate are reduced. In regions with deficit or high temperature of cooling water provision is made for successively operated steam turbine of grade К , which is the modification of turbine К , specially designed for installation at such TPP. These turbines are operated at TPP, built by Technopromexport in Bosnia and Herzegovina, Iran, Greece, China and other countries. This model of turbine is characterized by high reliability and serviceability. At will of customer Technopromexport implements delivery of equipment and construction of TPP with power-generating units of unit capacity MW with sub-critical parameters of steam pressure MPa and temperature С. 12

15 Construction of Thermal Power Plants TPP Ramin (4 х 300, 2 х 300), Iran Steam generator ТГМП 344СО ТГМП 344ИСО Nominal steam capacity, t/h Outlet pressure, MPa: working steam reheat steam Temperature, 0 С: working steam reheat steam feed water exhaust gases Efficiency factor (gross), guaranteed, % Fuel type... gas, fuel oil Configuration...П-shaped Turbine generator set ТВВ 320 2ТЗ Active power, kw Total power, kva Capacity factor Voltage, V Frequency, Hz...50 Rotational speed, rpm Efficiency, % Total weight, t Rotor weight, t Stator weight, t Unit transformer ТДЦ /220 ДЦ /220 Steam turbine К Nominal capacity, MW Initial steam conditions: pressure, MPa temperature, 0 С Maximum working steam flow, t/h Number of steam extractions for regeneration... 8 Feed water temperature, 0 С Cooling water temperature, 0 С: nominal...12 maximum...33 Cooling water flow through condenser, m 3 /h Length of turbine, m Main Parameters of Steam Boilers Parameters 300 MW Units 330 MW Units 350 MW Units 1. Nominal capacity, t/h Working steam outlet pressure, MPa Working steam temperature, 0 С

16 Technopromexport Large Power-Generating Units, Capacity 500, 525, 660 and 800 MW Technopromexport offers construction of thermal power plants with large power-generating units of individual capacity of 500, 525, 660 and 800 MW. For the power plants with power-generating units of 500 and 525 MW, which use bituminous coal as the main fuel, Technopromexport delivers the units with the steam generator, type Пп , with supercritical pressure, direct-flow, gas-tight, balanced-draft, steam reheating, single-body, T-configuration, with regulation of flue gases and solid slag disposal. For the power plants designed for using brown coals, we offer a modified boiler. Boilers of this type have no own cradle and are suspended to the building structures by means of a special metal framework. The boilers are equipped with necessary fittings, devices for steam and water sample taking, instrumentation, and the state-of-the-art systems for suppression of harmful atmospheric emissions. The processes of feeding, steam temperature control and burning in the boiler are automated. Taking into account the world trends in boiler manufacturing, Russian manufacturers are continuously working on perfection of the boiler equipment. For instance, they widely use two-layer flat-stud tubes, hinged expansion loops, augmentation-type packing of regenerative air heaters and other improved equipment to raise reliability and increase useful life of the steam generators. The equipment is produced using highly mechanized and automated processes. Steam boilers are equipped with the state-of-the-art systems for suppression of harmful emissions. The machine bay of the 500 and 525 MW powergenerating units accommodates a steam turbine with a turbine-generator set. The steam turbine is a state-of-the-art upgrade of К the four-cylinder, one-shaft turbine with steam reheating. The turbine design provides for additional steam extraction for the power plant s own needs. The turbine is characterized by high reliability and is convenient in operation. The turbine-generator set includes the TBB 500 2Е turbine generator with direct hydrogen cooling of the rotor winding and water cooling of the stator windings, the generator has an independent thyristor excitation system. A three-phase transformer, capacity 630 MVA, type ТНЦ , can be delivered with each turbine-generator set. The house transformers are delivered to satisfy the power plant s own needs. 14

17 Construction of Thermal Power Plants TPP Yimin (2 х 500), China Steam generator П-78 Nominal steam capacity, t/h Outlet pressure, MPa: working steam reheat steam Temperature, 0 С: working steam reheat steam feed water exhaust gases Efficiency factor (gross), guaranteed, % Fuel type...bituminous coal Arrangement... T-shaped Turbine generator set ТВВ-500-2Е Active-power, kw Total power, kva Power factor Voltage, V Frequency, Hz...50 Rotational speed, r/min Efficiency factor, % Total weight, t Rotor weight, t Stator weight, t The unit transformer was not part of the Company responsibility. Steam turbine K Nominal capacity, MW Steam initial parameters: pressure, MPa temperature, 0 С Maximum working steam flow, t/h Number of steam extractions for reheating... 8 Feed water temperature, 0 С Cooling water temperature, 0 С: nominal...12 maximum...33 The cooling water flow through condenser, m 3 /h Length of turbine, m Main Parameters of Steam Boilers Parameters 500 MW Units 525 MW Units 1. Nominal capacity, t/h Working steam outlet pressure, MPa Working steam temperature, 0 С

18 Technopromexport For the power generating units of 660 MW, Technopromexport delivers boiler units Пп (ТПП-660) with supercritical pressure, direct-flow, gas-tight, steam reheating, single-body, T-configuration. Steam capacity of one boiler is 2225 tons of steam per hour at the outlet steam pressure is 24.8 MPa. The boilers are manufactured with special margin for strength and thickness of the pipes. The boiler is suspended to own cradle with the intermediate metal structures (center sills and inter-center sills). The service life is 50 years. The turbine-generator set includes the TBB-type turbine generator with direct hydrogen cooling of the rotor winding and water cooling of the stator windings, the generator has an independent thyristor excitation system. A three-phase transformer, capacity 630 MVA, type ТНЦ , can be delivered with each turbine-generator set. The house transformers are delivered to satisfy the power plant s own needs. For the 660 MW power-generating unit, Technopromexport offers to deliver four-cylinder steam turbines K with steam reheating and developed feed water regenerative heating system. Along with a number of competitive design solutions, for the first time in Russian practice, this turbine uses honeycomb seals, which, as a whole, allow us to attain one of the highest efficiency factors in the world. TPP Barh (3 х 660), India Currently, Technopromexport carries out construction of the boiler island the first phase of the TPP Barh with general installed capacity of 1980 MW (3 power-generating units х 660 MW each). Power-generating units of the TPP Barh are equipped with the state-of-the-art automatic process control system produced by US company Emerson. Steam generator ТПП 660/ABCO Nominal steam capacity, t/h Outlet pressure, MPa: working steam reheat steam... Temperature, 0 С: working steam reheat steam feed water exhaust gases... Efficiency factor (gross), guaranteed, % Fuel type...bituminous coal Arrangement... Т-shaped For the power plants with power-generating units of 800 MW using bituminous coal as the main fuel, the steam generator, type Пп , with supercritical pressure, direct-flow, gas-tight, balanced-draft, steam reheating, single-body, T-configuration is installed. The machine bay accommodates the condensing steam turbine with a turbine generator. The condensing steam turbine, type K , (the latest modification of turbine K ), developed and manufactured by power machinebuilding concern Power Machines, is a fivecylinder, one-shaft turbine with steam reheating and six exhausts in two longitudinal condensers. The size of the power house bay is 54 х 72 m. The long experience of operation of similar turbines under variable load conditions has demonstrated their unique reliability and maneuverability. On the customer s order, additional uncontrolled steam extraction can be provided for the power 16

