1 Town of Lyons Electrical Distribution System Material and Design INDEX 6.1 Design Criteria 6.11 Submissions Method Criteria 6.2 Specifications Scope General Requirements Materials 6.3 Construction General Requirements Specific Requirements 6.4 Testing Compaction Test Construction Standards and Details Specifications for Construction Underground Distribution Systems 1 Town of Lyons Electrical Distribution System Design Standards
2 6.1 DESIGN CRITERIA Section 6 Electrical Distribution System Design Standards SUBMISSIONS : The electrical distribution system public improvement plans shall describe the proposed electrical distribution system in adequate detail so as to serve as construction drawings as well as satisfying the requirements of this section METHOD: The design of the electrical distribution system shall be based on standard design practices and design criteria contained in this section CRITERIA : The design of the electrical distribution system shall be based on the following: 1. In areas zoned for residential uses, the electrical distribution system and building services shall be installed underground with transformers, junction boxes, and pedestals surface mounted. Locations and general layout shall be as shown in Standards 6-1, 6-2 and In areas zoned for commercial and industrial uses, the electrical distribution system and building services may be installed underground or overhead. To be determined by Electrical Department. 3. The remainder of this section shall pertain to underground electrical distribution systems only. The design and construction of overhead electrical distribution systems and building services shall be coordinated with the Town administration prior to commencement. 4. Primary and secondary conductors will be placed in Schedule 40 PVC duct throughout the system. Conduit size to be determined by Town s Electric Engineer or Town staff. Minimum size duct shall be Town Electrical Engineer will determine wire sizes and system design at Developer s expense. 6. Joint Use Coordination: a. Whenever possible, construction will be coordinated with the telephone company and any authorized cable TV company so that they can install their facilities before final backfill. 2 Town of Lyons Electrical Distribution System Design Standards
3 6.2 SPECIFICATIONS b. Upon receipt of a copy of the proposed development from the developer, the telephone company or CATV will make a layout for their facilities. The Telephone Company or CATV will coordinate this layout with the town Electric Department for joint use trenches. The Telephone Company or CATV will coordinate this layout with the Town Electric Department for joint use trenches. The Telephone Company or CATV will then coordinate construction of their facilities directly with the developer SCOPE: The work covered by these specifications concerns the furnishing of all labor, equipment, and materials and performing all operations for the construction of the electrical distribution system including primary and secondary lines, transformers, junction boxes, protective devices and other fittings and appurtenances in accordance with these specifications and the Standard Design Drawings in Paragraph GENERAL REQUIREMENTS: The electrical distribution system shall be constructed in accordance with engineered construction plans for the work prepared under the direction of a Town Engineer and approved by the Town Engineer MATERIALS: Will meet industry standards and be approved by the Electrical Department. 1. Conductor: All primary and secondary conductors will be new and on original factor reels marked with the manufacturer s name, address, type, date of manufacture and length of cable. a. Underground secondary cable shall be copper or aluminum, 600V, cross-linked polyethylene, triplexed UD cable. Cable size to be determined by Town s electrical Engineer. b. Under ground primary cable to be 25 Kv, XLPE, 220 mil Al. 1/3 neutral cable. Cable size to be determined by Town s Electrical Engineer. 2. Precast Concrete Underground Distribution Vaults: a. Vaults. (1) This Commercial specification covers the requirements for steel reinforced, precast concrete, underground distribution vaults. The structure described in this 3 Town of Lyons Electrical Distribution System Design Standards
4 specification shall be used in conjunction with underground primary cable for three phase installations. (2) GENERAL. All vaults and components shall conform to this specification and associated drawings in all respects and be constructed using high quality materials in accordance with good industry practice. The Town Engineer will determine the dimensional requirements. (3) COMPONENTS. (a) PULLING EYES: All pulling eyes or irons shall be capable of withstanding a 15,000-pound force. b. Vault Frame and Cover: (1) SCOPE. This specification covers the requirements for steel reinforced, precast concrete, underground distribution vault lids. The structure described in this specification shall be used in conjunction with electrical concrete vaults for Underground Distribution Systems. (2) GENERAL. All vault lid components shall conform to this specification and associated drawings in all respects and be constructed using high quality materials in accordance with good industry practice. (3) DESIGN. The present vault lid shall be designed to resist all dead loads and live loads equivalent to an H-20 or S-16 loading as stated in the latest revision of the AASHTO Standard Specifications for highway bridges. The combination of loads that produces the maximum shear and moment shall be used to design the structure. The vault lid shall be adequately reinforced to resist the stresses resulting from the above loading conditions. The supplier shall be responsible for the structural design. 4 Town of Lyons Electrical Distribution System Design Standards
