Probabilistic Framework for Onboard Fire Safety

Size: px
Start display at page:

Download "Probabilistic Framework for Onboard Fire Safety"

Transcription

1 1 Probabilistic Framework for Onboard Fire Safety Reliability and Effectiveness Models of Passive and Active Fire Safety Systems (D1.3) Philipp Lohrmann (BMT), Apurba Kar (IRS), Antoine Breuillard (BV) BMT - document author - - organisation name - Kostas Spyrou document approved by - - revision number - 13 January 2011 PU - submission date - - distribution level - 1

2 2 Document history Revision number Date Remarks /07/2009 Skeleton document /10/2010 Final draft for revision by partners /10/2010 Final version /01/2011 Revised version 2

3 3 Contents 1 Introduction Overview Current SOLAS regulations for passenger ships Essential systems in SOLAS Chap II-2 Part C Emergency procedures Objectives Analysis of Fire Safety Systems Automatic Fire Detection Systems System set-up Smoke Detector Heat detector Fault tree analysis of a Detector System Sprinkler Systems System set-up Sprinkler Types and their working principles Regulatory requirements (Reference FSS code) Fault tree analysis of a Sprinkler System Water Mist Systems System set-up Fault tree analysis of a Water Mist System/Hi-Fog System CO 2 Systems System set-up Fault tree analysis of a CO2 system

4 4 2.5 Foam Systems System set-up Fault tree analysis of a Foam System Reliability model of detection and suppression systems The generic model Propagation of error Maintenance intervals Application to concrete systems Heat detector Photoelectric Smoke Detector Ionisation Smoke Detector Detector panel Sprinkler system Foam System Water Mist System Hi-Fog System CO2 System Conclusions References...66 Appendix - Fault trees and diagrams used in the failure rate analysis

5 5 Executive summary A ship fire is a complex scenario that depends on a large range of parameters. While the location and cause of the fire are crucial, the sequence of events immediately after the ignition is of equal importance. In particular, the reaction of the crew and the influence of the fire suppression systems decide whether or not the fire escalates to dangerous proportions. To realistically model a ship fire, it is important to have a quantitative measure for the influence of these factors. We present a methodology to analyse the reliability of fire suppression systems. For a given (constant) failure rate, we use an exponential curve to describe the reliability as a function of time. The domain of this curve is given by the maintenance interval of the system. To determine the failure rate of each system, we refer to historical data if possible. In case such data is not available, we perform a detailed fault tree analysis of the system, taking into account redundancies and manual actions. The failure rate derived in this way is then used as input for the exponential model. For each system, we compute the average and standard deviation of the reliability over the maintenance interval. These figures might be referred to in subsequent scenario analyses carried out later in the project. 5

6 1 Introduction Overview Although the days of wooden ships are long gone, fire remains one of the most dangerous threats to seafaring vessels. In fact, accident statistics (Figure 1) show that fire is the most frequent incident on cruise ships, outstripping collisions and grounding. Figure 1- Most frequent hazards on passenger ships (1) Since 1970, the size of cruise ships has roughly doubled every decade, with the latest generation the Oasis or Genesis class (2) carrying over 5,000 passengers. This dramatic increase in size poses new challenges for the avoidance and mitigation of fire risk. To the present day, fire safety regulations, including SOLAS (3), have been based on prescribed designs and performance based approaches. The weakness of this methodology is twofold: (i) it does not provide a systematic framework for testing fire scenarios and (ii) it might be too rigid to accommodate novel designs. The aim of FIREPROOF is to provide a probabilistic framework that allows a risk-based approach to fire safety. The aim of work package 1 (WP1) is to systematically generate fire scenarios based on the set up of the vessel, including space type and fire safety systems. Each of these scenarios comes with a probability that determines its weight in the risk analysis. The total fire risk of the ship is then given by R = i σ p i C i 6

7 7 where σ denotes the set of all scenarios, p i is the probability for scenario i, and C i is a measure of the consequences (or cost) of this scenario (e.g. loss of life). In theory, this sum runs over all possible scenarios. In practice, however, it is impossible to consider all scenarios, and hence one has to preselect. In particular, all scenarios with low probability and low cost would be excluded. These scenarios constitute the input for the fire and evacuation models developed under work package 2, which in turn will be used for benchmarking in work package Current SOLAS regulations for passenger ships The IMO convention SOLAS Chap II-2 (see (3)) has been one of the first maritime chapters to be rewritten (December 1996 Amendments) in a goal based manner and with support of a Fire Test Procedures code. The goals and functional requirements are given in the first place. Then the sub-sections are given. The fire safety objectives of SOLAS Chapter II-2 are to: prevent the occurrence of fire and explosion; reduce the risk to life caused by fire; reduce the risk of damage caused by fire to the ship, its cargo and the environment; contain, control and suppress fire and explosion in the compartment of origin; provide adequate and readily accessible means of escape for passengers and crew. In order to achieve the fire safety objectives, the following functional requirements are embodied in the regulations of Chapter II-2 as appropriate division of the ship into main vertical and horizontal zones by thermal and structural boundaries; separation of accommodation spaces from the remainder of the ship by thermal and structural boundaries; restricted use of combustible materials; detection of any fire in the zone of origin; containment and extinction of any fire in the space of origin; protection of means of escape and access for fire fighting; ready availability of fire-extinguishing appliances; and minimization of possibility of ignition of flammable cargo vapour As mentioned above, the fire risk is composed of a frequency of ignition and a consequent severity. The frequency of ignition can be reduced by the prevention of fire ignition and several theoretical possibilities exist (See (4)). The severity is in fact a probabilistic distribution of severity depending on the random nature of activation and efficiency of fire safety systems as well as the random nature of the protection of persons. 7

8 8 SOLAS ChapII-2 provides the minimum rules to decrease the frequency of ignition onboard in the second part B (Prevention of fire and explosion), to manage the fire in the third part C (Suppression of fire) and finally to manage the exposed with the fourth part D (Escape). Ro-ro passenger ships have special requirements included in Part G (Special requirements for the protection of vehicles, special category spaces and ro-ro spaces). In this part, the interest is to exemplify part C with essential systems mandatory onboard passenger ships, including Ro-Pax vessels. The emergency procedures requirements are also presented Essential systems in SOLAS Chap II-2 Part C Detection and alarm (Regulation 7) Smoke detection in service spaces, control stations and accommodation spaces, including corridors, stairways and escape routes within accommodation spaces. Smoke detectors need not be fitted in private bathrooms and galleys and in spaces having little or no fire risk. (regulation 7-5.2) Manually operated call points throughout the accommodation spaces, service spaces and control stations. (regulation 7-7) An efficient patrol system shall be maintained so that an outbreak of fire may be promptly detected (Regulation 7-8) Fire detection alarms for the systems required by paragraph 5.2 centralized in a continuously manned central control station (regulation 7-9) Control of smoke spread (Regulation 8) Release of smoke from machinery spaces Draught stops. Air spaces enclosed behind ceilings, panelling or linings shall be divided by close-fitting draught stops spaced not more than 14m apart. In the vertical direction, such enclosed air spaces, including those behind linings of stairways, trunks, etc., shall be closed at each deck. (regulation 8-4) Atriums equipped with a smoke extraction system. The smoke extraction system shall be activated by the required smoke detection system and be capable of manual control. The fans shall be sized such that the entire volume within the space can be exhausted in 10 min or less Containment of fire (Regulation 9) Main vertical zones bounded by "A-60" class divisions. (regulation ) Bulkheads within a main vertical zone required to be "A" class divisions shall be at least "B" class or "C" class divisions as prescribed in the tables in regulation (regulation ) Protection of stairways and lifts in accommodation area as per regulation Penetrations in fire-resisting divisions and prevention of heat transmission as per regulation 9-3 Openings in bulkheads and decks in passenger ships as per regulation Ventilation systems as per regulation 9-7 Among others, the ventilation fans shall be so disposed that the ducts reaching the various spaces remain within the main 8

9 9 vertical zone; and stairway enclosures shall be ventilated and served by an independent fan and duct system which shall not serve any other spaces in the ventilation systems Fire fighting (Regulation 10) Automatic sprinkler, fire detection and fire alarm system in all control stations, accommodation and service spaces, including corridors and stairways. Alternatively, control stations, where water may cause damage to essential equipment, may be fitted with an approved fixed fire-extinguishing system of another type. Spaces having little or no fire risk such as voids, public toilets, carbon dioxide rooms and similar spaces need not be fitted with an automatic sprinkler system. Water supply systems, portable fire extinguishers, Fixed fire-extinguishing systems, Fire-fighter's outfits as per regulation Structural integrity (Regulation 11) The hull, superstructures, structural bulkheads, decks and deckhouses shall be constructed of steel or other equivalent material (regulation 11-2) Protection of vehicles, special category and ro-ro spaces (Regulation 20) Detection should take into account the effect of ventilation of those spaces Sample extraction smoke detection systems may be used Special category spaces shall be patrolled Structural fire protection insulation should be A60 all around the spaces except when spaces of category (5), (9) and (10) are on the other side sealable ro-ro spaces : CO2 or inert gas or high expansion foam as per resolution A123 (V) MSC.1/ Circ 1272 other : water spraying system as per resolution A123 (V) MSC.1/ Circ 1272 scuppers and possibly drainage/pumping Portable fire extinguishers Casualty threshold, safe return to port and safe areas (Regulation 21) and Design criteria for systems to remain operational after a fire casualty (Regulation 22) For new ships of 120m in length or having three or more fire zones the new regulation II-2 reg. 21 applies: Definition of casualty threshold defined as the loss of any space of origin of fire up to the nearest A class boundaries being part of the space if fitted with a fixed fire fighting system (sprinklers) or being part of the adjacent spaces otherwise. Safe return to port if fire breaks out but no casualty threshold is exceeded: a list of systems should remain operational and safe areas should be designed to accommodate the passengers. Design criteria for systems if fire breaks out and one casualty threshold is exceeded in one MVZ: listed FSSs should be so arranged and segregated as to remain operational during 3 hours in other MVZs and so that the orderly evacuation and abandonment of the ship is possible. 9

10 Emergency procedures General Emergency procedures are of primary importance with regards to safety. An effort was undertaken to identify systems required with respect to an emergency situation. In the following, II-2 means SOLAS Chapter II-2; FSS/n Fire Safety Code Chapter n, and LSA/n Life Saving Appliances Code Chapter n Detection and alarm Fire detection and fire alarm systems, according to SOLAS Chapter II-2 and FSS Code, rely on fixed fire detection (smoke detection and manual operated call point) and automatic sprinkler. The requirements are mainly encapsulated in: SOLAS Chapter II-2 Regulation 7 Detection and alarm SOLAS Chapter II-2 Regulation 10 Fire fighting FSS Code Chapter 8 - Automatic sprinkler, fire detection and fire alarm systems FSS Code Chapter 9 - Fixed fire detection and fire alarm systems The following tables summarises main requirements related to fire detection and fire alarm systems. More details, as well as technical implementations, are described in the next chapter. Smoke Manual Operated Call Point Sprinkler Location II-2/7-5.2 In service spaces, control stations and accommodation spaces, including corridors, stairways, escape routes within accommodation spaces and ro-ro spaces (II-2/20.4.1) II-2/7-7 Throughout the accommodation spaces, service spaces, control stations and ro-ro spaces (II- 2/ ) II-2/ In all control stations, accommodation and service spaces, including corridors and stairways Section FSS9/ Grouped into sections System with individually identifiable fire detectors: a section may serve spaces on both sides of the ship and on several decks, but shall not be situated in more than one main vertical zone. FSS9/ Grouped into sections FSS8/ Grouped into separate sections. Each of which shall contain not more than 200 sprinklers. Shall not serve more than two decks and shall not be situated in more than one main vertical zone. System control: Indication FSS Visual and audible fire signal at the control panel and indicating units. As per smoke FSS8/ Visual and audible alarm signal automatically at one or 10