19 Construction of Thermal Power Plants plant s own needs from the turbine regenerative extraction. The power generating unit of 800 MW includes the TBB-800-2Е turbine generator with direct hydrogen cooling of the rotor winding and water cooling of the stator windings, and active power of 800 MW. The generator has an independent thyristor excitation system. The three-phase transformer, capacity 1000 MW, type ТНЦ /500, is installed with each turbine-generator set. The house transformers are provided for installation to satisfy the power plant s own needs. TPP Suychzhun (2 х 800), China Steam generator ТПП 807 Nominal steam capacity, t/h Outlet pressure, MPa: working steam reheat steam Temperature, 0 С: working steam reheat steam feed water exhaust gases Efficiency factor (gross), guaranteed, % Fuel type...bituminous coal Arrangement... Т-shaped Steam turbine K Nominal capacity, MW Initial conditions of steam: pressure, MPa temperature, 0 С Maximum working steam flow, t/h Number of steam extractions for reheating... 8 Feed water temperature, 0 С Cooling water temperature, 0 С: nominal...12 maximum...33 Cooling water flow through condenser, m 3 /h Length of turbine, m Turbine generator set ТВВ 800 2Е Active power, kw Total power, kva Power factor Voltage, V Frequency, Hz...50 Rotational speed, r/min Efficiency factor, % Total weight, t Rotor weight, t Stator weight, t Unit transformer ТНЦ /500 Main Parameters of Steam Boilers Parameters 500 MW Units 525 MW Units 1. Nominal capacity, t/h Working steam outlet pressure, MPa Working steam temperature, 0 С

20

21 Gas-Steam Combined Cycle Power-Generating Units

22 Technopromexport CCGT 120 MW 20

23 Construction of Thermal Power Plants TPP Mezhdunarodnaya, Russia The TPP Mezhdunarodnaya (phase II) is a power plant, where the Technopromexport specialists have included the most advanced solutions and developments of the power engineering industry in the design. Such power plant is an optimum solution for municipal power engineering in big cities because the area of power plant construction site complies with the most stringent requirements of the compact urban development. The area of the plot of land and that of the TPP buildings and structures is 1.88 ha and 1.61 ha respectively. It equals the area of a district thermal plant (DTР) for a large community area. An important factor is also a possibility to arrange the TPP facilities in close proximity to the consumers of thermal and electric energy, and for fitting the TPP in the new community areas. Ecological requirements to the plant operation meet the most stringent specifications applied in the world power engineering. The main building of the plant is characterized by compact arrangement of the main process and auxiliary equipment. Installed on the roof of the power house of the main building are the units of the dry-air cooling towers to remove excessive heat generated by the TPP gas-steam cycle, and also the units of the integral cooling systems for various plant equipment: oil systems of the GTP and the steam turbine. The dry-air blower-type cooling tower is equipped with controlled swiveling louver mechanism to automatically control the cooling air flow depending on the cooling water temperature. The plant uses frequency regulation of the electromechanical equipment, which helps to increase the service life of the equipment and to reduce consumption for own needs. The state-of-the-art water purification technologies using reverse osmosis (membrane technologies) help to achieve the required quality of water with the use of a compact-size TPP watertreatment system. The output power is 20 kv and 110 kv voltage. The 110 kv gas-insulated switchgear and control gear is an enclosed cubicle of the latest design, which practically requires no operational expenses. For the first time, the TPP Mezhdunarodhaya uses small-size monolithic three-phase bus ducts with polymer filling. The plant capital equipment has local monitoring and control systems combined in an integrated PCS. The high degree of automation of the process and electrical equipment helped to minimize handwork during the plant start-up and normal operation. The equipment monitoring and control is carried out by the power-generating unit operators from the main control panel using computer network. The period of the plant construction has been considerably reduced to 17 months instead of the scheduled 24 months. Basic Technical Characteristics Installed electric capacity, MW Installed thermal capacity, Gcal/h Efficiency factor, %...52 Composition of main equipment: gas-turbine installations, ea, type...2, Siemens GTX-100 (SGT-800) gas turbine capacity, MW steam heat-recovery boiler, ea, type...2, Alstom steam turbine, ea, type... 1, Siemens MP-16DH steam turbine capacity, MW peak standby water boiler, ea, type... 1, ПТВМ-150 generator...siemens generator capacity, MW cooling... air 21

