1 Least Cost Cable System Strategies to Reduce Cable and Infrastructure Costs When Transitioning to an All Conduit Systems
2 Cost Sharing of Cable Systems Underground Extensions The Company will construct Extensions underground when requested by the Applicant or if required by local ordinance or conditions. The Applicant shall provide all trenching and backfilling, imported backfill material, conduits, and equipment foundations that the Company requires for the Extension.
3 Standard Advisory & Decision Process
4 Trenching requirements Direct Buried See Standard GA 211 Curb Backfill the trench with 6 inches of sand over the cables. An inspection may be required prior to covering the cables. Check with responsible Rocky Mountain Power (RMP) manager. Backfill both primary and secondary trenches another 12 inches with native soil then add red Danger Tape. (See Standard GB 101). As an alternative to certain trenching requirements, applicants may choose to install full conduit & vault systems. Check with the RMP manager for more information.
5 Pad Mount Transformer--Direct Buried Box Pad Install box pad after primary and secondary cables have been installed in the trench. Install box pad on level, compacted soil. Interior of the box pad is to remain free of dirt and debris. Backfill box pad leaving 3-4 inches above final grade measured from top of curb.
6 Vaults with Terminal Duct Entrances and Ground Grids
7 A transformer and sectionalizer side by side.
8
9 Changing to an All Conduit System When changing the cable installation practices the CG-12 provides a guideline for a rationale way to minimize cable cost. The document discusses many cable design approaches that may be considered that control cost, yet assure reliability for a cable system.
10 Conductor Studies showed that even when the cost difference between aluminum and copper was near $0.30/pound that for a three circuit substation getaway (9 cables) installing 1000 kcmil aluminum cables with a fluidized backfill was less expensive than copper cables for a getaway system. The cost difference between aluminum and copper on the COMEX is now over $2.00/pound.
11 First Project near Bend, Oregon.
12 The first project in Bend, Oregon showing the fill.
13 Cable Structure Drives a Blueprint for Cable Design AEIC CG12, GUIDE FOR MINIMIZING COST FOR EXTRUDED DIELECTRIC SHIELDED POWER CABLES RATED 5 THROUGH 46 KV,
14 The West has soils with poor heat transfer rate.
15 An example of thermal runaway where the soil spreads!
16 This cloud blew east.
17 Dry Clay at this location had a RHO of PSI Concrete Backfill RHO dry 90
18 Core Samples taken near Bend, Oregon
19
20 Fiberglass Riser in Yakima, Washington PVC and steel conduit for risers are being replaced by fiberglass. Prior this was the limiting factor for an ampacity rating.
21 Riser in Bend, Oregon
22 Fiberglass with lower COF allows for longer pulls. This reduces the number expensive vaults
23 Single Reel Trailers with Payout and Retrieve
24 What has been Gained With the reduction in cable cost and labor-hours, PacifiCorp s initial cost is close to the same whether in duct or direct buried. PVRR (Present Value Revenue Requirements) to implement all conduit is 1.38:1 over fifty years. This is from present system snapshot. This model does not include the salvage of 15 million pounds of copper and aluminum. Outage time reduced by ½ from 3 million to 1.5 million.
