Least Cost Cable System. Strategies to Reduce Cable and Infrastructure Costs When Transitioning to an All Conduit Systems

Size: px
Start display at page:

Download "Least Cost Cable System. Strategies to Reduce Cable and Infrastructure Costs When Transitioning to an All Conduit Systems"

Transcription

1 Least Cost Cable System Strategies to Reduce Cable and Infrastructure Costs When Transitioning to an All Conduit Systems

2 Cost Sharing of Cable Systems Underground Extensions The Company will construct Extensions underground when requested by the Applicant or if required by local ordinance or conditions. The Applicant shall provide all trenching and backfilling, imported backfill material, conduits, and equipment foundations that the Company requires for the Extension.

3 Standard Advisory & Decision Process

4 Trenching requirements Direct Buried See Standard GA 211 Curb Backfill the trench with 6 inches of sand over the cables. An inspection may be required prior to covering the cables. Check with responsible Rocky Mountain Power (RMP) manager. Backfill both primary and secondary trenches another 12 inches with native soil then add red Danger Tape. (See Standard GB 101). As an alternative to certain trenching requirements, applicants may choose to install full conduit & vault systems. Check with the RMP manager for more information.

5 Pad Mount Transformer--Direct Buried Box Pad Install box pad after primary and secondary cables have been installed in the trench. Install box pad on level, compacted soil. Interior of the box pad is to remain free of dirt and debris. Backfill box pad leaving 3-4 inches above final grade measured from top of curb.

6 Vaults with Terminal Duct Entrances and Ground Grids

7 A transformer and sectionalizer side by side.

8

9 Changing to an All Conduit System When changing the cable installation practices the CG-12 provides a guideline for a rationale way to minimize cable cost. The document discusses many cable design approaches that may be considered that control cost, yet assure reliability for a cable system.

10 Conductor Studies showed that even when the cost difference between aluminum and copper was near $0.30/pound that for a three circuit substation getaway (9 cables) installing 1000 kcmil aluminum cables with a fluidized backfill was less expensive than copper cables for a getaway system. The cost difference between aluminum and copper on the COMEX is now over $2.00/pound.

11 First Project near Bend, Oregon.

12 The first project in Bend, Oregon showing the fill.

13 Cable Structure Drives a Blueprint for Cable Design AEIC CG12, GUIDE FOR MINIMIZING COST FOR EXTRUDED DIELECTRIC SHIELDED POWER CABLES RATED 5 THROUGH 46 KV,

14 The West has soils with poor heat transfer rate.

15 An example of thermal runaway where the soil spreads!

16 This cloud blew east.

17 Dry Clay at this location had a RHO of PSI Concrete Backfill RHO dry 90

18 Core Samples taken near Bend, Oregon

19

20 Fiberglass Riser in Yakima, Washington PVC and steel conduit for risers are being replaced by fiberglass. Prior this was the limiting factor for an ampacity rating.

21 Riser in Bend, Oregon

22 Fiberglass with lower COF allows for longer pulls. This reduces the number expensive vaults

23 Single Reel Trailers with Payout and Retrieve

24 What has been Gained With the reduction in cable cost and labor-hours, PacifiCorp s initial cost is close to the same whether in duct or direct buried. PVRR (Present Value Revenue Requirements) to implement all conduit is 1.38:1 over fifty years. This is from present system snapshot. This model does not include the salvage of 15 million pounds of copper and aluminum. Outage time reduced by ½ from 3 million to 1.5 million.

25 Continuing the Process Still in the process of implementing the concrete vaults. Need sources near our Districts. Post design to web. To fully implement will probably require meeting with the developers Need to Communicate to the field on Savings

26 National Documents--AEIC Went to Aluminum Conductor Changed Cable Packaging Reduced Concentric Neutral Size Thanks for your time. Any questions

Underground Cable Temperature Monitoring in the Real World

Underground Cable Temperature Monitoring in the Real World Underground Cable Temperature Monitoring in the Real World Executive Summary Background Brain Storming Possible Causes to Duct Bank Over Heating Mitigating Duct Bank Overheating DTS Installation for Duct

More information

COMMERCIAL CONDUIT RULES AND REGULATION

COMMERCIAL CONDUIT RULES AND REGULATION Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875

More information

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

MOBILE HOME SERVICE REQUIREMENTS GAS

MOBILE HOME SERVICE REQUIREMENTS GAS ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS

More information

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document

More information

KNOW YOUR OPTIONS: 230 KV POWER CABLES

KNOW YOUR OPTIONS: 230 KV POWER CABLES KNOW YOUR OPTIONS: 230 KV POWER CABLES 71 CONDUCTOR MATERIAL AND SIZE Conductor material is a matter of both customer preference and required current carrying capacity At 230 kv, copper is most common

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

345 kv Underground Report

345 kv Underground Report POWER ENGINEERS, INC. February 24, 2010 345 kv Underground Report PROJECT NUMBER: 117910 PROJECT CONTACT: Mike Mueller Richard C. Mues, PE EMAIL: mike.mueller@powereng.com rmues@powereng.com PHONE: 314-851-4050

More information

Section 5 161 kv Power Cables

Section 5 161 kv Power Cables Know Your Options: 161 kv Power Cable 61 material and size material is a matter of both customer preference and required current carrying capacity Copper conductor common for larger loads When both copper

More information

1 Town of Lyons Electrical Distribution System Design Standards

1 Town of Lyons Electrical Distribution System Design Standards Town of Lyons Electrical Distribution System Material and Design INDEX 6.1 Design Criteria 6.11 Submissions 6.1.2 Method 6.1.3 Criteria 6.2 Specifications 6.2.1 Scope 6.2.2 General Requirements 6.2.3 Materials

More information

KNOW YOUR OPTIONS: 69 KV XLPE POWER CABLE

KNOW YOUR OPTIONS: 69 KV XLPE POWER CABLE Know Your Options: 69 kv XLPE Power Cable 3 material and size material is a matter of both customer preference and required current carrying capacity Copper conductor common for larger loads When both

More information

Underground Commercial Electric Service

Underground Commercial Electric Service Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer

More information

TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3

TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3 UNDERGROUND TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS... Page 1 NEW SERVICE QUESTIONNAIRE... Page 2 GENERAL... Page 3 TRENCHING SECONDARY (120/240 volts)... Page 3 CONDUITS FOR PUD-INSTALLED CONDUCTORS...

More information

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET

More information

Underground Service Requirements and Instructions

Underground Service Requirements and Instructions This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page

More information

Merrimac Municipal Light Department. Residential Developments Policy

Merrimac Municipal Light Department. Residential Developments Policy Merrimac Municipal Light Department Residential Developments Policy General: This document provides specific instructions for the provision of underground electrical facilities associated with the construction

More information

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.

PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property. INTRODUCTION These rules are issued for use by Customers, builders, electrical contractors, architects, engineers, etc. The rules require the installation of safe and adequate wiring and electrical equipment,

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

Specification for Installation of Underground Conduit Systems

Specification for Installation of Underground Conduit Systems Specification for Installation of Underground Conduit Systems November 2008 Version 2.0 Specification For Installation of Underground Conduit Systems Revision Date: November, 2008 Version No.: 2.0 Table

More information

16300 MEDIUM VOLTAGE DISTRIBUTION

16300 MEDIUM VOLTAGE DISTRIBUTION 16300 MEDIUM VOLTAGE PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served

More information

NTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS

NTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS NTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS These guidelines are intended to familiarize Developers regarding some issues that are important to get electric

More information

SPECIAL SPECIFICATION 5757 Power Duct System

SPECIAL SPECIFICATION 5757 Power Duct System 2004 Specifications CSJ 0353-04-088 SPECIAL SPECIFICATION 5757 Power Duct System 1. Description. This Item shall govern for the furnishing and installing of all materials, equipment, and labor listed in

More information

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope 3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service

More information

LEAD FREE FIREX. Interlock Armored Cables TECK90 and MC Industrial Cables. w w w. n e x a n s e n e r g y. c o m

LEAD FREE FIREX. Interlock Armored Cables TECK90 and MC Industrial Cables. w w w. n e x a n s e n e r g y. c o m FIREX Interlock Armored Cables TECK90 and MC Industrial Cables LEAD FREE O V E R 1 8 0 Y E A R S O F E X P E R I E N C E 866-663-9267 w w w. n e x a n s e n e r g y. c o m Interlock Armored Cables Introduction....2

More information

Electric Service Guide. Residential Subdivision

Electric Service Guide. Residential Subdivision January 1, 2016 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website (www.mid.org) Electric Service Guide for the

More information

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of

More information

History of Secondary Cable Designs

History of Secondary Cable Designs History of Secondary Cable Designs John Hans Consulting Engineer Commonwealth Edison, Chicago Illinois Presented at the ICC Education Session St. Petersburg Beach, FL April 20, 2005 ComEd Background System

More information

DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS.

DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS. DISCUSSION OF CROSS-LINKED POLYETHYLENE INSULATED CABLES FOR UNDERGROUND PORTIONS OF THE MIDDLETOWN-NORWALK 345 kv PROJECTS December 20, 2004 David W. Forrest Rachel I. Mosier 1. EXECUTIVE SUMMARY CL&P

More information

CABLE TRENCH INSTALLATION GUIDE

CABLE TRENCH INSTALLATION GUIDE 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL INFORMATION 4.0 PLANNING INFORMATION 5.0 CREW INFORMATION 6.0 CONTRACTOR INFORMATION 7.0 PRECASTED/ POURED-IN-PLACE TRENCH DRAWINGS 2.0 PURPOSE This standard

More information

IEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO

IEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO IEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO WHEN YOU HEAR AN ENGINEER SAY A NUMBER OF DIFFERENT APPROACHES ARE BEING IMPLEMENTED

More information

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013 CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES EFFECTIVE MARCH 1, 1995 Revised 1/01/2013 CARROLL COUNTY ELECTRICAL DEPARTMENT 103 WEST PARIS ST. P. O. BOX 527 HUNTINGDON, TENNESSEE 38344 Telephone

More information

UNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL

UNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL S 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 CUSTOMER RESPONSIBILITY FOR TOTAL TEMPORARY SERVICE 4.0 CUSTOMER RESPONSIBILITY FOR TEMPORARY SERVICE IN PERMANENT LOCATION 5.0 NVE RESPONSIBILITIES 6.0 GROUNDING

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

GAS INSTALLERS MANUAL CINERGY AND SUBSIDIARY COMPANIES CUSTOMER PROCEDURE FOR INSTALLING 3", 4", 6", AND 8" IPS PLASTIC GAS SERVICE PIPING

GAS INSTALLERS MANUAL CINERGY AND SUBSIDIARY COMPANIES CUSTOMER PROCEDURE FOR INSTALLING 3, 4, 6, AND 8 IPS PLASTIC GAS SERVICE PIPING CINERGY AND SUBSIDIARY COMPANIES CUSTOMER PROCEDURE FOR INSTALLING 3", 4", 6", AND 8" IMPORTANT TELEPHONE NUMBERS IPS PLASTIC GAS SERVICE PIPING Cinergy Gas & Electric Services For information regarding

More information

ELECTRIC DISTRIBUTION SYSTEMS ENERGY SERVICES DEPARTMENT TECHNICAL DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS

ELECTRIC DISTRIBUTION SYSTEMS ENERGY SERVICES DEPARTMENT TECHNICAL DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS ELECTRIC DISTRIBUTION SYSTEMS ENERGY SERVICES DEPARTMENT TECHNICAL DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS JULY 2009 DIVISION 16 ELECTRICAL... 16050 General... 16111 Conduits-Primary Service (15

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

337500 MEDIUM VOLTAGE DISTRIBUTION

337500 MEDIUM VOLTAGE DISTRIBUTION 337500 MEDIUM VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary selective open loop

More information

How To Get A Power Line Extension

How To Get A Power Line Extension GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs

More information

HIGH- AND EXTRA-HIGH-VOLTAGE GLOBAL CABLE SYSTEM SOLUTIONS Rely On Our Experience... Experience Our Capabilities

HIGH- AND EXTRA-HIGH-VOLTAGE GLOBAL CABLE SYSTEM SOLUTIONS Rely On Our Experience... Experience Our Capabilities HIGH- AND EXTRA-HIGH-VOLTAGE GLOBAL CABLE SYSTEM SOLUTIONS Rely On Our Experience... Experience Our Capabilities RELY ON OUR EXPERIENCE... EXPERIENCE OUR CAPABILITIES For close to half a century, Silec

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction

More information

SECTION 18370 SIGNAL WIRE AND CABLE

SECTION 18370 SIGNAL WIRE AND CABLE SECTION 18370 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for all cable and wire required for signal and signal power system wiring to wayside shelters, junction boxes, and factory

More information

Uptown Campus, Primary Electric Master Plan - Program Study State University of New York At Albany, SUCF Project No. 01832 V.