24 Technopromexport CCGT 230 MW 22

25 Construction of Thermal Power Plants TPP Sisak-3, Croatia The new power-generating unit using gas-steam cycle, capacity 230 MW, currently under construction by Technopromexport will increase the plant electric capacity to 640 MW and additionally produce 50 Gcal/h of thermal energy. The steam-gas unit of the TPP Sisak-3 consists of the heat-recovery boiler, type ПР-230, produced by OJSC Podolsk machine-building factory, gas-turbine installation ГТЭ -160, produced by OJSC Power Machines, and the heating steam-turbine plant, type К-80/65 7.0, produced by OJSC Power Machines with matching generators. Ecological requirements to the plant operation comply with the most stringent specifications applicable in the European Union. The unit is designed for seismic intensity 8 on the MSK-64 scale. The power-generating unit cooling systems will use the direct-flow cooling system from the Sava river. The TPP is characterized by compactness of arrangement of the key process and auxiliary equipment. Design of the main building provides for accommodating the hardware and software complex, the unit control room, the engineering stations and the offices. The power-generating unit will use the most advanced distributed control system, local monitoring and control systems of the main equipment of the plant are designed and delivered by OJSC Interautomatics. The operator in charge of monitoring and controlling the equipment will receive complete information of the process, condition of the equipment, and the monitoring and control systems in the most convenient format. Basic Technical Characteristics Installed electric capacity, MW Installed thermal capacity, Gcal/h...50 Efficiency factor, %...52 Composition of main equipment: gas-turbine sets, ea, type...1, ГТЭ-160 OJSC Power Machines gas turbine capacity, MW heat-recovery boiler, ea, type...1, Пр 230 OJSC ZiO-Podolsk steam turbine ea, type...1, К-80/ OJSC Power Machines steam turbine capacity, MW generator, ea, type...1, ТЗПФ-80-2УЗ OJSC Power Machines generator capacity, MW...80 transformer...unit, OJSHC ELEKTROZAVOD cooling... air 23

26 Technopromexport CCGT 400 MW 24

27 Construction of Thermal Power Plants Power-Generating Unit CCGT 400 MW of Nizhnevartovsk State District Power Plant, Russia Power unit CCGT-400 MW of the Nizhnevartovsk power plant, currently under construction by Technopromexport, is a binary gas-steam installation with three steam generation circuits designed for production of electric power. The main and standby fuel of the power-generating unit is pretreated associated petroleum gas from deposits of the TNK-BP company one of the construction owners. The CCGT main equipment includes multipleshaft power installation 109FA, produced by General Electric with gas turbine PG9351FA and steam turbine 109D12 installed on different shafts and connected to their own generators, and also heat-recovery boiler П-143 produced by JSC EC ZIOMAR. The power-generating unit will use the most advanced distributed control system based on Siemens equipment, local monitoring and control systems of the main equipment of the plant are designed and delivered by OJSC Interautomatics. Ecological parameters of the installation will comply with the requirements of Federal Law 7-FL On Preservation of Environment dated January 10, The power will be delivered into the electric power system through the ОРУ-500 kv available at the state district power plant. For connection to ОРУ-500 kv, an outpost with the 500-kV gasinsulated gear will be built. The design provides for connecting the powergenerating unit to the existing direct-flow water system of the Nizhnevartovsk state district power plant from the Vakh river. Main Technical Characteristics Installed electric capacity, MW Installed thermal capacity, Gcal/h...unit without heating Efficiency factor, % Composition of main equipment: gas-turbine plants, ea, type...1, PG9351FA General Electric gas turbine capacity, MW heat-recovery boiler, ea, type...1, П-143 OJSC Atomenergomash steam turbine, ea, type...1, 109D12 General Electric steam turbine capacity, MW GT generator, ea, type H with hydrogen cooling General Electric ST generator, ea, type...9а5 with an air cooling General Electric GT generator capacity, MW ST generator capacity, MW transformer... ТРДНС32000/35 УХЛ1 OJSC Uralelectrotyazhmash cooling... air 25

28 Technopromexport CCGT 450 MW 26

29 Construction of Thermal Power Plants Power-Generating Unit CCGT 450 MW Yuzhnaya CHP-22, Russia Expansion of Yuzhnaya CHP-22 using gassteam combined cycle was carried out with a view of providing electric and thermal power to the industrial and communal facilities of St. Petersburg by building CCGT- 450 MW. When developing the project Feasibility Report, specialists of Technopromexport have made provisions for further expansion of Yuzhnaya CHP-22. The new power-generating unit was erected in the heat generation plant territory as a separate building connected by process lines with the existing facilities. The new power-generating operates in the basic roundthe-clock mode and with the maximum possible number of hours of use of electric and thermal energy according to the loading schedule. To effectively use the limited territory of the construction site of a new gas-steam powergenerating unit, use was made of vertically configured heat-recovery boilers. This helped to significantly reduce the construction site area. The use of forced circulation in the HP and LP circuits of the vertical heat-recovery boiler increased its reliability in low-load operation and in starting conditions. The main equipment of unit 4 of CCGT-450 of Yuzhnaya CHP-22 included: two gas-turbine installations, type ГТЭ-160, produced by OJSC Power Machines (LMZ), two heat-recovery boilers for two pressure ratings produced by OJSC Podolsk machine-building factory, and one steam-turbine plant of the heating type with adjustable steam extraction for heating produced by OJSC Power Machines. The equipment has been tested at the main power-generating unit CCGT-450 installed at the North-West CHP in St. Petersburg, and also at other similar facilities Kaliningradskaya CHP-2, and CHP-21 and CHP -27 in Moscow. Main Technical Characteristics Installed electric capacity, MW Installed heat capacity, Gcal/h Efficiency factor, %... 50,8 Composition of main equipment: gas-turbine installations, ea, type... 2, ГТЭ-160 OJSC Power Machines gas turbine capacity, MW heat-recovery boiler, ea, type...2, Пр 228 OJSC ZiO-Podolsk steam turbine, ea, type... 1, Т-125/ OJSC Power Machines steam turbine capacity, MW generator, ea, type... 1, ТЗФГ-160-2МУЗ generator capacity, MW transformer... unit ЗТЗ cooling... air 27

30 Technopromexport IMPLEMENTED PROJECTS Description of facility Country Year of construction completion Capacity of units, MW Type of fuel TPP 200, 210, 215, 225 MW TPP Pontnuv Poland х 200 bituminous coal TPP Ludush Romania х 200 gas, oil fuel TPP Tuzla Bosnia and Herzegovina х 100, 1 х 210 lignites TPP Tirbah Germany х 210 brown coal TPP Keratsini Greece х 200 oil fuel TPP Kovin Serbia х 210 lignites TPP Kishkan-Braila Romania х 210 gas, oil fuel TPP Bobov Dol Bulgaria х 210 bituminous coal TPP Sisak Croatia х 210 oil fuel TPP Negotino Macedonia х 210 oil fuel TPP Varna Bulgaria х 210 bituminous coal TPP Boxberg Germany х 210, 2 х 500 brown coal TPP Deva Romania х 210 coal, gas TPP Kostolac Serbia х 100,1 х 210 lignites TPP Guddu Pakistan х 210 oil fuel TPP Nasiriyah Iraq х 210 gas, oil fuel TPP Pljevlja Montenegro х 210 lignites TPP Bitola Macedonia х 210 lignites TPP Maritsa East Bulgaria х 25, 4 х 50, 6 х 150, 6 х 210 lignites TPP Vindyachal India х 210 brown coal TPP Orhaneli Turkey х 210 lignites TPP Jijel Algeria х 210 gas TPP Multan Pakistan х 210 oil fuel TPP Kahalgaon India , х 210 brown coal 28