25 Continuing the Process Still in the process of implementing the concrete vaults. Need sources near our Districts. Post design to web. To fully implement will probably require meeting with the developers Need to Communicate to the field on Savings
26 National Documents--AEIC Went to Aluminum Conductor Changed Cable Packaging Reduced Concentric Neutral Size Thanks for your time. Any questions
Underground Cable Temperature Monitoring in the Real World
Underground Cable Temperature Monitoring in the Real World Executive Summary Background Brain Storming Possible Causes to Duct Bank Over Heating Mitigating Duct Bank Overheating DTS Installation for Duct
More informationCOMMERCIAL CONDUIT RULES AND REGULATION
Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875
More informationREQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3
More informationElectric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
More informationMOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
More informationELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document
More informationKNOW YOUR OPTIONS: 230 KV POWER CABLES
KNOW YOUR OPTIONS: 230 KV POWER CABLES 71 CONDUCTOR MATERIAL AND SIZE Conductor material is a matter of both customer preference and required current carrying capacity At 230 kv, copper is most common
More informationHyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More information345 kv Underground Report
POWER ENGINEERS, INC. February 24, 2010 345 kv Underground Report PROJECT NUMBER: 117910 PROJECT CONTACT: Mike Mueller Richard C. Mues, PE EMAIL: mike.mueller@powereng.com rmues@powereng.com PHONE: 314-851-4050
More informationSection 5 161 kv Power Cables
Know Your Options: 161 kv Power Cable 61 material and size material is a matter of both customer preference and required current carrying capacity Copper conductor common for larger loads When both copper
More information1 Town of Lyons Electrical Distribution System Design Standards
Town of Lyons Electrical Distribution System Material and Design INDEX 6.1 Design Criteria 6.11 Submissions 6.1.2 Method 6.1.3 Criteria 6.2 Specifications 6.2.1 Scope 6.2.2 General Requirements 6.2.3 Materials
More informationKNOW YOUR OPTIONS: 69 KV XLPE POWER CABLE
Know Your Options: 69 kv XLPE Power Cable 3 material and size material is a matter of both customer preference and required current carrying capacity Copper conductor common for larger loads When both
More informationUnderground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
More informationTABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3
UNDERGROUND TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS... Page 1 NEW SERVICE QUESTIONNAIRE... Page 2 GENERAL... Page 3 TRENCHING SECONDARY (120/240 volts)... Page 3 CONDUITS FOR PUD-INSTALLED CONDUCTORS...
More informationTS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
More informationUnderground Service Requirements and Instructions
This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page
More informationMerrimac Municipal Light Department. Residential Developments Policy
Merrimac Municipal Light Department Residential Developments Policy General: This document provides specific instructions for the provision of underground electrical facilities associated with the construction
More informationSPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
More informationCONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationPRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.
INTRODUCTION These rules are issued for use by Customers, builders, electrical contractors, architects, engineers, etc. The rules require the installation of safe and adequate wiring and electrical equipment,
More informationElectrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
More informationSpecification for Installation of Underground Conduit Systems
Specification for Installation of Underground Conduit Systems November 2008 Version 2.0 Specification For Installation of Underground Conduit Systems Revision Date: November, 2008 Version No.: 2.0 Table
More information16300 MEDIUM VOLTAGE DISTRIBUTION
16300 MEDIUM VOLTAGE PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served
More informationNTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS
NTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS These guidelines are intended to familiarize Developers regarding some issues that are important to get electric
More informationSPECIAL SPECIFICATION 5757 Power Duct System
2004 Specifications CSJ 0353-04-088 SPECIAL SPECIFICATION 5757 Power Duct System 1. Description. This Item shall govern for the furnishing and installing of all materials, equipment, and labor listed in
More information3. TYPES OF SERVICE AVAILABLE. 3.1 Scope
3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service
More informationLEAD FREE FIREX. Interlock Armored Cables TECK90 and MC Industrial Cables. w w w. n e x a n s e n e r g y. c o m
FIREX Interlock Armored Cables TECK90 and MC Industrial Cables LEAD FREE O V E R 1 8 0 Y E A R S O F E X P E R I E N C E 866-663-9267 w w w. n e x a n s e n e r g y. c o m Interlock Armored Cables Introduction....2
More informationElectric Service Guide. Residential Subdivision
January 1, 2016 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website (www.mid.org) Electric Service Guide for the
More informationAT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding
AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of
More informationHistory of Secondary Cable Designs
History of Secondary Cable Designs John Hans Consulting Engineer Commonwealth Edison, Chicago Illinois Presented at the ICC Education Session St. Petersburg Beach, FL April 20, 2005 ComEd Background System
More informationDISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS.
DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS December 20, 2004 David W. Forrest Rachel I. Mosier 1. EXECUTIVE SUMMARY CL&P
More informationCABLE TRENCH INSTALLATION GUIDE
1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL INFORMATION 4.0 PLANNING INFORMATION 5.0 CREW INFORMATION 6.0 CONTRACTOR INFORMATION 7.0 PRECASTED/ POURED-IN-PLACE TRENCH DRAWINGS 2.0 PURPOSE This standard
More informationIEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO
IEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO WHEN YOU HEAR AN ENGINEER SAY A NUMBER OF DIFFERENT APPROACHES ARE BEING IMPLEMENTED
More informationCARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013
CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES EFFECTIVE MARCH 1, 1995 Revised 1/01/2013 CARROLL COUNTY ELECTRICAL DEPARTMENT 103 WEST PARIS ST. P. O. BOX 527 HUNTINGDON, TENNESSEE 38344 Telephone
More informationUNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL
S 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 CUSTOMER RESPONSIBILITY FOR TOTAL TEMPORARY SERVICE 4.0 CUSTOMER RESPONSIBILITY FOR TEMPORARY SERVICE IN PERMANENT LOCATION 5.0 NVE RESPONSIBILITIES 6.0 GROUNDING
More informationSECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
More informationGAS INSTALLERS MANUAL CINERGY AND SUBSIDIARY COMPANIES CUSTOMER PROCEDURE FOR INSTALLING 3", 4", 6", AND 8" IPS PLASTIC GAS SERVICE PIPING
CINERGY AND SUBSIDIARY COMPANIES CUSTOMER PROCEDURE FOR INSTALLING 3", 4", 6", AND 8" IMPORTANT TELEPHONE NUMBERS IPS PLASTIC GAS SERVICE PIPING Cinergy Gas & Electric Services For information regarding
More informationELECTRIC DISTRIBUTION SYSTEMS ENERGY SERVICES DEPARTMENT TECHNICAL DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS
ELECTRIC DISTRIBUTION SYSTEMS ENERGY SERVICES DEPARTMENT TECHNICAL DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS JULY 2009 DIVISION 16 ELECTRICAL... 16050 General... 16111 Conduits-Primary Service (15
More informationSpecifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
More information337500 MEDIUM VOLTAGE DISTRIBUTION
337500 MEDIUM VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary selective open loop
More informationHow To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
More informationHIGH- AND EXTRA-HIGH-VOLTAGE GLOBAL CABLE SYSTEM SOLUTIONS Rely On Our Experience... Experience Our Capabilities
HIGH- AND EXTRA-HIGH-VOLTAGE GLOBAL CABLE SYSTEM SOLUTIONS Rely On Our Experience... Experience Our Capabilities RELY ON OUR EXPERIENCE... EXPERIENCE OUR CAPABILITIES For close to half a century, Silec
More informationGas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
More informationSECTION 18370 SIGNAL WIRE AND CABLE
SECTION 18370 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for all cable and wire required for signal and signal power system wiring to wayside shelters, junction boxes, and factory
More informationUptown Campus, Primary Electric Master Plan - Program Study State University of New York At Albany, SUCF Project No. 01832 V.
V. DESIGN STANDARDS i. Medium Voltage Cables ii. iii. iv. Separable Connectors Splices & Fault Indicators Manholes & Ductbanks Primary Switches & Medium Voltage Transformers v. Metering, Monitoring, &
More informationIndianapolis Power & Light Company
Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis
More informationConsidering UNDERGROUND. tampaelectric.com
Considering UNDERGROUND Electric Service? tampaelectric.com INTRODUCTION The majority of Tampa Electric s customers receive their electric service through overhead construction, which is the standard type
More informationSession 14 Cable Support Systems
Session 14 Cable Support Systems Cable Support Systems in the IEC World A new IEC Standard, IEC61537 2001 has been developed If full details of the cabling layout are available then the likely cable load
More informationSECTION 16402 UNDERGROUND ELECTRIC SERVICE
SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and
More informationELECTRIC SYSTEM BULLETIN No. 754/759
SUPPLEMENT TO SPECIFICATIONS FOR ELECTRICAL INSTALLATIONS OUTDOOR PADMOUNTED OR VAULT ENCLOSED THREE PHASE TRANSFORMER ELECTRIC SYSTEM BULLETIN No. 754/759 October 2007 (Supersedes issue dated December
More informationMultiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained
Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase
More informationSpecifications for Electrical Installations
Electric Service Bulletin No. 759B April 2014 Supplement to Specifications for Electrical Installations Underground Commercial Distribution (UCD) Installation and Responsibility Guide Liberty Utilities
More informationCONSTRUCTION, MATERIAL, AND WORK SPECIFICATIONS FOR NEW. 15/25kV PRIMARY UNDERGROUND DISTRIBUTION SYSTEMS UP TO 200 AMPS
