Iron Hill Corporate Center Newark, DE

Size: px
Start display at page:

Download "Iron Hill Corporate Center Newark, DE"

Transcription

1 Iron Hill Corporate Center Newark, DE Delaware s Premier Suburban Office Park Contact: John Kaczowka (302) or Brian Hopkins (302)

2 Total Project Size 463,085 RSF Red Wing Built in 1988 (84,191 RSF) White Wing Built in 1992 (108,552 RSF) Blue Wing Built in 1990 (85,568 RSF) Iron Hill Corporate Center Project Summary 300 Bellevue Parkway Bowman Building Built in 1991 (14,720 RSF) Cole House Built in 1981 (103,328 RSF) Sabre Wing Built in 1987 (65,226 RSF) Parking Garage Built in 1992 (931 Spaces) Fleet Building (1,500 RSF)

3 Iron Hill Corporate Center Amenities Tenants at Iron Hill Corporate Center will enjoy the following amenities: Numerous hotels, restaurants and shops within a 1 mile radius Ample on-site parking at 4.8 per 1,000 ratio with additional high density parking located contiguous to property. On-site cafeteria On-site conference center 300 Bellevue Parkway Covered parking Generator back-up Plug & Play finished space with ceiling heights exceeding 10 feet. On-site property management Dart bus service with stop at site

4 Locational Benefits: Location Direct access to I-95 through multiple routes Approximately 1 mile to Christiana Hospital Within 3 miles to the University of Delaware and Delaware Technology Park

5 Location

6 Building Information Iron Hill Corporate Center Red Wing Address: 750 Prides Crossing Newark, DE Year Constructed: 1988 Zoning: CR Commercial Regional Size: 84,191 BOMA Rentable SF Floors: Three (3) HVAC: Building currently includes the following: - One hundred twenty eight (128) water source heat pumps with 200-ton evaporative cooling tower for the cooling loop in summer - Two (2) DX split systems are located on the roof - A 435KW electric boiler maintains loop temperature during the winter - Two (2) Liebert HVAC systems control temperature and humidity on the second floor TER room - Seven (7) exhaust fans Electric: 12KV, 480Y/277V Elevators: Two (2) hydraulic piston driven elevators Fire Protection: Wet fire suppression system Generators: Building includes a 200 amp transfer switch with emergency circuit

7 Building Information Iron Hill Corporate Center White Wing Address: 700 Prides Crossing Newark, DE Year Constructed: 1992 Zoning: CR Commercial Regional Size: 108,552 BOMA Rentable SF Floors: Three (3) HVAC: Building currently includes the following: - One hundred seventy (170) water source heat pumps - Two (2) 200-ton evaporative cooling towers for the cooling loop in summer. A 435KW electric boiler maintains loop temperature in winter - Four (4) Liebert air conditioning systems maintain temperature in second floor DATA and TER rooms - Two (2) exhaust fans Electric: 12KV, 480Y/277V Elevators: Three (3) hydraulic piston driven elevators Fire Protection: Wet fire suppression system. Three-story atrium has a deluge system and two pre-action systems are located in the TER room and generator room Generators: Property includes a 1600 KW diesel with a 3,000 gallon skid-mounted fuel tank. One 338KVA and 125KVA Liebert UPS system is also available.

8 Building Information Iron Hill Corporate Center Blue Wing Address: 800 Prides Crossing Newark, DE Year Constructed: 1990 Zoning: CR Commercial Regional Size: 85,568 BOMA Rentable SF Floors: Three (3) HVAC: Building currently includes the following: - One hundred sixteen (116) water source heat pumps - Two (2) 290-ton evaporative cooling towers for the cooling loop in summer. A 435KW electric boiler maintains loop temperature in winter - Four (4) Liebert air conditioning systems maintain temperature in second floor DATA and TER rooms Electric: 12KV, 480Y/277V Elevators: Three (3) hydraulic piston driven elevators Fire Protection: Wet fire suppression system. Pre-action systems used in TER room Generators: Property includes a 1200 KW diesel with a 2,000 gallon skid-mounted fuel tank. One 125KVA Liebert UPS system is also available.