31 Construction of Thermal Power Plants Description of facility Country Year of construction completion Capacity of units, MW Type of fuel TPP Ghorazal Bangladesh , 2000, 2005, х 55, 4 х 210 gas, oil fuel TPP Isfahan Iran х 200 gas, oil fuel TPP Siddirganch Bangladesh х 210 gas TPP Youssifiyah Iraq Facility inspection TPP Kharta Iraq Under construction Cherepetskaya PP Russia Under construction 8 х 210 gas, oil fuel, crude oil 2 х 200 gas, oil fuel, crude oil 2 х 225 coal TPP Gacko Bosnia and Herzegovina TPP 300 MW 1983, х 300 lignites TPP Agios Dimitios Greece х 310 lignites TPP Uglevik Bosnia and Herzegovina х 300 lignites TPP Nanking China х 300 bituminous coal TPP Yingkou China х 300 bituminous coal TPP Ramin Iran х 300 gas, oil fuel TPP 500, 660 and 800 MW TPP Tuzla B Bosnia and Herzegovina х 500 lignites TPP Enshvalde Germany х 500 brown coal TPP Tszisyan China х 500 bituminous coal TPP Yimin China х 500 bituminous coal TPP Barh India Under construction 3 х 660 bituminous coal TPP Suychzhyn China х 800 bituminous coal 29

32 30 Technopromexport

33 Construction of Thermal Power Plants Description of facility Country Year of construction completion Capacity of units, MW Type of fuel CCGT 120 MW TPP Mezhdunarodnaya Russia х 120 natural gas CCGT 230 MW TPP Sisak-3 Croatia Under construction 1 х 230 natural gas CCGT 325 MW Ivanovskie CCGT Russia 2007, х 325 natural gas, diesel oil CCGT 400 MW Nizhnevartovskaya PP Russia Under construction 1 х 400 natural gas, diesel oil CCGT 450 MW North-West CHP Russia 2000, х 450 natural gas, diesel oil Kaliningradskaya CHP-2 Russia х 450 natural gas, diesel oil Yuzhnaya CHP-22 Russia х 450 natural gas Urengoyskaya PP Russia Under construction 1 х 450 natural gas 31

34 Technopromexport CONTACTS Algeria Algeria Ph.: (213) Belarus Polotsk Ph.: (375) Jordan Amman Ph.: (962) Fax: (962) Serbia Belgrade Ph.: (381) Fax: (381) Afghanistan Kabul Ph.: (93) Greece Athens Ph.: (30) Fax: (30) Iran Teheran Ph.: (98) Fax: (98) Croatia Zagreb Ph.: (385) Fax: (385) Bangladesh Dacca Ph.: (880) Fax: (880) India Delhi Ph.: (91) Fax: (91) Russia St.-Petersburg Ph.: (812) Fax: (812) Head Office JSC Technopromexport 15, bld. 2, Noviy Arbat str., Moscow,119019, Russia Ph.: + 7 (495) Fax: + 7 (495) inform@tpe.ru Foto in cover Nickolay Vinokurov, page 10 szefei, page 20 Roman Sigaev, page 22 Roman Czupryniak, page 24 Sergey Toronto, page 26 SPb photo maker shutterstock.com Design by griffel.ru 32

35

36

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: 31 Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: Construction of Group 1 of the Tokyo Electric Power Company s Kawasaki Thermal Power Station KIYOSHI KAWAKAMI

More information

Turbo generators Best quality for thermal power plants

Turbo generators Best quality for thermal power plants Turbo generators Best quality for thermal power plants www.andritz.com ANDRITZ HYDRO Turbo generators International technology Group ANDRITZ is a globally leading supplier of plants, equipment, and services

More information

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours: Current state of plant Functioning as a peak and emergency centre Statistics Accumulated operating hours: D1-2-3-6-7: 43000 to 48000 hrs D4-5: 53000 to 57000 hrs D8: 33000 hrs Layout of the plant Index:

More information

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority 1 2 What is Efficiency? Efficiency: What you get divided by what you pay for Heatrate is a measure of plant efficiency

More information

LLC "VT Technology" INTRODUCTION OF SCREW ROTOR STEAM ENGINES AT THERMAL POWER GENERATION FACILITIES. St. Petersburg, Russia 2015

LLC VT Technology INTRODUCTION OF SCREW ROTOR STEAM ENGINES AT THERMAL POWER GENERATION FACILITIES. St. Petersburg, Russia 2015 LLC "VT Technology" INTRODUCTION OF SCREW ROTOR STEAM ENGINES AT THERMAL POWER GENERATION FACILITIES St. Petersburg, Russia 2015 DESCRIPTION OF THE SOLUTION AND TECHNOLOGY TECHNOLOGY OF SCREW ROTOR STEAM

More information

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria International Journal of Electronic and Electrical Engineering. ISSN 0974-2174 Volume 4, Number 3 (2011), pp. 281-289 International Research Publication House http://www.irphouse.com Performance Analysis

More information

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA Matthias Fränkle Siemens Power Generation (PG), Germany Page 1 of 11 1 Introduction Deregulation and competition are further

More information

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H. POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,

More information

Power Plant Electrical Distribution Systems

Power Plant Electrical Distribution Systems PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com

More information

Top Technology for Industry, Agriculture, Business and Communities

Top Technology for Industry, Agriculture, Business and Communities Top Technology for Industry, Agriculture, Business and Communities CHP The Technology with a Potential for Saving Energy Combined Heat and Power (CHP) is a highly efficient technology for the conversion

More information

Skoda Supercritical Steam Turbine 660 MW

Skoda Supercritical Steam Turbine 660 MW Skoda Supercritical Steam Turbine 660 MW Jiri Fiala Head of Engineering Dept. Skoda Power s.r.o. 27th of October 2010 Vrnjacka Banja - Serbia ŠKODA History Establishment of the company in 1859 Mr. Emil