5 (4) CONSTRUCTION. The minimum compressive strength in all concrete components of the precast vault lid shall not be less than 4000 psi after it has cured to reach its 28 day strength. The maximum nominal aggregate size shall be ¾ and shall not exceed 1/5 of the minimum dimension of cross section of any one concrete casting. Four swift lift lifting anchors (recessed lugs) or four ¾ standard SAE threaded inserts shall be provided. These shall be located on the top face of the vault lid. The vault lid shall be constructed to the dimensions indicated on the attached drawings with all appurtenances firmly fixed in the forms to prevent dislodgment during construction and future use. (5) COMPONENTS. (a) FRAME AND COVER: Frameco Fabricators galvanized steel frame and cover assembly or approved equal. The lid shall have Torsion Spring Assisted: access doors rated for H-20 (highway) traffic loading. The doors are either to be equipped with stops for latching in the open position or designed for removal by lift off. The access doors shall be secured by a recessed, captive pentahead bolt which threads into a nut with a blind hole. Frameco model #3 x 3 S.M.U.D. frame and cover shall be cast in all 5 x 5 O.D. vault lids for use with 4 x4 x4 x8 I.D. electric 5 Town of Lyons Electrical Distribution System Design Standards
6 vaults (Spec ). Frameco catalog #4272 frame and cover shall be cast in all 5 x7 O.D. vault lids for use with 4 x 6 x 8 I.D. electric vaults (Spec ). 3. Transformer: All transformers shall be designed according to American National Standard Institute Type I design. Transformers will be padmounted, loop-feed, with load break primary bushings, 5/8 brass stud, 2 primary taps 2 ½ % above and below normal and externally operable, primary load sensing fuse and isolation link. Manufacturer s metal nameplate with above data will be securely attached to the inside compartment of the transformer. Manufacturer will provide non-pcb label attached to transformer door. Manufacturer to provide along with other transformer information the type of insulating material used, i.e. petroleum products. 6.3 CONSTRUCTION a. All other major components of equipment shall have as a minimum the manufacturer s name, address, and catalog or style number on a nameplate securely attached to the item of equipment. b. All metallic materials shall be protected against corrosion. Aluminum shall not be used in contact with earth, and where connected to dissimilar metal, shall be protected by approved fittings and treatment. All ferrous metals such as anchors, bolts, braces, boxes, bodies, clamps, fittings, guards, nuts, pins, rods, shim, thimbles, washers and miscellaneous parts not of corrosion resistant steel, shall be hot-dip galvanized. c. Materials and equipment to be provided shall be essentially the standard cataloged products of a manufacturer regularly engaged in the manufacture of these products. Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer GENERAL REQUIREMENTS: Section 7, General Specifications, shall be followed except as modified in Paragraph SPECIFIC REQUIREMENTS: The following specific requirements shall apply in the construction of the electrical distribution system: 1. Trench Excavation Requirements: 6 Town of Lyons Electrical Distribution System Design Standards
7 a. The trench for direct-buried duct systems shall meet the following depth Requirements (see figures 6-5a and 6-5b). (1) For residential applications all duct shall be a minimum of 36 inches below final sub-grade. The trench shall be no deeper than 42 inches below final sub-grade. (2) For commercial application the trench shall be a minimum of 48 Inches below final sub-grade. b. Trench backfill and Compaction Requirements: (1) Single duct trench widths shall not exceed 24 inches. (2) The Town shall not accept trenching outside of rightof-way or easement areas. 2. Trench Backfill and Compaction Requirements: a. Backfill material shall be placed in uniform layers not exceeding 12 inches in un-compacted thickness and mechanically compacted using platform type tampers or other Town approved methods. b. Backfill material shall be finely divided and free from debris and organic material. The first 12- inch lift shall contain no rocks larger than 3/4 inch in greatest dimension. Subsequent lifts shall contain no rocks larger than 3 inches in greatest dimension. c. Trench backfill at all depths shall be compacted to not less than 95 percent of maximum density. Backfill for trenches traversing subgrades of roads, parking areas, underground piping, and other facilities subject to damage by settlement shall be compacted to not less than 95 percent of maximum density. ASTM Specification D698, otherwise known as Standard Proctor, shall define maximum density. 3. Duct Laying: a. The duct shall be laid in a good workmanlike manner, with glued joints and smooth ends where duct requires cutting. The Town Inspector prior to concrete encasement when required will inspect the duct installation, ground rod locations and elbows up to surface apparatus. 7 Town of Lyons Electrical Distribution System Design Standards