9 Building Information Iron Hill Corporate Center Bowman Building Address: 900 Prides Crossing Newark, DE Year Constructed: 1991 Zoning: CR Commercial Regional Auditorium: 381 seats Size: 14,720 BOMA Rentable SF Floors: One (1) HVAC: Building currently includes the following: - Seven (7) gas fired rooftop units - Two (2) exhaust fans - Four (4) cooking exhaust fans Electric: Building includes a 12KV primary open-ended URD loop through a 500 KVA pad mount 12KV/480Y/277V volt transformer Elevators: N/A Fire Protection: Wet fire suppression system Generators: None self contained emergency lighting system

10 Building Information Iron Hill Corporate Center Cole House Address: 4041 Ogletown Road Newark, DE Year Constructed: 1981 Zoning: CR Commercial Regional Size: 103,328 BOMA Rentable SF Floors: Two (2) HVAC: Building currently includes the following: - Sixty-two (62) gas fired rooftop package units - Eight (8) DX split systems - Six (6) water heaters for HVAC loop - Liebert air conditioning for temperature and humidity in DATA, TER and UPS rooms - Eleven (11) exhaust fans - Two (2) chilled water pumps - Four (4) cooking exhaust fans Electric: Dual feed 12KV, 208Y/120V Elevators: Two (2) elevators Fire Protection: Wet fire suppression system and dry system equipped with a double interlocked pre-action and Halon FM-200 system protecting the TER room Generators: - 900KW generator - Two (2) 125KVA and one (1) 130 KVA UPS system

11 Building Information Iron Hill Corporate Center Sabre Wing Address: 4051Ogletown Road Newark, DE Year Constructed: 1987 Zoning: CR Commercial Regional Size: 65,226 BOMA Rentable SF Floors: Three (3) HVAC: Building currently includes the following: - Seventy-five (75) water source heat pumps - Liebert air conditioning controls in DATA, TER and UPS rooms - Six (6) exhaust fans - Two (2) 120-ton evaporative cooling towers maintain cooling loop water during the summer and a 420 KW electric boiler maintains loop temperature in the winter Electric: Dual feed 12KV, 208Y/120V Elevators: Two (2) hydraulic piston driven elevators Fire Protection: Wet fire suppression system and dry system equipped with a double interlocked pre-action and a FM-200 system protect the TER room Generators: A 125 KVA UPS system supports the first floor DATA and TER room. UPS and TER cooling is backed by a generator feeder from the Cole House through a 400 amp transfer switch

12 Building Information Iron Hill Corporate Center Fleet Building Address: 610 Christiana Road Newark, DE Zoning: CR Commercial Regional Size: Approximately 1,500 Rentable SF Floors: One (1)

13 Building Information Iron Hill Corporate Center Parking Deck Address: 1000 Prides Crossing, Newark, DE Year Constructed: 1992 Zoning: CR Commercial Regional Size: 312,000 SF Floors: Two (2) HVAC: N/A Electric: Building includes a 225 amp/277v circuit panel Elevators: One (1) hydraulic piston driven elevator Fire Protection: Dry standpipe system with two (2) hydrants located in the front and back of garage Generators: N/A

14 Iron Hill Corporate Center Building Photos Red Wing

15 Iron Hill Corporate Center Building Photos White Wing

16 Iron Hill Corporate Center Building Photos Cole House

17 Iron Hill Corporate Center Building Photos Sabre Wing

18 Iron Hill Corporate Center Building Photos Connector Between Cole House & Red Wing

19 Iron Hill Corporate Center Interior Photos Atrium Between Red & White Wings

20 Iron Hill Corporate Center Interior Photos Red & White Lobby

21 Iron Hill Corporate Center Interior Photos Ceiling of Lobby to Red & White Wing

22 Iron Hill Corporate Center Interior Photos Sabre Atrium

23 Iron Hill Corporate Center Availabilities Red Wing 1 st Floor 27,743 RSF (84,191 RSF) 2 nd Floor 27,813 RSF- Leased 3 rd Floor 12,721 RSF White Wing 1 st Floor 37,514 RSF - Leased (108,552 RSF) 2 nd Floor 36,228 RSF- Leased 3 rd Floor 34,810 RSF Blue Wing (85,568 RSF) Leased Bowman Building (14,720 RSF) Sold Cole House 1 st Floor 90,183 RSF (103,328 RSF) 2 nd Floor 13,145 RSF Sabre Wing 1 st Floor 19,839 RSF (65,226 RSF) 2 nd & 3 rd Floors 22,237 RSF- 3 rd Floor Leased Fleet Building 1,500 SF