More information

Committed to make a better world

Committed to make a better world Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to

More information

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat - Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e

More information

Piping Systems for Nuclear Power Industry. Prague, October 2011

Piping Systems for Nuclear Power Industry. Prague, October 2011 Piping Systems for Nuclear Power Industry Prague, October 2011 Introduction of the company Leading Czech supplier of piping systems for power engineering 60 years of experience in the field of power industry

More information

Best Choice BENSON BOILER. Excellent performance features make the Benson boiler the most widely used type of once-through boiler

Best Choice BENSON BOILER. Excellent performance features make the Benson boiler the most widely used type of once-through boiler BENSON BOILER Best Choice Excellent performance features make the Benson boiler the most widely used type of once-through boiler by JOACHIM FRANKE and RUDOLF KRAL Power for generations BENSON BOILER Best

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

Power Island. Industrial Power Plants. www.siemens.com / energy

Power Island. Industrial Power Plants. www.siemens.com / energy Power Island Industrial Power Plants www.siemens.com / energy Flexible combined-cycle power plants With today s increasing demands for flexible power plants, intensified by the increased amount of electricity

More information

DIETRISOL SOLAR WATER HEATING SYSTEMS ENERGY SAVINGS AND ECOLOGICAL BENEFITS SUSTAINED COMFORT SIMPLICITY AND RELIABILITY INNOVATIVE, MODULAR SYSTEMS

DIETRISOL SOLAR WATER HEATING SYSTEMS ENERGY SAVINGS AND ECOLOGICAL BENEFITS SUSTAINED COMFORT SIMPLICITY AND RELIABILITY INNOVATIVE, MODULAR SYSTEMS DIETRISOL SOLAR WATER HEATING SYSTEMS ENERGY SAVINGS AND ECOLOGICAL BENEFITS SUSTAINED COMFORT SIMPLICITY AND RELIABILITY INNOVATIVE, MODULAR SYSTEMS DIETRISOL SOLAR WATER HEATING SYSTEMS NON-POLLUTING,

More information

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management

More information

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables

More information

525-MVA Generator-motor and Thyristor Starter Put into Service at the Tokyo Electric Power Co., Inc. s Kannagawa Hydroelectric Power Station

525-MVA Generator-motor and Thyristor Starter Put into Service at the Tokyo Electric Power Co., Inc. s Kannagawa Hydroelectric Power Station 525-MVA Generator-motor and Thyristor Starter Put into Service at the Tokyo Electric Power Co., Inc. s Kannagawa Hydroelectric Power Station 114 525-MVA Generator-motor and Thyristor Starter Put into Service

More information

Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant

Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant Supercritical CO2 Power Cycle Symposium September 9-10, 2014 Pittsburg, Pennsylvania USA Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant Dr. Leonid Moroz, Dr. Maksym

More information

Steam Power Plants as Partners for Renewable Energy Systems

Steam Power Plants as Partners for Renewable Energy Systems Steam Power Plants as Partners for Renewable Energy Systems Hans-Joachim Meier Head of VGB Competence Centre 4 Environmental Technology, Chemistry, Safety and Health VGB PowerTech e.v., Essen, Germany

More information

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG) BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT Jaroslav Lahoda Olaf Arndt Walter Hanstein Siemens Power Generation (PG) Brno, Czech Republic & Görlitz, Germany BIOMASS LOOKING FOR EFFICIENT

More information

Powerformer chosen for Swedish combined heat and power plant

Powerformer chosen for Swedish combined heat and power plant Powerformer chosen for Swedish combined heat and power plant Powerformer, a radically new type of generator developed by ABB, has been chosen for a combined heat and power plant in Eskilstuna, Sweden.

More information

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN FULL ELECTRICAL LN PLANTS: HIHEST AVAILABILITY AND ENERY EFFICIENCY THROUH OVERALL SYSTEM DESIN Dr. Edwin Lerch Siemens A Infrastructure and Cities Sector, IC S SE PTI, ermany Phone: 49-9131-7-34052 Fax:

More information

MODERNIZATION OF STEAM GENERATORS

MODERNIZATION OF STEAM GENERATORS MODERNIZATION OF STEAM GENERATORS 341-G-004 & 341-G -005 in Rijeka Refinery Energy Plant by consumption of natural gas Opatija 2012. Svetlana Petrović, Mag.ing.mech; Univ.spec.oec. Rijeka Refinery Utility

More information

Industrial Steam Turbines

Industrial Steam Turbines Industrial Power Industrial Steam Turbines The comprehensive product range from 2 to 250 megawatts Scan the QR code with the QR code reader in your mobile! siemens.com / energy / steamturbines A Full Range

More information

Offshore Platform Powered With New Electrical Motor Drive System

Offshore Platform Powered With New Electrical Motor Drive System Offshore Platform Powered With New Electrical Motor Drive System Authors: Jan O. Lamell, M.Sc E.E. ABB Automation Technologies Presenters: Thomas Johansson, M.Sc E.E. ABB Automation Technologies Timothy

More information

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district PLANT TORINO NORD Iren Energia is the company in the Iren Group whose core businesses are the production and distribution of electricity, the production and distribution of thermal energy for district

More information

Siemens Steam Turbine-Generator SST-5000 Series. for combined cycle and subcritical steam applications. Answers for energy.

Siemens Steam Turbine-Generator SST-5000 Series. for combined cycle and subcritical steam applications. Answers for energy. Siemens Steam Turbine-Generator SST-5000 Series for combined cycle and subcritical steam applications Answers for energy. SST-5000 series steam turbine-generator For combined cycle and subcritical steam

More information

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS by Kevin Rafferty Geo-Heat Center January 2000 REALITY CHECK Owners of low-temperature geothermal resources are often interested

More information

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS Shinji Nishikawa 1, Toshiyuki Takahashi 1, Takeshi Koi 1, and Katsuyoshi Yamada 2 1 Toshiba Corporation Power Systems & Services Company,

More information

INTEC Engineering GmbH Heating Solutions for the Marine Industry

INTEC Engineering GmbH Heating Solutions for the Marine Industry INTEC Engineering GmbH Heating Solutions for the Marine Industry Thermal Oil Heaters Heating Solutions for the Marine Industry Compared to conventional plants using hot water or steam, thermal oil as a

More information

PHOENIX ENERGY of NEVADA, LLC (PENV) (PENV)

PHOENIX ENERGY of NEVADA, LLC (PENV) (PENV) PHOENIX ENERGY of NEVADA, LLC (PENV) INDUCTION FIELD ENERGY POWERED INDUCED FEED WATER RE-HEAT ING STEAM WASTE HEAT ENERGY RECOVERY DRY COOLING REVERSE CONDENSER REGENERATIVE STEAM CYCLE ELECTRIC POWER

More information

This is a Master s degree level apprenticeship which includes academic learning combined workplace learning and training.