Uptown Campus, Primary Electric Master Plan - Program Study State University of New York At Albany, SUCF Project No. 01832 V. V. DESIGN STANDARDS i. Medium Voltage Cables ii. iii. iv. Separable Connectors Splices & Fault Indicators Manholes & Ductbanks Primary Switches & Medium Voltage Transformers v. Metering, Monitoring, &

More information

Indianapolis Power & Light Company

Indianapolis Power & Light Company Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis

More information

Considering UNDERGROUND. tampaelectric.com

Considering UNDERGROUND. tampaelectric.com Considering UNDERGROUND Electric Service? tampaelectric.com INTRODUCTION The majority of Tampa Electric s customers receive their electric service through overhead construction, which is the standard type

More information

Session 14 Cable Support Systems

Session 14 Cable Support Systems Session 14 Cable Support Systems Cable Support Systems in the IEC World A new IEC Standard, IEC61537 2001 has been developed If full details of the cabling layout are available then the likely cable load

More information

SECTION 16402 UNDERGROUND ELECTRIC SERVICE

SECTION 16402 UNDERGROUND ELECTRIC SERVICE SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and

More information

ELECTRIC SYSTEM BULLETIN No. 754/759

ELECTRIC SYSTEM BULLETIN No. 754/759 SUPPLEMENT TO SPECIFICATIONS FOR ELECTRICAL INSTALLATIONS OUTDOOR PADMOUNTED OR VAULT ENCLOSED THREE PHASE TRANSFORMER ELECTRIC SYSTEM BULLETIN No. 754/759 October 2007 (Supersedes issue dated December

More information

Multiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained

Multiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase

More information

Specifications for Electrical Installations

Specifications for Electrical Installations Electric Service Bulletin No. 759B April 2014 Supplement to Specifications for Electrical Installations Underground Commercial Distribution (UCD) Installation and Responsibility Guide Liberty Utilities

More information

CONSTRUCTION, MATERIAL, AND WORK SPECIFICATIONS FOR NEW. 15/25kV PRIMARY UNDERGROUND DISTRIBUTION SYSTEMS UP TO 200 AMPS

CONSTRUCTION, MATERIAL, AND WORK SPECIFICATIONS FOR NEW. 15/25kV PRIMARY UNDERGROUND DISTRIBUTION SYSTEMS UP TO 200 AMPS Page 1 of 34 CONSTRUCTION, MATERIAL, AND WORK SPECIFICATIONS FOR NEW 15/25kV PRIMARY UNDERGROUND DISTRIBUTION SYSTEMS UP TO 200 AMPS These Specifications supersede all related URD specifications from former

More information

City of St. George Energy Services. Underground Power Construction Standards

City of St. George Energy Services. Underground Power Construction Standards City of St. George Energy Services Underground Power Construction Standards Updated July 2015 TABLE OF CONTENTS GENERAL PREFACE...1 JOINT UTILITY COMMITTEE (JUC) STANDARDS...2 CABLE INSTALLATION...8 CABLE

More information

Cable Selection for Medium Voltage Capacitor Banks and Harmonic Filter Banks

Cable Selection for Medium Voltage Capacitor Banks and Harmonic Filter Banks Cable Selection for Medium Voltage Capacitor Banks and Harmonic Filter Banks Introduction This document presents the fundamental aspects of cable and conductor selection for connecting pad mounted shunt

More information

Ontario Electrical Safety Code - Info Sheet

Ontario Electrical Safety Code - Info Sheet Ontario Electrical Safety Code - Info Sheet The following are the Code requirements and explanatory material for buried electrical wiring that are applicable to most residential applications. 12-012 Underground

More information

IRRIGATION PUMPING Table of Contents - Section 900

IRRIGATION PUMPING Table of Contents - Section 900 IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS

More information

TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities

TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities 1 TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities Beginning in January 2010 TELUS began designing new subdivisions within the Top 48 population

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

800 Communications Circuits

800 Communications Circuits ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that

More information

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp SERVICE ENTRANCE - UNDERGROUND 07-01-15 PAGE 1 OF 6 USE: Arrangement of service equipment to supply electric energy to an underground, outdoor self contained meter installation. LATEST REVISION: PREVIOUS