Page 1 of 34 CONSTRUCTION, MATERIAL, AND WORK SPECIFICATIONS FOR NEW 15/25kV PRIMARY UNDERGROUND DISTRIBUTION SYSTEMS UP TO 200 AMPS These Specifications supersede all related URD specifications from former
More informationCity of St. George Energy Services. Underground Power Construction Standards
City of St. George Energy Services Underground Power Construction Standards Updated July 2015 TABLE OF CONTENTS GENERAL PREFACE...1 JOINT UTILITY COMMITTEE (JUC) STANDARDS...2 CABLE INSTALLATION...8 CABLE
More informationCable Selection for Medium Voltage Capacitor Banks and Harmonic Filter Banks
Cable Selection for Medium Voltage Capacitor Banks and Harmonic Filter Banks Introduction This document presents the fundamental aspects of cable and conductor selection for connecting pad mounted shunt
More informationOntario Electrical Safety Code - Info Sheet
Ontario Electrical Safety Code - Info Sheet The following are the Code requirements and explanatory material for buried electrical wiring that are applicable to most residential applications. 12-012 Underground
More informationIRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
More informationTELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities
1 TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities Beginning in January 2010 TELUS began designing new subdivisions within the Top 48 population
More informationSIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More information800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
More informationSERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp
SERVICE ENTRANCE - UNDERGROUND 07-01-15 PAGE 1 OF 6 USE: Arrangement of service equipment to supply electric energy to an underground, outdoor self contained meter installation. LATEST REVISION: PREVIOUS
More informationMV CABLE TYPE C 33-226
MV CABLE TYPE C 33-226 Standards : CENELEC HD 620 C 33-226 Rated voltage Rated voltage : 12/20 (24) kv Design 1 Stranded aluminium, class 2 conductor 2 Extruded conducting screen on conductor 3 XLPE insulation
More informationGas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
More informationNetwork Standard Advice No. 1420C 9/6/2011
Network Standard Advice No. 1420C 9/6/2011 TO: Customers, Service Providers and Ausgrid Staff. Advisory Note on Changes to the Use of 11kV Cable Types. Introduction This Network Standard Advice (NSA) provides
More informationRadial Distribution Test Feeders
Radial Distribution Test Feeders Distribution System Analysis Subcommittee Report Abstract: Many computer programs are available for the analysis of radial distribution feeders. In 1992 a paper was published
More informationBeacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
More informationELECTRIC SERVICE HANDBOOK
ELECTRIC SERVICE HANDBOOK Revised July 2006 Table of Contents Electric Construction Title: Electric Service Handbook Page No. TOC Rev. July-06 Section 1: Introduction...1-010 Section 2: DP&L Offices...2-010
More informationCable Accessories. for Extruded Dielectric Cable 69kV - 230kV Rated. Catalog Python13
Cable Accessories for Extruded Dielectric Cable 69kV - 230kV Rated Components used in cable systems 100% Tested Factory Molded For outdoor applications through 230kV For gas insulated substations and transformers
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
More informationTown House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
More informationCATHODIC PROTECTION SYSTEM DESIGN
CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of
More informationMobile Home Pre-Inspection Checklist
Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING
More information505.3.6 For a building with a crawl space, see Figure 10. 505-1
505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the
More informationEXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
More information261000 Medium Voltage Electrical Distribution
Sections Included In This Standard: 1.1 General 1.2 Underground Cable 1.3 Medium Voltage Switches 1.4 Transformers 1.5 Electrical Manholes 1.6 Switch Vaults 1.7 Distribution Switchgear/Switchboards This
More informationTHE STABILOY BRAND ADVANTAGE UNLOCKING THE SECRETS OF ALUMINUM A LOOK AT THE ADVANTAGES OF ALUMINUM ALLOY OVER COPPER
THE STABILOY BRAND ADVANTAGE UNLOCKING THE SECRETS OF ALUMINUM A LOOK AT THE ADVANTAGES OF ALUMINUM ALLOY OVER COPPER Ever Wonder Why There s No Copper in the Air? Since the early 1900s, aluminum and aluminum
More information2.4 kv to 34.5 kv SP-1099
Specifications for Customer Electric Service 2.4 kv to 34.5 kv SP-1099 FORWARD...1 CHAPTER 1 - PRIMARY METERED SERVICE...4 General Service Information...4 CA-206...6 CA-208A...7 Section 1...8 Existing