24 Iron Hill Corporate Center Red Wing 1 st Floor 27,743 BOMA Rentable SF As-Built Plan 350 Workstations

25 Iron Hill Corporate Center Red Wing 2 nd Floor 27,813 BOMA Rentable SF As-Built Plan 122 Workstations

26 Iron Hill Corporate Center Red Wing 3 rd Floor 28,635 BOMA Rentable SF As-Built Plan 86 Workstations

27 Iron Hill Corporate Center White Wing 3 rd Floor 34,810 BOMA Rentable SF As-Built Plan 288 Workstations

28 Iron Hill Corporate Center Cole House 1 st Floor 90,183 BOMA Rentable SF As-Built Plan 291 Workstations

29 Iron Hill Corporate Center Cole House C 2 nd Floor 13,145 BOMA Rentable SF As-Built Plan 73 Workstations

30 Iron Hill Corporate Center Sabre Building 1 st Floor 20,752 BOMA Rentable SF As-Built Plan 92 Workstations

31 Iron Hill Corporate Center Sabre Building 2 nd Floor 22,237 BOMA Rentable SF As-Built Plan 109 Workstations

32 Iron Hill Corporate Center Fleet Building 1,500 BOMA Rentable SF As-Built Plan

33 Iron Hill Corporate Center Red Wing 1 st Floor 27,743 BOMA Rentable SF Hypothetical Full Floor User Layout

34 Iron Hill Corporate Center Red Wing 2nd Floor 27,813 BOMA Rentable SF INSERT FULL FLOOR PLAN Hypothetical Full Floor User Layout

35 Iron Hill Corporate Center Red Wing 3 rd Floor 28,635 BOMA Rentable SF Hypothetical Full Floor User Layout

36 Iron Hill Corporate Center White Wing 3 rd Floor 34,810 BOMA Rentable SF Hypothetical Full Floor User Layout

37 Iron Hill Corporate Center Cole House 1 st Floor 90,183 BOMA Rentable SF Hypothetical Full Floor User Layout

38 Iron Hill Corporate Center Cole House 2 nd Floor 13,145 BOMA Rentable SF Hypothetical Full Floor User Layout

39 Iron Hill Corporate Center Sabre Building 1 st Floor 20,752 BOMA Rentable SF Hypothetical Full Floor User Layout

40 Iron Hill Corporate Center Sabre Building 2 nd Floor 22,237 BOMA Rentable SF Hypothetical Full Floor User Layout

41 Contact Information Leasing Agent (CB Richard Ellis, Inc.) John Kaczowka (O) (F) (C) Brian Hopkins (O) (F) (C)

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G 100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

1301 Fannin. Houston Data Center & Office Facility

1301 Fannin. Houston Data Center & Office Facility 1301 Fannin & Office Facility 1301 FANNIN Building Features Building Location Building Typical Floor plans Systems Infrastructure Amenities BUILDING FEATURES YEAR BUILT/RENOVATED: 1984/2009 TOTAL LEASE

More information

san francisco//usa data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence

san francisco//usa data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence internet + intellectual property + intelligence We thank you for the opportunity to work with you regarding your colocation needs in San Francisco, USA. We can colocate standard rack-mountable servers

More information

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS 5200, 5250, 5300 AUTO CLUB DRIVE DEARBORN, MICHIGAN Ideal location minutes from Detroit Metro Airport, four expressways and hours from entire Midwest and

More information

3901 Calverton Boulevard Beltsville, Maryland

3901 Calverton Boulevard Beltsville, Maryland 3901 Calverton Boulevard Beltsville, Maryland GHP Office Realty One West Red Oak Lane White Plains, New York 10604 Phone: 914.642.9300 Fax: 914.642.9301 ghpoffice.com 3901 CALVERTON BOULEVARD, BELTSVILLE,

More information

COMMODITIZING THE DATA CENTER MARKET

COMMODITIZING THE DATA CENTER MARKET COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.