11 11 signal more indicating units System control: location FSS9 / The control panel: on the navigation bridge or in the continuously manned central control station. / Indicating unit: - At least one, be so located that it is easily accessible to responsible members of the crew at all times. Ditto FSS8/ On the navigation bridge or in the continuously-manned central control station. In addition, in a position other than on the aforementioned spaces to ensure that the indication of fire is immediately received by the crew. - One be located on the navigation bridge if the control panel is located in the main fire control station. System control: identificatio n FSS9/ Indicating units shall, as a minimum, denote the section. Ditto FSS8/ units shall indicate in which section served by the system a fire has occurred Table -1: Alarm and indication In addition, a fire patrol shall be maintained so that an outbreak of fire may be promptly detected (II-2/7-8-1) Control and monitoring of systems General Active fire protection systems should be controlled and monitored. On passenger ships, this is mainly centralized in a continuously manned central control station (CMCCS). According to SOLAS Chapter II-2 Regulation 3 Definition : Continuously manned central control station is a central control station which is continuously manned by a responsible member of the crew Central control station is a control station in which the following control and indicator functions are centralized: 1. fixed fire detection and fire alarm systems; 2. automatic sprinkler, fire detection and fire alarm systems; 3. fire door indicator panels; 4. fire door closure; 5. watertight door indicator panels; 6. watertight door closures; 11

12 12 7. ventilation fans; 8. general/fire alarms; 9. communication systems including telephones; and 10. microphones to public address systems. Control stations are those spaces in which the ship's radio or main navigating equipment or the emergency source of power is located or where the fire recording or fire control equipment is centralized. Spaces where the fire recording or fire control equipment is centralized are also considered to be a fire control station. Additionally, new ChapII-2 reg. 23 imposes New Passenger ships (>1 st July 2010) to have one safety centre be part or be close to the navigation bridge and should 1. be ergonomic 2. have communication means with CMCCSs, bridge, storage rooms for FSSs and fire equipment lockers 3. be capable to control and monitor of functionalities of FSSs: all powered ventilation systems; fire doors; general emergency alarm system; public address system; electrically powered evacuation guidance systems; watertight and semi-watertight doors; indicators for shell doors, loading doors and other closing appliances; water leakage of inner/outer bow doors, stern doors and any other shell door; television surveillance system; fire detection and alarm system; fixed fire-fighting local application system(s); sprinkler and equivalent systems; water-based systems for machinery spaces; alarm to summon the crew; atrium smoke extraction system; flooding detection systems; and fire pumps and emergency fire pumps. Control and monitoring from the continuously manned central control station In addition to previously discussed requirements on fire detection alarms, according to II-2/9-3 Passenger ships carrying more than 36 passengers shall have the fire detection alarms centralized in a continuously manned central control station. The following table summarises control and monitoring requirements for ventilation fans and fire doors. Location Ventilation fan II-2/ In general, ducts should remain in the MVZ Fire door MVZ Stairway enclosure 12

13 13 Separated system for stairway enclosures and dangerous areas Galley boundaries Ro-ro spaces boundaries CMCCS Control II-2/7-9.3 Remote shutting down II-2/7-9.3 Remote closing and be capable of reactivation CMCCS Indicator Control panel Other requirements II-2/7-9.3 closed or off status II-2/ Controls so grouped that that all fans may be stopped from either of two separate positions II-2/7-9.3 & II-2/ Open or closed positions II-2/ A door closed remotely from the central control station shall be capable of being re-opened from both sides of the door by local control. After such local opening, the door shall automatically close again Table -2: Control and monitoring: ventilation fans and fire doors Other Control and monitoring The following systems could also been controlled and/or monitored from the CMCCS. Location Control Indicator Fire damper II-2/ Where it is necessary that a ventilation duct passes through a main vertical zone division, a fail-safe automatic closing fire damper shall be fitted adjacent to the division II/9-7.3 Ducts with a free cross-sectional area exceeding 0.075m 2 shall be fitted with fire dampers through "A" class bulkheads or decks Fail-safe automatic Be capable of being manually closed from each side of the division Shall be fitted on at least one side of the division with a visible indicator showing whether the damper is in the open position Smoke extraction system II2/8-5 Atrium By the required smoke detection system (*) Be capable of manual control Table -3: Control and monitoring: Fire damper and smoke extraction system (*) According to IMO MSC/Circ.1034 (see (5)): Guidelines for smoke control and ventilation systems for internal assembly stations and atriums on new passenger ships, The automatic activation of the smoke extraction system, by means of the smoke detectors, may be delayed for up to 2 min from the activation of the first detector, if not 13

14 14 acknowledged. This 2 minute delay is intended to allow for crew verification of the smoke detector alarm. This Circular is not a mandatory text but should be brought to the attention of interested parties. 1.3 Objectives As stated above, the aim of work package 1 is to create a methodology for the systematic generation of fire scenarios and their incident probabilities. The aim of task 1.3 is to develop a probabilistic model for the reliability and effectiveness of active and passive Fire Safety Systems (FSS). In this context, active FSS are any systems that are activated in the event of a fire and include detection systems (smoke and heat detectors), automatic suppression systems (sprinklers, CO 2 systems etc) as well as any manual measures. In contrast, passive FSS include structural features like fire walls and fire doors. The analysis done within this task focuses on the reliability of automatic FSS. A methodology is developed that can in principle applied to any system, provided that its setup is known and the failure rates of its components are available. We will analyse the following systems: Smoke detectors; Heat detector; Alarm panel/detector system; Sprinkler; Foam system; Water mist system and Hi-Fog system; CO 2 system. For each system, we perform fault tree analyses as necessary and express the reliability as a function of time over the maintenance interval. 14

15 15 2 Analysis of Fire Safety Systems An important part of this task is the analysis of the Fire Safety Systems used on cruise ships. The reliability and efficiency of these systems are crucial input parameters for any fire simulation model that massively influence the incidence probabilities and consequences of fire scenarios. In this chapter, we describe in technical detail some typical FSS used on cruise ships. In particular, we give an overview over the functionality of these systems, list its components and briefly describe regulatory requirements. We analyse fault trees of the relevant systems to obtain values for their failure rates. 2.1 Automatic Fire Detection Systems System set-up Definition An Automatic Detection System comprises of detectors, manually operated call points, a control panel displaying the location of the source of a fire and a power supply. Its purpose is to detect a fire at its initial stage and to automatically activate an alarm. Application as per SOLAS and FP 53/3/1 convention (6): Table 4 - SOLAS regulation for detection systems Operation Any required fixed fire detection and fire alarm system with manually operated call points shall be capable of immediate operation at all times (This does not require a back-up control panel). In passenger ships, the fixed fire detection and fire alarm system shall be capable of remotely and individually identifying each detector and manually operated call point. Fire detectors fitted in passenger ship cabins, when activated, shall also be capable of emitting, or cause to be emitted, an audible alarm within the space where they are located. There shall be not less than two sources of power supply for the 15

16 16 Power Supply Total operation Smoke detector Heat detector electrical equipment used in the operation of the fixed fire detection and fire alarm system, one of which shall be an emergency source of power. Separate feeders reserved shall provide the supply solely for that purpose. Such feeders shall run to an automatic changeover switch situated in or adjacent to the control panel for the fire detection system. There shall be sufficient power to permit the continued operation of the system with all detectors activated, but not more than 100 if the total exceeds this figure Required in all stairways, corridors and escape routes within accommodation spaces shall be certified to operate before the smoke density exceeds 12.5% obscuration per meter, but not until the smoke density exceeds 2% obscuration per meter. Smoke detectors to be installed in other spaces shall operate within sensitivity limits to the satisfaction of the Administration having regard to the avoidance of detector insensitivity or over sensitivity. Heat detectors shall be certified to operate before the temperature exceeds 78ºC but not until the temperature exceeds 54ºC, when the temperature is raised to those limits at a rate less than 1ºC per min. At higher rates of temperature rise, the heat detector shall operate within temperature limits to the satisfaction of the Administration having regard to the avoidance of detector insensitivity or over sensitivity. Operating temperature The operation temperature of heat detectors in drying rooms and similar spaces of a normal high ambient temperature may be up to 130ºC, and up to 140ºC in saunas 1.Control and monitor input signals from all connected fire and smoke detectors and manual call points 2. Provide output signals to the navigation bridge, continuously manned central control station or onboard safety centre to notify the crew of fire and fault conditions 3. Monitor power supplies and circuits necessary for the operation of the system for loss of power and fault conditions Control panel 4. May be arranged with output signals to other fire safety systems including - paging systems, the fire alarm or public address system, fan stops, fire doors, fire dampers, the sprinkler system, the smoke extraction system, the low-location lighting system, the fixed local application fire-extinguishing system, the CCTV system, other fire safety systems; and fuel system quick closing valves. 16

17 17 The maximum spacing of detectors Table 5 - Spacing of detectors Type of detector Maximum floor area per detector (m2) Maximum distance apart between centers (m) Maximum distance away from bulkheads (m) Heat Smoke Regulatory Requirements (FSS code, FP 53/3/1 ): Fixed fire detection and fire alarm systems with individually identifiable fire detectors shall be so arranged that: 1. means are provided to ensure that any fault (e.g., power break, short circuit, earth, etc.) occurring in the section will not prevent the continued individual identification of the remainder of the connected detectors in the section; 2. all arrangements are made to enable the initial configuration of the system to be restored in the event of failure (e.g., electrical, electronic, informatics, etc.); 3. the first initiated fire alarm will not prevent any other detector from initiating further fire alarms; and 4. no section will pass through a space twice. When this is not practical (e.g., for large public spaces), the part of the section which by necessity passes through the space for a second time shall be installed at the maximum possible distance from the other parts of the section. 17

18 18 Cables used in the electrical circuits shall be flame retardant according to standard IEC On passenger ships, cables routed through other main vertical zones that they serve, and cables to control panels in an unattended fire control station shall be fire resisting according to standard IEC 60331, unless duplicated and well separated. Detectors shall be located for optimum performance. Positions near beams and ventilation ducts, or other positions where patterns of airflow could adversely affect performance, and positions where impact or physical damage is likely, shall be avoided. Detectors shall be located on the overhead at a minimum distance of 0.5 m away from bulkheads, except in corridors, lockers and stairways. The activation of any detector or manually operated call point shall initiate a visual and audible fire detection alarm signal at the control panel and indicating units. If the signals have not been acknowledged within 2 min, an audible fire alarm shall be automatically sounded throughout the crew accommodation and service spaces, control stations and machinery spaces of category A. This alarm sounding system need not be an integral part of the detection system. Functionality A typical detection system has some sensing elements which can sense the presence of smoke or heat caused by a fire in or near to the affected area. Subsequently these sensors send an electrical signal to the fire alarm panel or to specific safety equipment for activation. When this signal activates the audio-visual alarms on the panel, the concerned crew members are alerted. The panel helps them to quickly identify the fire-affected zone and thus to take appropriate countermeasures like fire extinguishing or evacuation. The responsible crew member is expected to acknowledge the alarm by pressing a cancel button within two minutes of its activation which silences the hooter/alarm. If this is not done, then the alarm gets activated in all areas/zones. The control panel has alarms for the following fault situations: On detection of fire and smoke Failure of main supply or low voltage of the battery backup system. Excessive current (fuse gets blown). Fault in the electrical power cable. 18

