1 FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme) 1. LAND ENVIRONMENT : (Attach panoramic view of the project site and the vicinity) 1.1 Will the existing landuse get significantly altered from the project that is not consistent with the surroundings? (Proposed landuse must conform to the approved Master Plan / Development Plan of the area. Change of landuse if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. : The housing complex is being developed on 6, sqm of land and is surrounded by various other developmental structures. As such it will not have any significant impact on the land use of the area. Satellite imagery in and around the site (Exhibit-1), Level Map (Exhibit-2), Location Plan (Exhibit- 3), Photographic images of the site (Exhibit-4), Master Plan (Exhibit-5), Perspective View (Exhibit-6), Water Balance Diagram (Exhibit-7), Storm Water Drainage Network Plan & Rainwater Harvesting Plan (Exhibit-8), Proposed Sewerage Network Plan (Exhibit-9), STP Details (Exhibit-10), Landscape Plan (Exhibit-11), Traffic Movement Plan Basement (Exhibit- 12), Traffic Movement Plan Ground Floor (Exhibit-13),. Concept Plan Annexure Summary sheet giving project details Annexure Land details Appendix I Soil Test report Appendix II 1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc i) Land Area - 6, sqm ii) Ground coverage - 2, sqm (35.15%) iii) Total Built-up Area - 20, sqm iv) Tree Plantation Area - 1, sqm (20.07%) v) Semi-paved Area - 2, (43.20%) vi) Other Green Area sqm (1.59%) vii) Softscape Area [(iv) + 50% of (v) + (vi)] - 2, sqm (43.256%) viii) Hardscape [50% of (v)] - 1, sqm (21.60%) ix) Car Parking required Nos x) Car Parking provided Nos xi) Total no. of dwelling units xii) Population (fixed), 60 (floating) xiii) Source of water - KMC 1

2 xiv) Quantum of water required KLD xv) Quantum of fresh water required KLD xvi) Quantity of waste water generation KLD xvii) Treated water recycled KLD xviii) Quantity of treated waste water discharged KLD xix) Quantity of solid waste generation kg/day xx) Total population during construction phase persons xxi) Constructional phase water demand KLD xxii) Electricity Demand KW xxiii) Electricity supplied by - CESC xxiv) D.G. Sets - 3 Nos. 315 KVA DG Set xxv) Stack height for D.G sets metres xxvi) Total no. of trees required - 85 Nos xxvii) Total no. of trees provided - 90 Nos xxviii) Connectivity - Arabinda Sarani and other arteries of North and Central Kolkata. 1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing landuse, disturbance to the local ecology). The surrounding area is predominantly rural. The total land area of the proposed project is 6, sqm. By applying rational formula the peak rate of storm runoff considering 25 mm/hour rainfall is given below. Total land area = 6, sqm = ha. By applying rational method, the peak rate of runoff = 10 x 0.60 x 25 x ha /hr = cum/hr = 0.02 cum/sec. The storm drains of the complex will collect and convey the rainwater into the adjacent Municipal drain. The internal drainage system will be constructed with modified NP 3 pipes to avoid any flooding or water logging in the site. 250 mm diameter pipe with gradient of 1:200 would be laid to maintain design self cleansing velocity of 0.8 m/sec as per the Manual on Sewerage & Sewage Treatment. The invert level of the municipal drain at the outfall point would be the guiding level. During construction phase pollution due to air borne dust, wastewater, noise and vibration will be anticipated. The site will be enclosed to a reasonable height (about feet) to prevent transportation of air borne dust and to create barrier for the noise. No significant additional load is anticipated to existing noise and air quality status. During constructional activities water sprinkling arrangement will be made in regular manner for dust suppression. Wastewater originating from labour hut will be discharged to the Municipal drain through temporary septic tank during construction phase. Both during construction and operational phase vehicular movement will be increase but the level of increment will be accommodated easily with the prevailing traffic load. Traffic movement will be controlled by the security personnel inside the premises. 2