More information

NEW JERSEY CENTER OF EXCELLENCE

NEW JERSEY CENTER OF EXCELLENCE Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves

More information

Columbia University Master Planning & Optimization

Columbia University Master Planning & Optimization Columbia University Master Planning & Optimization February 20, 2014 Mr. Frank Martino Vice President, Operations 1 Agenda Columbia University Campus District Energy Overview Evolution of Columbia s District

More information

1450 Infinite Drive. Unique Space Opportunity In Northwest Denver! 1450 Infinite Drive Louisville, Colorado 80027

1450 Infinite Drive. Unique Space Opportunity In Northwest Denver! 1450 Infinite Drive Louisville, Colorado 80027 1450 Infinite Drive Offi ce, Clean Electronics Lab and Clean Room Manufacturing Environment Intensive Infrastructure & Growth Capabilities! The space use in the building includes offi ce, lab space, clean

More information

BEAR CREEK CORPORATE CENTER BEAR CREEK CORPORATE CENTER NEW LEASING OPPORTUNITY

BEAR CREEK CORPORATE CENTER BEAR CREEK CORPORATE CENTER NEW LEASING OPPORTUNITY NEW LEASING OPPORTUNITY 98,246 SF CLASS A OFFICE BUILDING 17425 NORTHEAST UNION HILL ROAD, REDMOND, WA 98052 AVAILABILITIES BUILDING B AVAILABILITIES FLOOR SQUARE FOOT RATE DATE AVAILABLE 1st Floor 46,541

More information

Santa Clara, CA 95054

Santa Clara, CA 95054 Leading-Edge Datacenter Facility Silicon Valley GENERAL In excess of 41,000 sq. ft. of raised floor 9 MVA of utility power into facility Purpose built Green Datacenter Sutton Roley Lic. 00793235 (408)

More information

TURN-KEY LAB SPACE AVAILABLE

TURN-KEY LAB SPACE AVAILABLE TURN-KEY LAB SPACE AVAILABLE 910 CLOPPER ROAD LOCATION... Tech Park 270 910 Clopper Road BUILDING... 180,650 rentable square feet TURN-KEY LAB/OFFICE SPACE AVAILABLE Second Floor 9,800 SF 14,644 SF (can

More information

OFFICE SPACE SUBLEASE 1105 Berkshire Boulevard / The TRAVELERS BUILDING Wyomissing, PA 19610. Rare Wyomissing Sublease 4,926 SF AVAILABLE NOW

OFFICE SPACE SUBLEASE 1105 Berkshire Boulevard / The TRAVELERS BUILDING Wyomissing, PA 19610. Rare Wyomissing Sublease 4,926 SF AVAILABLE NOW SPACE SUBLEASE 1105 Berkshire Boulevard / The TRAVELERS BUILDING Rare Wyomissing Sublease 4,926 SF AVAILABLE NOW Full Service Lease, all-in for only $16.50 / SF! Glass on three sides, huge conference room

More information

Data Center CH1. Elk Grove Village, IL

Data Center CH1. Elk Grove Village, IL Data Center CH1 Elk Grove Village, IL powerful/ efficient /reliable solutions > Data Center CH1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero

More information

How To Visit An Internet Data Center

How To Visit An Internet Data Center AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina

More information

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to

More information

Building Energy Systems. - HVAC: Heating, Distribution -

Building Energy Systems. - HVAC: Heating, Distribution - * Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center

More information

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and

More information

1475 Peachtree Street NE

1475 Peachtree Street NE UP TO 46,102 RSF FOR LEASE > OFFICE SPACE > MIDTOWN Space Overview > Class A 235,314 RSF office building in the heart of midtown > Built in 1986 and renovated in 2012 > Excellent location with 2-turn access

More information

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA

More information

HISTOREMIX. A new spin on a classic structure

HISTOREMIX. A new spin on a classic structure HISTOREMIX A new spin on a classic structure The pioneering spirit of this Daniel Burnham designed building (1907) is alive in the iconic structure, which is once again making a bold statement in the Central

More information

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.

More information

PLUG & PLAY CALL CENTER SPACE AVAILABLE

PLUG & PLAY CALL CENTER SPACE AVAILABLE PLUG & PLAY CALL CENTER SPACE AVAILABLE Brent Roberts, CCIM First Vice President 816.968.5830 [email protected] www.cbre.com/1414callcenter 146,591± SF First class finishes Centrally located Access

More information

OPERATOR - FACILITY ADDRESS - DATE

OPERATOR - FACILITY ADDRESS - DATE . Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.