19 19 Technical details of the Fire Control Panel Primary Power supply: Commonly a non-switched 120 or 240 V AC source supplied from a commercial power utility. In non-residential applications, a branch circuit is dedicated to the fire alarm system and its constituents. "Dedicated branch circuits" should not be confused with "Individual branch circuits" which supply energy to a single appliance. Secondary (backup) Power supplies: This component, usually sealed, lead-acid storage batteries or other emergency sources including generators, is used to supply energy in the event of a primary power failure. Initiating Devices: This component acts as input to the fire alarm control unit and are either manually or automatically activated. Notification appliances: This component uses energy supplied from the fire alarm system or other stored energy source to inform crew members of the need to take action, usually to evacuate. Safety Interfaces: This interface allows the fire alarm system to control aspects of the built environment and to prepare the place for fire and to control the spread of smoke fumes and fire by influencing air movement, lighting, process control, human transport and exit Smoke Detector Definition A smoke detector is a device that monitors the smoke concentration in the surrounding air. Most smoke detectors work either by optical detection (photoelectric) or by physical process (ionisation), while others use both detection methods (hybrid system) to increase sensitivity to smoke. Smoke detectors are usually powered by a central fire alarm system, which in turn is powered by the main power supply system with a battery backup. Types of Smoke Detectors Optical This detector type is based on the fact that smoke particles scatter light. It typically consists of a light source (bulb or infrared LED), a lens to collimate the light into a beam, and 19

20 20 a photodiode or other photoelectric sensor at an angle to the beam as a light detector. In the absence of smoke, the light passes in a straight line and misses the detector. When smoke enters the optical chamber across the path of the light beam, some light is scattered by the smoke particles, directing it at the sensor and thus triggering the alarm. Ionisation This type of detector is based on the principle that α-radiation is attenuated by smoke particles. A typical source of radiation is a small sample of Americium-241 which has a half-life of over 430 years. The α-particles emitted by the sample pass through the ionisation chamber, an air filled space between two electrodes. The radiation ionises gas molecules within the ionisation chamber, which allows a small electric current to flow between the electrodes. When smoke particles enter the ionisation chamber, they absorb the radiation and hence reduce this current, which triggers the alarm. While ionisation smoke detectors tend to be cheaper than optical ones, they are also more prone to false alarms Heat detector Definition A heat detector is a device which responds to the changes in ambient temperature in the vicinity of the detector. A predetermined threshold value is set in the detector system. When the ambient temperature exceeds this threshold value, it sends out an electrical signal to trigger the alarm. In some cases the automatic sprinkler and detection functions are combined in one single device, such that when the temperature exceeds the threshold limit both the fusible bulb of the sprinkler gets fused causing discharge of water and the detector alarm gets activated simultaneously. Heat detectors are generally of three basic types, depending on the physics of operation: rate of rise type, fixed temperature and rate compensation. Yet again, to increase sensitivity any combination of these two types is used. Types of heat detectors in comparison Table 6 - Types of detectors Criterion Rate of rise detector Fixed temperature Detector Rate compensation detector 20

21 21 Type of detection Rate-of-rise detectors sense the rate of change in ambient temperature. Fixed-temperature heat detectors operate when the temperature of the operating elements reaches a specific point. This type of detector also activates on sensing the rate of rise of ambient temperature. However, at the lower temperature range it acts as a Fixed temperature type and at the higher range of ambient temperature, in particular close to the set value, it works as rate-ofrise type. Thus it provides more warning time before the temperature actually reaches the set value. Operating range Operating range is about 12 to 15 F (7-8 C) per min. Operating temperature is about 135 F (58 C) (up to 5 F per minute) Areas where it is used Applied in areas subjected to high ambient temperature, i.e. boiler rooms or places which require detectors that operate only if close to fire. Used mainly in unattended spaces to detect smoldering fires that increase the temperature of a detector above its design value, usually 135 F to 145 F or 185 to 200 F. Places where there are low rates of temperature change Combination type heat detectors This type of detector has multiple sensor elements to respond to the presence of fire and/or smoke. There are many variations in the design of such detectors such as: response from any element, response from a partial combination of all elements or complete response from all elements. Generally, the principle of operation of the first type is to respond to both the rateof-raise and fixed-temperature scenario. The operation based on rate-of-rise of temperature is very useful and effective in case when fire develops rapidly because it requires much less response time. In contrast, the elements which operate on the principle of fixed-temperature respond slowly to the development of fire because time is required to reach the set temperature, as such this is useful for the case of slowly developing fire. In general, the common features of the construction of a combination detector include a vented air chamber and a flexible diaphragm for sensing the rate-of-rise of temperature. On the other hand, the elements based on the fixed-temperature principle usually consist of a leaf-spring restrained by 21

22 22 a eutectic metal which fuses on reaching the temperature at the element to its preset temperature, closing and hence activating the circuit Fault tree analysis of a Detector System We use the fault tree analysis to obtain a value for the failure rate of an Automatic Detector System. To obtain failure rates for individual components, the OREDA handbook (7), (8) has been used. In cases where it didn t provide the required information, RIAC data (9) has been referred to. The type of the failure rate distribution for various components has been assumed to be Exponential as indicated in the OREDA handbook. All abbreviations used in the table below are same as those in the OREDA and RIAC data books. Item Failure Mode Mean (λ) per 10 6 hrs Standard Dev. Mean time to failure (hrs) Data Source Remarks Pump Centrifugal, Sea Water MD- Critical OREDA This item has been considered for all sea water lifting pumps in the fault tree. Valve General Critical OREDA For all valves same value has been used. Compressor general Pump centrifugal General Fire and Gas Critical, breakdow n MD- Critical, breakdow n UD- Critical, OREDA OREDA For pumps other that sea water lift these values have been used OREDA 22

23 23 detector General spurious operation WB- Critical PrC- Critical Table 7 - Failure rates for components from OREDA The data for the following items has been taken from the RIAC handbook. We have assumed that these items also follow an exponential distribution like those given in OREDA. 23

24 24 ITEMS Part Description Quality Level Hooter Alarm (annunciator, buzzer) Application Environment (λ) per 10 6 hrs Mean time to failure (hrs) Data Source Remarks COM GB RAC No item in name of Hooter in the RAC, data for Alarm considered Ventilator Ventilator, air UNK GM RAC - circulator Timer Timer(summary) RAC - Relay switch or other failure in panel Panel,fire control system MIL GM RAC - Switch Fail Push Button (Summary) COM GM RAC Push button type switch has been considered. Cable connection Cable, electrical UNK GM RAC, - Audio visual Device Alarm (Summary) RAC - Battery DB, BL- Battery Battery, Rechargable COM N RAC - 24

25 25 Power Supply MS-Uninterrupted COM GF RAC For main supply Pressure switch ES-Diesel Generator (summary) Switch, Pressure (Summary) COM GF RAC For emergency supply RAC - Pressure Gauge Gauge, Pressure UNK GM RAC - Level Indicator Indicator, liquid level UNK GM RAC - Strainer Strainer, Water COM GF RAC - Nozzle Nozzle (Summary) RAC - Solenoid Valve Valve, Solenoid (Summary) UNK GM RAC - Pipe Pipe, water COM GF RAC - 25

26 Actuator Pipe UNK GM RAC - Pipe(AP) Fiber optic cable Assumed This Item is supposed to be reliable. We have assumed its reliability Table 8 - Component failure rates taken from RIAC value as 0.85 over 8000 hrs. of mission time and the MTTF value estimated accordingly

27 27 In some cases, no data is available. In these cases expert judgement has been used to obtain approximate failure rates. The components in question are given in the table below. ITEMS for which Static Reliability has been assumed* Assumed Reliability Operator fails to take action 0.85 DOOR 0.85 Cylinder 0.85 Battery general 0.85 Table 9 - Static reliabilities *Static reliability is independent of mission time. It is considered as availability on demand. The fault tree for a Detector System is given in the appendix. We have used the software BlockSim to analyse the tree. We obtain the following failure rate for the whole system: λ = days 2.2 Sprinkler Systems Definition A sprinkler system is a fixed installation that discharges water in case of a fire. It is generally used for fighting and suppressing fire in control stations, accommodation and service spaces, as well as corridors and stairways. 27

28 28 Precautionary note: In the spaces where water may cause damage to essential equipment, it may be fitted with an alternative approved fixed fire-extinguishing system (SOLAS Regulation ) System set-up A typical sprinkler system consists of three parts: pressure tank, air compressor and sprinkler pump. A sprinkler system is generally installed for the purpose of fire extinguishing in accommodation areas and service spaces. These are fixed type installations. The system consists of a network of sprinkler heads located in the areas that need to be protected, with an appropriate spacing. Due care needs to be taken for placing the heads so that these do not get damaged by mechanical contacts or impacts. There are different types of sprinkler heads, differing by their mechanism of operation. One very common type is a glass bulb head, used for automatic activation. The glass bulb gets fused at a predetermined temperature in the wide range of 50 C to 300 C (10), (11). Usually the network of sprinkler heads is divided into sections. As per FSS regulations, each of these sections must not have more than 200 sprinkler heads. The sections are equipped with valves which trigger signals for activation of both audible and visual alarms when water flows through them. Thus it is possible to identify which section of the ship has been affected by fire. There is a system fitted in the main control room which automatically keeps track of all the sections of sprinkler heads. Functional diagrams of the system are given below. 28

29 29 Is o la tio n V a lv e s W a te r c o n n e c tio n fro m s h o re T o S p rin k le r H e a d s to a u to m a tic sprinkler system C o m p re s s o r P re s s u re S w ic h e s re d u c e r C o m p re s s e d a ir T o B ilg e F re s h w a te r F ilte rs S a fe ty V a lv e h y d ro p h o re ta n k L e v e l L e v e l S w ic th J o c k e y P u m p P in d ic a to r P u m p P u m p s L e v e l in d ic a to r P re s s u re T a n k T o B ilg e E n g in e R o o m F ire p u m p T o B ilg e F w d. P u m p R o o m S e a C h e s t F w d. P u m p R o o m S e a C h e s t P P re s s u re C o n tro l P S ta rt M P a P S to p M P a P re s s u re S w itc h e s 1 : C o m p re s s o r S ta rtin g P s ta rt :- 0.7 M P a, P s to p :- 0.8 M P a 2 : S p rin k le r P u m p S ta rtin g P start :- 0.5 MPa 3 : L o w P re s s u re S ig n a llin g P start : MPa Figure 2 - Functional diagrams of a sprinkler system 29

30 30 The regulations demand that each section of sprinklers can be isolated by one stop valve only. The stop valve in each section should be readily accessible in a location outside of the associated section or in cabinets within stairway enclosures. Additional isolation valves may be fitted for the purpose of servicing, maintenance or for refilling of antifreeze solutions in the sprinkler piping. Audio-visual alarms are provided for these additional isolation valves when fitted. The quantities of spare nozzles carried on the ships are as follows (FSS Code): Table 10 - Nozzles Total number of nozzles Required number of spares < to > The number of spare nozzles of any type need not exceed the total number of nozzles installed of that type Sprinkler Types and their working principles As per Resolution A.800(19), the types of Sprinklers Systems are (12): Wet pipe systems Dry pipe systems Deluge systems Antifreeze systems Pre-action system Water-based extinguishing medium Wet pipe systems This type of sprinkler is the most widely used system. It is the simplest type of sprinkler and also the only type which can be operated automatically. Its active components are an automatic sprinkler head and usually (but not always) an automatic alarm check valve. This simplicity makes the system very reliable as compared to the other types. The pipelines of the 30