More information

MV CABLE TYPE C 33-226

MV CABLE TYPE C 33-226 MV CABLE TYPE C 33-226 Standards : CENELEC HD 620 C 33-226 Rated voltage Rated voltage : 12/20 (24) kv Design 1 Stranded aluminium, class 2 conductor 2 Extruded conducting screen on conductor 3 XLPE insulation

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction

More information

Network Standard Advice No. 1420C 9/6/2011

Network Standard Advice No. 1420C 9/6/2011 Network Standard Advice No. 1420C 9/6/2011 TO: Customers, Service Providers and Ausgrid Staff. Advisory Note on Changes to the Use of 11kV Cable Types. Introduction This Network Standard Advice (NSA) provides

More information

Radial Distribution Test Feeders

Radial Distribution Test Feeders Radial Distribution Test Feeders Distribution System Analysis Subcommittee Report Abstract: Many computer programs are available for the analysis of radial distribution feeders. In 1992 a paper was published

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

ELECTRIC SERVICE HANDBOOK

ELECTRIC SERVICE HANDBOOK ELECTRIC SERVICE HANDBOOK Revised July 2006 Table of Contents Electric Construction Title: Electric Service Handbook Page No. TOC Rev. July-06 Section 1: Introduction...1-010 Section 2: DP&L Offices...2-010

More information

Cable Accessories. for Extruded Dielectric Cable 69kV - 230kV Rated. Catalog Python13

Cable Accessories. for Extruded Dielectric Cable 69kV - 230kV Rated. Catalog Python13 Cable Accessories for Extruded Dielectric Cable 69kV - 230kV Rated Components used in cable systems 100% Tested Factory Molded For outdoor applications through 230kV For gas insulated substations and transformers

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

CATHODIC PROTECTION SYSTEM DESIGN

CATHODIC PROTECTION SYSTEM DESIGN CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of

More information

Mobile Home Pre-Inspection Checklist

Mobile Home Pre-Inspection Checklist Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING

More information

505.3.6 For a building with a crawl space, see Figure 10. 505-1

505.3.6 For a building with a crawl space, see Figure 10. 505-1 505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

261000 Medium Voltage Electrical Distribution

261000 Medium Voltage Electrical Distribution Sections Included In This Standard: 1.1 General 1.2 Underground Cable 1.3 Medium Voltage Switches 1.4 Transformers 1.5 Electrical Manholes 1.6 Switch Vaults 1.7 Distribution Switchgear/Switchboards This

More information

THE STABILOY BRAND ADVANTAGE UNLOCKING THE SECRETS OF ALUMINUM A LOOK AT THE ADVANTAGES OF ALUMINUM ALLOY OVER COPPER

THE STABILOY BRAND ADVANTAGE UNLOCKING THE SECRETS OF ALUMINUM A LOOK AT THE ADVANTAGES OF ALUMINUM ALLOY OVER COPPER THE STABILOY BRAND ADVANTAGE UNLOCKING THE SECRETS OF ALUMINUM A LOOK AT THE ADVANTAGES OF ALUMINUM ALLOY OVER COPPER Ever Wonder Why There s No Copper in the Air? Since the early 1900s, aluminum and aluminum

More information

2.4 kv to 34.5 kv SP-1099

2.4 kv to 34.5 kv SP-1099 Specifications for Customer Electric Service 2.4 kv to 34.5 kv SP-1099 FORWARD...1 CHAPTER 1 - PRIMARY METERED SERVICE...4 General Service Information...4 CA-206...6 CA-208A...7 Section 1...8 Existing

More information

By Anne Bartosewicz, Northeast Utilities, and J. Brett Williams and Jim Hogan, Burns & McDonnell

By Anne Bartosewicz, Northeast Utilities, and J. Brett Williams and Jim Hogan, Burns & McDonnell By Anne Bartosewicz, Northeast Utilities, and J. Brett Williams and Jim Hogan, Burns & McDonnell CONNECTICUT LIGHT & POWER SERVES ONE OF THE MOST POWER-CONSTRAINED REGIONS IN THE UNITED STATES. Recognizing

More information

Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants

Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks

More information

How to estimate the cost of installing an Electrical Distribution Center (EDC)