This is a Master s degree level apprenticeship which includes academic learning combined workplace learning and training. Power Engineer Degree Apprenticeship The UK s energy sector is integral to the prosperity and stability of the UK economy as a whole, delivering an absolutely fundamental service for all its citizens.

More information

OVERVIEW OF GENERAL ELECTRIC S ADVANCED TURBINE SYSTEMS PROGRAM

OVERVIEW OF GENERAL ELECTRIC S ADVANCED TURBINE SYSTEMS PROGRAM OVERVIEW OF GENERAL ELECTRIC S ADVANCED TURBINE SYSTEMS PROGRAM CONTRACT INFORMATION Cooperative Agreement Contractor Contractor Project Manager Principal Investigators DOE Project Manager DE-FC21-95MC31176

More information

Generators TEM. for small hydroelectric power stations. Electric Machines

Generators TEM. for small hydroelectric power stations. Electric Machines Generators for small hydroelectric power stations TEM Electric Machines Advanced solutions for the cleanest energy Reputable manufacturer of generators for small hydroelectric power stations TED Electric

More information

Gas-Fired Power HIGHLIGHTS

Gas-Fired Power HIGHLIGHTS Gas-Fired Power HIGHLIGHTS PROCESS AND TECHNOLOGY STATUS Approximately 21% of the world s electricity production is based on natural gas. The global gas-fired generation capacity amounts to 1168 GW e (2007).

More information

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal. 413 POWER PLANT ENGINEERING PART-A 1. Define Power. Power is the rate at which energy is used (or) Energy/time. 2. What are the types of fuels? Solid fuel Liquid fuel Gaseous fuel (Any one among the above

More information

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in

More information

Making power plants energy efficient

Making power plants energy efficient Making power plants energy efficient The Italian utility Enel has transformed its Torrevaldaliga Nord thermal power plant from heavy fuel to clean coal with the help of ABB power and automation technologies,

More information

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author BIOPOWER 5 CEX 1 Wärtsilä 10 January 2012 Presentation name / Author GENERAL INFORMATION ELECTRICAL OUTPUT 4.3 5.5 MWe HEAT OUTPUT Up to 10 MWth (16 t/h steam 1,3 bara) FUEL TYPE Wood chips, bark, saw

More information

NEW JERSEY CENTER OF EXCELLENCE

NEW JERSEY CENTER OF EXCELLENCE Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves

More information

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN Authors: Presenter: T. Efrat, Yu Haimiao Tomer Efrat Deputy Manager, Thermal Process Dept. IDE Technologies

More information

Efficiency Assessment of Condensing Steam Turbine

Efficiency Assessment of Condensing Steam Turbine Efficiency Assessment of Condensing Steam Turbine DOSA ION, Department of Mechanical Engineering, Industrial Engineering and Transportation University of Petrosani Address Str. Universitatii nr. 20, 332006,

More information

10 Nuclear Power Reactors Figure 10.1

10 Nuclear Power Reactors Figure 10.1 10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of

More information

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application.

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. 1) Introduction This Expression of Interest (EoI) seeks response

More information

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Reprint from Aluminium World 2009, Volume 2 Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Emirates Aluminium (EMAL), a joint venture between Abu Dhabi s

More information

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS Dr Petri Kouvo Helsinki Region Environmental Services Authority THIRD INTERNATIONAL SYMPOSIUM ON ENERGY FROM BIOMASS AND WASTE Venice, Italy 8-11

More information

High-performance steam boiler and hot water boiler plants for industry

High-performance steam boiler and hot water boiler plants for industry High-performance steam boiler and hot water boiler plants for industry Information 2/3 HKB leading manufacturer of industrial boiler plants in Europe and Asia Steam boilers with outputs up to 120 t/h and

More information

Company Profile. New and overhauled Power Plants for sale

Company Profile. New and overhauled Power Plants for sale 1 Company Profile New and overhauled Power Plants for sale - Combined Cycle - Gas & Steam Turbines - Gas & Diesel Engines - Wind Turbines & Green Energy - Coal fired Power & Waste to Energy - Biomass &

More information

Continuous flow direct water heating for potable hot water

Continuous flow direct water heating for potable hot water Continuous flow direct water heating for potable hot water An independently produced White Paper for Rinnai UK 2013 www.rinnaiuk.com In the 35 years since direct hot water systems entered the UK commercial

More information

vacon ac drives for mining & minerals

vacon ac drives for mining & minerals vacon ac drives for mining & minerals 1 strong experience in mining & minerals Vacon AC drives are robust to handle your most demanding requirements from simple ventilation to the most complex load sharing

More information

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In

More information

www.opraturbines.com Gas Turbine Power COMPACT, EFFICIENT, RELIABLE

www.opraturbines.com Gas Turbine Power COMPACT, EFFICIENT, RELIABLE www.opraturbines.com Gas Turbine Power COMPACT, EFFICIENT, RELIABLE T U R B I N E S About OPRA Turbines King Olav V of Norway with Jan Mowill and the KG2 in 1969 Production of OP16 generating sets in Hengelo,

More information

21.1 Functions, Basic Configuration, and Interfaces

21.1 Functions, Basic Configuration, and Interfaces 21 (6.2.M) Site Services Building 21.1 Functions, Basic Configuration, and Interfaces 21.1.1 Functions The primary functions performed by the site services building are to house, support, provide a suitable

More information

The stable way. Synchronous condenser solutions. siemens.com/energy/facts

The stable way. Synchronous condenser solutions. siemens.com/energy/facts The stable way Synchronous condenser solutions siemens.com/energy/facts Bringing grids in line with new requirements Global climate change poses new challenges for power generation and transmission. Innovative

More information

AE BIO SOLAR AE BIO SOLAR HYBRID PLANT SOLAR/BIOMASS ADESSO ENERGIA SRL HYBRID PLANT SOLAR/BIOMASS THE BEGINNING OF A NEW ENERGY PRESENTATION