8 b. When encasement is required, the duct run will be encased in four-sack mix concrete with ¾ inch aggregate. A minimum thickness of three inches will be maintained on top, bottom and sides of duct. Earth backfill will not be placed on concrete easement until concrete has set up enough to prevent displacement when earth fill is compacted. The earth backfill shall then be placed in lifts not to exceed a loose depth of 10 inches. The lift shall be well tamped. This procedure shall be followed until a minimum of one (1) foot of compacted backfill covers the encasement. The maximum thickness of each lift after the one-foot of cover has been reached shall be 18 inches. The backfill at all depths shall be compacted to at least ninety-five percent (95%) of the maximum density obtainable by the Standard Proctor Density Test. See standard 5-1 for trench detail concrete encased ducts. 4. Installation of conductor: a. Pulling of conductors into duct runs shall be done with care to prevent damage. The reels shall be set up so there will be a minimum of bending into the cable entrance. Conduit shall have bell ends of guard protection at each end of the duct to protect the cable jacket. Where several wires or cables are to occupy one conduit, they will be pulled together. To facilitate the pulling of conductors, lubrication only as recommended by the cable manufacturer shall be used. Cable pulling tension and bending radius shall not exceed values as recommended by the cable manufacturer. b. Cables shall be attached to the pulling lines by means of woven cable or basket grips. A swivel connection shall be used with all cable pulling operations. The Town Inspector shall be present during all pulling operations. The cable ends shall be sealed with a moisture-tight seal. c. Conductors will be identified according to instructions from the Town Inspector. 5. Equipment Installation: a. Transformers: Transformers will be installed and wiring connections made as shown in standard and details 6-1, 6-2, 6-6A through 6-6D. The transformer box pad will be placed on soil that has been compacted to 95% of Standard Proctor to provide a level and stable foundation. 8 Town of Lyons Electrical Distribution System Design Standards
9 b. Handholes or junction boxes: Handholes will be installed and wiring connections made as shown in Figures 6-7A and 6-7B on six to eight inches of ¾ inch crushed rock. c. Pedestals: Pedestals will be installed as shown in Figure 6-8 on six to eight inches of ¾ inch crushed rock. 6.4 TESTING COMPACTION TEST: Compaction tests to verify specified compaction shall be performed as required in Section 7 of this manual. 6.5 CONSTRUCTION STANDARDS AND DETAILS 5-1 Typical Trench for concrete encased ducts 6-1 Front lot line U.R.D. construction design -2 Transformer box pad and conduit 6-3 Meter location 6-5A Typical trenches for direct buried ducts 6-5B Under ground street crossing 6-6 Loop system with radial tap showing lightning arrester locations 6-6A Ground assembly for pad-mounted single-phase transformers & enclosures 6-6B Typical primary connections on a grounded-front pad-mounted transformer 6-6C Bushing mounted lightning arrestor for a grounded-front pad-mounted transformer. 6-6D Single phase pad-mounted transformer deferred unit, pedestal type. 6-6F Sectionalizing pedestal grounding. 6-6G Single-phase pad-mounted sectionalizing assembly 6-6H Three-phase pad-mounted sectionalizing assembly 6-6P URD service to typical apartment complex 6-7A Hand hole and secondary cable and duct 6-7B Front lot line hand hole, secondary cable and duct installation. 6-8 Below grade service pedestal 7-1 Three phase primary riser pole. 7-2 Three phase cable terminal pole with intermediate arresters and hook stick operated disconnect switches. 7-3 Single phase riser pole 7-4 Primary riser feeding single-phase transformer. 9 Town of Lyons Electrical Distribution System Design Standards