3 The ecological scenario around the existing site is mainly composed of rural area with some trees and vegetation. The pollutants anticipated in this site have already been mentioned with the mitigation measures to be adopted. The site will be landscaped with garden and evergreen trees, which would act as a pollutant absorber. Therefore, the activities both during construction and operation phase would not cause any adverse impact on the local ecology. The community facilities such as hospitals, nursing homes, schools, post office etc present in the neighbouring area will not be affected as adequate preventive measures will be taken as discussed above. 1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given). This zone is not susceptible to subsidence and seismicity. As per the seismic zoning map of India, the country has been divided into five seismic zones, namely, Zone-I to V. Zone-V is considered to be the most seismically active region, while Zone I is the least. The project site falls in seismic zone III. Seismic load has been considered in structural design. During construction phase removal of top soil may cause soil erosion at the construction site. The construction site run off with eroded soil will be routed through catch pit / sedimentation basin prior to final disposal to Municipal drain (Refer Soil Test Report Appendix II) 1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site). The surrounding area is predominantly urban. The total land area of the proposed project is 6, sqm. By applying rational formula the peak rate of storm runoff considering 25 mm/hr rainfall is given below : Total land area = 6, sqm = ha. By applying rational method, the peak rate of runoff = 10 x 0.60 x 25 x ha /hr = cum/hr = 0.02 cum/sec. The storm drains of the complex will collect and convey the rainwater into the adjacent Municipal drain. The internal drainage system will be designed considering the invert level of the Municipal drain (outfall) in front of the project site to avoid any flooding or water logging in the site. The project will not alter the natural drainage system of the area. The storm drainage system will comprise of modified NP 3 pipes of varying diameters of 0.8 mm with adequate slope to maintain a self cleaning velocity of 0.8 m/sec. 1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) The project site is a barren piece of land. Total quantity of excavated soil is 19,740 cum (approx). The excavated soil will be used for filling operation required for leveling and grading of land according to the surrounding area. The soil will also be reused for landscaping etc. 1.7 Give details regarding water supply, waste handling etc during the construction period. Water demand during construction phase : About 100 KLD during peak construction period. Water supply : Water during construction phase will be drawn from KMC. No construction material of wastes e.g. excavated soil, debris etc will be dumped outside the project area. 3

4 Construction waste originating from construction activities will be 30 kg/day. Construction waste will be used in the site and road preparation work. Garbage will be segregated at source for biodegradable, recyclables and inert material. Waste generated during construction period will be 30 kg/day and finally disposed of by Project Proponent as per MSW (M&H) Rules During construction phase wastewater originating from labour hut will be discharged to Municipal drain through septic tank. 1.8 Will the low lying areas & wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) No. The construction site is neither lowland nor a wetland. 1.9 Whether construction debris & waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labour and the means of disposal) Construction waste does not contain any tangible harmful substances that can cause health hazards. The hazardous waste is mainly comprised of oil, grease, water proofing compounds, paints, wood dust from treated wood, discarded lube oil etc. Special care will be taken to prevent mixing of these harmful substances with non-hazardous construction waste. Discarded lube oil will be stored in HDPE container and finally sold to the authorized vendor of MoEF. Therefore, possibility of any health hazard will be negligible. Solid waste originating from construction activities will be 30 kg/day Construction waste will be used in the site and road preparation work. Proper sanitary and health care facilities will be developed for the construction workers and the persons associated with the project within the project site. Temporary residential arrangements with adequate number of decentralized latrines and urinals for construction workers will be provided during the construction period. The wastewater originating from labour hut will be discharged to Municipal drain (temporary sewer connection) through septic tank. Garbage will be segregated at source for biodegradable, recyclables and inert material. Waste produced during the construction period will be 60 kg/day and will be disposed of by Project Proponent as per MSW (M&H) Rules WATER ENVIRONMENT 2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement be met? State the sources & quantities and furnish a water balance statement. Daily water demand of the proposed project during operation phase will be KLD, out of the total water demand 59.6 KLD will be fresh water demand and rest will be recycled from treated wastewater. The fresh water will be received from KMC. Flushing (29.8KLD), Car Washing (3.5 KLD), Landscaping (6.65 KLD) and Road Washing (1.32KLD) comprise the treated recycled water (Refer Exhibit-7 & Annexure-4) 2.2 What is the capacity (dependable flow or yield) of the proposed source of water? Water will be supplied by KMC 4

5 2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) N.A 2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage) Total Recycled Water : KLD Car Washing : 3.5 KLD Flushing : 29.8 KLD Landscaping : 6.65 KLD Road Washing : 1.32 KLD (Refer Annexure-4 & Exhibit-7) 2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) Water will be supplied from KMC. Rainwater harvesting will be done and recharged into underground aquifer. So no negative impact is anticipated on surrounding users and groundwater source. The rainwater harvesting details is given in Annexure What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity) The wastewater discharged from this project will be KLD. As such, no impact is anticipated on the local surface water quality because there will be STP & ETP for treating the sewage. This treated wastewater will be discharged into the municipal drain. The composition of raw wastewater is given below. Parameters : Value TSS : 400 mg/l BOD 5 : mg/l COD : mg/l ph : Inflow time : 18.0 hrs Peak factor : 2.5 Treated wastewater quality would conform to the standards for reuse within the project and discharging into surface water bodies. ph : TSS : <30 mg/l BOD 5 : <10 mg/l COD : <50 mg/l Color : Unobjectionable Odor : Unobjectionable 2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created. Rainwater harvesting details is given in Annexure-7. It would be observed that 927 cum of rainwater would be harvested annually, with majority as ground water recharge. 5