31 31 water supply system for this type of sprinkler arrangement always remain filled with fresh water (in order to prevent corrosion) under pressure and get activated automatically with the fusing of the sprinkler heads. The sprinkler heads get fused and open for discharge of water only when the temperature reaches a threshold value. Working Principle: When the sprinkler heads exposed to the threshold temperature, the heat sensitive element (glass bulb or fusible link) is released, allowing water to flow from that sprinkler. The glass bulb or link applies pressure to a cap which acts as a plug preventing water from flowing until the ambient temperature around the sprinkler reaches the design activation temperature of the individual sprinkler. Because each sprinkler activates independently when the predetermined heat level is reached, the number of sprinklers that operate is limited to only those near the fire, thereby maximising the available water pressure over the location of the fire Dry pipe systems On vessels operating in areas where the ambient temperature is below the freezing point of water, the wet pipe system is not suitable to use because the static water inside the pipe might freeze, causing blockage of the water flow. In such cases a dry pipe system is a suitable option. In dry pipe systems, the pipes are kept pressurised with air or nitrogen instead of water when the system is in idle state. Water is discharged only after the air/nitrogen is released on fusing of the sprinkler bulb when exposed to the threshold temperature. Hence in the initial stage only air/nitrogen is vented out of the sprinkler head which does not contribute to extinguishing the fire. The actual effect of fire suppression begins when water is discharged through sprinkler nozzles. Due to this delay this system is not as effective as the wet pipe system in the initial stages of a fire. Working Principle: When the temperature at the sprinkler head reaches the threshold level, it opens out, allowing the air or nitrogen to vent out through the sprinkler head. Thus the pressure in the pipeline drops. This leads to a pressure gradient across the dry pipe valve, allowing water to enter in to the sprinkler piping system. The venting of air or nitrogen from the sprinkler in the initial stage causes the delay in the venting of water from the sprinklers needed to control the fire. Therefore, during the initial stages of fire the dry pipe systems are usually not as effective as wet pipe systems for the suppression of fire Comparison of Dry Pipe fire Sprinkler systems and Wet Pipe Sprinkler system Table 11 - Different types of sprinkler systems Criterion Dry Pipe System Wet Pipe System 31

32 32 Complexity Dry pipe systems require additional control equipment and air pressure supply components which increases its complexity. Wet pipe systems are simple, with the only operating components being the automatic sprinkler heads. Pipes are filled with water under pressure so no extra components are required. Installation and Maintenance costs The added complexity impacts the overall dry-pipe installation costs, and increases maintenance expenditure primarily due to added service labour costs. Its simplicity and wet pipe reduces maintenance and installation costs. Corrosion potential After operation or testing, the dry-pipe sprinkler system s piping is drained, but residual water may collect in low spots, and moisture is also retained in the atmosphere within the piping. This moisture, coupled with the oxygen increases pipe internal wall corrosion rates, possibly leading to leaks. Wet pipe systems are filled with water all the time, so oxygen exposure is reduced, hence less chance of corrosion or leakage. Application Dry pipe systems are usually only used in spaces in which the ambient temperature may be cold enough to freeze water. Wet pipe systems cannot be used in places where the ambient temperature drops below the freezing point of water Deluge Systems As per IMO Resolution A.800(19), "Deluge" systems are systems employing open sprinklers attached to a piping system connected to a water supply through a valve that is opened by the detection system installed in the same areas as the sprinklers. In these systems, the sprinklers fitted are of open type (i.e. without any bulb) and the sprinkler network piping system is not filled with liquid or gas under normal condition. This type of system is suitable to rapidly 32

33 33 cover large areas affected by fire. Sometimes it is also used to prevent fire from entering from other adjacent locations. Under normal conditions (i.e. when there is no fire), the ingress of water into the sprinkler network piping is prevented by a deluge valve fitted at the inter-connection of the water supply line with the sprinkler network piping. Working Principle: On activation of the automatic detector or manual call point the corresponding signal is transmitted to the control panel, which in turn signals the deluge valve to open, allowing water to pass into the sprinkler network piping system and water is instantly discharged through the sprinkler heads Antifreeze Systems This type of system is a wet pipe sprinkler system employing automatic sprinklers attached to a piping network containing an antifreeze solution and connected to a water supply (Resolution A.800(19)). Working principle: When an automatic sprinkler is exposed to sufficient heat, the heat sensitive element (glass bulb or fusible link) is triggered, allowing antifreeze solution to discharge. Immediately after this, water flows from the sprinkler head Pre-action Systems This type of sprinkler system employs automatic sprinklers attached to a piping system containing air that may or may not be under pressure, with a supplemental detection system installed in the same area as the sprinklers (Resolution A.800(19)). Working Principle: Actuation of the detection system opens a valve that permits water to flow into the sprinkler piping system and to be discharged from any sprinklers that may be open Construction and Working Principle of a Sprinkler Head Fusible sprinkler heads can be used for both detection and extinguishing of fire. A typical fusible sprinkler head is covered by a semicircular quartzoid bulb, which contains an expandable liquid. A deflector plate is attached at the end of the bulb. This plate serves the purpose of spraying the water over a larger area (Figure 3). When the bulb is exposed to heat, it causes the liquid inside the bulb to expand, leading to breakage of the bulb, and thus allowing the water to flow from the sprinkler head. The water supply system for this sprinkler arrangement features a tank pressurised with compressed air to keep the water in the pipes at a constant pressure. When the bulb fuses and the water flows out, the pressure in the pipe lines drops, which causes a salt water pump to start automatically. This salt water pump provides a continuous supply of water to the sprinkler system. In case of a wet sprinkler system, the piping and heads are initially filled with fresh water under pressure in order to protect the system from corrosion. 33

34 34 Figure 3 - Sprinkler head Regulatory requirements (Reference FSS code) Table 12 - Regulations on sprinklers Type of operation -Automatic in operation, -Capable of both detecting the fire and suppressing the fire. Pressure Tank capacity -A pressure tank should have a volume of at least twice that of the charge of fresh water, equivalent to the amount of water which would be discharged in 1 min by the pump. -Means of replenishing the air under pressure and of replenishing the fresh water charge in the tank -Provision to prevent passage of sea- water into the tank. 34

35 35 -Not less than two sources of power for the system. Power supply -Sources of power -Main generator and an emergency source. One supply for the pump should be taken from the main switchboard, and one from the emergency switchboard by separate feeders reserved solely for that purpose. -Provision of a redundant means of pumping. Water-Supply Back up Temperature rating Pump capacity Sprinkler Piping Isolation Valves Sprinkler position and Capacity System Location -The capacity of the redundant means should be sufficient to compensate for the loss of any single supply pump or alternative source. One of the pumps may be the main fire pump connected to the sprinkler system. In accommodation and service spaces the sprinklers should have a nominal temperature rating of 57 C to 79 C, except that in locations such as drying rooms, where high ambient temperatures might be expected, the nominal temperature may be increased by not more than 30 C above the maximum deck head temperature. Pumps and alternative supply components should be capable of supplying the required flow rate and pressure for the space with the greatest hydraulic demand. For the purposes of this calculation, the design area used to calculate the required flow and pressure should be the deck area of the most hydraulically demanding space, separated from adjacent spaces by A-class divisions. The design area need not exceed 280 m 2. Should not be used for any other purpose. Isolation valves used for service, maintenance or for refilling of antifreeze solutions may be installed in the sprinkler piping in addition to the section stop valves, if provided with a means for giving a visual and audible alarm. Sprinklers should be placed in an overhead position and spaced in a pattern to maintain an average application rate of not less than 5 l/m²/min over the nominal area covered by the sprinklers. -Sprinkler pump and tank shall be situated in a position reasonably remote from any machinery space of category A and -shall not be situated in space required to be protected by sprinkler system. 35

36 36 Testing requirement at the time of installation (Reference FTP Code) The response time is expressed as a response time index (RTI), which typically has values between 35 and 250 m ½ s ½, where a low value indicates a fast response. Under standard testing procedures (135 C air at a velocity of 2.5 m/s), a 68 C sprinkler bulb will break within 7 to 33 seconds, depending on the RTI. The RTI can also be specified in imperial units, where 1 ft ½ s ½ is equivalent to 0.55 m ½ s ½ Fault tree analysis of a Sprinkler System Analogously to the previous section, we perform a fault tree analysis of the system. The component failure rates are given in Table 7, Table 8 and Table 9. Once again, we use the software BlockSim to analyse the fault tree diagram given in the appendix. The resulting failure rate is 1 λ = days 2.3 Water Mist Systems System set-up Definition Water mist systems are fixed installations that produce small droplets of water to control and/or extinguish fires. Working principle The system works in two ways to control and extinguish fire. The first effect is to remove oxygen from the atmosphere in the vicinity of the fire and the second one is the cooling effect. High-pressure water mist systems generate very small droplets of water. When exposed to the heat of fire, these droplets evaporate. As this happens, the vapour displaces the oxygen in the vicinity of the flammable material in the area affected by fire. This helps with the extinction and controlling of fire by disruption of the oxygen supply. 36

37 37 Water mist systems discharge water at a very high pressure, producing extremely small droplets of water. Unlike the larger drops produced by conventional sprinklers, these smaller particles stay afloat and eventually fill the whole space, creating an atmosphere that impedes fire growth. Moreover, due to their large surface areas, the droplets are very efficient in cooling and hence suppressing the fire. Typical Schematic Diagram: Figure 4 - Schematic diagram of a water mist system Components requirements (FSS Code, MSC/Cir 913): Nozzle- An approved type of nozzle with an average distribution of water of at least 5 liters per minute. Inside Diameter of nozzle at the tip is to be not less than 6 mm. Corrosion resistant material. Distribution valves- To be operated from easily accessible positions outside the spaces to be protected and which will not be readily cut off by an outbreak of fire. Water Supply Pump- 37

38 38 To be sufficient to pressurize the piping system at all times and capable of automatically starting to pump on detecting a pressure drop. The pump and control equipment are to be provided outside the protected space. If the pump is fed from the sources of electrical power of the main and emergency generator, the emergency generator is to be capable of automatically starting in the event of failure of the main source of electrical power supply. Water Storage tank Should be capable of continuously supplying water-based medium for at least 20 minutes. Note: Specifications for the following items have not been found in the regulations- 1. Operational requirements 2. Capacity/Quantity requirements 3. Specification for air supply, e.g. quantity, pressure etc. System Description: Water Mist Systems consist of a high-pressure pump unit with cylinders, section valves, piping system and nozzle heads. Water is supplied via a pump unit or cylinders depending on the system through a variety of different section valves operated either remotely or manually. For easy operation and monitoring a control panel is installed. Water Mist Systems are an alternative to CO 2 systems (see below) and are installed in high-risk areas. Sometimes the system is equipped with glass bulb nozzles, which contain detection bulb glass (see the section on sprinklers) to start the system automatically in the event of fire. For some areas, the system can be activated both automatically and manually [MSC/Cir 913]. For the protection of machinery spaces and local risk areas, the system can be equipped with open nozzles and a detection system to operate manually for total flooding or local protection of high-risk areas. System Configuration: The main component of the MIST Fire Extinguishing System and their functions are as follows. Discharge nozzle -Fire extinguishing head Section valve -Valve for deluge discharge to the hazardous area 38