10 Specifications For Construction For Underground Distribution Systems 1. General These specifications provide for the construction of underground distribution power facilities by the cable installed in conduit and trenching. All construction work shall be done in a thorough and workmanlike manner in accordance with the staking sheets, plans and specifications, and the construction drawings. The most current Edition of the National Electrical Safety Code (ANSI C2-1981) shall be followed, except where local regulations are more stringent, in which case local regulations shall govern. 2. Handling of Cable Cable shall be handled carefully at all times to avoid damage, and shall not be dragged across the ground, fences or sharp projections. Care shall be exercised to avoid excessive bending of the cable. The ends of the cable shall be sealed at all times against moisture with suitable end caps. Where it is necessary to cut the cable, the ends shall be terminated or sealed immediately after the cutting operation. 3. Trenching All trenching depths specified are minimum as measured from the final grade to the top surface of the conduit. The routing shall be as shown on the staking sheets and plans and specifications unless conditions encountered are such that changes are necessary to accomplish the work. In such event, the Engineer shall be notified 10 Town of Lyons Electrical Distribution System Design Standards
11 promptly. If rock or other difficult digging is involved, the contractor shall determine the nature and extent of the difficulty, and the Engineer will determine whether rerouting, rock trenching, or other changes are necessary. Loose soil or crumbly rock will not be considered as difficult digging. The trench widths specified are minimum and should be increased as necessary to obtain the required depths in loose soils. 4. Conduit All exposed ends of conduit shall be plugged during construction to prevent the entrance of foreign matter and moisture into the conduit. Burrs or sharp projections, which might injure the cable, shall be removed. Riser shield or conduit shall extend at least 1.0 foot below grade at all riser poles. The minimum size of conduit, or riser guard with equivalent usable area is to be determined by the Town Engineer. 5. Installation in Conduit or Duct Where cable must be pulled through conduit or duct, the operation shall be performed in such a way that the cable will not be damaged from strain or dragging. The cable shall be lubricated with a suitable cable lubricant prior to pulling into conduit or duct. In placing primary cables, the stress applied while pulling into ducts or during other pulling operations shall not exceed the least of the following: a. Where a pulling eye is attached to the conductor, the maximum pulling strain in pounds shall not exceed.006 times the circular mil area for aluminum or.008 times the circular mil area for copper. b. Where a basket grip is placed over the cable, the pulling strain shall not exceed the lesser of (1) that calculated in an above or (2) 1000 pounds. The cable under the cable grip and 3.0 foot preceding it shall be severed and discarded after the pulling operation. c. In no case shall the maximum pulling tension exceed that recommended by the specific cable manufacturer. d. At bends the maximum sidewall pressure recommended by the cable manufacturer shall not be exceeded. 6. Tagging of Cables at Termination Points As the cables are laid they shall be identified and tagged. The identification shall be a permanent type, such as that done with an 11 Town of Lyons Electrical Distribution System Design Standards
12 embossing type tape writer on plastic and colored cable tape. The tag shall be securely attached to the cable. 7. Secondary and Service Connections A suitable inhibiting compound shall be used with all secondary and service connections. All secondary cable connections located below grade or in secondary pedestals shall be made with pre-insulated secondary connector blocks. Diving bells with open terminals, insulating boots or moisture barriers that depend solely on tape are not acceptable. All transformer secondary phase terminal connections shall be completely insulated. If the secondary phase terminals are threaded studs, the connection shall be made with a pre-insulated secondary transformer connection block. If the transformer secondary phase terminals are insulated cable leads, connection shall be made with a pre-insulated secondary connector block or with a secondary prefabricated splice when the transformer leads continue directly to the service. If a transformer is so large that it must have secondary spades, the spades shall be taped or otherwise insulated. Boots used for insulation shall be taped so that they cannot be readily slipped off. Secondary connections to terminals of pole-mounted transformers shall be made so that moisture cannot get inside the cable insulation. This may be accomplished by covering the terminals and bare conductor ends with an appropriate moisture sealant (item es in the List of Materials). The secondary connections and insulation shall have accommodations for all future and existing services as shown on the plans and specifications. 8. Inspection and Inventory of Buried Units Before any backfilling operations are begun, the contractor and Town shall jointly inspect all trenches, cable placement, risers, pedestal stakes, and other construction not accessible after backfilling, and an inventory of units shall be taken. If corrections 12 Town of Lyons Electrical Distribution System Design Standards