6 2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? This is a plain developed land with no undulation. The surrounding area is predominantly rural area. The total land area of the proposed project is 6, sqm.. The storm drainage of the complex will collect and convey the stormwater into the adjacent municipal drain. The internal drainage system will be adequately designed as regards size, slope & invert levels. 2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) The required amount of water will be drawn from KMC. The water aquifers will be recharged by rainwater. Rainwater harvesting details is given in Annexure-7. So there will be no negative impact on groundwater What precautions/measures are taken to prevent the run-off from construction activities polluting land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts) Very negligible quantity of construction materials are expected to be deposited on the construction site, which may be carried through surface run off. As a preventive measures surface run off will be routed through catch pit/sedimentation basin prior to final/ultimate disposal to Municipal drain. Special care will be taken while using some hazardous substances such as oil, paint, wood dust from treated wood, etc to prevent mixing with the surface run off. As such pollution of land and aquifers due to the construction activities is not anticipated How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) The land is a developed land. The storm water collected from roof top will be connected with the rainwater harvesting tank (partially) and partially recharging in to the deep aquifer as proposed earlier. The surface storm water drainage will be designed considering the invert level of the municipal drain so that the excess storm water and surface run off can easily be led to the municipal drain (Refer Exhibits-8 & 9) Will the deployment of construction labourers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation) Primarily the construction workers shall come to the site from the adjoining areas. They will be provided with clean drinking water by Project Proponent. The labour huts will be temporarily constructed with adequate number of decentralized latrines and urinals. The wastewater will be finally connected to the Local Municipal drain by temporary connection through septic tanks. As such, development of unsanitary condition due to deployment of construction workers is not expected. 6

7 2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal) The total quantity of wastewater generation will be about KLD. The wastewater from residential blocks will be collected through a well designed sewer network leading to STP. The STP will be based on FAB Technology followed by tertiary treatment (Refer Exhibit-10). The wastewater from Commercial block will be collected through a well designed sewer network leading to ETP. The treated wastewater of STP will be reused as much possible within the project (41.27 KLD). Process flow sheet of STP is given in Exhibit Give details of dual plumbing system if treated waste used is used for flushing of toilets or any other use. Flushing system will be provided for Residential blocks 29.8 KLD of treated wastewater will be used for this system. 3. VEGETATION 3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with it s unique features, if any) There is no threat to the biodiversity as no trees would be felled in the project area. The operation stage of the proposed project will not pose any significant impact to the biodiversity of the area. Moreover plantation program will give shelter to the avifauna. 3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) There will no extensive clearing or modification of vegetation as the site is barren land. 3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) The proposed residential complex will have landscape garden and plantation along the boundary, roadside and inside the project. The plantation programme will create a better landscape quality as will as a barrier for dust and noise (Refer Exhibit-11). 4. FAUNA 4.1 Is there likely to be any displacement of fauna - both terrestrial and aquatic or creation of barriers for their movement? Provide the details. There will be no significant impact on the faunal resources of the area due to the construction and operation of the proposed residential complex. 4.2 Any direct or indirect impacts on the avifauna of the area? Provide details. The activities including plantation program to be carried out will have no link to any direct or indirect negative impact on the avifauna. On the converse additional trees will provide shelter for avifauna. 7

8 4.3 Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on fauna N.A 5. AIR ENVIRONMENT 5.1 Will the project increase atmospheric concentration of gases & result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) Yearly average concentration of pollutants in ambient air and compliance status with National Standard at four location in Kolkata during Location Parameters Yearly average Standard (Annual) Shyambazar PM NO SO Pollutant concentration values are in µg/cm 3, non compliant values marked in bold. Source : A Source Book on Environment of Kolkata a KMC Publication, 2013 by Dr Chinmoy Chakraborti The parking lot has a space for 175 Cars. The incremental traffic volume is too negligible to cause any impact of concern on the background air quality. 5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. Dust particles will be liberated due to different constructional activities, as unloading, storage and handling of different constructional materials, handling of construction site debris, rubbish etc and vehicular movement for transportation of these materials. As a result, PM 10 concentration in the ambient air will tend to increase to some extent. Dust suppression system would be installed during construction phase to negate such impacts. 5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site. Adequate provisions for parking will be kept within the project site. Adequate security personnel will be posted at the entry and exit points of the complex to supervise traffic management in and around the complex (Refer Car Parking Calculation Annexure-6). 5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category. Internal wide road will be constructed by the project authority to ensure smooth & non conflict traffic flow (Refer Exhibits-12 & 13). 8