39 39 Area valve startup solenoid valve -Control valve to drive air-driven area valves Water pump -High-pressure pump to feed fire extinguishing water under pressure Control panel -Startup panel for starter to start up the high-pressure pump, Startup device for area discharge by manual operation Fire detector (for flame and smoke) -Smoke detector and flame detector to judge the fire area Visible and audible alarms -Lamps and alarms to warn the persons in the area Figure 5 - Configuration of a water mist system Applications: Water mist systems, as an alternative to CO 2 system (see below), can generally be used in the similar spaces as the latter. This includes engine rooms, boiler rooms, cargo spaces, galleys, rooms containing electrical and electronic plants and equipment, fuel and lubricating oil tanks and pumps, flammable liquid storages and paint storages. Although the Water Mist system is considered equivalent to CO 2 systems, for large ships with engine rooms of larger heights, this 39

40 40 system is not as effective as the CO 2 system. This system is preferred for installation on small boats, hovercrafts etc. with smaller engine rooms Fault tree analysis of a Water Mist System/Hi-Fog System We have analysed two different systems. The first one is a generic water mist system analysed with the BlockSim software (Figure 28). The resulting failure rate is 1 λ WaterMist = days The second system is a Hi-Fog system as used by Carnival Cruise Lines. This system (see Figure 29) was analysed using BV s VeriSTAR methodology. The resulting failure rate is λ Hi Fog = days 2.4 CO 2 Systems System set-up Definition CO 2 systems are fixed installations in an enclosed space that reduce the oxygen content in the atmosphere by the emission of CO 2 to an extent where combustion is no longer possible. Overview CO 2 is well established as an effective medium for fixed fire extinguishing systems. It is widely used in domestic as well industrial houses. On board ships it is used for the machinery spaces and accepted as an alternative to mist and foam fire extinguishing systems (see below). It can be used to fight electrical fire, liquid fire, melted solid fire, solid surface fire, part deepseated solid fire and gas fire. The inhalation of CO 2 poses a danger to life, and therefore this system is not suitable for spaces occupied by passengers. It can, however, be used in machinery spaces with special precautionary arrangements to ensure complete evacuation before discharging of CO 2 in the 40

41 41 affected space. In particular, the system should only be activated through manual operation and only on confirmation that the space has no soul left inside. CO 2 cylinders should be stored in well ventilated cabinets or lockers in order to prevent accumulation of gases that might be caused by leakages. Typical Schematic Diagram of Shipboard CO 2 system (13): Figure 6 - Schematic diagram of a CO 2 system Components and its requirements (As per FSS Code) Cylinders- Should be kept outside protected space. 41

42 42 Pipes, fittings and nozzles- Constructed of materials having a melting temperature which exceeds 925 ºC. Corrosion resistant materials. Actuation and control systems- Back up power requirements. Distribution valves Readily accessible, simple to operate and grouped means of control outside protected space which will not be readily cut-off by an outbreak of fire. Salient features of the applicable rules (FSS Code, SOLAS) Quantity of CO 2 - Cargo Spaces: Sufficient quantity of CO 2 shall be available to give a minimum volume of free gas equal to 30% of the gross volume of the largest cargo space to be protected, Machinery Spaces: Sufficient quantity of CO 2 shall be available to give a minimum volume of free gas equal to the larger of the following: 40% of the gross volume of the largest machinery space so protected or 35% of the gross volume of the largest machinery space protected, including the casing. CO 2 discharge time - 85% of the gas shall be discharged into the space within 2 min (for machinery spaces). Operational precaution- Automatic release of fire-extinguishing medium shall not be permitted except as permitted by the administration Alarm - Opening of release cabinet door shall automatically activate pre -discharge alarm. It shall operate for the length of time needed to evacuate the space, but not less than 20 s before medium is released. 42

43 43 Advantages of CO 2 based system -100% natural, environmentally friendly, -Does not leave a residue, -Zero ozone depletion potential. Disadvantages -Highly asphyxiating (suffocative), -Even if discharge CO 2 is cold, it has little cooling effect - danger of re-ignition if air is readmitted, -When discharged, particles of solid carbon dioxide may generate static electricity (CO 2 is not an inert medium. For fault tree diagrams, please refer to the Appendix Fault tree analysis of a CO2 system As in the previous sections, we analyse the fault tree diagram given in the appendix. The resulting failure rate is λ = days 2.5 Foam Systems System set-up Definition Foam systems are fixed installations that produce foam to control and/or extinguish fires. 43

44 44 Working principle Foam is generated by the formation of air bubbles from aqueous solutions. Since foam has a lower density than flammable liquids, it remains floating on the surface and creates a blanket on the liquids, cutting off the oxygen supply and thus suppressing the fire. Components of a typical Foam system: Foam storage tank Mixing system Control panel Foam liquid Emergency fire pump 44

45 45 L E V E L G A U G E T A N K N O N R E T U R N IN G V A L V E S T R A IN E R R E D U C E R P U M P R E D U C E R N O N R E T U R N IN G V A L V E V A L V E V A L V E P U M P P R O P O R T IO N E R V A L V E P U M P F O A M M A IN IS O L A T IO N V A L V E Figure 7 - Schematic diagram of a foam system 45

46 46 F o a m R o o m F o a m T a n k U n it L e v e l g a u g e P ressu re vacuum V alve ta n k D ra in F lush ing Line F illing Line R ecircu lation L ine F o a m L iq u id E D C D ra in B F o a m M o n ito r V a lv e F T o F ire M a in F oam M ain Iso lating V alve Figure 8 - Configuration of a typical foam system Regulatory Requirements (FSS Code, SOLAS, FP 53/3/1) Table 13 - Regulations on foam systems Quantity of foam Quantity of foam - forming liquid Operation Shall be designed to produce foam at the required application rate within 1 min of release. The quantity of foam concentrate available shall be sufficient to produce a volume of foam equal to at least five times the volume of the largest protected space at the nominal expansion ratio, but in any case not less than enough for 30 min of full operation for the largest protected space. The system shall be capable of manual release, Automatic release of the system shall not be permitted unless appropriate operational measures or interlocks are provided to prevent any local application 46

47 47 systems required by regulation II-2/ of the Convention from interfering with the effectiveness of the system. Power supply Warning Alarms Filling rate No. of foam producing units Distribution of foam producing units The system shall be supplied by both main and emergency sources of power. The emergency power supply shall be provided from outside the protected machinery space. All electrical components in connection with the foam generating components shall have at least an IP 54 rating. Means shall be provided for automatically giving audible and visual warning of the release of the system. The alarms shall operate for the length of time needed to evacuate the space, but in no case less than 20 s. The design-filling rate for the system shall. be adequate to completely fill the largest protected space in 10 min or less A minimum of two generators shall be installed in every space containing combustion engines, boilers, purifiers, and similar equipment. Small workshops and similar spaces may be covered with only one foam generator. Foam generators shall be uniformly distributed under the uppermost ceiling in the protected spaces including the engine casing. The number and location of foam generators shall be adequate to ensure all high risk areas are protected in all parts and at all levels of the spaces. Extra foam generators may be required in obstructed locations. The foam generators shall be arranged with at least 1 m free space in front of the foam outlets, unless tested with less clearance. Operation of a foam system Open sea suction valve and start firewater pump. Open fire water supply valve. Open foam liquid non-return valve Start foam liquid pump (confirm that the flushing valve is closed) Open foam liquid proportioner valve. Open monitor as required to bring fire under control 47

48 48 Recent Developments with respect to the FSS Code A new chapter 6 of FSS (Ref: FP 53/3/1) Salient Points: The system and its components shall be suitably designed to withstand ambient temperature changes, vibration, humidity, shock, clogging and corrosion normally encountered on ships, and manufactured and tested to satisfaction of the Administration in accordance with the requirements of new chapter 6 of FSS (From FP 53/3/1) Piping, fittings and related components inside the protected spaces (except gaskets) shall be designed to withstand 925 C. System piping, foam concentrate storage tanks, components and pipe fittings in [continuous] contact with the foam concentrate shall be compatible with the foam concentrate and be constructed of corrosion resistant materials such as stainless steel or equivalent. Other system piping and foam generators shall be galvanized steel or equivalent. Means shall be provided for the crew to safely check the quantity of foam concentrate and take periodic control samples for foam quality. Means for testing the operation of the system and assuring the required pressure and flow shall be provided by pressure gauges at both inlets (water and foam liquid supply) and at the outlet of the foam proportioner. A test valve should be installed on the distribution piping downstream of the foam proportioner, along with orifices, which reflect the calculated pressure drop of the system. All sections of piping shall be provided with connections for flushing, draining and purging with air Fault tree analysis of a Foam System As above, we analyse the tree diagram given in the appendix. The resulting failure rate is: λ = days 48

49 3 Reliability model of detection and suppression systems The generic model Following the literature, we define the reliability R of a system as the probability that the system will function on demand. In this section, we derive the reliability as a function of time. We assume that R is influenced by two factors: The system s intrinsic failure rate, denoted throughout this report by λ, The intervals in which the system is checked (and repaired or replaced if necessary). In general, λ itself is time-dependent. In particular, one would expect to see the welldocumented burn-in and wear-out effects, resulting in the familiar bathtub curve. However, as we have no information about the time-dependence of the failure rate, we will assume it to be constant. This is an acceptable approximation for most of the system s life span. We assume that each system is checked after a maximum time T max. Let I = [0, T max ) denote the maintenance interval of the given system. The reliability of the system at time t is then given by R(λ, t) = e λt, t ε I, ( 1 ) where λ is measured in 1 days and t in days. A fire can occur at any time during the maintenance interval; hence all values in the range of R are equally likely to occur. We therefore compute the expectation value of R over the maintenance interval and use this number as the system s reliability: R = 1 e λt dt = T Max 0 T Max 1 T Max λ 1 e λt Max ( 2 ) The variance of R can be computed as usual: var R = R 2 R 2 = 1 2λT Max 1 e 2λT Ma x R 2 ( 3 ) 49

50 Propagation of error In general, the failure rate λ is not known exactly; often the literature provides error margins on λ. This uncertainty of λ propagates to an uncertainty of the reliability R. Let Δλ denote the error (i.e. standard deviation) of the failure rate λ. The uncertainty of R due to the uncertainty of λ can be computed using Taylor s expansion: ΔR(λ, t) = k=1 Δλ k k! k R(λ, t) λ k With R as given in equation ( 1 ), this takes the form ΔR(λ, t) = k=1 Δλ k k! ( 1)k t k e λt For small values of Δλ we only use the linear term, and hence we obtain ΔR λ, t Δλ te λt ( 4 ) 3.3 Maintenance intervals The intervals in which fire detection and suppression systems are tested differ between systems and between ship operators. The testing intervals are regulated by IMO MSC/Circ.850 (14) and are currently under revision (15). In the new version, each system may be the subject to different intervals for different tests. For example, a variety of tests are to be performed on sprinkler systems with intervals ranging between monthly ( verify all control and section valves are in the proper open or closed position, and all pressure gauges are in the proper range etc) and 10-yearly ( perform a hydrostatic test and internal examination of 10% of the system s compressed gas cylinders. If one or more cylinders fail, a total of 50% of the onboard cylinders should be tested. If further cylinders fail, all cylinders should be tested ). 50

51 Reliability/% Application to concrete systems We use the above model to obtain reliability curves for the systems considered in Chapter 2. In each case, we plot the reliability against time and if possible give an estimate for the error of each data point. We will use two different maintenance intervals of one month and one year. This will serve to highlight the effect maintenance intervals have on the reliability of the system Heat detector According to the OREDA data (8), the mean critical failure for heat detectors is given by λ Heat = 6.4 ± day We use a maintenance interval of one year. Plugging this into equations ( 1 ) and ( 4 ), we obtain the following reliability data: Heat Detector - yearly maintenance Time / Days Figure 9 - Reliability of Heat detector yearly maintenance 51