More informationBy Anne Bartosewicz, Northeast Utilities, and J. Brett Williams and Jim Hogan, Burns & McDonnell
By Anne Bartosewicz, Northeast Utilities, and J. Brett Williams and Jim Hogan, Burns & McDonnell CONNECTICUT LIGHT & POWER SERVES ONE OF THE MOST POWER-CONSTRAINED REGIONS IN THE UNITED STATES. Recognizing
More informationCathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks
More informationHow to estimate the cost of installing an Electrical Distribution Center (EDC)
How to estimate the cost of installing an Electrical Distribution Center (EDC) Candidate Number 0112233 June 2012 Table of Contents 1) Introduction 3 2) Types and Methods of Measurement 3 5 3) Specific
More informationX Planning X Quality X Maintenance & Operations
Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual
More informationCables, Cable Laying & Accessories Manual
Distribution Business Cables, Cable Laying & Accessories Manual Database ref: File Ref: Title Page & Revision Log For Cables & Access v4 - Nov 2003.doc Manual Name: Cables & Accessories Manual Version
More informationResidential Electric Service Handbook
Residential Electric Service Handbook INTRODUCTION This booklet was developed to help you acquire electrical power to your property. It presents information and general specification about the supply and
More informationBUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
More informationSpecification Standards Communications Underground Ducts, Raceways and Structures 27 05 43
PART 1: GENERAL 1.01 SCOPE OF WORK A. The work required under this Section consist of all primary, secondary, Information Technology underground ducts and raceway, including manholes and handholes for
More informationJune 2014 Electric Service Handbook
June 2014 Electric Service Handbook Commercial/Industrial and Multifamily Projects Permanent & Temporary Service 2014 by Puget Sound Energy All rights reserved. No part of this book may be reproduced or
More informationVision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
More informationNew Commercial Service Application
Please submit with this form an application fee of $500.00 and an Electronic CAD file of your preliminary plat. CAD file can be emailed to craign@inlandpower.com. Member Information Work Order Number:
More informationELECTRIC SERVICE GUIDELINES (For Indiana)
ELECTRIC SERVICE GUIDELINES (For Indiana) FOR COMMERCIAL / INDUSTRIAL DEVELOPMENTS ELECTRIC SERVICE GUIDELINES FOR COMMERCIAL/INDUSTRIAL DEVELOPMENTS INTRODUCTION... 2 WHAT YOU NEED TO OBTAIN ELECTRIC
More informationBuilding Industry Consulting Services (BICS) Guide to TELUS Communications Inc. Alberta Subdivision Servicing 2011
Building Industry Consulting Services (BICS) Guide to TELUS Communications Inc. Alberta Subdivision Servicing 2011 Table of Contents 1.0 Introduction... 3 2.0 Pre Planning... 4 3.0 Required Information...
More informationAll work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.
DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which
More informationChecklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System
Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System An application for the construction or alteration of an individual subsurface sewage disposal system shall
More informationPOWER CABLE INSTALLATION GUIDE
POWER CABLE INSTALLATION GUIDE Southwire Company One Southwire Drive Carrollton, Georgia 30119 2005 Southwire Company. All rights reserved. Printed in the United States of America. Hypalon is a registered
More informationUnderground Transmission Lines
Underground Transmission Lines INTRODUCTION In today s urban, environmentally sensitive environment, how are you going to get power to the people who need it? In many cities, overhead transmission lines
More informationGROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationMaterials required to perform the cable circuit lowering will consist of the following:
DESCRIPTION Relocation of Roslyn Road to eliminate the Grade Crossing with the Long Island Rail Road (LIRR) in Mineola, NY requires that the New York Power Authority s (NYPA) high presure fluid filed 345kV
More informationCITY OF SELMA, TEXAS Inspection Checklist: Commercial
Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides
More informationUnderground Electric Transmission Lines Introduction
Underground Electric Transmission Lines Introduction This overview contains information about electric transmission lines which are installed underground, rather than overhead on poles or towers. Underground
More informationSolar Power Solutions
Solar Power Solutions Wire and Cable Photovoltaic Connectors Combiner Boxes Fuses Grounding Power Connectors Physical Support Products Cable Ties Supply Chain Solutions Products. Technology. Services.
More information