9 5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above. Ambient Noise Level at Residential / Silence Zone Area adjacent to major roads in Kolkata, (Leq 24 dba Sl. No. Station Noise Level (Leq dba) 1 Shyambazar Girish Park Bowbazar 68.6 [A Source Book on Environment of Kolkata, a KMC Publication, 2013] There may be some increase in movement of light vehicles, private cars and two wheelers in the area due to the proposed project. The movement of such vehicles in the area and blowing of their horns may contribute to the ambient noise level. Blowing of the horns will be restricted inside the project site. Adequate security personnel will be posted at the entry and exit points of the complex to supervise traffic management and avoid traffic congestion. However, the magnitude of such impacts would be insignificant. 5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details. As DG sets would prescribe to emission norms of WBPCB and the emissions would be released 3.0 m above the top most point of the complex, the incremental NO X content would be very marginal. The noise level would also be within the permissible limits & would be contained through enclosures. 6. AESTHETICS 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents? There will not be any obstruction of view, scenic amenity or landscapes since such factors had been taken into consideration while formulating the project concept, which is located in a highly developed urban landscape. 6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? Not expected as the new construction would be initiated with all structural safety measures as bored piling, etc. 6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. The architecture would blend with the surrounding cityscape. 6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered. N.A 9

10 7. SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details. Borough Area (km 2 ) Population Socioeconomic characteristics Density (person/sqm) Gender Ratio Slum population Households Household size II ,02,567 61, ,040 44, [A Source Book on Environment of Kolkata, a KMC Publication] Some local people will get job during the construction phase of the project. Some manpower will be required for regular operation and maintenance of the complex building. The project will generate job opportunities in both direct and indirect sectors. 7.2 Give details of the existing social infrastructure around the proposed project. There are residence, commercial complexes, schools, post office, hospitals in the neighbouring areas of the site as the same is located in the heart of the Kolkata metropolis. 7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? Not Applicable. 8. BUILDING MATERIALS 8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) The project will be conceived mostly using RCC and brick wall. The building materials to be used are of low to moderate-embodied energy as major percentage of construction materials will be covered by cement mixed with fly ash, sand, tiles and reinforcement (steel). A little amount of high-embodied energy content material such as aluminium and glass will be used as required for residential complex. 8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts? i) The construction materials will not be dumped in public roads around the project site. ii) iii) iv) Loading and unloading of construction materials will not be done at night at the store yard considering the noise likely to be generated from this activity. Attempts will be taken to keep the debris under cover during storage at site and while transporting. Applying water and maintaining soils in a visible damp condition for temporary stabilization. v) Limit vehicle speeds to km/hr to negate dust generation. vi) Clean overhaul truck before leaving the site. 10

11 8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? Yes, discarded construction waste and debris will be used in the roads and site preparation works. 8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. The garbage (solid waste) within the project site will be biodegradable, recyclables and inert material in nature. The total quantity of solid waste generated during operational phase will be 357. kg per day. The solid waste will be segregated at source and collected in separate bins. The solid waste will be collected through containerized system and finally it will be treated and disposed off as per MSW (M&H) Rules 2000 by Project Proponent in association with Municipality. (Refer Solid Waste Generation Table Annexure-5). Mechanical composting facilities would be inculcated in the project. 9. ENERGY CONSERVATION 9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption? Electricity will be supplied by CESC. The demand load will be KW. 3 Nos. DG sets, 315 kva will be installed for backup power. In the common area, solar energy to the tune of 25.% of the total requirement will be used I some places for lighting to minimize the energy consumption. 9.2 What type of, and capacity of, power back-up to you plan to provide? For back up power 3 Nos. DG sets of 315 kva. 9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? Vertical fenestration area would be less than 35.% of the gross wall area. U value of the glass used in this project will be in accordance with Energy Conservation Building Code (ECBC), What solar passive architectural features are being used in the building? Illustrate the applications made in the proposed project. Orientation of building façade is an important parameter of solar passive building design. Orientation also plays an important role with respect to wind direction. The amount of solar radiation falling on surfaces of different orientation varies considerably depending on the view or exposure to the sun. All these features have been given due cognizance to the extent practicable depending on the site configuration towards orientation & layout of the buildings. 9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. Energy efficient lighting system e.g. High Pressure Sodium Vapour (HPSV) lamps, LED etc will be used. Emergency lighting will be provided by DG Sets. Solar energy will be used in street lighting. No. of street lights = 17 Nos. 11