13 are required, a second inspection shall be made after completion of the changes. 9. Backfilling The first 12 inches of trench backfill shall be free from rock, gravel larger than ¾ or other material, which might damage the conduit. In lieu of cleaning the trench, the contractor may, at his option, place a 4-inch bed of clean sand or soil under the conduit and twelve inches of clean soil above the conduit. Cleaned soil backfill when used shall contain no solid material larger than ¾. This soil layer shall be carefully compacted so that the conduit will not be damaged. Backfilling shall be completed in such a manner that voids will be minimized. Excess soil shall be piled on top and shall be well tamped. All rock and debris shall be removed from the site, and any damage to the premises repaired immediately. Pieces of scrap cable shall not be buried in the trench as a means of disposal. 10. Equipment Pads The site for the pad shall be on undisturbed earth adjacent to but not over the trench. The site shall be cleared of all debris and excavated to the specified depth. Gravel, sand or other acceptable self-draining material shall be added to the site and thoroughly compacted. The pad shall be installed at the specified elevation. Poly pads, precast concrete, or cast-in-place concrete may be used. 11. Transformers Transformers shall be handled carefully to avoid damage to the finish and shall be positioned in accordance with the staking sheets and the plans and specifications. Only qualified and experienced personnel shall be allowed to make connections and cable terminations. 12. Equipment Enclosures Excavations for transformer hole liners and other below-grade enclosures shall be made so as to disturb the surrounding earth as little as practical. Enclosures shall be installed with sidewalls plumb or the top of enclosure level.. When enclosures are of fiber, plastic, or other semi flexible material, backfilling should be done with 13 Town of Lyons Electrical Distribution System Design Standards
14 covers in place and with careful tamping so as to avoid distortion of the enclosure. When installation is complete, the cover of the enclosure shall not be lower than and not more than two inches higher than the grade specified by the Town. Soil in the immediate vicinity shall be tamped and sloped away from the enclosure. At the Town s option the excess soil shall be removed from the site or spread evenly over the surface of the ground to the satisfaction of the Town. Warning : A hazardous voltage may exist on the cable after de-energizing. Therefore, before the handling the cable, the conductor shall be grounded to permit any charge to drain to earth. 14 Town of Lyons Electrical Distribution System Design Standards
15 15 Town of Lyons Electrical Distribution System Design Standards
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
COMMERCIAL CONDUIT RULES AND REGULATION
Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875
Merrimac Municipal Light Department. Residential Developments Policy
Merrimac Municipal Light Department Residential Developments Policy General: This document provides specific instructions for the provision of underground electrical facilities associated with the construction
SECTION 16402 UNDERGROUND ELECTRIC SERVICE
SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and
CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
Underground Service Requirements and Instructions
This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page
SECTION 18370 SIGNAL WIRE AND CABLE
SECTION 18370 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for all cable and wire required for signal and signal power system wiring to wayside shelters, junction boxes, and factory
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
MOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
Underground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3
CHAPTER 6 - SANITARY SEWER
CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION
CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Gas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION
Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
Ontario Electrical Safety Code - Info Sheet
Ontario Electrical Safety Code - Info Sheet The following are the Code requirements and explanatory material for buried electrical wiring that are applicable to most residential applications. 12-012 Underground
SECTION 02845 GUARDRAILS
SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
ELECTRIC METERING COMMERCIAL & INDUSTRIAL
ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS
The Contractor shall furnish and install all shielded power cable suitable for use on this project.
Section 16122 PRIMARY POWER CABLES PART 1 GENERAL: WORK INCLUDED The Contractor shall furnish and install all shielded power cable suitable for use on this project. RELATED WORK Section 16020: Tests SUBMITTALS
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D
12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3
UNDERGROUND TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS... Page 1 NEW SERVICE QUESTIONNAIRE... Page 2 GENERAL... Page 3 TRENCHING SECONDARY (120/240 volts)... Page 3 CONDUITS FOR PUD-INSTALLED CONDUCTORS...