52 Reliability/% Heat Detector - monthly maintenance Time / Days Figure 10 - Reliability of Heat detector - monthly maintenance Finally, we use equation ( 2 ) and ( 3 ) to obtain the average reliability and standard deviation: R Heat yearly = 98.8% ± 0.7% R Heat mont hly = 99.90% ± 0.06% Photoelectric Smoke Detector Analogously to the previous section we use the failure rate given in the OREDA handbook: λ Photo = 4.5 ± day Using a maintenance interval of one year, we obtain the following reliability data: 52

53 Reliability/% Reliability/% Photoelectric Smoke Detector - yearly maintenance Time / Days Figure 11 - Reliability of Photoelectric Smoke detector yearly maintenance Photoelectric Smoke Detector - monthly maintenance Time / Days Figure 12 - Reliability of Photoelectric Smoke detector monthly maintenance 53

54 Reliability/% 54 Averaging over the maintenance intervals, we obtain: R Photo yearly = 99.2% ± 0.5% R Photo mont hly = 99.93% ± 0.04% Ionisation Smoke Detector The OREDA failure rate is λ Ion = 1.0 ± day This yields the following data: Ionisation Smoke Detector - yearly maintenance Time / Days Figure 13 - Reliability of Ionisation Smoke Detector - yearly maintenance 54

55 Reliability/% Ionisation Smoke Detector - monthly maintenance Time / Days Figure 14 - Reliability of Ionisation Smoke Detector - monthly maintenance The mean reliability over the maintenance intervals is R Ion yearly = 98.2% ± 1.1% R Ion mont hly = 99.85% ± 0.09% Detector panel This is the system described in section As there is no historical data available, we will use the failure rate derived by fault tree analysis: λ = days 55

56 Reliability/% Reliability/% 56 Mind that no errorbars were derived from the fault trees. With this failure rate, we obtain the following reliability data: Detector Panel - yearly maintenance Time / Days Figure 15 - Reliability of Detector Panel - yearly maintenance Detector Panel - monthly maintenance Time / Days Figure 16 - Reliability of Detector Panel - monthly maintenance 56

57 Reliability/% 57 Taking the average over the maintenance intervals, we obtain the following reliability: R Panel yearly = 62% ± 19% R Panel mont hly = 95.8% ± 2.4% Sprinkler system As there is no historical data available for this system, we will use the value for λ as derived by fault tree analysis in chapter 2. The value is λ = days With this failure rate, we obtain the following reliability data: Sprinkler - yearly maintenance Time / Days Figure 17 - Reliability of Sprinkler - yearly maintenance 57

58 Reliability/% Sprinkler - monthly maintenance Time / Days Figure 18 - Reliability of Sprinkler - monthly maintenance Taking the average as above, we obtain the reliability: R Sprinkler yearly = 93.7% ± 3.6% R Sprinkler mont hly = 99.5% ± 0.3% Foam System Analogously to the sprinkler system, we use the value for λ derived in chapter 2, λ = days 58

59 Reliability/% Reliability/% 59 This yields the following reliability data: Foam System - yearly maintenance Time / Days Figure 19 - Reliability of Foam system - yearly maintenance Foam System - monthly maintenance Time / Days Figure 20 - Reliability of Foam system - monthly maintenance 59

60 Reliability/% 60 The average reliability is found to be R Foam yearly = 35% ± 25% R Foam mont hly = 89.9% ± 5.6% Water Mist System Analogously to the previous sections, we use the failure rate derived by fault tree analysis: Thus we obtain for the reliability: λ = days Water Mist System - yearly maintenance Time / Days Figure 21- Reliability of Water Mist system - yearly maintenance 60

61 Reliability/% Water Mist System - monthly maintenance Time / Days Figure 22 - Reliability of Water Mist System - monthly maintenance We obtain for the average reliability: R Mist yearly = 69% ± 16% R Mist mont hly = 96.8% ± 1.8% Hi-Fog System We use the failure rate derived by the VeriSTAR analysis: We obtain the following reliability data: λ = days 61

62 Reliability/% Reliability/% Hi-Fog System - yearly maintenance Time / Days Figure 23- Reliability of Hi-Fog System - yearly maintenance Hi-Fog System - monthly maintenance Time / Days Figure 24- Reliability of Hi-Fog System - monthly maintenance 62

63 Reliability/% 63 Thus we obtain for the average reliability: R Hi Fog yearly = 84.7% ± 8.3% R Hi Fog mont hly = 98.6% ± 0.8% CO2 System In chapter 2, we derived the following failure rate: λ = days Thus we obtain the following reliability data: CO2 System - yearly maintenance Time / Days Figure 25- Reliability of CO2 system - yearly maintenance 63

64 Reliability/% CO2 System - monthly maintenance Time / Days Figure 26- Reliability of CO2 system - monthly maintenance This gives the average reliability: R CO2 yearly = 63% ± 18% R CO2 mont hly = 96.0% ± 2.3% 64

65 4 Conclusions 65 We have developed a methodology to determine the reliability of fire detection and suppression systems as a function of time, taking into account the effects of regular system checks. The only input required for this method is the failure rate of the system (λ). For several devices, historical data is available and can be used to deduce the failure rate. If such data is not available (as is generally the case for more complex system, like an alarm panel), fault tree analysis can be used to determine the system s failure rate. We have demonstrated this in Chapter 2, where we analysed detector, sprinkler, foam, water mist and CO 2 systems. The results show a range of reliabilities for these systems. Sprinkler systems show a particularly high reliability. This is apparently due to the presence of potential manual backups for the automatic action of the components in the system. The reliability of detector, CO 2 and Water Mist systems is generally in the same order of magnitude. However, CO 2 systems are relatively more reliable owing to the existence of some static blocks through AND gates in the fault tree structure. These static blocks represent manual action and have been indicated by blue blocks in the fault trees. Foam system, in contrast, have a significantly lower reliability caused by the presence of large numbers of OR gates in the fault tree structure. Figure 33 in the appendix compares the reliabilities of the five systems analysed by fault trees. The strength of the fault tree method is that it can in principle be used for any system, regardless of its complexity. The disadvantage of this method is the fact that it does not take into account interactions between components and knock-on effects. In other words, the failure probabilities of different components of the same system are not necessarily independent; damage to one component may affect the failure probability of other (neighbouring) components. For this reason, a failure rate derived with the fault tree method is only an approximation of the system s actual failure rate. It appears that some of the failure rates derived for this report are unrealistically high (in particular for the foam system) and should be treated with caution. A refined analysis might be required to obtain more reliable results. Nonetheless, the methodology can yield useful results when no other sources of data are available. It is advisable to compare the results of any fault tree analysis with experimental or historical data whenever possible to verify the predictions of the model. 65

66 5 References 1. Nilsen, O.V. Risk Analysis for Cruise Ships (SAFEDOR, Deliverable 4.1.2). s.l. : DNV, NRI. Worldcruise Network. [Online] MCA. Maritime and Coast Guard Agency. [Online] National Fire Protection Association. NFPA 550: Guide to the Fire Safety Concepts Tree International Maritime Organization. Guidelines for Smoke Control and Ventilation Systems for Internal Assembly Stations and Atriums on New Passenger Ships IMO Sub Committee on Fire Protection. Report to the Maritime Safety Committee. s.l. : International Maritime Organization, report.pdf. 7. SINTEF Industrial Management. Offshore Reliability Data Handbook. s.l. : OREDA participants, Offshore Reliability Data Handbook. s.l. : OREDA participants, The Reliability Information Analysis Center. Nonelectronic Parts Reliability Data Maritime Training Advisory Board. Marine Fire Prevention, Fire Fighting and Fire Safety. s.l. : Dept. of Commerce, Maritime Administration, Cote, Arthur E. Operation of Fire Protection Systems. s.l. : NFPA, IMO Assembly. Revised Guidelines for Approval of Sprinkler Systems. s.l. : International Maritime Organization, Indian Registry of Shipping Archive. 14. International Maritime Organization. MSC/Circ Private correspondence with IMO. 66

67 16. Estimates of the Operational Reliability of Fire Protection Systems. Bukowski R.W., Budnick E.K. and Schemel C.F. s.l. : Fire Protection Strategies for 21st Century Building and Fire Codes Symposium, J.R., Hall. U.S. Experience with Sprinklers and Other Automatic Fire Extinguishing Equipment. s.l. : National Fire Protection Association, NTUA. Probabilistic Framework for Onboard Fire Safety - Comprehensive Fire Accidents Database. s.l. : FIREPROOF Deliverable 1.1, VTT Technical Research Centre of Finland. Survivability for Ships in Case of Fire. s.l. : Final Report of SURSHIP-FIRE project, NTUA, SSRC. Probabilistic Framework for Onboard Fire Safety - Fire Ignition Model Specification. s.l. : FIREPROOF Deliverable 1.2, International Maritime Organisation. MSC/Circ

68 Appendix - Fault trees and diagrams used in the failure rate analysis Figure 27 - Foam System on Reliasoft BlockSim 68

69 Water mist fails to suppress fire OR Solenoid valve failure SV Improper Water Supply OR Nozzzle Failure N Pump failure OR Piping damage P Section valve failure/ mistakenly closed V Fail to operate pump Mechanical damage Pre pump valve failure/ mistakenly closed Power supply failure PF MD V AND Figure 28 - Water Mist System on Reliasoft BlockSim Main supply failure MS Emergency supply failure ES 69

70 Figure 29 - Set-up of the Hi-Fog system 70

71 No Discharge Top F ire Main F ail to start on demand OR A utomatic Sprinkler Sy stem Fail to start OR No Power Supply A ND O perator fails to start MStF Mechanical Damage MD Emergency Pump F ail to start on demand OR Pressure Tank Failure Detection F ailure Sprinkler Pump Fail to start No Power Supply A ND D OR A ND Main Supply F ailure Emergency Supply F ailure No Power Supply Mechanical Damage MD O perator Fail to start MStF MS ES Main Supply F ailure A ND Emergency Supply F ailure C ompressor Damage C Pressure Gauge Failure PG Jocky pump F ailure E Pressure switch F ailure PS Mechanical Damage MD Main Supply F ailure MS Emergency Supply F ailure ES MS ES Valve Failure Mechanical Damage RV MD Figure 30 - Sprinkler System on Reliasoft BlockSim 71

72 Figure 31 - CO2 System on Reliasoft BlockSim 72

73 Figure 32 - Detector System on Reliasoft BlockSim 73

74 Reliability/% Sprinkler System Foam System Mist System CO2 System Detector System Hi-Fog System Time / Days Figure 33- Reliabilities of systems analysed by fault trees over one year 74

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations; (1979) (Rev.1 1990) (Rev.2 1996) (Rev.3 Jan 2012) Safety features.1 Fire protection and extinction.1.1 General Fire protection arrangements and fire extinguishing systems are to be in accordance with the

More information

International Code for Fire Safety Systems (FSS Code) Resolution MSC.98(73)

International Code for Fire Safety Systems (FSS Code) Resolution MSC.98(73) International Code for Fire Safety Systems (FSS Code) Resolution MSC.98(73) INTERNATIONAL MARITIME ORGANIZATION London, 2001 Foreword The International Code for Fire Safety Systems (FSS Code) was adopted

More information

CLASSIFICATION NOTES

CLASSIFICATION NOTES CLASSIFICATION NOTES Type Approval, Installation and Testing of Water Level Detectors on Bulk Carriers and Single Hold Cargo Ships other than Bulk Carriers General Information This edition of the classification