12 9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? Light colour and smooth building finish is preferred to promote reflectivity and reduce absorption of solar radiation. In order to reduce the U-value of the Roof assembly PUF insulation (k=0.019 W/m.K) of 45 to 50 mm thickness between the water-proofing coating above RCC roof slab and the screed concrete laid in slope, will increase the total resistance to the required level. 9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. In the residential area individual AC will be installed. Uses of Air Conditioner in the individual residential building will be CFC and HCFC free. Adequate light points have been provided in all the workspaces and common areas such as corridors, lift lobbies as well as landscaped areas and façade. For load calculation. Energy Efficient Lighting in all areas is to be provided with High Pressure Sodium Vapour (HPSV) Lamps, LED for its high luminous efficacy, low power consumption and high average life, compared to Fluorescent Tube Light (FTL). The emergency lighting will be provided at 10-lux uniform illuminance at floor level with two hours battery backup in compliance to the relevant Code. The lighting level of the various spaces will be in accordance to the recommendation of Energy Conservation Building Code (ECBC), Solar lights for campus lightning will be installed to reduce energy consumption. 9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? To negate heat island effects the following interventions are proposed : i) Green areas of about 43.25% ii) Paved area only about 21.60% iii) Ground coverage only about 35.15% 9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components. Wall : U-value of the wall : 1.72 W/m 2 K Roof : U-value of the Roof :2.75 W/m 2 K PU Foam of thickness 45 to 50 mm with the said roof assembly is recommended to reduce the U-value to the required level of about 2.75 W/m 2 K. However, PU foam of thickness of 30 mm, may be provided for satisfying the standard prescribed in NBC, External insulation should be properly waterproofed to prevent loss of insulating properties. 12

13 Vertical Fenestration The overall assembly design including the sash and frame, would look to optimize vertical fenestration features consisting of single glazing are assumed. i) U-value ii) Solar Heat Gain Coefficient (SHGC) iii) Visible Light Transmittance (VLT) An adjusted SHGC, accounting for overhangs and/or sidefins, is calculated by multiplying the SHGC of the unshaded fenestration product times a multiplication (M) factor. If this exception is applied a separate M Factor shall be determined for each orientation and unique shading condition. The M factor could be determined by the Projection Factor (PF), which is the ratio of the overhang projection (P) divided by the sum of the height of the fenestration and the distance from the top of the fenestration to the bottom of the farthest point of the external projection in consistent units (H). Thus, PF= P/H. Materials will be selected keeping in mind the above factors during detailed engineering to the extent practicable What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans. i) Fire fighting system will be designed in accordance with the WBFS norms. ii) Fire alarm system will be provided at appropriate locations. iii) Proper exit signages would be demarcated iv) Security Manager will be stationed to inform Fire Brigade / Police Station / Hospitals / Local Administrations in case of an emergency / disaster If you are using glass as wall material provides details and specifications including emissivity and thermal characteristics. In this residential complex use of glass would be minimum What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration. The building would be kept under positive pressure, so infiltration of air is minimal, to the extent possible To what extent the non-conventional energy technologies are utilised in the overall energy consumption? Provide details of the renewable energy technologies used. Solar lighting will be used for internal road and garden illumination. Land Area : 6, sqm Proposed Ground coverage : 2,137.27sqm Proposed Open area (6, ,137.27) sqm = 3, sqm = 42,436 sft Considering External Area Illumination Road as W/sqft, external area power requirement = x 42,436 Watt = 6,365.4Watt 13