How to estimate the cost of installing an Electrical Distribution Center (EDC) How to estimate the cost of installing an Electrical Distribution Center (EDC) Candidate Number 0112233 June 2012 Table of Contents 1) Introduction 3 2) Types and Methods of Measurement 3 5 3) Specific

More information

X Planning X Quality X Maintenance & Operations

X Planning X Quality X Maintenance & Operations Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual

More information

Cables, Cable Laying & Accessories Manual

Cables, Cable Laying & Accessories Manual Distribution Business Cables, Cable Laying & Accessories Manual Database ref: File Ref: Title Page & Revision Log For Cables & Access v4 - Nov 2003.doc Manual Name: Cables & Accessories Manual Version

More information

Residential Electric Service Handbook

Residential Electric Service Handbook Residential Electric Service Handbook INTRODUCTION This booklet was developed to help you acquire electrical power to your property. It presents information and general specification about the supply and

More information

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877

More information

Specification Standards Communications Underground Ducts, Raceways and Structures 27 05 43

Specification Standards Communications Underground Ducts, Raceways and Structures 27 05 43 PART 1: GENERAL 1.01 SCOPE OF WORK A. The work required under this Section consist of all primary, secondary, Information Technology underground ducts and raceway, including manholes and handholes for

More information

June 2014 Electric Service Handbook

June 2014 Electric Service Handbook June 2014 Electric Service Handbook Commercial/Industrial and Multifamily Projects Permanent & Temporary Service 2014 by Puget Sound Energy All rights reserved. No part of this book may be reproduced or

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

New Commercial Service Application

New Commercial Service Application Please submit with this form an application fee of $500.00 and an Electronic CAD file of your preliminary plat. CAD file can be emailed to craign@inlandpower.com. Member Information Work Order Number:

More information

ELECTRIC SERVICE GUIDELINES (For Indiana)

ELECTRIC SERVICE GUIDELINES (For Indiana) ELECTRIC SERVICE GUIDELINES (For Indiana) FOR COMMERCIAL / INDUSTRIAL DEVELOPMENTS ELECTRIC SERVICE GUIDELINES FOR COMMERCIAL/INDUSTRIAL DEVELOPMENTS INTRODUCTION... 2 WHAT YOU NEED TO OBTAIN ELECTRIC

More information

Building Industry Consulting Services (BICS) Guide to TELUS Communications Inc. Alberta Subdivision Servicing 2011

Building Industry Consulting Services (BICS) Guide to TELUS Communications Inc. Alberta Subdivision Servicing 2011 Building Industry Consulting Services (BICS) Guide to TELUS Communications Inc. Alberta Subdivision Servicing 2011 Table of Contents 1.0 Introduction... 3 2.0 Pre Planning... 4 3.0 Required Information...

More information

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition. DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which

More information

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System An application for the construction or alteration of an individual subsurface sewage disposal system shall

More information

POWER CABLE INSTALLATION GUIDE

POWER CABLE INSTALLATION GUIDE POWER CABLE INSTALLATION GUIDE Southwire Company One Southwire Drive Carrollton, Georgia 30119 2005 Southwire Company. All rights reserved. Printed in the United States of America. Hypalon is a registered

More information

Underground Transmission Lines

Underground Transmission Lines Underground Transmission Lines INTRODUCTION In today s urban, environmentally sensitive environment, how are you going to get power to the people who need it? In many cities, overhead transmission lines

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Materials required to perform the cable circuit lowering will consist of the following:

Materials required to perform the cable circuit lowering will consist of the following: DESCRIPTION Relocation of Roslyn Road to eliminate the Grade Crossing with the Long Island Rail Road (LIRR) in Mineola, NY requires that the New York Power Authority s (NYPA) high presure fluid filed 345kV

More information

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

CITY OF SELMA, TEXAS Inspection Checklist: Commercial Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides

More information

Underground Electric Transmission Lines Introduction

Underground Electric Transmission Lines Introduction Underground Electric Transmission Lines Introduction This overview contains information about electric transmission lines which are installed underground, rather than overhead on poles or towers. Underground

More information

Solar Power Solutions

Solar Power Solutions Solar Power Solutions Wire and Cable Photovoltaic Connectors Combiner Boxes Fuses Grounding Power Connectors Physical Support Products Cable Ties Supply Chain Solutions Products. Technology. Services.

More information