AE BIO SOLAR AE BIO SOLAR HYBRID PLANT SOLAR/BIOMASS ADESSO ENERGIA SRL HYBRID PLANT SOLAR/BIOMASS THE BEGINNING OF A NEW ENERGY PRESENTATION ADESSO ENERGIA SRL AE BIO SOLAR THE BEGINNING OF A NEW ENERGY PRESENTATION Tel.0918887364 14.05.2014 fax 0917480735 Pagina 1 INTRODUCTION Adesso Energia is an innovative startup based in Palermo created

More information

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION 1 EFFICIENT ELECTRICAL ENERGY TRANSMISSION

More information

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may

More information

Siemens Steam Turbine SST-600

Siemens Steam Turbine SST-600 Power and Gas Siemens Steam Turbine SST-600 This PDF offers an advanced interactive experience. This symbol indicates interactive content. For the best viewing experience, please use Acrobat Reader X or

More information

Making power plants energy efficient ABB, integrated power and automation solutions

Making power plants energy efficient ABB, integrated power and automation solutions Making power plants energy efficient ABB, integrated power and automation solutions Making power plants energy efficient ABB has a singularly broad and comprehensive offering in power generation. It covers

More information

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 1 of 27 UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 2 of 27 Table of Contents 1. OBJECTIVE... 4 2. SCOPE... 4 3. COMMUNICATION... 4 4. LOSS OF NATURAL GAS SUPPLY... 5 5. LOSS OF

More information

Unit 96: Marine Propulsion Power Plant

Unit 96: Marine Propulsion Power Plant Unit 96: Marine Propulsion Power Plant Unit code: R/503/1756 QCF Level: 5 Credit value: 15 Aim This unit provides learners with an understanding of marine propulsion power plant. Learners will also gain

More information

Efficiency on a large scale CFB Steam Boilers

Efficiency on a large scale CFB Steam Boilers Efficiency on a large scale CFB Steam Boilers Circulating Fluidized Bed Steam Boiler The Circulating Fluidized Bed Steam Boiler is an offering from Bosch Thermotechnology a member of the worldwide Bosch

More information

Annex-A TECHNICAL SPECIFICATION

Annex-A TECHNICAL SPECIFICATION Annex-A TECHNICAL SPECIFICATION FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 0.4kV (2,000kVA) DIESEL GENERATOR 1 1.0 SCOPE This specification covers the requirements of design, manufacture, delivery

More information

Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels

Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels international energy agency agence internationale de l energie Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels IEA Information paper In Support of the G8 Plan of Action

More information

Columbia University Master Planning & Optimization

Columbia University Master Planning & Optimization Columbia University Master Planning & Optimization February 20, 2014 Mr. Frank Martino Vice President, Operations 1 Agenda Columbia University Campus District Energy Overview Evolution of Columbia s District

More information

The SGT5-8000H proven in commercial operation

The SGT5-8000H proven in commercial operation www.siemens.com/energy The SGT5-8000H proven in commercial operation Answers for energy. 2 375 MW Output of the Siemens Gas Turbine SGT5-8000H.* * Gross: ISO ambient conditions 375 MW Rated output of 375

More information

Review of Potential Efficiency Improvements at Coal-Fired Power Plants

Review of Potential Efficiency Improvements at Coal-Fired Power Plants Review of Potential Efficiency Improvements at Coal-Fired Power Plants Introduction The Clean Air Markets Division, U.S. Environmental Protection Agency requested that Perrin Quarles Associates, Inc.,

More information

PRE-QUALIFICATION ANNOUNCEMENT

PRE-QUALIFICATION ANNOUNCEMENT Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: info@elektrowniapolnoc.pl

More information

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 1 (2014), pp. 1-8 Research India Publications http://www.ripublication.com/ijame.htm A Review on Power Generation

More information

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Grid Interconnection & Contract Development Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Submittal Instructions Prior to submitting your application and

More information

Steam Turbine Concepts for the Future Volatile Power Market

Steam Turbine Concepts for the Future Volatile Power Market Steam Turbine Concepts for the Future Volatile Power Market Power-Gen Europe June 12 14, 2012 Michael Wechsung Thomas Loeper Radim Znajda Siemens AG - Energy Sector Fossil Power Generation Agenda Situation

More information

DLW 8. POWER RATING 1500 rpm/50 Hz 1800 rpm/60 Hz Prime 7.5 kva, 6 kw 9.1 kva, 7.3 kw Standby 8.5 kva, 6.8 kw 10.1 kva, 8.1 kw

DLW 8. POWER RATING 1500 rpm/50 Hz 1800 rpm/60 Hz Prime 7.5 kva, 6 kw 9.1 kva, 7.3 kw Standby 8.5 kva, 6.8 kw 10.1 kva, 8.1 kw DLW 8 POWER RATING 1500 rpm/50 Hz 1800 rpm/60 Hz Prime 7.5 kva, 6 kw 9.1 kva, 7.3 kw Standby 8.5 kva, 6.8 kw 10.1 kva, 8.1 kw Generator set consisting of engine and alternator mounted on a fabricated steel

More information

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Environment Impact Assessment of Thermal Power Plant for Sustainable Development International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment

More information

1 DESCRIPTION OF THE APPLIANCE

1 DESCRIPTION OF THE APPLIANCE 1 DESCRIPTION OF THE APPLIANCE 1.1 INTRODUCTION The cast iron SF boilers are a valid solution for the present energetic problems, since they can run with solid fuels: wood and coal. These series of boilers

More information

The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation

The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation PowerGen Europe, 9-11 June 2015 The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation Nicholas Muntz, Dr. Thorsten Krol Security classification Siemens AG 2015 All rights

More information

WWW.SMETS-TECHNOLOGY.COM COMBI. 7 SW COMBINED. SEWER. CLEANING. TRUCK ENGLISH 01. 2013 INNOVATIONS FOR POWERFUL PERFORMANCES

WWW.SMETS-TECHNOLOGY.COM COMBI. 7 SW COMBINED. SEWER. CLEANING. TRUCK ENGLISH 01. 2013 INNOVATIONS FOR POWERFUL PERFORMANCES WWW.SMETS-TECHNOLOGY.COM COMBI. 7 SW COMBINED. SEWER. CLEANING. TRUCK ENGLISH 01. 2013 INNOVATIONS FOR POWERFUL PERFORMANCES COMBI. 7 SW COMBINED. SEWER. CLEANING. TRUCK PAGE 02 ENGLISH STATUS 01. 2013