14 Considering power factor as 0.80, power required for external area illumination Considering power requirement of each street light as 150 watt, no. of street light fixture required = 0.80 x 6,365.4 = 5, watt = 5, / 150 = 34 50% of total street lighting fixture will be catered by solid power with LED lamps. Thus no. of solar lighting fixture to be provided i.e. 34 x 0.50 = 17 Nos 10. ENVIRONMENTAL MANAGEMENT PLAN The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire. Introduction An Environmental Management Plan consisting of proposed pollution abatement systems to curb the undesirable impacts elucidated earlier, has been drawn up, which is discussed in the next few sections. A Post Project Monitoring Programme to be undertaken after commissioning of the project, which would assist in detecting the development of any unwanted environmental situations, has also been designed and presented Recommended Mitigatory Measures During Construction Phase The impacts of the construction phase on the environment would basically be of transient nature and are expected to gradually wear out on completion of the construction programme. However, once the construction of the complex is completed and its operations started, the operation stage impacts would overlap the impacts due to the construction activities. In order to mitigate such impacts and restrict them within tolerable levels, the following measures should be adopted by the project proponents: 1. Implementation of necessary drainage facilities inclusive of catchpits or sedimentation basins and septic tanks for the drainage of the construction wastewater, prior to discharge. Such systems would prevent the formation of stagnant pools of water within the project site, which generally create unsanitary conditions and promote the breeding of mosquitoes. 2. Initiation of an extensive landscape programme including trees and flowering plants in the parks within the complex. This should be developed all around the complex, which would serve the dual purpose of controlling fugitive dust and dampening of noise levels, in addition to improving the aestheticity of the area. 3. Health and Safety of Workers : In order to ensure that Health and Safety of Workers/Labourers working at site remains in good state, adequate measures will be taken like worker awareness and education, regular health check-ups etc and also an information system devised to prepare suitable strategies to minimize the damage. 4. Solid Waste Management of construction debris: A proposal in the lines mentioned earlier will be framed in order to collect, store, transport and dispose off the solid waste generated during the construction. 14

15 Recommended Mitigatory Measures During Operation Stage The following mitigatory measures should be adopted by the project authorities in order to mitigate and control the environmental impacts that may arise due to operation of the project. 1. The complex would generate waste water of the order of KLD. This waste water would be led to a sewage treatment plant and KLD of the treated effluent would be reused for non-critical uses and the rest would be discharged to municipal drainage. 2. Solid wastes (357 kg/day) generated from the complex should be scientifically collected and segregated at source. The non-biodegradable waste shall be disposed into the Municipal Waste Disposal System and the biodegradable waste shall be disposed off within the premises through mechanical composting system. 3. Major afforestation and plantation development programmes would be initiated. 4. Regular sprinkling of water through artificial means should be undertaken to assist in maintaining a clean environment. 5. The road surfaces in the complex should be properly maintained to reduce dust from the traffic movement. 6. Rainwater harvesting would be inculcated in the project parameters. 7. A Disaster Management Plan covering different interventions for combating emergencies due to Fire would be prepared. Post Project Monitoring of Environment Need for Monitoring It is important that the project authorities set up regular monitoring stations to assess the ambient levels in cardinal parameters of environment after the commissioning of the project. A post project monitoring programme is important, as it provides useful information on the following aspects: 1. It helps to verify the findings presented in this study. 2. It helps to indicate warnings of development of any alarming environmental situation and thus provide opportunities for adopting appropriate control measures. The post project monitoring to be conducted in various categories of environment is discussed in the succeeding sections. Ambient Air Quality The ambient air quality should be monitored around the project site. The monitoring should be conducted at a frequency of twice a week on a 24-hour basis for one dry season of the year. The parameters to be analyzed would include PM 10,, NO 2, and SO 2. Ambient Noise Ambient noise levels at selected stations covering industrial, commercial, residential areas and silence zones should be monitored twice a year. The monitoring should cover a 24-hour period so that day time and night time L eq levels could be determined and compared with the prescribed ambient noise standards. 15

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

FORM-1 A 1. LAND ENVIRONMENT

FORM-1 A 1. LAND ENVIRONMENT FORM-1A. FORM-1 A 1. LAND ENVIRONMENT 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

16. Storm water drainage

16. Storm water drainage 16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank. SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage

More information

BASEMENT FLOODING. Prevention Guide for. Homeowners

BASEMENT FLOODING. Prevention Guide for. Homeowners BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

City of Green Bay Department of Public Works Engineering Department

City of Green Bay Department of Public Works Engineering Department City of Green Bay Department of Public Works Engineering Department The Difference Between Sanitary & Storm Sewers Contact Information: Department of Public Works City Hall 100 North Jefferson Street,

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Features High-performance HVAC High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Landscaping Recycled and Regional Materials Storm-water Management District

More information

EMP for Pirangut Project Tal Mulshi Pune ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN

EMP for Pirangut Project Tal Mulshi Pune ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN Pact Real Estate Pvt. Ltd proposes at Construction project at Pirangut. Proposed project of Construction project is coming up in Pirangut, Tal. Mulshi. This area

More information

PROPOSED TOR FOR EIA STUDY

PROPOSED TOR FOR EIA STUDY JAWAHARPUR VIDYUT UTPADAN NIGAM LIMITED 2x660 MW JAWAHARPUR THERMAL POWER PROJECT JAWAHARPUR, DISTRICT ETAH, UTTAR PRADESH PROPOSED TOR FOR EIA STUDY SEPTEMBER- 2015 DESEIN PRIVATE LIMITED CONSULTING ENGINEERS