More information

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS

IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS IT White Paper MANAGING EXTREME HEAT: COOLING STRATEGIES FOR HIGH-DENSITY SYSTEMS SUMMARY As computer manufacturers pack more and more processing power into smaller packages, the challenge of data center

More information

For Sale - $11,000,000 - Negotiable Excellent User Opportunity -

For Sale - $11,000,000 - Negotiable Excellent User Opportunity - 4770 White Plains Road Bronx, New York For Sale - $11,000,000 - Negotiable Excellent User Opportunity - Jerry Houlihan GHP Office Realty One West Red Oak Lane White Plains, New York 10604 Phone: 914.642.9300

More information

Portland s Financial District. Overview FOR SALE RETAIL/OFFICE BUILDING 6-8 CITY CENTER, PORTLAND, MAINE

Portland s Financial District. Overview FOR SALE RETAIL/OFFICE BUILDING 6-8 CITY CENTER, PORTLAND, MAINE FOR SALE RETAIL/OFFICE BUILDING Portland s Financial District Overview 6-8 City Center is a well know 4-story retail and office building with a mix of granite and brick architecture and interesting interior

More information

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:

More information

Scalable. Affordable. Flexible. Fast.

Scalable. Affordable. Flexible. Fast. Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

Experience Matters...

Experience Matters... Experience Matters... Travelport Data Center offers confidence and space to meet your demanding IT needs Transwestern presents the Travelport Data Center in Denver, Colorado totaling 267,000 SF with 121,600

More information

Assessment of Existing Data Centers for Critical Facilities Round Table Group

Assessment of Existing Data Centers for Critical Facilities Round Table Group Assessment of Existing Data Centers for Critical Facilities Round Table Group Chuck Shalley, P.E. Consulting Electrical Engineers BACKGROUND INFORMATION ASSIGNMENT Data Center Criteria Type Raised Floor

More information

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same

More information

AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the

More information

BELLE VUE MANCHESTER DATA CENTRE

BELLE VUE MANCHESTER DATA CENTRE www.iracknet.com 0843 557 5712 [email protected] www.iracknet.com BELLE VUE MANCHESTER DATA CENTRE 02 BELLE VUE MANCHESTER HIGHLY ADVANCED DATA CENTRE PURPOSE BUILT TO DELIVER UNRIVALLED FLEXIBILITY

More information

property introduction

property introduction THE PINNACLE IN DOWNTOWN SARASOTA OFFICE SPACE property introduction Built in 1970 as part of the Ellis Group of banks, downtown Sarasota s Ellis Building has always had a healthy and stable mix of business

More information

01-3 0000-00 6810-20 AIR CONDITIONING SYSTEM 1. FFH SPECIFICATION AIR CONDITIONING SYSTEM RODIUS 2004.09

01-3 0000-00 6810-20 AIR CONDITIONING SYSTEM 1. FFH SPECIFICATION AIR CONDITIONING SYSTEM RODIUS 2004.09 0000-00 01-3 6810-20 1. FFH SPECIFICATION 01-4 0000-00 2. SYSTEM LAYOUT AND COMPONENTS 0000-00 01-5 01-6 0000-00 3. FFH GENERAL INFORMATION The system is to increase the coolant temperature quickly by

More information

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier

More information

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...

More information

N O W A V A I L A B L E

N O W A V A I L A B L E N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina S P E C I F I C A T I O N S Contact Doug Hollidge for more information

More information

Data Center Planning. PUE Overview

Data Center Planning. PUE Overview Data Center Planning PUE Overview Steve Carter, Americas Managing Principal Charles Prawdzik Jr., Project Manager HP Critical Facility Services delivered by EYP Mission Critical Facilities, Inc. 2008 Hewlett-Packard

More information

Heating & Cooling Efficiency

Heating & Cooling Efficiency Heating & Cooling Efficiency Advantages of Geothermal HVAC Efficiency Keith Swilley Gulf Power Company Why Gulf Power Promotes Energy Efficiency? Customer Satisfaction Education Help Customers Make Smart