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
Issued 06-01-07 E.C.S. Section WTR00 INFORMATION SECTION Page 1 of 1
Issued 06-01-07 E.C.S. Section WTR00 INFORMATION SECTION Page 1 of 1 INDEX SECTION WTR01: ELECTRICAL CONNECTIONS PRIMARY.. Page 1 SERVICE DROPS FROM THREE-PHASE TRANSFORMER BANKS.. Page 9 SECTION WTR02:
AIRPORT SECURITY FENCING. A. American Society for Testing and Materials (ASTM):
SECTION 02832 AIRPORT SECURITY FENCING PART 1-GENERAL 1.1 SUMMARY A. Section includes: Construct airport security chain-link fence and gate at specified areas and conforming lines, grades, details indicated
STREETLIGHT SYSTEM GROUNDING AND BONDING
Page: 1 of 8 STREETLIGHT SYSTEM GROUNDING AND BONDING 1. Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial
Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL
155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
Electric Service Guide for Commercial Construction
Electric Service Guide for Commercial Construction Contents Contacting KCP&L... 2 Voltages... 2 Temporary Service... 2 Customer-Provided Temporary Service... 2 KCP&L-Provided Temporary Service.... 2 Current
Gas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density
ORDIC FIBERGLASS, INC. Wind Farm Products
Wind Farm Products Box Pad Solutions Nordic leads the way with the first chuted fiberglass box pad. This unique design enables workers to fit the chute against the tower s base cable opening. Underground
Multiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained
Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding
AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
Please check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
SECTION 32 31 13 CHAIN LINK FENCES AND GATES
PART 1 GENERAL 1.1 DESCRIPTION SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTES: 1. Delete or add information between //---// and any other items applicable to project. Cover any item added
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
Town House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
16300 MEDIUM VOLTAGE DISTRIBUTION
16300 MEDIUM VOLTAGE PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served
ELECTRIC SERVICE HANDBOOK
ELECTRIC SERVICE HANDBOOK Revised July 2006 Table of Contents Electric Construction Title: Electric Service Handbook Page No. TOC Rev. July-06 Section 1: Introduction...1-010 Section 2: DP&L Offices...2-010
Mobile Home Pre-Inspection Checklist
Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING
SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS
SECTION 15056 PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. A written request to use Ductile
505.3.6 For a building with a crawl space, see Figure 10. 505-1
505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the
EARTHING AND BONDING AT SECONDARY SUBSTATIONS
DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
Requirements for the Attachment of Communication Cable Facilities on PPL Poles
Page 99 of 137 Requirements for the Attachment of Communication Cable Facilities on Replaces: URS-3002 URS-3004 URS-101C-304 A-157649 Page 100 of 137 Reference Notes for Drawings: General 1. The term communication
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12
SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions
Printing 3 March 2008 CP2 Buried Cable Pedestal Initial & Rehab Installation Instructions This instruction is intended for CP2 cable pedestal installations and replacements. The following tools will be
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)
SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
Electric Service Guide for Residential Construction
Electric Service Guide for Residential Construction Table of Contents Contacting KCP&L... 2 Existing Home Remodeling or Additions... 2 Changing your electric service... 2 What you need to know before you
Acceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Least Cost Cable System. Strategies to Reduce Cable and Infrastructure Costs When Transitioning to an All Conduit Systems
Least Cost Cable System Strategies to Reduce Cable and Infrastructure Costs When Transitioning to an All Conduit Systems Cost Sharing of Cable Systems Underground Extensions The Company will construct
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes
CANTEX INC. 301 Commerce Ste 2700 Fort Worth, Texas 76102 817-215-7000 Fax: 817-215-7001 Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes YOUR FULL
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
CONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
Policy and Guidelines for Electric Service
Policy and Guidelines for Electric Service FRANKLIN MUNICIPAL POWER & LIGHT 1050 Pretlow Street Franklin, VA 23851 757-562-8568 757-562-7883 Fax January 2008 Franklin Power & Light HELPFUL TELEPHONE NUMBERS
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
3. TYPES OF SERVICE AVAILABLE. 3.1 Scope
3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service
All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.
DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
OPERATING INSTRUCTIONS AND PARTS LIST FOR U075075 U100058 UNDERGROUND HOSE REELS
OPERATING INSTRUCTIONS AND PARTS LIST FOR U075075 U0005 FORM NO.: 3-00 REV: RAIN BIRD CORPORATION ONE REELCRAFT CENTER COLUMBIA CITY, IN 675 (00) -33 / (60) - FAX: (60) -605 U0005 MODEL NUMBER SIGNIFICANCE