More information

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust Annexure-A Compliance Report SEAC 2010/CR.824/TC-2 Dated 02/11/2011 Reporting Date : 27/06/2014 Manufacture of alpha Pinene, Beta Pinene, Limonene and byproducts by way of backward integration at MIDC,

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

RHODE ISLAND. Downloaded 01.15.11

RHODE ISLAND. Downloaded 01.15.11 Housekeeping/Laundry/Maintenance Section 35.0 Housekeeping RHODE ISLAND Downloaded 01.15.11 35.1 A full time employee of the facility shall be designated responsible for housekeeping services, supervision

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

SEPTIC TANK SYSTEMS. Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only.

SEPTIC TANK SYSTEMS. Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only. SEPTIC TANK SYSTEMS There are three common types of septic tank systems in Tasmania Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only. Dual purpose (or all-waste)

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project.

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project. 1568651343757 01234567418199129126 76566544740738 313148746568 012204653107 81664 633840 91 APPENDIX I FORM 1 Basic Information Sr No. Item Details 1 Name of the project/s Proposed Residential and Commercial

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

Green House, Hungary

Green House, Hungary Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support noel.morrin@skanska.se Green House, Hungary Case Study 109 Aspects of Sustainability This project

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

BOROUGH OF OAKLAND COUNTY OF BERGEN STATE OF NEW JERSEY ORDINANCE 13-CODE-685

BOROUGH OF OAKLAND COUNTY OF BERGEN STATE OF NEW JERSEY ORDINANCE 13-CODE-685 BOROUGH OF OAKLAND COUNTY OF BERGEN STATE OF NEW JERSEY ORDINANCE 13-CODE-685 AN ORDINANCE TO AMEND, SUPPLEMENT AND REVISE THE CODE OF THE BOROUGH OF OAKLAND, LAND USE, CHAPTER 59 ENTITLED LAND USE AND

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Environment Management Plan. of M/s Mahananda Spa & Resorts Pvt. Ltd.

Environment Management Plan. of M/s Mahananda Spa & Resorts Pvt. Ltd. Environment Management Plan of At Khasra No. 605 PTC Road, Village & Tehsil Narender Nagar, District Tehri Garhwal (Uttarakhand) Brief Features of the Project: Name of the Project Hotel & Resort Project

More information

1. INTRODUCTION: Proposed Residential and Commercial development at S. No. 22/2, Pune by Goel Ganga Developers (India) Pvt Ltd.

1. INTRODUCTION: Proposed Residential and Commercial development at S. No. 22/2, Pune by Goel Ganga Developers (India) Pvt Ltd. ENVIRONMENTAL MANAGEMENT PLAN: 1. INTRODUCTION: Proposed Residential and Commercial development at S. No. 22/2, Pune by Goel Ganga Developers (India) Pvt Ltd. Proposed Buildings: The proposed development

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

BOMBAY XI FORM 1 FORM-1. Plot Area. FSI Area

BOMBAY XI FORM 1 FORM-1. Plot Area. FSI Area FORM 1 FORM 1 (I) Basic Information FORM-1 Item Details 1 Name of the Project Bombay XI 2 S.. in the Schedule 8(a) 3 Proposed capacity/area /length/tonnage to be handled/command area/lease area/ number

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY. 3.5 ENERGY CONSERVATION AND SUSTAINABILITY As a result of the analysis undertaken in the Initial Study 1 for the Los Angeles Mission College Facilities Master Plan, the LACCD determined that the proposed

More information

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE 31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that

More information

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the

More information

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s) Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone

More information

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company RISK MANAGEMENT PLAN is an integral part of a modernized and sophisticated residential complex. No efforts will be spared in identifying the all possible risks and disasters, evaluating them, installing

More information

Scheduling Maintenance for Infiltration Basins and Trenches

Scheduling Maintenance for Infiltration Basins and Trenches Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections

More information

Package Treatment Plant Policy and Procedure

Package Treatment Plant Policy and Procedure Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are

More information

GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS

GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS STATE OF CONNECTICUT August 2007 DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 Elm Street, Hartford, CT 06106-5127

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

Sydney Port Botany Terminal 3 Project Water Resource Management Plan

Sydney Port Botany Terminal 3 Project Water Resource Management Plan Civil Works Construction Contract Phase 1 1/8 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP

More information

SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS SECTION 01 50 00 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. Regulations: Comply with industry standards and applicable laws and regulations of authorities