More information

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839 AVAILABLE TO DOWNLOAD ON THE APOLLO APP a guide to Fire Alarm Systems Design BS5839 Part1:2013 The Regulatory Reform (Fire Safety) Order (FSO) became law on 1 October 2006 Legally you must comply! What

More information

CBD-233. Fire Alarm and Detection Systems

CBD-233. Fire Alarm and Detection Systems Page 1 of 5 CBD-233. Fire Alarm and Detection Systems Originally published August 1984. R.H.L. McEwen Fire alarm systems are normally required by building codes. In the case of new buildings, this is usually

More information

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS

PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS January 1997 PLAN SUBMITTAL REQUIREMENTS FOR SPRAY BOOTHS AND SPRAYING ROOMS EXTINGUISHING SYSTEMS 1.0 PERMIT 1.1 After receipt of a Building Permit from the City of San Jose Building Department, submit

More information

The Merchant Shipping (Fire Protection) Regulations 1998: Fixed fire detection alarm and extinguishing systems

The Merchant Shipping (Fire Protection) Regulations 1998: Fixed fire detection alarm and extinguishing systems MERCHANT SHIPPING NOTICE Maritime and Coastguard Agency MSN 1666 (M) The Merchant Shipping (Fire Protection) Regulations 1998: Fixed fire detection alarm and extinguishing systems Notice to Shipowners,

More information

MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY

MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE DESIGN AND ARRANGEMENTS FOR FIRE SAFETY INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 Telex: 23588 IMOLDN G IMO E Ref. MSC/Circ.1002 26 June 2001 GUIDELINES ON ALTERNATIVE

More information

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result

More information

IMO. 8 June 1998 *** I:\CIRC\MSC\848.WPD INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

IMO. 8 June 1998 *** I:\CIRC\MSC\848.WPD INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR E Telephone: 0171-735 7611 Fax: 0171-587 3210 Telex: 23588 IMOLDN G IMO Ref. T4/4.03 MSC/Circ.848 8 June 1998 REVISED GUIDELINES FOR

More information

Safety of Life at Sea, 1974 (SOLAS)

Safety of Life at Sea, 1974 (SOLAS) Safety of Life at Sea, 1974 (SOLAS) Prof. Manuel Ventura Ship Design I MSc in Marine Engineering and Naval Architecture Chapter II-2. Construction Fire Protection, Fire Detection and Fire Extinguishing

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-281

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-281 PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-281 PanCanal Building Albrook, Panama City Republic of Panama Tel: (507) 501-5355 [email protected] To: Ship-owners/Operators, Company Security

More information

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS)

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS) SURVEYOR S MANUAL - STATUTORY TD-SP-DGC Page. 1 de 8 CARRIAGE OF DANGEROUS GOODS SECTION 1 General 1.1 Surveyors carrying out surveys for the carriage of dangerous goods should be familiar with the applicable

More information

ANALYSIS OF FIRE HAZARD AND SAFETY REQUIREMENTS OF A SEA VESSEL ENGINE ROOMS

ANALYSIS OF FIRE HAZARD AND SAFETY REQUIREMENTS OF A SEA VESSEL ENGINE ROOMS Journal of KONES Powertrain and Transport, Vol. 18, No. 011 ANALYSIS OF FIRE HAZARD AND SAFETY REQUIREMENTS OF A SEA VESSEL ENGINE ROOMS Adam Charchalis, Stefan Czy Gdynia Maritime University, Faculty

More information

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) Annex 3, page 1 ANNEX 3 RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) THE MARITIME SAFETY COMMITTEE, RECALLING

More information

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Fire. The Fire Installers Mate. A guide to fire alarm systems design Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects

More information

Alarm and Detection/Suppression

Alarm and Detection/Suppression Alarm and Detection/Suppression Fire Safety American Fire Technologies To provide special hazard services world wide to the industrial market through the integration of components and services Clean Agent

More information

Ammonia Detection System Codes and Design Specifications

Ammonia Detection System Codes and Design Specifications Ammonia Detection System Codes and Design Specifications December 28, 2015 Revision 5 920 N Trade Winds Pkwy Columbia, MO 65201 Ammonia detection system codes and design specifications Following is a discussion

More information

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies 海 事 處 船 舶 事 務 科 香 港 中 環 統 一 碼 頭 道 38 號 海 港 政 府 大 樓 ---------- 香 港 郵 箱 4155 號 MARINE DEPARTMENT Shipping Division Harbour Building 38 Pier Road, Central, Hong Kong ----------- G.P.O.Box 4155 網 站 Website

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK 1. (Contractor) shall provide fire alarm system maintenance/repair/testing services as described herein to the California Department of Veterans Affairs (hereinafter CDVA, CalVet,

More information

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion Annex 17, page 1 ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16 Part B Prevention of fire and explosion Regulation 4 Probability of ignition 1 The existing paragraph 5.5 is replaced

More information

Overview. Components of an alarm system Technology behind the equipment Communication Platforms Industry Terminology False Alarm Tips DSC products

Overview. Components of an alarm system Technology behind the equipment Communication Platforms Industry Terminology False Alarm Tips DSC products Basic Security 101 Overview Components of an alarm system Technology behind the equipment Communication Platforms Industry Terminology False Alarm Tips DSC products Components of an Alarm System Main Control

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice FIR-001 Rev. 06/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

Bold items are particular to the City of Euless

Bold items are particular to the City of Euless EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 2/12 Fire Chief Wes Rhodes Fire Marshal Paul Smith EFD-FMO 3-2 2009 International Fire & Building Code as Amended NFPA Standards Adopted

More information

Conventional Fire Detection and Extinguishant Control System Specification

Conventional Fire Detection and Extinguishant Control System Specification Conventional Fire Detection and Extinguishant Control System Specification Page 1 of 9 Scope Furnish a complete 24VDC Conventional, electrically supervised, combined fire detection and extinguishant release

More information

REPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS

REPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS REPUBLIC OF Marine Notice THE MARSHALL ISLANDS No. 2-011-14 OFFICE OF THE MARITIME ADMINISTRATOR Rev. 2/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED

More information

PANAMA MARITIME AUTHORITY

PANAMA MARITIME AUTHORITY PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-226 PanCanal Building Albrook, Panama City Republic of Panama Tel: (507) 501-5000 [email protected] To: Ship-owners/Operators, CSO, Legal Representatives

More information

BS5839 Part 1:2002 Overview

BS5839 Part 1:2002 Overview BS5839 Part 1:2002 Overview 1 Contents Introduction So why is the current standard being revised? The brief for the new standard Changes to structure of current Standard Enhanced certification of Fire

More information

FIRE ALARM SYSTEM TECHNICAL SPECIFICATIONS Page 1 of 10

FIRE ALARM SYSTEM TECHNICAL SPECIFICATIONS Page 1 of 10 TECHNICAL SPECIFICATIONS Page 1 of 10 FIRE DETECTION AND ALARM SYSTEM Scope Furnish a complete 24V DC conventional, electrically supervised, zone annunciated, fire detection and alarm system as specified

More information

FIRE DETECTION AND ALARM SYSTEMS

FIRE DETECTION AND ALARM SYSTEMS HMO Information Sheet No 1 FIRE DETECTION AND ALARM SYSTEMS 1. Introduction When a property is in multiple occupation, the risk of fire breaking out is greater than in an ordinary single family home. Some

More information

Fire detection, alarm, and suppression systems are installed to:

Fire detection, alarm, and suppression systems are installed to: Fire detection, alarm, and suppression systems are installed to: Notify occupants to escape a fire Summon emergency responders Initiate suppression systems Supervise suppression systems for operational

More information

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee:

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee: M-20.2 SOLAS II-2 THE PREFERRED EEBD SOLUTION The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee: The 73rd meeting of the IMO s

More information

Fire Protection Systems, Appliances and Compressed Gas Cylinders Periodic Maintenance, Inspection and Testing

Fire Protection Systems, Appliances and Compressed Gas Cylinders Periodic Maintenance, Inspection and Testing Fire Protection Systems, Appliances and Compressed Gas Cylinders Periodic Maintenance, Inspection and Testing Notice to Shipowners, Ship Operators, Managers, Masters, Owners Representatives and Recognised

More information

Automatic fire-extinguishing systems for commercial cooking

Automatic fire-extinguishing systems for commercial cooking Automatic fire-extinguishing systems for commercial cooking Leading Items First Ignited in Eating and Drinking Establishment Structure Fires, 2000-2004 Annual Averages Cooking materials, incl. food and

More information

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS

UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS Fire Safety Technical Guide UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS 1.0. BACKGROUND 1.1. The Regulatory Reform (Fire Safety) Order (known Fire Safety Order) applies to England and Wales (Northern

More information

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

IFE Level 4 Certificate in Fire Science and Fire Safety (HL) IFE Level 4 Certificate in Fire Science and Fire Safety (HL) Unit 2: Fire Safety Unit Reference Number: D/505/5932 Introduction This unit focuses on the prevention and detection of fire in premises and

More information

PLAN REVIEW GUIDE FOR FIRE ALARM

PLAN REVIEW GUIDE FOR FIRE ALARM PLAN REVIEW GUIDE FOR FIRE ALARM PROJECT NAME: PERMIT # PROJECT ADDRESS: CONTACT PERSON: PHONE Fire alarm system installation information shall be provided on the appropriate architectural and electrical

More information

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar Engineering Specification SAPPHIRE 42 Bar PART 1 GENERAL 1.1 DESCRIPTION OF WORK This specification outlines the requirements for a "Total Flood" SAPPHIRE Clean Agent Fire Suppression System. The work

More information

BERMAD Fire Protection

BERMAD Fire Protection Model: 400E-2M BERMAD Electrically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance Safety First BERMAD believes that the safety of personnel working with and around

More information

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL January, 2003 Environmental Health and Safety Florida Atlantic University 777 Glades Rd. Boca Raton, FL 33431 Phone: 561-297-3129 Fax:

More information

Recommended Practice for Installation of Transit Vehicle Fire Protection Systems

Recommended Practice for Installation of Transit Vehicle Fire Protection Systems Recommended Practice for Installation of Transit Vehicle Fire Protection Systems Approved October 25, 2007 APTA Fire Safety Working Group Approved May 3, 2008 APTA Bus Safety Committee Approved October

More information

ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS

ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS SECTION 1 GENERAL SPECIFICATIONS I. SCOPE This specification outlines the requirements for a pre-engineered

More information

Transformer Deluge Systems

Transformer Deluge Systems Transformer Deluge Systems How Do Transformer Fires Ignite? Common causes of transformer failure: Weather-related events such as lightning Short circuits in electrical equipment The most common cause is

More information

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.

More information

- Save lives and reduce material damage

- Save lives and reduce material damage - Save lives and reduce material damage Small droplets reduce heat to a minimum Ultra Fog s high pressure water fog sprinkler system is based on water being sprayed through special nozzles at high pressure.