More information

Turbine Generator Sets 101 Skinner Power Systems LLC September 2006 Rev 1 May 2009

Turbine Generator Sets 101 Skinner Power Systems LLC September 2006 Rev 1 May 2009 SKINNER POWER SYSTEMS L.L.C. 8214 EDINBORO ROAD ERIE, PA 16509 USA Phone: 814-868-8500 Fax: 814-868-5299 email: jeff@skinnerpowersystems.net web: www.skinnerpowersystems.net Basic turbine generator set

More information

A S Y N C H R O N O U S M O T O R S

A S Y N C H R O N O U S M O T O R S ASYNCHRONOUS M O T O R S S E R I E S INDAR ASYNCHRONOUS MOTORS S E R I E S WHO WE ARE Indar Electric s trajectory is endorsed by the construction of thousands of motors for the different industrial sectors.

More information

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Parallel session Producing more with less: Efficiency in Power Generation EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Johann Gimmelsberger Linz Strom GmbH EFFICIENT ENERGY

More information

THERMAL POWER PLANTS Vol. III - Gas Turbines For Electric Power Generation - H.I.H. Saravanamuttoo GAS TURBINES FOR ELECTRIC POWER GENERATION

THERMAL POWER PLANTS Vol. III - Gas Turbines For Electric Power Generation - H.I.H. Saravanamuttoo GAS TURBINES FOR ELECTRIC POWER GENERATION GAS TURBINES FOR ELECTRIC POWER GENERATION H.I.H. Saravanamuttoo Department of Mechanical and Aerospace Engineering, Carleton University, Canada. Keywords: Heavy Frame, aeroderivative, combined cycles,

More information

ECOCIAT. Domestic hot water heat recovery unit

ECOCIAT. Domestic hot water heat recovery unit Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY

More information

RPV - RP - RA air handling units

RPV - RP - RA air handling units APPLICATIONS Heating, ventilation, cooling >> FACTORIES >> WAREHOUSES >> HALLS >> DISTRIBUTION CENTRES >> COMMERCIAL PREMISES >> PLACES OF WORSHIP RPV - RP - RA air handling units www.reznor.eu RPV - RP

More information

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units.

COGENERATION. This section briefly describes the main features of the cogeneration system or a Combined Heat & Power (CHP) system. 36 Units. COGENERATION 1. INTRODUCTION... 1 2. TYPES OF COGENERATION SYSTEMS... 2 3. ASSESSMENT OF COGENERATION SYSTEMS... 10 4. ENERGY EFFICIENCY OPPORTUNITIES... 14 5. OPTION CHECKLIST... 16 6. WORKSHEETS... 17

More information

Solar Hot Water Heaters

Solar Hot Water Heaters Solar Hot Water Heaters Three High Vacuum Water inlet Stainless Steel screw Gel seal and insulation Water outlet Dust proof seals Non Pressure Models Details ASWH-1b ( Color Painted 304 ) ASWH-1c ( stainless

More information

Session 2: Hot Water Supply

Session 2: Hot Water Supply MEBS6000 Utility Services http://www.hku.hk/mech/msc-courses/mebs6000/index.html Session 2: Hot Water Supply Dr. Benjamin P.L. Ho Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

SYNCHRONOUS MACHINES

SYNCHRONOUS MACHINES SYNCHRONOUS MACHINES The geometry of a synchronous machine is quite similar to that of the induction machine. The stator core and windings of a three-phase synchronous machine are practically identical

More information

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley. Sample Questions REVISED FIRST CLASS PARTS A1, A2, AND A3 (NOTE: these questions are intended as representations of the style of questions that may appear on examinations. They are not intended as study

More information

Source: EIA Natural Gas Issues and Trends 1998

Source: EIA Natural Gas Issues and Trends 1998 7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it

More information

www.universityquestions.in

www.universityquestions.in DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT: ME6701-POWER PLANT ENGINEERING YEAR/SEM: III/V UNIT-I COAL BASED THERMAL POWER PLANTS 1. What are the processes of rankine cycle?

More information

IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines

IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines IEA Workshop Copenhagen Small scale biomass co-generation with modern steam engines Dipl.-Ing. Till Augustin October, 7 th 2010 Solid Biomass Cogeneration with Spilling Steam Engines Contents: Who is Spilling

More information

Overview of Waste Heat Recovery for Power and Heat

Overview of Waste Heat Recovery for Power and Heat Overview of Waste Heat Recovery for Power and Heat Dave Sjoding Northwest Clean Energy Application Center Washington State University Extension Energy Program Waste Heat Recovery for Power and Heat Workshop

More information

Pre-designed Steam Turbines

Pre-designed Steam Turbines Industrial Power Pre-designed Steam Turbines The comprehensive product range up to 12 megawatts Scan the QR code with the QR code reader in your mobile! siemens.com / energy / steamturbines A Full Range

More information

From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015

From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015 From today s systems to the future renewable energy systems Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015 STRUCTURE OF ENERGY SYSTEMS 8/17/2015 Copenhagen, Denmark 2 Components Demand Heat

More information

System Assessment Capabilities for Fossil Fuel Power Stations

System Assessment Capabilities for Fossil Fuel Power Stations System Assessment Capabilities for Fossil Fuel Power Stations Technical Services LifeCycle Advantage Educational Services Consulting Technology Advantage The mission of Flowserve Technical Services is

More information

Hybrid Power Generations Systems, LLC

Hybrid Power Generations Systems, LLC Coal Integrated Gasification Fuel Cell System Study Pre-Baseline Topical Report April 2003 to July 2003 Gregory Wotzak, Chellappa Balan, Faress Rahman, Nguyen Minh August 2003 Performed under DOE/NETL

More information

Development of Tandem-Compound 1,000-MW Steam Turbine and Generator

Development of Tandem-Compound 1,000-MW Steam Turbine and Generator 176 Development of -Compound -MW Steam Turbine and Generator Development of -Compound -MW Steam Turbine and Generator Yuji Nameki Takanori Murohoshi Futoshi Hiyama Kiyoshi Namura ABSTRACT: Investment in

More information