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Guidance on applying for approval of installation of a commercial onsite wastewater system

Guidance on applying for approval of installation of a commercial onsite wastewater system Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the

More information

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8

INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8 1 INDEX Introduction 3 The Septic System 3 What Does The Septic Tank Do? 4 Where It All Goes 5 Problems 7 Some Dontʼs 8 Management of Your On-Site System 9 Tank Maintenance 9 Disposal Field Area 10 Appendix

More information

Sanitary Sewer Service Guide Information you need to know about sanitary sewer service and how to prevent sewer backups

Sanitary Sewer Service Guide Information you need to know about sanitary sewer service and how to prevent sewer backups Illinois American Water 1000 Internationale Parkway Woodridge, IL 60517 2010 Illinois American Water Sanitary Sewer Service Guide Information you need to know about sanitary sewer service and how to prevent

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

House Code. House Code

House Code. House Code 1 Application This Code will apply in assessing material change of use and/or building work for a house. 2 Using this Code In using this Code reference should also be made to Section 1.1 How to use the

More information

BY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS

BY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS CITY OF MONTRÉAL BY-LAW 03-096 BY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS As the municipal administration seeks to ensure that all Montrealers benefit from acceptable housing conditions;

More information

minimum deductible may be increased significantly.

minimum deductible may be increased significantly. ABOUT YOUR HOUSE CE 50 Basement flooding is unfortunately a common occurrence in many parts of Canada. But the good news is that many types of basement flooding may be avoided. This publication explains

More information

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

APPENDIX I. Revised FORM 1

APPENDIX I. Revised FORM 1 APPENDIX I Revised FORM 1 Basic Information Serial No. Item Details 1.1 Name of the project/s Proposed Residential Project by S. S. Properties at S. No.31/ & 32, Tal.- Mulshi, Dist. Pune 2. S. No. in the

More information

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished

More information

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.: SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller

More information

SOLAR ENERGY FACILITIES ZONING AMENDMENTS

SOLAR ENERGY FACILITIES ZONING AMENDMENTS SOLAR ENERGY FACILITIES ZONING AMENDMENTS 1. In Section 10, Special Regulations, of the Zoning Bylaw, insert a new Section 10.06, to be entitled Solar Energy Facilities and to read as follows: SECTION

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP

Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP Project Location: S.No. 8/3/2, 8/3/3, Mundhwa, Tal- Haveli, Dist- Pune. Project Details: 1 Plot Area 14200 sqm

More information

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills. WQ-3 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design and Operation Standards Section 1. Introduction According to the EPA, the majority of water pollution

More information

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester. Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage

More information

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills. WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in

More information

CHAPTER 17. Sewers and Sewage

CHAPTER 17. Sewers and Sewage Sec. 17-1. Industrial Wastes in Rivers and Streams; Treatment. Sec. 17-4. Discharging Water or Waste Onto Sidewalks. CHAPTER 17. SEWERS AND SEWAGE ARTICLE 1 GENERALLY Sec. 17-1. Industrial Wastes in Rivers

More information

6. Principles of effective plumbing systems

6. Principles of effective plumbing systems 6. Principles of effective plumbing systems This chapter summarizes the aims and objectives of a good local plumbing system that is, the drinking-water supply that serves a building and the system for

More information

Storm Water Management Requirements for Construction Projects Less than One Acre

Storm Water Management Requirements for Construction Projects Less than One Acre Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to

More information

GREEN SCHOOLS CASE STUDY. West Wing Elementary

GREEN SCHOOLS CASE STUDY. West Wing Elementary GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location:

More information

Basements and Deep Building Construction Policy 2014

Basements and Deep Building Construction Policy 2014 Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS

A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

Climate and Disaster Resilience Index of Asian Cities

Climate and Disaster Resilience Index of Asian Cities Climate and Disaster Resilience Index of Asian Cities Coexistence of Contrast Rajib Shaw Professor, http://www.iedm.ges.kyoto-u.ac.jp/ Increasing Trend 4000 3500 Source: UNPD, 2010 3000 2500 2000 1500

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

FLOOD DAMAGE PREVENTION ORDINANCE

FLOOD DAMAGE PREVENTION ORDINANCE FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS FO FACT, PURPOSE, AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of Washington has in RCW delegated

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS

COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS At Survey No.s 73/1, 73/2A, 74 (P) & 81, Bommenahalli Village, Bidarahalli Hobli, Bangalore East Taluk,

More information

SILICON VALLEY CLEAN WATER. May 2015

SILICON VALLEY CLEAN WATER. May 2015 SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information