More information

BERMAD Fire Protection

BERMAD Fire Protection 400E-2M/700E-2M IOM Bermad Electrically Controlled Deluge Valve with EasyLock Manual Reset Model: 400E-2M/700E-2M INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 400E-2M/700E-2M Bermad

More information

Attachment 9. Trouble signals. Interfaced equipment. Primary (main) power supply

Attachment 9. Trouble signals. Interfaced equipment. Primary (main) power supply FIRE DETECTION, ALARM AND MASS NOTIFICATION SYSTEMS Inspection, testing, and maintenance of fire detection, alarm and Mass Notification systems shall be performed in accordance with the manufacturer's

More information

GUIDELINES FOR FLOODING DETECTION SYSTEMS ON PASSENGER SHIPS

GUIDELINES FOR FLOODING DETECTION SYSTEMS ON PASSENGER SHIPS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T1/2.04 MSC.1/Circ.1291 9 December 2008 GUIDELINES FOR FLOODING DETECTION SYSTEMS

More information

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering Model: 400E-2M Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance Application Engineering BERMAD 1. Safety First BERMAD believes that the safety

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS. n OSHA Changes

FLAMMABLE AND COMBUSTIBLE LIQUIDS. n OSHA Changes FLAMMABLE AND COMBUSTIBLE LIQUIDS OSHA Changes Introduction This module covers the two primary hazards associated with flammable and combustible liquids: explosion and fire. In order to prevent these hazards,

More information

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT FIRE EXTINGUISHERS,SPRINKLER SYSTEMS AND FIRE ALARMS Attachment #1 Inspection of Fire Extinguishers Fire Extinguishers must be tested according

More information

BRANCH SOLUTION. Automatic fire extinguishing systems for paint spraying plants. Safe for certain.

BRANCH SOLUTION. Automatic fire extinguishing systems for paint spraying plants. Safe for certain. BRANCH SOLUTION Automatic fire extinguishing systems for paint spraying plants Safe for certain. ISK IDENTIFYING With the extreme high degree of automation in painting technology, the risk of fire has

More information

Winnipeg Fire Department Fire Prevention Branch

Winnipeg Fire Department Fire Prevention Branch Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of

More information

Maintaining Fire Protection Systems

Maintaining Fire Protection Systems Maintaining Fire Protection Systems Fire continues to be a major threat to your business and your personal safety. Each year several thousand people are injured or killed by fires and billions of dollars

More information

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Module 5. Fire and Emergency Alarm System Part I- Basics

Module 5. Fire and Emergency Alarm System Part I- Basics Module 5 Fire and Emergency Alarm System Part I- Basics 1 This module will describe: 1. Components and the arrangements of components in fire and emergency alarm systems. 2. How these systems work. 3.

More information

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting

More information

Module 4, Lesson 12 Fire Alarm Systems

Module 4, Lesson 12 Fire Alarm Systems Student Manual Module 4, Lesson 12 Fire Alarm Systems Performance Objectives At the conclusion of this lesson, you will be able to: Identify the components and functions of a fire alarm system and determine

More information

Manual for Fire Suppression & Methane Detection System

Manual for Fire Suppression & Methane Detection System Manual for Fire Suppression & Methane Detection System Fogmaker North America Post address: 150 Gordon Dr Exton, PA 19341 Delivery address: 150 Gordon Dr Exton, PA 19341 Tel: 610-265-3610 Fax: 610-265-8327

More information

Fighting Fire in Sprinklered Buildings. Student Guide

Fighting Fire in Sprinklered Buildings. Student Guide Fighting Fire in Sprinklered Buildings Student Guide Fighting Fire in Sprinklered Buildings Student Guide Table of Contents Purpose........................................................... 3 Instruction

More information

Recommendations for the Safety of Cargo Vessels of less than Convention Size

Recommendations for the Safety of Cargo Vessels of less than Convention Size (Dec 2007) (Rev.1 Apr 2013) Recommendations for the Safety of Cargo Vessels of less than Convention Size Preamble Cargo vessels of less than 500 Gross Tonnage (except vessels down to 300 GT with respect

More information

Decree of the Ministry of the Environment. on fire safety of garages

Decree of the Ministry of the Environment. on fire safety of garages E4 THE NATIONAL BUILDING CODE OF FINLAND Fire safety of garages Guidelines 2005 Decree of the Ministry of the Environment on fire safety of garages Adopted in Helsinki, 22 March 2005 Pursuant to the Decision

More information

Introduction to Aircraft Design and Aviation Systems (ENG3005)

Introduction to Aircraft Design and Aviation Systems (ENG3005) Chapter 3 Emergency power generation 1. Power distribution 1.1 The power source for many civil aircraft: a.main aircraft generator : through a Generator Control Breaker (GCB). Controlled by Generator Control

More information

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T4/4.01 MSC.1/Circ.1320 11 June 2009 GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING

More information

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT CITY OF SPRING LAKE PARK Code Enforcement Department 1301 81 st Avenue NE Spring Lake Park MN 55432 Business Phone 763-784-6491 Fax 763-792-7257 INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS

More information

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010

EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010 EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

FIRE-FIGHTING DESIGN BRIEF REPORT

FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 1 SECTION 04 (Doc.No.A/DBR 001) FIRE-FIGHTING DESIGN BRIEF REPORT P a g e 2 1.0 SCOPE 2.0 STANDARDS AND CODES 3.0 TYPES OF SYSTEM PROPOSED 4.0 FIRE HYDRANT SYSTEM 5.0 AUTOMATIC SPRINKLER SYSTEM

More information

Name Of Occupancy Date. Yes No Describe

Name Of Occupancy Date. Yes No Describe FIRE PREVENTION INSPECTION CHECKLIST For Class A Occupancy (For Assembly Buildings, Bars, Restaurants, Gyms, Churches, Arenas, Theatres or wherever people gather) Name Of Occupancy Date Physical Address

More information

Sprinkler and Fire Alarm Systems for the Building Official

Sprinkler and Fire Alarm Systems for the Building Official Sprinkler and for the Building Official Randall Kovacs, P.Eng., CP, FEC Gage-Babcock & Associates, Ltd. Topics Coordinated System Testing 1 Wet Dry Pre-action Deluge Wet System: Pipes filled with water

More information

Technical Information

Technical Information Subject Maintenance, Testing and Inspection of Fire Protection Systems and Fire Fighting Systems and appliances on board the Singapore flag ships To whom it may concern Technical Information No. TEC-0977

More information

HVAC Processes. Lecture 7

HVAC Processes. Lecture 7 HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump

More information

singapore//singapore data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence

singapore//singapore data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence internet + intellectual property + intelligence We thank you for the opportunity to work with you regarding your colocation needs in Singapore. We can colocate standard rack-mountable servers or other

More information

DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION

DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION DEPARTMENT OF TRADE MERCHANT SHIPPING NOTICE NO.M.847 DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION Notice to Shipowners, Masters, Shipbuilders and Repairers 1. It has come to the notice

More information

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use.

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use. Large Facility Fire Safety Checklists and Logs This package contains checklists to ensure that all fire and life safety equipment are properly inspected. There are also logs on which to record the inspections

More information

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website www.iomfire.com

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website www.iomfire.com ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK Website www.iomfire.com ADDRESS OF PREMISES FIRE CERTIFICATE No. (where applicable).. LOCATION OF LOG BOOK. CONTENTS OF LOG BOOK Useful telephone

More information

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS The equipment requirements of this section apply to the IUB Campus. The IUPUI Campus has a preferred vendor agreement for fire alarm systems. Contact Pat

More information

Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009

Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009 Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009 By Carsten Palle, VID Fire-Fill, www.vid.eu Presented at ISTSS

More information

HEATER, AIR CONDITIONING AND VENTILATION

HEATER, AIR CONDITIONING AND VENTILATION 55-1 GROUP 55 HEATER, AIR CONDITIONING AND VENTILATION CONTENTS GENERAL DESCRIPTION 55-2 HEATER AND AIR CONDITIONING SYSTEM 55-4 HEATER CONTROL 55-6 A/C-ECU 55-7 A/C COMPRESSOR 55-9 CONDENSER 55-9 DUCT

More information

Aerosol Fire Suppression. Your Choice for Special Hazard Fire Protection

Aerosol Fire Suppression. Your Choice for Special Hazard Fire Protection Aerosol Fire Suppression Your Choice for Special Hazard Fire Protection Traditional Special Hazard Fire Protection Centers Around Two Technologies Water deluge and chemical agent fixed systems protect

More information

- 5 - Table1. Maximum Compartment Volumes

- 5 - Table1. Maximum Compartment Volumes - 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

Understanding Emergency Power Off (EPO)

Understanding Emergency Power Off (EPO) Understanding Emergency Power Off (EPO) White Paper #22 Executive Summary Emergency Power Off (EPO) is the capability to power down a piece of electronic equipment or an entire installation from a single

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD IEC 61892-7 INTERNATIONAL STANDARD Edition 2.0 2007-11 Mobile and fixed offshore units Electrical installations Part 7: Hazardous areas INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE XA ICS 47.020.60

More information

FLAMMABLE LIQUIDS COMPLIANCE NOTE

FLAMMABLE LIQUIDS COMPLIANCE NOTE Issued by: Heather Rice Page: 1 of 7 COMPLIANCE NOTE INTRODUCTION This document provides additional guidance to support the Arrangement on Flammable Liquids (Ref No. CYC/HS/A27) CONTENTS Section Topic

More information

Section 6 Fire Detection and Alarm Systems Russell Porteous Chief Executive Officer Firewize Services

Section 6 Fire Detection and Alarm Systems Russell Porteous Chief Executive Officer Firewize Services Section 6 Fire Detection and Alarm Systems Russell Porteous Chief Executive Officer Firewize Services General Information Section 6 of AS1851-2012 covers: Fire Detection and Alarms Systems Electrical Detection

More information

OHIO BOARD OF BUILDING STANDARDS. Smoke Alarms and Fire Safety

OHIO BOARD OF BUILDING STANDARDS. Smoke Alarms and Fire Safety OHIO BOARD OF BUILDING STANDARDS Smoke Alarms and Fire Safety Updated January 2016 2 UNDERSTANDING THE TERMINOLOGY Detector. An initiation device suitable for connection to a circuit that has a sensor

More information

Compliance Schedules and Building Warrant of Fitness

Compliance Schedules and Building Warrant of Fitness Compliance Schedules and Building Warrant of Fitness Purpose of this guidance information The purpose of this guidance information is to help building owners and managers of commercial, industrial or communal

More information

Fire Protection of Data Centres

Fire Protection of Data Centres Fire Protection of Data Centres With SEM-SAFE High-Pressure Water Mist System Danfoss Semco A/S Total Solution Provider of Certified Fixed Fire Fighting Systems Need a fire fighting system that: Allows

More information

Notes. Material 1. Appropriate Flammable Liquids

Notes. Material 1. Appropriate Flammable Liquids 29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make

More information

Operating instructions

Operating instructions 6302 6959 02/2006 GB For the user Operating instructions Logano G215 WS Oil and gas-fired boilers Please read thoroughly before use. Overview Regulations and directives Installation: 90/396/EEC gas appliance

More information

FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS -

FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS - International Conference Nuclear Energy in Central Europe 2000 Golf Hotel, Bled, Slovenia, September 11-14, 2000 FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS - H.P. Berg Bundesamt für Strahlenschutz

More information

Proposed changes to the Acceptable Solution for Building Code clause F7 (Warning Systems) Proposed amended Acceptable Solution for Warning Systems

Proposed changes to the Acceptable Solution for Building Code clause F7 (Warning Systems) Proposed amended Acceptable Solution for Warning Systems Proposed changes to the Acceptable Solution for Building Code clause F7 (Warning Systems) Appendix A Proposed amended Acceptable Solution for Warning Systems s in the grey boxes form part of the proposed

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS

ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS ALBERTA FIRE CODE SAFETY EQUIPMENT MAINTENANCE REQUIREMENTS In this document are the fire safety equipment maintenance requirements that are found in Division B of the Alberta Fire Code (AFC 2006) for

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS PROPERTY ADDRESS (BRT Address Required) TESTING CONTRACTOR (Name and Address) License No. ANNUAL

More information