More information

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle

More information

MID-TOWN RE-DEVELOPMENT

MID-TOWN RE-DEVELOPMENT FOR SALE MID-TOWN RE-DEVELOPMENT 293 MACPHERSON AVENUE, TORONTO, ON Property Description > 21,135 square feet > 153.25 feet frontage, 89.63 feet depth > Site area: 13,735 SF > Zoning: ID2.5 Legal Description

More information

Miami University Design Standards

Miami University Design Standards Miami University Design Standards INDEX General Division 01 Supplemental Conditions Division 02 Existing Conditions Division 03 Concrete Division 04 Masonry Division 05 Metals Division 06 Wood, Plastics,

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

COMMISSIONING OF HVAC SYSTEMS

COMMISSIONING OF HVAC SYSTEMS FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS

More information

RELEASE NOTES EG USA 3.0.0

RELEASE NOTES EG USA 3.0.0 RELEASE NOTES EG USA 3.0.0 Version 3.0 has a multitude of changes from version 2.8.05. One of the major changes is the ability to break up a home into Blocks with different HVAC systems. This includes

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning Load Calculation Criteria PART 1 - GENERAL 1.01 OVERVIEW A. This section includes requirements for calculating HVAC cooling and heating loads. B. Load calculations must be performed in accordance with

More information

The ASHRAE HQ Building Can the energy efficiency of the different mechanical systems really be compared? RESIDENTIAL LIGHT COMMERCIAL COMMERCIAL

The ASHRAE HQ Building Can the energy efficiency of the different mechanical systems really be compared? RESIDENTIAL LIGHT COMMERCIAL COMMERCIAL The ASHRAE HQ Building Can the energy efficiency of the different mechanical systems really be compared? RESIDENTIAL LIGHT COMMERCIAL COMMERCIAL Technical Article April 2013 The ASHRAE HQ Building Can

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

HVAC Systems: Overview

HVAC Systems: Overview HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct

More information

Columbus State Community College MASTER PLANNING

Columbus State Community College MASTER PLANNING Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT

More information

LEVEL 3 DATA CENTER ASSESSMENT

LEVEL 3 DATA CENTER ASSESSMENT Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with

More information

FACILITIES / SYSTEMS REQUIRING ASSESSMENT

FACILITIES / SYSTEMS REQUIRING ASSESSMENT M7-360 (SSPF) SYSTEMS B. FAN COIL UNIT C. A/C (LIEBERT) D. PUMPS 1. CHILLED WATER PUMP 2. HOT WATER PUMP E. REFRIGERATOR F. EXHAUST FAN G. FAN SUPPLY H. HUMIDIFIER, STEAM I. SHOWER AIR A. CRANES 1. CRANE

More information

Integrated Solar Radiant Systems

Integrated Solar Radiant Systems Integrated Solar Radiant Systems William Shady PE President Topics Radiant heating Indoor air quality Radiant Cooling Project Photos Questions and answers The goal for our clients Healthy Comfort Why Radiant

More information

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) Site Biography Market Area: New York City, New Jersey, Upstate NY and Lower Connecticut Location: Secaucus, NJ 07094 Address: 15

More information

FOR LEASE. 823 Pilot Rd. - Data Center. Las Vegas, NV. Property Features:

FOR LEASE. 823 Pilot Rd. - Data Center. Las Vegas, NV. Property Features: Property Features: Located in Hughes Airport Center Close proximity to McCarren International Airport, I-15, I-215 and the Las Vegas Strip First class 420 acre 3.3 million sq. ft. business park Turnkey

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Tier 3+ 1 Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Abstract: Schoolcraft College is constructing a High Availability (HA) Data Center

More information

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747 POLK STATE COLLEGE WINTER HAVEN, FLORIDA CHILLER PLANT EVALUATION APRIL 2, 2014 C&A# 5747 C arastro & A ssociates, c o n s u l t i n g e n g i n e e r s inc. 2609 W. De Leon Street, Tampa, Florida 33609

More information

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries

More information

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.

in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus. DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure

More information

PULASKI AND DUBLIN MIDDLE SCHOOLS

PULASKI AND DUBLIN MIDDLE SCHOOLS PULASKI AND DUBLIN MIDDLE SCHOOLS HVAC/ ELECTRICAL/ WINDOW REPLACEMENT STUDY DUBLIN MIDDLE SCHOOL REPORT BY: PULASKI MIDDLE SCHOOL P.C. Plaza Suite 1 10 Church Avenue SE Roanoke, VA 24011-2104 540.342.6001

More information

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service vcloud SERVICES vcloud SERVICE Virtual Tech offers competitive pricing on vcloud hosted services at our world class Tier 4 data centre facility fully equipped with redundant power, cooling, internet connectivity

More information

LHD LINEAR HEAT D ETECTIONN

LHD LINEAR HEAT D ETECTIONN Tri-Metallic Core: Steel provides tensile strength Copper increase conductivity Tin for corrosion resistance LHD LINEAR HEAT D ETECTIONN TECHNICAL DATA Temperature Rating: 155 F (68 C) (typical temperature)

More information

University of St Andrews. Energy Efficient Data Centre Cooling

University of St Andrews. Energy Efficient Data Centre Cooling Energy Efficient Data Centre Cooling St. Andrews and Elsewhere Richard Lumb Consultant Engineer Future-Tech Energy Efficient Data Centre Cooling There is no one single best cooling solution for all Data

More information

Gateway Center I 128,396 SF LEED GOLD CERTIFIED CLASS A OFFICE BUILDING CAMP CREEK PARKWAY AT I-85, COLLEGE PARK, GA. Free Airport Parking for Tenants

Gateway Center I 128,396 SF LEED GOLD CERTIFIED CLASS A OFFICE BUILDING CAMP CREEK PARKWAY AT I-85, COLLEGE PARK, GA. Free Airport Parking for Tenants Gateway Center I Free Airport ing for Tenants 128,396 SF LEED GOLD CERTIFIED CLASS A OFFICE BUILDING Airport/South Atlanta Developed By: Leased By: PROJECT AERIAL MARRIOTT TENANT AMENITIES CAMP CREEK PARKWAY

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER

More information

Mechanical Systems Proposal revised

Mechanical Systems Proposal revised Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option

More information

Energy Efficient High-tech Buildings

Energy Efficient High-tech Buildings Energy Efficient High-tech Buildings Can anything be done to improve Data Center and Cleanroom energy efficiency? Bill Tschudi Lawrence Berkeley National Laboratory [email protected] Acknowledgements California

More information

VIRGINIASCAN OFFICE BUILDING DATA SHEET

VIRGINIASCAN OFFICE BUILDING DATA SHEET VIRGINIASCAN OFFICE BUILDING DATA SHEET To be included on VirginiaScan, the building must have at least 10,000 sq. ft. available and all the fields in blue must be provided. A sale/lease price or price

More information

For Sale. 3418 N. Knox Ave., Chicago, IL $1,350,000 27,600 sq.ft.

For Sale. 3418 N. Knox Ave., Chicago, IL $1,350,000 27,600 sq.ft. For Sale 3418 N. Knox Ave., Chicago, IL $1,350,000 27,600 sq.ft. 1. Fast access to downtown for entertaining or business, exactly 1 mile west of Kennedy expressway, 4 miles west of Wrigley fi eld. 20 minutes

More information

ISOMEDIA COLOCATION WWW.ISOMEDIA.COM/COLOCATION

ISOMEDIA COLOCATION WWW.ISOMEDIA.COM/COLOCATION ISOMEDIA COLOCATION WWW.ISOMEDIA.COM/COLOCATION Your business needs a robust infrastructure that is secure, cost effective and reliable in order to remain competitive in today s market. ISOMEDIA s colocation

More information

FIRE-FIGHTING DESIGN BRIEF REPORT

FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM

More information

Total Cost of Ownership Analysis for Data Center Projects

Total Cost of Ownership Analysis for Data Center Projects Total Cost of Ownership Analysis for Data Center Projects Presented to: Critical Facilities Round Table January 13, 2006 Presented by: Jerry Inguagiato Sr. Vice President 408.453.7462 Shap Roder Vice President

More information

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 1 of 27 UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 2 of 27 Table of Contents 1. OBJECTIVE... 4 2. SCOPE... 4 3. COMMUNICATION... 4 4. LOSS OF NATURAL GAS SUPPLY... 5 5. LOSS OF

More information